Gov't Est
| MONO Exhibit: Fabrication Independent Government Estimate | | | | | |
| | | Labor | Materials | Totals |
| PROJECT MANAGEMENT | | $0.00 | | $0.00 |
| FABRICATION DRAWINGS | | $0.00 | $0.00 | $0.00 |
| SAMPLES | | $0.00 | $0.00 | $0.00 |
| LIGHTING | | $0.00 | $0.00 | $0.00 |
| EXHIBIT STRUCTURES | | $0.00 | $0.00 | $0.00 |
| CUSTOM ELEMENTS | | $0.00 | $0.00 | $0.00 |
| ELECTRICAL/ ELECTRONIC | | $0.00 | $0.00 | $0.00 |
| GRAPHICS | | $0.00 | $0.00 | $0.00 |
| CONSERVATION | | $0.00 | $0.00 | $0.00 |
| PROJECT CLOSEOUT | | $0.00 | $0.00 | $0.00 |
| SHIPPING | | $0.00 | $0.00 | $0.00 |
| INSTALLATION | | $0.00 | $0.00 | $0.00 |
| TRAVEL | | $0.00 | $0.00 | $0.00 |
| | | $0.00 | $0.00 | |
| | Grand Total | | | $0 |
| PROJECT MANAGEMENT (excluding travel) | | | | | |
| LABOR | | hours | x | rate | amount |
| Project Manager | | hours @ | | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Project Management $0.00
| Fabrication Drawings | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| Miscellaneous | | job | | $0.00 |
| SUBTOTAL MATERIALS | | $0.00 |
| MARK-UP on materials | percent | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| Detailling | | hours @ | | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Fabrication Drawings $0.00
| Samples/Mock-ups/Prototypes | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| graphic samples | | job | | $0.00 |
| graphic samples-color proofs | | job | | $0.00 |
| custom elements samples | | job | | $0.00 |
| prototypes | | job | | $0.00 |
| SUBTOTAL MATERIALS | | | $0.00 |
| MARK-UP on materials | 15 | percent | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| exhibit spec-fabrication | | hours @ | | $0.00 |
| model maker | | hours @ | | $0.00 |
| TOTAL ALL LABOR | | | | $0.00 |
TOTAL Samples $0.00
| Lighting | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| Lighting Type: LED wash | | Each | | $0.00 |
| Lighting Type: | | Each | | $0.00 |
| Lighting Type: | | Each | | $0.00 |
| Lighting Type: | | per foot | | $0.00 |
| Lighting Type: | | per foot | | $0.00 |
| Lighting Type: | | per foot | | $0.00 |
| Lighting Type: | | per foot | | $0.00 |
| Lighting Type: | | each | | $0.00 |
| Lighting Type: | | each | | $0.00 |
| Lighting Type: | | each | | $0.00 |
| Scissor Lift rental | | Week | | $0.00 |
| Scissor Lift Delivery | | PU/Ret | | $0.00 |
| SUBTOTAL, AV EQUIPMENT | | | $0.00 |
| MARK-UP on materials | 15 | percent | $0.00 |
TOTAL ALL MATERIALS $0.00
| LABOR | | hours | x | rate | amount |
| Lighting Technician | | hours @ | | $0.00 |
| TOTAL ALL LABOR | | | | $0.00 |
TOTAL Lighting $0.00
| Exhibit Structures | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| Typical A | 11 | Job | | $0.00 |
| Typical B | 4 | Job | | $0.00 |
| Typical C | 16 | Job | | $0.00 |
| Typical D | 7 | Job | | $0.00 |
| Typical E | 6 | Job | | $0.00 |
| Typical F, Flipbook | 3 | Job | | $0.00 |
| Typical G | 5 | Job | | $0.00 |
| Typical I, Vitrine | 4 | Job | | $0.00 |
| Projection surface, and bezel | 1 | Job | | $0.00 |
| Intro towers | 2 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| ST-00.00-000 | 1 | Job | | $0.00 |
| SUBTOTAL MATERIALS | | | | $0.00 |
| MARK-UP on materials | 15 | percent | | $0.00 |
