Attachment A - USCGC STONE (WMSL-758) Specs.pdf
PDF 4 MB Posted
- Attached to
- Dockside: USCGC STONE DS FY25 FQ3
- Solicitation number
- 70Z08525RLREP0003
About this file
This file contains detailed specifications for dockside repairs to be performed on the USCGC STONE (WMSL-758), a 418-foot National Security Cutter. The work includes 23 distinct work items focused on inspection, maintenance, cleaning and preservation of various ship systems including: air conditioning plants, refrigeration systems, reverse osmosis systems, cargo handling elevator, circuit breakers, fire detection systems, folding boom cranes, relief valves, tanks (aviation fuel, JP-5, ballast, high purity water, potable water, grey water, and sewage), and temporary services.
The specifications outline extensive technical requirements for each work item, including required government-furnished property, contractor responsibilities, quality control measures, and testing procedures. Several work items require specialized technical representatives, particularly for coating/preservation work which requires NACE Level 3 certified inspectors. The contractor must provide fire prevention services and temporary facilities while work is being performed. Optional work items include preservation of various tank systems. Key equipment involved includes York air conditioning plants, Bitzer refrigeration systems, Appleton Marine folding boom cranes, Square D circuit breakers, and Consilium fire detection systems. The work will be performed at Coast Guard facilities in Charleston, SC.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USCGC STONE (WMSL 758)
SPECIFICATION FOR DOCKSIDE REPAIRS
FY2025
(Rev-0, 17 December 2024)
USCGC STONE (WMSL-418) DOCKSIDE AVAILABILITY FY2025
ii (Rev-0)
TABLE OF CONTENTS
Revisions Record ......................................................................................................................................... iii Consolidated List of References ................................................................................................................... iv Consolidated List of Government-furnished Property ................................................................................. ix Consolidated List of Critical Inspection Items ............................................................................................. xi Principal Characteristics ............................................................................................................................. xii General Requirements WORK ITEM 1: Air Conditioning Plants, Groom WORK ITEM 2: Refrigeration Plant, System Groom WORK ITEM 3: Reverse Osmosis, System Groom WORK ITEM 4: Cargo Handling Elevator, Annual Inspection and Test, Perform WORK ITEM 5: Circuit Breakers(Draw Out), Inspect and Test WORK ITEM 6: Fire Detection System, Inspect and Test WORK ITEM 7: Folding Boom Cranes, Biennial Maintenance, Perform WORK ITEM 8: Miscellaneous System Relief Valves, 5 Year Certification WORK ITEM 9: VCHT Pump Discharge Check Valve, Renew WORK ITEM 10: Tanks (Aviation Fuel Stowage and Overflow), Clean and Inspect WORK ITEM 11: Tanks (JP-5), Preserve (Full) - OPTIONAL WORK ITEM 12: Tanks (JP-5), Preserve (Partial) - OPTIONAL WORK ITEM 13: Tanks (Ballast), Clean and Inspect WORK ITEM 14: Tanks (Ballast), Preserve (100%) - OPTIONAL WORK ITEM 15: Tanks (Ballast), Preserve (Partial) - OPTIONAL WORK ITEM 16: Tank (High Purity Water), Clean and Inspect WORK ITEM 17: Tank (Potable Water Hydro Pneumatic), Clean and Inspect WORK ITEM 18: Grey Water Holding Tank(s) and Lift Stations, Clean and Inspect WORK ITEM 19: Sewage Holding Tank(s), Clean and Inspect WORK ITEM 20: Tanks (Sewage Holding Tank), Preserve (100%) - OPTIONAL WORK ITEM 21: Tanks (Grey Water Holding), Preserve (Partial) - OPTIONAL WORK ITEM 22: Temporary Services, Provide - Cutter WORK ITEM 23: Fire Prevention, Provide iii (Rev-0)
REVISIONS RECORD
This page is used to record specification revisions, which may have occurred subsequent to a Revision 0 (Rev-0) package. Information listed is intended to provide contractors and field unit personnel a means to ensure all the current specification revision pages are present when reviewing or utilizing this specification package.
DATE REV# WORK
ITEM#
CHANGES MADE
NOTE : All work item and paragraph numbers listed above for a given revision correspond to same numbers in the previous revision. This revised specification is self-contained with all of the above listed changes incorporated.
iv (Rev-0)
CONSOLIDATED LIST OF REFERENCES
The below-listed documents form a part of this specification to the extent specified herein. Approval/publication dates or revision dates/numbers are also identified, to ensure that same document versions are used at the time of specification writing and during contract execution.
All Coast guard drawings, technical publications, and standard specifications will be provided to contractors by the Coast Guard at an appropriate time, or upon request, free of charge. Other Government documents may be accessed – free of charge – from links located on the SFLC website. Commercial sites provide access to their respective documents.
COAST GUARD DRAWINGS
A Team: Please determine if the ASW mods forward of FR 52 were completed. It is not clear if they were done on the STONE. I can help the PE/EO make this identification
Coast Guard Drawing 26B-CB-IV-801-001, Rev -, Booklet of General Plans
Coast Guard Drawing 35-LRI-II-801-001, Rev -, General Arrangement
Coast Guard Drawing 418A-WMSL-100-001, Rev B, General Arrangements
Coast Guard Drawing 418A-WMSL-100-006, Rev A, Inboard and Outboard Profiles
Coast Guard Drawing 418A-WMSL-101-001, Rev B, Compartment & Access Drawing
Coast Guard Drawing 418A-WMSL-528-001, Rev A, Plumbing and Interior Deck Drain Diagram
Coast Guard Drawing 418A-WMSL-530-001, Rev C, Potable Water System Diagram
Coast Guard Drawing 418A-WMSL-542-001, Rev B, JP-5 System Diagram
Coast Guard Drawing 418A-WMSL-555-001, Rev A, AFFF System Diagram
Coast Guard Drawing 418A-WMSL-593-002, Rev B, Sewage System Diagram
Coast Guard Drawing 418A-WMSL-801-001, Rev A, Booklet of General Plans
Coast Guard Drawing 750-WMSL_100_011, Rev J, Unit 1110 Structure – Inner Bottom, 1st Platf & 2nd
Deck – Bow to Fr 10 (ASC100111)
Coast Guard Drawing 750-WMSL_100_13, Rev L, Unit 1210 Structure – Inner Bottom to 1st Platform –
Fr 10 to Fr 22 (ASC100121)
Coast Guard Drawing 750-WMSL_100_23, Rev J, Unit 2120 Structure – 1st Platf to 2nd Deck Fr 35 to Fr
44 (ASC100212)
Coast Guard Drawing 750-WMSL_100_40, Rev M, Unit 3210 Structure – Inner Bottom to 1st Platform –
Fr 76 to Fr 88 (ASC100321)
Coast Guard Drawing 750-WMSL_520_1, Rev H, Seawater Cooling System Diagram (ASC520001)
Coast Guard Drawing 750-WMSL-085-025, Rev -, Compartment Areas & Volumes NSC 3 & Follow
(AS3085012)
Coast Guard Drawing 750-WMSL-085-043, Rev -, Tank Capacity Curves (758 Only) (ASC085013J)
Coast Guard Drawing 750-WMSL-100-031, Rev K, Unit 2300 Structure - Inner Bottom - Fr 52 to Fr 64
(ASC100230)
Coast Guard Drawing 750-WMSL-100-032, Rev L, Unit 2310 Structure – Inner Bottom to 1st Platform -
Fr 52 to Fr 64 (ASC100231) v (Rev-0)
Coast Guard Drawing 750-WMSL-100-036, Rev N, Unit 3110 Structure 1st Platform and Below Frs 65-
77 (ASC100311)
Coast Guard Drawing 750-WMSL-100-088, Rev -, General Arrangements NSC 9 & Follow (AS9100001)
Coast Guard Drawing 750-WMSL-100-090, Rev -, General Arrangements NSC 7 AND Follow
Coast Guard Drawing 750-WMSL-100-21, Rev F, Unit 2100 Struct – Inner Bottom – Fr 35 to Fr 44
(ASC100210)
Coast Guard Drawing 750-WMSL-100-37, Rev H, Unit 3120 Structure – 1st Platf to 2nd Dk- Fr 64 to Fr
76 (ASC100312)
Coast Guard Drawing 750-WMSL-167-001, Rev J, Manhole List Installation and Fabrication Details Ship
Wide (ASC167001)
Coast Guard Drawing 750-WMSL-303-002, Rev D, Coordination of Protective Devices (ASC303004)
Coast Guard Drawing 750-WMSL-320-047, Rev B, Electrical One Line Diagram (ASC320001J) (SRD
WMSL 758)
Coast Guard Drawing 750-WMSL-320-579, Rev -, Electrical Installations Iwo New Aft Folding Cranes
Coast Guard Drawing 750-WMSL-436-011, Rev E, Fire Detection Sys Deck Plan (ASC436009)
Coast Guard Drawing 750-WMSL-436-013, Rev C, Fire Detection Sys Cable Running Sheets
(ASC436010)
Coast Guard Drawing 750-WMSL-436-014, Rev -, Fire Detection and Control System Schematic
(ASC436028)
Coast Guard Drawing 750-WMSL-501-004, Rev D, Misc Independent Tanks Design and Details and
L/M (ASC501004)
Coast Guard Drawing 750-WMSL-505-001, Rev C, List of Relief Valves (ASC505001)
Coast Guard Drawing 750-WMSL-508-001, Rev C, Piping And Machinery Insulation And L/M
(ASC508001)
Coast Guard Drawing 750-WMSL-516-001, Rev E, A/C & Refrigeration Piping Diagram
Coast Guard Drawing 750-WMSL-516-002, Rev K, Chilled Water System Diagram (ASC516002)
Coast Guard Drawing 750-WMSL-520-001, Rev H, Seawater Cooling System Diagram
Coast Guard Drawing 750-WMSL-520-004, Rev E, Salt Water Cooling Unit 1320
Coast Guard Drawing 750-WMSL-520-005, Rev E, Salt Water Cooling System Unit 2110
Coast Guard Drawing 750-WMSL-520-008, Rev F, Salt Water Cooling Unit 2210
Coast Guard Drawing 750-WMSL-520-506, Rev F, Auxiliary Seawater Piping Mods FWD of FR 52
Coast Guard Drawing 750-WMSL-530-019, Rev E, Potable Water Unit 3120 (ASC 530312-PW)
Coast Guard Drawing 750-WMSL-530-044, Rev A, Potable Water Systems Diagram Selected Record
NSC 9
Coast Guard Drawing 750-WMSL-540-001, Rev G, Fuel Oil Diagram
Coast Guard Drawing 750-WMSL-540-003, Rev G, Diesel Engine and Gas Turbine LO fill, Trans, &
Service System
Coast Guard Drawing 750-WMSL-551-052, Rev A, Compressed Air Diagram Selected Record Drawing
NSC 9
Coast Guard Drawing 750-WMSL-572-002, Rev D, Elevator Arr & Instl (ASC572002)
Coast Guard Drawing 750-WMSL-583-508, Rev -, Installations IWO Aft Folding Cranes
Coast Guard Drawing 750-WMSL-593-009, Rev B, Sewage System Schematic (ASC593020)
Coast Guard Drawing 750-WMSL-593-027, Rev D, Sewage System Unit 2120 vi (Rev-0)
Coast Guard Drawing 750-WMSL-593-104, Rev -, Sewage System Diagram (ASC593004) (SRD)
(NSC8)
Coast Guard Drawing 750-WMSL-801-013, Rev -, Booklet of General Plans (NSC 8 SRD)
Coast Guard Drawing 750-WMSL-85-43, Rev -, Tank Capacity Curves (WMSL 758 Only)
(ASC085013H)
Coast Guard Fleet Drawing FL-1702-11, Rev -, Inspection of Sheaves
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3, Jun 2006, Coatings and Colors
Manual
Coast Guard Technical Publication (TP) 7082, SWBS 533, 2020, Potable & Chilled Water Tanks
Coast Guard Technical Publication (TP) 7087, Jan 2022, Pressure Relief Valve
Coast Guard Technical Publication (TP) 7107, SWBS 531, 2022, Reverse Osmosis Water Purifier-
SW6994463CNG
Coast Guard Technical Publication (TP) 7108A, SWBS 573, Jan 2022, Stores Elevator - Model 20833
Coast Guard Technical Publication (TP) 7165B, SWBS 324, Nov 2020, Ship Service Switchboards 1S, 2S, 3S & 1SP Shore Power - Operation, Maintenance & Installation - Volume 1
Coast Guard Technical Publication (TP) 7166B, SWBS 324, Nov 2020, Ship Service Switchboards 1S, 2S, 3S & 1SP Shore Power - Operation, Maintenance & Installation - Volume 2 & 4
Coast Guard Technical Publication (TP) 7167, SWBS 324, Feb 2019, Ship Service Switchboards 1S, 2S, 3S & 1SP Shore Power – Operation, Maintenance & Installation – Volume 3
Coast Guard Technical Publication (TP) 7168, January 2022, 3.2-ton Refrigeration Ships Store Plant
Coast Guard Technical Publication (TP) 7184, SWBS 593, Jan 2022, Vacuum Sewage System –
Operation, Maintenance & Parts List
Coast Guard Technical Publication (TP) 7903, SWBS 583, Oct 2021, Aft Boat Handling System –Model
FB90-28
Coast Guard Technical Publication (TP) 9847, SWBS 252, Jul 2022, Fire and Smoke Detection System
Technical Manual (For Hull 758)
Coast Guard Technical Publication (TP) S9514-F1-MMA-010, SWBS 514, Jun 2020, Air Conditioning
Plant - 130-Ton Capacity, HFC-134A - Description, Operation & Maintenance - REV 2
Fire Prevention and Response
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 3041 (SFLC Std Spec 3041), 2022, Shipboard
Electrical Cable Test
Surface Forces Logistics Center Standard Specification 3042 (SFLC Std Spec 3042), 2022, Shipboard
Electrical Cable Removal, Relocation, Splice, Repair, and Installation
Surface Forces Logistics Center Standard Specification 3100 (SFLC Std Spec 3100), 2022, Inspect, Test and Recondition AC Synchronous Machines In-Place
Surface Forces Logistics Center Standard Specification 5000 (SFLC Std Spec 5000), 2022, Auxiliary
Machine Systems
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Version, Fire
Prevention and Response vii (Rev-0)
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2020, Temporary
Services
Surface Forces Logistics Center Standard Specification 8636 (SFLC Std Spec 8636), 2022, Temporary
Hull Accesses
OTHER REFERENCES
American National Standards Institute/American Water Works Association (ANSI/AWWA) C652, 2019, Disinfection of Water-Storage Facilities
American Society of Mechanical Engineers (ASME) A17.2, Guide for the Inspection of Elevators, Escalators and Moving Walks.
American Welding Society (AWS) B1.10M/ B1.10, 2016, Guide for Nondestructive Examination of
Welds
American Welding Society (AWS) B1.11M/B1.11, 2015, Guide for the Visual Examination of Welds
American Welding Society (AWS) D1.1/D1.1M, 2020, Structural Welding Code – Steel
American Welding Society (AWS) D3.5, 2000, Guide for Steel Hull Welding
ASTM International (ASTM) D1330, 2022, Standard Specification for Rubber Sheet Gaskets
Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for
Shipyard Employment
MIL-C-24757, Nov 1990, Cloth, Fiberglass, Coated
National Fire Protection Association (NFPA) 70E, 2018 Edition, Standard for Electrical Safety in the
Work Place
National Fire Protection Association (NFPA) 72, 2022 Edition, National Fire Alarm and Signaling Code
Naval Sea System Command (NAVSEA) Technical Manual (TM) S6435-TP-MMI-010, Rev 5, Angle
Relief Valves BCS Series for Air/Gas Service
Naval Sea Systems Command (NAVSEA) Technical Manual (TM) S6435-TL-MMI-010, Rev 9, Angle
Relief Valve – Type D50
Naval Sea Systems Command (NAVSEA) Technical Manual (TM) S6435-UU-MMO-010, Rev 5, Angle
Relief Valve – Model D50FF
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for
Fabrication, Welding, and Inspection of Submarine Structure
Schneider Electric Maintenance and Field Testing Guide for Masterpact NT and NW Circuit Breaker
Maintenance and Field Testing Guide Instruction Bulletin No. 0613IB1202, Aug 2015
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2020, Bare Metal Power Tool Cleaning
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.11 (SSPC-SP 11), 2020, Power Tool Cleaning to Bare Metal
The Society for Protective Coatings (SSPC) Surface Preparation Specification No.3 (SSPC-SP 3), 2018, Power Tool Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 10 (WAB)/NACE WAB-2, 2015, Near-White Metal Wet Abrasive Blast
Cleaning viii (Rev-0)
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP 6 (WAB)/NACE WAB-3, 2015, Commercial Abrasive Blast Cleaning
The Society for Protective Coatings (SSPC)/NACE International (NACE) Joint Surface Preparation
Standard SSPC-SP WJ-4/NACE WJ-4, 2017, Waterjet Cleaning of Metals – Light Cleaning
The Society for Protective Coatings (SSPC)/NACE Joint Surface Preparation Standard SSPC-SP
10/NACE No.2, 2007, Near-White Blast Cleaning ix (Rev-0)
CONSOLIDATED LIST OF GOVERNMENT-FURNISHED PROPERTY
The following is a list of property, which the Government will furnish. This list supersedes any other material obligations indicated or implied by referenced drawings.
WORK
ITEM
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST
($/UNIT)
1 NÂ Resilient mount type
6E2000 Mil Spec MIL-
M-17508, Barry
Controls 3114-4Â
NSN: 5342-00-598-8825 18 ea 460.00Â
2 N -3/8― Henry Seal
Cap Valve (Main
Valve P/N: 2031)
Bonnet, Stem & Seat
Disc Assembly
PN: 8-059-008 2 $184.16
2 N 1-5/8― Henry Seal
Cap Valve (Main
Valve PN: 2032), Bonnet, Stem & Seat
Disc Assembly
PN: 8-059-010 3 $233.44
2 N 2-1/8― Henry Seal
Cap Valve (Main
Valve PN: 2033), Bonnet, Stem & Seat
Disc Assembly
PN: 8-059-012 2 $440.57
2 N Henry “Y―
Strainer Assembly
(Main Assembly P/N:
896A-5/8S)
PN: 5-010-003 (Screen) PN:
5-023-100 (Gasket) PN: 2-
023-080 (O-Ring)
2 N Sea Water Regulating
Valve (Condenser).
Metrex Valve Corp lead time is usually 6-8 weeks.
PN: M900P-125-LRFL2-3W 2 $2,552.00
2 N Sea Water Regulating
Valve (Oil Cooler).
Metrex Valve Corp lead time is usually 3-4 weeks
PN: DA-868T-75-SE-M 2 $1,740.00
2 N Disk, Rupturable NSN: 4820-01-366-7330 PN:
026-31284-000
6 $2,274.06
2 N Connector, Flexible, Liquid
NSN: 4730-01-561-7408 PN:
026-41967-000
2 $3,196.17
2 N Connector, Flexible, Vapor
NSN: 5935-01-561-7463 PN:
026-41968-000
2 $5,303.11
2 N Valve, Pressure Relief NSN:4820-01-561-6471
PN:022-11355-000
6 $352.12
3 N Brominator filter PN: MI160102 2 ea. 1,000.00 x (Rev-0) cartridge**
7 Y *CB-OTH Mark IV
(Coast Guard Drawing
26B-CB-IV-801-001)
N/A 1 ea. N/A
7 Y *Long Range
Interceptor II (LRI-II)
Cutter Boat (Coast
Guard Drawing 35-
LRI-II-801-001)
N/A 1 ea. N/A
9 N Check Valve NSN: 4820-01-541-5446 PN:
5500447
2 ea. $1,168.00
17 N Bladder, Water NSN: 4510-01-601-2564 PN:
660603996
1 ea. 2,506.00
*Government-loaned property, which shall be returned to the vessel upon completion of the availability.
**New or refurbished equipment that the Government may provide for installation in place of existing equipment.
***Government-furnished property, which is to be supplied by either the vessel or the C4IT ServiceCenter xi (Rev-0)
CONSOLIDATED LIST OF CRITICAL INSPECTION ITEMS
The following is a list of work items, which contain Critical Inspection reports, which the Contractor must complete within the first 25% of the availability contract period (see SFLC Std Spec 0000, paragraph 3.2.6.5
(Inspection report particulars)):
Work
Item Title
2 Refrigeration Plant, System Groom
3 Reverse Osmosis, System Groom
5 Circuit Breakers(Draw Out), Inspect and Test
6 Fire Detection System, Inspect and Test
7 Folding Boom Cranes, Biennial Maintenance, Perform
10 Tanks (Aviation Fuel Stowage and Overflow), Clean and Inspect
11 Tanks (JP-5), Preserve (Full) - OPTIONAL
12 Tanks (JP-5), Preserve (Partial) - OPTIONAL
13 Tanks (Ballast), Clean and Inspect
16 Tank (High Purity Water), Clean and Inspect
17 Tank (Potable Water Hydro Pneumatic), Clean and Inspect xii (Rev-0)
PRINCIPAL CHARACTERISTICS
418' WMSL
PHYSICAL
Length overall 418' 0"
Length between perpendiculars 390' 0"
Maximum beam 54' 0"
Beam @ 01 level 47' 9-1/8"
Depth (01 level @ side to baseline) 39' 2-3/4"
01 deck camber foredeck 1/4" in 1'-0"
Minimum berth depth 20' 0"
Height of highest projection Approximately 119'
Draft, design 14.40'
Design displacement 3925 long tons
MACHINERY
Two diesel engines MTU 20V, 20-cylinder 9,730 SHP each
One gas turbine General Electric LM2500; 29,500 SHP
Type of propulsion CODAG
Electrical system 24 Volt DC
Two controllable pitch propellers Rolls-Royce 5 blade, 14' 0" diameter; 229 RPM max
Two reduction gears RENK
One cross connect gear RENK
HULL
Hull material 5086 Aluminum
HSLA-80 Steel
ABS EH 36 Steel
ABS AH 36
Frame spacing
FWD of FR 9 2' 3"
FR 9 to FR 10 6' 9"
FR 10 to FR 98 4' 1"
FR 98 to FR 99 3'-8"
ELECTRICAL
Power Three 1360 kW, 450 V, 60 Hz, 3 Phase, 1800 RPM Caterpillar 3512B diesel engines with Baylor ship service generators
Shore tie cable Seven MIL-C-24368/2 (NATO) shore power receptacles, 400 A each
TANK CAPACITIES
Diesel oil 220,359 gal
Fresh water 12,454 gal
JP-5 Fuel 35,182 gal
1 (Rev-0)
00000_0824_FLT
REC_00000_FLT_Commercial Project @ CG Facility (0121)
General Requirements
1. SCOPE
1.1 Intent. This standard specification invokes general requirements for conducting vessel repairs performed by commercial contractors at a Coast Guard facility for Coast Guard vessels.
1.2 Term interchangeability. The terms 'Contractor', 'CG Yard', 'NAVSTA EVERETT', 'shipyard', 'Base', and
'Coast Guard Industrial' are used interchangeably in this specification. Where the primary service provider is
Coast Guard personnel, references to contractor and other noted descriptors within this specification or within drawings, publications, SFLC Standard Specifications or other commercial and military references are deemed the same as prime service provider.
2. REFERENCES
COAST GUARD DRAWINGS
None
COAST GUARD PUBLICATIONS
Coast Guard Commandant Instruction (COMDTINST) M10360.3 (series), Coatings and Color Manual
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General
Requirements
Surface Forces Logistics Center Standard Specification 0740 (SFLC Std Spec 0740), 2022, Welding and
Allied Processes
Surface Forces Logistics Center Standard Specification 5550 (SFLC Std Spec 5550), 2022, Version, Fire Prevention and Response
Surface Forces Logistics Center Standard Specification 8635 (SFLC Std Spec 8635), 2020, Temporary
Services
OTHER REFERENCES
Code of Federal Regulations (CFR) Title 29, Part 1915, Occupational Safety and Health Standards for
Shipyard Employment
NAVSEA Technical Publication T9074-AD-GIB-010/1688, (TP 1688), July 2012, Requirements for
Fabrication, Welding, and Inspection of Submarine Structure
2 (Rev-0)
3. REQUIREMENTS
3.1 General. The Contractor must conform to all requirements specified in SFLC Std Spec 0000 and in this item, as applicable, during the performance of this availability. The requirements in this WI applies to all work under the scope of this contract, whether explicitly stated in all following work items or not, and to all other work subsequently authorized by changes, modifications, or extensions to the contract.
3.1.1 The Contractor must conform to all requirements specified in SFLC Std Spec 5550 and in the Fire
Protection and Response work item, as applicable, during the performance of this availability.
3.1.1.1 Fire Safety Plan submission. The Contractor must submit a copy of the CFR 1915, Subpart P, Fire Safety
Plan with the Contractor’s bid when work will be conducted in a Contractor–owned facility. Include any MOA(s) with local firefighting facilities.
3.1.1.2 Fire Plan submission. The Contractor must submit a copy of the developed availability specific fire plan, as requested in the Fire Protection and Response work item, seven (7) days before the Arrival Conference.
NOTE
NAVSEA drawings listed will be available FOR INSPECTION ONLY from the Coast
Guard Port Engineer post-award. SFLC will not redistribute NAVSEA documents.
Contractors can apply to NAVSEA headquarters directly for copies.
3.2 Contractor-provided fire watch personnel. The Contractor must provide fire watch personnel and equipment.
3.3 Preservation requirements. The Contractor must accomplish all preservation tasks, including touch-ups, in accordance with SFLC Std Spec 6310.
3.3.1 Brand name approval. Ensure that all contractor-furnished coatings are in accordance with SFLC Std Spec
6310, Appendix C (Authorized Coatings for Use on Cutters and Boats).
3.3.2 Coating colors and system color schemes. The Contractor must obtain a written KO authorization to deviate from any coatings required in SFLC Std Spec 6310 Appendix C before work.
3.3.3 In-process quality control measures. The Contractor must abide by all the safety, preservation, and quality control requirements specified in SFLC Std Spec 0000, paragraph 3.2.4.2 (In-process QC measures for “critical-coated surfaces”).
3.3.3.1 Quality control requirements. The Contractor must abide by the following when performing preservation related inspections. The following measurements must be randomly spaced throughout for the purposes of providing a representation of the entire prepared or coated surface.
3.3.3.1.1 Surface profile measurements. One surface profile measurement must be taken for every 200 square feet for the first 1000 square feet; for each additional 500 square feet or less, one profile measurement must be taken.
Profile measurements must be taken in accordance with SFLC Std Spec 6310, paragraph 3.1.8.3 (Surface profile measurements). A “measurement” for surface profile is defined as follows:
• ASTM D4417, Method B: One profile measurement is the average (mean) of 10 individual readings.
• ASTM D4417, Method C: One profile measurement is the average (mean) of 2 individual readings.
3.3.3.1.2 Soluble salt conductivity measurements. 5 conductivity measurements must be taken every 1000 square feet. For submerged (immersed) applications conductivity measurements must not exceed 30 microsiemens/cm.
3 (Rev-0)
For non-submerged (non-immersed) applications conductivity measurements must not exceed 70 microsiemens/cm. If a conductivity check fails, clean the surface in accordance with SFLC Std Spec 6310, paragraph 3.1.8.5 (Soluble salt removal).
3.3.3.1.3 Coating thickness measurements. Three area measurements must be taken for the first 1000 square feet;
for each additional 1000 square feet, perform an additional area measurement. A “measurement” for coating thickness is defined as follows:
• SSPC-PA 2 defines an area measurement as 5 separate spot measurements randomly spaced throughout a 100 square foot area.
• SSPC-PA 2 defines a spot measurement as 3 gage readings and each new gage reading the probe must be moved to a new location within a 1.5-inch diameter circle defining the spot.
3.4 Welding and brazing requirements. The Contractor must perform all welding and allied processes, and NDE in accordance with SFLC Std Spec 0740.
3.4.1 HY-130 material substitution. The Contractor must be aware that HY-130 steel plating is no longer commercially available. For the purpose of performing flight deck repairs on US Coast Guard WMEC-270 “B-
Class” cutters, Weldox 900 steel plating has been approved as a replacement for HY-130. Due to the similarity in material properties and weldability of HY-130 and Weldox 900, all welding procedures and welder qualifications for welding Weldox 900 must be the same as those outlined in NAVSEA TP 1688 as applicable for welding HY-
130.
3.4.2 Standard spec modification. For any welding involving HY-130 on the flight deck of WMEC-270 “B-Class” cutters, perform all welding and allied processes, and non-destructive evaluation (NDE) in accordance with
NAVSEA TP 1688. The Contractor must be aware that the welding requirements specified in this document take precedence over paragraph 3.3.6 of SFLC Standard Spec 0000 for the purpose of welding involving HY-130.
3.4.3 Approval to weld HY-130. To obtain Coast Guard approval to weld on HY-130 steel for WMEC-270 “B-
Class” cutters, the Contractor must provide written Performance Qualification Records (PQR’s) for each process to be used. The PQR’s must be approved by one of the regulatory agencies affirming that the WPS meets the welding requirements of NAVSEA TP 1688. In addition, the Contractor must ensure that all subcontractors, prior to performing welding operations, have qualified procedures by meeting all the requirements set forth in this document.
NOTE
NAVSEA approval is NOT required for welding procedures submitted but the procedures must be reviewed and shown to satisfy the requirements set forth in
NAVSEA TP 1688, by a welding regulatory agency. The requirements for welding
Weldox 900 are considered the same as those for welding HY-130.
3.5 Environmental protection requirements. The Contractor must adhere to the following environmental protection requirements in accordance with the SFLC Stand Spec 0000:
3.5.1 USCG facilities. The Contractor must provide and maintain environmental protection as defined in SFLC
Std Spec 0000 Appendix B, Requirements for Environmental Protection at USCG Facilities, during the performance of this availability. Contractor must plan for and provide environmental protective measures to control pollution that develops during normal practice, as well as plan for and provide environmental protective measures required to correct conditions that develop during the project. Contractor must comply with applicable
Federal, state, and local laws, codes, ordinances, and regulations in their entirety. Any reference to a specific
4 (Rev-0) portion of a Federal, state, or local law, code, ordinance, or regulation in this or any other item must not be construed to mean that relief is provided from any other sections of the law, code, ordinance, or regulation.
3.5.1.1 USCG Generator status. The EPA ID for the Coast Guard facility is SCR000005389. This number can only be used to for the generator status. The transporter and designated facility must have their own EPA ID numbers and cannot use this one.
3.5.1.2 Plans and permits. The CG Facility has unit specific permits including the following:
• Spill Prevention Control and Countermeasures (SPCC) Plan: Unit has a SPCC Plan which requires certain unit-specific procedures be followed for the storage, inspection, and transfer of petroleum products in containers 55 gallons or greater.
3.5.2 Test and procedures. The Contractor is required to promptly conduct tests and procedures for the purpose of assessing whether operations are in compliance with applicable Environmental Laws. Analytical work must be done by NELAP accredited laboratories.
3.5.3 Regulatory notifications. The Contractor is responsible for all regulatory notification requirements in accordance with Federal, State and local regulations. In cases where the Coast Guard must also provide public notification, such as storm water permitting, the Contractor must coordinate with the Contracting Officer or COR, and if work is being performed at a USCG Facility, the local Facility Engineer or Engineering Officer. The
Contractor must submit copies of all regulatory notifications to the Contracting Officer and the local Facility
Engineer or Engineering Officer prior to commencement of work activities. Regulatory notifications must be provided for including but not limited to demolition, renovation, National Pollutant Discharge Elimination System
(NPDES) defined site work, and remediation of controlled substances such as asbestos, hazardous waste, and lead paint.
3.5.4 Environmental manager. The Contractor must appoint in writing an Environmental Manager for the project, who is responsible for coordinating Contractor compliance with Federal, State, local, and station environmental requirements. The Environmental Manager must ensure compliance with Hazardous Waste Program requirements, including hazardous waste handling, storage, manifesting, and disposal; implement the Contractors’
Environmental Management Plan; ensure that all environmental permits are obtained, maintained, and closed out;
ensure compliance with Storm Water Program Management requirements; ensure compliance with Hazardous
Materials including storage, handling, and reporting requirements; as well as coordinate any remediation of regulated substances such as lead, asbestos, and polychlorinated biphenyl (PCB). This may be a collateral position; however the individual must be trained to accomplish the following duties; ensure waste segregation and storage compatibility requirements are met; inspect and manage Satellite Accumulation areas; ensure only authorized personnel add wastes to containers; ensure all Contractor personnel are trained in 40 CFR requirements and individual position requirements; coordinate removal of waste containers; and maintain the Environmental
Records binder and required documentation, including environmental permits compliance and close-out.
3.5.5 HW disposal. Contractor must comply with SFLC Std Spec 0000 Appendix B, Requirements For
Environmental Protection At USCG Facilities for HW disposal and ensure that waste removals are conducted during normal business hours (0800-1500) on Monday through Friday (excluding holidays).
3.5.6 Additional Requirements. The Contractor must be aware of the following:
3.5.6.1 No Contractor or Subcontractor must have the authority to sign a Hazardous Waste Manifest using the
Coast Guard facility’s EPA Generator ID Number or remove contract generated hazardous waste from the Coast
Guard facility without COR or KO-approval.
3.5.6.2 Local environmental regulations at the Government facilities may be more stringent. As with all
5 (Rev-0) environmental regulations, the Contractor must prepare for and comply with local and state regulations.
3.5.6.3 Coast Guard facilities do not maintain Facilities Response Plans (FRPs) per 33 CFR 154. Contractor must furnish the FRP when required for over-the-water liquids transfers to and from vessels and is required for oil/fuel transfers to/from vessels for 250 barrels (10,500 gallons) or more.
3.6 Local Policy. The Contractor must refer to site (e.g., Base) Regulations and Instructions for details regarding local policies (e.g., crane services, parking, or facility usage).
3.7 SFLC Standard Specification approved changes. Approved updates to the 2022 SFLC Standard Specifications will appear here.
4. NOTES
4.1 QA inspection forms. QA inspection forms (QA-1 thru QA-5), required in SFLC Std Spec 6310 to be completed and submitted during preservation of “critical-coated surfaces”, are provided at the end of this document.
6 (Rev-0)
QA-1 - QUALITY ASSURANCE INSPECTION FORM
(PRESERVATION CHECKLIST)
VESSEL NAME HULL # WORK
ITEM #
WORK ITEM TITLE
LOCATION OF WORK (INCL. FRAME #’S) AREA (SQFT)
CHECKPOINT 1 – COATING SYSTEM COMPLIANCE
Ensure all coatings are in compliance with SFLC Std Spec 6310, Appendix C.
CHECKPOINT 2 - PAINT STORAGE
Ensure all coatings are kept at a temperature of 65 to 85°F at all times, unless otherwise specified by the coating mfg.
CHECKPOINT 3 - AMBIENT CONDITIONS
Ensure surface and surrounding temperatures are each between 50 and 90°F for water-containing coatings, and 35 and 95°F for other coatings, unless otherwise specified by the coating manufacturer(s).
Ensure maximum relative humidity (RH) is as follows, from surface preparations through final curing of topcoat: 50% for tanks, voids, and vent plenum; and 85% for all other areas, unless otherwise specified by manufacturer(s).
Ensure surface temperature is at least 5°F above the dew point, unless otherwise specified by the coating mfg.
CHECKPOINT 4 - PRE-SURFACE PREPARATION
Remove surface contaminants (soluble salts, loose rust, mud, and marine growth) with low pressure fresh water wash down (maximum 5,000 psi). If oil and grease are present, perform solvent cleaning, as per SSPC SP-1.
Verify equipment setup, blast media, and surface preparation methods match designated test coupon.
CHECKPOINT 5 - SURFACE PREPARATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure cleanliness of prepared surface is as per specification (i.e.: SSPC SP-11, SP-10, SP WJ-2…).
Verify surface anchor profile using ASTM D4417-Methods B or C against SFLC Std Spec 6310. Conduct profile readings at a minimum of 5 locations for the first 1000-sqft area, and 2 locations for each succeeding 1000-sqft area.
Measure soluble salt conductivity in accordance with SSPC-Guide 15. Conduct 5 measurements per each 1000-sqft area (max. threshold: 70 microsiemens/cm for non-submerged surfaces, 30 microsiemens/cm for submerged surfaces).
CHECKPOINT 6 - PRIMER COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Verify proper mixing and stand-in (induction) times.
Ensure no paint is applied when the temperature is expected to drop to freezing before the paint has dried.
Ensure surfaces are completely dry, unless otherwise allowed by the coating manufacturer(s).
Verify wet film thickness (WFT) at random, to prevent under or over application. Verify final DFT.
Brush out all runs, sags, drips, and puddles.
Perform visual inspection for holidays and other defects.
CHECKPOINT 7 – STRIPE COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
After primer coat (mist coat after inorganic zinc), brush-apply un-thinned coat of same primer paint over edges, weld seams, cut-outs, and areas of complex geometries @ 3-4 mils wet film thickness (WFT).
CHECKPOINT 8 – TOP COAT APPLICATION
Verify environmental conditions (see CHECKPOINT 3).
Ensure overcoating window is as per manufacturer’s instructions.
Verify proper mixing and stand-in (induction) times, as applicable.
Verify wet film thickness at random, to prevent under or over application.
Brush out all runs, sags, drips, and puddles.
CHECKPOINT 9 – FINAL INSPECTION
Verify final system dry film thickness. Conduct 5 sets of 3 readings for each of the first 3 100-sqft areas, followed by 5 sets of 3 readings for each succeeding 1000-sqft area.
Ensure that system cure is in accordance with manufacturer's recommendation for intended service.
Ensure potable water tank exhaust ventilation is maintained continuously from and during coating application through final system cure, to exhaust all solvent to the atmosphere and to prevent solvent entrapment.
For immersion coatings (including tank U/W body), record date and time of the following events:
Final coat application: _____/_____; Return to service or removal from environment controls: _____/_____
CHECKPOINT 10 – RECORD KEEPING
Complete, sign, and submit all provided QA Inspection Forms.
NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE / TIME
NAME OF CG REPRESENTATIVE SIGNATURE UNIT DATE/TIME
7 (Rev-0)
QA-2 - QUALITY ASSURANCE INSPECTION FORM
(ENVIRONMENTAL READINGS)
VESSEL NAME HULL #
WORK
Use one sheet for each activity. Record conditions every four hours from before surface preparation to application of final coating system coat.
DATE
TIME
ACTIVITY (SURFACE
PREPARATION, PRIMER
COAT, BARRIER COAT, TOP
COAT, ETC…)
LOCATION (FRAME &
DECK, RELATION TO
EQUIPMENT, ETC.)
TEMPERATURE % REL.
HUMID-
ITY
DEW
PT.
SURFAC
E
AMBIEN
T
ΔT
| DP -
SURFACE |
8 (Rev-0)
QA-3a - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-C)
VESSEL NAME HULL # WORK ITEM
LOCATION OF WORK (FRAME REFERENCES) AREA (SQFT)
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/AMPP No. 2
SSPC-SP WJ-2/AMPP WJ-2
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
PLACE SURFACE PROFILE REPLICA TAPES IN THE SPACES PROVIDED BELOW, TO SERVE AS
PERMANENT QA RECORD. MAINTAIN A SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS
DIVIDED INTO SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Place Surface Profile
Replica Tape Here
Reading (mils): Reading (mils): Reading (mils):
MEAN MIL READING (IAW ASTM D4417-METHOD C) FOR ABOVE 15 READINGS:
NAME OF QP-1/AMPP INSPECTOR SIGNATURE CERT. # DATE /
TIME
9 (Rev-0)
QA-3b - QUALITY ASSURANCE INSPECTION FORM
(SURFACE PROFILE LOG FOR PROFILE MEASUREMENTS IAW ASTM D4417-METHOD-B)
VESSEL NAME HULL # WORK ITEM
SURFACE PREPARATION METHOD PROFILE ACHIEVED (MILS)
MIN MAX MEAN
SSPC-SP-10/AMPP No. 2
SSPC-SP WJ-2/AMPP WJ-2
SSPC-SP-3
SSPC-SP-11
SSPC-SP-11 (inaccessible area)
Brush-blasting (non-metallic substrate)
ABRASIVE MANUFACTURER: ABRASIVE SIEVE SIZE:
RECORD MEASUREMENTS TAKEN IN THE SPACES PROVIDED BELOW, TO SERVE AS PERMANENT
QA RECORD. MAINTAIN SEPARATE LOG FOR EACH LOCATION. WHEN AN AREA IS DIVIDED INTO
SEPARATE SECTIONS, MAINTAIN A SEPARATE LOG FOR EACH SECTION.
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Reading (mils):
Mean Mils Reading (IAW ASTM D4417-Method B for above 10 readings (by column):
Mean Reading
(mils)
10 (Rev-0)
QA-4 - QUALITY ASSURANCE INSPECTION FORM
(SURFACE SOLUBLE SALT CONDUCTIVITY LOG)
VESSEL NAME HULL # WORK
SOLUBLE SALT CONDUCTIVITY MEASUREMENTS IAW SSPC-GUIDE 15.
DATE TEST LOCATIONS CONDUCTIVITY (MICROSIEMENS/CM)
11 (Rev-0)
QA-5 - QUALITY ASSURANCE DATA FORM
(COATING THICKNESS)
(Use one sheet for each sequence)
VESSEL NAME HULL #
WORK ITEM
COATING MFG PRODUCT NAME
BATC
H #
INDUCTI
ON TIME
COATING SYSTEM
SEQUENCE
(PRIMER/TOUCHUP/3RD
COAT, ETC.)
DRY FILM THICKNESS (DFT) MEASUREMENTS IAW SSPC-PA 2.
SPOT 1 2 3 4 5
AVERAGE
VALUE
*BASE METAL READING
(BMR)
*Required, If Magnetic Pull-Off (Type I/Banana) Gauge Is Used.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
LOCATION (FRAME REFERENCE):
SPOT 1 2 3 4 5 OVERALL AVG. DFT ADJUSTMENTS
1 AVG. BMR DEVIATION
3 BEFORE ADJUSTMENTS AFTER ADJUSTMENTS
AVG.
APPLICATION METHOD (AIRLESS,
CONVENTIONAL SPRAY, ROLLED)
AVERAGE DFT
12 (Rev-0)
4.2 Tank and Void Assessment form.
13 (Rev-0)
14 (Rev-0)
51400_BJA_0924_418
WORK ITEM 1: Air Conditioning Plants, Groom
1. SCOPE
1.1 Intent. This work item describes the requirements for the Contractor to groom each of the ship’s three
(3) air conditioning plants.
TABLE 1 – A/C PLANT NAME PLATE DATA
COMPRESSOR COMPRESSOR MOTOR CONDENSER
Manufacturer: York International Manufacturer: A.O. Smith Manufacturer: Ketema
Type: Semi-Hermetic Screw Part No.: 625272-005 Part No: MHX-1208-2P
Type: Shell and Tube
Model: YCWS Voltage: 440 Shell Dia.: 12.75 inch
Displacement: 239.3 Cu. Ft/Hr, Speed: 3600 RPM 60Hz Shell Length: 95.75 inch
Oil Charge: 6 gallons (3 gallons per refrigerant circuit) York “L” Oil Full Load Amps: 98 Water Pass: 2 pass
1.2 Government-furnished property.
MTI ITEM DESCRIPTION NSN/PN QTY ESTIMATED
COST ($/UNIT)
N Resilient mount type 6E2000 Mil Spec MIL-M-17508, Barry Controls 3114-4
NSN: 5342-
00-598-8825
18 460.00
N Valve, Pressure Relief, Superior 3030, 240 psi, 0.5-inch NPTI Inlet and Outlet
NSN: 4820-
01-561-6471
12 247.00
N Disk, Rupturable, 2-inch IPS, Type AV NSN: 4820-
01-366-7330
6 2,820.00
2. REFERENCES
COAST GUARD DRAWINGS
Coast Guard Drawing 750-WMSL-508-001, Rev C, Piping And Machinery Insulation And L/M
(ASC508001)
Coast Guard Drawing 750-WMSL-520-001, Rev H, Seawater Cooling System Diagram
Coast Guard Drawing 750-WMSL-520-506, Rev F, Auxiliary Seawater Piping Mods FWD of FR
15 (Rev-0)
COAST GUARD PUBLICATIONS
Coast Guard Technical Publication (TP) S9514-F1-MMA-010, SWBS 514, Jun 2020, Air
Conditioning Plant - 130-Ton Capacity, HFC-134A - Description, Operation & Maintenance
- REV 2
Surface Forces Logistics Center Standard Specification 0000 (SFLC Std Spec 0000), 2022, General Requirements
Surface Forces Logistics Center Standard Specification 6310 (SFLC Std Spec 6310), 2022, Requirements for Preservation of Ship Structures
OTHER REFERENCES
None
3. REQUIREMENTS
3.1 General.
3.1.1 CIR.
None.
3.1.2 Tech Rep.
3.1.2.1 AC Tech Rep. The Contractor must provide the services of a Qualified Technical
Representative who is familiar with the York 130-Ton capacity, HFC-134A Air Conditioning plants to accomplish the following on site:
• Advise on manufacturer’s system information.
• Assist with disassembly, inspection, repair, modification, calibration, testing and reassembly of the equipment/system.
• Ensure compliance with manufacturer's procedures and standards during system disassembly, inspection, and reassembly as applicable.
3.1.2.1.2 Ensure the Tech Rep has experience with the system/equipment stated above and demonstrated on their résumé.
3.1.2.1.3 Submit the name and résumé of the Tech Rep to the COR at the Arrival Conference.
3.1.2.2 Eddy Current Tech Rep. The Contractor must provide the services of a certified Tech
Rep, who is familiar with eddy current testing and can demonstrate ASNT-TC-1A certification
Level 2. to accomplish the following tasks – on site:
• Eddy current testing
3.1.2.2.1 Submit the Tech Rep’s name, certification documentation and résumé to the COR at the Arrival
Conference.
16 (Rev-0)
3.1.2.2.2 Submit the name and résumé of the Tech Rep to the COR at the Arrival Conference
3.1.3 Protective measures. The Contractor must furnish and install all protective measures in accordance with SFLC Std Spec 0000, paragraph 3.3.3 (Vessel component, space, and equipment protection).
