This document is a Room Finish Schedule and Glazing Type Legend for the St. Clair Shores Police Headquarters building project, prepared by Partners Architecture. The detailed spreadsheet provides comprehensive interior design specifications for approximately 50 rooms across two floors, including finishes for floors, walls, bases, and ceilings. The schedule uses abbreviation codes to specify materials such as carpet (CPT), resilient base (RB), paint (PNT), ceramic tile (CT), and acoustic tile ceiling (ACT) for various spaces including lobbies, offices, restrooms, storage areas, interview rooms, and specialized areas like evidence processing and booking.
The document includes additional technical notes about material transitions, paint color matching, window treatments, and specific installation instructions. Key notes highlight specific requirements like brush broom finish for stairs, 6-inch epoxy base height, chair rail placement, and carpet installation methods (linear pattern, basket weave). The glazing type legend provides detailed specifications for different glass types, including clear, low-E, tempered, impact safety-rated, and security glazing varieties, which suggests careful consideration of functional and safety requirements for the police facility's architectural elements.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment A.pdf | ||
| Attachment H.pdf | ||
| Attachment B.pdf | ||
| Attachment C.pdf | ||
| Attachment E.pdf | ||
| PD-FD-Furniture-Specs-2025.pdf | ||
| Attachment D.pdf | ||
| Attachment G.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ROOM�FINISH�LEGEND
ACT ACOUSTIC�TILE�AND�GRID�CEILING�SYSTEM
CONC CONRETE
CPT CARPET
CT CERAMIC�TILE
EP EPOXY�FLOORING
EP�PNT EPOXY�PAINT
EX-PNT EXTERIOR�PAINT
FP FIBERGLASS�REINFORCED�PANELING
PC EXPOSED�PRECAST�CONCRETE�PLANK�CEILING
PL PLASTIC�LAMINATE
PT PORCELAIN�TILE
PNT PAINT
RAF ATHLETIC�FLOORING
RB RESIL IENT�WALL�BASE
RWS ROLLER�WINDOW�SHADES
SC SEALED�CONCRETE
SN STAIR�TREADS�AND�NOSING
SS SOLID�SURFACING
ST WOOD�STAIN
MP FORMED�METAL�CEILING�PANEL
ROOM�FINISH�GENERAL�NOTES
A.
B.
C.
D.
E.
F.
G.
H.
I.
REFER�TO�REFLECTED�CEILING�PLANS,�INTERIOR�ELEVATIONS,�AND�FINISH�FLOOR�PLANS�FOR�LOCATIONS�OF�MATERIAL�/�PAINT�
TRANSIT IONS.
REFER�TO�MATERAL�FINISH�&�COLOR�SCHEDULE,�SPECIFICATION�SECTION�000200.
PROVIDE�REDUCER�STRIP�AT�FLOOR�MATERIAL�TRANSITIONS�AS�NEEDED,�REFER�TO�THRESHOLD�DETAILS�AND�DOOR�SCHEDULE.
WINDOW�SILLS�TO�BE�SOLID�SURFACE�(SS-1),�TYPICAL.�
EXPOSED�LINTELS�IN�MASONRY�WALLS�TO�BE�PAINTED�TO�MATCH�WALL�COLOR,�TYPICAL.�
EXPOSED�STRUCTURE�TO�BE�PAINTED�TO�MATCH�CEILING�COLOR,�TYPICAL.�
ALL�WINDOW�GYPSUM�HEAD�&�JAMBS�TO�MATCH�WALL�COLOR,�TYPICAL.
SOFFITS�/�BULKHEADS�TO�BE�PAINTED�ON�ALL�SIDES,�TYPICAL.�REFER�TO�ROOM�FINISH�SCHEDULE,�INTERIOR�ELEVATIONS,�AND�
REFLECTED�CEILING�PLAN�FOR�COLOR.�
OWNER�PROVIDED�=�OWNER�FURNISHED,�OWNER�INSTALLED
ROOM�FINISH�KEY�NOTES
1. STAIRS�AND�LANDING�TO�HAVE�BRUSH�BROOM�FINISH.
2.� ALL�EPOXY�BASE�TO�BE�6"�IN�HEIGHT.
