Attachment F - Drawings (PA).pdf
PDF 8 MB Posted
- Attached to
- Replace Hospital Nurse Call, MATV, & Public Address System Federal contract opportunity
- Solicitation number
- 36C26224B0002
About this file
This solicitation is for a project to replace the hospital nurse call, MATV, and public address systems at the VA San Diego Healthcare System. The project scope includes replacing antiquated systems throughout buildings 1 and 11 to improve emergency response times and notifications across the campus. The contractor will be responsible for supervision, labor, materials, equipment, training and transportation to furnish and install the new systems. All work must be done in accordance with applicable local and VA building codes while minimizing disruptions to the functioning hospital. Relevant experience with similar healthcare facility projects is preferred. The solicitation number is 36C26224B0002 and responses are due by [date]. The VA Veterans Health Administration is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Award Notice (Contract 36C26224C0180).pdf | ||
| Attachment H - Specification Section 01 35 26 - Safety Requirements.pdf | ||
| Attachment I - Hazardous Materials Survey.pdf | ||
| Amendment 0003 (SF30) - Solicitation 36C26224B0002.pdf | ||
| RFI Notice - Solicitation 36C26224B0002.pdf | ||
| Amendment 0002 (SF30) - Solicitation 36C26224B0002.pdf | ||
| Amendment 0001 (SF30) - Solicitation 36C26224B0002.pdf | ||
| Pre-Bid Site Visit Sign-In Sheet (36C26224B0002).pdf | ||
| Solicitation (SF 1442) - 36C26224B0002.pdf | ||
| Attachment A - Statement of Work (SOW).pdf | ||
| Attachment B - Specifications.pdf | ||
| Attachment C - Drawings (ARCH).pdf | ||
| Attachment E - Drawings (ELECT).pdf | ||
| Attachment G - Wage Determination (CA20240001).pdf | ||
| Attachment D - Drawings (DEMO).pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
OFFICE
TOILET
MALE
LOCKERS
MALE
ROOM
CONFERENCE
AREA
STORAGE
OFFICE
STORAGE
STERILE
CART HOLDING AREA
STERILE STORAGE
CORRIDOR
OFFICE
SERVICES
BUILDING
RM.
ELEC.
LOUNGE
LOCKERS
FEMALE
TOILET
FEMALE
LOCKERS
MALE
TOILET
MALE
JANITOR
CART AREA
ROOM
VENDOR
AND BREAKOUT
CLEAN RECEIVING
CORRIDOR
DETERGENT
DECONTAMINATION
SOILED /
ANTE ROOM
PROCESSING
SCOPE
DRYING
TRANSFER
CART WASH
CARTWASH
AUTOMATIC
WASH
INSTRUMENT
STORAGE
BULK
DISPATCH
HALLWAY
TOILET
FEMALE
LOCKERS
FEMALE
SIGNAL ROOM
DATA/TELE
ETO
STORAGE
AREA
STAGING
DRUGS
RM.
JANITOR
OFFICE
OFFICE
UP
DUMB
DW1-B-1
B190
A/C SHOP
B190A
A/C SHOP
B254
A/C SHOP
B252
OFFICES(S)
B253
A/C SHOP
B255
PIPE SHOP
B191
STORAGE
B251
MECHANICAL
B200
ELECTRONICS
B177L
STORAGE
GENERAL
B177K
STORAGE
OIT
B177J
STORAGE
GENERAL
B128
KITCHEN
B177F
UTILITY
B177E
STORAGE
EQUIPMENT
B177H
RECEIVING
B236
AUTOPSY
B247
OFFICE
B248
OFFICE
B249
OFFICE(S)
B176
OFFICE(T)
B177B
CORR.
B171A
OFFICE(T)
B117P
CORR.
B173
STORAGE
OXYGEN
B177C
CORR.
B177A
CORR.
B177N
STORAGE
GENERAL
B177D
STORAGE
GENERAL
B191R
CORRIDOR
B194
STOR.
GENERAL
B194A
STOR.
GENERAL
B245
STOR.
MORGUE
B244
STOR.
MORGUE
B235
REFERIGER. B241
OFFICE
B234
OFFICE
B232B
OFFICE
B181
REFER.
B138
REFER.
B137
REFER.
B213
BIOMED
B250
OFFICE(S)
B232A
OFFICE
B233
OFFICE(T)
B177M
CORR. B117B
CORR.
B232
OFFICE(T)
B231
MECHANICAL
B136
REFER.
B183A
STOR.
GENERAL
B183
STOR.
GENERAL
B129
OFFICE(S)
B130
OFFICE(S)
B166
ELECTRICAL
B188
ELECTRICAL
B167
EQUIPMENT
OIT
B165
TELEPHONE
B165A
OIT STOR.
B176
OFFICE
B131
OFFICE(S)
B126
CONFERENCE
B127
OFFICE(S)
B126D
OFFICE(S)
B127A-1
OFFICE(S)
B132
OFFICE(S)
B126C
OFFICE(S)
B114A
OFFICE(S)
B114
OFFICE(S)
B115
OFFICE(S)
B134
MANAGEMENT
RECORDS
B122
DISHWASHING
B119
WASH
CAR
B184
STOR.
GENERAL
B185
STOR.
GENERAL
B128B
STOR.
GENERALB186
STOR.
GENERAL
B140A
REFER.
B140
CORR.
B143
LAB
B142A
LAB
B142
LAB
B142E
LAB
B147
RESIDENT B156A
LAB
B156A
LAB
B198
ELECTRIC SHOP
B240
CORR.
B212
CORR.
B204
CORR.
B210
CARPENTRY
B210C
MECHANICAL
B141
MICROSCOPE FACILITY
CORE ELECTRON
B142D
LAB
B142B
SUPPLY
STERILE
B144
LOCKER(F)
B145
CONF. RM /OFFICE(S)
PHARMACY
B144A
LOCKER(F)
B149
LOCKER(M)
B152
OFFICE
PHARMACOECO.
BB152A
OFFICE(S)
B125
CORR.
B123
PREP
B157
VAULT
B153
STOR.
VAULT
B121
CORR.
B152E
ED. TRAINING OFF.(S)
DIR. PHARM.
B152D
DATA APPS.ANALYSIS OFF.(S)
DIR. PHARM.
B155
ADMIN.0FFICE
PHARMACY
B160
KITCHEN
B155C
SVC OFF.(S)
CHIEF PHARM.
B159B
OFFICE
B159A
OFFICE
B217
STOR.
EQUIPMENT
B223B
OFFICE(T)
B218
OFFICE(S)
B246
CORR.
B100
LOBBY
B156
AREA
PHARMACY
B215
STORAGE
B215A
STORAGE
B215B
CORRIDOR
B215B
CORRIDOR
B128C
OFFICE(S)
DIET INFO.
B117
CORRIDOR
B191J
STORAGE
GENERAL
B191G
STORAGE
OIT
B191P
STORAGE
GENERAL
B1000
CENTER OFFICE
IT SERVICE
B171
OFFICE
B201A
KITCHEN
B200A
STOR.
GENERAL
B205
KEYS
B216
LINEN
SOIL
B217A
STOR.
EQUIPMENT
SW6-B-1
STAIRS
SW7-B-1
STAIRS
SW8-B-1
STAIRS
B206
OFFICE(S)
B189B
STOR.
GENERAL
B198A
OFFICE(S)
SW1-B-1
STAIR
B191Q
CORR.
B191H
STORAGE
GENERAL
B214
OFFICE
B211
OFFICE
B217B
ELEC
B217C
ELEC
B212B
CORR.
B162
SERVICE OFFICE(S)
ENVIRONMENTAL
B210B
MECHANICAL
B210A
OFFICE(S)
B220
STOR.
GENERAL
B224
STOR.
HAC
B229
OPERATIONS
MGR. OFF.
B108A
STOR.
GENERAL
B101
LOBBY
B108B
STOR.
EQUIPMENT
B109
CORRIDOR
B108C
STOR.
EQUIPMENT
SW13-B-1
STAIRS
B201
STOR.
MAINTENANCE
B202
SIGNAGE
B239
CORR.
B238
CORR.
B158
STAIR
B182
KITCHEN
STOR.
B146
SHOWER(F)
B189A
STOR.
B125A
MALE TOI.
B133
FEMALE TOI.
B176A
MALE TOI.
B176B
MALE TOI.
W9-B-1
STAIR
B180
MECH.
B135A
HAC
B148
SHOWER(M)
B149A
LOCKER(M)
B149B
MECH.
B155B
OFF.OFF.(S)
ADMIN.
B155E
CORR.
B155F
CORR.
B154
CORR.
B172C
OFFICE
B196
ELEC. RM
S5-B-1
PET ELEV
B212A
CORR.
B191A
MALE TOI.
B191B
MALE TOI.
B242
MALE TOI.
B243
FEMALE TOI.
B128A
MGR. OFFICE(S)
CLINICAL NUTRITION
B128D
STOR.
