Attachment D - Drawings (DEMO).pdf

PDF 5 MB Posted

Attached to
Replace Hospital Nurse Call, MATV, & Public Address System Federal contract opportunity
Solicitation number
36C26224B0002
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 22

About this file

This solicitation seeks proposals to replace the nurse call, MATV, and public address systems at the VA San Diego Healthcare System facilities in Buildings 1 and 11. The current systems are antiquated and failing, preventing timely emergency notifications and patient responses. The selected contractor will furnish all labor, materials, equipment, supervision, and transportation to demolish existing systems and install new nurse call, MATV, and public address systems. The contractor must select qualified manufacturers for VA approval and provide a complete, functional system for each. Work will be performed at the 3350 La Jolla Village Drive campus in a functioning hospital environment. The contractor is responsible for all required permits, scheduling utility outages in advance, and complying with safety requirements for working in occupied areas with asbestos materials. Proposals are due by the date specified in the solicitation issued by the VA Veterans Health Administration VISN 22.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REPLACE HOSPITAL NURSE CALL,

MATV, AND PUBLIC ADDRESS

PROJECT NO. : 664-18-331

VETERANS AFFAIRS

SAN DIEGO HEALTHCARE SYSTEM

3350 LA JOLLA VILLAGE DRIVE, SAN DIEGO, CA 92161

COVER SHEET

P4 P6P5

P2P1

S1 S2

P3

S4S3

P4 P6P5

P2P1

S1 S2

P3

S4S3

VENDING

CART

F.S.

FREEZER

REFRIG

FOOD

DISPLAY

DN.

DN.

DN.

F.S.

ON

LY

VA

LE

T

PA

RK

SE

LF

ONLY

EXIT

15'

MOTORCYCLE

PARKING

R=25

R 'R=

R=

R=

R=

15'

R=50

DO NOT

ONE WAY

ENTER

DO NOT

ONE WAY

ENTER

ONE WAY

DO NOT

ENTER

DO NOT

ONE WAY

ENTER

S T O P

S T O P

DO NOT ONE WAY

ENTER

STOP

S T O P

S

TO

P

S

TO

P

S T O P

ONE WAY

S T O P

S T O P

S T O P

STOP

S

TO

P

S

TO

P

S T O P

STOP STOP

S

TO

P

STOP

S T O P

STOPSTOP

STOP

PARKING LOT - E1

ST

OP

S

TO

P

YIELD

S

TO

P

O N E

W A Y

PARKING LOT - E

STOP

O N E

W A Y

S

TO

P

S

TO

P

S

TO

P

STOP

STO

P

STO

P

O N

LY

STOP

PARKING

GARAGE

PHASE 1 PARKING

GARAGE

PHASE 2

PARKING

GARAGE

PHASE 3

BLDG. 27

(PAD)

(DESIGN)

(BID)

sf x8 x8 x8 sf sf

12x80 960sf

960sf 12x80

960sf 12x80 x8 sf sf x8 x8 sf x8 sf

V ill a La J ol la

Pedestrian Bridge

Length =Bearing =

South Road

TUNNEL

North Road

Gilman Drive

STOP

TUNNEL TUNNEL

E a st

R o a d

COURTYARD

M

BUILDING 1 BUILDING 11

GI001

A. SHRESTHA

REPLACE HOSPITAL NURSE CALL,

MATV, AND PUBLIC ADDRESS

664-18-331

SAN DIEGO, CA

COVER SHEET

SCALE: NONEGI001

3 SITE MAP

NORTH

SCALE: NONEGI001

2 VICINITY MAP

NORTH

SCALE: NONEGI001

1 LOCATION MAP

NORTH

ARCHITECTURAL

TI101 BASEMENT FLOOR - DEMO PLAN

TI102 BASEMENT FLOOR PLAN

TI103 LEVEL 1 - NORTH FLOOR - DEMO PLAN

TI104 LEVEL 1 - NORTH FLOOR PLAN

TI105 LEVEL 1 - SOUTH FLOOR - DEMO PLAN

TI106 LEVEL 1 - SOUTH FLOOR PLAN

TI107 LEVEL 2 - NORTH FLOOR - DEMO PLAN

TI108 LEVEL 2 - NORTH FLOOR PLAN

TI109 LEVEL 2 - SOUTH FLOOR - DEMO PLAN

TI110 LEVEL 2 - SOUTH FLOOR PLAN

TI111 LEVEL 3 - NORTH FLOOR - DEMO PLAN

TI112 LEVEL 3 - NORTH FLOOR PLAN

TI113 LEVEL 3 - SOUTH FLOOR - DEMO PLAN

TI114 LEVEL 3 - SOUTH FLOOR PLAN

TI115 LEVEL 4 - NORTH FLOOR - DEMO PLAN

TI116 LEVEL 4 - NORTH FLOOR PLAN

TI117 LEVEL 4 - SOUTH FLOOR - DEMO PLAN

TI118 LEVEL 4 - SOUTH FLOOR PLAN

TI119 LEVEL 5 - NORTH FLOOR - DEMO PLAN

TI120 LEVEL 5 - NORTH FLOOR PLAN

TI121 LEVEL 5 - SOUTH FLOOR - DEMO PLAN

TI122 LEVEL 5 - SOUTH FLOOR PLAN

TI123 LEVEL 6 - NORTH FLOOR - DEMO PLAN

TI124 LEVEL 6 - NORTH FLOOR PLAN

TI125 LEVEL 6 - SOUTH FLOOR - DEMO PLAN

TI126 LEVEL 6 - SOUTH FLOOR PLAN

TI127 LEVEL 7 - FLOOR - DEMO PLAN

TI128 LEVEL 7 - FLOOR PLAN

TI129 BASEMENT FLOOR - DEMO PLAN

TI130 BASEMENT FLOOR PLAN

TI131 LEVEL 1 FLOOR - DEMO PLAN

TI132 LEVEL 1 FLOOR PLAN

TI133 LEVEL 2 FLOOR - DEMO PLAN

TI134 LEVEL 2 FLOOR PLAN

TI601 INFRASTRUCTURE AND POWER REQUIREMENTS

SINGLE LINETI701

SINGLE LINETI702

SINGLE LINETI703

SINGLE LINETI704

SINGLE LINETI705

SINGLE LINETI706

SINGLE LINETI707

Project Number:

Building Number:

Drawing Number:

Project Title:

Location:

Issue Date: Checked: Drawn:

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase:ARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

K F DAVIS

ENGINEERING, INC

530 LA GONDA WAY, SUITE E,

DANVILLE, CA 94526

WWW.KFDE.COM

(925) 743-8884

H :\R ev it

T em p Fo ld er

\V

AS

D _R ep la ce N ur se

C al l M

AT

V

PA

_v

_r on

.b la yl oc k.

rv t

G. FERNANDEZ

REPLACE HOSPITAL NURSE CALL,

MATV, AND PUBLIC ADDRESS

664-18-331

SAN DIEGO, CA

Revisions: Date: 02/02/2024

100% SUBMITTAL

1 & 11

SHEET INDEX

Sheet Number Sheet Name

GENERAL

GI001 COVER SHEET

GI102 PROJECT GENERAL NOTES

SHEET INDEX

Sheet Number Sheet Name Sheet Number Sheet Name

SHEET INDEX (CONT.)

