About this file

This is a Price Schedule document (Attachment F) for Solicitation 25-0003, Environmental Inspection and Remediation Planning, issued by Beaverton School District #48 in Oregon. The document outlines pricing structures for comprehensive environmental services across multiple work orders at district facilities, including Sunset High School and Barnes Elementary School. The scope includes four primary work orders: fungal growth remediation at Sunset High School (rooms A6 and A7, approximately 25 square feet of impacted sheetrock per room), lead-in-water sampling following faucet replacement in the Band Room, radon testing in room G-4, and underground storage tank (UST) sampling assessment at Barnes Elementary School. Services are structured on a time-and-material basis with hourly rates for personnel (Principal, Project Manager/Lead Person/Designer, Industrial Hygienist, CAD/Drafter, and Clerical/Support Staff) supplemented by per-sample testing fees. Additional services are available including asbestos re-inspection, asbestos periodic surveillance, asbestos pre-renovation surveys, mold-related services, lead paint services, and radon testing with varying turnaround times.

The pricing schedule establishes unit costs for specialized testing and analysis services, including PLM bulk samples with both standard (3-5 day) and expedited (24-hour) turnaround options, TEM and PCM air samples, air clearance testing, tape lift testing, and lead-in-water sampling with standard (10-day) and rush (3-day) turnaround options. All mileage, reproduction, photos, postage, and delivery services are billed at cost using IRS rates. Sub-contractor work is also available at cost. The pricing structure accommodates lump sum arrangements for asbestos re-inspection and surveillance services across all 36 district buildings containing asbestos-containing materials. The document does not specify contract duration, renewal options, award dates, or specific response deadlines within the excerpt provided.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sunset Floor Plan.dwg

SHEET REVISION HISTORY

DISTRICT #48 FACILITIES DEPARTMENT

2180 SW 170TH AVE, BEAVERTON, OR 97003

SUNSET HIGH SCHOOL

13840 NW CORNELL ROAD

PORTLAND, OR 97229-5403

MAIN FLOOR PLAN

NO

RT

H

06/25/2020 2016 TEAM RM, LOCKERS, CONCS

06/25/2020 2018 THRUST STAGE REPL

11/23/2020 2019 AUD UPGR, BOOTH LDDR

Area of discovered fungal growth

Preflush/Lead in Water Sample

Radon Retesting

Mold Sampling

Work Order #1:

Fungal growth was discovered at Sunset High School in rooms A6 & A7 behind bookcases and cabinets on the north wall. Each room has approximately 25 square feet of impacted sheetrock. Beaverton School District is requesting complete Microbial Services at Sunset High School, located at 13840 NW Cornell Rd, Portland OR 97229. Include two(2) indoor air samples and one tape lift.

Service Rate Time/Hours Service Total

Principal $ /hour 2.0 hours

Project Manager/Lead Person/Designer $ /hour

5 .0 hours

Industrial Hygienist $ /hour 2.0 hours

CAD/Drafter $ /hour 1.0 hour

Clerical/Sta Support $ /hour 1.0 hour

Air Clearance Testing $ /per sample

2 samples 24 hour turn around

Tape Lift Sample $ /per sample

1 sample 24 hour turn around

Mileage/Reproduction/Photos/Postage/Delivery At Cost/IRS Rate

TOTAL

Lead in Water Sampling

Work Order #2:

At Sunset High School in the Band Room 3-3, a faucet was replaced with all lead-free components including faucet, supply line and angle stop. Provide pre-flushing service and first draw sample at this fixture with a 10-day turnaround on lab results.

Service Rate Time/Hours Service Total

Project Manager/Lead $ /hour .50 hour

Industrial Hygienist $ /hour 2.0 hours

Clerical/Sta Support $ /hour 1.0 hour

Regular 10-day Turnaround Sampling $ /per sample

1 sample

Mileage/Reproduction/Photos/Postage/Delivery At Cost/IRS Rate

__________________________________________________________________ DOLLARS

Radon Testing

Work Order #3:

At Sunset High School room G-4 complete radon testing. Provide per sample pricing for short-term passive radon sampling tests in accordance with Oregon Revised State (ORG) 332.166-167.

Service Rate Time/Hours Service Total

Project Manager/Lead $ /hour .50 hour

Industrial Hygienist $ /hour 1.50 hours

Clerical/Sta Support $ /hour 1.50 hours

Short Term Sampling $ /per sample

1 sample

Mileage/Reproduction/Photos/Postage/Delivery At Cost/IRS Rate

TOTAL

__________________________________________________________________ DOLLARS

UST Sampling

Work Order #4:

At Barnes ES the District assumes that an 5000 gallons UST is present behind the boiler room. The District requests sample pricing to document existing conditions, review contractor recommendations, DEQ submissions and monitor the remediation process.

Service Rate Time/Hours Service Total

Project Manager/Lead $ /hour 5

Industrial Hygienist $ /hour 2

Clerical/Staff Support $ /hour 2

Mileage/Reproduction/Photos/Postage/Delivery At Cost/IRS Rate

Price Schedule March 10, 2025

Schedule A & B Services Price Unit Asbestos Re-inspection Services for All District ACM Containing Buildings

Asbestos Periodic Surveillance for All District ACM Containing Buildings

Asbestos Pre-Renovation Survey $

Time & Material Rates Price Unit Principal $ Hour

Project Manager/Lead Person/Designer $ Hour

AHERA Inspector/Technician $ Hour

Industrial Hygienist Investigation $ Hour

CAD Drafter $ Hour

Clerical/Support Staff $ Hour

Mileage/Reproduction/Photos/Postage/Delivery $ At Cost/IRS Rate

Sub-Contractors $ At Cost/IRS Rate

Asbestos Analysis Price Unit PLM Bulk Samples (3-5 day turnaround) $ Each

PLM Bulk Samples (24 hour turnaround) $ Each

TEM Air Samples (3-5 day turnaround) $ Each

TEM Air Samples (24 hour turnaround) $ Each

PCM Air Samples (24 hour turnaround) $ Each

Mold Related Services Price Unit Air Clearance Testing $

Tape Lift Testing $

Lead Paint Services Price Unit Lead Paint Sampling $

Pre-Renovation Survey $

Each

Each

Each

Each

Each

Lump Sum/36 Buildings

Lump Sum/36 Buildings

Each

Price Schedule Attachment F

Radon Price Unit Short Term Sampling

Long Term Sampling

Lead In Water Price Unit Regular 10 Day Turnaround Sampling

Rush 3 Day Turnaround Sampling

Other Available Services Price Unit (Provide details & units of measure)