This federal solicitation seeks replacement of a hospital nurse call, MATV, and public address system. The VA San Diego Healthcare System requires upgrading aging infrastructure in Buildings 1 and 11 to modernize emergency notification and patient response. The contractor shall provide all labor, materials, equipment, and transportation to demolish existing systems and install new nurse call, MATV, and public address equipment per specifications. Work will take place in an active hospital and require safety precautions. The Department of Veterans Affairs Veterans Health Administration VISN 22 issued the solicitation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Award Notice (Contract 36C26224C0180).pdf | ||
| Attachment H - Specification Section 01 35 26 - Safety Requirements.pdf | ||
| Attachment I - Hazardous Materials Survey.pdf | ||
| Amendment 0003 (SF30) - Solicitation 36C26224B0002.pdf | ||
| RFI Notice - Solicitation 36C26224B0002.pdf | ||
| Amendment 0002 (SF30) - Solicitation 36C26224B0002.pdf | ||
| Amendment 0001 (SF30) - Solicitation 36C26224B0002.pdf | ||
| Pre-Bid Site Visit Sign-In Sheet (36C26224B0002).pdf | ||
| Attachment B - Specifications.pdf | ||
| Solicitation (SF 1442) - 36C26224B0002.pdf | ||
| Attachment A - Statement of Work (SOW).pdf | ||
| Attachment E - Drawings (ELECT).pdf | ||
| Attachment F - Drawings (PA).pdf | ||
| Attachment G - Wage Determination (CA20240001).pdf | ||
| Attachment D - Drawings (DEMO).pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DN
OFFICE
TOILET
MALE
LOCKERS
MALE
ROOM
CONFERENCE
AREA
STORAGE
OFFICE
STORAGE
STERILE
CART HOLDING AREA
STERILE STORAGE
CORRIDOR
OFFICE
SERVICES
BUILDING
RM.
ELEC.
LOUNGE
LOCKERS
FEMALE
TOILET
FEMALE
LOCKERS
MALE
TOILET
MALE
JANITOR
CART AREA
ROOM
VENDOR
AND BREAKOUT
CLEAN RECEIVING
CORRIDOR
DETERGENT
DECONTAMINATION
SOILED /
ANTE ROOM
PROCESSING
SCOPE
DRYING
TRANSFER
CART WASH
CARTWASH
AUTOMATIC
WASH
INSTRUMENT
STORAGE
BULK
DISPATCH
HALLWAY
TOILET
FEMALE
LOCKERS
FEMALE
SIGNAL ROOM
DATA/TELE
ETO
STORAGE
AREA
STAGING
DRUGS
RM.
JANITOR
OFFICE
OFFICE
UP
DUMB
DW1-B-1
B190
A/C SHOP
B190A
A/C SHOP
B254
A/C SHOP
B252
OFFICES(S)
B253
A/C SHOP
B255
PIPE SHOP
B191
STORAGE
B251
MECHANICAL
B200
ELECTRONICS
B177L
STORAGE
GENERAL
B177K
STORAGE
OIT
B177J
STORAGE
GENERAL
B128
KITCHEN
B177F
UTILITY
B177E
STORAGE
EQUIPMENT
B177H
RECEIVING
B236
AUTOPSY
B247
OFFICE
B248
OFFICE
B249
OFFICE(S)
B176
OFFICE(T)
B177B
CORR.
B171A
OFFICE(T)
B117P
CORR.
B173
STORAGE
OXYGEN
B177C
CORR.
B177A
CORR.
B177N
STORAGE
GENERAL
B177D
STORAGE
GENERAL
B191R
CORRIDOR
B194
STOR.
GENERAL
B194A
STOR.
GENERAL
B245
STOR.
MORGUE
B244
STOR.
MORGUE
B235
REFERIGER. B241
OFFICE
B234
OFFICE
B232B
OFFICE
B181
REFER.
B138
REFER.
B137
REFER.
B213
BIOMED
B250
OFFICE(S)
B232A
OFFICE
B233
OFFICE(T)
B177M
CORR. B117B
CORR.
B232
OFFICE(T)
B231
MECHANICAL
B136
REFER.
B183A
STOR.
GENERAL
B183
STOR.
GENERAL
B129
OFFICE(S)
B130
OFFICE(S)
B166
ELECTRICAL
B188
ELECTRICAL
B167
EQUIPMENT
OIT
B165
TELEPHONE
B165A
OIT STOR.
B176
OFFICE
B131
OFFICE(S)
B126
CONFERENCE
B127
OFFICE(S)
B126D
OFFICE(S)
B127A-1
OFFICE(S)
B132
OFFICE(S)
B126C
OFFICE(S)
B114A
OFFICE(S)
B114
OFFICE(S)
B115
OFFICE(S)
B134
MANAGEMENT
RECORDS
B122
DISHWASHING
B119
WASH
CAR
B184
STOR.
GENERAL
B185
STOR.
GENERAL
B128B
STOR.
GENERALB186
STOR.
GENERAL
B140A
REFER.
B140
CORR.
B143
LAB
B142A
LAB
B142
LAB
B142E
LAB
B147
RESIDENT B156A
LAB
B156A
LAB
B198
ELECTRIC SHOP
B240
CORR.
B212
CORR.
B204
CORR.
B210
CARPENTRY
B210C
MECHANICAL
B141
MICROSCOPE FACILITY
CORE ELECTRON
B142D
LAB
B142B
SUPPLY
STERILE
B144
LOCKER(F)
B145
CONF. RM /OFFICE(S)
PHARMACY
B144A
LOCKER(F)
B149
LOCKER(M)
B152
OFFICE
PHARMACOECO.
BB152A
OFFICE(S)
B125
CORR.
B123
PREP
B157
VAULT
B153
STOR.
VAULT
B121
CORR.
B152E
ED. TRAINING OFF.(S)
DIR. PHARM.
B152D
DATA APPS.ANALYSIS OFF.(S)
DIR. PHARM.
B155
ADMIN.0FFICE
PHARMACY
B160
KITCHEN
B155C
SVC OFF.(S)
CHIEF PHARM.
B159B
OFFICE
B159A
OFFICE
B217
STOR.
EQUIPMENT
B223B
OFFICE(T)
B218
OFFICE(S)
B246
CORR.
B100
LOBBY
B156
AREA
PHARMACY
B215
STORAGE
B215A
STORAGE
B215B
CORRIDOR
B215B
CORRIDOR
B128C
OFFICE(S)
DIET INFO.
B117
CORRIDOR
B191J
STORAGE
GENERAL
B191G
STORAGE
OIT
B191P
STORAGE
GENERAL
B1000
CENTER OFFICE
IT SERVICE
B171
OFFICE
B201A
KITCHEN
B200A
STOR.
GENERAL
B205
KEYS
B216
LINEN
SOIL
B217A
STOR.
EQUIPMENT
SW6-B-1
STAIRS
SW7-B-1
STAIRS
SW8-B-1
STAIRS
B206
OFFICE(S)
B189B
STOR.
GENERAL
B198A
OFFICE(S)
SW1-B-1
STAIR
B191Q
CORR.
B191H
STORAGE
GENERAL
B214
OFFICE
B211
OFFICE
B217B
ELEC
B217C
ELEC
B212B
CORR.
B162
SERVICE OFFICE(S)
ENVIRONMENTAL
B210B
MECHANICAL
B210A
OFFICE(S)
B220
STOR.
GENERAL
B224
STOR.
HAC
B229
OPERATIONS
MGR. OFF.
B108A
STOR.
GENERAL
B101
LOBBY
B108B
STOR.
EQUIPMENT
B109
CORRIDOR
B108C
STOR.
EQUIPMENT
SW13-B-1
STAIRS
B201
STOR.
MAINTENANCE
B202
SIGNAGE
B239
CORR.
B238
CORR.
B158
STAIR
B182
KITCHEN
STOR.
B146
SHOWER(F)
B189A
STOR.
B125A
MALE TOI.
B133
FEMALE TOI.
B176A
MALE TOI.
B176B
MALE TOI.
W9-B-1
STAIR
B180
MECH.
B135A
HAC
B148
SHOWER(M)
B149A
LOCKER(M)
B149B
MECH.
B155B
OFF.OFF.(S)
ADMIN.
B155E
CORR.
B155F
CORR.
B154
CORR.
B172C
OFFICE
B196
ELEC. RM
S5-B-1
PET ELEV
B212A
CORR.
B191A
MALE TOI.
B191B
MALE TOI.
B242
MALE TOI.
B243
FEMALE TOI.
B128A
MGR. OFFICE(S)
CLINICAL NUTRITION
B128D
STOR.
GENERAL
SW11-B-1
STAIRS
SW12-B-1
STAIRS
B191K
STORAGE
GENERAL
B191E
UPPERB191D
STORAGE
GENERAL
B191C
STORAGE
B191F
STORAGE UPPER
GENERAL
B191C
STORAGE LOWER
GENERAL
B237
HAC
B232C
RECEPTION
B230A
TELECOM
B108
MECHANICAL
B152B
SAFETY OFF.(S)
DIR. MED.
