Attachment D - Drawings (DEMO).pdf
PDF 5 MB Posted
- Attached to
- Replace Hospital Nurse Call, MATV, & Public Address System Federal contract opportunity
- Solicitation number
- 36C26224B0002
About this file
This solicitation seeks proposals to replace the nurse call, MATV, and public address systems at the VA San Diego Healthcare System facilities in Buildings 1 and 11. The current systems are antiquated and failing, preventing timely emergency notifications and patient responses. The selected contractor will furnish all labor, materials, equipment, supervision, and transportation to demolish existing systems and install new nurse call, MATV, and public address systems. The contractor must select qualified manufacturers for VA approval and provide a complete, functional system for each. Work will be performed at the 3350 La Jolla Village Drive campus in a functioning hospital environment. The contractor is responsible for all required permits, scheduling utility outages in advance, and complying with safety requirements for working in occupied areas with asbestos materials. Proposals are due by the date specified in the solicitation issued by the VA Veterans Health Administration VISN 22.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Award Notice (Contract 36C26224C0180).pdf | ||
| Amendment 0003 (SF30) - Solicitation 36C26224B0002.pdf | ||
| RFI Notice - Solicitation 36C26224B0002.pdf | ||
| Attachment H - Specification Section 01 35 26 - Safety Requirements.pdf | ||
| Attachment I - Hazardous Materials Survey.pdf | ||
| Amendment 0002 (SF30) - Solicitation 36C26224B0002.pdf | ||
| Amendment 0001 (SF30) - Solicitation 36C26224B0002.pdf | ||
| Pre-Bid Site Visit Sign-In Sheet (36C26224B0002).pdf | ||
| Attachment E - Drawings (ELECT).pdf | ||
| Attachment F - Drawings (PA).pdf | ||
| Attachment G - Wage Determination (CA20240001).pdf | ||
| Solicitation (SF 1442) - 36C26224B0002.pdf | ||
| Attachment A - Statement of Work (SOW).pdf | ||
| Attachment B - Specifications.pdf | ||
| Attachment C - Drawings (ARCH).pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
PROJECT NO. : 664-18-331
VETERANS AFFAIRS
SAN DIEGO HEALTHCARE SYSTEM
3350 LA JOLLA VILLAGE DRIVE, SAN DIEGO, CA 92161
COVER SHEET
P4 P6P5
P2P1
S1 S2
P3
S4S3
P4 P6P5
P2P1
S1 S2
P3
S4S3
VENDING
CART
F.S.
FREEZER
REFRIG
FOOD
DISPLAY
DN.
DN.
DN.
F.S.
ON
LY
VA
LE
T
PA
RK
SE
LF
ONLY
EXIT
15'
MOTORCYCLE
PARKING
R=25
R 'R=
R=
R=
R=
15'
R=50
DO NOT
ONE WAY
ENTER
DO NOT
ONE WAY
ENTER
ONE WAY
DO NOT
ENTER
DO NOT
ONE WAY
ENTER
S T O P
S T O P
DO NOT ONE WAY
ENTER
STOP
S T O P
S
TO
P
S
TO
P
S T O P
ONE WAY
S T O P
S T O P
S T O P
STOP
S
TO
P
S
TO
P
S T O P
STOP STOP
S
TO
P
STOP
S T O P
STOPSTOP
STOP
PARKING LOT - E1
ST
OP
S
TO
P
YIELD
S
TO
P
O N E
W A Y
PARKING LOT - E
STOP
O N E
W A Y
S
TO
P
S
TO
P
S
TO
P
STOP
STO
P
STO
P
O N
LY
STOP
PARKING
GARAGE
PHASE 1 PARKING
GARAGE
PHASE 2
PARKING
GARAGE
PHASE 3
BLDG. 27
(PAD)
(DESIGN)
(BID)
sf x8 x8 x8 sf sf
12x80 960sf
960sf 12x80
960sf 12x80 x8 sf sf x8 x8 sf x8 sf
V ill a La J ol la
Pedestrian Bridge
Length =Bearing =
South Road
TUNNEL
North Road
Gilman Drive
STOP
TUNNEL TUNNEL
E a st
R o a d
COURTYARD
M
BUILDING 1 BUILDING 11
GI001
A. SHRESTHA
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
664-18-331
SAN DIEGO, CA
COVER SHEET
SCALE: NONEGI001
3 SITE MAP
NORTH
SCALE: NONEGI001
2 VICINITY MAP
NORTH
SCALE: NONEGI001
1 LOCATION MAP
NORTH
ARCHITECTURAL
TI101 BASEMENT FLOOR - DEMO PLAN
TI102 BASEMENT FLOOR PLAN
TI103 LEVEL 1 - NORTH FLOOR - DEMO PLAN
TI104 LEVEL 1 - NORTH FLOOR PLAN
TI105 LEVEL 1 - SOUTH FLOOR - DEMO PLAN
TI106 LEVEL 1 - SOUTH FLOOR PLAN
TI107 LEVEL 2 - NORTH FLOOR - DEMO PLAN
TI108 LEVEL 2 - NORTH FLOOR PLAN
TI109 LEVEL 2 - SOUTH FLOOR - DEMO PLAN
TI110 LEVEL 2 - SOUTH FLOOR PLAN
TI111 LEVEL 3 - NORTH FLOOR - DEMO PLAN
TI112 LEVEL 3 - NORTH FLOOR PLAN
TI113 LEVEL 3 - SOUTH FLOOR - DEMO PLAN
TI114 LEVEL 3 - SOUTH FLOOR PLAN
TI115 LEVEL 4 - NORTH FLOOR - DEMO PLAN
TI116 LEVEL 4 - NORTH FLOOR PLAN
TI117 LEVEL 4 - SOUTH FLOOR - DEMO PLAN
TI118 LEVEL 4 - SOUTH FLOOR PLAN
TI119 LEVEL 5 - NORTH FLOOR - DEMO PLAN
TI120 LEVEL 5 - NORTH FLOOR PLAN
TI121 LEVEL 5 - SOUTH FLOOR - DEMO PLAN
TI122 LEVEL 5 - SOUTH FLOOR PLAN
TI123 LEVEL 6 - NORTH FLOOR - DEMO PLAN
TI124 LEVEL 6 - NORTH FLOOR PLAN
TI125 LEVEL 6 - SOUTH FLOOR - DEMO PLAN
TI126 LEVEL 6 - SOUTH FLOOR PLAN
TI127 LEVEL 7 - FLOOR - DEMO PLAN
TI128 LEVEL 7 - FLOOR PLAN
TI129 BASEMENT FLOOR - DEMO PLAN
TI130 BASEMENT FLOOR PLAN
TI131 LEVEL 1 FLOOR - DEMO PLAN
TI132 LEVEL 1 FLOOR PLAN
TI133 LEVEL 2 FLOOR - DEMO PLAN
TI134 LEVEL 2 FLOOR PLAN
TI601 INFRASTRUCTURE AND POWER REQUIREMENTS
SINGLE LINETI701
SINGLE LINETI702
SINGLE LINETI703
SINGLE LINETI704
SINGLE LINETI705
SINGLE LINETI706
SINGLE LINETI707
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
T em p Fo ld er
\V
AS
D _R ep la ce N ur se
C al l M
AT
V
PA
_v
_r on
.b la yl oc k.
rv t
G. FERNANDEZ
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
664-18-331
SAN DIEGO, CA
Revisions: Date: 02/02/2024
100% SUBMITTAL
1 & 11
SHEET INDEX
Sheet Number Sheet Name
GENERAL
GI001 COVER SHEET
GI102 PROJECT GENERAL NOTES
SHEET INDEX
Sheet Number Sheet Name Sheet Number Sheet Name
SHEET INDEX (CONT.)