Sheet Number Sheet Name

TELECOMMUNICATIONS

ELECTRICAL

E001 ELECTRICAL GENERAL NOTES, LEGEND, SYMBOLS

AND ABBREVIATIONS

EY101 BUILDING 1 - FIRST FLOOR NURSE CALL PLAN

EY102 BUILDING 1 - THIRD FLOOR NURSE CALL PLAN

EY103 BUILDING 1 - FOURTH FLOOR NURSE CALL PLAN

ET101 BUILDING 1 - BASEMENT MATV PLAN

ET102 BUILDING 1 - FIRST FLOOR MATV PLAN

ET103 BUILDING 1 - SECOND FLOOR MATV PLAN

ET104 BUILDING 1 - THIRD FLOOR MATV PLAN

ET105 BUILDING 1 - FOURTH FLOOR MATV PLAN

ET106 BUILDING 1 - FIFTH FLOOR MATV PLAN

ET107 BUILDING 1 - SIXTH FLOOR MATV PLAN

ET108 BUILDING 1 - SEVENTH FLOOR MATV PLAN

ET200 MATV RISER DIAGRAM

ET101A BUILDING 1 - BASEMENT INTERSTITIAL PLAN

ET102A BUILDING 1 - FIRST FLOOR INTERSTITIAL PLAN

ET103A BUILDING 1 - SECOND FLOOR INTERSTITIAL PLAN

ET104A BUILDING 1 - THIRD FLOOR INTERSTITIAL PLAN

ET105A BUILDING 1 - FOURTH FLOOR INTERSTITIAL PLAN

ET106A BUILDING 1 - FIFTH FLOOR INTERSTITIAL PLAN

ET107A BUILDING 1 - SIXTH FLOOR INTERSTITIAL PLAN

GENERAL NOTES, LEGEND, AND

ABBREVIATIONS

A001

AD101 ARCHITECTURAL BASEMENT FLOOR - DEMO PLAN

AD102 ARCHITECTURAL LEVEL 1 - NORTH FLOOR - DEMO PLAN

AD103 ARCHITECTURAL LEVEL 1 - SOUTH FLOOR - DEMO PLAN

AD104 ARCHITECTURALLEVEL 2 - NORTH FLOOR - DEMO PLAN

AD105 ARCHITECTURAL LEVEL 2 - SOUTH FLOOR - DEMO PLAN

AD106 ARCHITECTURAL LEVEL 3 - NORTH FLOOR - DEMO PLAN

AD107 ARCHITECTURAL LEVEL 3 - SOUTH FLOOR - DEMO PLAN

AD108 ARCHITECTURAL LEVEL 4 - NORTH FLOOR - DEMO PLAN

AD109 ARCHITECTURAL LEVEL 4 - SOUTH FLOOR - DEMO PLAN

AD110 ARCHITECTURAL LEVEL 5 - NORTH FLOOR - DEMO PLAN

AD111 ARCHITECTURAL LEVEL 5 - SOUTH FLOOR - DEMO PLAN

AD112 ARCHITECTURAL LEVEL 6 - NORTH FLOOR - DEMO PLAN

AD113 ARCHITECTURAL LEVEL 6 - SOUTH FLOOR - DEMO PLAN

AD114 ARCHITECTURAL LEVEL 7 - FLOOR - DEMO PLAN

AD115 ARCHITECTURAL BASEMENT FLOOR - DEMO PLAN

AD116 ARCHITECTURAL LEVEL 1 FLOOR - DEMO PLAN

AD117 ARCHITECTURAL LEVEL 2 FLOOR - DEMO PLAN

AE101 ARCHITECTURAL BASEMENT FLOOR PLAN

AE102 ARCHITECTURAL LEVEL 1 - NORTH FLOOR PLAN

AE103 ARCHITECTURAL LEVEL 1 - SOUTH FLOOR PLAN

AE104 ARCHITECTURAL LEVEL 2 - NORTH FLOOR PLAN

AE105 ARCHITECTURAL LEVEL 2 - SOUTH FLOOR PLAN

AE106 ARCHITECTURAL LEVEL 3 - NORTH FLOOR PLAN

AE107 ARCHITECTURAL LEVEL 3 - SOUTH FLOOR PLAN

AE108 ARCHITECTURAL LEVEL 4 - NORTH FLOOR PLAN

AE109 ARCHITECTURAL LEVEL 4 - SOUTH FLOOR PLAN

AE110 ARCHITECTURAL LEVEL 5 - NORTH FLOOR PLAN

AE111 ARCHITECTURAL LEVEL 5 - SOUTH FLOOR PLAN

AE112 ARCHITECTURAL LEVEL 6 - NORTH FLOOR PLAN

AE113 ARCHITECTURAL LEVEL 6 - SOUTH FLOOR PLAN

AE114 ARCHITECTURAL LEVEL 7 - FLOOR PLAN

AE115 ARCHITECTURAL BASEMENT FLOOR PLAN

AE116 ARCHITECTURAL LEVEL 1 FLOOR PLAN

AE117 ARCHITECTURAL LEVEL 2 FLOOR PLAN

ST A T E O F CA L I F ORN I A

RE

G

IS

TE

RED PROFESS IONAL ENGINEERA U

GUST I NE K . L EUNG

E L E C T R I C A L

GENERAL NOTES

ABBREVIATIONS/DEFINITION

CO CONTRACTING OFFICER

COR CONTRACTING OFFICER'S (TECHNICAL) REPRESENTATIVE

OSHA OCCUPATIONAL SAFETY AND HEALTH ADMINISTRATION

GOVERNMENT THE TERM GOVERNMENT SHALL MEAN DEPARTMENT OF VETERANS AFFAIR

EXISTING HAZARDOUS MATERIALS

THE FOLLOWING CODES ARE USED FOR THE BASIS OF DESIGN FOR THIS PROJECT BUT ARE NOT LIMITED TO:

IBC: INTERNATIONAL BUILDING CODE 2021

NFPA 70: NATIONAL ELECTRICAL CODE 2020

NFPA 101: LIFE SAFETY CODE 101

NFPA 241: STANDARD FOR SAFEGUARDING CONSTRUCTION 2019

NOTE: THE CONTRACTOR IS RESPONSIBLE FOR VERIFYING AND USING THE MOST CURRENT APPLICABLE CODE EDITION.

THE CONTRACTOR IS TO PERFORM THE WORK AS SHOWN IN THE CONTRACT DOCUMENTS INCLUDING ALL CODES

ASSOCIATED WITH THIS SCOPE OF WORK.

CODE REFERENCES

1. THE CONTRACTOR IS RESPONSIBLE FOR OBTAINING ALL NECESSARY APPROVALS AND PERMITS REQUIRED FROM REGULATING AGENCIES BEFORE STARTING ANY WORK INCLUDING AN AIR QUALITY REQUIRED FORM PERMIT.

2. SUBJECT TO MINOR EXCEPTIONS, GENERALLY THE ITEMS SHOWN IN BOLD LINES ARE NEW AND ITEMS SHOWN IN

GRAYSCALE ARE EXISTING.

3. THE WORK ON THESE DRAWINGS IS GENERALLY DIAGRAMMATIC AND IS INTENDED TO CONVEY THE SCOPE OF WORK, INDICATE THE GENERAL ARRANGEMENT OF EQUIPMENT AND FINAL LAYOUT. THE DRAWINGS ARE GENERIC IN NATURE AND ARE INTENDED TO BE SUPPORTED BY SPECIFIC MANUFACTURER AND/OR FABRICATORS SHOP DRAWINGS AND SIMILAR

DETAILS TO DETERMINE EXACT SPACING AND/OR INSTALLATION REQUIREMENTS.

4. IF ANY PART OF THE DRAWINGS OR SPECIFICATIONS CONTRADICT THE MANUFACTURER'S RECOMMENDATIONS, APPLICATION OR INSTALLATION INSTRUCTIONS, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK, ADVISE THE

CONTRACTING OFFICER AND RECEIVE CLEAR, WRITTEN, DIRECTION BEFORE PROCEEDING.

5. DO NOT SCALE THE DRAWINGS. WRITTEN DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALED DIMENSIONS. IF ANY DISCREPANCIES OR OMISSIONS IN THE DIMENSIONS ARE DISCOVERED, THE CONTRACTOR SHALL NOTIFY THE CONTRACTING OFFICER IMMEDIATELY. ANY WORK DONE WITHOUT PROPER NOTIFICATION BEING GIVEN TO THE

CONTRACTING OFFICER IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR.

6. PRIOR TO DEMOLITION, CONTRACTOR SHALL VERIFY ALL DIMENSIONS, EXISTING CONDITIONS AND LOCATION OF NEW CONSTRUCTION WITH EXISTING WALLS, FLOORS, CEILINGS, COLUMNS, FURRING, MECHANICAL AND ELECTRICAL

EQUIPMENT AND EXISTING CONSTRUCTION.

7. FIELD INVESTIGATION PERFORMED DURING THE DESIGN STAGE IS LIMITED TO WHAT CAN BE REASONABLY SEEN AND DOCUMENTED WHILE THE SPACE IS OPERATIONAL AND OCCUPIED BY PERSONNEL, EQUIPMENT AND FURNITURE. AS SUCH, THE CONTRACTOR IS RESPONSIBLE FOR PERFORMING A THOROUGH REVIEW AND VALIDATING ALL FIELD CONDITIONS PRIOR TO COMMENCEMENT OF WORK. THE CONTRACTOR SHALL REPORT ANY PROBLEMS/CONFLICTS TO THE CONTRACTING OFFICER WITHIN TWO (2) DAYS OF DISCOVERY. ANY CHANGES RESULTING FROM CONDITIONS ARISING IN THE FIELD WHICH ARE NOT BROUGHT TO THE ATTENTION OF THE CONTRACTING OFFICER ARE TO BE MADE BY THE

CONTRACTOR AT NO ADDITIONAL COST TO GOVERNMENT.

8. DRAWINGS SHOWN ARE SCHEMATIC ONLY. THE CONTRACTOR SHALL FIELD VERIFY SITE CONDITIONS AND ENSURE SHOP DRAWINGS ARE PROVIDED BEFORE DETAILING COMPLETE UTILITY LAYOUT AND INSTALLATION. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO ROUTE NEW CONDUITS, DUCTS, PIPING AND SIMILAR LINES TO AVOID POTENTIAL INTERFERENCES, AND WHERE THIS CANNOT BE ACCOMPLISHED, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO REMOVE, REROUTE, ADJUST REINSTALL THE INTERFERENCE SUCH THAT IT NO LONGER POSES A PROBLEM. THESE ITEMS

ARE TO BE ADDRESSED AND CORRECTED AT NO ADDITIONAL COST TO THE GOVERNMENT.

9. CONTRACTOR SHALL COORDINATE WORK WITH OTHER TRADES TO AVOID POTENTIAL CONFLICTS.

10. FINAL LOCATION OF MECHANICAL AND ELECTRICAL EQUIPMENT SUCH AS PANELBOARD, METERS, FLUES, VENTS, ETC., SHALL BE APPROVED BY THE GOVERNMENT.

11. EACH SUBCONTRACTOR IS CONSIDERED TO BE A SPECIALIST IN HIS RESPECTIVE FIELD AND SHALL, PRIOR TO SUBMISSION OF BID OR PERFORMANCE OF WORK, NOTIFY THE CONTRACTOR AND THE CONTRACTING OFFICER, IN WRITING, OF ANY WORK CALLED FOR IN THE DRAWINGS OR SPECIFICATIONS THAT CANNOT BE FULLY GUARANTEED.

12. THE CONTRACTOR WARRANTS ALL WORK TO BE PERFORMED AND ALL MATERIALS TO BE FURNISHED UNDER THIS CONTRACT AGAINST DEFECTS IN WORKMANSHIP FOR A PERIOD OF NOT LESS THAN 1 YEAR FROM THE DATE OF FINAL ACCEPTANCE. UPON WRITTEN NOTICE OF ANY DEFECT IN MATERIALS OR WORKMANSHIP, THE CONTRACTOR SHALL, AT THE OPTION OF THE GOVERNMENT, REPAIR OR REPLACE SAID DEFECT WITHOUT COST TO THE GOVERNMENT.

13. ALL MATERIALS SHALL CONFORM TO THE "BUY AMERICAN ACT".

14. ALL CONSTRUCTION WORK, ARCHITECTURAL, MECHANICAL, ELECTRICAL, FIRE PROTECTION, ETC. SHALL CONFORM TO THE MOST CURRENT ISSUE OF THE NATIONAL FIRE PROTECTION ASSOCIATION (NFPA), THE INTERNATIONAL BUILDING CODE, VA CRITERIA AND ANY APPLICABLE LOCAL, STATE AND FEDERAL CODES AND GUIDELINES. SHOULD THE REQUIREMENTS OF THE INTERNATIONAL BUILDING CODE CONFLICT WITH THE REQUIREMENTS OF THE NATIONAL FIRE PROTECTION

ASSOCIATION (NFPA), THEN THE MORE STRINGENT BETWEEN THE TWO SHALL GOVERN.

15. IN ACCORDANCE WITH GENERALLY ACCEPTED CONSTRUCTION PRACTICES, THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR WORKING CONDITIONS AT THE JOB SITE, INCLUDING SAFETY OF ALL PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT SHALL APPLY CONTINUOUSLY AND SHALL NOT BE LIMITED TO WORK HOURS. CONTRACTOR SHALL CONFORM TO ALL SAFETY REGULATIONS ENFORCED AT THE TIME OF CONSTRUCTION. JOB SITE SAFETY IS STRICTLY THE RESPONSIBILITY OF THE CONTRACTOR, AND NOT THE

ARCHITECT/ENGINEER OR THE GOVERNMENT.