B155A
PHARM. SVC OFF.(S)
ASS. CHIEF
B135
MECH.
B126B
OFFICE
B126A
OFF.(S) NUTRITION FOOD SER.
ED. SECT.
B191M
CORR.
B191L
STOR.
B152C
COOR.OFF.(S)
U.O.P. REGIONAL
B141A
CORR.
B230
OFFICE
B224A
CORR.
B222
MALE TOI.
B187
HAS
B225
CORRIDOR
B104
TOILET
B172C
STOR.
SPS SUPPLY
B125B
CORR.
SW10-B-1
LIFT
B120
STORAGE
B125C
CORR.
B144B
DRESSING RM
B155G
CORR.
TUNNEL
STORAGE
B195B
CART WASH
B102A
HSK
B227
MALE TOILET
B107
FEMALE TOILET
B106
CORRIDOR
CORRIDOR
B111
B116
SPS
STORAGE
B112
SPS
ADMINISTRATION
OFFICE(S)B110
DECON
B102
SPS
PREP
AREAB105
STERILIZER
B102B
GAS ETO
B102C MENS LOCKER
B228
CORRIDOR
BREAK ROOM
B226
SPS
STERILE
STORAGEB197
UTILITY AND EQUIPMENT STORAGE
B223
VACANT STORAGE
PATIENT
EFFECTSB223C
GENERAL STORAGE
B223D
CORRIDOR
B191N
GENERAL
STORAGE
B195C
MATERIAL MANAGEMENT OFFICE
B172A
EQUIPMENT STORAGE
B112A
SPS
SUPPLY
STORAGEB172B
EQUIPMENT STORAGE
B172D
EQUIPMENT
STORAGE
B117
GENERAL STORAGE
B172
B223A
ELECTRICAL
UP
UPDNUPDN
B142C
DARK RM
ELEVATOR
S1
ELEVATOR
S2
ELEVATOR
S3
ELEVATOR
S4
M&O OFFICE
(FUTURE TV
SHOP)
SP
SP
SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP SP
SP
SP
SP
SP
SP
SP
SP
SP
SPSP
SP
SP
SP
SP
SPSPSP
SP
SP
SP
SP
SP
SP
SP
SPSPSPSPSP
SP
SP
SP
SP
SP
SP
W S
W S
W S
W S
W S
SPSPSPSP
SPAM
AM
KEY PLAN
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant: K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
Lo ca l F ile s\
VA
SD
_R ep la ce N ur se
C al l M
AT
V
PA
_V
_j am es .h ec k.
rv t
9/
/2
2:
:0
PM
A. SHRESTHAJ. ROBERTS
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
664-18-331
02/02/2024
100% SUBMITTAL
SAN DIEGO, CA
Revisions: Date:
ST
ATE OF CA L I FORN IA
REG
I ST ER ED A RCH I T ECT
ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS
FACILITY AND IN THE ABOVE CEILING SPACES. THE
CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY
TO PROTECT PERSONS FROM EXPOSURE. THESE
SAFEGUARDS WILL INCLUDE:
1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN
THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS
CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40
HOUR ASBESTOS TRAINING CLASS, AS APPROVED BY THE
VA, WITH CERTIFICATION.
2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND
WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT
(PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS
PRIOR TO ENTRY INTO ABOVE CEILING SPACES.
3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES,
CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT,
A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.
4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF
CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS
OR OTHER DISTURBANCE OF CELING OR WALL MATERIALS
SHALL BE PERFORMED WITH PROPER BARRICADES
INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH
PROTECTIVE BARRICADES SHALL BE PROVIDED BY THE
CONTRACTOR.
THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS
SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY,
PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR
EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY
FORM AT THE PROJECT SITE. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR JOB SITE SAFETY WHICH INCLUDES ALL
TRAINING AND SAFEGUARDS NECESSARY TO PROTECT
HIS/HER EMPLOYEES, VA PERSONNEL VISITORS AT THE SITE
AND ANY OTHER PERSONS.
ASBESTOS WARNING
1/16" = 1'-0"AE101
1 BASEMENT FLOOR PLAN
NORTH
SHEET NOTES
AE101
BASEMENT FLOOR PLAN
GENERAL NOTES
1 INSTALL PUBLIC ADDRESS PAGING SPEAKER
1 (TYP)
2 INSTALL AMBIENT NOISE MICROPHONE
(TYP)
3 (TYP)
3 AREAS ABOVE CEILING TILES CONTAINS ASBESTOS
CONTRACTOR WILL ENSURE TO USE METHODS TO
CONTAIN ASBESTOS IN ACCORDANCE WITH
SPECIFICATIONS.
1. REFER TO TI DEMOLITION PLANS FOR ADDITIONAL
GENERAL NOTES.
2. ACOUSTIC TILE CEILINGS: DEMOLISH/REMOVE ENTIRE
CEILING TILE AT LOCATIONS WHERE SPEAKERS ARE
SCHEDULED TO FOR REMOVAL OR REPLACEMENT.
EXISTING SUSPENSION SYSTEM TO REMAIN.
3. GYPSUM BOARD CEILINGS: WHERE SPEAKERS ARE
SCHEDULED FOR REMOVAL OR REPLACEMENT, PREPARE
CEILING SURFACE FOR PATCHING AND REPAIR TO MATCH
THE EXISTING ADJACENT CEILING SURFACE FINISH AND
PAINT FINISH.
4. REFER TO MANUFACTURER'S INSTALLATION
INSTRUCTIONS FOR SPEAKER INSTALLATION.
UPDNUPDN
BRIDGE
36" HIGH WALL
36" HIGH WALL
VOID
050-1-1
ALCOVE
VOID
062-1-1
VOID
068-1-1
VOID
052-1-1
VOID
074-1-1
VOID
010-1-1
VOID
028-1-1
VOID
027-1-1
VOID
026-1-1
VOID
023-1-1
VOID
049-1-1
WAITER
DW3-1-1
VOID
024-1-1
SP
SP
SP
SP
SP
SP
SPSPSPSPSPSPSPSPSP SP SP SP SP SP SP SP SP SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SPSP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SPSPSP
SP
SP
SP
SP
SP
SP
SP SP
SP
SP
SP
SP
SP
SPSPSPSP
SP
SP
SP
SP SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP SP
SP AM
SP
AM
AM AM
SP
AM
SP
SP
SP
SP
SP
SPSPSP
SP
SP SP
SP SP
SP SP
SP SP
SP SP
SP SP
SP SP SP
SP
SP
R01
VC
KEY PLAN
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant: K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
Lo ca l F ile s\
VA
SD
_R ep la ce N ur se
C al l M
AT
V
PA
_V
_j am es .h ec k.
rv t
9/
/2
2:
:0
PM
A. SHRESTHAJ. ROBERTS
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
664-18-331
02/02/2024
100% SUBMITTAL
SAN DIEGO, CA
Revisions: Date:
ST
ATE OF CA L I FORN IA
REG
I ST ER ED A RCH I T ECT
ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS
FACILITY AND IN THE ABOVE CEILING SPACES. THE
CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY
TO PROTECT PERSONS FROM EXPOSURE. THESE
SAFEGUARDS WILL INCLUDE:
1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN
THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS
CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40
HOUR ASBESTOS TRAINING CLASS, AS APPROVED BY THE
VA, WITH CERTIFICATION.
2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND
WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT
(PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS
PRIOR TO ENTRY INTO ABOVE CEILING SPACES.
3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES,
CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT,
A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.
4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF
CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS
OR OTHER DISTURBANCE OF CELING OR WALL MATERIALS
SHALL BE PERFORMED WITH PROPER BARRICADES
INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH
PROTECTIVE BARRICADES SHALL BE PROVIDED BY THE
CONTRACTOR.
THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS
SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY,
PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR
EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY
FORM AT THE PROJECT SITE. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR JOB SITE SAFETY WHICH INCLUDES ALL
TRAINING AND SAFEGUARDS NECESSARY TO PROTECT
HIS/HER EMPLOYEES, VA PERSONNEL VISITORS AT THE SITE
AND ANY OTHER PERSONS.
ASBESTOS WARNING
1/16" = 1'-0"AE102
1 LEVEL 1 - NORTH FLOOR PLAN
NORTH
SHEET NOTES
AE102
ARCHITECTURAL LEVEL 1 - NORTH
FLOOR PLAN
GENERAL NOTES
1 INSTALL PUBLIC ADDRESS PAGING SPEAKER
1 (TYP)
2 INSTALL AMBIENT NOISE MICROPHONE
2 (TYP)
3 (TYP)
3 1ST FLOOR PA RACK LOCATION
4 (TYP)
4 WALL MOUNTED VOLUME CONTROL
5 (TYP)
5 AREAS ABOVE CEILING TILES CONTAIN ASBESTOS.
ONLY PROPERLY TRAINED INDIVIDUALS WEARING
ALL REQUIRED PPE'S INCLUDING RESPIRATORS ARE
ALLOWED TO ENTER THIS SPACE.
