Summary Attachment F - Cost Sheet Template
Summary Sult, Christopher M CIV USARMY USAMRAA (USA): Example Amounts are filled in from the Objective Tabs and do not represent the Government's estimate.
| Cost | Fixed Fee | TOTAL (Cost + Fixed Fee) |
| Objective 1 - Labor (CPFF) | $451,699.88 | $45,169.99 | $496,869.86 |
| Objective 1 - ODCs (Cost only) | $10,481.25 | N/A | $10,481.25 |
| TOTAL: | $462,181.13 | $45,169.99 | $507,351.11 |
| Objective 2 - Labor (CPFF) | $301,133.25 | $30,113.33 | $331,246.58 |
| Objective 2 - ODCs (Cost only) | $6,987.50 | N/A | $6,987.50 |
| TOTAL: | $308,120.75 | $30,113.33 | $338,234.08 |
| Objective 3 - Labor (CPFF) | $752,833.13 | $75,283.31 | $828,116.44 |
| Objective 3 - ODCs (Cost only) | $17,468.75 | N/A | $17,468.75 |
| TOTAL: | $770,301.88 | $75,283.31 | $845,585.19 |
| Objective 4 - Labor (CPFF) | $301,133.25 | $30,113.33 | $331,246.58 |
| Objective 4 - ODCs (Cost only) | $6,987.50 | N/A | $6,987.50 |
| TOTAL: | $308,120.75 | $30,113.33 | $338,234.08 |
| Cost | Fixed Fee | TOTAL (cost + Fixed Fee) |
| Labor | $1,806,799.50 | $180,679.95 | $1,987,479.45 |
| ODCs | $41,925.00 | N/A | $41,925.00 |
| Total Government Project Cost | $1,848,724.50 | $180,679.95 | $2,029,404.45 |
| Cost Share Amount (If Applicable) | N/A | N/A | $0.00 |
Objective 1 Objective 1 - 24 Months (01 August 2024 - 31 July 2026)
| Fiscal Year 2024 (01 August 2024 - 30 September 2024) | | | | | | | | | | | | | |
| Labor | | | | | | | | | | | | | |
| Labor Position(s) | "Prime" or "Sub" | | | | | | | | | | | | |
| Sult, Christopher M CIV USARMY USAMRAA (USA): Please list labor for the Prime Performer then any Sub Performers. | Labor Hours | No of FTEs | Unburdened hourly rate ($) | Fringe ($) | Overhead ($) | Labor G&A ($) | Fee | Fully Burdened Hourly Rate (Cost) ($) | | Cost ($) | Fixed Fee ($) | TOTAL (Cost + FF) | | |
| Example: Computer Tech I | Prime | 1,980 | 1 | $50.00 | $7.50 | $8.63 | $9.92 | $7.60 | $76.04 | | $150,566.63 | $15,056.66 | $165,623.29 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| TOTAL | N/A | 1980.00 | 1.00 | N/A | $7.50 | $8.63 | $9.92 | | N/A | | $150,566.63 | $15,056.66 | $165,623.29 |
| Other Direct Costs (ODCs) |
| ODCs |
Burns, Julia L (Julie) CIV USARMY USAMRAA (USA): ODCs: "Cost" only. (No Fee added to the cost of ODCs)
| Sult, Christopher M CIV USARMY USAMRAA (USA): Please list labor for the Prime Performer then any Sub Performers. | | Quantity | Cost ($) | G&A ($) | | Fully Burdened Cost ($) | | TOTAL Cost | |
| Example: Hardware for development | | | 25 | $65.00 | $74.75 | $139.75 | | $3,493.75 |
| | | | 0 | $0.00 | $0.00 | $0.00 | | $0.00 |
| | | | 0 | $0.00 | $0.00 | $0.00 | | $0.00 |
| | | | 0 | $0.00 | $0.00 | $0.00 | | $0.00 |
| | | | 0 | $0.00 | $0.00 | $0.00 | | $0.00 |
| | | | 0 | $0.00 | $0.00 | $0.00 | | $0.00 |
| TOTAL | | | N/A | $65.00 | $74.75 | $139.75 | | $3,493.75 |
| Fiscal Year 2025 (01 October 2024 - 30 September 2025) | | | | | | | | | | | | |