GENERAL
SW11-B-1
STAIRS
SW12-B-1
STAIRS
B191K
STORAGE
GENERAL
B191E
UPPERB191D
STORAGE
GENERAL
B191C
STORAGE
B191F
STORAGE UPPER
GENERAL
B191C
STORAGE LOWER
GENERAL
B237
HAC
B232C
RECEPTION
B230A
TELECOM
B108
MECHANICAL
B152B
SAFETY OFF.(S)
DIR. MED.
B155A
PHARM. SVC OFF.(S)
ASS. CHIEF
B135
MECH.
B126B
OFFICE
B126A
OFF.(S) NUTRITION FOOD SER.
ED. SECT.
B191M
CORR.
B191L
STOR.
B152C
COOR.OFF.(S)
U.O.P. REGIONAL
B141A
CORR.
B230
OFFICE
B224A
CORR.
B222
MALE TOI.
B187
HAS
B225
CORRIDOR
B104
TOILET
B172C
STOR.
SPS SUPPLY
B125B
CORR.
SW10-B-1
LIFT
B120
STORAGE
B125C
CORR.
B144B
DRESSING RM
B155G
CORR.
TUNNEL
STORAGE
B195B
CART WASH
B102A
HSK
B227
MALE TOILET
B107
FEMALE TOILET
B106
CORRIDOR
CORRIDOR
B111
B116
SPS
STORAGE
B112
SPS
ADMINISTRATION
OFFICE(S)B110
DECON
B102
SPS
PREP
AREAB105
STERILIZER
B102B
GAS ETO
B102C MENS LOCKER
B228
CORRIDOR
BREAK ROOM
B226
SPS
STERILE
STORAGEB197
UTILITY AND EQUIPMENT STORAGE
B223
VACANT STORAGE
PATIENT
EFFECTSB223C
GENERAL STORAGE
B223D
CORRIDOR
B191N
GENERAL
STORAGE
B195C
MATERIAL MANAGEMENT OFFICE
B172A
EQUIPMENT STORAGE
B112A
SPS
SUPPLY
STORAGEB172B
EQUIPMENT STORAGE
B172D
EQUIPMENT
STORAGE
B117
GENERAL STORAGE
B172
B223A
ELECTRICAL
UP
UPDNUPDN
B142C
DARK RM
ELEVATOR
S1
ELEVATOR
S2
ELEVATOR
S3
ELEVATOR
S4
M&O OFFICE
(FUTURE TV
SHOP)
SP SP SP SP SP SP SP SP SP SP SP
SP
SP
SP
SP
SP SP SP SP SP SP
SP
SP
SP
SP
SP
SP
SP SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SPSP
SP
SP
SP
SP
SP
SP
W S
W S
W S
W S
W S
KEY PLAN
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant: K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
Lo ca l F ile s\
VA
SD
_R ep la ce N ur se
C al l M
AT
V
PA
_V
_j am es .h ec k.
rv t
9/
/2
2:
:0
PM
G. PROFUMOD. LEPAGE
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
NAUTILUS ENTERTAINMENT GROUP
1010 TURQUOISE ST #215
SAN DIEGO CA, 92123
858-456-6395
DANIEL LEPAGE
664-18-331
02/02/2024
100% SUBMITTAL
SAN DIEGO, CA
Revisions: Date:
1/16" = 1'-0"TI101
1 BASEMENT FLOOR - DEMO PLAN
NORTH
SHEET NOTES
TI101
BASEMENT FLOOR - DEMO PLAN
GENERAL NOTES
1 REMOVE ALL EXISTING PAGING SYSTEM SPEAKERS
2. CONTRACTOR SHALL HANDLE, REMOVE AND DISPOSE OF
ALL DEMOLISHED MATERIALS FROM SITE PER THE
LATEST FEDERAL, STATE AND LOCAL REGULATIONS
UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL SUBMIT A DEMOLITION WORK PLAN
TO THE VAMC FOR APPROVAL PRIOR TO COMMENCING
DEMOLITION WORK. CONTRACTOR SHALL INCLUDE ALL
APPLICABLE SAFETY DATA SHEETS (SDS’s) IN HIS
DEMOLITION WORK PLAN.
4. CONTRACTOR SHALL DEMO ALL PAGING SPEAKER
BRACING AND SHOT WIRES ASSOCIATED WITH DEMO'D
EQUIPMENT AND REPAIR ALL DAMAGE TO SUSPENDED AND
HARD LID CEILINGS FROM DEMO'D PAGING SPEAKERS.
1. ALL PAGING SYSTEM CABLING, CONDUITS, AND BACK
BOXES SHALL BE DEMOLISHED. NEW CABLING, CONDUITS
AND BACK BOXES SHALL BE PROVIDED FOR THE NEW
PAGING SYSTEM, UNLESS OTHERWISE NOTED.
1 (TYP)
1 (TYP)
5. CONTRACTOR SHALL LEAVE THE EMERGENCY ROOM AND
PHARMACY'S LOCAL PAGING SYSTEMS INTACT AND ADD
THE NEW HOSPITAL WIDE PA SYSTEM SPEAKERS TO
THESE AREAS.
6. CONTRACTOR SHALL MAINTAIN THE EXISTING PA SYSTEM
DURING THE INSTALLATION OF THE NEW PA SYSTEM.
7. CONTRACTOR SHALL DEMO THE EXISTING PA SYSTEM AND
ASSOCIATED CABLE, CONDUITS, AND BACK BOXES ONCE
THE NEW PA SYSTEM IS COMPLETE.
8. 2ND FLOOR SOUTH IS THE INPUT PSYCHIATRIC UNIT.
ADDITIONAL SECURITY WHILE WORKING IN THIS AREA IS
REQUIRED. CONTRACTOR TO CHECK IN AND OUT WITH 2S
NURSING STAFF. ALL TOOLS AND EQUIPMENT WILL
REQUIRE AN ESCORT TO ENSURE THE SECURITY OF THE
TOOLS AND EQUIPMENT. ALL FASTENERS USED IN THIS
AREA WILL BE TAMPER PROOF.
2 (TYP)
2 AREAS ABOVE CEILING TILES CONTAINS ASBESTOS.
CONTRACTOR WILL ENSURE TO USE METHODS TO
CONTAIN ASBESTOS IN ACCORDANCE WITH
SPECIFICATIONS.
ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS
FACILITY AND IN THE ABOVE CEILING SPACES. THE
CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY
TO PROTECT PERSONS FROM EXPOSURE. THESE
SAFEGUARDS WILL INCLUDE:
1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN
THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS
CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40
HOUR ASBESTOS TRAINING CLASS, AS APPROVED BY THE
VA, WITH CERTIFICATION.
2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND
WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT
(PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS
PRIOR TO ENTRY INTO ABOVE CEILING SPACES.
3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES,
CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT,
A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.
4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF
CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS
OR OTHER DISTURBANCE OF CELING OR WALL MATERIALS
SHALL BE PERFORMED WITH PROPER BARRICADES
INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH
PROTECTIVE BARRICADES SHALL BE PROVIDED BY THE
CONTRACTOR.
THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS
SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY,
PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR
EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY
FORM AT THE PROJECT SITE. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR JOB SITE SAFETY WHICH INCLUDES ALL
TRAINING AND SAFEGUARDS NECESSARY TO PROTECT
HIS/HER EMPLOYEES, VA PERSONNEL VISITORS AT THE SITE
AND ANY OTHER PERSONS.
ASBESTOS WARNING
DN
OFFICE
TOILET
MALE
LOCKERS
MALE
ROOM
CONFERENCE
AREA
STORAGE
OFFICE
STORAGE
STERILE
CART HOLDING AREA
STERILE STORAGE
CORRIDOR
OFFICE
SERVICES
BUILDING
RM.
ELEC.
LOUNGE
LOCKERS
FEMALE
TOILET
FEMALE
LOCKERS
MALE
TOILET
MALE
JANITOR
CART AREA
ROOM
VENDOR
AND BREAKOUT
CLEAN RECEIVING
CORRIDOR
DETERGENT
DECONTAMINATION
SOILED /
ANTE ROOM
PROCESSING
SCOPE
DRYING
TRANSFER
CART WASH
CARTWASH
AUTOMATIC
WASH
INSTRUMENT
STORAGE
BULK
DISPATCH
HALLWAY
TOILET
FEMALE
LOCKERS
FEMALE
SIGNAL ROOM
DATA/TELE
ETO
STORAGE
AREA
STAGING
DRUGS
RM.
JANITOR
OFFICE
OFFICE
UP
DUMB
DW1-B-1
B190
A/C SHOP
B190A
A/C SHOP
B254
A/C SHOP
B252
OFFICES(S)
B253
A/C SHOP
B255
PIPE SHOP
B191
STORAGE
B251
MECHANICAL
B200
ELECTRONICS
B177L
STORAGE
GENERAL
B177K
STORAGE
OIT
B177J
STORAGE
GENERAL
B128
KITCHEN
B177F
UTILITY
B177E
STORAGE
EQUIPMENT
B177H
RECEIVING
B236
AUTOPSY
B247
OFFICE
B248
OFFICE
B249
OFFICE(S)
B176
OFFICE(T)
B177B
CORR.