Sheet Number Sheet Name
TELECOMMUNICATIONS
ELECTRICAL
E001 ELECTRICAL GENERAL NOTES, LEGEND, SYMBOLS
AND ABBREVIATIONS
EY101 BUILDING 1 - FIRST FLOOR NURSE CALL PLAN
EY102 BUILDING 1 - THIRD FLOOR NURSE CALL PLAN
EY103 BUILDING 1 - FOURTH FLOOR NURSE CALL PLAN
ET101 BUILDING 1 - BASEMENT MATV PLAN
ET102 BUILDING 1 - FIRST FLOOR MATV PLAN
ET103 BUILDING 1 - SECOND FLOOR MATV PLAN
ET104 BUILDING 1 - THIRD FLOOR MATV PLAN
ET105 BUILDING 1 - FOURTH FLOOR MATV PLAN
ET106 BUILDING 1 - FIFTH FLOOR MATV PLAN
ET107 BUILDING 1 - SIXTH FLOOR MATV PLAN
ET108 BUILDING 1 - SEVENTH FLOOR MATV PLAN
ET200 MATV RISER DIAGRAM
ET101A BUILDING 1 - BASEMENT INTERSTITIAL PLAN
ET102A BUILDING 1 - FIRST FLOOR INTERSTITIAL PLAN
ET103A BUILDING 1 - SECOND FLOOR INTERSTITIAL PLAN
ET104A BUILDING 1 - THIRD FLOOR INTERSTITIAL PLAN
ET105A BUILDING 1 - FOURTH FLOOR INTERSTITIAL PLAN
ET106A BUILDING 1 - FIFTH FLOOR INTERSTITIAL PLAN
ET107A BUILDING 1 - SIXTH FLOOR INTERSTITIAL PLAN
GENERAL NOTES, LEGEND, AND
ABBREVIATIONS
A001
AD101 ARCHITECTURAL BASEMENT FLOOR - DEMO PLAN
AD102 ARCHITECTURAL LEVEL 1 - NORTH FLOOR - DEMO PLAN
AD103 ARCHITECTURAL LEVEL 1 - SOUTH FLOOR - DEMO PLAN
AD104 ARCHITECTURALLEVEL 2 - NORTH FLOOR - DEMO PLAN
AD105 ARCHITECTURAL LEVEL 2 - SOUTH FLOOR - DEMO PLAN
AD106 ARCHITECTURAL LEVEL 3 - NORTH FLOOR - DEMO PLAN
AD107 ARCHITECTURAL LEVEL 3 - SOUTH FLOOR - DEMO PLAN
AD108 ARCHITECTURAL LEVEL 4 - NORTH FLOOR - DEMO PLAN
AD109 ARCHITECTURAL LEVEL 4 - SOUTH FLOOR - DEMO PLAN
AD110 ARCHITECTURAL LEVEL 5 - NORTH FLOOR - DEMO PLAN
AD111 ARCHITECTURAL LEVEL 5 - SOUTH FLOOR - DEMO PLAN
AD112 ARCHITECTURAL LEVEL 6 - NORTH FLOOR - DEMO PLAN
AD113 ARCHITECTURAL LEVEL 6 - SOUTH FLOOR - DEMO PLAN
AD114 ARCHITECTURAL LEVEL 7 - FLOOR - DEMO PLAN
AD115 ARCHITECTURAL BASEMENT FLOOR - DEMO PLAN
AD116 ARCHITECTURAL LEVEL 1 FLOOR - DEMO PLAN
AD117 ARCHITECTURAL LEVEL 2 FLOOR - DEMO PLAN
AE101 ARCHITECTURAL BASEMENT FLOOR PLAN
AE102 ARCHITECTURAL LEVEL 1 - NORTH FLOOR PLAN
AE103 ARCHITECTURAL LEVEL 1 - SOUTH FLOOR PLAN
AE104 ARCHITECTURAL LEVEL 2 - NORTH FLOOR PLAN
AE105 ARCHITECTURAL LEVEL 2 - SOUTH FLOOR PLAN
AE106 ARCHITECTURAL LEVEL 3 - NORTH FLOOR PLAN
AE107 ARCHITECTURAL LEVEL 3 - SOUTH FLOOR PLAN
AE108 ARCHITECTURAL LEVEL 4 - NORTH FLOOR PLAN
AE109 ARCHITECTURAL LEVEL 4 - SOUTH FLOOR PLAN
AE110 ARCHITECTURAL LEVEL 5 - NORTH FLOOR PLAN
AE111 ARCHITECTURAL LEVEL 5 - SOUTH FLOOR PLAN
AE112 ARCHITECTURAL LEVEL 6 - NORTH FLOOR PLAN
AE113 ARCHITECTURAL LEVEL 6 - SOUTH FLOOR PLAN
AE114 ARCHITECTURAL LEVEL 7 - FLOOR PLAN
AE115 ARCHITECTURAL BASEMENT FLOOR PLAN
AE116 ARCHITECTURAL LEVEL 1 FLOOR PLAN
AE117 ARCHITECTURAL LEVEL 2 FLOOR PLAN
ST A T E O F CA L I F ORN I A
RE
G
IS
TE
RED PROFESS IONAL ENGINEERA U
GUST I NE K . L EUNG
E L E C T R I C A L
GENERAL NOTES
ABBREVIATIONS/DEFINITION
CO CONTRACTING OFFICER
COR CONTRACTING OFFICER'S (TECHNICAL) REPRESENTATIVE
OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION
GOVERNMENT THE TERM GOVERNMENT SHALL MEAN DEPARTMENT OF VETERANS AFFAIR
EXISTING HAZARDOUS MATERIALS
THE FOLLOWING CODES ARE USED FOR THE BASIS OF DESIGN FOR THIS PROJECT BUT ARE NOT LIMITED TO:
IBC: INTERNATIONAL BUILDING CODE 2021
NFPA 70: NATIONAL ELECTRICAL CODE 2020
NFPA 101: LIFE SAFETY CODE 101
NFPA 241: STANDARD FOR SAFEGUARDING CONSTRUCTION 2019
NOTE: THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING AND USING THE MOST CURRENT APPLICABLE CODE EDITION.
THE CONTRACTOR IS TO PERFORM THE WORK AS SHOWN IN THE CONTRACT DOCUMENTS INCLUDING ALL CODES
ASSOCIATED WITH THIS SCOPE OF WORK.
CODE REFERENCES
1. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY APPROVALS AND PERMITS REQUIRED FROM REGULATING AGENCIES BEFORE STARTING ANY WORK INCLUDING AN AIR QUALITY REQUIRED FORM PERMIT.
2. SUBJECT TO MINOR EXCEPTIONS, GENERALLY THE ITEMS SHOWN IN BOLD LINES ARE NEW AND ITEMS SHOWN IN
GRAYSCALE ARE EXISTING.
3. THE WORK ON THESE DRAWINGS IS GENERALLY DIAGRAMMATIC AND IS INTENDED TO CONVEY THE SCOPE OF WORK, INDICATE THE GENERAL ARRANGEMENT OF EQUIPMENT AND FINAL LAYOUT. THE DRAWINGS ARE GENERIC IN NATURE AND ARE INTENDED TO BE SUPPORTED BY SPECIFIC MANUFACTURER AND/OR FABRICATORS SHOP DRAWINGS AND SIMILAR
DETAILS TO DETERMINE EXACT SPACING AND/OR INSTALLATION REQUIREMENTS.
4. IF ANY PART OF THE DRAWINGS OR SPECIFICATIONS CONTRADICT THE MANUFACTURER'S RECOMMENDATIONS, APPLICATION OR INSTALLATION INSTRUCTIONS, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK, ADVISE THE
CONTRACTING OFFICER AND RECEIVE CLEAR, WRITTEN, DIRECTION BEFORE PROCEEDING.
5. DO NOT SCALE THE DRAWINGS. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DIMENSIONS. IF ANY DISCREPANCIES OR OMISSIONS IN THE DIMENSIONS ARE DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IMMEDIATELY. ANY WORK DONE WITHOUT PROPER NOTIFICATION BEING GIVEN TO THE
CONTRACTING OFFICER IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.
6. PRIOR TO DEMOLITION, CONTRACTOR SHALL VERIFY ALL DIMENSIONS, EXISTING CONDITIONS AND LOCATION OF NEW CONSTRUCTION WITH EXISTING WALLS, FLOORS, CEILINGS, COLUMNS, FURRING, MECHANICAL AND ELECTRICAL
EQUIPMENT AND EXISTING CONSTRUCTION.
7. FIELD INVESTIGATION PERFORMED DURING THE DESIGN STAGE IS LIMITED TO WHAT CAN BE REASONABLY SEEN AND DOCUMENTED WHILE THE SPACE IS OPERATIONAL AND OCCUPIED BY PERSONNEL, EQUIPMENT AND FURNITURE. AS SUCH, THE CONTRACTOR IS RESPONSIBLE FOR PERFORMING A THOROUGH REVIEW AND VALIDATING ALL FIELD CONDITIONS PRIOR TO COMMENCEMENT OF WORK. THE CONTRACTOR SHALL REPORT ANY PROBLEMS/CONFLICTS TO THE CONTRACTING OFFICER WITHIN TWO (2) DAYS OF DISCOVERY. ANY CHANGES RESULTING FROM CONDITIONS ARISING IN THE FIELD WHICH ARE NOT BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER ARE TO BE MADE BY THE
CONTRACTOR AT NO ADDITIONAL COST TO GOVERNMENT.
8. DRAWINGS SHOWN ARE SCHEMATIC ONLY. THE CONTRACTOR SHALL FIELD VERIFY SITE CONDITIONS AND ENSURE SHOP DRAWINGS ARE PROVIDED BEFORE DETAILING COMPLETE UTILITY LAYOUT AND INSTALLATION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ROUTE NEW CONDUITS, DUCTS, PIPING AND SIMILAR LINES TO AVOID POTENTIAL INTERFERENCES, AND WHERE THIS CANNOT BE ACCOMPLISHED, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REMOVE, REROUTE, ADJUST REINSTALL THE INTERFERENCE SUCH THAT IT NO LONGER POSES A PROBLEM. THESE ITEMS
ARE TO BE ADDRESSED AND CORRECTED AT NO ADDITIONAL COST TO THE GOVERNMENT.
9. CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES TO AVOID POTENTIAL CONFLICTS.
10. FINAL LOCATION OF MECHANICAL AND ELECTRICAL EQUIPMENT SUCH AS PANELBOARD, METERS, FLUES, VENTS, ETC., SHALL BE APPROVED BY THE GOVERNMENT.
11. EACH SUBCONTRACTOR IS CONSIDERED TO BE A SPECIALIST IN HIS RESPECTIVE FIELD AND SHALL, PRIOR TO SUBMISSION OF BID OR PERFORMANCE OF WORK, NOTIFY THE CONTRACTOR AND THE CONTRACTING OFFICER, IN WRITING, OF ANY WORK CALLED FOR IN THE DRAWINGS OR SPECIFICATIONS THAT CANNOT BE FULLY GUARANTEED.
12. THE CONTRACTOR WARRANTS ALL WORK TO BE PERFORMED AND ALL MATERIALS TO BE FURNISHED UNDER THIS CONTRACT AGAINST DEFECTS IN WORKMANSHIP FOR A PERIOD OF NOT LESS THAN 1 YEAR FROM THE DATE OF FINAL ACCEPTANCE. UPON WRITTEN NOTICE OF ANY DEFECT IN MATERIALS OR WORKMANSHIP, THE CONTRACTOR SHALL, AT THE OPTION OF THE GOVERNMENT, REPAIR OR REPLACE SAID DEFECT WITHOUT COST TO THE GOVERNMENT.
13. ALL MATERIALS SHALL CONFORM TO THE "BUY AMERICAN ACT".
14. ALL CONSTRUCTION WORK, ARCHITECTURAL, MECHANICAL, ELECTRICAL, FIRE PROTECTION, ETC. SHALL CONFORM TO THE MOST CURRENT ISSUE OF THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), THE INTERNATIONAL BUILDING CODE, VA CRITERIA AND ANY APPLICABLE LOCAL, STATE AND FEDERAL CODES AND GUIDELINES. SHOULD THE REQUIREMENTS OF THE INTERNATIONAL BUILDING CODE CONFLICT WITH THE REQUIREMENTS OF THE NATIONAL FIRE PROTECTION
ASSOCIATION (NFPA), THEN THE MORE STRINGENT BETWEEN THE TWO SHALL GOVERN.
15. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR WORKING CONDITIONS AT THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND SHALL NOT BE LIMITED TO WORK HOURS. CONTRACTOR SHALL CONFORM TO ALL SAFETY REGULATIONS ENFORCED AT THE TIME OF CONSTRUCTION. JOB SITE SAFETY IS STRICTLY THE RESPONSIBILITY OF THE CONTRACTOR, AND NOT THE
ARCHITECT/ENGINEER OR THE GOVERNMENT.
16. THE CONTRACTOR SHALL PROVIDE U.L. RATED PORTABLE FIRE EXTINGUISHERS, TYPE 24.10.B.C ON SITE AND IN A LOCATION
APPROVED BY THE GOVERNMENT.
17. THE CONTRACTOR SHALL MAINTAIN THE CONSTRUCTION AREA AND ALL ADJACENT AFFECTED AREAS, IN A CLEAN AND ORDERLY MANNER THROUGHOUT THE COURSE OF CONSTRUCTION. DO NOT BLOCK ENTRANCES, EXITS, LOBBIES, CORRIDORS, ETC.
18. THE CONTRACTOR SHALL REMOVE ALL DEBRIS ON A DAILY BASIS IN ACCORDANCE WITH VA AND EPA REGULATIONS.
DEBRIS SHALL BE TRANSPORTED ON COVERED CARTS TO THE APPROVED DISPOSAL AREA AS DIRECTED BY THE CONTRACTING OFFICER. THE CONSTRUCTION AREA, AND ALL ADJACENT AREAS, SHALL BE CLEAN AND FREE OF DEBRIS AT
THE END OF EACH DAY.
19. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ALL LEFT-OVER MATERIALS, DEBRIS, TOOLS AND EQUIPMENT INVOLVED IN HIS OPERATIONS AT THE CONCLUSION OF THE PROJECT. ALL PROJECT AREAS AND SURROUNDING AREAS
AFFECTED BY CONSTRUCTION SHALL BE LEFT CLEAN AND IN PERFECT CONDITION.
20. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES TO ENSURE THAT ALL PROPERTIES, EQUIPMENT AND DEVICES AT THE PROJECT SITE ARE PROTECTED DURING THE CONSTRUCTION PERIOD. ANY DAMAGES TO EXISTING CONSTRUCTION, LANDSCAPING, EQUIPMENT AND DEVICES SHALL BE REPAIRED AND RESTORED TO A CONDITION EQUAL TO THAT EXISTING AT THE COMMENCEMENT OF THE WORK. THE CONTRACTOR SHALL RESTORE ANY DAMAGE AT HIS OWN EXPENSE. THE CONTRACTOR SHALL SUBMIT THE PROCEDURE FOR CONSTRUCTION AND DEMOLITION PRIOR TO
COMMENCING WORK.
21. ALL FINISH WORK, EITHER NEW OR EXISTING, WHICH IS DAMAGED OR STAINED AS A RESULT OF CONSTRUCTION ACTIVITIES, SHALL BE REPAIRED OR REPLACED AS NECESSARY AT NO ADDITIONAL COST TO GOVERNMENT.
22. ALL SURFACES SHALL BE SMOOTH, CONTINUOUSLY FREE OF IMPERFECTIONS AND IN PROPER CONDITION TO RECEIVE THE FINISH AS SPECIFIED. IN AREAS WHERE A FINISH IS NOT SPECIFIED, THEY SHALL MATCH ADJACENT MATERIAL IN
CONSTRUCTION, COLOR, TEXTURE AND MANUFACTURER.
23. WORK SHALL NOT BE PERFORMED WHEN WEATHER CONDITIONS MAY CREATE HAZARDOUS WORKING CONDITIONS OR
LEAD TO FAILURE IN WORKMANSHIP.
24. ANY ROOF, WALL OR OTHER OPENINGS MADE DURING CONSTRUCTION SHALL BE SEALED AND PROTECTED FROM RAIN, MOISTURE, WIND, DUST AND OTHER OUTSIDE ELEMENTS.
25. AN APPROPRIATELY QUALIFIED REPRESENTATIVE OF THE CONTRACTOR SHALL BE ON SITE TO SUPERVISE AND COORDINATE CONSTRUCTION AT ALL TIMES WHILE WORK IS IN PROGRESS. SUCH PERSON SHALL BE RESPONSIBLE FOR OSHA COMPLIANCE AND JOB SITE SAFETY. JOB SITE SAFETY IS STRICTLY THE SOLE RESPONSIBILITY OF THE CONTRACTOR. THE GOVERNMENT, ARCHITECTS AND ENGINEERS ARE NOT RESPONSIBLE FOR ANY ASPECT OF JOB SITE
SAFETY.
26. QUALITY CONTROL, INSPECTIONS AND WORKMANSHIP IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. ANY OBSERVATIONS MADE BY THE GOVERNMENT OR ARCHITECT/ENGINEER DURING THE COURSE OF CONSTRUCTION ARE FOR THE BENEFIT OF THE GOVERNMENT AND DO NOT ALLEVIATE THE CONTRACTOR OF THIS RESPONSIBILITY.
27. THE CONTRACTOR SHALL NOT STORE ANY CHEMICALS ON THE SITE OR WITHIN THE CONFINES OF THE BUILDING
28. IF THE CONTRACTOR ENCOUNTERS ANY UNKNOWN SUBSTANCE OR MATERIAL THAT MAY BE SUSPECTED HAZARDOUS, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK AND NOTIFY THE CONTRACTING OFFICER. ASBESTOS CONTAINING
MATERIALS ARE NOT PERMITTED.
29. ASBESTOS CONTAINING MATERIALS ARE NOT PERMITTED.
30. CONTRACTOR SHALL MAINTAIN AND KEEP THE EXISTING FIRE ACCESS LANE AND PEDESTRIAN ACCESS AND EXIT PATHS
CLEAR AT ALL TIMES.
31. SOME WORK MAY BE REQUIRED AFTER NORMAL WORKING HOURS, ON HOLIDAYS AND/OR WEEKENDS. THIS INCLUDES ANY WORK WHICH COULD POTENTIALLY BLOCK ACCESS TO THE FACILITY OR CAUSE DISRUPTION TO THE NORMAL OPERATIONS OF THE MEDICAL CENTER. THE WORK WILL HAVE TO BE CAREFULLY PLANNED AND PHASED FOR MINIMAL DISRUPTION TO MEDICAL CENTER ACTIVITIES. ANY WORK AFTER HOURS MUST BE CAREFULLY COORDINATED WITH, AND APPROVED BY THE GOVERNMENT, A MINIMUM OF TWO WEEKS IN ADVANCE.
32.
THE
33. UNDER NO CIRCUMSTANCES CAN THERE BE UTILITY OUTAGES, INCLUDING BRIEF CUTOVERS, ANYWHERE ON THE CAMPUS WITHOUT THE EXPRESS WRITTEN CONSENT OF THE GOVERNMENT. THE CONTRACTOR SHALL PLAN AND FORECAST UPCOMING WORK WHICH MAY DISRUPT NORMAL OPERATIONS OR INTERFERE WITH STAFF OR PATIENTS AND IDENTIFY THESE IN THE PHASING PLAN, AS WELL AS REPORT THESE IN THE WEEKLY MEETINGS. IT MAY BE NECESSARY TO POSTPONE OR RESCHEDULE WORK TO ACCOMMODATE THE NEEDS OF THE MEDICAL CENTER. ALL SUCH TIME SHALL BE INCLUDED IN THE BASE BID AND WILL NOT BE BILLABLE TO THE GOVERNMENT.
34. CONTRACTOR SHALL SUBMIT TO THE GOVERNMENT, FOR APPROVAL, THE LOCATION FOR LOADING AND UNLOADING MATERIALS. CONTRACTOR IS ADVISED THAT THERE WILL BE TIME RESTRICTIONS ASSOCIATED WITH SUCH ACTIVITIES
AND SHALL TAKE THIS INTO CONSIDERATION WHEN PREPARING THE PHASING PLAN.
35. CONTRACTOR SHALL PROVIDE SEISMIC ANCHORING AND/OR BRACING OF ALL CONSTRUCTION, WHETHER OR NOT SPECIFICALLY STATED ON THE DRAWINGS OR SPECIFICATIONS, INCLUDING BUT NOT LIMITED TO, WALLS, PARTITIONS, CASEWORK, FIXTURES, CEILING SUSPENDED ITEMS, OVERHEAD DUCTWORK, EQUIPMENT, PLUMBING AND ELECTRICAL PIPES AND RACEWAYS, AND FIRE PROTECTION SYSTEMS PER SPECIFICATION SECTION 130541 AND AS SHOWN ON THE
PLANS AND/OR SPECIFIED BY EACH RESPECTIVE DISCIPLINE.
36. WHERE EXTERIOR WORK OCCURS, THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTING A WATERTIGHT FACILITY USING THE MEANS AND METHODS ESTABLISHED BY THE NATIONAL FENESTRATION RATING COUNCIL (NFRC), THE NATIONAL ROOFING CONTRACTOR'S ASSOCIATION, WESTERN STATES ROOFING CONTRACTOR'S ASSOCIATION AND ANY ADDITIONAL STANDARD PRACTICES, CODES AND REQUIREMENTS AS NECESSARY TO ENSURE A WATERTIGHT FACILITY FREE OF ANY LEAKS. ANY DETAILS PROVIDED HEREIN ARE PROVIDED FOR GENERAL GUIDANCE TO CONVEY THE INTENTION OF THE DESIGN, AND DOES NOT ALLEVIATE THE CONTRACTOR FROM THE RESPONSIBILITY TO PROVIDE A COMPLETELY WATERTIGHT FACILITY. THE CONTRACTOR SHALL PERFORM WATER TESTS TO DEMONSTRATE TO THE SATISFACTION OF THE CONTRACTING OFFICER THAT THE BUILDING DOES NOT LEAK. ANY DEFECTS OR LEAKS SHALL BE
IMMEDIATELY REPAIRED AT THE CONTRACTOR'S EXPENSE.