| Labor | | | | | | | | | | | | |
| Labor Position(s) | "Prime" or "Sub" | Labor Hours | No of FTEs | Unburdened hourly rate ($) | Fringe ($) | Overhead ($) | Labor G&A ($) | Fee | Fully Burdened Hourly Rate (Cost) ($) | Cost ($) | Fixed Fee ($) | TOTAL (Cost + FF) |
| Example: Computer Tech I | Prime | 1,980 | 1 | $50.00 | $7.50 | $8.63 | $9.92 | $7.60 | $76.04 | $150,566.63 | $15,056.66 | $165,623.29 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| TOTAL | N/A | 1980.00 | 1.00 | N/A | $7.50 | $8.63 | $9.92 | | N/A | $150,566.63 | $15,056.66 | $165,623.29 |
| Other Direct Costs (ODCs) | | | | | |
| ODCs | Quantity | Cost ($) | G&A ($) | Fully Burdened Cost ($) | TOTAL Cost |
| Example: Hardware for development | 25 | $65.00 | $74.75 | $139.75 | $3,493.75 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| TOTAL | N/A | $65.00 | $74.75 | $139.75 | $3,493.75 |
| Fiscal Year 2026 (01 October 2025 - 31 July 2026) | | | | | | | | | | | | |
| Labor | | | | | | | | | | | | |
| Labor Position(s) | "Prime" or "Sub" | Labor Hours | No of FTEs | Unburdened hourly rate ($) | Fringe ($) | Overhead ($) | Labor G&A ($) | Fee | Fully Burdened Hourly Rate (Cost) ($) | Cost ($) | Fixed Fee ($) | TOTAL (Cost + FF) |
| Example: Computer Tech I | Prime | 1,980 | 1 | $50.00 | $7.50 | $8.63 | $9.92 | $7.60 | $76.04 | $150,566.63 | $15,056.66 | $165,623.29 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| TOTAL | N/A | 1980.00 | 1.00 | N/A | $7.50 | $8.63 | $9.92 | | N/A | $150,566.63 | $15,056.66 | $165,623.29 |
| Other Direct Costs (ODCs) | | | | | |
| ODCs | Quantity | Cost ($) | G&A ($) | Fully Burdened Cost ($) | TOTAL Cost |
| Example: Hardware for development | 25 | $65.00 | $74.75 | $139.75 | $3,493.75 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| TOTAL | N/A | $65.00 | $74.75 | $139.75 | $3,493.75 |
| Indirect Rates | | | | | |
| Fringe | Overhead | Labor G&A / G&A | Fee | Escalation Rate |
| Objective 1 - FY24 Labor | 0.00% | 0.00% | 0.00% | 0.00% | N/A |
| Objective 1 - FY24 ODCs | N/A | N/A | 0.00% | N/A | N/A |
| Objective 1 - FY25 Labor | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Objective 1 - FY25 ODCs | N/A | N/A | 0.00% | N/A | 0.00% |
| Objective 1 - FY26 Labor | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Objective 1 - FY26 ODCs | N/A | N/A | 0.00% | N/A | 0.00% |
| Cost ($) | Fixed Fee ($) | Total Cost ($) |
| Objective 1 - FY24 Labor | $150,566.63 | $15,056.66 | $165,623.29 |
| Objective 1 - FY24 ODCs | $3,493.75 | N/A | $3,493.75 |
| Objective 1 - FY25 Labor | $150,566.63 | $15,056.66 | $165,623.29 |
| Objective 1 - FY25 ODCs | $3,493.75 | N/A | $3,493.75 |
| Objective 1 - FY26 Labor | $150,566.63 | $15,056.66 | $165,623.29 |
| Objective 1 - FY26 ODCs | $3,493.75 | N/A | $3,493.75 |
| Total Objective 1 | $462,181.13 | $45,169.99 | $507,351.11 |
Objective 2 Objective 2 - 12 Months (01 August 2026 - 31 July 2027)
| Fiscal Year 2026 (01 August 2026 - 30 September 2026) | | | | | | | | | | | | | |