TOTAL ALL MATERIALS $0.00
| LABOR | | hours | x | rate | amount |
| Fabrication Shop Supervisor | | hours @ | | $0.00 |
| Exhibit Specialist (Fabrication) | | hours @ | | $0.00 |
| TOTAL ALL LABOR | | | | $0.00 |
TOTAL Exhibit Structures $0.00
| Custom Elements | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| CE-01.01-155, Tactile Floorplan | 1 | Job | | $0.00 |
| CE-02.01-100, Raised Relief Terrain Model | 1 | Job | | $0.00 |
| CE-03.04-240, mini vignette of Worthington Farm cellar | 1 | Job | | $0.00 |
| CE-04.01-250, Vignette of commanders field desk | 1 | Job | | $0.00 |
| CE-04.01-254, Life size figure in soldiers costume | 1 | Job | | $0.00 |
| CE-04.01-255, Facsimile of letter between McCoy and Eck | 1 | Job | | $0.00 |
| CE-05.02.200, Graphic Spinners "Sick and Wounded" | 1 | Job | | $0.00 |
| CE-06.03-350, Repro Maggie Toogood chain | 1 | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| CE-00.00-000 | | Job | | $0.00 |
| SUBTOTAL MATERIALS | | | $0.00 |
| MARK-UP on materials | 15 | percent | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| Map model maker | | hours @ | | $0.00 |
| Model maker | 0 | hours @ | | $0.00 |
| Illustrator | 0 | hours @ | | $0.00 |
| TOTAL ALL LABOR | | | | $0.00 |
| TOTAL CE | | | | | $0.00 |
| Electrical/Electronic | | | | | |
| MATERIALS - AV EQUIPMENT: | | qty. | unit | unit cost | amount |
| EP-00.00-000 | Audio Description. Delivered through NPS app | | | | |
| Beacons | | each | 30 | $0.00 |
| Headphone cushion sanitary cover, black, 50 pair | | each | 10 | $0.00 |
| Headphone cushion sanitary cover, black, Master carton of (12) 50 pair | | each | 97 | $0.00 |
| Headphones | | each | 6 | $0.00 |
| Induction neckloop | | each | 39 | $0.00 |
| iPhone XR, black, 128GB, unlocked sim-free | | each | 600 | $0.00 |
| Lanyard, 5/8", breakaway, cell phone loop / keyring, dark forest green, NPS text | | each | 12 | $0.00 |
| Lightning to 3.5 mm Headphone Jack Adapter, 2 pack | | each | 12 | $0.00 |
| Refresh Kit, replacement cushion and bag | | each | 3.5 | $0.00 |
| Ruggedized case for media player | | each | 80 | $0.00 |
| Sreen Protector for media player | | each | 35 | $0.00 |
| USB charging station, 6 ports, 6 Apple cables, white | | each | 40 | $0.00 |
| EE-02.01-110 | LG ProBeam projector | 1 | each | | $0.00 |
| EE-02.01-115 | Dakota MA-5 mini arrary speakers | 6 | each | | $0.00 |
| EE-02.01-125 | Brightsign | 1 | each | | $0.00 |
| EE-02.01-150 | Caption monitor | 3 | each | | $0.00 |
| EP-02.01-110 | Battle Map | | | | $0.00 |
| Battle Animation | 1 | each | | $0.00 |
| Battle map captioning | 1 | each | | $0.00 |
| EP-00.00-000 | | | | | |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| EP-00.00-000 | | | | | |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| EP-00.00-000 | | | | | |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| EP-00.00-000 | | | | | |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| EP-00.00-000 | | | | | |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| EP-00.00-000 | | | | | |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| EP-00.00-000 | | | | | |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| EP-00.00-000 | | | | | |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| EP-00.00-000 | | | | | |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| EP-00.00-000 | | | | | |