37. CONTRACTOR SHALL PROVIDE ALL SAFETY AND CAUTION SIGNAGE TO REDIRECT PEDESTRIAN TRAFFIC AND/OR ALERT THEM TO POTENTIAL CONSTRUCTION ACTIVITIES AND HAZARDS. SAFE AND ACCESSIBLE PEDESTRIAN ROUTES SHALL BE MAINTAINED AT ALL TIMES. PROVIDE SIGNAGE IN ACCORDANCE WITH OSHA STANDARD SPECIFICATION FOR ACCIDENT
PREVENTION SIGNS AND TAGS 1910.145.
38. FOR VA-PROVIDED EQUIPMENT TO BE INSTALLED BY THE CONTRACTOR (SHOWN AS "VC" ON THE PLANS OR SCHEDULES), CONTRACTOR SHALL DISCONNECT, REMOVE AND RELOCATE SUCH EQUIPMENT AND SHALL BE RESPONSIBLE FOR RE-CONNECTING AND TESTING PROPER OPERATION (PER MANUFACTURER'S INSTRUCTIONS) OF
SUCH EQUIPMENT PRIOR TO TURNING OVER SUCH EQUIPMENT TO THE VA.
39. FOR UTILITY INTERRUPTIONS OF LESS THAN 15 MINUTES IN DURATION, THE CONTRACTOR SHALL SUBMIT A REQUEST TO INTERRUPT ANY SUCH SERVICES TO COTR, IN WRITING, FIVE (5) WORKING DAYS IN ADVANCE OF PROPOSED INTERRUPTION. FOR UTILITY INTERRUPTIONS EXCEEDING 15 MINUTES IN DURATION, THE CONTRACTOR SHALL SUBMIT A REQUEST TO INTERRUPT ANY SUCH SERVICES TO COTR, IN WRITING, TEN (10) WORKING DAYS IN ADVANCE OF PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE, EXACT TIME OF, AND APPROXIMATE DURATION OF
SUCH INTERRUPTION.
40. CONSTRUCTION IS TAKING PLACE IN AN EXISTING OCCUPIED FACILITY. AS SUCH, DEMOLITION OR CONSTRUCTION THAT PRODUCES EXCESSIVE (60 DB OR GREATER) NOISE OR VIBRATION SHALL BE PERFORMED AT TIMES COORDINATED AND APPROVED BY THE COTR. CONTRACTOR IS ADVISED THAT WORK MAY BE STOPPED OR DELAYED AT ANY TIME AT THE DISCRETION OF THE COTR SHOULD CONSTRUCTION ACTIVITIES CAUSE ANY DISTURBANCE OR INTERFERENCE WITH
PATIENT CARE.
41. THE CEILING ACCESS PANELS SHOWN ON DRAWINGS ARE FOR MAJOR MECHANICAL EQUIPMENT ACCESS ONLY.
ADDITIONAL ACCESS PANELS (NOT SHOWN) WILL BE REQUIRED FOR MAINTENANCE, PLUMBING, ELECTRICAL AND FIRE PROTECTION. CONTRACTOR SHALL PROVIDE ADDITIONAL ACCESS PANELS REQUIRED FOR THE ABOVE SPECIALTIES AT NO ADDITIONAL COST TO THE GOVERNMENT. CONTRACTOR SHALL COORDINATE WITH EACH SPECIALTY TRADE AND LOCATE ADDITIONAL ACCESS PANELS FOR REVIEW AND APPROVAL BY THE VA PRIOR TO FRAMING THE CEILING.
42. SHORING, BRACING AND PROTECTION OF EXISTING STRUCTURE AND EARTHWORK IS THE CONTRACTORS RESPONSIBILITY. PROVIDE ADEQUATE SHORING OF ANY EXISTING CONDITIONS OR CONDITIONS CAUSED BY CONSTRUCTION RELATED ACTIVITIES, AS NECESSARY TO PROTECT PERSONS AND STRUCTURE FROM POTENTIAL FALLING STRUCTURE, EQUIPMENT OR COLLAPSE OF EARTHWORK. AS A MINIMUM, FOR ANY EARTHWORK RESULTING IN TRENCHES OR EXCAVATIONS EXCEEDING THREE FEET (3') IN DEPTH, THE CONTRACTOR SHALL RETAIN THE SERVICES
OF A LICENSED STRUCTURAL ENGINEER TO PROVIDE INSTRUCTIONS, FOR VA APPROVAL, ON THE METHODS TO BE USED FOR SHORING. ANY OVERHEAD STRUCTURE, EQUIPMENT OR SIMILARLY HEAVY CONDITION TO REMAIN, SHALL BE PROPERLY SHORED WITH INPUT FROM A LICENSED STRUCTURAL ENGINEER, AS REQUIRED, TO ENSURE THE PERSONAL
SAFETY AND PROTECTION OF REMAINING STRUCTURE.
43. PROVIDE TEMPORARY CONSTRUCTION BARRIERS AS NECESSARY TO SEPARATE DEMOLITION AREAS FROM ADJACENT OCCUPIED SPACES WHEN BARRIERS CROSS A REQUIRED EXIT PATH, PROVIDE EXIT DOORS WITHIN BARRIER WALL.
44. THESE DOCUMENTS ARE NOT INTENDED TO SHOW EVERY EXISTING CONDITION OR ITEM. CONTRACTOR SHALL NOTIFY VA OF MISCELLANEOUS ITEMS FOUND. COORDINATE WITH THE VA REGARDING THE DISPOSITION OF SUCH ITEMS, AND
HANDLE ACCORDINGLY AT NO COST TO THE GOVERNMENT.
45. NOTIFY VA OF MISCELLANEOUS ITEMS FOUND. COORDINATE WITH THE VA REGARDING THE DISPOSITION OF SUCH
ITEMS, AND HANDLE ACCORDINGLY AT NO COST TO THE GOVERNMENT.
46. ALL STRUCTURAL ELEMENTS INCLUDING THEIR FIRE PROTECTION MATERIALS ARE TO REMAIN EXCEPT WHERE FURRING
IS INDICATED TO BE REMOVED.
47. BEFORE LAYING OUT DUCTWORK, PIPING, CONDUITS, FIXTURES, REGISTERS AND/OR OTHER UTILITIES ABOVE CEILING, COORDINATE CEILING SUSPENSION SYSTEM SUPPORT LOCATIONS TO AVOID CONFLICTS WITH EXISTING OR NEW CONSTRUCTION. WHERE INTERFERENCE WITH CEILING SUPPORTS CANNOT BE AVOIDED, CONTRACTOR SHALL PROVIDE ALTERNATE CODE-COMPLIANT SUSPENSION SYSTEM AND LAYOUT AT NO EXTRA COST TO THE VA.
FIRE STOPPING
VAMC THE TERM VAMC SHALL MEAN DEPARTMENT OF VETERANS AFFAIR
CONTRACTOR SHALL PROVIDE FIRE STOPPING WHERE MISSING, DAMAGED, OR IMPACTED BY NEW CONSTRUCTION AND AS REQUIRED IN ACCORDANCE WITH SPECIFICATIONS. DRAWINGS TO HAVE ALL DETAILS OR UL NUMBERS FOR FIRE
STOPPING MEASURES
CONTRACTOR SHALL DEVELOP AND SUBMIT A DETAILED PHASING PLAN INDICATING THE SEQUENCE OF WORK, THE POTENTIAL UTILITY CUTOVERS OR OUTAGES, AND SPECIFICALLY LIST ANY POTENTIAL DISRUPTIONS TO THE NORMAL OPERATIONS OF THE MEDICAL CENTER. THIS PLAN SHALL BE SUBMITTED AND APPROVED PRIOR TO MOBILIZING ON
SITE. THE CONTRACTOR IS TO PROVIDE A WORK PLAN FOR ANY DISRUPTION.
THE DRAWINGS AND SPECIFICATIONS REPRESENT A PERFORMANCE BASED DESIGN OUTLINING THE INSTALLATION OF THREE SPECIALIZED SYSTEMS; A NURSE CALL SYSTEM, AN MATV SYSTEM AND A PUBLIC ADDRESS SYSTEM IN BUILDINGS 1 AND 11.
FOR THE NURSE CALL SYSTEM, THE WORK DESCRIBED IN THE DRAWINGS AND SPECIFICATIONS CALL FOR INSTALLATION OF A RAULAND RESPONDER 5 NURSE CALL CENTRAL MONITORING STATION AND DUTY STATION, OR APPROVED EQUAL IN BUILDING 1. THE CONTRACTOR SHALL INSTALL ALL REQUIRED WIRING, DATA CONNECTIONS, CONDUITS AND OTHER ASSOCIATED EQUIPMENT NECESSARY FOR A COMPLETE INSTALLATION. CONTRACTOR SHALL ALSO PROVIDE ALL SOFTWARE AND PROGRAMMING FOR INTERFACE WITH EXISTING NURSE CALL AND/OR COMPUTER SYSTEMS.
FOR THE MATV SYSTEM, THE WORK DESCRIBED IN THE DRAWINGS AND SPECIFICATIONS CALL FOR NEW CABLING AND CONDUITS FROM THE HEADEND EQUIPMENT ON THE 7TH FLOOR TO EACH CABLE TELEVISION THROUGHOUT BUILDING 1. NOTE, AS PART OF THIS WORK THE CONTRACTOR SHALL REMOVE ALL EXISTING MATV CABLING, SPLITTERS AND TAPS. IN SOME CASES, THESE DEVICES ARE LOCATED WITHIN EXISTING WALLS AND ARE NOT SHOWN ON THE
DRAWINGS.
