Attachment F - Cutter Work Hours_USCGC STONE (WMSL-758).pdf

PDF 98 KB Posted

Attached to
Dockside: USCGC STONE DS FY25 FQ3
Solicitation number
70Z08525RLREP0003
Issued by

About this file

This is a work hours schedule attachment that specifies the permitted working hours for contractors performing maintenance and repairs on the USCGC STONE cutter. The document outlines different categories of work and their allowed timeframes:

General work is permitted Monday through Saturday from 0700-1900, while hot work has a slightly later start time of 0800-1900 Monday through Saturday. More specialized work including transfers of fuel/oil/water and operation of major machinery is restricted to Monday through Friday from 0700-1900. Work is also permitted on federal holidays from 0700-1900. The document notes that contractors may request to work outside these designated hours by providing advance notice to the Contracting Officer's Representative (COR).

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Cutter Work Hours

Cutter work hours are as follows:

General work: Monday-Saturday, 0700-1900 Hot work: Monday-Saturday, 0800-1900 Transfers of fuel, oil, and/or water: Monday-Friday, 0700-1900 Operation of major machinery: Monday-Friday, 0700-1900 Federal holidays: 0700-1900

The Contractor may request to work outside of the above designated days/hours with advance notice to the COR.

File details come from the government source that posted it. Updated .