Attachment_F_HAFE_Cost_Estimate_Form.xlsx
XLSX spreadsheet 21 KB Posted
- Attached to
- HAFC HAFE OUTDOOR TACTILE MAPS
- Solicitation number
- 140P2126R0028
About this file
This is a Cost Estimate Form (Attachment C) for an Exhibit Design Build project related to the HAFC HAFE Outdoor Tactile Maps solicitation issued by the National Park Service under Solicitation Number 140P2126R0028. The form is a blank template provided for contractors to complete as part of their proposal submission.
The form requires cost estimates across multiple labor categories including Project Manager, Artifact Mounter, Audio Describer, AV Systems Developer, AV Technician, Electrical Technician, Exhibit Designer, Exhibit Detailer, Exhibit Developer, Exhibit Specialists (Graphics and Fabrication), Fabrication Shop Supervisor, Graphic Designer, Graphic Shop Supervisor, Model Maker, and Exhibit Writer/Editor. Contractors must enter labor hours and rates for each category to calculate individual labor costs. The form also includes line items for Material Total, Travel, a CLIN for Image Acquisition, and a CLIN for Project Total. As this is a template form with all cost fields showing zero values, it provides no specific pricing information, budget constraints, or award details, but establishes the cost structure and labor categories that proposers must address in their submissions.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cost Estimate Form
| ATTACHMENT C - EISE EXHIBIT DESIGN BUILD Estimate Form | ||||
| Labor Category | Labor Hours | Rate | Cost | |
| PROJECT MANAGER | $ - 0 | |||
| ARTIFACT MOUNTER | $ - 0 | |||
| AUDIO DESCRIBER | $ - 0 | |||
| AV SYSTEMS DEVELOPER | $ - 0 | |||
| AV TECHNICIAN | $ - 0 | |||
| ELECTRICAL TECHNICIAN | $ - 0 | |||
| EXHIBIT DESIGNER | $ - 0 | |||
| EXHIBIT DETAILER | $ - 0 | |||
| EXHIBIT DEVELOPER | $ - 0 | |||
| EXHIBIT SPECIALIST (GRAPHICS) | $ - 0 | |||
| EXHIBIT SPECIALIST (FABRICATION) | $ - 0 | |||
| FABRICATION SHOP SUPERVISOR | $ - 0 | |||
| GRAPHIC DESIGNER | $ - 0 | |||
| GRAPHIC SHOP SUPERVISOR | $ - 0 | |||
| MODEL MAKER | $ - 0 | |||
| EXHIBIT WRITER/EDITOR | $ - 0 |
| Labor Total | $ - 0 |
| Material Total | |
| Travel CLIN | |
| Image Acquisition CLIN | |
| Project Total | $ - 0 |
File details come from the government source that posted it. Updated .