B171A
OFFICE(T)
B117P
CORR.
B173
STORAGE
OXYGEN
B177C
CORR.
B177A
CORR.
B177N
STORAGE
GENERAL
B177D
STORAGE
GENERAL
B191R
CORRIDOR
B194
STOR.
GENERAL
B194A
STOR.
GENERAL
B245
STOR.
MORGUE
B244
STOR.
MORGUE
B235
REFERIGER. B241
OFFICE
B234
OFFICE
B232B
OFFICE
B181
REFER.
B138
REFER.
B137
REFER.
B213
BIOMED
B250
OFFICE(S)
B232A
OFFICE
B233
OFFICE(T)
B177M
CORR. B117B
CORR.
B232
OFFICE(T)
B231
MECHANICAL
B136
REFER.
B183A
STOR.
GENERAL
B183
STOR.
GENERAL
B129
OFFICE(S)
B130
OFFICE(S)
B166
ELECTRICAL
B188
ELECTRICAL
B167
EQUIPMENT
OIT
B165
TELEPHONE
B165A
OIT STOR.
B176
OFFICE
B131
OFFICE(S)
B126
CONFERENCE
B127
OFFICE(S)
B126D
OFFICE(S)
B127A-1
OFFICE(S)
B132
OFFICE(S)
B126C
OFFICE(S)
B114A
OFFICE(S)
B114
OFFICE(S)
B115
OFFICE(S)
B134
MANAGEMENT
RECORDS
B122
DISHWASHING
B119
WASH
CAR
B184
STOR.
GENERAL
B185
STOR.
GENERAL
B128B
STOR.
GENERALB186
STOR.
GENERAL
B140A
REFER.
B140
CORR.
B143
LAB
B142A
LAB
B142
LAB
B142E
LAB
B147
RESIDENT B156A
LAB
B156A
LAB
B198
ELECTRIC SHOP
B240
CORR.
B212
CORR.
B204
CORR.
B210
CARPENTRY
B210C
MECHANICAL
B141
MICROSCOPE FACILITY
CORE ELECTRON
B142D
LAB
B142B
SUPPLY
STERILE
B144
LOCKER(F)
B145
CONF. RM /OFFICE(S)
PHARMACY
B144A
LOCKER(F)
B149
LOCKER(M)
B152
OFFICE
PHARMACOECO.
BB152A
OFFICE(S)
B125
CORR.
B123
PREP
B157
VAULT
B153
STOR.
VAULT
B121
CORR.
B152E
ED. TRAINING OFF.(S)
DIR. PHARM.
B152D
DATA APPS.ANALYSIS OFF.(S)
DIR. PHARM.
B155
ADMIN.0FFICE
PHARMACY
B160
KITCHEN
B155C
SVC OFF.(S)
CHIEF PHARM.
B159B
OFFICE
B159A
OFFICE
B217
STOR.
EQUIPMENT
B223B
OFFICE(T)
B218
OFFICE(S)
B246
CORR.
B100
LOBBY
B156
AREA
PHARMACY
B215
STORAGE
B215A
STORAGE
B215B
CORRIDOR
B215B
CORRIDOR
B128C
OFFICE(S)
DIET INFO.
B117
CORRIDOR
B191J
STORAGE
GENERAL
B191G
STORAGE
OIT
B191P
STORAGE
GENERAL
B1000
CENTER OFFICE
IT SERVICE
B171
OFFICE
B201A
KITCHEN
B200A
STOR.
GENERAL
B205
KEYS
B216
LINEN
SOIL
B217A
STOR.
EQUIPMENT
SW6-B-1
STAIRS
SW7-B-1
STAIRS
SW8-B-1
STAIRS
B206
OFFICE(S)
B189B
STOR.
GENERAL
B198A
OFFICE(S)
SW1-B-1
STAIR
B191Q
CORR.
B191H
STORAGE
GENERAL
B214
OFFICE
B211
OFFICE
B217B
ELEC
B217C
ELEC
B212B
CORR.
B162
SERVICE OFFICE(S)
ENVIRONMENTAL
B210B
MECHANICAL
B210A
OFFICE(S)
B220
STOR.
GENERAL
B224
STOR.
HAC
B229
OPERATIONS
MGR. OFF.
B108A
STOR.
GENERAL
B101
LOBBY
B108B
STOR.
EQUIPMENT
B109
CORRIDOR
B108C
STOR.
EQUIPMENT
SW13-B-1
STAIRS
B201
STOR.
MAINTENANCE
B202
SIGNAGE
B239
CORR.
B238
CORR.
B158
STAIR
B182
KITCHEN
STOR.
B146
SHOWER(F)
B189A
STOR.
B125A
MALE TOI.
B133
FEMALE TOI.
B176A
MALE TOI.
B176B
MALE TOI.
W9-B-1
STAIR
B180
MECH.
B135A
HAC
B148
SHOWER(M)
B149A
LOCKER(M)
B149B
MECH.
B155B
OFF.OFF.(S)
ADMIN.
B155E
CORR.
B155F
CORR.
B154
CORR.
B172C
OFFICE
B196
ELEC. RM
S5-B-1
PET ELEV
B212A
CORR.
B191A
MALE TOI.
B191B
MALE TOI.
B242
MALE TOI.
B243
FEMALE TOI.
B128A
MGR. OFFICE(S)
CLINICAL NUTRITION
B128D
STOR.
GENERAL
SW11-B-1
STAIRS
SW12-B-1
STAIRS
B191K
STORAGE
GENERAL
B191E
UPPERB191D
STORAGE
GENERAL
B191C
STORAGE
B191F
STORAGE UPPER
GENERAL
B191C
STORAGE LOWER
GENERAL
B237
HAC
B232C
RECEPTION
B230A
TELECOM
B108
MECHANICAL
B152B
SAFETY OFF.(S)
DIR. MED.
B155A
PHARM. SVC OFF.(S)
ASS. CHIEF
B135
MECH.
B126B
OFFICE
B126A
OFF.(S) NUTRITION FOOD SER.
ED. SECT.
B191M
CORR.
B191L
STOR.
B152C
COOR.OFF.(S)
U.O.P. REGIONAL
B141A
CORR.
B230
OFFICE
B224A
CORR.
B222
MALE TOI.
B187
HAS
B225
CORRIDOR
B104
TOILET
B172C
STOR.
SPS SUPPLY
B125B
CORR.
SW10-B-1
LIFT
B120
STORAGE
B125C
CORR.
B144B
DRESSING RM
B155G
CORR.
TUNNEL
STORAGE
B195B
CART WASH
B102A
HSK
B227
MALE TOILET
B107
FEMALE TOILET
B106
CORRIDOR
CORRIDOR
B111
B116
SPS
STORAGE
B112
SPS
ADMINISTRATION
OFFICE(S)B110
DECON
B102
SPS
PREP
AREAB105
STERILIZER
B102B
GAS ETO
B102C MENS LOCKER
B228
CORRIDOR
BREAK ROOM
B226
SPS
STERILE
STORAGEB197
UTILITY AND EQUIPMENT STORAGE
B223
VACANT STORAGE
PATIENT
EFFECTSB223C
GENERAL STORAGE
B223D
CORRIDOR
B191N
GENERAL
STORAGE
B195C
MATERIAL MANAGEMENT OFFICE
B172A
EQUIPMENT STORAGE
B112A
SPS
SUPPLY
STORAGEB172B
EQUIPMENT STORAGE
B172D
EQUIPMENT
STORAGE
B117
GENERAL STORAGE
B172
B223A
ELECTRICAL
UP
UPDNUPDN
B142C
DARK RM
ELEVATOR
S1
ELEVATOR
S2
ELEVATOR
S3
ELEVATOR
S4
M&O OFFICE
(FUTURE TV
SHOP)
SP
SP
SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP
SP
SP
SP
SP
SP
SP
SP
SP
SPSP
SP
SP
SP
SP
SPSPSP
SP
SP
SP
SP
SP
SP
SP
SPSPSPSPSP
SP
SP
SP
SP
SP
SP
W S
W S
W S
W S
W S
SPSPSPSP
SPAM
AM
KEY PLAN
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant: K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
Lo ca l F ile s\
VA
SD
_R ep la ce N ur se
C al l M
AT
V
PA
_V
_j am es .h ec k.
rv t
9/
/2
2:
:0
PM
G. PROFUMOD. LEPAGE
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
NAUTILUS ENTERTAINMENT GROUP
1010 TURQUOISE ST #215
SAN DIEGO CA, 92123
858-456-6395
DANIEL LEPAGE
664-18-331
02/02/2024
100% SUBMITTAL
SAN DIEGO, CA
Revisions: Date:
1/16" = 1'-0"TI102
1 BASEMENT FLOOR PLAN
NORTH
SHEET NOTES
TI102
BASEMENT FLOOR PLAN
GENERAL NOTES
1. CABLING:
A) ALL AUDIO CABLING IS TO BE CONTINUOUS,
UNSPLICED, AND INSTALLED SEPARATELY
FROM ALL POWER LINES.