| Labor | | | | | | | | | | | | | |
| Labor Position(s) | "Prime" or "Sub" | | | | | | | | | | | | |
| Sult, Christopher M CIV USARMY USAMRAA (USA): Please list labor for the Prime Performer then any Sub Performers. | Labor Hours | No of FTEs | Unburdened hourly rate ($) | Fringe ($) | Overhead ($) | Labor G&A ($) | Fee | Fully Burdened Hourly Rate (Cost) ($) | | Cost ($) | Fixed Fee ($) | TOTAL (Cost + FF) | | |
| Example: Computer Tech I | Prime | 1,980 | 1 | $50.00 | $7.50 | $8.63 | $9.92 | $7.60 | $76.04 | | $150,566.63 | $15,056.66 | $165,623.29 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| TOTAL | N/A | 1980.00 | 1.00 | N/A | $7.50 | $8.63 | $9.92 | | N/A | | $150,566.63 | $15,056.66 | $165,623.29 |
| Other Direct Costs (ODCs) |
| ODCs |
Burns, Julia L (Julie) CIV USARMY USAMRAA (USA): ODCs: "Cost" only. (No Fee added to the cost of ODCs)
| Sult, Christopher M CIV USARMY USAMRAA (USA): Please list labor for the Prime Performer then any Sub Performers. | | Quantity | Cost ($) | G&A ($) | | Fully Burdened Cost ($) | | TOTAL Cost | |
| Example: Hardware for development | | | 25 | $65.00 | $74.75 | $139.75 | | $3,493.75 |
| | | | 0 | $0.00 | $0.00 | $0.00 | | $0.00 |
| | | | 0 | $0.00 | $0.00 | $0.00 | | $0.00 |
| | | | 0 | $0.00 | $0.00 | $0.00 | | $0.00 |
| | | | 0 | $0.00 | $0.00 | $0.00 | | $0.00 |
| | | | 0 | $0.00 | $0.00 | $0.00 | | $0.00 |
| TOTAL | | | N/A | $65.00 | $74.75 | $139.75 | | $3,493.75 |
| Fiscal Year 2027 (01 October 2026 - 31 July 2027) | | | | | | | | | | | | |
| Labor | | | | | | | | | | | | |
| Labor Position(s) | "Prime" or "Sub" | Labor Hours | No of FTEs | Unburdened hourly rate ($) | Fringe ($) | Overhead ($) | Labor G&A ($) | Fee | Fully Burdened Hourly Rate (Cost) ($) | Cost ($) | Fixed Fee ($) | TOTAL (Cost + FF) |
| Example: Computer Tech I | Prime | 1,980 | 1 | $50.00 | $7.50 | $8.63 | $9.92 | $7.60 | $76.04 | $150,566.63 | $15,056.66 | $165,623.29 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| TOTAL | N/A | 1980.00 | 1.00 | N/A | $7.50 | $8.63 | $9.92 | | N/A | $150,566.63 | $15,056.66 | $165,623.29 |
| Other Direct Costs (ODCs) | | | | | |
| ODCs | Quantity | Cost ($) | G&A ($) | Fully Burdened Cost ($) | TOTAL Cost |
| Example: Hardware for development | 25 | $65.00 | $74.75 | $139.75 | $3,493.75 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| TOTAL | N/A | $65.00 | $74.75 | $139.75 | $3,493.75 |
| Indirect Rates | | | | | |
| Fringe | Overhead | Labor G&A / G&A | Fee | Escalation Rate |
| Objective 2 - FY26 Labor | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Objective 2 - FY26 ODCs | N/A | N/A | 0.00% | N/A | 0.00% |
| Objective 2 - FY27 Labor | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Objective 2 - FY27 ODCs | N/A | N/A | 0.00% | N/A | 0.00% |
| Cost ($) | Fixed Fee ($) | Total Cost ($) |
| Objective 2 - FY26 Labor | $150,566.63 | $15,056.66 | $165,623.29 |
| Objective 2 - FY26 ODCs | $3,493.75 | N/A | $3,493.75 |