FOR THE PUBLIC ADDRESS (PA) SYSTEM; THE WORK DESCRIBED IN THE DRAWINGS AND SPECIFICATIONS CALL FOR A NEW PUBLIC ADDRESS SYSTEM. THE CONTRACTOR SHALL SELECT, FOR VA APPROVAL, A QUALIFIED MANUFACTURER FOR EACH OF THE PROPOSED SYSTEMS AND INSTALL A COMPLETE AND FULLY OPERATIONAL SYSTEM WITH ALL NECESSARY COMPONENTS FOR THE PROPER FUNCTIONING OF THE SELECTED SYSTEM. NOTE, AS PART OF THIS WORK THE CONTRACTOR SHALL REMOVE ALL EXISTING PUBLIC ADDRESS SPEAKERS AND ASSOCIATED EQUIPMENT. ADDITIONAL WORK INCLUDES PATCHING AND REPAIRING ANY GYPSUM BOARD CEILINGS, AND REPLACEMENT OF CEILING TILES. THE NEW PUBLIC ADDRESS SYSTEM SHALL BE INSTALLED
IN BUILDING 1 AND BUILDING 11.
DEVICE LOCATIONS SHOWN ON THE DRAWINGS ARE APPROXIMATE ONLY AND ARE INTENDED ONLY TO CONVEY THE GENERAL SCOPE OF THE PROJECT.
PRIOR TO COMMENCEMENT OF ANY WORK, THE CONTRACTOR SHALL PERFORM A FIELD SURVEY TO LOCATE ALL EXISTING EQUIPMENT AND DEVICES. THIS
SURVEY SHALL BE DOCUMENTED AND PRESENTED TO THE VA BEFORE COMMENCING WORK.
ASBESTOS-CONTAINING MATERIALS (ACM'S) EXIST THROUGHOUT THE ABOVE CEILING SPACES. THE CONTRACTOR IS REQUIRED TO HAVE ALL PERSONNEL TRAINED AND CERTIFIED IN THE SAFE HANDLING OF ASBESTOS CONTAINING MATERIALS PRIOR TO COMMENCEMENT OF ANY WORK. PPE'S, INCLUDING THE USE OF RESPIRATORS, WILL APPLY FOR ALL ABOVE CEILING WORK AND ANY OTHER AREAS WHERE ASBESTOS CONTAINING MATERIALS ARE SUSPECTED.
ACOUSTIC TILE CEILINGS: DEMOLISH/REMOVE ENTIRE CEILING TILE AT LOCATIONS WHERE ITEMS SCHEDULED FOR REMOVAL OR REPLACEMENT, EXISTING
CEILING SUSPENSION SYSTEM TO REMAIN.
GYPSUM BOARD WALLS AND CEILINGS: WHERE ITEMS ARE SCHEDULED FOR REMOVAL OR REPLACEMENT, PREPARE WALL OR CEILING SURFACE FOR PATCHING AND REPAIR TO MATCH THE EXISTING ADJACENT WALL OR CEILING SURFACE FINISH AND PAINT FINISH.
REMOVE AND LEGALLY DISPOSE OF ALL ITEMS SCHEDULED FOR REMOVAL OR DEMOLITION. MATERIALS REMOVED SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF IN COMPLIANCE WITH APPLICABLE FEDERAL, STATE, OR LOCAL RULES AND REGULATIONS.
SCOPE OF WORK
ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS FACILITY AND IN THE ABOVE CEILING SPACES. THE CONTRACTOR SHALL TAKE EVERY PRECAUTION
NECESSARY TO PROTECT PERSONS FROM EXPOSURE. THESE SAFEGUARDS WILL INCLUDE:
1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING THE ABOVE CEILING SPACES AND/OR REMOVING ANY CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40 HOUR ASBESTOS TRAINING CLASS, AS
APPROVED BY THE VA, WITH CERTIFICATION.
2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING THE ABOVE CEILING SPACES AND/OR REMOVING ANY CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT (PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS PRIOR TO ENTRY INTO ABOVE CEILING
SPACES.
3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES, CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT, A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.
4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS OR OTHER DISTURBANCE OF CELING OR WALL
MATERIALS SHALL BE PERFORMED WITH PROPER BARRICADES INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH PROTECTIVE BARRICADES SHALL BE
PROVIDED BY THE CONTRACTOR.
THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY, PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY FORM AT THE PROJECT SITE. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR JOB SITE SAFETY WHICH INCLUDES ALL TRAINING AND SAFEGUARDS NECESSARY TO PROTECT HIS/HER EMPLOYEES, VA PERSONNEL VISITORS AT THE SITE OR ANY OTHER PERSONS.
GI102
PROJECT GENERAL NOTES
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
T em p Fo ld er
\V
AS
D _R ep la ce N ur se
C al l M
AT
V
PA
_v
_r on
.b la yl oc k.
rv t
G. FERNANDEZ
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
664-18-331
SAN DIEGO, CA
Revisions: Date: 02/02/2024
100% SUBMITTAL
A. SHRESTHA
S T A T E O F CA L I F ORN I A
RE
G
IS
TE
RED PROFESS IONAL ENGINEERA U
GUST I NE K . L EUNG
E L E C T R I C A L
GENERAL NOTES
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
13.
14.
15.
16.
17.
ALL DIMENSIONS ARE TO FACE OF STUD, OR CENTERLINE OF COLUMN U.O.N.
ALL DIMENSIONS INDICATED AS "CLEAR" ARE TO FACE OF FINISH AND INDICATE A MINIMUM REQUIRED DISTANCE.
WHEN LAYING OUT WALLS, CONTRACTOR SHALL MAKE FIELD MEASUREMENTS TO ENSURE ALL REQUIRED CLEAR DIMENSIONS
ARE MAINTAINED AS INDICATED.
PENETRATIONS ARE NOT PERMITTED THROUGH STRUCTURAL MEMBERS.
WHERE FULL HEIGHT WALLS ARE SHOWN, FRAME WALL TO FORM A TIGHT FIT AROUND DUCT OR PIPING; SEAL ALL GAPS AND
CAULK ALL AROUND TO KEEP INTEGRITY OF WALL RATING AS APPLICABLE.
WHERE DUCTS OR PIPING PENETRATE FULL HEIGHT WALLS, EXTEND FRAMING & GYPSUM BOARD FINISH TO FORM A TIGHT FIT AROUND SUCH PIPING OR DUCTS; SEAL ALL GAPS AND FIRE CAULK ALL AROUND TO KEEP INTEGRITY OF FIRE RATING AS
APPLICABLE.
IN ALL AREAS WITH DEPRESSED SLAB, FILL AS APPLICABLE WITH CONCRETE TOPPING OR MORTAR BED PRIOR TO INSTALLING FLOOR FINISH. CONTRACTOR SHALL PATCH, LEVEL, AND PREPARE FLOOR SLAB TO RECEIVE NEW FLOORING. THIS INCLUDES REMOVAL OF BUMPS AND OTHER IMPERFECTION AND FILLING ANY VOIDS OR NON-LEVEL SURFACES WHERE THEY OCCUR.
INSTALL NEW FLOORING FLUSH WITH ADJACENT FLOORING.
TERMINATE FLOORING EDGE BELOW DOOR THRESHOLD OR CENTERED BELOW DOOR AS APPLICABLE U.O.N.
WHEN WALL SEGMENT IS AN EXTENSION OF A WALL OR FURRING, STUDS SHALL MATCH AND BOTH FINISHES SHALL ALIGN.
CONTRACTOR SHALL FIELD COORDINATE CORRECT PLACEMENT OF STUDS.
ALL INTERIOR PARTITION METAL STUDS SHALL BE 4" U.O.N. (SEE FLOOR PLAN FOR LOCATION OF INTERIOR 6" METAL STUDS).
ALL WALL FURRING SHALL BE 3 5/8" METAL STUDS. MIN. U.O.N.
CONTRACTOR IS TO PROVIDE ALL ITEMS SHOWN ON THE PLANS UNLESS INDICATED AS (GFCI) OR (GFGI).
SOUND RATED PARTITIONS SHALL HAVE A MIN. STC RATING OF 45 U.O.N. SOME FIRE RATED PARTITIONS ARE ALSO SOUND RATED WHERE INDICATED. PARTITIONS AROUND THE MECH ROOM SHALL HAVE AN STC RATING OF 60 WHERE INDICATED
AT FIRE RATED ROOMS, EXTEND COLUMN FURRING TO UNDERSIDE OF FLOOR/ROOF DECK OR BEAMS AS APPLICABLE.
PROVIDE REQUIRED BLOCKING AND BACKING FOR ALL WALL MOUNTED ITEMS, FIXTURES, ACCESSORIES, CASEWORK AND
EQUIPMENT.
ALL EXTERIOR WALL METAL STUDS SHALL BE 6" WITH A VAPOR BARRIER ON THE INSIDE FACE OF STUD U.O.N.
BEFORE LAYING OUT DUCTWORK, PIPING, CONDUITS AND / OR UTILITIES ABOVE CEILING, COORDINATE CEILING SUSPENSION
SYSTEM SUPPORT LOCATIONS TO AVOID CONFLICTS.
WHERE INTERFERENCE WITH CEILING SUPPORTS CANNOT BE AVOIDED, CONTRACTOR SHALL PROVIDE ALTERNATE SUSPENSION SYSTEM IN COMPLIANCE WITH APPLICABLE CODES AND STANDARDS AT NO EXTRA COST TO THE GOVERNMENT.