G) ALL CABLE TO BE LABELED AT BOTH ENDS.
H) USE STRIP TERMINAL BLOCKS MOUNTED IN THE
EQUIPMENT RACK.
I) CABLES WITHIN RACKS SHALL BE BUNDLED
AND LACED NEATLY TO SUPPORT MEMBERS
WITH A SERVICE LOOP LARGE ENOUGH TO
MAINTAIN CONVENIENT ACCESS TO ALL
EQUIPMENT CONNECTIONS.
J) AC POWER TO THE POWER STRIPS IN THE
RACK SHALL BE RUN IN EMT CONDUIT.
K) AC OUTLETS WITHIN THE RACK SHALL BE
GROUNDED TO EARTH.
2. THE TERM "PROVIDE" MEANS TO FURNISH AND INSTALL.
3. INSTALL AND ADJUST ALL EQUIPMENT PER MANUFACTURER
RECOMMENDATIONS.
4. INSTALL ALL ELECTRICAL RACK-MOUNTED EQUIPMENT IN
THE EQUIPMENT RACK.
5. PROVIDE FASTENERS SUPPORTS AND SEISMIC
RESTRAINTS TO ADEQUATELY SUPPORT THE LOAD AS
REQUIRED BY LOCAL BUILDING CODES.
1 INSTALL PUBLIC ADDRESS PAGING SPEAKER
1 (TYP)
6. CONTRACTOR SHALL LEAVE THE EMERGENCY ROOM AND
PHARMACY'S LOCAL PAGING SYSTEMS INTACT AND ADD
THE NEW HOSPITAL WIDE PA SYSTEM SPEAKERS TO
THESE AREAS.
2 INSTALL AMBIENT NOISE MICROPHONE
7. CONTRACTOR SHALL MAINTAIN THE EXISTING PA SYSTEM
DURING THE INSTALLATION OF THE NEW PA SYSTEM.
8.
9. 2ND FLOOR SOUTH IS THE INPUT PSYCHIATRIC UNIT.
ADDITIONAL SECURITY WHILE WORKING IN THIS AREA IS
REQUIRED. CONTRACTOR TO CHECK IN AND OUT WITH 2S
NURSING STAFF. ALL TOOLS AND EQUIPMENT WILL
REQUIRE AN ESCORT TO ENSURE THE SECURITY OF THE
TOOLS AND EQUIPMENT. ALL FASTENERS USED IN THIS
AREA WILL BE TAMPER PROOF.
(TYP)
3 (TYP)
3 AREAS ABOVE CEILING TILES CONTAINS ASBESTOS
CONTRACTOR WILL ENSURE TO USE METHODS TO
CONTAIN ASBESTOS IN ACCORDANCE WITH
SPECIFICATIONS.
CONTRACTOR SHALL DEMO THE EXISTING PA SYSTEM AND
ASSOCIATED CABLE, CONDUITS, AND BACK BOXES ONCE
THE NEW PA SYSTEM IS COMPLETE.
ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS
FACILITY AND IN THE ABOVE CEILING SPACES. THE
CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY
TO PROTECT PERSONS FROM EXPOSURE. THESE
SAFEGUARDS WILL INCLUDE:
1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN
THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS
CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40
HOUR ASBESTOS TRAINING CLASS, AS APPROVED BY THE
VA, WITH CERTIFICATION.
2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND
WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT
(PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS
PRIOR TO ENTRY INTO ABOVE CEILING SPACES.
3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES,
CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT,
A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.
4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF
CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS
OR OTHER DISTURBANCE OF CELING OR WALL MATERIALS
SHALL BE PERFORMED WITH PROPER BARRICADES
INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH
PROTECTIVE BARRICADES SHALL BE PROVIDED BY THE
CONTRACTOR.
THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS
SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY,
PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR
EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY
FORM AT THE PROJECT SITE. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR JOB SITE SAFETY WHICH INCLUDES ALL
TRAINING AND SAFEGUARDS NECESSARY TO PROTECT
HIS/HER EMPLOYEES, VA PERSONNEL VISITORS AT THE SITE
UPDNUPDN
BRIDGE
36" HIGH WALL
36" HIGH WALL
VOID
050-1-1
ALCOVE
VOID
062-1-1
VOID
068-1-1
VOID
052-1-1
VOID
074-1-1
VOID
010-1-1
VOID
028-1-1
VOID
027-1-1
VOID
026-1-1
VOID
023-1-1
VOID
049-1-1
WAITER
DW3-1-1
VOID
024-1-1
SPSP
SP
SP SP SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP SP
SP
SP
SPSPSP
SPSPSPSP
SP
SP
SP
SP
SP
SP SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP SP
SP
SP
SP
SPSPSP SP SP
SP
SP SP SP SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP SP
SP SP
SP
SP
SP
SP
SP SP
SP
SP SP SP SP SP
SP
SP SP
SP
SP
SP
SP
SP
SP SPSPSPSPSP SP SP
SPSP
SP
SP
SP
SP
SP SP
SP
SP
SP
SP
SP
SP SP
SP
SP
SP
KEY PLAN
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant: K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
Lo ca l F ile s\
VA
SD
_R ep la ce N ur se
C al l M
AT
V
PA
_V
_j am es .h ec k.
rv t
9/
/2
2:
:0
PM
G. PROFUMOD. LEPAGE
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
NAUTILUS ENTERTAINMENT GROUP
1010 TURQUOISE ST #215
SAN DIEGO CA, 92123
858-456-6395
DANIEL LEPAGE
664-18-331
02/02/2024
100% SUBMITTAL
SAN DIEGO, CA
Revisions: Date:
1/16" = 1'-0"TI103
1 LEVEL 1 - NORTH FLOOR - DEMO PLAN
NORTH
SHEET NOTES
TI103
LEVEL 1 - NORTH FLOOR - DEMO PLAN
GENERAL NOTES
1 REMOVE ALL EXISTING PAGING SYSTEM SPEAKERS
1 (TYP)
2 (TYP)
2 AREAS ABOVE CEILING TILES CONTAINS ASBESTOS.
CONTRACTOR WILL ENSURE TO USE METHODS TO
CONTAIN ASBESTOS IN ACCORDANCE WITH
SPECIFICATIONS.
2. CONTRACTOR SHALL HANDLE, REMOVE AND DISPOSE OF
ALL DEMOLISHED MATERIALS FROM SITE PER THE
LATEST FEDERAL, STATE AND LOCAL REGULATIONS
UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL SUBMIT A DEMOLITION WORK PLAN
TO THE VAMC FOR APPROVAL PRIOR TO COMMENCING
DEMOLITION WORK. CONTRACTOR SHALL INCLUDE ALL
APPLICABLE SAFETY DATA SHEETS (SDS’s) IN HIS
DEMOLITION WORK PLAN.
4. CONTRACTOR SHALL DEMO ALL PAGING SPEAKER
BRACING AND SHOT WIRES ASSOCIATED WITH DEMO'D
EQUIPMENT AND REPAIR ALL DAMAGE TO SUSPENDED AND
HARD LID CEILINGS FROM DEMO'D PAGING SPEAKERS.
1. ALL PAGING SYSTEM CABLING, CONDUITS, AND BACK
BOXES SHALL BE DEMOLISHED. NEW CABLING, CONDUITS
AND BACK BOXES SHALL BE PROVIDED FOR THE NEW
PAGING SYSTEM, UNLESS OTHERWISE NOTED.
5. CONTRACTOR SHALL LEAVE THE EMERGENCY ROOM AND
PHARMACY'S LOCAL PAGING SYSTEMS INTACT AND ADD
THE NEW HOSPITAL WIDE PA SYSTEM SPEAKERS TO
THESE AREAS.
6. CONTRACTOR SHALL MAINTAIN THE EXISTING PA SYSTEM
DURING THE INSTALLATION OF THE NEW PA SYSTEM.
7. CONTRACTOR SHALL DEMO THE EXISTING PA SYSTEM AND
ASSOCIATED CABLE, CONDUITS, AND BACK BOXES ONCE
THE NEW PA SYSTEM IS COMPLETE.
8. 2ND FLOOR SOUTH IS THE INPUT PSYCHIATRIC UNIT.
ADDITIONAL SECURITY WHILE WORKING IN THIS AREA IS
REQUIRED. CONTRACTOR TO CHECK IN AND OUT WITH 2S
NURSING STAFF. ALL TOOLS AND EQUIPMENT WILL
REQUIRE AN ESCORT TO ENSURE THE SECURITY OF THE
TOOLS AND EQUIPMENT. ALL FASTENERS USED IN THIS
AREA WILL BE TAMPER PROOF.
ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS
FACILITY AND IN THE ABOVE CEILING SPACES. THE
CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY
TO PROTECT PERSONS FROM EXPOSURE. THESE
SAFEGUARDS WILL INCLUDE:
1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN
THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS
CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40
HOUR ASBESTOS TRAINING CLASS, AS APPROVED BY THE
VA, WITH CERTIFICATION.
2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND
WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT
(PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS
PRIOR TO ENTRY INTO ABOVE CEILING SPACES.