16. THE CONTRACTOR SHALL PROVIDE U.L. RATED PORTABLE FIRE EXTINGUISHERS, TYPE 24.10.B.C ON SITE AND IN A LOCATION

APPROVED BY THE GOVERNMENT.

17. THE CONTRACTOR SHALL MAINTAIN THE CONSTRUCTION AREA AND ALL ADJACENT AFFECTED AREAS, IN A CLEAN AND ORDERLY MANNER THROUGHOUT THE COURSE OF CONSTRUCTION. DO NOT BLOCK ENTRANCES, EXITS, LOBBIES, CORRIDORS, ETC.

18. THE CONTRACTOR SHALL REMOVE ALL DEBRIS ON A DAILY BASIS IN ACCORDANCE WITH VA AND EPA REGULATIONS.

DEBRIS SHALL BE TRANSPORTED ON COVERED CARTS TO THE APPROVED DISPOSAL AREA AS DIRECTED BY THE CONTRACTING OFFICER. THE CONSTRUCTION AREA, AND ALL ADJACENT AREAS, SHALL BE CLEAN AND FREE OF DEBRIS AT

THE END OF EACH DAY.

19. THE CONTRACTOR SHALL BE RESPONSIBLE FOR REMOVING ALL LEFT-OVER MATERIALS, DEBRIS, TOOLS AND EQUIPMENT INVOLVED IN HIS OPERATIONS AT THE CONCLUSION OF THE PROJECT. ALL PROJECT AREAS AND SURROUNDING AREAS

AFFECTED BY CONSTRUCTION SHALL BE LEFT CLEAN AND IN PERFECT CONDITION.

20. THE CONTRACTOR SHALL TAKE ALL PRECAUTIONARY MEASURES TO ENSURE THAT ALL PROPERTIES, EQUIPMENT AND DEVICES AT THE PROJECT SITE ARE PROTECTED DURING THE CONSTRUCTION PERIOD. ANY DAMAGES TO EXISTING CONSTRUCTION, LANDSCAPING, EQUIPMENT AND DEVICES SHALL BE REPAIRED AND RESTORED TO A CONDITION EQUAL TO THAT EXISTING AT THE COMMENCEMENT OF THE WORK. THE CONTRACTOR SHALL RESTORE ANY DAMAGE AT HIS OWN EXPENSE. THE CONTRACTOR SHALL SUBMIT THE PROCEDURE FOR CONSTRUCTION AND DEMOLITION PRIOR TO

COMMENCING WORK.

21. ALL FINISH WORK, EITHER NEW OR EXISTING, WHICH IS DAMAGED OR STAINED AS A RESULT OF CONSTRUCTION ACTIVITIES, SHALL BE REPAIRED OR REPLACED AS NECESSARY AT NO ADDITIONAL COST TO GOVERNMENT.

22. ALL SURFACES SHALL BE SMOOTH, CONTINUOUSLY FREE OF IMPERFECTIONS AND IN PROPER CONDITION TO RECEIVE THE FINISH AS SPECIFIED. IN AREAS WHERE A FINISH IS NOT SPECIFIED, THEY SHALL MATCH ADJACENT MATERIAL IN

CONSTRUCTION, COLOR, TEXTURE AND MANUFACTURER.

23. WORK SHALL NOT BE PERFORMED WHEN WEATHER CONDITIONS MAY CREATE HAZARDOUS WORKING CONDITIONS OR

LEAD TO FAILURE IN WORKMANSHIP.

24. ANY ROOF, WALL OR OTHER OPENINGS MADE DURING CONSTRUCTION SHALL BE SEALED AND PROTECTED FROM RAIN, MOISTURE, WIND, DUST AND OTHER OUTSIDE ELEMENTS.

25. AN APPROPRIATELY QUALIFIED REPRESENTATIVE OF THE CONTRACTOR SHALL BE ON SITE TO SUPERVISE AND COORDINATE CONSTRUCTION AT ALL TIMES WHILE WORK IS IN PROGRESS. SUCH PERSON SHALL BE RESPONSIBLE FOR OSHA COMPLIANCE AND JOB SITE SAFETY. JOB SITE SAFETY IS STRICTLY THE SOLE RESPONSIBILITY OF THE CONTRACTOR. THE GOVERNMENT, ARCHITECTS AND ENGINEERS ARE NOT RESPONSIBLE FOR ANY ASPECT OF JOB SITE

SAFETY.

26. QUALITY CONTROL, INSPECTIONS AND WORKMANSHIP IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR. ANY OBSERVATIONS MADE BY THE GOVERNMENT OR ARCHITECT/ENGINEER DURING THE COURSE OF CONSTRUCTION ARE FOR THE BENEFIT OF THE GOVERNMENT AND DO NOT ALLEVIATE THE CONTRACTOR OF THIS RESPONSIBILITY.

27. THE CONTRACTOR SHALL NOT STORE ANY CHEMICALS ON THE SITE OR WITHIN THE CONFINES OF THE BUILDING

28. IF THE CONTRACTOR ENCOUNTERS ANY UNKNOWN SUBSTANCE OR MATERIAL THAT MAY BE SUSPECTED HAZARDOUS, THE CONTRACTOR SHALL IMMEDIATELY STOP WORK AND NOTIFY THE CONTRACTING OFFICER. ASBESTOS CONTAINING

MATERIALS ARE NOT PERMITTED.

29. ASBESTOS CONTAINING MATERIALS ARE NOT PERMITTED.

30. CONTRACTOR SHALL MAINTAIN AND KEEP THE EXISTING FIRE ACCESS LANE AND PEDESTRIAN ACCESS AND EXIT PATHS

CLEAR AT ALL TIMES.

31. SOME WORK MAY BE REQUIRED AFTER NORMAL WORKING HOURS, ON HOLIDAYS AND/OR WEEKENDS. THIS INCLUDES ANY WORK WHICH COULD POTENTIALLY BLOCK ACCESS TO THE FACILITY OR CAUSE DISRUPTION TO THE NORMAL OPERATIONS OF THE MEDICAL CENTER. THE WORK WILL HAVE TO BE CAREFULLY PLANNED AND PHASED FOR MINIMAL DISRUPTION TO MEDICAL CENTER ACTIVITIES. ANY WORK AFTER HOURS MUST BE CAREFULLY COORDINATED WITH, AND APPROVED BY THE GOVERNMENT, A MINIMUM OF TWO WEEKS IN ADVANCE.

32.

THE

33. UNDER NO CIRCUMSTANCES CAN THERE BE UTILITY OUTAGES, INCLUDING BRIEF CUTOVERS, ANYWHERE ON THE CAMPUS WITHOUT THE EXPRESS WRITTEN CONSENT OF THE GOVERNMENT. THE CONTRACTOR SHALL PLAN AND FORECAST UPCOMING WORK WHICH MAY DISRUPT NORMAL OPERATIONS OR INTERFERE WITH STAFF OR PATIENTS AND IDENTIFY THESE IN THE PHASING PLAN, AS WELL AS REPORT THESE IN THE WEEKLY MEETINGS. IT MAY BE NECESSARY TO POSTPONE OR RESCHEDULE WORK TO ACCOMMODATE THE NEEDS OF THE MEDICAL CENTER. ALL SUCH TIME SHALL BE INCLUDED IN THE BASE BID AND WILL NOT BE BILLABLE TO THE GOVERNMENT.

34. CONTRACTOR SHALL SUBMIT TO THE GOVERNMENT, FOR APPROVAL, THE LOCATION FOR LOADING AND UNLOADING MATERIALS. CONTRACTOR IS ADVISED THAT THERE WILL BE TIME RESTRICTIONS ASSOCIATED WITH SUCH ACTIVITIES

AND SHALL TAKE THIS INTO CONSIDERATION WHEN PREPARING THE PHASING PLAN.

35. CONTRACTOR SHALL PROVIDE SEISMIC ANCHORING AND/OR BRACING OF ALL CONSTRUCTION, WHETHER OR NOT SPECIFICALLY STATED ON THE DRAWINGS OR SPECIFICATIONS, INCLUDING BUT NOT LIMITED TO, WALLS, PARTITIONS, CASEWORK, FIXTURES, CEILING SUSPENDED ITEMS, OVERHEAD DUCTWORK, EQUIPMENT, PLUMBING AND ELECTRICAL PIPES AND RACEWAYS, AND FIRE PROTECTION SYSTEMS PER SPECIFICATION SECTION 130541 AND AS SHOWN ON THE

PLANS AND/OR SPECIFIED BY EACH RESPECTIVE DISCIPLINE.

36. WHERE EXTERIOR WORK OCCURS, THE CONTRACTOR IS RESPONSIBLE FOR CONSTRUCTING A WATERTIGHT FACILITY USING THE MEANS AND METHODS ESTABLISHED BY THE NATIONAL FENESTRATION RATING COUNCIL (NFRC), THE NATIONAL ROOFING CONTRACTOR'S ASSOCIATION, WESTERN STATES ROOFING CONTRACTOR'S ASSOCIATION AND ANY ADDITIONAL STANDARD PRACTICES, CODES AND REQUIREMENTS AS NECESSARY TO ENSURE A WATERTIGHT FACILITY FREE OF ANY LEAKS. ANY DETAILS PROVIDED HEREIN ARE PROVIDED FOR GENERAL GUIDANCE TO CONVEY THE INTENTION OF THE DESIGN, AND DOES NOT ALLEVIATE THE CONTRACTOR FROM THE RESPONSIBILITY TO PROVIDE A COMPLETELY WATERTIGHT FACILITY. THE CONTRACTOR SHALL PERFORM WATER TESTS TO DEMONSTRATE TO THE SATISFACTION OF THE CONTRACTING OFFICER THAT THE BUILDING DOES NOT LEAK. ANY DEFECTS OR LEAKS SHALL BE

IMMEDIATELY REPAIRED AT THE CONTRACTOR'S EXPENSE.

37. CONTRACTOR SHALL PROVIDE ALL SAFETY AND CAUTION SIGNAGE TO REDIRECT PEDESTRIAN TRAFFIC AND/OR ALERT THEM TO POTENTIAL CONSTRUCTION ACTIVITIES AND HAZARDS. SAFE AND ACCESSIBLE PEDESTRIAN ROUTES SHALL BE MAINTAINED AT ALL TIMES. PROVIDE SIGNAGE IN ACCORDANCE WITH OSHA STANDARD SPECIFICATION FOR ACCIDENT

PREVENTION SIGNS AND TAGS 1910.145.