3. REFER�TO�INTERIOR�ELEVATIONS�FOR�WALL�TILE�LAYOUT�AND�DESIGN.
4.� CHAIR�RAIL�(CR-1)
5.� REFER�TO�REFLECTED�CEILING�PLAN�FOR�CEILING�PAINT�LOCATIONS.�
6. REFER�TO�INTERIOR�ELEVATIONS�FOR�PAINT/MATERIAL�LOCATIONS.�
7. REFER�TO�INTERIOR�ELEVATION�16/A8-01�FOR�TYPICAL�CHAIR�RAIL�AND�CORNER�GUARD�LAYOUT.�
8.� CARPET�TO�BE�INSTALLED�ASHLAR�-�LINEAR�PATTERN�TO�RUN�EAST�TO�WEST
9. CARPET�TO�BE�INSTALLED�ASHLAR�-�LINEAR�PATTERN�TO�RUN�NORTH�TO�SOUTH
10.� WALL�COLOR�TRANSITION�AT�9'-6"�AFF�-�PNT-6�TO�GO�UP�TO�DECK
11.� CARPET�INSTALLATION�METHOD�TO�BE�BASKETWEAVE
CURTAINWALL�ELEVATIONS:
A S �S
C
HE
D
FIN.�FL.�
IG-13
IG-13
IG-14
�5
/8
2� 1/
4' �8
2�
1/
5' �4
�3 /8
2�
1/ 2"
2' �8
�1 /8
2�
1/
3' �9
�1 /8
2�
1/
3' �7
�5 /8
2�
/2
2'
�2
�5 /8
2�1/2 " EQ. 2�1/2" EQ. 2�1/2" 2�1/2"3'�-�10�7/8"2�1/2"AS�SCHED.
FIN.�FL. �
IG-13
IG-14
FIN.�FL.�
IG-14
IG-13
�4
2� 1/
3' �9
�1 /4
2� 1/
2"
3' �7
�1 /2
2� 1/
2"
2' �2
�5 /8
2�1/2 "
EQ.
2�1/2"
EQ.
2�1/2"
9�1/2"
FIN.�FL.�
IG-14
IG-13
IG-13
2�1/2" 8"
2�1/2"
AS�SCHED.
2�1/2" 3'�-�1�7/8"
2�1/2"
2� 1/
" 2' �2
�5 /8
"2� /2
3' �7
�1 /2
2�
1/
3' �9
�1 /4
2�
1/
A S �S
C
HE
D
I NTERIOR
MG-10 CLEAR,�MONOLITHIC�GLAZING
MG-11 CLEAR,�MONOLITHIC,�TEMPERED�&�IMPACT�SAFETY-RATED�GLAZING
MG-12 CLEAR,�MONOLITHIC,�SPANDREL�GLAZING
MG-13 CLEAR,�MONOLITHIC,�ETCHED�LOGO,�TEMPERED�&�IMPACT�SAFETY-RATED�GLAZING
SFG-11 SPECIAL�FUNCTIONING�(SWITCH)�GLASS
SECURITY�GLAZING
SG-10 CLEAR,�BALLISTIC�RATED�GLAZING,�LEVEL�4�
SG-11 CLEAR,�LAMINATED�FORCED-ENTRY�SECURITY�GLAZING
EXTERIOR
IG-10 CLEAR,�LOW-E�INSULATING�GLAZING
IG-11 CLEAR,�LOW-E�INSULATED,�TEMPERED�&�IMPACT�SAFETY-RATED�GLAZING
IG-12 CLEAR,�LOW-E�INSULATED,�SPANDREL�GLAZING
IG-13 CLEAR,�REFLECTIVE,�LOW-E�INSULATED�GLAZING
IG-14 CLEAR,�REFLECTIVE,�LOW-E�INSULATED,�TEMPERED�&�IMPACT�SAFETY�RATED�GLAZING
GLAZING�TYPE�LEGEND:
PARTNERS�in�Architecture,�PLCPARTNERS�in�Architecture,�PLC
DRAWN�BY
CHECKED�BY
Statement�of�Intellectual�Property
65�Market�Street Mount �Clemens,�MI�48043 P�586.469.3600
PROJECT�NO.
APPROVED�BY
PROJECT�NAME
OWNER
SHEET�NAME
KEY�PLAN
ISSUES�/�REVISIONS
SHEET�NO.
CONSULTANT
The�ideas,�concepts,�drawings�and�thoughts�conveyed� herein�are�the�intellectual�property�of�PARTNERS�in� Architecture,�PLC,�65�Market�Street,�Mount�Clemens,�MI,� 48043�(P586.469.3600).�This�set�of�drawings,� in�whole�or� in�part,�may�not�be�reproduced,�without�the�written�consent� of�PARTNERS�in�Architecture,�PLC.�This�information�is� protected�under�U.S.�Copyright�Law,�all�rights�reserved.