3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES,
CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT,
A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.
4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF
CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS
OR OTHER DISTURBANCE OF CELING OR WALL MATERIALS
SHALL BE PERFORMED WITH PROPER BARRICADES
INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH
PROTECTIVE BARRICADES SHALL BE PROVIDED BY THE
CONTRACTOR.
THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS
SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY,
PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR
EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY
FORM AT THE PROJECT SITE. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR JOB SITE SAFETY WHICH INCLUDES ALL
TRAINING AND SAFEGUARDS NECESSARY TO PROTECT
HIS/HER EMPLOYEES, VA PERSONNEL VISITORS AT THE SITE
UPDNUPDN
BRIDGE
36" HIGH WALL
36" HIGH WALL
VOID
050-1-1
ALCOVE
VOID
062-1-1
VOID
068-1-1
VOID
052-1-1
VOID
074-1-1
VOID
010-1-1
VOID
028-1-1
VOID
027-1-1
VOID
026-1-1
VOID
023-1-1
VOID
049-1-1
WAITER
DW3-1-1
VOID
024-1-1
SP
SP
SP
SP
SP
SP
SPSPSPSPSPSPSPSPSP SP SP SP SP SP SP SP SP SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SPSP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SPSPSP
SP
SP
SP
SP
SP
SP
SP SP
SP
SP
SP
SP
SP
SPSPSPSP
SP
SP
SP
SP SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP SP
SP AM
SP
AM
AM AM
SP
AM
SP
SP
SP
SP
SP
SPSPSP
SP
SP SP
SP SP
SP SP
SP SP
SP SP
SP SP
SP SP SP
SP
SP
R01
VC
KEY PLAN
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant: K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
Lo ca l F ile s\
VA
SD
_R ep la ce N ur se
C al l M
AT
V
PA
_V
_j am es .h ec k.
rv t
9/
/2
2:
:0
PM
G. PROFUMOD. LEPAGE
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
NAUTILUS ENTERTAINMENT GROUP
1010 TURQUOISE ST #215
SAN DIEGO CA, 92123
858-456-6395
DANIEL LEPAGE
664-18-331
02/02/2024
100% SUBMITTAL
SAN DIEGO, CA
Revisions: Date:
1/16" = 1'-0"TI104
1 LEVEL 1 - NORTH FLOOR PLAN
NORTH
SHEET NOTES
TI104
LEVEL 1 - NORTH FLOOR PLAN
GENERAL NOTES
1 INSTALL PUBLIC ADDRESS PAGING SPEAKER
1 (TYP)
2 INSTALL AMBIENT NOISE MICROPHONE
2 (TYP)
3 (TYP)
3 1ST FLOOR PA RACK LOCATION
4 (TYP)
4 WALL MOUNTED VOLUME CONTROL
1. CABLING:
A) ALL AUDIO CABLING IS TO BE CONTINUOUS,
UNSPLICED, AND INSTALLED SEPARATELY
FROM ALL POWER LINES.
G) ALL CABLE TO BE LABELED AT BOTH ENDS.
H) USE STRIP TERMINAL BLOCKS MOUNTED IN THE
EQUIPMENT RACK.
I) CABLES WITHIN RACKS SHALL BE BUNDLED
AND LACED NEATLY TO SUPPORT MEMBERS
WITH A SERVICE LOOP LARGE ENOUGH TO
MAINTAIN CONVENIENT ACCESS TO ALL
EQUIPMENT CONNECTIONS.
J) AC POWER TO THE POWER STRIPS IN THE
RACK SHALL BE RUN IN EMT CONDUIT.
K) AC OUTLETS WITHIN THE RACK SHALL BE
GROUNDED TO EARTH.
2. THE TERM "PROVIDE" MEANS TO FURNISH AND INSTALL.
3. INSTALL AND ADJUST ALL EQUIPMENT PER MANUFACTURER
RECOMMENDATIONS.
4. INSTALL ALL ELECTRICAL RACK-MOUNTED EQUIPMENT IN
THE EQUIPMENT RACK.
5. PROVIDE FASTENERS SUPPORTS AND SEISMIC
RESTRAINTS TO ADEQUATELY SUPPORT THE LOAD AS
REQUIRED BY LOCAL BUILDING CODES.
6. CONTRACTOR SHALL LEAVE THE EMERGENCY ROOM AND
PHARMACY'S LOCAL PAGING SYSTEMS INTACT AND ADD
THE NEW HOSPITAL WIDE PA SYSTEM SPEAKERS TO
THESE AREAS.
7. CONTRACTOR SHALL MAINTAIN THE EXISTING PA SYSTEM
DURING THE INSTALLATION OF THE NEW PA SYSTEM.
8.
9. 2ND FLOOR SOUTH IS THE INPUT PSYCHIATRIC UNIT.
ADDITIONAL SECURITY WHILE WORKING IN THIS AREA IS
REQUIRED. CONTRACTOR TO CHECK IN AND OUT WITH 2S
NURSING STAFF. ALL TOOLS AND EQUIPMENT WILL
REQUIRE AN ESCORT TO ENSURE THE SECURITY OF THE
TOOLS AND EQUIPMENT. ALL FASTENERS USED IN THIS
AREA WILL BE TAMPER PROOF.
5 (TYP)
5 AREAS ABOVE CEILING TILES CONTAINS ASBESTOS.
CONTRACTOR WILL ENSURE TO USE METHODS TO
CONTAIN ASBESTOS IN ACCORDANCE WITH
SPECIFICATIONS.
CONTRACTOR SHALL DEMO THE EXISTING PA SYSTEM AND
ASSOCIATED CABLE, CONDUITS, AND BACK BOXES ONCE
THE NEW PA SYSTEM IS COMPLETE.
ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS
FACILITY AND IN THE ABOVE CEILING SPACES. THE
CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY
TO PROTECT PERSONS FROM EXPOSURE. THESE
SAFEGUARDS WILL INCLUDE:
1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN
THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS
CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40
HOUR ASBESTOS TRAINING CLASS, AS APPROVED BY THE
VA, WITH CERTIFICATION.
2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND
WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT
(PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS
PRIOR TO ENTRY INTO ABOVE CEILING SPACES.
3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES,
CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT,
A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.
4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF
CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS
OR OTHER DISTURBANCE OF CELING OR WALL MATERIALS
SHALL BE PERFORMED WITH PROPER BARRICADES
INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH
PROTECTIVE BARRICADES SHALL BE PROVIDED BY THE
CONTRACTOR.
THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS
SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY,
PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR
EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY
FORM AT THE PROJECT SITE. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR JOB SITE SAFETY WHICH INCLUDES ALL
TRAINING AND SAFEGUARDS NECESSARY TO PROTECT
HIS/HER EMPLOYEES, VA PERSONNEL VISITORS AT THE SITE
VOID
050-1-1
VOID
052-1-1
SP
SP
SP
SP
SPSPSP
SP
SP
SP
SP SP SP
SP
SP SP SP SP
SP
SP SP SP SP
SP SP
SP
SPSP
SP
SP
SP
SP
SP
SP
SPSP
SP
SP
SP
SP
SP
SP
SP SP
SP
SP
SP
SP SP
SP
SP
SP
SP
SP
SP
SP SPSPSP
SP
SP
SP
SPSP SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SPSPSPSP
KEY PLAN
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant: K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
Lo ca l F ile s\
VA
SD
_R ep la ce N ur se
C al l M
AT
V
PA
_V
_j am es .h ec k.
rv t
9/
/2
2:
:0
PM
G. PROFUMOD. LEPAGE
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
NAUTILUS ENTERTAINMENT GROUP
1010 TURQUOISE ST #215
SAN DIEGO CA, 92123
858-456-6395
DANIEL LEPAGE
664-18-331
02/02/2024
100% SUBMITTAL
SAN DIEGO, CA
Revisions: Date:
1/16" = 1'-0"TI105
1 LEVEL 1 - SOUTH FLOOR - DEMO PLAN
NORTH
SHEET NOTES
TI105
LEVEL 1 - SOUTH FLOOR - DEMO PLAN
GENERAL NOTES
1 REMOVE ALL EXISTING PAGING SYSTEM SPEAKERS
1 (TYP)
2 (TYP)
2 AREAS ABOVE CEILING TILES CONTAINS ASBESTOS.
CONTRACTOR WILL ENSURE TO USE METHODS TO
CONTAIN ASBESTOS IN ACCORDANCE WITH
SPECIFICATIONS.
2. CONTRACTOR SHALL HANDLE, REMOVE AND DISPOSE OF
ALL DEMOLISHED MATERIALS FROM SITE PER THE
LATEST FEDERAL, STATE AND LOCAL REGULATIONS
UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL SUBMIT A DEMOLITION WORK PLAN
TO THE VAMC FOR APPROVAL PRIOR TO COMMENCING
DEMOLITION WORK. CONTRACTOR SHALL INCLUDE ALL
APPLICABLE SAFETY DATA SHEETS (SDS’s) IN HIS
DEMOLITION WORK PLAN.