| Objective 2 - FY27 Labor | $150,566.63 | $15,056.66 | $165,623.29 |
| Objective 2 - FY27 ODCs | $3,493.75 | N/A | $3,493.75 |
| Total Objective 2 | $308,120.75 | $30,113.33 | $338,234.08 |
Objective 3 Objective 3 - 42 Months (01 April 2027 - 31 January 2031)
| Fiscal Year 2027 (01 August 2027 - 30 September 2027) | | | | | | | | | | | | | |
| Labor | | | | | | | | | | | | | |
| Labor Position(s) | "Prime" or "Sub" | | | | | | | | | | | | |
| Sult, Christopher M CIV USARMY USAMRAA (USA): Please list labor for the Prime Performer then any Sub Performers. | Labor Hours | No of FTEs | Unburdened hourly rate ($) | Fringe ($) | Overhead ($) | Labor G&A ($) | Fee | Fully Burdened Hourly Rate (Cost) ($) | | Cost ($) | Fixed Fee ($) | TOTAL (Cost + FF) | | |
| Example: Computer Tech I | Prime | 1,980 | 1 | $50.00 | $7.50 | $8.63 | $9.92 | $7.60 | $76.04 | | $150,566.63 | $15,056.66 | $165,623.29 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| TOTAL | N/A | 1980.00 | 1.00 | N/A | $7.50 | $8.63 | $9.92 | | N/A | | $150,566.63 | $15,056.66 | $165,623.29 |
| Other Direct Costs (ODCs) |
| ODCs |
Burns, Julia L (Julie) CIV USARMY USAMRAA (USA): ODCs: "Cost" only. (No Fee added to the cost of ODCs)
| Sult, Christopher M CIV USARMY USAMRAA (USA): Please list labor for the Prime Performer then any Sub Performers. | | Quantity | Cost ($) | G&A ($) | | Fully Burdened Cost ($) | | TOTAL Cost | |
| Example: Hardware for development | | | 25 | $65.00 | $74.75 | $139.75 | | $3,493.75 |
| | | | 0 | $0.00 | $0.00 | $0.00 | | $0.00 |
| | | | 0 | $0.00 | $0.00 | $0.00 | | $0.00 |
| | | | 0 | $0.00 | $0.00 | $0.00 | | $0.00 |
| | | | 0 | $0.00 | $0.00 | $0.00 | | $0.00 |
| | | | 0 | $0.00 | $0.00 | $0.00 | | $0.00 |
| TOTAL | | | N/A | $65.00 | $74.75 | $139.75 | | $3,493.75 |
| Fiscal Year 2028 (01 October 2027 - 30 September 2028) | | | | | | | | | | | | |
| Labor | | | | | | | | | | | | |
| Labor Position(s) | "Prime" or "Sub" | Labor Hours | No of FTEs | Unburdened hourly rate ($) | Fringe ($) | Overhead ($) | Labor G&A ($) | Fee | Fully Burdened Hourly Rate (Cost) ($) | Cost ($) | Fixed Fee ($) | TOTAL (Cost + FF) |
| Example: Computer Tech I | Prime | 1,980 | 1 | $50.00 | $7.50 | $8.63 | $9.92 | $7.60 | $76.04 | $150,566.63 | $15,056.66 | $165,623.29 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| TOTAL | N/A | 1980.00 | 1.00 | N/A | $7.50 | $8.63 | $9.92 | | N/A | $150,566.63 | $15,056.66 | $165,623.29 |
| Other Direct Costs (ODCs) | | | | | |
| ODCs | Quantity | Cost ($) | G&A ($) | Fully Burdened Cost ($) | TOTAL Cost |
| Example: Hardware for development | 25 | $65.00 | $74.75 | $139.75 | $3,493.75 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| TOTAL | N/A | $65.00 | $74.75 | $139.75 | $3,493.75 |
| Fiscal Year 2029 (01 October 2028 - 30 September 2029) | | | | | | | | | | | | |
| Labor | | | | | | | | | | | | |