©�Copyright�2024
PARTNERS
NORTH
THIS�DRAWING�IS�NOT�TO�BE�USED�FOR
CONSTRUCTION�UNLESS�ISSUED�BELOW
SPECIFICALLY�FOR�BIDDING/CONSTRUCTION"
8/19/2024�8:22:42�AM c:\_revit local\22-145�SCS-Police�Station�A23_CGazdikH3X66.rvt A0-07
City�of�St.�Clair�Shores
St.�Clair�Shores- Police�Headquarters
CTG/PF
MFT
22-145
27665�Jefferson�Ave.
St.�Clair�Shores,�MI�48081
Room�Finish�Schedule &�Curtain�Wall Elevations
CW-1 CW-2 CW-3 CW-4
Room�Finish�Schedule
ROOM
NO. ROOM�NAME FLOOR BASE
WALLS
CEILING
ROOM
FINISH�KEY
NOTESNORTH EAST SOUTH WEST
100 VESTIBULE CPT-1 RB-1 -- -- -- -- EXPOSED�-�PNT-2
101 LOBBY RTF-1,2,3 SGT-1�/
RB-1
GFM-1�/�PNT GFM-1 GFM-1�/�PNT GFM-1�/�PNT ACT-1,2�/�PNT 5
102 PUBLIC�RESTROOM PT-1 PT-2 EP-PNT-1 EP-�PNT-1 EP-PNT-1 EP-�PNT-1 PNT-2 3
103 RECORDS�DESK RTF-1 SGT-1 GFM-1�/�PNT-3 PNT-1 -- GFM-1 ACT-1�/�PNT 5
104 FRONT�DESK CPT-3 RB-1 PNT-1 GFM-1 GFM-1�/�PNT GFM-1 ACT-1�/�PNT 5
105 PASSAGE CPT-3 RB-1 PNT-1 PNT-1 GFM(-1) -- ACT-2�/�PNT
106 INTERVIEW CPT-2 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 11
107 SHIFT�COMMAND CPT-3 RB-1 PNT-1 PNT-4 PNT-1 PNT-1 ACT-1
108 RECORDS�OFFICE CPT-4 RB-1 PNT-1 -- PNT-1 PNT-1 ACT-1�/�PNT 5
109 PASSAGE CPT-4 RB-1 PNT-1 -- PNT-1 PNT-1 ACT-1
110 RECORDS�SERGEANT CPT-3 RB-1 PNT-1 -- PNT-1 PNT-4 ACT-1
111 TRAINING/�ACCREDITATION CPT-3 RB-1 PNT-1 PNT-4 PNT-1 PNT-1 ACT-1
112 BREAK�ROOM CPT-2 RB-1 PNT-1 PNT-1 PNT-1 CT-1�/�PNT-1 ACT-1 3,11
113 RECORDS�STORAGE SC-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1
114A PASSAGE CPT-2 RB-1 -- GFM-1 PNT-1 PNT-1 ACT-2�/�PNT 5,11
114B CORRIDOR CPT-2 RB-1 -- PNT-1�/�CR-1 -- PNT-1�/�CR-1 ACT-1�/�PNT 4,5,11
114C CORRIDOR CPT-2 RB-1 PNT-1�/�CR-1 PNT-1�/�CR-1 PNT-1�/�CR-1 -- ACT-1 4,11
114D CORRIDOR CPT-2 RB-1 -- PNT-1�/�CR-1�/��GFM-1 -- GFM-1 ACT-1 4,11
114E CORRIDOR CPT-3 RB-1 GFM-1 -- CT-1 ,2�/�PNT-1 PNT-1 ACT-1 3
115 BREAK�ROOM CPT-2 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1�/�PNT 5,11
116 ERT�READY�ROOM CPT-2 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 11
117 ERT�STORAGE SC-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 EXPOSED�-�PNT-2
118 STORAGE SC-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 EXPOSED�-�PNT-2
119 EVIDENCE�TECH/�PROCESSING EP-1 EP-2 EP-PNT-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 ACT-1 2
120 PROPERTY�ROOM PC-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 EXPOSED�-�PNT-2
121 VAULT PC-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 EXPOSED�-�PNT-2
122 EQUIPMENT�ROOM CPT-3 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1
123 HOST/�MAIL/�BB CPT-3,4,5 RB-1 PNT-1 PNT-1 GFM-1 PNT-1 ACT-1�/�PNT 5,8
124 REPORT�WRITING CPT-3 RB-1 GFM-1 PNT-1 PNT-1 PNT-1 ACT-1�/�PNT-1
125 BRIEFING�ROOM CPT-3,4,5 RB-1 PNT-1,4�/�CR-1 -- -- GFM-1 ACT-1�/�PNT 5,8
126 PATROL�ARMORY SC-1 RB-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 ACT-1
127 TRAFFIC CPT-3 RB-1 PNT-1 PNT-1 PNT-1 PNT-4 ACT-1
128 TRAFFIC�STORAGE CPT-3 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1
129 J.C SC-1 RB-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 EXPOSED�-�PNT-2
130 MEN'S�RESTROOM PT-1 PT-2 EP-PNT-1 EP-PNT-1 CT-1,2�/�EP-PNT-1 CT-1,2�/�EP-PNT-1 ACT-1
131 WOMENS�RESTROOM PT-1 PT-2 EP-PNT-1 CT-1,2�/�EP-PNT-1 CT-1,2�/�EP-PNT-1 EP-PNT-1 ACT-1 3
132 SALLY�PORT SC-1 RB-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 EXPOSED�-�PNT-2
132A BIKE�AREA SC-1 RB-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 EXPOSED�-�PNT-2
132B KENNELS SC-1 RB-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 EXPOSED�-�PNT-2