ARCHITECTURAL ABBREVIATIONS
& AND
L ANGLE
@ AT
ll PARALLEL
PL PLATE
DIAMETER OR ROUND CHANNEL
CHANNEL
# POUND OR NUMBER
AB ANCHOR BOLT
AC ASPHALT CONCRETE
AD AREA DRAIN
ADD ADDENDUM
AFF ABOVE FINISH FLOOR
AGG AGGREGATE
ALUM ALUMINUM
ALT ALTERNATE
ANOD ANODIZED
APPROX APPROXIMATE
ARCH ARCHITECT (URAL)
ASB ASBESTOS
AT ACOUSTICAL TILE
AUTO AUTOMATIC
AVG AVERAGE
ARB AIR RESISTANT BARRIER
BARI BARIATRIC
BD BOARD
BEL BELOW
BET BETWEEN
BITUM BITUMINOUS
BLDG BUILDING
BLK BLOCK
BLKG BLOCKING
BM BEAM
BOT BOTTOM
BS BOTH SIDES
BSMT BASEMENT
BW BOTH WAYS
CPL CEMENT PLASTER
CAB CABINET
CC CONTRACTOR FURNISHED
CONTRACTOR INSTALLED
CIP CAST IN PLACE
CJ CONTROL JOINT
CLO CLOSET
CLG CEILING
CLK(G) CAULK(ING)
CLR CLEAR (ANCE)
CMU CONCRETE MASONRY WALL
CO CONTRACTING OFFICER
COL COLUMN
CONC CONCRETE
CONN CONNECT (ION)
CONST CONSTRUCTION
CONT CONTINUOUS/CONTINUED
COR CONTRACTING OFFICER'S
REPRESENTATIVE
CORR CORRIDOR
COTR CONTRACTING OFFICER'S
TECHNICAL REPRESENTATIVE
CT CERAMIC TILE
CW COLD WATER
C.G. CORNER GUARD
DBL DOUBLE
DEMO DEMOLISH/DEMOLITION
DET DETAIL
DIA DIAMETER
DIAG DIAGONAL
DIM DIMENSION
DIV DIVISION
DL DEAD LOAD
DN DOWN
DO DITTO
DR DOOR
DS DOWNSPOUT
DWG DRAWING
(E) EXISTING
EA EACH
EL ELEVATION
ELEC ELECTRIC (AL)
ELEV ELEVATOR
ENGR ENGINEER
EPDM ETHYLENE PROPYLENE
DIENE MONOMER
EQ EQUAL
EST ESTIMATE
ETC ETCETERA
EXP EXPANSION
EXT EXTERIOR
EIFS EXTERIOR INSULATION FINISH
SYSTEM
EPS EXPANDED POLYSTYRENE
COMP COMPOSITE
CTF CUT TO FIT
F FLUSH
FD FLOOR DRAIN
FEC FIRE EXTINGUISHER CABINET
FF FINISHED FLOOR
FHP FULL HEIGHT PARTITION
FIN FINISH (ED)
FIX FIXTURE
FLASH FLASHING (ED)
FLEX FLEXIBLE
FLUOR FLUORESCENT
FLR FLOOR (ING)
FNDN FOUNDATION
FOC FACE OF CONCRETE
FOF FACE OF FINISH
FOM FACE OF MASONRY
FOS FACE OF STUD
FOW FACE OF WALL
FP FIRE PROTECTION
FRP FIBERGLASS REINFORCED PANEL
FT FOOT/FEET OR FIRE TREATED
FTG FOOTING
FTP FIRE TREATED WOOD
FURR FURRING/FURRED
GA GAGE, GAUGE
GALV GALVANIZED
GC GENERAL CONTRACT (OR)
GI GALVANIZED IRON
GLZ GLAZING (ED)
GRND GROUND
GSM GALVANIZED SHEET METAL
GWB GYPSUM WALL BOARD
GYP GYPSUM
GMF GLASS MAT FACE (D)
HB HOSE BIBB
HC HOLLOW CORE
HD HEAVY DUTY
HDCP HANDICAP
HDR HEADER
HDW HARDWARE
HDWD HARDWOOD
HM HOLLOW METAL
HORIZ HORIZONTAL
HR HOUR
HT HEIGHT
HW HOT WATER
HVAC HEATING, VENTILATION AND
AIR CONDITIONING
ID INSIDE DIAMETER
INCL INCLUDE (D) (ING)
INSUL INSULATE (D) (ION)
INT INTERIOR
INV INVERT
JB JUNCTION BOX
JST JOIST
JT JOINT
LAM LAMINATE
LAV LAVATORY
LAFW LAMINAR AIRFLOW WORK BENCH
LBS POUNDS
LL LIVE LOAD
LT LIGHT
MAS MASONRY
MAX MAXIMUM
MB MACHINE BOLT
MC MEDICINE CABINET
MECH MECHANIC (AL)
MED MEDIUM
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
M-LAM MICROLAM
MTL METAL
MUL MULLION
MPF METAL PAN FLASHING
(N) NEW
N NORTH
NA NOT APPLICABLE
NIC NOT IN CONTRACT
NFPA NATIONAL FIRE PROTECTION
ASSOCIATION
NO. NUMBER
NOM. NOMINAL
NRC NOISE REDUCTION COEFFICIENT
NTS NOT TO SCALE
O/ OVER
OA OVERALL
OAE OR APPROVED EQUAL
OBS OBSCURE
OC ON CENTER (S)
OD OUTSIDE DIAMETER
O.H. OPPOSITE HAND
OPP OPPOSITE
OPNG OPENING
OSHA OCCUPATIONAL SAFETY AND
HEALTH ADMINISTRATION
PANO PANORAMIC
PAR PARALLEL
PCB POLYCHLORINATE BIPHENYL
PCF POUNDS PER CUBIC FOOT
PED PEDESTAL
PERF PERFORATE (D)
PERP PERPENDICULAR
PL PLATE
P-LAM PLASTIC LAMINATE
PLF POUNDS PER LINEAR FOOT
PSI POUNDS PER SQUARE INCH
PT PRESSURE TREATED
PVC POLYVINYL CHLORIDE
PNL PANEL (S)
RAD RADIUS
RC RESILIENT CHANNEL
RD ROOF DRAIN
RDWD REDWOOD
RE REINFORCE (D) (ING)
REC RECEIVING
REF REFRIGERATOR
REM REMOVE (D)
REQ REQUIRED
RET RETAINED
REV REVISION (S)/REVISED
RM ROOM
RO ROUGH OPENING
RWL RAINWATER LEADER
S SKYLIGHT
SAB SOUND ATTENUATION BLANKET
SC SOLID CORE
SCD SEE CIVIL DRAWINGS
SCHED SCHEDULE
SD SMOKE DETECTOR
SD STORM DRAIN
SDSF SOLID SURFACE
SECT SECTION
SED SUSTAINABLE ENERGY
DEVELOPMENTS
SEL SELECT
SHTG SHEATHING
SIM SIMILAR
SKL SKYLIGHT
SMD SEE MECHANICAL DRAWINGS
SPEC SPECIFICATION (S)
SPD SUPPLY/PROCESSING/
DISTRIBUTION
S & BR SEALANT AND BACK-UP ROD
SPS SUPPLY/PROCESSING SERVICES
SQ SQUARE
SS STAINLESS STEEL
SSD SEE STRUCTURAL DRAWINGS
ST STREET
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
SYM SYMMETRY (ICAL)
T TREAD
T&B TOP & BOTTOM
TELE TELEPHONE
TEMP TEMPERED
TO TOP OF
TOC TOP OF CONCRETE
TOD TOP OF DECK
TOG TOP OF GRADE
TOP TOP OF PARAPET
TP TOP PLATE
T&G TONGUE AND GROOVE
THK THICK (NESS)
TPO THERMOPLASTIC POLYOLEFIN
TW TOP OF WALL
TV TELEVISION
TYP TYPICAL
UL UNDERWRITERS LABORATORY
UON UNLESS OTHERWISE NOTED
VR VAPOR RETARDER
VA VETERAN'S ADMINISTRATION
VETERANS AFFAIRS
VB VAPOR BARRIER
VC (GFCI) GOVERNMENT FURNISHED,
CONTRACTOR INSTALLED
VV (GFGI) GOVERNMENT FURNISHED,
GOVERNMENT INSTALLED
VENT VENTILATE (ION)
VIF VERIFY IN FIELD
VERT VERTICAL
VCFW VINYL COATED FABRIC WALL
COVERING
VWP VINYL WALL PROTECTION
WC WATER CLOSET
WD WOOD
W/ WITH
WH WATER HEATER
WI WROUGHT IRON
WIN WINDOW
W/O WITHOUT
WP WATERPROOF (ED) (ING)
WR WATER RESISTANT
WRB WATER RESISTANT BARRIER
WT WEIGHT
ABBREVIATIONS DESCRIPTION ABBREVIATIONS DESCRIPTION ABBREVIATIONS DESCRIPTION
ARCHITECTURAL SYMBOLS
CENTER LINE
ELEVATION INDICATOR
CENTER LINE INDICATOR
PROJECT AREA
DEMOLITION LINE
EXISTING TO REMAIN LINE
FEATURES ABOVE LINE INDICATOR
FIRE RESISTIVE RATED LINE, 1 HOUR
FIRE RESISTIVE RATED LINE, 2 HOUR
FIRE-RATED, SMOKE BARRIER LINE, 1 HOUR
LEAD LINE
HIDDEN FEATURES LINE
NEW LINE
PROPERTY LINE
BREAK, ROUND (USER DEFINES SIZE)
BREAK, STRAIGHT (SEE SECTION INDICATORS,
BUILDING, WITH BREAK STANDARDS)
DETAIL INDICATOR
DETAIL INDICATOR
DETAIL INDICATOR FOR SMALL CONDITIONS
DETAIL INDICATOR
FURNITURE, FIXTURE, & EQUIPMENT INDICATOR
DIMENSION LINE
DOOR NUMBER
WINDOW/LOUVER TAG
ELEVATION INDICATOR, EXTERIOR
ELEVATION INDICATOR, INTERIOR, MULTIPLE VIEW
BUILDING SECTION INDICATOR
GRAPHIC SCALE, 1/8"=1'-0"
ROOM NAME AND NUMBER
COLUMN GRID
KEYNOTE
NORTH ARROW
ALIGN (N) FINISH W/ (E) FINISH
WALL STUD SIZE
SOUND TRANSMISSION CLASS
ABBREVIATIONS DESCRIPTION
A
CORRIDOR
1C06
0 16'8'4'
AS500
AS801
CL
AS601
DETAIL NUMBER
SHEET WHERE DRAWN
AS500
AS801
AS801
AS801
8"
L
NORTH
A
60 ST
C
AS500
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
T em p Fo ld er
\V
AS
D _R ep la ce N ur se
C al l M
AT
V
PA
_v
_r on
.b la yl oc k.
rv t
G. FERNANDEZ
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
664-18-331
SAN DIEGO, CA
Revisions: Date: 02/02/2024
100% SUBMITTAL
A001
GENERAL NOTES, LEGEND,
AND ABBREVIATIONS
R. KORTEJ. ROBERTS
ST
ATE OF CA L I FORN IA
REG
I ST ER ED A RCH I T ECT
DN
OFFICE
TOILET
MALE
LOCKERS
MALE
ROOM
CONFERENCE
AREA
STORAGE
OFFICE
STORAGE
STERILE
CART HOLDING AREA
STERILE STORAGE
CORRIDOR
OFFICE
SERVICES
BUILDING
RM.