| | | each | | $0.00 |
| | | each | | $0.00 |
| | | each | | $0.00 |
| SUBTOTAL, AV EQUIPMENT | | | | $0.00 |
| MARK-UP on materials | 15 | percent | | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR (Production) | | hours | x | rate | amount |
| Audio Describer | | Hours | | $0.00 |
| AV Producder | | Hours | | $0.00 |
| AV Technician | | Hours | | $0.00 |
| Electrical Technician | | Hours | | $0.00 |
| Videographer | | Hours | | $0.00 |
TOTAL ALL LABOR (see AV Estimate for Detail) $0.00
TOTAL Electrical/Mechanical/AV $0.00
| Graphics | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| GL-01.01-100 | 1 | Job | | $0.00 |
| GL-01.01-110 | 1 | Job | | $0.00 |
| GL-01.01-150 | 1 | Job | | $0.00 |
| GL-01.01-200 | 1 | Job | | $0.00 |
| GL-01.01-210 | 1 | Job | | $0.00 |
| GL-01.01-250 | 1 | Job | | $0.00 |
| GL-01.02.215 | 1 | Job | | $0.00 |
| GL-01.02.205 | 1 | Job | | $0.00 |
| GL-01.01.105 | 1 | Job | | $0.00 |
| GL-01.01.115 | 1 | Job | | $0.00 |
| GL-02-01-050 | 1 | Job | | $0.00 |
| GL-02-01-200 | 1 | Job | | $0.00 |
| GL-03.00.100 | 1 | Job | | $0.00 |
| GL-03.01.100 | 1 | Job | | $0.00 |
| GL-03.01.200 | 1 | Job | | $0.00 |
| GL-03.01.300 | 1 | Job | | $0.00 |
| GL-03.01-400 | 1 | Job | | $0.00 |
| GL-03.01-500 | 1 | Job | | $0.00 |
| GL-03.02-100 | 1 | Job | | $0.00 |
| GL-03.02-200 | 1 | Job | | $0.00 |
| GL-03.02-250 | 1 | Job | | $0.00 |
| GL-03.02-260 | 1 | Job | | $0.00 |
| GL-03.02-300 | 1 | Job | | $0.00 |
| GL-03.02.340 | 1 | Job | | $0.00 |
| GL-03.02-345 | 1 | Job | | $0.00 |
| GL-03.02.500 | 1 | Job | | $0.00 |
| GL-03.03-100 | 1 | Job | | $0.00 |
| GL-03.03-200 | 1 | Job | | $0.00 |
| GL-03.03-500 | 1 | Job | | $0.00 |
| GL-03.04-100 | 1 | Job | | $0.00 |
| GL-03.04-200 | 1 | Job | | $0.00 |
| CE-03-04-240 | 1 | Job | | $0.00 |
| GL-03.04.230 | 1 | Job | | $0.00 |
| GL-03.04-500 | 1 | Job | | $0.00 |
| GL-03.05-100 | 1 | Job | | $0.00 |
| GL-03.05-200 | 1 | Job | | $0.00 |
| GL-03.05-220 | 1 | Job | | $0.00 |
| GL-03.05.240 | 1 | Job | | $0.00 |
| GL-03.05-300 | 1 | Job | | $0.00 |
| CE-03.05.310/315/320/325/330/335/340 | 1 | Job | | $0.00 |
| GL-03.05-400 | 1 | Job | | $0.00 |
| GL-03.05-500 | 1 | Job | | $0.00 |
| GL-03.05-600 | 1 | Job | | $0.00 |
| GL-03.05-700 | 1 | Job | | $0.00 |
| GL-04.01-100 | 1 | Job | | $0.00 |
| GL-04.01-200 | 1 | Job | | $0.00 |
| GL-04.01-220 | 1 | Job | | $0.00 |
| GL-04-01-230 | 1 | Job | | $0.00 |
| GL-04.01-240 | 1 | Job | | $0.00 |
| GL-04.01-250 | 1 | Job | | $0.00 |
| GL-04.02-100 | 1 | Job | | $0.00 |
| GL-04.02-210/15/20 | 1 | Job | | $0.00 |
| GL-04.02-300 | 1 | Job | | $0.00 |
| GL-04.02-310 | 1 | Job | | $0.00 |
| GL-04.02-320 | 1 | Job | | $0.00 |
| GL-04.02-330 | 1 | Job | | $0.00 |
| GL-04.02-340 | 1 | Job | | $0.00 |
| GL-04.02-350 | 1 | Job | | $0.00 |
| GL-04.02-360 | 1 | Job | | $0.00 |
| GL-04.02-400 | 1 | Job | | $0.00 |
| GL-04.02-410, flipbook | 1 | Job | | $0.00 |
| GL-04.03-100 | 1 | Job | | $0.00 |
| GL-04.03-200 | 1 | Job | | $0.00 |
| GL-04.03-210 | 1 | Job | | $0.00 |
| GL-04.03-300 | 1 | Job | | $0.00 |
| GL-04.04-100 | 1 | Job | | $0.00 |
| GL-04.04-150 | 1 | Job | | $0.00 |