1. REFER TO TI DEMOLITION PLANS FOR ADDITIONAL
GENERAL NOTES.
2. ACOUSTIC TILE CEILINGS: DEMOLISH/REMOVE ENTIRE
CEILING TILE AT LOCATIONS WHERE SPEAKERS ARE
SCHEDULED TO FOR REMOVAL OR REPLACEMENT.
EXISTING SUSPENSION SYSTEM TO REMAIN.
3. GYPSUM BOARD CEILINGS: WHERE SPEAKERS ARE
SCHEDULED FOR REMOVAL OR REPLACEMENT, PREPARE
CEILING SURFACE FOR PATCHING AND REPAIR TO MATCH
THE EXISTING ADJACENT CEILING SURFACE FINISH AND
PAINT FINISH.
4. FIBERGLASS TILE CEILINGS: PROVIDE NEW FIBERGLASS
TILE AT AREAS WHERE SPEAKERS WERE REMOVED.
"CERTAINTEED" ECHOPHON FOCUS DG WING, 48"X48"
SEMI-CONCEALED OR VA APPROVED EQUAL. EXISTING
SUSPENSION SYSTEM TO REMAIN.
5. REFER TO MANUFACTURER'S INSTALLATION
INSTRUCTIONS FOR SPEAKER INSTALLATION.
6 CROSSHATCH AREA INDICATES 48" X 48" FIBERGLASS
CEILING TILES
VOID
050-1-1
VOID
052-1-1
PS
SPSP
SP
SP
SPSP
SPSP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SPSPSPSP SP
SP
SP
SP
SPSPSPSPSPSPSPSPSP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SPSPSPSP
SP
SP
SP SP SP SP
SP
SP
SP
SP SP SP SP
SP
SPSPSP
SP
SP
SP
SP SP
SP
AM
SP AM
SP
SP
SP
SP
SP
SP
SP
SPSPSP
SPSPSP
SPSPSP SPSP
SP
SP
SP
SP
SP
SP
AM
R01
KEY PLAN
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant: K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
Lo ca l F ile s\
VA
SD
_R ep la ce N ur se
C al l M
AT
V
PA
_V
_j am es .h ec k.
rv t
9/
/2
2:
:0
PM
A. SHRESTHAJ. ROBERTS
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
664-18-331
02/02/2024
100% SUBMITTAL
SAN DIEGO, CA
Revisions: Date:
ST
ATE OF CA L I FORN IA
REG
I ST ER ED A RCH I T ECT
ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS
FACILITY AND IN THE ABOVE CEILING SPACES. THE
CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY
TO PROTECT PERSONS FROM EXPOSURE. THESE
SAFEGUARDS WILL INCLUDE:
1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN
THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS
CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40
HOUR ASBESTOS TRAINING CLASS, AS APPROVED BY THE
VA, WITH CERTIFICATION.
2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND
WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT
(PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS
PRIOR TO ENTRY INTO ABOVE CEILING SPACES.
3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES,
CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT,
A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.
4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF
CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS
OR OTHER DISTURBANCE OF CELING OR WALL MATERIALS
SHALL BE PERFORMED WITH PROPER BARRICADES
INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH
PROTECTIVE BARRICADES SHALL BE PROVIDED BY THE
CONTRACTOR.
THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS
SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY,
PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR
EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY
FORM AT THE PROJECT SITE. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR JOB SITE SAFETY WHICH INCLUDES ALL
TRAINING AND SAFEGUARDS NECESSARY TO PROTECT
HIS/HER EMPLOYEES, VA PERSONNEL VISITORS AT THE SITE
AND ANY OTHER PERSONS.
ASBESTOS WARNING
1/16" = 1'-0"AE103
1 LEVEL 1 - SOUTH FLOOR PLAN
NORTH
SHEET NOTES
AE103
ARCHITECTURAL LEVEL 1 - SOUTH
FLOOR PLAN
GENERAL NOTES
1 INSTALL PUBLIC ADDRESS PAGING SPEAKER
1 (TYP)
3 INSTALL PUBLIC ADDRESS PAGING STATION
2 INSTALL AMBIENT NOISE MICROPHONE
4 1ST FLOOR RACK LOCATION
5 (TYP)
5 AREAS ABOVE CEILING TILES CONTAIN ASBESTOS.
ONLY PROPERLY TRAINED INDIVIDUALS WEARING
ALL REQUIRED PPE'S INCLUDING RESPIRATORS ARE
ALLOWED TO ENTER THIS SPACE.
1. REFER TO TI DEMOLITION PLANS FOR ADDITIONAL
GENERAL NOTES.
2. ACOUSTIC TILE CEILINGS: DEMOLISH/REMOVE ENTIRE
CEILING TILE AT LOCATIONS WHERE SPEAKERS ARE
SCHEDULED TO FOR REMOVAL OR REPLACEMENT.
EXISTING SUSPENSION SYSTEM TO REMAIN.
3. GYPSUM BOARD CEILINGS: WHERE SPEAKERS ARE
SCHEDULED FOR REMOVAL OR REPLACEMENT, PREPARE
CEILING SURFACE FOR PATCHING AND REPAIR TO MATCH
THE EXISTING ADJACENT CEILING SURFACE FINISH AND
PAINT FINISH.
4. FIBERGLASS TILE CEILINGS: PROVIDE NEW FIBERGLASS
TILE AT AREAS WHERE SPEAKERS WERE REMOVED.
"CERTAINTEED" ECHOPHON FOCUS DG WING, 48"X48"
SEMI-CONCEALED OR VA APPROVED EQUAL. EXISTING
SUSPENSION SYSTEM TO REMAIN.
5. REFER TO MANUFACTURER'S INSTALLATION
INSTRUCTIONS FOR SPEAKER INSTALLATION.
6 CROSSHATCH AREA INDICATES 48"X48" FIBERGLASS
STAIR
STAIR
CORRIDOR
ELEVATORELEVATORELEVATORELEVATOR
ELEVATORELEVATORELEVATOR
ELEVATORELEVATORELEVATOR
HSK
W/D W/DW/D
SP
SP
SP
SP
SP
SP
SP
SP
SPSPSPSP
SP SP
SP
SP
SP SP SP SP
SP
SP
SP
SPSP SPSP SP SP SP
SP
SP SP SP
SP
SP
SP
SP
SP
SP
SP
SPSPSP
SP
SP
SP
SP
SP
SP
SP
SP
SP SP
SPSP
SP
SP
SP
SP
SPSP
SP
SP
SP
SP
SP SP
SP
SP SP
SP
SP
SP
SPSP
SP SP
SP
AM
SP AM
AM
SP
AM
SM SM
SM
KEY PLAN
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant: K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
Lo ca l F ile s\
VA
SD
_R ep la ce N ur se
C al l M
AT
V
PA
_V
_j am es .h ec k.
rv t
9/
/2
2:
:0
PM
A. SHRESTHAJ. ROBERTS
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
664-18-331
02/02/2024
100% SUBMITTAL
SAN DIEGO, CA
Revisions: Date:
ST
ATE OF CA L I FORN IA
REG
I ST ER ED A RCH I T ECT
ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS
FACILITY AND IN THE ABOVE CEILING SPACES. THE
CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY
TO PROTECT PERSONS FROM EXPOSURE. THESE
SAFEGUARDS WILL INCLUDE:
1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN
THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS
CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40
HOUR ASBESTOS TRAINING CLASS, AS APPROVED BY THE
VA, WITH CERTIFICATION.
2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND
WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT
(PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS
PRIOR TO ENTRY INTO ABOVE CEILING SPACES.
3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES,
CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT,
A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.
4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF
CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS
OR OTHER DISTURBANCE OF CELING OR WALL MATERIALS
SHALL BE PERFORMED WITH PROPER BARRICADES
INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH
PROTECTIVE BARRICADES SHALL BE PROVIDED BY THE
CONTRACTOR.
THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS
SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY,
PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR
EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY
FORM AT THE PROJECT SITE. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR JOB SITE SAFETY WHICH INCLUDES ALL
TRAINING AND SAFEGUARDS NECESSARY TO PROTECT
HIS/HER EMPLOYEES, VA PERSONNEL VISITORS AT THE SITE
AND ANY OTHER PERSONS.
ASBESTOS WARNING
1/16" = 1'-0"AE104
1 LEVEL 2 - NORTH FLOOR PLAN
NORTH
SHEET NOTES
AE104
ARCHITECTURAL LEVEL 2 - NORTH
FLOOR PLAN
GENERAL NOTES
1 INSTALL PUBLIC ADDRESS PAGING SPEAKER
1 (TYP)
2 INSTALL AMBIENT NOISE MICROPHONE
2 (TYP)
3 (TYP)
3 INSTALL OUTDOOR PUBLIC ADDRESS PAGING
SPEAKER
4 (TYP)
4 AREAS ABOVE CEILING TILES CONTAIN ASBESTOS.
ONLY PROPERLY TRAINED INDIVIDUALS WEARING
ALL REQUIRED PPE'S INCLUDING RESPIRATORS ARE
ALLOWED TO ENTER THIS SPACE.