38. FOR VA-PROVIDED EQUIPMENT TO BE INSTALLED BY THE CONTRACTOR (SHOWN AS "VC" ON THE PLANS OR SCHEDULES), CONTRACTOR SHALL DISCONNECT, REMOVE AND RELOCATE SUCH EQUIPMENT AND SHALL BE RESPONSIBLE FOR RE-CONNECTING AND TESTING PROPER OPERATION (PER MANUFACTURER'S INSTRUCTIONS) OF

SUCH EQUIPMENT PRIOR TO TURNING OVER SUCH EQUIPMENT TO THE VA.

39. FOR UTILITY INTERRUPTIONS OF LESS THAN 15 MINUTES IN DURATION, THE CONTRACTOR SHALL SUBMIT A REQUEST TO INTERRUPT ANY SUCH SERVICES TO COTR, IN WRITING, FIVE (5) WORKING DAYS IN ADVANCE OF PROPOSED INTERRUPTION. FOR UTILITY INTERRUPTIONS EXCEEDING 15 MINUTES IN DURATION, THE CONTRACTOR SHALL SUBMIT A REQUEST TO INTERRUPT ANY SUCH SERVICES TO COTR, IN WRITING, TEN (10) WORKING DAYS IN ADVANCE OF PROPOSED INTERRUPTION. REQUEST SHALL STATE REASON, DATE, EXACT TIME OF, AND APPROXIMATE DURATION OF

SUCH INTERRUPTION.

40. CONSTRUCTION IS TAKING PLACE IN AN EXISTING OCCUPIED FACILITY. AS SUCH, DEMOLITION OR CONSTRUCTION THAT PRODUCES EXCESSIVE (60 DB OR GREATER) NOISE OR VIBRATION SHALL BE PERFORMED AT TIMES COORDINATED AND APPROVED BY THE COTR. CONTRACTOR IS ADVISED THAT WORK MAY BE STOPPED OR DELAYED AT ANY TIME AT THE DISCRETION OF THE COTR SHOULD CONSTRUCTION ACTIVITIES CAUSE ANY DISTURBANCE OR INTERFERENCE WITH

PATIENT CARE.

41. THE CEILING ACCESS PANELS SHOWN ON DRAWINGS ARE FOR MAJOR MECHANICAL EQUIPMENT ACCESS ONLY.

ADDITIONAL ACCESS PANELS (NOT SHOWN) WILL BE REQUIRED FOR MAINTENANCE, PLUMBING, ELECTRICAL AND FIRE PROTECTION. CONTRACTOR SHALL PROVIDE ADDITIONAL ACCESS PANELS REQUIRED FOR THE ABOVE SPECIALTIES AT NO ADDITIONAL COST TO THE GOVERNMENT. CONTRACTOR SHALL COORDINATE WITH EACH SPECIALTY TRADE AND LOCATE ADDITIONAL ACCESS PANELS FOR REVIEW AND APPROVAL BY THE VA PRIOR TO FRAMING THE CEILING.

42. SHORING, BRACING AND PROTECTION OF EXISTING STRUCTURE AND EARTHWORK IS THE CONTRACTORS RESPONSIBILITY. PROVIDE ADEQUATE SHORING OF ANY EXISTING CONDITIONS OR CONDITIONS CAUSED BY CONSTRUCTION RELATED ACTIVITIES, AS NECESSARY TO PROTECT PERSONS AND STRUCTURE FROM POTENTIAL FALLING STRUCTURE, EQUIPMENT OR COLLAPSE OF EARTHWORK. AS A MINIMUM, FOR ANY EARTHWORK RESULTING IN TRENCHES OR EXCAVATIONS EXCEEDING THREE FEET (3') IN DEPTH, THE CONTRACTOR SHALL RETAIN THE SERVICES

OF A LICENSED STRUCTURAL ENGINEER TO PROVIDE INSTRUCTIONS, FOR VA APPROVAL, ON THE METHODS TO BE USED FOR SHORING. ANY OVERHEAD STRUCTURE, EQUIPMENT OR SIMILARLY HEAVY CONDITION TO REMAIN, SHALL BE PROPERLY SHORED WITH INPUT FROM A LICENSED STRUCTURAL ENGINEER, AS REQUIRED, TO ENSURE THE PERSONAL

SAFETY AND PROTECTION OF REMAINING STRUCTURE.

43. PROVIDE TEMPORARY CONSTRUCTION BARRIERS AS NECESSARY TO SEPARATE DEMOLITION AREAS FROM ADJACENT OCCUPIED SPACES WHEN BARRIERS CROSS A REQUIRED EXIT PATH, PROVIDE EXIT DOORS WITHIN BARRIER WALL.

44. THESE DOCUMENTS ARE NOT INTENDED TO SHOW EVERY EXISTING CONDITION OR ITEM. CONTRACTOR SHALL NOTIFY VA OF MISCELLANEOUS ITEMS FOUND. COORDINATE WITH THE VA REGARDING THE DISPOSITION OF SUCH ITEMS, AND

HANDLE ACCORDINGLY AT NO COST TO THE GOVERNMENT.

45. NOTIFY VA OF MISCELLANEOUS ITEMS FOUND. COORDINATE WITH THE VA REGARDING THE DISPOSITION OF SUCH

ITEMS, AND HANDLE ACCORDINGLY AT NO COST TO THE GOVERNMENT.

46. ALL STRUCTURAL ELEMENTS INCLUDING THEIR FIRE PROTECTION MATERIALS ARE TO REMAIN EXCEPT WHERE FURRING

IS INDICATED TO BE REMOVED.

47. BEFORE LAYING OUT DUCTWORK, PIPING, CONDUITS, FIXTURES, REGISTERS AND/OR OTHER UTILITIES ABOVE CEILING, COORDINATE CEILING SUSPENSION SYSTEM SUPPORT LOCATIONS TO AVOID CONFLICTS WITH EXISTING OR NEW CONSTRUCTION. WHERE INTERFERENCE WITH CEILING SUPPORTS CANNOT BE AVOIDED, CONTRACTOR SHALL PROVIDE ALTERNATE CODE-COMPLIANT SUSPENSION SYSTEM AND LAYOUT AT NO EXTRA COST TO THE VA.

FIRE STOPPING

VAMC THE TERM VAMC SHALL MEAN DEPARTMENT OF VETERANS AFFAIR

CONTRACTOR SHALL PROVIDE FIRE STOPPING WHERE MISSING, DAMAGED, OR IMPACTED BY NEW CONSTRUCTION AND AS REQUIRED IN ACCORDANCE WITH SPECIFICATIONS. DRAWINGS TO HAVE ALL DETAILS OR UL NUMBERS FOR FIRE

STOPPING MEASURES

CONTRACTOR SHALL DEVELOP AND SUBMIT A DETAILED PHASING PLAN INDICATING THE SEQUENCE OF WORK, THE POTENTIAL UTILITY CUTOVERS OR OUTAGES, AND SPECIFICALLY LIST ANY POTENTIAL DISRUPTIONS TO THE NORMAL OPERATIONS OF THE MEDICAL CENTER. THIS PLAN SHALL BE SUBMITTED AND APPROVED PRIOR TO MOBILIZING ON

SITE. THE CONTRACTOR IS TO PROVIDE A WORK PLAN FOR ANY DISRUPTION.

THE DRAWINGS AND SPECIFICATIONS REPRESENT A PERFORMANCE BASED DESIGN OUTLINING THE INSTALLATION OF THREE SPECIALIZED SYSTEMS; A NURSE CALL SYSTEM, AN MATV SYSTEM AND A PUBLIC ADDRESS SYSTEM IN BUILDINGS 1 AND 11.

FOR THE NURSE CALL SYSTEM, THE WORK DESCRIBED IN THE DRAWINGS AND SPECIFICATIONS CALL FOR INSTALLATION OF A RAULAND RESPONDER 5 NURSE CALL CENTRAL MONITORING STATION AND DUTY STATION, OR APPROVED EQUAL IN BUILDING 1. THE CONTRACTOR SHALL INSTALL ALL REQUIRED WIRING, DATA CONNECTIONS, CONDUITS AND OTHER ASSOCIATED EQUIPMENT NECESSARY FOR A COMPLETE INSTALLATION. CONTRACTOR SHALL ALSO PROVIDE ALL SOFTWARE AND PROGRAMMING FOR INTERFACE WITH EXISTING NURSE CALL AND/OR COMPUTER SYSTEMS.

FOR THE MATV SYSTEM, THE WORK DESCRIBED IN THE DRAWINGS AND SPECIFICATIONS CALL FOR NEW CABLING AND CONDUITS FROM THE HEADEND EQUIPMENT ON THE 7TH FLOOR TO EACH CABLE TELEVISION THROUGHOUT BUILDING 1. NOTE, AS PART OF THIS WORK THE CONTRACTOR SHALL REMOVE ALL EXISTING MATV CABLING, SPLITTERS AND TAPS. IN SOME CASES, THESE DEVICES ARE LOCATED WITHIN EXISTING WALLS AND ARE NOT SHOWN ON THE

DRAWINGS.

FOR THE PUBLIC ADDRESS (PA) SYSTEM; THE WORK DESCRIBED IN THE DRAWINGS AND SPECIFICATIONS CALL FOR A NEW PUBLIC ADDRESS SYSTEM. THE CONTRACTOR SHALL SELECT, FOR VA APPROVAL, A QUALIFIED MANUFACTURER FOR EACH OF THE PROPOSED SYSTEMS AND INSTALL A COMPLETE AND FULLY OPERATIONAL SYSTEM WITH ALL NECESSARY COMPONENTS FOR THE PROPER FUNCTIONING OF THE SELECTED SYSTEM. NOTE, AS PART OF THIS WORK THE CONTRACTOR SHALL REMOVE ALL EXISTING PUBLIC ADDRESS SPEAKERS AND ASSOCIATED EQUIPMENT. ADDITIONAL WORK INCLUDES PATCHING AND REPAIRING ANY GYPSUM BOARD CEILINGS, AND REPLACEMENT OF CEILING TILES. THE NEW PUBLIC ADDRESS SYSTEM SHALL BE INSTALLED

IN BUILDING 1 AND BUILDING 11.