| GL-04.04-200, flipbook | 1 | Job | | $0.00 |
| GL-04.05-100 | 1 | Job | | $0.00 |
| GL-04.05-110 | 1 | Job | | $0.00 |
| GL-04.05-120 | 1 | Job | | $0.00 |
| GL-04.06-100/150 | 1 | Job | | $0.00 |
| GL-04.06-300 | 1 | Job | | $0.00 |
| GL-05.01-010 | 1 | Job | | $0.00 |
| GL-05.01-100 | 1 | Job | | $0.00 |
| GL-05.01-300 | 1 | Job | | $0.00 |
| GL-05.01-300/310/315/320/330/335/340/345/350/355 Lift Panel Series | 1 | Job | | $0.00 |
| GL-05.02-200 | 1 | Job | | $0.00 |
| GL-05.02-100 | 1 | Job | | $0.00 |
| CE-05.02-205-260, spinner cubes | 1 | Job | | $0.00 |
| GL-05.03-150 | 1 | Job | | $0.00 |
| GL-06.01-050 | 1 | Job | | $0.00 |
| GL-06.01-150 | 1 | Job | | $0.00 |
| GL-06.01-100 | 1 | Job | | $0.00 |
| GL-06.01-125 | 1 | Job | | $0.00 |
| GL-06.02-200 | 1 | Job | | $0.00 |
| GL-06.02-300 | 1 | Job | | $0.00 |
| GL-06.02-400 | 1 | Job | | $0.00 |
| GL-06.02-500 | 1 | Job | | $0.00 |
| GL-06.01-200 | 1 | Job | | $0.00 |
| GL-06.01.300 | 1 | Job | | $0.00 |
| GL-06.01-400 | 1 | Job | | $0.00 |
| GL-06.01-500 | 1 | Job | | $0.00 |
| GL-06.02-100 | 1 | Job | | $0.00 |
| GL-06.02-125 | 1 | Job | | $0.00 |
| GL-06.02-200 | 1 | Job | | $0.00 |
| GL-06.02-300 | 1 | Job | | $0.00 |
| GL-06.02-350 | 1 | Job | | $0.00 |
| GL-06.03.050 | 1 | Job | | $0.00 |
| GL-06.03-100 | 1 | Job | | $0.00 |
| GL-06.03-200 Series | 1 | Job | | $0.00 |
| GL-06.03-250 | 1 | Job | | $0.00 |
| GL-06.03-300 | 1 | Job | | $0.00 |
| GL-06.03-350 | 1 | Job | | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| | 1 | Job | $0.00 | $0.00 |
| GL-00.00-00 | 1 | Job | $0.00 | $0.00 |
| GL-00.00-00 | 1 | Job | $0.00 | $0.00 |
| GL-00.00-00 | 1 | Job | $0.00 | $0.00 |
| GL-00.00-00 | 1 | Job | $0.00 | $0.00 |
| GL-00.00-00 | 1 | Job | $0.00 | $0.00 |
| GL-00.00-00 | 1 | Job | $0.00 | $0.00 |
| GL-00.00-00 | 1 | Job | $0.00 | $0.00 |
| GL-00.00-00 | 1 | Job | $0.00 | $0.00 |
| GL-00.00-00 | 1 | Job | $0.00 | $0.00 |
| GL-00.00-00 | 1 | Job | $0.00 | $0.00 |
| GL-00.00-00 | 1 | Job | $0.00 | $0.00 |
| GL-00.00-00 | 1 | Job | $0.00 | $0.00 |
| SUBTOTAL MATERIALS | | | | $0.00 |
| MARK-UP on materials | 15 | percent | | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| Graphics Shop Supervisor | | hours @ | | $0.00 |
| Exhibit Specialist (Graphics) | | hours @ | | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Graphics $0.00
| Conservation (Artifact/Prop Mounting) | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| AO-03.02-250, Shoe | 1 | job | | $0.00 |
| AO-03.02-251, Canteen | 1 | job | | $0.00 |
| AO-03.02-252, T&E for Science & Technology | 1 | job | | $0.00 |
| AO-03.02-253, Ramrod | 1 | job | | $0.00 |
| AO-03.05-240, Rifle butt | 1 | job | | $0.00 |
| AO-03.05-501, Tunic/Frock Coat | 1 | job | | $0.00 |
| AO-03-05-502, Vest | 1 | job | | $0.00 |
| AO-03.05.503, Sash | 1 | job | | $0.00 |
| AO-03.05-504, Carte-de-Visite | 1 | job | | $0.00 |
| AO-04.01-251, Field Desk | 1 | job | | $0.00 |
| AO-04.01-252, Fife | 1 | job | | $0.00 |
| AO-04.01-253, Ink well | 1 | job | | $0.00 |
| AO-04.02-210, Frock Coat | 1 | job | | $0.00 |
| AO-04.02-211, Epaulets | 1 | job | | $0.00 |
| AO-04.02-212, Vest | 1 | job | | $0.00 |
| AO-04.02-215, Trunk | 1 | job | | $0.00 |