1. REFER TO TI DEMOLITION PLANS FOR ADDITIONAL
GENERAL NOTES.
2. ACOUSTIC TILE CEILINGS: DEMOLISH/REMOVE ENTIRE
CEILING TILE AT LOCATIONS WHERE SPEAKERS ARE
SCHEDULED TO FOR REMOVAL OR REPLACEMENT.
EXISTING SUSPENSION SYSTEM TO REMAIN.
3. GYPSUM BOARD CEILINGS: WHERE SPEAKERS ARE
SCHEDULED FOR REMOVAL OR REPLACEMENT, PREPARE
CEILING SURFACE FOR PATCHING AND REPAIR TO MATCH
THE EXISTING ADJACENT CEILING SURFACE FINISH AND
PAINT FINISH.
4. FIBERGLASS TILE CEILINGS: PROVIDE NEW FIBERGLASS
TILE AT AREAS WHERE SPEAKERS WERE REMOVED.
"CERTAINTEED" ECHOPHON FOCUS DG WING, 48"X48"
SEMI-CONCEALED OR VA APPROVED EQUAL. EXISTING
SUSPENSION SYSTEM TO REMAIN.
5. REFER TO MANUFACTURER'S INSTALLATION
INSTRUCTIONS FOR SPEAKER INSTALLATION.
5 CROSSHATCH AREA INDICATES 48"X48" FIBERGLASS
W/D W/DW/D
234 SF
OFFICE
2227 (R)
116 SF
OFFICE
2227B (R)
SALLYPORT
VESTIBULE
SPSPSP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP SP
SP
SPSP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP SP
SP
SP
SP
SP
SP
SPSP
SP AM
SP
AM
SP AM
SP
AM
SP
AM
SM SM
SM
KEY PLAN
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant: K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
Lo ca l F ile s\
VA
SD
_R ep la ce N ur se
C al l M
AT
V
PA
_V
_j am es .h ec k.
rv t
9/
/2
2:
:0
PM
A. SHRESTHAJ. ROBERTS
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
664-18-331
02/02/2024
100% SUBMITTAL
SAN DIEGO, CA
Revisions: Date:
ST
ATE OF CA L I FORN IA
REG
I ST ER ED A RCH I T ECT
ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS
FACILITY AND IN THE ABOVE CEILING SPACES. THE
CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY
TO PROTECT PERSONS FROM EXPOSURE. THESE
SAFEGUARDS WILL INCLUDE:
1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN
THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS
CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40
HOUR ASBESTOS TRAINING CLASS, AS APPROVED BY THE
VA, WITH CERTIFICATION.
2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND
WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT
(PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS
PRIOR TO ENTRY INTO ABOVE CEILING SPACES.
3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES,
CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT,
A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.
4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF
CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS
OR OTHER DISTURBANCE OF CELING OR WALL MATERIALS
SHALL BE PERFORMED WITH PROPER BARRICADES
INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH
PROTECTIVE BARRICADES SHALL BE PROVIDED BY THE
CONTRACTOR.
THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS
SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY,
PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR
EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY
FORM AT THE PROJECT SITE. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR JOB SITE SAFETY WHICH INCLUDES ALL
TRAINING AND SAFEGUARDS NECESSARY TO PROTECT
HIS/HER EMPLOYEES, VA PERSONNEL VISITORS AT THE SITE
AND ANY OTHER PERSONS.
ASBESTOS WARNING
1/16" = 1'-0"AE105
1 LEVEL 2 - SOUTH FLOOR PLAN
NORTH
SHEET NOTES
ARCHITECTURAL LEVEL 2 - SOUTH
FLOOR PLAN
AE105
GENERAL NOTES
1 INSTALL PUBLIC ADDRESS PAGING SPEAKER
1 (TYP)
2 INSTALL AMBIENT NOISE MICROPHONE
2 (TYP)
3 (TYP)
3 TIE THE EXISTING 2ND FLOOR SOUTH SPEAKERS IN
THIS AREA INTO THE NEW PAGING SYSTEM. VERIFY
THAT EXISTING 2ND FLOOR SOUTH SPEAKERS ARE
FUNCTIONING CORRECTLY.
4 (TYP)
4 INSTALL OUTDOOR PUBLIC ADDRESS PAGING
SPEAKER
5 (TYP)
AREAS ABOVE CEILING TILES CONTAIN ASBESTOS.
ONLY PROPERLY TRAINED INDIVIDUALS WEARING ALL
REQUIRED PPE'S INCLUDING RESPIRATORS ARE
ALLOWED TO ENTER THIS SPACE.
1. REFER TO TI DEMOLITION PLANS FOR ADDITIONAL
GENERAL NOTES.
2. ACOUSTIC TILE CEILINGS: DEMOLISH/REMOVE ENTIRE
CEILING TILE AT LOCATIONS WHERE SPEAKERS ARE
SCHEDULED TO FOR REMOVAL OR REPLACEMENT.
EXISTING SUSPENSION SYSTEM TO REMAIN.
3. GYPSUM BOARD CEILINGS: WHERE SPEAKERS ARE
SCHEDULED FOR REMOVAL OR REPLACEMENT, PREPARE
CEILING SURFACE FOR PATCHING AND REPAIR TO MATCH
THE EXISTING ADJACENT CEILING SURFACE FINISH AND
PAINT FINISH.
SHOWER
2 BED RM
2 BED RM
2 BED RM 3372
2 BED RM
2 BED RM
UTILITY
CLEAN
3363A
UTILITY
SOILED
4 BED RM
BREAK
WAITING
3357A
STORAGE
EQUIPMENT
3357B
TOILET
4 BED RM
UTILITY
CLEAN
3353A
UTILITY
SOILED
2 BED RM
2 BED RM
4 BED RM
STATION
NURSE
TOI.
STATION
NURSE
EQUIP RM
CLEAN
ROOM
MED 3342
2 BED RM
2 BED RM
LINEN
CLEAN
RM
MEDICATION
CORRIDOR
CORRIDOR
SHOWER
SHOWER
SHOWER
SHOWER
SHOWER
PHYSICIANS
OFFICE
HAC
OFFICE
RECEPTION
CONFERENCE
RM
PATIENT
BED ROOM
PATIENT
BED ROOM
SHOWER
ROOM
MED
SHOWER
WORK RM
CORRIDOR
PHARMACY
WAITING
PHYSICIANS
OFFICE
SW8-1
STAIR
OFFICE
OFFICE
CORR.
OFFICE
SOCIAL
WORKER
OFF.
RESIDENT
ON CALL
SHOWER
SHOWER
ALCOVE
OFFICE
SHOWER
CORRIDOR
STATION
NURSE
PATIENT
BED ROOM
SHOWER
UTILITY
SOILED
3397A
KITCHEN
PATIENT
BED ROOM
SHOWER
OFFICE
PHYS.
PHYS.
CORR.
3308A
OFFICE
3308B
OFFICE
TOI.
WORK ROOM
RESIDENT 3316
WORK ROOM
RESIDENT
3317A
OFFICE
OFFICE
COMPUTER
SHOWER
HAC
PHYS.
PHYSICIAN
SLEEP RM
PHYSICIAN 3308C
STOR.
GENERAL
TOI.
TOI.
3402A
T AND L
CALL
ON-
CALL
ON-
CALL
ON-
CALL
ON-
CALL
ON-
CALL
ON-
CALL
ON-
CALL
ON-
CALL
ON-
CALL
ON-
CALL
ON-
OFFICE 3280A
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
3282A
OFFICE
3276B
OFFICE
3276A
OFFICE
OFFICE
OFFICE
3275B
OFFICE
OFFICE
3269A
OFFICE
3273C
OFFICE
OFFICE
OFFICE
3255A
OFFICE
3275A
OFFICE
3251A
OFFICE
OFFICE
OFFICE
3262A
OFFICE
OFFICE
OFFICE
3267A
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
3217B
MECH. 3217
OFFICE
3217A
OFFICE 3216
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE 3008
OFFICE
3008A
OFFICE3007
OFFICE
EXAM
EXAM
EXAM
EXAM
EXAM
EXAM
OFFICE
OFFICE
3231A
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
CORR.
CORR.
CORR.
CORR.
CORR.
CONF RM
CONF RM
LOUNGE
SLEEP RM
CONF RM
CONF RM
CORR.
RESTRM
MEN
WOMEN
BED RM
STATION
NURSE
UTILITY
CLEAN
249A
UTILITY
CLEAN
CORR.
3273B
CORR.
KITCHEN
3286A
WAITING
SHOWER
SHOWER
SHOWER
3209A
RM
CLEAN
PHYSICIAN
CORR.