4. CONTRACTOR SHALL DEMO ALL PAGING SPEAKER
BRACING AND SHOT WIRES ASSOCIATED WITH DEMO'D
EQUIPMENT AND REPAIR ALL DAMAGE TO SUSPENDED AND
HARD LID CEILINGS FROM DEMO'D PAGING SPEAKERS.
1. ALL PAGING SYSTEM CABLING, CONDUITS, AND BACK
BOXES SHALL BE DEMOLISHED. NEW CABLING, CONDUITS
AND BACK BOXES SHALL BE PROVIDED FOR THE NEW
PAGING SYSTEM, UNLESS OTHERWISE NOTED.
5. CONTRACTOR SHALL LEAVE THE EMERGENCY ROOM AND
PHARMACY'S LOCAL PAGING SYSTEMS INTACT AND ADD
THE NEW HOSPITAL WIDE PA SYSTEM SPEAKERS TO
THESE AREAS.
6. CONTRACTOR SHALL MAINTAIN THE EXISTING PA SYSTEM
DURING THE INSTALLATION OF THE NEW PA SYSTEM.
7. CONTRACTOR SHALL DEMO THE EXISTING PA SYSTEM AND
ASSOCIATED CABLE, CONDUITS, AND BACK BOXES ONCE
THE NEW PA SYSTEM IS COMPLETE.
8. 2ND FLOOR SOUTH IS THE INPUT PSYCHIATRIC UNIT.
ADDITIONAL SECURITY WHILE WORKING IN THIS AREA IS
REQUIRED. CONTRACTOR TO CHECK IN AND OUT WITH 2S
NURSING STAFF. ALL TOOLS AND EQUIPMENT WILL
REQUIRE AN ESCORT TO ENSURE THE SECURITY OF THE
TOOLS AND EQUIPMENT. ALL FASTENERS USED IN THIS
AREA WILL BE TAMPER PROOF.
ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS
FACILITY AND IN THE ABOVE CEILING SPACES. THE
CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY
TO PROTECT PERSONS FROM EXPOSURE. THESE
SAFEGUARDS WILL INCLUDE:
1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN
THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS
CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40
HOUR ASBESTOS TRAINING CLASS, AS APPROVED BY THE
VA, WITH CERTIFICATION.
2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND
WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT
(PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS
PRIOR TO ENTRY INTO ABOVE CEILING SPACES.
3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES,
CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT,
A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.
4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF
CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS
OR OTHER DISTURBANCE OF CELING OR WALL MATERIALS
SHALL BE PERFORMED WITH PROPER BARRICADES
INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH
PROTECTIVE BARRICADES SHALL BE PROVIDED BY THE
CONTRACTOR.
THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS
SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY,
PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR
EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY
FORM AT THE PROJECT SITE. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR JOB SITE SAFETY WHICH INCLUDES ALL
TRAINING AND SAFEGUARDS NECESSARY TO PROTECT
HIS/HER EMPLOYEES, VA PERSONNEL VISITORS AT THE SITE
VOID
050-1-1
VOID
052-1-1
PS
SPSP
SP
SP
SPSP
SPSP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SPSPSPSP SP
SP
SP
SP
SPSPSPSPSPSPSPSPSP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SPSPSPSP
SP
SP
SP SP SP SP
SP
SP
SP
SP SP SP SP
SP
SPSPSP
SP
SP
SP
SP SP
SP
AM
SP AM
SP
SP
SP
SP
SP
SP
SP
SPSPSP
SPSPSP
SPSPSP SPSP
SP
SP
SP
SP
SP
SP
AM
R01
KEY PLAN
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant: K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
Lo ca l F ile s\
VA
SD
_R ep la ce N ur se
C al l M
AT
V
PA
_V
_j am es .h ec k.
rv t
9/
/2
2:
:0
PM
G. PROFUMOD. LEPAGE
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
NAUTILUS ENTERTAINMENT GROUP
1010 TURQUOISE ST #215
SAN DIEGO CA, 92123
858-456-6395
DANIEL LEPAGE
664-18-331
02/02/2024
100% SUBMITTAL
SAN DIEGO, CA
Revisions: Date:
1/16" = 1'-0"TI106
1 LEVEL 1 - SOUTH FLOOR PLAN
NORTH
SHEET NOTES
TI106
LEVEL 1 - SOUTH FLOOR PLAN
GENERAL NOTES
1 INSTALL PUBLIC ADDRESS PAGING SPEAKER
1 (TYP)
3 INSTALL PUBLIC ADDRESS PAGING STATION
2 INSTALL AMBIENT NOISE MICROPHONE
1. CABLING:
A) ALL AUDIO CABLING IS TO BE CONTINUOUS,
UNSPLICED, AND INSTALLED SEPARATELY
FROM ALL POWER LINES.
G) ALL CABLE TO BE LABELED AT BOTH ENDS.
H) USE STRIP TERMINAL BLOCKS MOUNTED IN THE
EQUIPMENT RACK.
I) CABLES WITHIN RACKS SHALL BE BUNDLED
AND LACED NEATLY TO SUPPORT MEMBERS
WITH A SERVICE LOOP LARGE ENOUGH TO
MAINTAIN CONVENIENT ACCESS TO ALL
EQUIPMENT CONNECTIONS.
J) AC POWER TO THE POWER STRIPS IN THE
RACK SHALL BE RUN IN EMT CONDUIT.
K) AC OUTLETS WITHIN THE RACK SHALL BE
GROUNDED TO EARTH.
2. THE TERM "PROVIDE" MEANS TO FURNISH AND INSTALL.
3. INSTALL AND ADJUST ALL EQUIPMENT PER MANUFACTURER
RECOMMENDATIONS.
4. INSTALL ALL ELECTRICAL RACK-MOUNTED EQUIPMENT IN
THE EQUIPMENT RACK.
5. PROVIDE FASTENERS SUPPORTS AND SEISMIC
RESTRAINTS TO ADEQUATELY SUPPORT THE LOAD AS
REQUIRED BY LOCAL BUILDING CODES.
6. CONTRACTOR SHALL LEAVE THE EMERGENCY ROOM AND
PHARMACY'S LOCAL PAGING SYSTEMS INTACT AND ADD
THE NEW HOSPITAL WIDE PA SYSTEM SPEAKERS TO
THESE AREAS.
7. CONTRACTOR SHALL MAINTAIN THE EXISTING PA SYSTEM
DURING THE INSTALLATION OF THE NEW PA SYSTEM.
8.
9.
4 1ST FLOOR RACK LOCATION
2ND FLOOR SOUTH IS THE INPUT PSYCHIATRIC UNIT.
ADDITIONAL SECURITY WHILE WORKING IN THIS AREA IS
REQUIRED. CONTRACTOR TO CHECK IN AND OUT WITH 2S
NURSING STAFF. ALL TOOLS AND EQUIPMENT WILL
REQUIRE AN ESCORT TO ENSURE THE SECURITY OF THE
TOOLS AND EQUIPMENT. ALL FASTENERS USED IN THIS
AREA WILL BE TAMPER PROOF.
5 (TYP)
5 AREAS ABOVE CEILING TILES CONTAINS ASBESTOS.
CONTRACTOR WILL ENSURE TO USE METHODS TO
CONTAIN ASBESTOS IN ACCORDANCE WITH
SPECIFICATIONS.
CONTRACTOR SHALL DEMO THE EXISTING PA SYSTEM AND
ASSOCIATED CABLE, CONDUITS, AND BACK BOXES ONCE
THE NEW PA SYSTEM IS COMPLETE.
ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS
FACILITY AND IN THE ABOVE CEILING SPACES. THE
CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY
TO PROTECT PERSONS FROM EXPOSURE. THESE
SAFEGUARDS WILL INCLUDE:
1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN
THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS
CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40
HOUR ASBESTOS TRAINING CLASS, AS APPROVED BY THE
VA, WITH CERTIFICATION.
2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND
WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT
(PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS
PRIOR TO ENTRY INTO ABOVE CEILING SPACES.
3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES,
CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT,
A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.
4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF
CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS
OR OTHER DISTURBANCE OF CELING OR WALL MATERIALS
SHALL BE PERFORMED WITH PROPER BARRICADES
INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH
PROTECTIVE BARRICADES SHALL BE PROVIDED BY THE
CONTRACTOR.
THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS
SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY,
PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR
EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY
FORM AT THE PROJECT SITE. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR JOB SITE SAFETY WHICH INCLUDES ALL
TRAINING AND SAFEGUARDS NECESSARY TO PROTECT
HIS/HER EMPLOYEES, VA PERSONNEL VISITORS AT THE SITE
STAIR
CORRIDOR
ELEVATORELEVATORELEVATORELEVATOR
ELEVATORELEVATORELEVATOR
ELEVATORELEVATORELEVATOR
HSK
W/D W/DW/D
SP
SP
SP
SP
SP
SPSP
SP
SP
SP
SP
SP
SP
SP
SP
SP SP SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP SP SP
SP SP SP
SP
SP
SP
SP SP SP SP
SP SP
SP SP
SPSPSP SP
SP
SP SP
SP SP SP
KEY PLAN
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant: K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
Lo ca l F ile s\
VA
SD
_R ep la ce N ur se
C al l M
AT
V
PA
_V
_j am es .h ec k.
rv t
9/
/2
2:
:0
PM
G. PROFUMOD. LEPAGE
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
NAUTILUS ENTERTAINMENT GROUP
1010 TURQUOISE ST #215
SAN DIEGO CA, 92123
858-456-6395
DANIEL LEPAGE
664-18-331
02/02/2024
100% SUBMITTAL
SAN DIEGO, CA
Revisions: Date:
1/16" = 1'-0"TI107
1 LEVEL 2 - NORTH FLOOR - DEMO PLAN
NORTH
SHEET NOTES
TI107
LEVEL 2 - NORTH FLOOR - DEMO PLAN
GENERAL NOTES
1 REMOVE ALL EXISTING PAGING SYSTEM SPEAKERS
1 (TYP)
2 (TYP)
2 AREAS ABOVE CEILING TILES CONTAINS ASBESTOS.
CONTRACTOR WILL ENSURE TO USE METHODS TO
CONTAIN ASBESTOS IN ACCORDANCE WITH
SPECIFICATIONS.
2. CONTRACTOR SHALL HANDLE, REMOVE AND DISPOSE OF
ALL DEMOLISHED MATERIALS FROM SITE PER THE
LATEST FEDERAL, STATE AND LOCAL REGULATIONS
UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL SUBMIT A DEMOLITION WORK PLAN
TO THE VAMC FOR APPROVAL PRIOR TO COMMENCING
DEMOLITION WORK. CONTRACTOR SHALL INCLUDE ALL
APPLICABLE SAFETY DATA SHEETS (SDS’s) IN HIS
DEMOLITION WORK PLAN.
4. CONTRACTOR SHALL DEMO ALL PAGING SPEAKER
BRACING AND SHOT WIRES ASSOCIATED WITH DEMO'D
EQUIPMENT AND REPAIR ALL DAMAGE TO SUSPENDED AND
HARD LID CEILINGS FROM DEMO'D PAGING SPEAKERS.
1. ALL PAGING SYSTEM CABLING, CONDUITS, AND BACK
BOXES SHALL BE DEMOLISHED. NEW CABLING, CONDUITS
AND BACK BOXES SHALL BE PROVIDED FOR THE NEW
PAGING SYSTEM, UNLESS OTHERWISE NOTED.
5. CONTRACTOR SHALL LEAVE THE EMERGENCY ROOM AND
PHARMACY'S LOCAL PAGING SYSTEMS INTACT AND ADD
THE NEW HOSPITAL WIDE PA SYSTEM SPEAKERS TO
THESE AREAS.
6. CONTRACTOR SHALL MAINTAIN THE EXISTING PA SYSTEM
DURING THE INSTALLATION OF THE NEW PA SYSTEM.
7. CONTRACTOR SHALL DEMO THE EXISTING PA SYSTEM AND
ASSOCIATED CABLE, CONDUITS, AND BACK BOXES ONCE
THE NEW PA SYSTEM IS COMPLETE.
8. 2ND FLOOR SOUTH IS THE INPUT PSYCHIATRIC UNIT.
ADDITIONAL SECURITY WHILE WORKING IN THIS AREA IS
REQUIRED. CONTRACTOR TO CHECK IN AND OUT WITH 2S
NURSING STAFF. ALL TOOLS AND EQUIPMENT WILL
REQUIRE AN ESCORT TO ENSURE THE SECURITY OF THE
TOOLS AND EQUIPMENT. ALL FASTENERS USED IN THIS
AREA WILL BE TAMPER PROOF.
ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS
FACILITY AND IN THE ABOVE CEILING SPACES. THE
CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY
TO PROTECT PERSONS FROM EXPOSURE. THESE
SAFEGUARDS WILL INCLUDE:
1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN
THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS
CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40
HOUR ASBESTOS TRAINING CLASS, AS APPROVED BY THE
VA, WITH CERTIFICATION.
2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND
WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT
(PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS
PRIOR TO ENTRY INTO ABOVE CEILING SPACES.
3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES,
CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT,
A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.
4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF
CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS
OR OTHER DISTURBANCE OF CELING OR WALL MATERIALS
SHALL BE PERFORMED WITH PROPER BARRICADES
INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH
PROTECTIVE BARRICADES SHALL BE PROVIDED BY THE
CONTRACTOR.
THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS
SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY,
PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR
EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY
FORM AT THE PROJECT SITE. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR JOB SITE SAFETY WHICH INCLUDES ALL
TRAINING AND SAFEGUARDS NECESSARY TO PROTECT
HIS/HER EMPLOYEES, VA PERSONNEL VISITORS AT THE SITE
CORRIDOR
ELEVATORELEVATORELEVATORELEVATOR
ELEVATORELEVATORELEVATOR
ELEVATORELEVATORELEVATOR
HSK
W/D W/DW/D
SP
SP
SP
SP
SP
SP
SP
SP
SPSPSPSP
SP SP
SP
SP
SP SP SP SP
SP
SP
SP
SPSP SPSP SP SP SP
SP
SP SP SP
SP
SP
SP
SP
SP
SP
SP
SPSPSP
SP
SP
SP
SP
SP
SP
SP
SP
SP SP
SPSP
SP
SP
SP
SP
SPSP
SP
SP
SP
SP
SP SP
SP
SP SP
SP
SP
SP
SPSP
SP SP
SP
AM
SP AM
AM
SP
AM
SM SM
SM
KEY PLAN
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant: K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
Lo ca l F ile s\
VA
SD
_R ep la ce N ur se
C al l M
AT
V
PA
_V
_j am es .h ec k.
rv t
9/
/2
2:
:0
PM
G. PROFUMOD. LEPAGE
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
NAUTILUS ENTERTAINMENT GROUP
1010 TURQUOISE ST #215
SAN DIEGO CA, 92123
858-456-6395
DANIEL LEPAGE
664-18-331
02/02/2024
100% SUBMITTAL
SAN DIEGO, CA
Revisions: Date:
1/16" = 1'-0"TI108
1 LEVEL 2 - NORTH FLOOR PLAN
NORTH
SHEET NOTES
TI108
LEVEL 2 - NORTH FLOOR PLAN
GENERAL NOTES
1 INSTALL PUBLIC ADDRESS PAGING SPEAKER
1 (TYP)
2 INSTALL AMBIENT NOISE MICROPHONE
2 (TYP)
1. CABLING:
A) ALL AUDIO CABLING IS TO BE CONTINUOUS,
UNSPLICED, AND INSTALLED SEPARATELY
FROM ALL POWER LINES.
G) ALL CABLE TO BE LABELED AT BOTH ENDS.
H) USE STRIP TERMINAL BLOCKS MOUNTED IN THE
EQUIPMENT RACK.
I) CABLES WITHIN RACKS SHALL BE BUNDLED
AND LACED NEATLY TO SUPPORT MEMBERS
WITH A SERVICE LOOP LARGE ENOUGH TO
MAINTAIN CONVENIENT ACCESS TO ALL
EQUIPMENT CONNECTIONS.
J) AC POWER TO THE POWER STRIPS IN THE
RACK SHALL BE RUN IN EMT CONDUIT.
K) AC OUTLETS WITHIN THE RACK SHALL BE
GROUNDED TO EARTH.
2. THE TERM "PROVIDE" MEANS TO FURNISH AND INSTALL.
3. INSTALL AND ADJUST ALL EQUIPMENT PER MANUFACTURER
RECOMMENDATIONS.
4. INSTALL ALL ELECTRICAL RACK-MOUNTED EQUIPMENT IN
THE EQUIPMENT RACK.
5. PROVIDE FASTENERS SUPPORTS AND SEISMIC
RESTRAINTS TO ADEQUATELY SUPPORT THE LOAD AS
REQUIRED BY LOCAL BUILDING CODES.
6. CONTRACTOR SHALL LEAVE THE EMERGENCY ROOM AND
PHARMACY'S LOCAL PAGING SYSTEMS INTACT AND ADD
THE NEW HOSPITAL WIDE PA SYSTEM SPEAKERS TO
THESE AREAS.
7. CONTRACTOR SHALL MAINTAIN THE EXISTING PA SYSTEM
DURING THE INSTALLATION OF THE NEW PA SYSTEM.
8.
9.
3 (TYP)
3 INSTALL OUTDOOR PUBLIC ADDRESS PAGING
SPEAKER. PROVIDE WEATHER PROOF OR WEATHER
RESISTANT OUT DOOR SPEAKERS
2ND FLOOR SOUTH IS THE INPUT PSYCHIATRIC UNIT.
ADDITIONAL SECURITY WHILE WORKING IN THIS AREA IS
REQUIRED. CONTRACTOR TO CHECK IN AND OUT WITH 2S
NURSING STAFF. ALL TOOLS AND EQUIPMENT WILL
REQUIRE AN ESCORT TO ENSURE THE SECURITY OF THE
TOOLS AND EQUIPMENT. ALL FASTENERS USED IN THIS
AREA WILL BE TAMPER PROOF.