| AO-04.02-220, Carte-de-Visite | 1 | job | | $0.00 |
| AO-04.02-401, Cartridge Pouch | 1 | job | | $0.00 |
| AO-04.02-405, Amunition | 1 | job | | $0.00 |
| AO-04.04-150, Musket | 1 | job | | $0.00 |
| AO-04.04-152, Canteen | 1 | job | | $0.00 |
| AO-04.04-154, Letter | 1 | job | | $0.00 |
| AO-04.04-156, Insignia Pin | 1 | job | | $0.00 |
| AO-04.04-158, Revolver | 1 | job | | $0.00 |
| AO-04.04-160, Belt | 1 | job | | $0.00 |
| AO-04.04-162, Presentation Sword | 1 | job | | $0.00 |
| AO-04.04-164, Uniform Hat | 1 | job | | $0.00 |
| AO-04.04-166, Dice | 1 | job | | $0.00 |
| AO-04.04-176, Blanket | 1 | job | | $0.00 |
| AO-04.04-178, Samuel Weigel 138th ID tag | 1 | job | | $0.00 |
| AO-04.04-180, Serving Spoon | | job | | $0.00 |
| AO-04.04-180, Military Button | | job | | $0.00 |
| AO-04.04-180, Campaign Pin | | job | | $0.00 |
| AO-04.04-180, Shoulder Strap | | job | | $0.00 |
| AO-04.04-180, Coin | | job | | $0.00 |
| AO-04.04-180, Coin | | job | | $0.00 |
| AO-04.04-180, Coin | | job | | $0.00 |
| AO-04.04-180, Coin | | job | | $0.00 |
| AO-04.04-180, Coin | | job | | $0.00 |
| AO-04.04-180, Coin | | job | | $0.00 |
| AO-04.04-180, Cartridge Box | | job | | $0.00 |
| AO-04.04-180, Cap Box | | job | | $0.00 |
| AO-04.04-180, Bayonet | | job | | $0.00 |
| AO-04.04-180, Shortgun | | job | | $0.00 |
| AO-04.04-480, Cateen | | job | | $0.00 |
| AO-04.04-180,Sword | | job | | $0.00 |
| AO-04.04-180, Cartridge Box 0016945 | | job | | $0.00 |
| AO-04.04-180, Long Gun | | job | | $0.00 |
| AO-04.04-180, CurrencyA | | job | | $0.00 |
| AO-04.04-180, Binoculars | | job | | $0.00 |
| AO-04.04-180, Flask | | job | | $0.00 |
| AO-04.04-180 CurrencyB | | job | | $0.00 |
| AO-04.04-180, Sword 00025958 | | job | | $0.00 |
| AO-04.04-180, Spur | | job | | $0.00 |
| AO-04.04-180, Cartridge BoxC | | job | | $0.00 |
| AO-04.04-180, Cap Box 00026025 | | job | | $0.00 |
| AO-04.04-180, Silver medal ID belonging to NG Wilson | | job | | $0.00 |
| AO-04.05-120, Minie Bullet | 1 | job | | $0.00 |
| AO-04.05-122, Epaulet | 1 | job | | $0.00 |
| AO-04.05-124, Campaign Pin | 1 | job | | $0.00 |
| AO-04.05-126, Artillery Shell | 1 | job | | $0.00 |
| AO-04.06-150, Flag | 1 | job | | $0.00 |
| AO-05.01-360, Thomas Cox Bible | 1 | job | | $0.00 |
| AO-05.03-151, Minie Bullet | 1 | job | | $0.00 |
| AO-05.03-152, Minie Bullet | 1 | job | | $0.00 |
| AO-05.03-153, Artillery Shell | 1 | job | | $0.00 |
| AO-05.03-154, Cannonball | 1 | job | | $0.00 |
| AO-05.03-155, Artillery Shell | 1 | job | | $0.00 |
| AO-05.03-156, Cannonball | 1 | job | | $0.00 |
| SUBTOTAL MATERIALS | | | $0.00 |
| MARK-UP on materials | 15 | percent | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| Mount maker | | hours @ | | $0.00 |
TOTAL ALL LABOR $0.00
TOTAL Conservation $0.00
| PROJECT CLOSEOUT | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| Manual | 1 | | | $0.00 |
| SUBTOTAL MATERIALS | | | $0.00 |
| MARK-UP on materials | 15 | percent | $0.00 |
| TOTAL ALL MATERIALS | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| Project Manager | | hours @ | | $0.00 |
| TOTAL ALL LABOR | | | | $0.00 |
TOTAL Project Closeout $0.00
| SHIPPING | | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| Packing | 1 | job @ | | $0.00 |