| Labor Position(s) | "Prime" or "Sub" | Labor Hours | No of FTEs | Unburdened hourly rate ($) | Fringe ($) | Overhead ($) | Labor G&A ($) | Fee | Fully Burdened Hourly Rate (Cost) ($) | Cost ($) | Fixed Fee ($) | TOTAL (Cost + FF) |
| Example: Computer Tech I | Prime | 1,980 | 1 | $50.00 | $7.50 | $8.63 | $9.92 | $7.60 | $76.04 | $150,566.63 | $15,056.66 | $165,623.29 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| TOTAL | N/A | 1980.00 | 1.00 | N/A | $7.50 | $8.63 | $9.92 | | N/A | $150,566.63 | $15,056.66 | $165,623.29 |
| Other Direct Costs (ODCs) | | | | | |
| ODCs | Quantity | Cost ($) | G&A ($) | Fully Burdened Cost ($) | TOTAL Cost |
| Example: Hardware for development | 25 | $65.00 | $74.75 | $139.75 | $3,493.75 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| TOTAL | N/A | $65.00 | $74.75 | $139.75 | $3,493.75 |
| Fiscal Year 2030 (01 October 2029 - 30 September 2030) | | | | | | | | | | | | |
| Labor | | | | | | | | | | | | |
| Labor Position(s) | "Prime" or "Sub" | Labor Hours | No of FTEs | Unburdened hourly rate ($) | Fringe ($) | Overhead ($) | Labor G&A ($) | Fee | Fully Burdened Hourly Rate (Cost) ($) | Cost ($) | Fixed Fee ($) | TOTAL (Cost + FF) |
| Example: Computer Tech I | Prime | 1,980 | 1 | $50.00 | $7.50 | $8.63 | $9.92 | $7.60 | $76.04 | $150,566.63 | $15,056.66 | $165,623.29 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| TOTAL | N/A | 1980.00 | 1.00 | N/A | $7.50 | $8.63 | $9.92 | | N/A | $150,566.63 | $15,056.66 | $165,623.29 |
| Other Direct Costs (ODCs) | | | | | |
| ODCs | Quantity | Cost ($) | G&A ($) | Fully Burdened Cost ($) | TOTAL Cost |
| Example: Hardware for development | 25 | $65.00 | $74.75 | $139.75 | $3,493.75 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| TOTAL | N/A | $65.00 | $74.75 | $139.75 | $3,493.75 |
| Fiscal Year 2031 (01 October 2029 - 31 January 2031) | | | | | | | | | | | | |
| Labor | | | | | | | | | | | | |
| Labor Position(s) | "Prime" or "Sub" | Labor Hours | No of FTEs | Unburdened hourly rate ($) | Fringe ($) | Overhead ($) | Labor G&A ($) | Fee | Fully Burdened Hourly Rate (Cost) ($) | Cost ($) | Fixed Fee ($) | TOTAL (Cost + FF) |
| Example: Computer Tech I | Prime | 1,980 | 1 | $50.00 | $7.50 | $8.63 | $9.92 | $7.60 | $76.04 | $150,566.63 | $15,056.66 | $165,623.29 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 |
| TOTAL | N/A | 1980.00 | 1.00 | N/A | $7.50 | $8.63 | $9.92 | | N/A | $150,566.63 | $15,056.66 | $165,623.29 |
| Other Direct Costs (ODCs) | | | | | |
| ODCs | Quantity | Cost ($) | G&A ($) | Fully Burdened Cost ($) | TOTAL Cost |
| Example: Hardware for development | 25 | $65.00 | $74.75 | $139.75 | $3,493.75 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| 0 | $0.00 | $0.00 | $0.00 | $0.00 |
| TOTAL | N/A | $65.00 | $74.75 | $139.75 | $3,493.75 |
| Indirect Rates | | | | | |
| Fringe | Overhead | Labor G&A / G&A | Fee | Escalation Rate |
| Objective 3 - FY27 Labor | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Objective 3 - FY27 ODCs | N/A | N/A | 0.00% | N/A | 0.00% |