PHYSICIAN
PHYSICIAN
PHYSICIAN
3018A
PHYSICIAN
HAC
ANTI RM
3214A
RM
CLEAN
TOI.
HAC
SHOWER
SWING
SHOWER
TOI.
LAB
TOI.
PHYSICIAN
STOR.
GEN.
CONFERENCE
T AND L
ANTI RM
AIR LOCK
SW7-1
STAIR
SW5-1
STAIR
SW6-1
STAIR
TOI.
SHOWER
SHOWER
SHOWER
SHOWER
SHOWER
TOI.
TOI.
GENERAL
STORAGE
SHOWER
SHOWER3315
SHOWER
SHOWER
SHOWER
3003A
TOI.(M)
TOI.(F)
MED PREP
CORR.
PHYSICIAN
PHYSICIAN
3214A-1
AIR LOCK
SW6-1
NO
S1
NO S4NO S3NO S2
NO P3NO P2NO
P1
NO P6NO P5NO P4
UP
RAMP
UPDN UPDN
FEC
FEC
OPEN TO BELOW
OPEN TO BELOW
OPEN TO BELOW
OPEN TO BELOW
K
K
K
K
SP
SP
SP
SP SP
SP SP SP SP SP
SP
SP
SP
SP
SP SP SP
SP SP SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SPSPSP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP SP SP
SP
SP
SP
SP SPSP
SP
SP
SP
SP
SP AM
SP AM
SP
AM
SPAM
SP
AM
SP
SP SP
KEY PLAN
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant: K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
Lo ca l F ile s\
VA
SD
_R ep la ce N ur se
C al l M
AT
V
PA
_V
_j am es .h ec k.
rv t
9/
/2
2:
:0
PM
A. SHRESTHAJ. ROBERTS
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
664-18-331
02/02/2024
100% SUBMITTAL
SAN DIEGO, CA
Revisions: Date:
ST
ATE OF CA L I FORN IA
REG
I ST ER ED A RCH I T ECT
ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS
FACILITY AND IN THE ABOVE CEILING SPACES. THE
CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY
TO PROTECT PERSONS FROM EXPOSURE. THESE
SAFEGUARDS WILL INCLUDE:
1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN
THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS
CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40
HOUR ASBESTOS TRAINING CLASS, AS APPROVED BY THE
VA, WITH CERTIFICATION.
2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND
WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT
(PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS
PRIOR TO ENTRY INTO ABOVE CEILING SPACES.
3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES,
CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT,
A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.
4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF
CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS
OR OTHER DISTURBANCE OF CELING OR WALL MATERIALS
SHALL BE PERFORMED WITH PROPER BARRICADES
INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH
PROTECTIVE BARRICADES SHALL BE PROVIDED BY THE
CONTRACTOR.
THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS
SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY,
PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR
EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY
FORM AT THE PROJECT SITE. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR JOB SITE SAFETY WHICH INCLUDES ALL
TRAINING AND SAFEGUARDS NECESSARY TO PROTECT
HIS/HER EMPLOYEES, VA PERSONNEL VISITORS AT THE SITE
AND ANY OTHER PERSONS.
ASBESTOS WARNING
1/16" = 1'-0"AE106
1 LEVEL 3 - NORTH FLOOR PLAN
NORTH
SHEET NOTES
ARCHITECTURAL LEVEL 3 - NORTH
FLOOR PLAN
AE106
GENERAL NOTES
1 INSTALL PUBLIC ADDRESS PAGING SPEAKER
1 (TYP)
2 INSTALL AMBIENT NOISE MICROPHONE
2 (TYP)
3 (TYP)
3 TIE THE 3RD FLOOR WEST EXISTING SPEAKERS INTO
THE NEW PAGING SYSTEM. VERIFY THAT EXISTING
3RD FLOOR WEST SPEAKERS ARE FUNCTIONING
CORRECTLY.
4 (TYP)
1. REFER TO TI DEMOLITION PLANS FOR ADDITIONAL
GENERAL NOTES.
2. ACOUSTIC TILE CEILINGS: DEMOLISH/REMOVE ENTIRE
CEILING TILE AT LOCATIONS WHERE SPEAKERS ARE
SCHEDULED TO FOR REMOVAL OR REPLACEMENT.
EXISTING SUSPENSION SYSTEM TO REMAIN.
3. GYPSUM BOARD CEILINGS: WHERE SPEAKERS ARE
SCHEDULED FOR REMOVAL OR REPLACEMENT, PREPARE
CEILING SURFACE FOR PATCHING AND REPAIR TO MATCH
THE EXISTING ADJACENT CEILING SURFACE FINISH AND
PAINT FINISH.
4. FIBERGLASS TILE CEILINGS: PROVIDE NEW FIBERGLASS
TILE AT AREAS WHERE SPEAKERS WERE REMOVED.
"CERTAINTEED" ECHOPHON FOCUS DG WING, 48"X48"
SEMI-CONCEALED OR VA APPROVED EQUAL. EXISTING
SUSPENSION SYSTEM TO REMAIN.
5. REFER TO MANUFACTURER'S INSTALLATION
INSTRUCTIONS FOR SPEAKER INSTALLATION.
CROSSHATCH AREA INDICATES 48"X48" FIBERGLASS
CEILING TILES
3148B
STORAGE ROOM
SCOPE
ROOM
CLEAN
3148A
ROOM
DIRTY
ROOM
READING
ROOM 1
OPERATING
3251A
OFFICE
3246A
OFFICE3221
OFFICE
OFFICE
3217B
MECH. 3217
OFFICE
3217A
OFFICE 3216
OFFICE
3202A
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE3193
OFFICE
OFFICE
OFFICE
OFFICE
3186A
OFFICE
3186B
OFFICE
3185A
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE
OFFICE 3170
OFFICE
3162F
OFFICE
3162E
OFFICE
3162D
OFFICE
3162C
OFFICE
OFFICE
3008A
OFFICE3007
OFFICE
OFFICE
OFF.
3162G
RM
ONFERENCE
EXAM
EXAM
CONTRACTOR
EXAM
EXAM
OFFICE
3231A
OFFICE
OFFICE
OFFICE
EXAM
CORR.
CORR.
CORR.
ROOM 2
OPERATING
ROOM 3
OPERATING
ROOM 4
OPERATING 3150
ROOM 6
OPERATING
ROOM 5
OPERATING
STOR.
EQUIP.
3 BED RM
3 BED RM3127
1 BED RM
RM
1 BED
RM
1 BED
BREAKRM
3162A
BREAKRM
SUPPLY
STERILE
CONF RM
BED RM
BED RM
BED RM
BED RM
STATION
NURSE
UTILITY
CLEAN
249A
UTILITY
CLEAN
SHOWER
SHOWER
SHOWER
SHOWER
LAB
UTILITY
CLEAN
UTILITY
SOILED
CORR.
CORR.
NURSE STATION
CORR.
SLEEP RM
ON-CALL
3174A
SLEEP RM
ON-CALL
3174B
SLEEP RM
ON-CALL
PHYSICIANS
OFFICE
SHOWER
PHYSICIAN
TOI.
MALE/
FEMALE
TOI.
SHOWER
SHOWER
TOI
TOI
WAITING
TOILET
3209A
3207A
T AND L
3207B
OFFICE
BEDS (5)
3214A
OFFICE
TOI.
TOI.
STOR.
GEN.
TOI.
3132A
UTILITY
HAC
STATION
NURSE
CORR.
RM
EXAM
ROOM
REST
SW3-1
STAIR
SW4-1
STAIR
SW5-1
STAIR
TOI.
TOI.
TOI.
TOI.
TOI
EXAM
KITCHEN
NUTRITION 3130
PREP
MED
PHYSICIAN
CORR.
3214A-1
AIR LOCK
EQUIPMENT
STORAGE
SW6-1
9'-11 15__
" 9'-11 15__
3E SKY
89 7 6
BED (5)
OPEN TO BELOW
OPEN TO BELOW
BIO
SP
SP
SP
SP
SP
SP
SP
SP SP SP
SP
SP SP SPSP
SP
SP
SP
SP
SP SP
SP
SP
SPSP
SP
SP
SP
SP
SP
KEY PLAN
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant: K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
Lo ca l F ile s\
VA
SD
_R ep la ce N ur se
C al l M
AT
V
PA
_V
_j am es .h ec k.
rv t
9/
/2
2:
:0
PM
A. SHRESTHAJ. ROBERTS
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
664-18-331
02/02/2024
100% SUBMITTAL
SAN DIEGO, CA
Revisions: Date:
ST
ATE OF CA L I FORN IA
REG
I ST ER ED A RCH I T ECT
ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS
FACILITY AND IN THE ABOVE CEILING SPACES. THE
CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY
TO PROTECT PERSONS FROM EXPOSURE. THESE
SAFEGUARDS WILL INCLUDE:
1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN
THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS
CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40
HOUR ASBESTOS TRAINING CLASS, AS APPROVED BY THE
VA, WITH CERTIFICATION.