ELEC.
LOUNGE
LOCKERS
FEMALE
TOILET
FEMALE
LOCKERS
MALE
TOILET
MALE
JANITOR
CART AREA
ROOM
VENDOR
AND BREAKOUT
CLEAN RECEIVING
CORRIDOR
DETERGENT
DECONTAMINATION
SOILED /
ANTE ROOM
PROCESSING
SCOPE
DRYING
TRANSFER
CART WASH
CARTWASH
AUTOMATIC
WASH
INSTRUMENT
STORAGE
BULK
DISPATCH
HALLWAY
TOILET
FEMALE
LOCKERS
FEMALE
SIGNAL ROOM
DATA/TELE
ETO
STORAGE
AREA
STAGING
DRUGS
RM.
JANITOR
OFFICE
OFFICE
UP
DUMB
DW1-B-1
B190
A/C SHOP
B190A
A/C SHOP
B254
A/C SHOP
B252
OFFICES(S)
B253
A/C SHOP
B255
PIPE SHOP
B191
STORAGE
B251
MECHANICAL
B200
ELECTRONICS
B177L
STORAGE
GENERAL
B177K
STORAGE
OIT
B177J
STORAGE
GENERAL
B128
KITCHEN
B177F
UTILITY
B177E
STORAGE
EQUIPMENT
B177H
RECEIVING
B236
AUTOPSY
B247
OFFICE
B248
OFFICE
B249
OFFICE(S)
B176
OFFICE(T)
B177B
CORR.
B171A
OFFICE(T)
B117P
CORR.
B173
STORAGE
OXYGEN
B177C
CORR.
B177A
CORR.
B177N
STORAGE
GENERAL
B177D
STORAGE
GENERAL
B191R
CORRIDOR
B194
STOR.
GENERAL
B194A
STOR.
GENERAL
B245
STOR.
MORGUE
B244
STOR.
MORGUE
B235
REFERIGER. B241
OFFICE
B234
OFFICE
B232B
OFFICE
B181
REFER.
B138
REFER.
B137
REFER.
B213
BIOMED
B250
OFFICE(S)
B232A
OFFICE
B233
OFFICE(T)
B177M
CORR. B117B
CORR.
B232
OFFICE(T)
B231
MECHANICAL
B136
REFER.
B183A
STOR.
GENERAL
B183
STOR.
GENERAL
B129
OFFICE(S)
B130
OFFICE(S)
B166
ELECTRICAL
B188
ELECTRICAL
B167
EQUIPMENT
OIT
B165
TELEPHONE
B165A
OIT STOR.
B176
OFFICE
B131
OFFICE(S)
B126
CONFERENCE
B127
OFFICE(S)
B126D
OFFICE(S)
B127A-1
OFFICE(S)
B132
OFFICE(S)
B126C
OFFICE(S)
B114A
OFFICE(S)
B114
OFFICE(S)
B115
OFFICE(S)
B134
MANAGEMENT
RECORDS
B122
DISHWASHING
B119
WASH
CAR
B184
STOR.
GENERAL
B185
STOR.
GENERAL
B128B
STOR.
GENERALB186
STOR.
GENERAL
B140A
REFER.
B140
CORR.
B143
LAB
B142A
LAB
B142
LAB
B142E
LAB
B147
RESIDENT B156A
LAB
B156A
LAB
B198
ELECTRIC SHOP
B240
CORR.
B212
CORR.
B204
CORR.
B210
CARPENTRY
B210C
MECHANICAL
B141
MICROSCOPE FACILITY
CORE ELECTRON
B142D
LAB
B142B
SUPPLY
STERILE
B144
LOCKER(F)
B145
CONF. RM /OFFICE(S)
PHARMACY
B144A
LOCKER(F)
B149
LOCKER(M)
B152
OFFICE
PHARMACOECO.
BB152A
OFFICE(S)
B125
CORR.
B123
PREP
B157
VAULT
B153
STOR.
VAULT
B121
CORR.
B152E
ED. TRAINING OFF.(S)
DIR. PHARM.
B152D
DATA APPS.ANALYSIS OFF.(S)
DIR. PHARM.
B155
ADMIN.0FFICE
PHARMACY
B160
KITCHEN
B155C
SVC OFF.(S)
CHIEF PHARM.
B159B
OFFICE
B159A
OFFICE
B217
STOR.
EQUIPMENT
B223B
OFFICE(T)
B218
OFFICE(S)
B246
CORR.
B100
LOBBY
B156
AREA
PHARMACY
B215
STORAGE
B215A
STORAGE
B215B
CORRIDOR
B215B
CORRIDOR
B128C
OFFICE(S)
DIET INFO.
B117
CORRIDOR
B191J
STORAGE
GENERAL
B191G
STORAGE
OIT
B191P
STORAGE
GENERAL
B1000
CENTER OFFICE
IT SERVICE
B171
OFFICE
B201A
KITCHEN
B200A
STOR.
GENERAL
B205
KEYS
B216
LINEN
SOIL
B217A
STOR.
EQUIPMENT
SW6-B-1
STAIRS
SW7-B-1
STAIRS
SW8-B-1
STAIRS
B206
OFFICE(S)
B189B
STOR.
GENERAL
B198A
OFFICE(S)
SW1-B-1
STAIR
B191Q
CORR.
B191H
STORAGE
GENERAL
B214
OFFICE
B211
OFFICE
B217B
ELEC
B217C
ELEC
B212B
CORR.
B162
SERVICE OFFICE(S)
ENVIRONMENTAL
B210B
MECHANICAL
B210A
OFFICE(S)
B220
STOR.
GENERAL
B224
STOR.
HAC
B229
OPERATIONS
MGR. OFF.
B108A
STOR.
GENERAL
B101
LOBBY
B108B
STOR.
EQUIPMENT
B109
CORRIDOR
B108C
STOR.
EQUIPMENT
SW13-B-1
STAIRS
B201
STOR.
MAINTENANCE
B202
SIGNAGE
B239
CORR.
B238
CORR.
B158
STAIR
B182
KITCHEN
STOR.
B146
SHOWER(F)
B189A
STOR.
B125A
MALE TOI.
B133
FEMALE TOI.
B176A
MALE TOI.
B176B
MALE TOI.
W9-B-1
STAIR
B180
MECH.
B135A
HAC
B148
SHOWER(M)
B149A
LOCKER(M)
B149B
MECH.
B155B
OFF.OFF.(S)
ADMIN.
B155E
CORR.
B155F
CORR.
B154
CORR.
B172C
OFFICE
B196
ELEC. RM
S5-B-1
PET ELEV
B212A
CORR.
B191A
MALE TOI.
B191B
MALE TOI.
B242
MALE TOI.
B243
FEMALE TOI.
B128A
MGR. OFFICE(S)
CLINICAL NUTRITION
B128D
STOR.
GENERAL
SW11-B-1
STAIRS
SW12-B-1
STAIRS
B191K
STORAGE
GENERAL
B191E
UPPERB191D
STORAGE
GENERAL
B191C
STORAGE
B191F
STORAGE UPPER
GENERAL
B191C
STORAGE LOWER
GENERAL
B237
HAC
B232C
RECEPTION
B230A
TELECOM
B108
MECHANICAL
B152B
SAFETY OFF.(S)
DIR. MED.
B155A
PHARM. SVC OFF.(S)
ASS. CHIEF
B135
MECH.
B126B
OFFICE
B126A
OFF.(S) NUTRITION FOOD SER.
ED. SECT.
B191M
CORR.
B191L
STOR.
B152C
COOR.OFF.(S)
U.O.P. REGIONAL
B141A
CORR.
B230
OFFICE
B224A
CORR.
B222
MALE TOI.
B187
HAS
B225
CORRIDOR
B104
TOILET
B172C
STOR.
SPS SUPPLY
B125B
CORR.
SW10-B-1
LIFT
B120
STORAGE
B125C
CORR.
B144B
DRESSING RM
B155G
CORR.