| Shipping | 1 | job @ | | $0.00 |
TOTAL MATERIALS $0.00
| LABOR | | hours | x | rate | amount |
| Exhibit Spec - Fabrication | | hours @ | | $0.00 |
TOTAL ALL LABOR $0.00
Total Shipping $0.00
| INSTALLATION | | | | | |
| Project manager | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| air fare | | job @ | | $0.00 |
| per diem | | days @ | | $0.00 |
| Rental Van and Gas | | days @ | | $0.00 |
| Lodging | | days @ | | $0.00 |
| Total | | | | $0.00 |
| LABOR | | hours | x | rate | amount |
| Project Manager (1 Person) | | hours @ | | $0.00 |
| Total Travel and Accomodation for: Project Manager | | | | $0.00 |
| Fabrication Installers | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| air fare | | job @ | | $0.00 |
| per diem | | days @ | | $0.00 |
| Lodging | | days @ | | $0.00 |
| | | | | $0.00 |
| LABOR | | | | | |
| Exhibit Spec - Fabricator | | hours @ | | $0.00 |
| Exhibit Spec - Fabricator | | hours @ | | $0.00 |
| Exhibit Spec - Fabricator | | hours @ | | $0.00 |
| Exhibit Spec - Fabricator | | hours @ | | $0.00 |
| Total | | | | $0.00 |
Total Travel and Accomodation for: Installer $0.00
| Lighting Specialists | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| air fare | | Each | | $0.00 |
| Rental Car and Gas | | days @ | | $0.00 |
| per diem | | days @ | | $0.00 |
| Lodging | | days @ | | $0.00 |
| | | | | $0.00 |
| LABOR | | | | | |
| Lighting Designer | | hours @ | | $0.00 |
| Lighting Technician | | hours @ | | $0.00 |
| Total | | | | $0.00 |
Total Travel and Accomodation for: Lighting $0.00
| Exhibit AV Specialist | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| air fare | | Each | | $0.00 |
| Rental Car and Gas | | days@ | | $0.00 |
| per diem | | days @ | | $0.00 |
| Lodging | | days @ | | $0.00 |
| | | | | $0.00 |
| LABOR | | | | | |
| AV Technician | | hours @ | | $0.00 |
| Total | | | | $0.00 |
Total Travel and Accomodation for: AV Specialist $0.00
| Object Mounter and Installer | | | | |
| MATERIALS: | | qty. | unit | unit cost | amount |
| air fare | | Each | | $0.00 |
| Rental Car and gas | | days @ | | $0.00 |
| per diem | | days @ | | $0.00 |
| Lodging | | days @ | | $0.00 |
| | | | | $0.00 |
| LABOR | | | | | |
| Object Installer and Mount Maker | | hours @ | | $0.00 |
| Object Installer and Mount Maker | | hours @ | | $0.00 |
| | | | | $0.00 |
Total Travel and Accomodation for: Object Installer $0.00
TOTAL ALL MATERIALS: INSTALLATION $0.00
TOTAL ALL LABOR: INSTALLATION $0.00
Total Installation $0.00
| OTHER TRAVEL | | | | | |
| Postaward meeting | | | | | |
| MATERIALS: | | | | | |
| | qty. | unit | unit cost | amount |
| air fare | | job @ | | $0.00 |
| per diem | | days @ | | $0.00 |
| lodging | | days @ | | $0.00 |
| Rental car and gas | | days @ | | $0.00 |
| Misc. | | job @ | | $0.00 |
TOTAL MATERIALS 1 PM $0.00
| Building Prep Site Visit | | | | | |
| MATERIALS: | | | | | |
| | qty. | unit | unit cost | amount |
| air fare | | job @ | | $0.00 |
| per diem | | days @ | | $0.00 |
| lodging | | days @ | | $0.00 |
| Rental car and gas | | days @ | | $0.00 |
| Misc. | | job @ | | $0.00 |
TOTAL MATERIALS 1 PM $0.00
| LABOR | | hours | x | rate | amount |
| Project Manager | | hours @ | | $0.00 |
TOTAL ALL LABOR $0.00
Total Travel $0.00