2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND
WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT
(PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS
PRIOR TO ENTRY INTO ABOVE CEILING SPACES.
3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES,
CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT,
A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.
4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF
CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS
OR OTHER DISTURBANCE OF CELING OR WALL MATERIALS
SHALL BE PERFORMED WITH PROPER BARRICADES
INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH
PROTECTIVE BARRICADES SHALL BE PROVIDED BY THE
CONTRACTOR.
THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS
SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY,
PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR
EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY
FORM AT THE PROJECT SITE. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR JOB SITE SAFETY WHICH INCLUDES ALL
TRAINING AND SAFEGUARDS NECESSARY TO PROTECT
HIS/HER EMPLOYEES, VA PERSONNEL VISITORS AT THE SITE
AND ANY OTHER PERSONS.
ASBESTOS WARNING
1/16" = 1'-0"AE107
1 LEVEL 3 - SOUTH FLOOR PLAN
NORTH
SHEET NOTES
ARCHITECTURAL LEVEL 3 - SOUTH
FLOOR PLAN
AE107
GENERAL NOTES
1 INSTALL PUBLIC ADDRESS PAGING SPEAKER
1 (TYP)
2 TIE THE 3RD FLOOR WEST EXISTING SPEAKERS INTO
THE NEW PAGING SYSTEM. VERIFY THAT EXISTING
3RD FLOOR WEST SPEAKERS ARE FUNCTIONING
CORRECTLY.
3 (TYP)
3 AREAS ABOVE CEILING TILES CONTAIN ASBESTOS.
ONLY PROPERLY TRAINED INDIVIDUALS WEARING
ALL REQUIRED PPE'S INCLUDING RESPIRATORS ARE
ALLOWED TO ENTER THIS SPACE.
1. REFER TO TI DEMOLITION PLANS FOR ADDITIONAL
GENERAL NOTES.
2. ACOUSTIC TILE CEILINGS: DEMOLISH/REMOVE ENTIRE
CEILING TILE AT LOCATIONS WHERE SPEAKERS ARE
SCHEDULED TO FOR REMOVAL OR REPLACEMENT.
EXISTING SUSPENSION SYSTEM TO REMAIN.
3. GYPSUM BOARD CEILINGS: WHERE SPEAKERS ARE
SCHEDULED FOR REMOVAL OR REPLACEMENT, PREPARE
CEILING SURFACE FOR PATCHING AND REPAIR TO MATCH
THE EXISTING ADJACENT CEILING SURFACE FINISH AND
PAINT FINISH.
WORK ROOM
CLEAN UTILITY
(UCCL1)
SHOWER (TSSF1)
LOCKER (LR002)
PAC CENTER
CLEAN ROOM
(ANCW2)
CARDIO CATH LAB 2
(XCCE1)
CONTROL ROOM
CARDIO CATH LAB 2
(ORHC1)
EQUIPMENT ROOM
(CATH LAB 1)
EQUIPMENT RM 4366
XCCA1
SEMI-RESTRICTED
CORRIDOR
(E) EXAM ROOM
OFFICE
(E) SHOWER
(E) SHOWER
(E) EXAM ROOM
(E) EXAM ROOM
4342A
(E) EXAM ROOM
4339B
(E) EXAM ROOM
4339C
HOLDING
CORRIDOR
CORRIDOR
4366A
CONTROL RM (CATH
LAB 1)
(E) CATH LAB I
(E) CORRIDOR
(E) CORRIDOR
(E) SCRUB / DIRTY
CLEAN LINEN
(SRSE1)
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SPSPSPSP SP SP SP
SP
SP
SP
SP
SP
SP
SP
SP
SPSPSP
SP
SP SP SP
SP
SP
SP
SP
SP
SPSP
SP
SP
SP
SP
SP
SP
SP SP
SP
SP
SP
SPSP
SP
SP
AM
VC
SP
AM
SP AM
SP
AM
SP
SP
AM
SP
AM
R01
KEY PLAN
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant: K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
Lo ca l F ile s\
VA
SD
_R ep la ce N ur se
C al l M
AT
V
PA
_V
_j am es .h ec k.
rv t
9/
/2
2:
:0
PM
A. SHRESTHAJ. ROBERTS
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
664-18-331
02/02/2024
100% SUBMITTAL
SAN DIEGO, CA
Revisions: Date:
ST
ATE OF CA L I FORN IA
REG
I ST ER ED A RCH I T ECT
ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS
FACILITY AND IN THE ABOVE CEILING SPACES. THE
CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY
TO PROTECT PERSONS FROM EXPOSURE. THESE
SAFEGUARDS WILL INCLUDE:
1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN
THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS
CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40
HOUR ASBESTOS TRAINING CLASS, AS APPROVED BY THE
VA, WITH CERTIFICATION.
2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND
WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT
(PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS
PRIOR TO ENTRY INTO ABOVE CEILING SPACES.
3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES,
CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT,
A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.
4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF
CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS
OR OTHER DISTURBANCE OF CELING OR WALL MATERIALS
SHALL BE PERFORMED WITH PROPER BARRICADES
INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH
PROTECTIVE BARRICADES SHALL BE PROVIDED BY THE
CONTRACTOR.
THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS
SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY,
PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR
EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY
FORM AT THE PROJECT SITE. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR JOB SITE SAFETY WHICH INCLUDES ALL
TRAINING AND SAFEGUARDS NECESSARY TO PROTECT
HIS/HER EMPLOYEES, VA PERSONNEL VISITORS AT THE SITE
AND ANY OTHER PERSONS.
ASBESTOS WARNING
1/16" = 1'-0"AE108
1 LEVEL 4 - NORTH FLOOR PLAN
NORTH
SHEET NOTES
ARCHITECTURAL LEVEL 4 - NORTH
FLOOR PLAN
AE108
GENERAL NOTES
1 INSTALL PUBLIC ADDRESS PAGING SPEAKER
1 (TYP)
2 INSTALL AMBIENT NOISE MICROPHONE
2 (TYP)
3 TIE THE 4TH FLOOR WEST EXISTING SPEAKERS INTO THE
NEW PAGING SYSTEM. VERIFY THAT EXISTING 3RD
FLOOR WEST SPEAKERS ARE FUNCTIONING CORRECTLY.
4 4TH FLOOR RACK LOCATION
5 (TYP)
5 AREAS ABOVE CEILING TILES CONTAIN ASBESTOS.
ONLY PROPERLY TRAINED INDIVIDUALS WEARING
ALL REQUIRED PPE'S INCLUDING RESPIRATORS ARE
ALLOWED TO ENTER THIS SPACE.
1. REFER TO TI DEMOLITION PLANS FOR ADDITIONAL
GENERAL NOTES.
2. ACOUSTIC TILE CEILINGS: DEMOLISH/REMOVE ENTIRE
CEILING TILE AT LOCATIONS WHERE SPEAKERS ARE
SCHEDULED TO FOR REMOVAL OR REPLACEMENT.
EXISTING SUSPENSION SYSTEM TO REMAIN.
3. GYPSUM BOARD CEILINGS: WHERE SPEAKERS ARE
SCHEDULED FOR REMOVAL OR REPLACEMENT, PREPARE
CEILING SURFACE FOR PATCHING AND REPAIR TO MATCH
THE EXISTING ADJACENT CEILING SURFACE FINISH AND
PAINT FINISH.
4. FIBERGLASS TILE CEILINGS: PROVIDE NEW FIBERGLASS
TILE AT AREAS WHERE SPEAKERS WERE REMOVED.
"CERTAINTEED" ECHOPHON FOCUS DG WING, 48"X48"
SEMI-CONCEALED OR VA APPROVED EQUAL. EXISTING
SUSPENSION SYSTEM TO REMAIN.
5. REFER TO MANUFACTURER'S INSTALLATION
INSTRUCTIONS FOR SPEAKER INSTALLATION.
6 CROSSHATCH AREA INDICATES 48"X48" FIBERGLASS
SP
SP
SPSPSPSP
SP
SP
SP
SP
SP
SP
SP SP SP SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SPAM
SP AM
SP
SP
VC
SP
SP
AM
SP
SP
PS
R01
KEY PLAN
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant: K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
Lo ca l F ile s\
VA
SD
_R ep la ce N ur se
C al l M
AT
V
PA
_V
_j am es .h ec k.
rv t
9/
/2
2:
:0
PM
A. SHRESTHAJ. ROBERTS
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
664-18-331
02/02/2024
100% SUBMITTAL
SAN DIEGO, CA
Revisions: Date:
ST
ATE OF CA L I FORN IA
REG
I ST ER ED A RCH I T ECT
ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS
FACILITY AND IN THE ABOVE CEILING SPACES. THE
CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY
TO PROTECT PERSONS FROM EXPOSURE. THESE
SAFEGUARDS WILL INCLUDE:
1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN
THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS
CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40
HOUR ASBESTOS TRAINING CLASS, AS APPROVED BY THE
VA, WITH CERTIFICATION.