4 (TYP)
4 AREAS ABOVE CEILING TILES CONTAINS ASBESTOS.
CONTRACTOR WILL ENSURE TO USE METHODS TO
CONTAIN ASBESTOS IN ACCORDANCE WITH
SPECIFICATIONS.
CONTRACTOR SHALL DEMO THE EXISTING PA SYSTEM AND
ASSOCIATED CABLE, CONDUITS, AND BACK BOXES ONCE
THE NEW PA SYSTEM IS COMPLETE.
ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS
FACILITY AND IN THE ABOVE CEILING SPACES. THE
CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY
TO PROTECT PERSONS FROM EXPOSURE. THESE
SAFEGUARDS WILL INCLUDE:
1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN
THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS
CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40
HOUR ASBESTOS TRAINING CLASS, AS APPROVED BY THE
VA, WITH CERTIFICATION.
2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND
WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT
(PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS
PRIOR TO ENTRY INTO ABOVE CEILING SPACES.
3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES,
CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT,
A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.
4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF
CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS
OR OTHER DISTURBANCE OF CELING OR WALL MATERIALS
SHALL BE PERFORMED WITH PROPER BARRICADES
INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH
PROTECTIVE BARRICADES SHALL BE PROVIDED BY THE
CONTRACTOR.
THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS
SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY,
PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR
EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY
FORM AT THE PROJECT SITE. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR JOB SITE SAFETY WHICH INCLUDES ALL
TRAINING AND SAFEGUARDS NECESSARY TO PROTECT
HIS/HER EMPLOYEES, VA PERSONNEL VISITORS AT THE SITE
W/D W/DW/D
234 SF
OFFICE
2227 (R)
116 SF
OFFICE
2227B (R)
SALLYPORT
VESTIBULE
SP
SP SP
SP
SPSP
SP
SP
SPSP
SP
SP SP
SP
SP SP
SP
SP
SP
SP
SP
SP
SP
SP
SP SP
KEY PLAN
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant: K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
Lo ca l F ile s\
VA
SD
_R ep la ce N ur se
C al l M
AT
V
PA
_V
_j am es .h ec k.
rv t
9/
/2
2:
:0
PM
G. PROFUMOD. LEPAGE
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
NAUTILUS ENTERTAINMENT GROUP
1010 TURQUOISE ST #215
SAN DIEGO CA, 92123
858-456-6395
DANIEL LEPAGE
664-18-331
02/02/2024
100% SUBMITTAL
SAN DIEGO, CA
Revisions: Date:
1/16" = 1'-0"TI109
1 LEVEL 2 - SOUTH FLOOR - DEMO PLAN
NORTH
SHEET NOTES
LEVEL 2 - SOUTH FLOOR - DEMO PLAN
TI109
GENERAL NOTES
1 REMOVE ALL EXISTING PAGING SYSTEM SPEAKERS
1 (TYP)
2 (TYP)
2 AREAS ABOVE CEILING TILES CONTAINS ASBESTOS.
CONTRACTOR WILL ENSURE TO USE METHODS TO
CONTAIN ASBESTOS IN ACCORDANCE WITH
SPECIFICATIONS.
2. CONTRACTOR SHALL HANDLE, REMOVE AND DISPOSE OF
ALL DEMOLISHED MATERIALS FROM SITE PER THE
LATEST FEDERAL, STATE AND LOCAL REGULATIONS
UNLESS OTHERWISE NOTED.
3. CONTRACTOR SHALL SUBMIT A DEMOLITION WORK PLAN
TO THE VAMC FOR APPROVAL PRIOR TO COMMENCING
DEMOLITION WORK. CONTRACTOR SHALL INCLUDE ALL
APPLICABLE SAFETY DATA SHEETS (SDS’s) IN HIS
DEMOLITION WORK PLAN.
4. CONTRACTOR SHALL DEMO ALL PAGING SPEAKER
BRACING AND SHOT WIRES ASSOCIATED WITH DEMO'D
EQUIPMENT AND REPAIR ALL DAMAGE TO SUSPENDED AND
HARD LID CEILINGS FROM DEMO'D PAGING SPEAKERS.
1. ALL PAGING SYSTEM CABLING, CONDUITS, AND BACK
BOXES SHALL BE DEMOLISHED. NEW CABLING, CONDUITS
AND BACK BOXES SHALL BE PROVIDED FOR THE NEW
PAGING SYSTEM, UNLESS OTHERWISE NOTED.
5. CONTRACTOR SHALL LEAVE THE EMERGENCY ROOM AND
PHARMACY'S LOCAL PAGING SYSTEMS INTACT AND ADD
THE NEW HOSPITAL WIDE PA SYSTEM SPEAKERS TO
THESE AREAS.
6. CONTRACTOR SHALL MAINTAIN THE EXISTING PA SYSTEM
DURING THE INSTALLATION OF THE NEW PA SYSTEM.
7. CONTRACTOR SHALL DEMO THE EXISTING PA SYSTEM AND
ASSOCIATED CABLE, CONDUITS, AND BACK BOXES ONCE
THE NEW PA SYSTEM IS COMPLETE.
8. 2ND FLOOR SOUTH IS THE INPUT PSYCHIATRIC UNIT.
ADDITIONAL SECURITY WHILE WORKING IN THIS AREA IS
REQUIRED. CONTRACTOR TO CHECK IN AND OUT WITH 2S
NURSING STAFF. ALL TOOLS AND EQUIPMENT WILL
REQUIRE AN ESCORT TO ENSURE THE SECURITY OF THE
TOOLS AND EQUIPMENT. ALL FASTENERS USED IN THIS
AREA WILL BE TAMPER PROOF.
ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS
FACILITY AND IN THE ABOVE CEILING SPACES. THE
CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY
TO PROTECT PERSONS FROM EXPOSURE. THESE
SAFEGUARDS WILL INCLUDE:
1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN
THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS
CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40
HOUR ASBESTOS TRAINING CLASS, AS APPROVED BY THE
VA, WITH CERTIFICATION.
2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND
WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT
(PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS
PRIOR TO ENTRY INTO ABOVE CEILING SPACES.
3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES,
CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT,
A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.
4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF
CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS
OR OTHER DISTURBANCE OF CELING OR WALL MATERIALS
SHALL BE PERFORMED WITH PROPER BARRICADES
INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH
PROTECTIVE BARRICADES SHALL BE PROVIDED BY THE
CONTRACTOR.
THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS
SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY,
PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR
EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY
FORM AT THE PROJECT SITE. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR JOB SITE SAFETY WHICH INCLUDES ALL
TRAINING AND SAFEGUARDS NECESSARY TO PROTECT
HIS/HER EMPLOYEES, VA PERSONNEL VISITORS AT THE SITE
W/D W/DW/D
234 SF
OFFICE
2227 (R)
116 SF
OFFICE
2227B (R)
SALLYPORT
VESTIBULE
SPSPSP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP SP
SP
SPSP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP SP
SP
SP
SP
SP
SP
SPSP
SP AM
SP
AM
SP AM
SP
AM
SP
AM
SM SM
SM
KEY PLAN
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant: K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
Lo ca l F ile s\
VA
SD
_R ep la ce N ur se
C al l M
AT
V
PA
_V
_j am es .h ec k.
rv t
9/
/2
2:
:0
PM
G. PROFUMOD. LEPAGE
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
NAUTILUS ENTERTAINMENT GROUP
1010 TURQUOISE ST #215
SAN DIEGO CA, 92123
858-456-6395
DANIEL LEPAGE
664-18-331
02/02/2024
100% SUBMITTAL
SAN DIEGO, CA
Revisions: Date:
1/16" = 1'-0"TI110
1 LEVEL 2 - SOUTH FLOOR PLAN
NORTH
SHEET NOTES
LEVEL 2 - SOUTH FLOOR PLAN
TI110
GENERAL NOTES
1 INSTALL PUBLIC ADDRESS PAGING SPEAKER
1 (TYP)
2 INSTALL AMBIENT NOISE MICROPHONE
2 (TYP)
1. CABLING:
A) ALL AUDIO CABLING IS TO BE CONTINUOUS,
UNSPLICED, AND INSTALLED SEPARATELY
FROM ALL POWER LINES.
G) ALL CABLE TO BE LABELED AT BOTH ENDS.
H) USE STRIP TERMINAL BLOCKS MOUNTED IN THE
EQUIPMENT RACK.
I) CABLES WITHIN RACKS SHALL BE BUNDLED
AND LACED NEATLY TO SUPPORT MEMBERS
WITH A SERVICE LOOP LARGE ENOUGH TO
MAINTAIN CONVENIENT ACCESS TO ALL
EQUIPMENT CONNECTIONS.
J) AC POWER TO THE POWER STRIPS IN THE
RACK SHALL BE RUN IN EMT CONDUIT.
K) AC OUTLETS WITHIN THE RACK SHALL BE
GROUNDED TO EARTH.
2.