TUNNEL
STORAGE
B195B
CART WASH
B102A
HSK
B227
MALE TOILET
B107
FEMALE TOILET
B106
CORRIDOR
CORRIDOR
B111
B116
SPS
STORAGE
B112
SPS
ADMINISTRATION
OFFICE(S)B110
DECON
B102
SPS
PREP
AREAB105
STERILIZER
B102B
GAS ETO
B102C MENS LOCKER
B228
CORRIDOR
BREAK ROOM
B226
SPS
STERILE
STORAGEB197
UTILITY AND EQUIPMENT STORAGE
B223
VACANT STORAGE
PATIENT
EFFECTSB223C
GENERAL STORAGE
B223D
CORRIDOR
B191N
GENERAL
STORAGE
B195C
MATERIAL MANAGEMENT OFFICE
B172A
EQUIPMENT STORAGE
B112A
SPS
SUPPLY
STORAGEB172B
EQUIPMENT STORAGE
B172D
EQUIPMENT
STORAGE
B117
GENERAL STORAGE
B172
B223A
ELECTRICAL
UP
UPDNUPDN
B142C
DARK RM
ELEVATOR
S1
ELEVATOR
S2
ELEVATOR
S3
ELEVATOR
S4
M&O OFFICE
(FUTURE TV
SHOP)
SP SP SP SP SP SP SP SP SP SP SP
SP
SP
SP
SP
SP SP SP SP SP SP
SP
SP
SP
SP
SP
SP
SP SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SPSP
SP
SP
SP
SP
SP
SP
W S
W S
W S
W S
W S
KEY PLAN
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant: K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
Lo ca l F ile s\
VA
SD
_R ep la ce N ur se
C al l M
AT
V
PA
_V
_j am es .h ec k.
rv t
9/
/2
2:
:0
PM
A. SHRESTHAJ. ROBERTS
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
664-18-331
02/02/2024
100% SUBMITTAL
SAN DIEGO, CA
Revisions: Date:
ST
ATE OF CA L I FORN IA
REG
I ST ER ED A RCH I T ECT
ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS
FACILITY AND IN THE ABOVE CEILING SPACES. THE
CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY
TO PROTECT PERSONS FROM EXPOSURE. THESE
SAFEGUARDS WILL INCLUDE:
1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN
THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS
CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40
HOUR ASBESTOS TRAINING CLASS, AS APPROVED BY THE
VA, WITH CERTIFICATION.
2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND
WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT
(PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS
PRIOR TO ENTRY INTO ABOVE CEILING SPACES.
3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES,
CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT,
A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.
4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF
CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS
OR OTHER DISTURBANCE OF CELING OR WALL MATERIALS
SHALL BE PERFORMED WITH PROPER BARRICADES
INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH
PROTECTIVE BARRICADES SHALL BE PROVIDED BY THE
CONTRACTOR.
THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS
SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY,
PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR
EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY
FORM AT THE PROJECT SITE. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR JOB SITE SAFETY WHICH INCLUDES ALL
TRAINING AND SAFEGUARDS NECESSARY TO PROTECT
HIS/HER EMPLOYEES, VA PERSONNEL VISITORS AT THE SITE
AND ANY OTHER PERSONS.
ASBESTOS WARNING
1/16" = 1'-0"AD101
1 BASEMENT FLOOR - DEMO PLAN
NORTH
SHEET NOTES
AD101
BASEMENT FLOOR - DEMO PLAN
GENERAL NOTES
1 REMOVE ALL EXISTING PAGING SYSTEM SPEAKERS
1 (TYP)
1 (TYP)
2 (TYP)
2 AREAS ABOVE CEILING TILES CONTAIN ASBESTOS.
ONLY PROPERLY TRAINED INDIVIDUALS WEARING
ALL REQUIRED PPE'S INCLUDING RESPIRATORS ARE
ALLOWED TO ENTER THIS SPACE.
1. REFER TO TI DEMOLITION PLANS FOR ADDITIONAL
GENERAL NOTES.
2. ACOUSTIC TILE CEILINGS: DEMOLISH/REMOVE ENTIRE
CEILING TILE AT LOCATIONS WHERE SPEAKERS ARE
SCHEDULED TO FOR REMOVAL OR REPLACEMENT.
EXISTING SUSPENSION SYSTEM TO REMAIN.
3. GYPSUM BOARD CEILINGS: WHERE SPEAKERS ARE
SCHEDULED FOR REMOVAL OR REPLACEMENT, PREPARE
CEILING SURFACE FOR PATCHING AND REPAIR TO MATCH
THE EXISTING ADJACENT CEILING SURFACE FINISH AND
PAINT FINISH.
UPDNUPDN
BRIDGE
36" HIGH WALL
36" HIGH WALL
VOID
050-1-1
ALCOVE
VOID
062-1-1
VOID
068-1-1
VOID
052-1-1
VOID
074-1-1
VOID
010-1-1
VOID
028-1-1
VOID
027-1-1
VOID
026-1-1
VOID
023-1-1
VOID
049-1-1
WAITER
DW3-1-1
VOID
024-1-1
SPSP
SP
SP SP SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP SP
SP
SP
SPSPSP
SPSPSPSP
SP
SP
SP
SP
SP
SP SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP SP
SP
SP
SP
SPSPSP SP SP
SP
SP SP SP SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP SP
SP SP
SP
SP
SP
SP
SP SP
SP
SP SP SP SP SP
SP
SP SP
SP
SP
SP
SP
SP
SP SPSPSPSPSP SP SP
SPSP
SP
SP
SP
SP
SP SP
SP
SP
SP
SP
SP
SP SP
SP
SP
SP
KEY PLAN
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant: K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
Lo ca l F ile s\
VA
SD
_R ep la ce N ur se
C al l M
AT
V
PA
_V
_j am es .h ec k.
rv t
9/
/2
2:
:0
PM
A. SHRESTHAJ. ROBERTS
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
664-18-331
02/02/2024
100% SUBMITTAL
SAN DIEGO, CA
Revisions: Date:
ST
ATE OF CA L I FORN IA
REG
I ST ER ED A RCH I T ECT
ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS
FACILITY AND IN THE ABOVE CEILING SPACES. THE
CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY
TO PROTECT PERSONS FROM EXPOSURE. THESE
SAFEGUARDS WILL INCLUDE:
1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN
THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS
CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40
HOUR ASBESTOS TRAINING CLASS, AS APPROVED BY THE
VA, WITH CERTIFICATION.
2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND
WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT
(PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS
PRIOR TO ENTRY INTO ABOVE CEILING SPACES.
3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES,
CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT,
A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.
4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF
CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS
OR OTHER DISTURBANCE OF CELING OR WALL MATERIALS
SHALL BE PERFORMED WITH PROPER BARRICADES
INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH
PROTECTIVE BARRICADES SHALL BE PROVIDED BY THE
CONTRACTOR.
THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS
SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY,
PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR
EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY
FORM AT THE PROJECT SITE. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR JOB SITE SAFETY WHICH INCLUDES ALL
TRAINING AND SAFEGUARDS NECESSARY TO PROTECT
HIS/HER EMPLOYEES, VA PERSONNEL VISITORS AT THE SITE
AND ANY OTHER PERSONS.
ASBESTOS WARNING
1/16" = 1'-0"AD102
1 LEVEL 1 - NORTH FLOOR - DEMO PLAN
NORTH
SHEET NOTES
AD102
ARCHITECTURAL
LEVEL 1 - NORTH FLOOR - DEMO PLAN
GENERAL NOTES
1 REMOVE ALL EXISTING PAGING SYSTEM SPEAKERS
1 (TYP)
2 (TYP)
2 AREAS ABOVE CEILING TILES CONTAIN ASBESTOS.
ONLY PROPERLY TRAINED INDIVIDUALS WEARING
ALL REQUIRED PPE'S INCLUDING RESPIRATORS ARE
ALLOWED TO ENTER THIS SPACE.
1. REFER TO TI DEMOLITION PLANS FOR ADDITIONAL
GENERAL NOTES.
2. ACOUSTIC TILE CEILINGS: DEMOLISH/REMOVE ENTIRE
CEILING TILE AT LOCATIONS WHERE SPEAKERS ARE
SCHEDULED TO FOR REMOVAL OR REPLACEMENT.
EXISTING SUSPENSION SYSTEM TO REMAIN.
3. GYPSUM BOARD CEILINGS: WHERE SPEAKERS ARE
SCHEDULED FOR REMOVAL OR REPLACEMENT, PREPARE
CEILING SURFACE FOR PATCHING AND REPAIR TO MATCH
THE EXISTING ADJACENT CEILING SURFACE FINISH AND
PAINT FINISH.
3 CROSSHATCH AREA INDICATES 48" X 48" FIBERGLASS
CEILING TILES
VOID
050-1-1
VOID
052-1-1
SP
SP
SP
SP
SPSPSP
SP
SP
SP
SP SP SP
SP
SP SP SP SP
SP
SP SP SP SP
SP SP
SP
SPSP
SP
SP
SP
SP
SP
SP
SPSP
SP
SP
SP
SP
SP
SP
SP SP
SP
SP
SP
SP SP
SP
SP
SP
SP
SP
SP
SP SPSPSP
SP
SP
SP
SPSP SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SPSPSPSP
KEY PLAN
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant: K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
Lo ca l F ile s\
VA
SD
_R ep la ce N ur se
C al l M
AT
V
PA
_V
_j am es .h ec k.
rv t
9/
/2
2:
:0
PM
A. SHRESTHAJ. ROBERTS
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
664-18-331
02/02/2024
100% SUBMITTAL
SAN DIEGO, CA
Revisions: Date:
ST
ATE OF CA L I FORN IA
REG
I ST ER ED A RCH I T ECT
ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS
FACILITY AND IN THE ABOVE CEILING SPACES. THE
CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY
TO PROTECT PERSONS FROM EXPOSURE. THESE
SAFEGUARDS WILL INCLUDE:
1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN
THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS
CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40
HOUR ASBESTOS TRAINING CLASS, AS APPROVED BY THE
VA, WITH CERTIFICATION.
2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND
WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT
(PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS
PRIOR TO ENTRY INTO ABOVE CEILING SPACES.
3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES,
CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT,
A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.
4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF
CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS
OR OTHER DISTURBANCE OF CELING OR WALL MATERIALS
SHALL BE PERFORMED WITH PROPER BARRICADES
INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH
PROTECTIVE BARRICADES SHALL BE PROVIDED BY THE
CONTRACTOR.
THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS
SHALL…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .