Attachment B - Pricing Schedule USCGC STONE (WMSL-758).xls

XLS spreadsheet 52 KB Posted

Attached to
Dockside: USCGC STONE DS FY25 FQ3
Solicitation number
70Z08525RLREP0003
Issued by

About this file

This is a pricing schedule template for dockside repairs and maintenance work on the USCGC STONE (WMSL-758), a 418-foot National Security Cutter for the US Coast Guard. The template includes 23 work items, with 17 definite items and 6 optional items, covering various maintenance tasks such as system grooming (air conditioning, refrigeration, reverse osmosis), inspections and testing (cargo elevator, circuit breakers, fire detection), tank cleaning and preservation (aviation fuel, JP-5, ballast, water, sewage), and general services (temporary services, fire prevention).

The schedule includes space for unit pricing, quantities, and extended prices for each work item, plus a composite labor rate calculation section with different labor categories (Engineer Tech, Machinist/Pipe Fitter, Electrician, etc.). The template assumes a 15% G&A factor and 10% profit factor, and includes labor rates for various US coastal locations. The work is scheduled for FY2025 with 5 laydays allocated for completion.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SOS&S

PRICING SCHEDULE FOR:
USCGC STONE (WMSL-418) DOCKSIDE AVAILABILITY FY2025
ITEMDESCRIPTIONUNIT PRICEUNITQTYEXTENDED PRICE
D-001Air Conditioning Plants, GroomJOB$0.00
D-002Refrigeration Plant, System GroomJOB$0.00
D-003Reverse Osmosis, System GroomJOB$0.00
D-004Cargo Handling Elevator, Annual Inspection and Test, PerformJOB$0.00
D-005Circuit Breakers(Draw Out), Inspect and TestJOB$0.00
D-006Fire Detection System, Inspect and TestJOB$0.00
D-007Folding Boom Cranes, Biennial Maintenance, PerformJOB$0.00
D-008Miscellaneous System Relief Valves, 5 Year CertificationJOB$0.00
D-009VCHT Pump Discharge Check Valve, RenewJOB$0.00
D-010Tanks (Aviation Fuel Stowage and Overflow), Clean and InspectJOB$0.00
O-011Tanks (JP-5), Preserve (Full) - OPTIONALJOB$0.00
O-012Tanks (JP-5), Preserve (Partial) - OPTIONALJOB$0.00
D-013Tanks (Ballast), Clean and InspectJOB$0.00
O-014Tanks (Ballast), Preserve (100%) - OPTIONALJOB$0.00
O-015Tanks (Ballast), Preserve (Partial) - OPTIONALJOB$0.00
D-016Tank (High Purity Water), Clean and InspectJOB$0.00
D-017Tank (Potable Water Hydro Pneumatic), Clean and InspectJOB$0.00
D-018Grey Water Holding Tank(s) and Lift Stations, Clean and InspectJOB$0.00
D-019Sewage Holding Tank(s), Clean and InspectJOB$0.00
O-020Tanks (Sewage Holding Tank), Preserve (100%) - OPTIONALJOB$0.00
O-021Tanks (Grey Water Holding), Preserve (Partial) - OPTIONALJOB$0.00
D-022Temporary Services, Provide - CutterJOB$0.00
D-023Fire Prevention, ProvideJOB$0.00
O-00AComposite Labor RateHour00
O-00ZLaydaysDay5$0.00
Total Price of Definite Items$0.00
Total Price of Option Items$0.00
Total Price$0.00

&C(11/18/2024) Draft-0 - Page &P of &N

CostEstimateBreakdowns

Composite Labor Rate55
Assumed G&A Factor15%
Assumed Profit Factor10%Direct LaborDirect Material/Subs Cost
ITEMDESCRIPTIONUNIT PRICESub-Contracted (put a "1" in the blank)Total Labor HoursTotal Material & Subs (cost + G&A + profit)Eng TechMachinest/Pipe FitterElectricianShipfitterWelderFirewatchInsulator/LaggerPainterGen Labor/Helper/RiggerSupt/QA/NDTMat/Sub Cost 1Mat/Sub Cost 2Mat/Sub Cost 3Mat/Sub Cost 4Lab RateAreaWorkItemIDWIFileIDLoadData
62Baltimore, MD
52Biloxi, MS
56Boston, MA
50Charleston, SC
60Corpus Christi, TX
51Hampton Roads
64Honolulu, HI
55Houston, TX
56Los Angeles, CA
55Median Rate
49Miami
50Narragansett Bay, RI
55New London, CN
45New Orleans
62NYNY
49Panama City, FL
60Philadelphia, PA
51Portland, ME
57Portland, OR
55San Diego, CA
67San Francisco, CA
55Santa Barbara, CA
55SE North Carolina
65Seattle, WA
48Tampa-St. Petersburg
60Wilmington, DE

&C(09/28/2009) Page &P of &N

CostEstimateTemplate

File details come from the government source that posted it. Updated .