DEVICE LOCATIONS SHOWN ON THE DRAWINGS ARE APPROXIMATE ONLY AND ARE INTENDED ONLY TO CONVEY THE GENERAL SCOPE OF THE PROJECT.

PRIOR TO COMMENCEMENT OF ANY WORK, THE CONTRACTOR SHALL PERFORM A FIELD SURVEY TO LOCATE ALL EXISTING EQUIPMENT AND DEVICES. THIS

SURVEY SHALL BE DOCUMENTED AND PRESENTED TO THE VA BEFORE COMMENCING WORK.

ASBESTOS-CONTAINING MATERIALS (ACM'S) EXIST THROUGHOUT THE ABOVE CEILING SPACES. THE CONTRACTOR IS REQUIRED TO HAVE ALL PERSONNEL TRAINED AND CERTIFIED IN THE SAFE HANDLING OF ASBESTOS CONTAINING MATERIALS PRIOR TO COMMENCEMENT OF ANY WORK. PPE'S, INCLUDING THE USE OF RESPIRATORS, WILL APPLY FOR ALL ABOVE CEILING WORK AND ANY OTHER AREAS WHERE ASBESTOS CONTAINING MATERIALS ARE SUSPECTED.

ACOUSTIC TILE CEILINGS: DEMOLISH/REMOVE ENTIRE CEILING TILE AT LOCATIONS WHERE ITEMS SCHEDULED FOR REMOVAL OR REPLACEMENT, EXISTING

CEILING SUSPENSION SYSTEM TO REMAIN.

GYPSUM BOARD WALLS AND CEILINGS: WHERE ITEMS ARE SCHEDULED FOR REMOVAL OR REPLACEMENT, PREPARE WALL OR CEILING SURFACE FOR PATCHING AND REPAIR TO MATCH THE EXISTING ADJACENT WALL OR CEILING SURFACE FINISH AND PAINT FINISH.

REMOVE AND LEGALLY DISPOSE OF ALL ITEMS SCHEDULED FOR REMOVAL OR DEMOLITION. MATERIALS REMOVED SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE DISPOSED OF IN COMPLIANCE WITH APPLICABLE FEDERAL, STATE, OR LOCAL RULES AND REGULATIONS.

SCOPE OF WORK

ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS FACILITY AND IN THE ABOVE CEILING SPACES. THE CONTRACTOR SHALL TAKE EVERY PRECAUTION

NECESSARY TO PROTECT PERSONS FROM EXPOSURE. THESE SAFEGUARDS WILL INCLUDE:

1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING THE ABOVE CEILING SPACES AND/OR REMOVING ANY CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40 HOUR ASBESTOS TRAINING CLASS, AS

APPROVED BY THE VA, WITH CERTIFICATION.

2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING THE ABOVE CEILING SPACES AND/OR REMOVING ANY CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT (PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS PRIOR TO ENTRY INTO ABOVE CEILING

SPACES.

3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES, CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT, A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.

4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS OR OTHER DISTURBANCE OF CELING OR WALL

MATERIALS SHALL BE PERFORMED WITH PROPER BARRICADES INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH PROTECTIVE BARRICADES SHALL BE

PROVIDED BY THE CONTRACTOR.

THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY, PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY FORM AT THE PROJECT SITE. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR JOB SITE SAFETY WHICH INCLUDES ALL TRAINING AND SAFEGUARDS NECESSARY TO PROTECT HIS/HER EMPLOYEES, VA PERSONNEL VISITORS AT THE SITE OR ANY OTHER PERSONS.

GI102

PROJECT GENERAL NOTES

Project Number:

Building Number:

Drawing Number:

Project Title:

Location:

Issue Date: Checked: Drawn:

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase:ARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

K F DAVIS

ENGINEERING, INC

530 LA GONDA WAY, SUITE E,

DANVILLE, CA 94526

WWW.KFDE.COM

(925) 743-8884

H :\R ev it

T em p Fo ld er

\V

AS

D _R ep la ce N ur se

C al l M

AT

V

PA

_v

_r on

.b la yl oc k.

rv t

G. FERNANDEZ

REPLACE HOSPITAL NURSE CALL,

MATV, AND PUBLIC ADDRESS

664-18-331

SAN DIEGO, CA

Revisions: Date: 02/02/2024

100% SUBMITTAL

A. SHRESTHA

S T A T E O F CA L I F ORN I A

RE

G

IS

TE

RED PROFESS IONAL ENGINEERA U

GUST I NE K . L EUNG

E L E C T R I C A L

GENERAL NOTES

1.

2.

3.

4.

5.

6.

7.

8.

9.

10.

11.

12.

13.

14.

15.

16.

17.

ALL DIMENSIONS ARE TO FACE OF STUD, OR CENTERLINE OF COLUMN U.O.N.

ALL DIMENSIONS INDICATED AS "CLEAR" ARE TO FACE OF FINISH AND INDICATE A MINIMUM REQUIRED DISTANCE.

WHEN LAYING OUT WALLS, CONTRACTOR SHALL MAKE FIELD MEASUREMENTS TO ENSURE ALL REQUIRED CLEAR DIMENSIONS

ARE MAINTAINED AS INDICATED.

PENETRATIONS ARE NOT PERMITTED THROUGH STRUCTURAL MEMBERS.

WHERE FULL HEIGHT WALLS ARE SHOWN, FRAME WALL TO FORM A TIGHT FIT AROUND DUCT OR PIPING; SEAL ALL GAPS AND

CAULK ALL AROUND TO KEEP INTEGRITY OF WALL RATING AS APPLICABLE.

WHERE DUCTS OR PIPING PENETRATE FULL HEIGHT WALLS, EXTEND FRAMING & GYPSUM BOARD FINISH TO FORM A TIGHT FIT AROUND SUCH PIPING OR DUCTS; SEAL ALL GAPS AND FIRE CAULK ALL AROUND TO KEEP INTEGRITY OF FIRE RATING AS

APPLICABLE.

IN ALL AREAS WITH DEPRESSED SLAB, FILL AS APPLICABLE WITH CONCRETE TOPPING OR MORTAR BED PRIOR TO INSTALLING FLOOR FINISH. CONTRACTOR SHALL PATCH, LEVEL, AND PREPARE FLOOR SLAB TO RECEIVE NEW FLOORING. THIS INCLUDES REMOVAL OF BUMPS AND OTHER IMPERFECTION AND FILLING ANY VOIDS OR NON-LEVEL SURFACES WHERE THEY OCCUR.

INSTALL NEW FLOORING FLUSH WITH ADJACENT FLOORING.

TERMINATE FLOORING EDGE BELOW DOOR THRESHOLD OR CENTERED BELOW DOOR AS APPLICABLE U.O.N.

WHEN WALL SEGMENT IS AN EXTENSION OF A WALL OR FURRING, STUDS SHALL MATCH AND BOTH FINISHES SHALL ALIGN.

CONTRACTOR SHALL FIELD COORDINATE CORRECT PLACEMENT OF STUDS.

ALL INTERIOR PARTITION METAL STUDS SHALL BE 4" U.O.N. (SEE FLOOR PLAN FOR LOCATION OF INTERIOR 6" METAL STUDS).

ALL WALL FURRING SHALL BE 3 5/8" METAL STUDS. MIN. U.O.N.

CONTRACTOR IS TO PROVIDE ALL ITEMS SHOWN ON THE PLANS UNLESS INDICATED AS (GFCI) OR (GFGI).

SOUND RATED PARTITIONS SHALL HAVE A MIN. STC RATING OF 45 U.O.N. SOME FIRE RATED PARTITIONS ARE ALSO SOUND RATED WHERE INDICATED. PARTITIONS AROUND THE MECH ROOM SHALL HAVE AN STC RATING OF 60 WHERE INDICATED

AT FIRE RATED ROOMS, EXTEND COLUMN FURRING TO UNDERSIDE OF FLOOR/ROOF DECK OR BEAMS AS APPLICABLE.

PROVIDE REQUIRED BLOCKING AND BACKING FOR ALL WALL MOUNTED ITEMS, FIXTURES, ACCESSORIES, CASEWORK AND

EQUIPMENT.

ALL EXTERIOR WALL METAL STUDS SHALL BE 6" WITH A VAPOR BARRIER ON THE INSIDE FACE OF STUD U.O.N.

BEFORE LAYING OUT DUCTWORK, PIPING, CONDUITS AND / OR UTILITIES ABOVE CEILING, COORDINATE CEILING SUSPENSION

SYSTEM SUPPORT LOCATIONS TO AVOID CONFLICTS.

WHERE INTERFERENCE WITH CEILING SUPPORTS CANNOT BE AVOIDED, CONTRACTOR SHALL PROVIDE ALTERNATE SUSPENSION SYSTEM IN COMPLIANCE WITH APPLICABLE CODES AND STANDARDS AT NO EXTRA COST TO THE GOVERNMENT.