133 EVIDENCE�STORAGE SC-1 RB-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 EXPOSED�-�PNT-2
134 STORAGE SC-1 RB-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 EXPOSED�-�PNT-2
135 STORAGE SC-1 RB-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 EXPOSED�-�PNT-2
136 MECHANICAL�ROOM SC-1 RB-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 EXPOSED�-�PNT-2
137 ELECTRICAL�ROOM SC-1 RB-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 EXPOSED�-�PNT-2
138 VESTIBULE EP-1 EP-2 EP-PNT-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 PNT-2 2
139 JUVENILE�PROCESSING EP-1 EP-2 EP-PNT-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 PNT-2 2
140 SCAN EP-1 EP-2 EP-PNT-1 EP-PNT-1 EP-PNT-3 EP-PNT-1 ACT-1 2
141 BOOKING EP-1 EP-2 EP-PNT-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 PNT-2 2
142 RESTROOM EP-1 EP-2 EP-PNT-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 PNT-2 2
143 CELL�1 EP-1 EP-2 EP-PNT-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 EXPOSED�-�PNT-2
144 CELL�2 EP-1 EP-2 EP-PNT-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 EXPOSED�-�PNT-2
145 GROUP�CELL EP-1 EP-2 EP-PNT-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 EXPOSED�-�PNT-2
146 INTERROGATION EP-1 EP-2 EP-PNT-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 PNT-2 2
147 ARRAIGN. EP-1 EP-2 EP-PNT-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 PNT-2 2
148 BAG�DROP CPT-2 RB-1 GFM-1 PNT-1 GFM-1 GFM-1 ACT-1 5,11
149 NORTH�STA IR SN-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 EXPOSED�-�PNT
150 VESTIBULE CPT-1 RB-1 PNT-1 -- GFM-1 -- PNT
150 SOUTH�STAIR SC-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1
160 ELEVATOR CPT-2 RB-1 PREMANU. PREMANU. PREMANU. PREMANU. PREMANU.
200 UPPER�LOBBY CPT-2 RB-1 CT-2�/�PNT-1 PNT-1 PNT-1 PNT-1 ACT-2�/�PNT 3,5,11
200.1 ELEVATOR�PANEL�CLOSET CPT-2 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 11
Room�Finish�Schedule
ROOM
NO. ROOM�NAME FLOOR BASE
WALLS
CEILING
ROOM
FINISH�KEY
NOTESNORTH EAST SOUTH WEST
201 TRAINING�ROOM CPT-3,4,5 RB-1 PNT-1,X�/�CR-1 PNT-1,X�/�CR-1 PNT-1,X�/�CR-1 PNT-1�/�WC-1�/��CR-1 ACT-1�/�PNT 4,9
202 TRAINING�STORAGE/�OFFICE CPT-3 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1
203 RESTROOM PT-1 PT-2 CT-1 ,2�/�EP-PNT-1 CT-1,2�/�EP-PNT-1 EP-PNT-1 CT-1 ,2�/�EP-PNT-1 ACT-1 3
204 CORRIDOR CPT-2 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1�/�PNT-1 5,11
205 RESTROOM PT-1 PT-2 CT-1 ,2�/�EP-PNT-1 CT-1,2�/�EP-PNT-1 EP-PNT-1 CT-1 ,2�/�EP-PNT-1 ACT-1 3
206 ADMIN CPT-3 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1
207 CORRIDOR CPT-3 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1
208 CORRIDOR CPT-3 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1