3.1.4 Interferences. The Contractor must handle all interferences in accordance with SFLC Std Spec 0000, paragraph 3.3.5 (Interferences). Known interferences include, but are not limited to the below-listed:
• Piping
• Insulation
3.1.5 Personnel qualification. The Contractor must ensure that all personnel servicing Air Conditioning and Refrigeration (AC&R) equipment that uses CFC or HCFC refrigerant hold a current Environmental
Protection Agency (EPA) Technician Certification, Type IV (Universal Certification), and meet all State and local regulations and licensing requirements.
3.1.6 AC Requirement. The Contractor must ensure that at least one A/C compressor is operational at all times.
NOTE
Coast Guard personnel will operate all shipboard machinery and equipment.
3.2 Operational test, Initial. Prior to commencement of work, the Contractor must witness Coast Guard personnel perform an initial operational test of all items or shipboard devices to be disturbed, used, repaired, or altered, to demonstrate existing operational condition. Including but not limited to the following testing. Submit a CFR.
3.2.1 During initial testing of the AC units run each individual compressor by itself (no other compressors operating) for an hour, record the following data shown in Table 1-1 of TP S9514-F1-MMA-010 every 5 minutes. Submit a CFR.
• Compressor Speed
• Saturation Suction Temperature
• Saturation Discharge Temperature
• Chilled Water Circulation flow (in GPM) o Chill Water Temperature Entering o Chill Water Temperature Leaving
• Condenser Water Flow (in GPM) o Condenser Water Temperature Entering o Condenser Water Temperature Exiting
3.3 Visual survey. Accompanied by the Coast Guard Inspector, the Contractor must conduct a visual survey of each of the three (3) air conditioning plants. Submit a condition found report noting any unusual conditions and recommending any repairs. The visual survey must include the following items at a minimum:
• Thermal Insulation
• Vibration isolators
• Refrigerant Piping/Tubing
17 (Rev-0)
• Condition of steel in the main structure
• Condition of paint
3.4. Refrigerant Recovery and Disposal. The contractor must pump down each plant in accordance with
Paragraph 6-1.2.1 of TP S9514-F1-MMA-010. Deviation from this procedure must be authorized by the
COR. Submit a CFR reporting the amount of refrigerant removed.
3.4.1 Prior to disposal, the Contractor must test the oil for acid and check for Air/Non-Condensable in the recovery bottle. CG Inspector must be present to verify Pressure/Temperature Relationship on recovery cylinders after recovery cylinders have settled for a minimum of 24 hours. Submit a CFR.
3.4.2 Dispose of recovered refrigerant in their own containers in accordance with Federal, state, and local regulations and SFLC Std Spec 0000.
3.6 Refrigerant Leak Test. The Contractor must perform a leak test in accordance with Paragraph 6-2.1 of
TP S9514-F1-MMA-010. Report results via a CFR.
3.7 Valve Maintenance. The Contractor must perform the following valve maintenance to the system.
Overhauls include renewal of all resilient components, including gaskets, o-rings, packing and seal as well as the inspection of valve bodies, stems and sealing mechanisms. Record renewed material for each valve in a CFR.
3.7.1 Replace or overhaul the following manual valves. Detailed information for each valve can be found in Table 1-1 of TP S9514-F1-MMA-010.
• Compressor Discharge Stop Valve
• Economizer Port Stop Valve
• Main Liquid Line Stop Valve
• Liquid Refrigerant Injection Stop Ball Valve
• Oil Charge and Drain Stop Valve
• Condenser Water Reg/Refrigerant Pressure Packed Angle Valve
• Refrigerant Charge and Drain/Chilled Water Drain Stop Valve
• Suction and Discharge Transducer Isolation Stop Valve
• Suction Access Stop Valve
3.7.2 Condenser Water Regulating Valve. The contractor must renew the Condenser Water Regulating valves (6 total) to ensure proper operation. Detailed information for the Condenser Water Regulating
Valve can be found in Table 1, Figure 7-9 and Appendix A of TP S9514-F1-MMA-010.
3.7.3 Solenoid Valve. The Contractor must overhaul the Solenoid Valves – including the Liquid Line
Solenoid Valve, the Liquid Refrigerant Injection Solenoid Valve and the Capacity Control Solenoid
Valve. Detailed information for these solenoid valves is shown in Table 1-1 of TP S9514-F1-MMA-010 and Figure 7-12, 7-13 and 7-14.
3.7.4 Thermal Expansion Valve. The Contractor must overhaul the thermal expansion valves for the
Chilled Water Evaporator and the Economizer and adjust the thermal expansion valves to achieve the performance listed in the first section of Table 1-1. Detailed information for these valves is shown in
Table 1-1 of TP S9514-F1-MMA-010 and Figures 7-10 and 7-11.
18 (Rev-0)
3.7.5 Relief Valves. The Contractor must renew the relief valves on the condensers and the evaporator using GFP. The evaporator relief valve is shown as Piece 7-3-25 in Figure 7-3 of TP
S9514-F1-MMA-010. The condenser relief valve is not listed as a particular part number, but it is the same relief valve that is used in the evaporator. Ensure that they are set to the appropriate pressure. Detailed information for these valves is shown in Table 1-1 of TP S9514-F1-MMA-
010.
3.7.6 Rupture Disks. The Contractor must renew the rupture disks, Piece 7-8-8 in Figure 7-8 of TP
S9514-F1-MMA-010 using GFP.
3.8 Compressor Oil. The Contractor must conduct the following maintenance on the compressor oil system.
3.8.1 Renew the oil in the compressor in accordance with paragraph 6-1.3 and paragraph 6-2.2 of TP
S9514-F1-MMA-010. Change the compressor oil in the refrigeration plants as shown in PC 34, Drawing
077-18147-001 in Section 21 of TP 7168. The Contractor must provide new oil and submit a CFR documenting the new oil specifications and the quantity provided.
3.8.2 Provide and install new oil filters in accordance with TP S9514-F1-MMA-010, qty two (2) per plant.
3.8.3. Clean and inspect the oil separator for damage.
3.9 Sensor Calibration. The Contractor must calibrate all sensors in accordance with Paragraph 4-4 of TP
S9514-F1-MMA-010. Submit a CFR for each sensor.
3.10 Condenser Maintenance.
3.10.1 The Contractor must conduct all condenser maintenance shown in Paragraph 4-5 of TP S9514-F1-
MMA-010. Utilize condenser head removal and reinstallation instructions from Paragraph 6-3 of TP
S9514-F1-MMA-010. Submit a CFR showing discrepancies.
3.10.1.1 Do not renew the anodes per paragraph 4-5.4. Submit a CFR if renewal is required.
3.10.1.2 Renew the head gasket regardless of inspected condition.
3.10.2 Eddy Current Testing. The Contractor must provide eddy current testing for all tubes for thesix condensers. Submit CFRs for all requested information.
3.10.2.1 The Contractor must provide the COR with…
This is the start of the file's text. The full file is on GovTribe.