ARCHITECTURAL ABBREVIATIONS

& AND

L ANGLE

@ AT

ll PARALLEL

PL PLATE

DIAMETER OR ROUND CHANNEL

CHANNEL

# POUND OR NUMBER

AB ANCHOR BOLT

AC ASPHALT CONCRETE

AD AREA DRAIN

ADD ADDENDUM

AFF ABOVE FINISH FLOOR

AGG AGGREGATE

ALUM ALUMINUM

ALT ALTERNATE

ANOD ANODIZED

APPROX APPROXIMATE

ARCH ARCHITECT (URAL)

ASB ASBESTOS

AT ACOUSTICAL TILE

AUTO AUTOMATIC

AVG AVERAGE

ARB AIR RESISTANT BARRIER

BARI BARIATRIC

BD BOARD

BEL BELOW

BET BETWEEN

BITUM BITUMINOUS

BLDG BUILDING

BLK BLOCK

BLKG BLOCKING

BM BEAM

BOT BOTTOM

BS BOTH SIDES

BSMT BASEMENT

BW BOTH WAYS

CPL CEMENT PLASTER

CAB CABINET

CC CONTRACTOR FURNISHED

CONTRACTOR INSTALLED

CIP CAST IN PLACE

CJ CONTROL JOINT

CLO CLOSET

CLG CEILING

CLK(G) CAULK(ING)

CLR CLEAR (ANCE)

CMU CONCRETE MASONRY WALL

CO CONTRACTING OFFICER

COL COLUMN

CONC CONCRETE

CONN CONNECT (ION)

CONST CONSTRUCTION

CONT CONTINUOUS/CONTINUED

COR CONTRACTING OFFICER'S

REPRESENTATIVE

CORR CORRIDOR

COTR CONTRACTING OFFICER'S

TECHNICAL REPRESENTATIVE

CT CERAMIC TILE

CW COLD WATER

C.G. CORNER GUARD

DBL DOUBLE

DEMO DEMOLISH/DEMOLITION

DET DETAIL

DIA DIAMETER

DIAG DIAGONAL

DIM DIMENSION

DIV DIVISION

DL DEAD LOAD

DN DOWN

DO DITTO

DR DOOR

DS DOWNSPOUT

DWG DRAWING

(E) EXISTING

EA EACH

EL ELEVATION

ELEC ELECTRIC (AL)

ELEV ELEVATOR

ENGR ENGINEER

EPDM ETHYLENE PROPYLENE

DIENE MONOMER

EQ EQUAL

EST ESTIMATE

ETC ETCETERA

EXP EXPANSION

EXT EXTERIOR

EIFS EXTERIOR INSULATION FINISH

SYSTEM

EPS EXPANDED POLYSTYRENE

COMP COMPOSITE

CTF CUT TO FIT

F FLUSH

FD FLOOR DRAIN

FEC FIRE EXTINGUISHER CABINET

FF FINISHED FLOOR

FHP FULL HEIGHT PARTITION

FIN FINISH (ED)

FIX FIXTURE

FLASH FLASHING (ED)

FLEX FLEXIBLE

FLUOR FLUORESCENT

FLR FLOOR (ING)

FNDN FOUNDATION

FOC FACE OF CONCRETE

FOF FACE OF FINISH

FOM FACE OF MASONRY

FOS FACE OF STUD

FOW FACE OF WALL

FP FIRE PROTECTION

FRP FIBERGLASS REINFORCED PANEL

FT FOOT/FEET OR FIRE TREATED

FTG FOOTING

FTP FIRE TREATED WOOD

FURR FURRING/FURRED

GA GAGE, GAUGE

GALV GALVANIZED

GC GENERAL CONTRACT (OR)

GI GALVANIZED IRON

GLZ GLAZING (ED)

GRND GROUND

GSM GALVANIZED SHEET METAL

GWB GYPSUM WALL BOARD

GYP GYPSUM

GMF GLASS MAT FACE (D)

HB HOSE BIBB

HC HOLLOW CORE

HD HEAVY DUTY

HDCP HANDICAP

HDR HEADER

HDW HARDWARE

HDWD HARDWOOD

HM HOLLOW METAL

HORIZ HORIZONTAL

HR HOUR

HT HEIGHT

HW HOT WATER

HVAC HEATING, VENTILATION AND

AIR CONDITIONING

ID INSIDE DIAMETER

INCL INCLUDE (D) (ING)

INSUL INSULATE (D) (ION)

INT INTERIOR

INV INVERT

JB JUNCTION BOX

JST JOIST

JT JOINT

LAM LAMINATE

LAV LAVATORY

LAFW LAMINAR AIRFLOW WORK BENCH

LBS POUNDS

LL LIVE LOAD

LT LIGHT

MAS MASONRY

MAX MAXIMUM

MB MACHINE BOLT

MC MEDICINE CABINET

MECH MECHANIC (AL)

MED MEDIUM

MFR MANUFACTURER

MIN MINIMUM

MISC MISCELLANEOUS

M-LAM MICROLAM

MTL METAL

MUL MULLION

MPF METAL PAN FLASHING

(N) NEW

N NORTH

NA NOT APPLICABLE

NIC NOT IN CONTRACT

NFPA NATIONAL FIRE PROTECTION

ASSOCIATION

NO. NUMBER

NOM. NOMINAL

NRC NOISE REDUCTION COEFFICIENT

NTS NOT TO SCALE

O/ OVER

OA OVERALL

OAE OR APPROVED EQUAL

OBS OBSCURE

OC ON CENTER (S)

OD OUTSIDE DIAMETER

O.H. OPPOSITE HAND

OPP OPPOSITE

OPNG OPENING

OSHA OCCUPATIONAL SAFETY AND

HEALTH ADMINISTRATION

PANO PANORAMIC

PAR PARALLEL

PCB POLYCHLORINATE BIPHENYL

PCF POUNDS PER CUBIC FOOT

PED PEDESTAL

PERF PERFORATE (D)

PERP PERPENDICULAR

PL PLATE

P-LAM PLASTIC LAMINATE

PLF POUNDS PER LINEAR FOOT

PSI POUNDS PER SQUARE INCH

PT PRESSURE TREATED

PVC POLYVINYL CHLORIDE

PNL PANEL (S)

RAD RADIUS

RC RESILIENT CHANNEL

RD ROOF DRAIN

RDWD REDWOOD

RE REINFORCE (D) (ING)

REC RECEIVING

REF REFRIGERATOR

REM REMOVE (D)

REQ REQUIRED

RET RETAINED

REV REVISION (S)/REVISED

RM ROOM

RO ROUGH OPENING

RWL RAINWATER LEADER

S SKYLIGHT

SAB SOUND ATTENUATION BLANKET

SC SOLID CORE

SCD SEE CIVIL DRAWINGS

SCHED SCHEDULE

SD SMOKE DETECTOR

SD STORM DRAIN

SDSF SOLID SURFACE

SECT SECTION

SED SUSTAINABLE ENERGY

DEVELOPMENTS

SEL SELECT

SHTG SHEATHING

SIM SIMILAR

SKL SKYLIGHT

SMD SEE MECHANICAL DRAWINGS

SPEC SPECIFICATION (S)

SPD SUPPLY/PROCESSING/

DISTRIBUTION

S & BR SEALANT AND BACK-UP ROD

SPS SUPPLY/PROCESSING SERVICES

SQ SQUARE

SS STAINLESS STEEL

SSD SEE STRUCTURAL DRAWINGS

ST STREET

STL STEEL

STOR STORAGE

STRUCT STRUCTURAL

SUSP SUSPENDED

SYM SYMMETRY (ICAL)

T TREAD

T&B TOP & BOTTOM

TELE TELEPHONE

TEMP TEMPERED

TO TOP OF

TOC TOP OF CONCRETE

TOD TOP OF DECK

TOG TOP OF GRADE

TOP TOP OF PARAPET

TP TOP PLATE

T&G TONGUE AND GROOVE

THK THICK (NESS)

TPO THERMOPLASTIC POLYOLEFIN

TW TOP OF WALL

TV TELEVISION

TYP TYPICAL

UL UNDERWRITERS LABORATORY

UON UNLESS OTHERWISE NOTED

VR VAPOR RETARDER

VA VETERAN'S ADMINISTRATION

VETERANS AFFAIRS

VB VAPOR BARRIER

VC (GFCI) GOVERNMENT FURNISHED,

CONTRACTOR INSTALLED

VV (GFGI) GOVERNMENT FURNISHED,

GOVERNMENT INSTALLED

VENT VENTILATE (ION)

VIF VERIFY IN FIELD

VERT VERTICAL

VCFW VINYL COATED FABRIC WALL

COVERING

VWP VINYL WALL PROTECTION

WC WATER CLOSET

WD WOOD

W/ WITH

WH WATER HEATER

WI WROUGHT IRON

WIN WINDOW

W/O WITHOUT

WP WATERPROOF (ED) (ING)

WR WATER RESISTANT

WRB WATER RESISTANT BARRIER

WT WEIGHT

ABBREVIATIONS DESCRIPTION ABBREVIATIONS DESCRIPTION ABBREVIATIONS DESCRIPTION

ARCHITECTURAL SYMBOLS

CENTER LINE

ELEVATION INDICATOR

CENTER LINE INDICATOR

PROJECT AREA

DEMOLITION LINE

EXISTING TO REMAIN LINE

FEATURES ABOVE LINE INDICATOR

FIRE RESISTIVE RATED LINE, 1 HOUR

FIRE RESISTIVE RATED LINE, 2 HOUR

FIRE-RATED, SMOKE BARRIER LINE, 1 HOUR

LEAD LINE

HIDDEN FEATURES LINE

NEW LINE

PROPERTY LINE

BREAK, ROUND (USER DEFINES SIZE)

BREAK, STRAIGHT (SEE SECTION INDICATORS,

BUILDING, WITH BREAK STANDARDS)

DETAIL INDICATOR

DETAIL INDICATOR

DETAIL INDICATOR FOR SMALL CONDITIONS

DETAIL INDICATOR

FURNITURE, FIXTURE, & EQUIPMENT INDICATOR

DIMENSION LINE

DOOR NUMBER

WINDOW/LOUVER TAG

ELEVATION INDICATOR, EXTERIOR

ELEVATION INDICATOR, INTERIOR, MULTIPLE VIEW

BUILDING SECTION INDICATOR

GRAPHIC SCALE, 1/8"=1'-0"

ROOM NAME AND NUMBER

COLUMN GRID

KEYNOTE

NORTH ARROW

ALIGN (N) FINISH W/ (E) FINISH

WALL STUD SIZE

SOUND TRANSMISSION CLASS

ABBREVIATIONS DESCRIPTION

A

CORRIDOR

1C06

0 16'8'4'

AS500

AS801

CL

AS601

DETAIL NUMBER

SHEET WHERE DRAWN

AS500

AS801

AS801

AS801

8"

L

NORTH

A

60 ST

C

AS500

Project Number:

Building Number:

Drawing Number:

Project Title:

Location:

Issue Date: Checked: Drawn:

Drawing Title

Approved:

VA FORM 08 - 6231

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase:ARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

K F DAVIS

ENGINEERING, INC

530 LA GONDA WAY, SUITE E,

DANVILLE, CA 94526

WWW.KFDE.COM

(925) 743-8884

H :\R ev it

T em p Fo ld er

\V

AS

D _R ep la ce N ur se

C al l M

AT

V

PA

_v

_r on

.b la yl oc k.

rv t

G. FERNANDEZ

REPLACE HOSPITAL NURSE CALL,

MATV, AND PUBLIC ADDRESS

664-18-331

SAN DIEGO, CA

Revisions: Date: 02/02/2024

100% SUBMITTAL

A001

GENERAL NOTES, LEGEND,

AND ABBREVIATIONS

R. KORTEJ. ROBERTS

ST

ATE OF CA L I FORN IA

REG

I ST ER ED A RCH I T ECT

DN

OFFICE

TOILET

MALE

LOCKERS

MALE

ROOM

CONFERENCE

AREA

STORAGE

OFFICE

STORAGE

STERILE

CART HOLDING AREA

STERILE STORAGE

CORRIDOR

OFFICE

SERVICES

BUILDING

RM.