2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND
WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT
(PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS
PRIOR TO ENTRY INTO ABOVE CEILING SPACES.
3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES,
CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT,
A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.
4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF
CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS
OR OTHER DISTURBANCE OF CELING OR WALL MATERIALS
SHALL BE PERFORMED WITH PROPER BARRICADES
INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH
PROTECTIVE BARRICADES SHALL BE PROVIDED BY THE
CONTRACTOR.
THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS
SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY,
PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR
EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY
FORM AT THE PROJECT SITE. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR JOB SITE SAFETY WHICH INCLUDES ALL
TRAINING AND SAFEGUARDS NECESSARY TO PROTECT
HIS/HER EMPLOYEES, VA PERSONNEL VISITORS AT THE SITE
AND ANY OTHER PERSONS.
ASBESTOS WARNING
1/16" = 1'-0"AE109
1 LEVEL 4 - SOUTH FLOOR PLAN
NORTH
SHEET NOTES
ARCHITECTURAL LEVEL 4 - SOUTH
FLOOR PLAN
AE109
GENERAL NOTES
1 INSTALL PUBLIC ADDRESS PAGING SPEAKER
4 (TYP)
3 INSTALL PUBLIC ADDRESS PAGING STATION
2 INSTALL AMBIENT NOISE MICROPHONE2 (TYP)
4 INSTALL PA SPEAKER VOLUME CONTROL. VOLUME
CONTROL SHALL ONLY CONTROL THE PA SPEAKER IN
THE CONFERENCE ROOM.
1 (TYP)
5 4TH FLOOR RACK LOCATION
7 (TYP)
6 TIE THE 4TH FLOOR WEST EXISTING SPEAKERS INTO
THE NEW PAGING SYSTEM. VERIFY THAT EXISTING
3RD FLOOR WEST SPEAKERS ARE FUNCTIONING
CORRECTLY.
7 AREAS ABOVE CEILING TILES CONTAIN ASBESTOS.
ONLY PROPERLY TRAINED INDIVIDUALS WEARING
ALL REQUIRED PPE'S INCLUDING RESPIRATORS ARE
ALLOWED TO ENTER THIS SPACE.
1. REFER TO TI DEMOLITION PLANS FOR ADDITIONAL
GENERAL NOTES.
2. ACOUSTIC TILE CEILINGS: DEMOLISH/REMOVE ENTIRE
CEILING TILE AT LOCATIONS WHERE SPEAKERS ARE
SCHEDULED TO FOR REMOVAL OR REPLACEMENT.
EXISTING SUSPENSION SYSTEM TO REMAIN.
3. GYPSUM BOARD CEILINGS: WHERE SPEAKERS ARE
SCHEDULED FOR REMOVAL OR REPLACEMENT, PREPARE
CEILING SURFACE FOR PATCHING AND REPAIR TO MATCH
THE EXISTING ADJACENT CEILING SURFACE FINISH AND
PAINT FINISH.
FEC
FEC
UPDNUPDN
HAC
ELEVATOR
S4
ELEVATOR
S3
ELEVATOR
S2
ELEVATOR
S1
ELEVATOR
P3
ELEVATOR
P2
ELEVATOR
P1
ELEVATOR
P6
ELEVATOR
P5
ELEVATOR
P4
CORRIDOR
5280A
ELEVATOR
S5
SP
SP
SP
SP
SP
SP
SP
SP
SPSPSPSPSP SP SP SP SP SP SP SP
SP
SP
SP
SP
SP
SP
SP
SPSP
SP
SPSPSP
SP
SP
SP
SPSPSP
SP
SP
SP
SP
SP
SP
SP
SPSP
SP
SP
SP
SP SP
SP
SP
SP
SP
SP
SPSPSPSPSPSP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
SP
AM
SP
AM
KEY PLAN
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant: K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
Lo ca l F ile s\
VA
SD
_R ep la ce N ur se
C al l M
AT
V
PA
_V
_j am es .h ec k.
rv t
9/
/2
2:
:0
PM
A. SHRESTHAJ. ROBERTS
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
664-18-331
02/02/2024
100% SUBMITTAL
SAN DIEGO, CA
Revisions: Date:
ST
ATE OF CA L I FORN IA
REG
I ST ER ED A RCH I T ECT
ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS
FACILITY AND IN THE ABOVE CEILING SPACES. THE
CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY
TO PROTECT PERSONS FROM EXPOSURE. THESE
SAFEGUARDS WILL INCLUDE:
1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN
THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS
CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40
HOUR ASBESTOS TRAINING CLASS, AS APPROVED BY THE
VA, WITH CERTIFICATION.
2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND
WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT
(PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS
PRIOR TO ENTRY INTO ABOVE CEILING SPACES.
3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES,
CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT,
A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.
4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF
CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS
OR OTHER DISTURBANCE OF CELING OR WALL MATERIALS
SHALL BE PERFORMED WITH PROPER BARRICADES
INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH
PROTECTIVE BARRICADES SHALL BE PROVIDED BY THE
CONTRACTOR.
THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS
SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY,
PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR
EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY
FORM AT THE PROJECT SITE. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR JOB SITE SAFETY WHICH INCLUDES ALL
TRAINING AND SAFEGUARDS NECESSARY TO PROTECT
HIS/HER EMPLOYEES, VA PERSONNEL VISITORS AT THE SITE
AND ANY OTHER PERSONS.
ASBESTOS WARNING
1/16" = 1'-0"AE110
1 LEVEL 5 - NORTH FLOOR PLAN
NORTH
SHEET NOTES
LEVEL 5 - NORTH FLOOR PLAN
AE110
GENERAL NOTES
1 INSTALL PUBLIC ADDRESS PAGING SPEAKER
1 (TYP)
2 INSTALL AMBIENT NOISE MICROPHONE
(TYP)
3 5TH FLOOR WEST IS THE OR SUITE. CONTRACTOR IS
REQUIRED TO SCHEDULE WORK IN THIS AREA 2
WEEKS IN ADVANCE. ALL WORK WILL BE DONE
AFTER BUSINESS HOURS.
4 TIE THE 5TH FLOOR EAST D POD EXISTING
SPEAKERS INTO THE NEW PAGING SYSTEM. VERIFY
THAT EXISTING 3RD FLOOR WEST SPEAKERS ARE
FUNCTIONING CORRECTLY.
5 (TYP)
5 AREAS ABOVE CEILING TILES CONTAIN ASBESTOS.
ONLY PROPERLY TRAINED INDIVIDUALS WEARING
ALL REQUIRED PPE'S INCLUDING RESPIRATORS ARE
ALLOWED TO ENTER THIS SPACE.
1. REFER TO TI DEMOLITION PLANS FOR ADDITIONAL
GENERAL NOTES.
2. ACOUSTIC TILE CEILINGS: DEMOLISH/REMOVE ENTIRE
CEILING TILE AT LOCATIONS WHERE SPEAKERS ARE
SCHEDULED TO FOR REMOVAL OR REPLACEMENT.
EXISTING SUSPENSION SYSTEM TO REMAIN.
3. GYPSUM BOARD CEILINGS: WHERE SPEAKERS ARE
SCHEDULED FOR REMOVAL OR REPLACEMENT, PREPARE
CEILING SURFACE FOR PATCHING AND REPAIR TO MATCH
THE EXISTING ADJACENT CEILING SURFACE FINISH AND
PAINT FINISH.
4. FIBERGLASS TILE CEILINGS: PROVIDE NEW FIBERGLASS
TILE AT AREAS WHERE SPEAKERS WERE REMOVED.
"CERTAINTEED" ECHOPHON FOCUS DG WING, 48"X48"
SEMI-CONCEALED OR VA APPROVED EQUAL. EXISTING
SUSPENSION SYSTEM TO REMAIN.
5. REFER TO MANUFACTURER'S INSTALLATION
INSTRUCTIONS FOR SPEAKER INSTALLATION.