209 WORK�/�COPY�AREA CPT-3 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1�/�PNT
210 CONFERENCE CPT-4,5 RB-1 PNT-4 PNT-1 -- -- ACT-1 4,8
211 DEPUTY�CHIEF'S�OFFICE CPT-3 RB-1 PNT-4 -- PNT-1 PNT-1 ACT-1
211B CLOSET CPT-3 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1
212 RESTROOM PT-1 PT-2 EP-PNT-1 CT-1,2�/�EP-PNT-1 CT-1 ,2�/�EP-PNT-1 CT-1 ,2�/�EP-PNT-1 ACT-1 3
213 CHIEF'S�OFFICE CPT-3 RB-1 PNT-1 PNT-1 PNT-1 PNT-4 ACT-1
213B CLOSET CPT-3 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1
214 SECURE�FILES SC-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1
215 STORAGE SC-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 EXPOSED�-�PNT-2
216 JANITOR�CLOSET SC-1 RB-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 EXPOSED�-�PNT-2
217 STORAGE SC-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 EXPOSED�-�PNT-2
218 SECRETARY/�ADMIN CPT-2 RB-1 PNT-1/�PNT-3 PNT-1 PNT-1 PNT-4 ACT-1�/�PNT 5,11
219 INTERVIEW CPT-3 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1
220 WORK/COPY�AREA CPT-2 RB-1 -- -- PNT-1 PNT-1 ACT-1 11
221 OPEN�DETECTIVES�OFFICE CPT-2 RB-1 PNT-1�/�PNT-6 PNT-1�/�PNT-6 PNT-1�/�PNT-5�/�PNT-6 PNT-1�/�PNT-6 ACT-1�/�PNT-X,6 5,10,11
222 JUVENILE�OFFICERS CPT-3 RB-1 PNT-1 PNT-1 PNT-1 -- ACT-1�/�PNT 5
223 BREAKOUT/�MEETING�ROOM CPT-2 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-2�/�PNT 5,11
224 NARCOTICS�DETECTIVES CPT-3 RB-1 PNT-1 PNT-1 -- PNT-1 ACT-1
225 DETECTIVE�LIEUTENANT CPT-3 RB-1 PNT-1 PNT-4 PNT-1 PNT-1 ACT-1
226 NARC�DETECTIVE CPT-3 RB-1 PNT-1 PNT-1 PNT-4 PNT-1 ACT-1
227 SPECIAL�INVESTIGATIONS CPT-3 RB-1 PNT-1 PNT-1 PNT-4 PNT-1 ACT-1
228 DB�READY�ROOM CPT-2 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 11
229 CORRIDOR CPT-2 RB-1 -- PNT-1 PNT-1 PNT-1 ACT-1�/�PNT 5,11
230 IT SC-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1
231 CORRIDOR CPT-2 RB-1 PNT-1 CT-1,2�/�PNT-1 PNT-1 PNT-1 ACT-1 3,11
232 HONOR�GUARD�STORAGE SC-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 EXPOSED�-�PNT-2
233 WOMEN'S�RESTROOM PT-1 PT-2 X�/�EP-PNT-1 X�/�EP-PNT-1 X�/�EP-PNT-1 X�/�EP-PNT-1 ACT-1
234 WOMEN'S�LOCKER�ROOM CPT-2 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 11
235 FITNESS RAF-1 RB-2 EP-PNT-1 EP-PNT-1 EP-PNT-1 EP-PNT-1 ACT-1�/�PNT-4
236 MEN'S�RESTROOM PT-1 PR-2 EP-PNT-1 CT-1,2�/�EP-PNT-1 CT-1 ,2�/�EP-PNT-1 EP-�PNT-1 ACT-1
237 MEN'S�LOCKER�ROOM CPT-2 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 11
249 NORTH�STAIRS SN-1�/�CPT-2 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 11
250 SOUTH�STAIRS SC-1 RB-1 PNT-1 PNT-1 PNT-1 PNT-1 ACT-1 1
100%�REVISED�SD 04/18/2024
DD�-�PROGRESS�SET 04/30/2024
DD�-�OWNER�REVIEW 05/06/2024
50%�DD 05/10/2024
95%�DD 06/07/2024
100%�DESIGN�DEVELOPMENT 06/14/2024
50%�CD 07/12/2024
75%�CD 08/02/2024
100%�CD 08/16/2024