ELEC.

LOUNGE

LOCKERS

FEMALE

TOILET

FEMALE

LOCKERS

MALE

TOILET

MALE

JANITOR

CART AREA

ROOM

VENDOR

AND BREAKOUT

CLEAN RECEIVING

CORRIDOR

DETERGENT

DECONTAMINATION

SOILED /

ANTE ROOM

PROCESSING

SCOPE

DRYING

TRANSFER

CART WASH

CARTWASH

AUTOMATIC

WASH

INSTRUMENT

STORAGE

BULK

DISPATCH

HALLWAY

TOILET

FEMALE

LOCKERS

FEMALE

SIGNAL ROOM

DATA/TELE

ETO

STORAGE

AREA

STAGING

DRUGS

RM.

JANITOR

OFFICE

OFFICE

UP

DUMB

DW1-B-1

B190

A/C SHOP

B190A

A/C SHOP

B254

A/C SHOP

B252

OFFICES(S)

B253

A/C SHOP

B255

PIPE SHOP

B191

STORAGE

B251

MECHANICAL

B200

ELECTRONICS

B177L

STORAGE

GENERAL

B177K

STORAGE

OIT

B177J

STORAGE

GENERAL

B128

KITCHEN

B177F

UTILITY

B177E

STORAGE

EQUIPMENT

B177H

RECEIVING

B236

AUTOPSY

B247

OFFICE

B248

OFFICE

B249

OFFICE(S)

B176

OFFICE(T)

B177B

CORR.

B171A

OFFICE(T)

B117P

CORR.

B173

STORAGE

OXYGEN

B177C

CORR.

B177A

CORR.

B177N

STORAGE

GENERAL

B177D

STORAGE

GENERAL

B191R

CORRIDOR

B194

STOR.

GENERAL

B194A

STOR.

GENERAL

B245

STOR.

MORGUE

B244

STOR.

MORGUE

B235

REFERIGER. B241

OFFICE

B234

OFFICE

B232B

OFFICE

B181

REFER.

B138

REFER.

B137

REFER.

B213

BIOMED

B250

OFFICE(S)

B232A

OFFICE

B233

OFFICE(T)

B177M

CORR. B117B

CORR.

B232

OFFICE(T)

B231

MECHANICAL

B136

REFER.

B183A

STOR.

GENERAL

B183

STOR.

GENERAL

B129

OFFICE(S)

B130

OFFICE(S)

B166

ELECTRICAL

B188

ELECTRICAL

B167

EQUIPMENT

OIT

B165

TELEPHONE

B165A

OIT STOR.

B176

OFFICE

B131

OFFICE(S)

B126

CONFERENCE

B127

OFFICE(S)

B126D

OFFICE(S)

B127A-1

OFFICE(S)

B132

OFFICE(S)

B126C

OFFICE(S)

B114A

OFFICE(S)

B114

OFFICE(S)

B115

OFFICE(S)

B134

MANAGEMENT

RECORDS

B122

DISHWASHING

B119

WASH

CAR

B184

STOR.

GENERAL

B185

STOR.

GENERAL

B128B

STOR.

GENERALB186

STOR.

GENERAL

B140A

REFER.

B140

CORR.

B143

LAB

B142A

LAB

B142

LAB

B142E

LAB

B147

RESIDENT B156A

LAB

B156A

LAB

B198

ELECTRIC SHOP

B240

CORR.

B212

CORR.

B204

CORR.

B210

CARPENTRY

B210C

MECHANICAL

B141

MICROSCOPE FACILITY

CORE ELECTRON

B142D

LAB

B142B

SUPPLY

STERILE

B144

LOCKER(F)

B145

CONF. RM /OFFICE(S)

PHARMACY

B144A

LOCKER(F)

B149

LOCKER(M)

B152

OFFICE

PHARMACOECO.

BB152A

OFFICE(S)

B125

CORR.

B123

PREP

B157

VAULT

B153

STOR.

VAULT

B121

CORR.

B152E

ED. TRAINING OFF.(S)

DIR. PHARM.

B152D

DATA APPS.ANALYSIS OFF.(S)

DIR. PHARM.

B155

ADMIN.0FFICE

PHARMACY

B160

KITCHEN

B155C

SVC OFF.(S)

CHIEF PHARM.

B159B

OFFICE

B159A

OFFICE

B217

STOR.

EQUIPMENT

B223B

OFFICE(T)

B218

OFFICE(S)

B246

CORR.

B100

LOBBY

B156

AREA

PHARMACY

B215

STORAGE

B215A

STORAGE

B215B

CORRIDOR

B215B

CORRIDOR

B128C

OFFICE(S)

DIET INFO.

B117

CORRIDOR

B191J

STORAGE

GENERAL

B191G

STORAGE

OIT

B191P

STORAGE

GENERAL

B1000

CENTER OFFICE

IT SERVICE

B171

OFFICE

B201A

KITCHEN

B200A

STOR.

GENERAL

B205

KEYS

B216

LINEN

SOIL

B217A

STOR.

EQUIPMENT

SW6-B-1

STAIRS

SW7-B-1

STAIRS

SW8-B-1

STAIRS

B206

OFFICE(S)

B189B

STOR.

GENERAL

B198A

OFFICE(S)

SW1-B-1

STAIR

B191Q

CORR.

B191H

STORAGE

GENERAL

B214

OFFICE

B211

OFFICE

B217B

ELEC

B217C

ELEC

B212B

CORR.

B162

SERVICE OFFICE(S)

ENVIRONMENTAL

B210B

MECHANICAL

B210A

OFFICE(S)

B220

STOR.

GENERAL

B224

STOR.

HAC

B229

OPERATIONS

MGR. OFF.

B108A

STOR.

GENERAL

B101

LOBBY

B108B

STOR.

EQUIPMENT

B109

CORRIDOR

B108C

STOR.

EQUIPMENT

SW13-B-1

STAIRS

B201

STOR.

MAINTENANCE

B202

SIGNAGE

B239

CORR.

B238

CORR.

B158

STAIR

B182

KITCHEN

STOR.

B146

SHOWER(F)

B189A

STOR.

B125A

MALE TOI.

B133

FEMALE TOI.

B176A

MALE TOI.

B176B

MALE TOI.

W9-B-1

STAIR

B180

MECH.

B135A

HAC

B148

SHOWER(M)

B149A

LOCKER(M)

B149B

MECH.

B155B

OFF.OFF.(S)

ADMIN.

B155E

CORR.

B155F

CORR.

B154

CORR.

B172C

OFFICE

B196

ELEC. RM

S5-B-1

PET ELEV

B212A

CORR.

B191A

MALE TOI.

B191B

MALE TOI.

B242

MALE TOI.

B243

FEMALE TOI.

B128A

MGR. OFFICE(S)

CLINICAL NUTRITION

B128D

STOR.

GENERAL

SW11-B-1

STAIRS

SW12-B-1

STAIRS

B191K

STORAGE

GENERAL

B191E

UPPERB191D

STORAGE

GENERAL

B191C

STORAGE

B191F

STORAGE UPPER

GENERAL

B191C

STORAGE LOWER

GENERAL

B237

HAC

B232C

RECEPTION

B230A

TELECOM

B108

MECHANICAL

B152B

SAFETY OFF.(S)

DIR. MED.

B155A

PHARM. SVC OFF.(S)

ASS. CHIEF

B135

MECH.

B126B

OFFICE

B126A

OFF.(S) NUTRITION FOOD SER.

ED. SECT.

B191M

CORR.

B191L

STOR.

B152C

COOR.OFF.(S)

U.O.P. REGIONAL

B141A

CORR.

B230

OFFICE

B224A

CORR.

B222

MALE TOI.

B187

HAS

B225

CORRIDOR

B104

TOILET

B172C

STOR.

SPS SUPPLY

B125B

CORR.

SW10-B-1

LIFT

B120

STORAGE

B125C

CORR.

B144B

DRESSING RM

B155G

CORR.

TUNNEL

STORAGE

B195B

CART WASH

B102A

HSK

B227

MALE TOILET

B107

FEMALE TOILET

B106

CORRIDOR

CORRIDOR

B111

B116

SPS

STORAGE

B112

SPS

ADMINISTRATION

OFFICE(S)B110

DECON

B102

SPS

PREP

AREAB105

STERILIZER

B102B

GAS ETO

B102C MENS LOCKER

B228

CORRIDOR

BREAK ROOM

B226

SPS

STERILE

STORAGEB197

UTILITY AND EQUIPMENT STORAGE

B223

VACANT STORAGE

PATIENT

EFFECTSB223C

GENERAL STORAGE

B223D

CORRIDOR

B191N

GENERAL

STORAGE

B195C

MATERIAL MANAGEMENT OFFICE

B172A

EQUIPMENT STORAGE

B112A

SPS

SUPPLY

STORAGEB172B

EQUIPMENT STORAGE

B172D

EQUIPMENT

STORAGE

B117

GENERAL STORAGE

B172

B223A

ELECTRICAL

UP

UPDNUPDN

B142C

DARK RM

ELEVATOR

S1

ELEVATOR

S2

ELEVATOR

S3

ELEVATOR

S4

M&O OFFICE

(FUTURE TV

SHOP)

SP SP SP SP SP SP SP SP SP SP SP

SP

SP

SP

SP

SP SP SP SP SP SP

SP

SP

SP

SP

SP

SP

SP SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SPSP

SP

SP

SP

SP

SP

SP

W S

W S

W S

W S

W S

KEY PLAN

Project Number:

Building Number:

Drawing Number:

Project Title:

Location:

Issue Date: Checked: Drawn:

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase:ARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant: K F DAVIS

ENGINEERING, INC

530 LA GONDA WAY, SUITE E,

DANVILLE, CA 94526

WWW.KFDE.COM

(925) 743-8884

H :\R ev it

Lo ca l F ile s\

VA

SD

_R ep la ce N ur se

C al l M

AT

V

PA

_V

_j am es .h ec k.

rv t

9/

/2

2:

:0

PM

A. SHRESTHAJ. ROBERTS

REPLACE HOSPITAL NURSE CALL,

MATV, AND PUBLIC ADDRESS

664-18-331

02/02/2024

100% SUBMITTAL

SAN DIEGO, CA

Revisions: Date:

ST

ATE OF CA L I FORN IA

REG

I ST ER ED A RCH I T ECT

ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS

FACILITY AND IN THE ABOVE CEILING SPACES. THE

CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY

TO PROTECT PERSONS FROM EXPOSURE. THESE

SAFEGUARDS WILL INCLUDE:

1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING

THE ABOVE CEILING SPACES AND/OR REMOVING ANY

CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN

THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS

CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40

HOUR ASBESTOS TRAINING CLASS, AS APPROVED BY THE

VA, WITH CERTIFICATION.