6 CROSSHATCH AREA INDICATES 48"X48" FIBERGLASS
Ca rt
Ref Hood
FEC
FEC
SP
SP
SP
SP
SP
SP
SP
SPSP
SP
SP
SP
SP SP SP
SP
SP
SP SP
SP
SP
SP
SPSP
SP
SP
SP
SP
SP
SP
SP
SPSPSP
SP
SPSPSP
SP
SP SP
SP
SPSP
SP
AM
SP
AM
SP
SP
SP
KEY PLAN
Project Number:
Building Number:
Drawing Number:
Project Title:
Location:
Issue Date: Checked: Drawn:
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase:ARCHITECT/ENGINEER OF RECORD A/E:
STAMPCONSULTANT
321 4 5 6 7 8 9 10
Consultant: K F DAVIS
ENGINEERING, INC
530 LA GONDA WAY, SUITE E,
DANVILLE, CA 94526
WWW.KFDE.COM
(925) 743-8884
H :\R ev it
Lo ca l F ile s\
VA
SD
_R ep la ce N ur se
C al l M
AT
V
PA
_V
_j am es .h ec k.
rv t
9/
/2
2:
:0
PM
A. SHRESTHAJ. ROBERTS
REPLACE HOSPITAL NURSE CALL,
MATV, AND PUBLIC ADDRESS
664-18-331
02/02/2024
100% SUBMITTAL
SAN DIEGO, CA
Revisions: Date:
ST
ATE OF CA L I FORN IA
REG
I ST ER ED A RCH I T ECT
ASBESTOS CONTAINING MATERIALS EXIST THROUGHOUT THIS
FACILITY AND IN THE ABOVE CEILING SPACES. THE
CONTRACTOR SHALL TAKE EVERY PRECAUTION NECESSARY
TO PROTECT PERSONS FROM EXPOSURE. THESE
SAFEGUARDS WILL INCLUDE:
1. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL BE TRAINED IN
THE IDENTIFICATION OF, AND HANDLING OF, ASBESTOS
CONTAINING MATERIALS. THIS TRAINING SHALL BE A 40
HOUR ASBESTOS TRAINING CLASS, AS APPROVED BY THE
VA, WITH CERTIFICATION.
2. ALL CONTRACTORS PERSONNEL WHO WILL BE ENTERING
THE ABOVE CEILING SPACES AND/OR REMOVING ANY
CEILINGS, WALLS OR CEILING TILES SHALL OBTAIN AND
WEAR, AT ALL TIMES, PERSONAL PROTECTIVE EQUIPMENT
(PPE) INCLUDING, BUT NOT LIMITED TO, RESPIRATORS
PRIOR TO ENTRY INTO ABOVE CEILING SPACES.
3. PRIOR TO ENTRY INTO ABOVE CEILING SPACES,
CONTRACTOR PERSONNEL SHALL UNDERGO AND SUBMIT,
A MEDICAL EVALUATION FOR USE OF A RESPIRATOR.
4. ANY WORK BELOW THE CEILING SUCH AS REMOVAL OF
CEILING TILES, GYPSUM BOARD CEILINGS, PA SPEAKERS
OR OTHER DISTURBANCE OF CELING OR WALL MATERIALS
SHALL BE PERFORMED WITH PROPER BARRICADES
INCLUDING THE USE OF CONTAINMENT CUBES. ALL SUCH
PROTECTIVE BARRICADES SHALL BE PROVIDED BY THE
CONTRACTOR.
THE ARCHITECT-ENGINEER AND HIS/HER CONSULTANTS
SHALL HAVE NO RESPONSIBILITY FOR THE DISCOVERY,
PRESENCE, HANDLING, REMOVAL OR DISPOSAL OF, OR
EXPOSURE OF PERSONS TO HAZARDOUS MATERIALS, IN ANY
FORM AT THE PROJECT SITE. THE CONTRACTOR IS SOLELY
RESPONSIBLE FOR JOB SITE SAFETY WHICH INCLUDES ALL
TRAINING AND SAFEGUARDS NECESSARY TO PROTECT
HIS/HER EMPLOYEES, VA PERSONNEL VISITORS AT THE SITE
AND ANY OTHER PERSONS.
ASBESTOS WARNING
1/16" = 1'-0"AE111
1 LEVEL 5 - SOUTH FLOOR PLAN
NORTH
SHEET NOTES
LEVEL 5 - SOUTH FLOOR PLAN
AE111
GENERAL NOTES
1 INSTALL PUBLIC ADDRESS PAGING SPEAKER
1 (TYP)
2 INSTALL AMBIENT NOISE MICROPHONE
2 (TYP)
3 (TYP)
3 AREAS ABOVE CEILING TILES CONTAIN ASBESTOS.
ONLY PROPERLY TRAINED INDIVIDUALS WEARING
ALL REQUIRED PPE'S INCLUDING RESPIRATORS ARE
ALLOWED TO ENTER THIS SPACE.
1. REFER TO TI DEMOLITION PLANS FOR ADDITIONAL
GENERAL NOTES.
2. ACOUSTIC TILE CEILINGS: DEMOLISH/REMOVE ENTIRE
CEILING TILE AT LOCATIONS WHERE SPEAKERS ARE
SCHEDULED TO FOR REMOVAL OR REPLACEMENT.
EXISTING SUSPENSION SYSTEM TO REMAIN.
3. GYPSUM BOARD CEILINGS: WHERE SPEAKERS ARE
SCHEDULED FOR REMOVAL OR REPLACEMENT, PREPARE
CEILING SURFACE FOR PATCHING AND REPAIR TO MATCH
THE EXISTING ADJACENT CEILING SURFACE FINISH AND
PAINT FINISH.
DN UP DN UP
A-FURN
CORRIDOR
6056A
LAB
LAB
LAB
LAB
LAB
6055A
LAB
6045B
LAB
6045A
LAB
LAB
LAB
LAB
LAB
LAB
LAB
LAB
LAB
6044A
LAB
6032A
LAB
LAB
LAB
LAB
LAB
6029A
LAB
LAB
LAB
LAB
LAB
LAB
LAB
LAB
LAB
LAB
LAB
LAB
6083A
LAB
LAB
LAB
LAB
LAB6072
LAB
LAB6064B
LAB
6064A
LAB
6064E
STORAGE(G)
LAB
LAB
STOR.
GEN.
LAB
(REF)
WALK-IN
6028A
OFFICE(T)
CORRIDOR
OFFICE(T)
6030A
OFFICE(T)
SW1-6
STAIR
6064D
LAB
6064C
LAB
OFFICE(T)
OFFICE(T)
LAB
STOR.
GEN.
6070A
FREEZER
CORRIDOR
CORR.
CORR.
SW2-6
STAIR
SW5-6
STAIR
SW6-6
STAIR
LAB
OFFICE(S)
LAB
LAB
6095A (T)
OFFICE
(T)
OFFICE6097
OFFICE
CORR.
CORR.
6064F
STOR.(G)
6026A
STOR.
GEN.
6081E
(REF)
WALK-IN
LAB
LAB
HAC
(REF)
WALK-IN
LOCKER
6041A
SHOWER
TOILET
FEMALE
SW10-6
STAIR
SW9-6
STAIR
6246A
-ERS
QUART
6245A
QUARTERS
6243A
QUARTERS
QUARTERS
QUARTERS
6233A
QUARTERS
QUARTERS
QUARTERS
LAB
6254B
QUARTERS
QUARTERS
QUARTERS
QUARTERS
QUARTERS
QUARTERS
-ERS
QUART
-ERS
QUART
HOLDING
ANIMAL
6268A
-ERS
QUART
CORR.
CORR.
LAB
LAB
LAB
LAB6223
LAB
LAB
LAB
LAB
LAB
LAB
LAB
LAB
LAB
6222C
LAB
6222C
LAB
6222F
LAB
6222E
LAB
LOUNGE
CORRIDOR
LAB
X-RAY
X-RAY
RM
DARK
CONTROL
6222D
UTILITY
SOILED
6222A
ROOM
ANTE
HAC6260
LAB
CORR.
CORR.
CORR.
OFFICE(S)
OFFICE(S)
-ERS
QUART
LAB
-ERS
QUART
-ERS
QUART
CORR.
STORAGE(G)
6249A
STOR.
GEN.
STOR.
GEN.
ROOM
PROCEDURE
MECH.
LAUNDRY
6252G
OR 6252E
CORR.
6252H
OR
6252B
-ERS
QUART
6252C
-ERS
QUART
6254A
LAB
6252A
UTILITY
CLEAN
UTILITY
SOILED
CORR.
6252I (G)
STOR.
6263A
OFFICE(S)
CORR.
6267A (G)
STOR.
TOI.
MALE
6214A
STORAGE(G)
LAB
LAB 6201
LAB
LAB
LAB
LAB
6184B
LAB
6184C
LAB
6184A
LAB
LAB
LAB6189B
LAB
LAB 6197A
LAB
LAB
LAB
LAB
LAB
LAB
LAB
LAB
LAB
LAB 6188A
LAB
LAB
LAB
LAB
LAB
LAB
LAB
LAB
LAB
LAB
LAB
LAB
LAB
LAB
LAB
LAB
LAB
LAB
CORR.
6206A
OFFICE(S)
OFFICE(S)
6189D
CORR.
CORR.
CORR.
OFFICE(S)
COMPUTER
6179A
OFFICE(S)
OFFICE(S)6175
CORR.
OFFICE(S)
6174E
LAB
6174A
LAB
6169A
LAB
6169B
OFFICE(S)
CORR.
OFFICE(S)
LINEN
SOILED
CORR.
6201A
OFFICE(S)
6201B (T)
OFFICE
6189C
OFFICE(S)
(REF)
WALK-IN
(REF)
WALK-IN
(REF)
WALK-IN
LAB
6182A
STOR.
LAB
LAB
STAIRC…
This is the start of the file's text. The full file is on GovTribe.