2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING

THE ABOVE CEILING SPACES AND/OR REMOVING ANY

CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND

WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT

(PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS

PRIOR TO ENTRY INTO ABOVE CEILING SPACES.

3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES,

CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT,

A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.

4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF

CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS

OR OTHER DISTURBANCE OF CELING OR WALL MATERIALS

SHALL BE PERFORMED WITH PROPER BARRICADES

INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH

PROTECTIVE BARRICADES SHALL BE PROVIDED BY THE

CONTRACTOR.

THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS

SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY,

PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR

EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY

FORM AT THE PROJECT SITE. THE CONTRACTOR IS SOLELY

RESPONSIBLE FOR JOB SITE SAFETY WHICH INCLUDES ALL

TRAINING AND SAFEGUARDS NECESSARY TO PROTECT

HIS/HER EMPLOYEES, VA PERSONNEL VISITORS AT THE SITE

AND ANY OTHER PERSONS.

ASBESTOS WARNING

1/16" = 1'-0"AD101

1 BASEMENT FLOOR - DEMO PLAN

NORTH

SHEET NOTES

AD101

BASEMENT FLOOR - DEMO PLAN

GENERAL NOTES

1 REMOVE ALL EXISTING PAGING SYSTEM SPEAKERS

1 (TYP)

1 (TYP)

2 (TYP)

2 AREAS ABOVE CEILING TILES CONTAIN ASBESTOS.

ONLY PROPERLY TRAINED INDIVIDUALS WEARING

ALL REQUIRED PPE'S INCLUDING RESPIRATORS ARE

ALLOWED TO ENTER THIS SPACE.

1. REFER TO TI DEMOLITION PLANS FOR ADDITIONAL

GENERAL NOTES.

2. ACOUSTIC TILE CEILINGS: DEMOLISH/REMOVE ENTIRE

CEILING TILE AT LOCATIONS WHERE SPEAKERS ARE

SCHEDULED TO FOR REMOVAL OR REPLACEMENT.

EXISTING SUSPENSION SYSTEM TO REMAIN.

3. GYPSUM BOARD CEILINGS: WHERE SPEAKERS ARE

SCHEDULED FOR REMOVAL OR REPLACEMENT, PREPARE

CEILING SURFACE FOR PATCHING AND REPAIR TO MATCH

THE EXISTING ADJACENT CEILING SURFACE FINISH AND

PAINT FINISH.

UPDNUPDN

BRIDGE

36" HIGH WALL

36" HIGH WALL

VOID

050-1-1

ALCOVE

VOID

062-1-1

VOID

068-1-1

VOID

052-1-1

VOID

074-1-1

VOID

010-1-1

VOID

028-1-1

VOID

027-1-1

VOID

026-1-1

VOID

023-1-1

VOID

049-1-1

WAITER

DW3-1-1

VOID

024-1-1

SPSP

SP

SP SP SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP SP

SP

SP

SPSPSP

SPSPSPSP

SP

SP

SP

SP

SP

SP SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP SP

SP

SP

SP

SPSPSP SP SP

SP

SP SP SP SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP SP

SP SP

SP

SP

SP

SP

SP SP

SP

SP SP SP SP SP

SP

SP SP

SP

SP

SP

SP

SP

SP SPSPSPSPSP SP SP

SPSP

SP

SP

SP

SP

SP SP

SP

SP

SP

SP

SP

SP SP

SP

SP

SP

KEY PLAN

Project Number:

Building Number:

Drawing Number:

Project Title:

Location:

Issue Date: Checked: Drawn:

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase:ARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant: K F DAVIS

ENGINEERING, INC

530 LA GONDA WAY, SUITE E,

DANVILLE, CA 94526

WWW.KFDE.COM

(925) 743-8884

H :\R ev it

Lo ca l F ile s\

VA

SD

_R ep la ce N ur se

C al l M

AT

V

PA

_V

_j am es .h ec k.

rv t

9/

/2

2:

:0

PM

A. SHRESTHAJ. ROBERTS

REPLACE HOSPITAL NURSE CALL,

MATV, AND PUBLIC ADDRESS

664-18-331

02/02/2024

100% SUBMITTAL

SAN DIEGO, CA

Revisions: Date:

ST

ATE OF CA L I FORN IA

REG

I ST ER ED A RCH I T ECT

ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS

FACILITY AND IN THE ABOVE CEILING SPACES. THE

CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY

TO PROTECT PERSONS FROM EXPOSURE. THESE

SAFEGUARDS WILL INCLUDE:

1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING

THE ABOVE CEILING SPACES AND/OR REMOVING ANY

CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN

THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS

CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40

HOUR ASBESTOS TRAINING CLASS, AS APPROVED BY THE

VA, WITH CERTIFICATION.

2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING

THE ABOVE CEILING SPACES AND/OR REMOVING ANY

CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND

WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT

(PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS

PRIOR TO ENTRY INTO ABOVE CEILING SPACES.

3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES,

CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT,

A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.

4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF

CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS

OR OTHER DISTURBANCE OF CELING OR WALL MATERIALS

SHALL BE PERFORMED WITH PROPER BARRICADES

INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH

PROTECTIVE BARRICADES SHALL BE PROVIDED BY THE

CONTRACTOR.

THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS

SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY,

PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR

EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY

FORM AT THE PROJECT SITE. THE CONTRACTOR IS SOLELY

RESPONSIBLE FOR JOB SITE SAFETY WHICH INCLUDES ALL

TRAINING AND SAFEGUARDS NECESSARY TO PROTECT

HIS/HER EMPLOYEES, VA PERSONNEL VISITORS AT THE SITE

AND ANY OTHER PERSONS.

ASBESTOS WARNING

1/16" = 1'-0"AD102

1 LEVEL 1 - NORTH FLOOR - DEMO PLAN

NORTH

SHEET NOTES

AD102

ARCHITECTURAL

LEVEL 1 - NORTH FLOOR - DEMO PLAN

GENERAL NOTES

1 REMOVE ALL EXISTING PAGING SYSTEM SPEAKERS

1 (TYP)

2 (TYP)

2 AREAS ABOVE CEILING TILES CONTAIN ASBESTOS.

ONLY PROPERLY TRAINED INDIVIDUALS WEARING

ALL REQUIRED PPE'S INCLUDING RESPIRATORS ARE

ALLOWED TO ENTER THIS SPACE.

1. REFER TO TI DEMOLITION PLANS FOR ADDITIONAL

GENERAL NOTES.

2. ACOUSTIC TILE CEILINGS: DEMOLISH/REMOVE ENTIRE

CEILING TILE AT LOCATIONS WHERE SPEAKERS ARE

SCHEDULED TO FOR REMOVAL OR REPLACEMENT.

EXISTING SUSPENSION SYSTEM TO REMAIN.

3. GYPSUM BOARD CEILINGS: WHERE SPEAKERS ARE

SCHEDULED FOR REMOVAL OR REPLACEMENT, PREPARE

CEILING SURFACE FOR PATCHING AND REPAIR TO MATCH

THE EXISTING ADJACENT CEILING SURFACE FINISH AND

PAINT FINISH.

3 CROSSHATCH AREA INDICATES 48" X 48" FIBERGLASS

CEILING TILES

VOID

050-1-1

VOID

052-1-1

SP

SP

SP

SP

SPSPSP

SP

SP

SP

SP SP SP

SP

SP SP SP SP

SP

SP SP SP SP

SP SP

SP

SPSP

SP

SP

SP

SP

SP

SP

SPSP

SP

SP

SP

SP

SP

SP

SP SP

SP

SP

SP

SP SP

SP

SP

SP

SP

SP

SP

SP SPSPSP

SP

SP

SP

SPSP SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SP

SPSPSPSP

KEY PLAN

Project Number:

Building Number:

Drawing Number:

Project Title:

Location:

Issue Date: Checked: Drawn:

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase:ARCHITECT/ENGINEER OF RECORD A/E:

STAMPCONSULTANT

321 4 5 6 7 8 9 10

Consultant: K F DAVIS

ENGINEERING, INC

530 LA GONDA WAY, SUITE E,

DANVILLE, CA 94526

WWW.KFDE.COM

(925) 743-8884

H :\R ev it

Lo ca l F ile s\

VA

SD

_R ep la ce N ur se

C al l M

AT

V

PA

_V

_j am es .h ec k.

rv t

9/

/2

2:

:0

PM

A. SHRESTHAJ. ROBERTS

REPLACE HOSPITAL NURSE CALL,

MATV, AND PUBLIC ADDRESS

664-18-331

02/02/2024

100% SUBMITTAL

SAN DIEGO, CA

Revisions: Date:

ST

ATE OF CA L I FORN IA

REG

I ST ER ED A RCH I T ECT

ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS

FACILITY AND IN THE ABOVE CEILING SPACES. THE

CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY

TO PROTECT PERSONS FROM EXPOSURE. THESE

SAFEGUARDS WILL INCLUDE:

1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING

THE ABOVE CEILING SPACES AND/OR REMOVING ANY

CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN

THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS

CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40

HOUR ASBESTOS TRAINING CLASS, AS APPROVED BY THE

VA, WITH CERTIFICATION.

2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING

THE ABOVE CEILING SPACES AND/OR REMOVING ANY

CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND

WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT

(PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS

PRIOR TO ENTRY INTO ABOVE CEILING SPACES.

3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES,

CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT,

A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.

4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF

CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS

OR OTHER DISTURBANCE OF CELING OR WALL MATERIALS

SHALL BE PERFORMED WITH PROPER BARRICADES

INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH

PROTECTIVE BARRICADES SHALL BE PROVIDED BY THE

CONTRACTOR.

THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS

SHALL…

This is the start of the file's text. The full file is on GovTribe.