| Objective 3 - FY28 Labor | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Objective 3 - FY28 ODCs | N/A | N/A | 0.00% | N/A | 0.00% |
| Objective 3 - FY29 Labor | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Objective 3 - FY29 ODCs | N/A | N/A | 0.00% | N/A | 0.00% |
| Objective 3 - FY30 Labor | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Objective 3 - FY30 ODCs | N/A | N/A | 0.00% | N/A | 0.00% |
| Objective 3 - FY30 Labor | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Objective 3 - FY30 ODCs | N/A | N/A | 0.00% | N/A | 0.00% |
| Cost ($) | Fixed Fee ($) | Total Cost ($) |
| Objective 3 - FY27 Labor | $150,566.63 | $15,056.66 | $165,623.29 |
| Objective 3 - FY27 ODCs | $3,493.75 | N/A | $3,493.75 |
| Objective 3 - FY28 Labor | $150,566.63 | $15,056.66 | $165,623.29 |
| Objective 3 - FY28 ODCs | $3,493.75 | N/A | $3,493.75 |
| Objective 3 - FY29 Labor | $150,566.63 | $15,056.66 | $165,623.29 |
| Objective 3 - FY29 ODCs | $3,493.75 | N/A | $3,493.75 |
| Objective 3 - FY30 Labor | $150,566.63 | $15,056.66 | $165,623.29 |
| Objective 3 - FY30 ODCs | $3,493.75 | N/A | $3,493.75 |
| Objective 3 - FY31 Labor | $150,566.63 | $15,056.66 | $165,623.29 |
| Objective 3 - FY31 ODCs | $3,493.75 | N/A | $3,493.75 |
| Total Objective 3 | $770,301.88 | $75,283.31 | $845,585.19 |
Objective 4 Objective 4 - 12 Months (01 February 2031 - 31 January 2032)
| Fiscal Year 2031 (01 February 2031 - 30 September 2031) | | | | | | | | | | | | | |
| Labor | | | | | | | | | | | | | |
| Labor Position(s) | "Prime" or "Sub" | | | | | | | | | | | | |
| Sult, Christopher M CIV USARMY USAMRAA (USA): Please list labor for the Prime Performer then any Sub Performers. | Labor Hours | No of FTEs | Unburdened hourly rate ($) | Fringe ($) | Overhead ($) | Labor G&A ($) | Fee | Fully Burdened Hourly Rate (Cost) ($) | | Cost ($) | Fixed Fee ($) | TOTAL (Cost + FF) | | |
| Example: Computer Tech I | Prime | 1,980 | 1 | $50.00 | $7.50 | $8.63 | $9.92 | $7.60 | $76.04 | | $150,566.63 | $15,056.66 | $165,623.29 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| TOTAL | N/A | 1980.00 | 1.00 | N/A | $7.50 | $8.63 | $9.92 | | N/A | | $150,566.63 | $15,056.66 | $165,623.29 |
| Other Direct Costs (ODCs) |
| ODCs |
Burns, Julia L (Julie) CIV USARMY USAMRAA (USA): ODCs: "Cost" only. (No Fee added to the cost of ODCs)
| Sult, Christopher M CIV USARMY USAMRAA (USA): Please list labor for the Prime Performer then any Sub Performers. | | Quantity | Cost ($) | G&A ($) | | Fully Burdened Cost ($) | | TOTAL Cost | |
| Example: Hardware for development | | | 25 | $65.00 | $74.75 | $139.75 | | $3,493.75 |
| | | | 0 | $0.00 | $0.00 | $0.00 | | $0.00 |
| | | | 0 | $0.00 | $0.00 | $0.00 | | $0.00 |
| | | | 0 | $0.00 | $0.00 | $0.00 | | $0.00 |
| | | | 0 | $0.00 | $0.00 | $0.00 | | $0.00 |
| | | | 0 | $0.00 | $0.00 | $0.00 | | $0.00 |
| TOTAL | | | N/A | $65.00 | $74.75 | $139.75 | | $3,493.75 |
| Fiscal Year 2031 (01 October 2031 - 31 January 2032) | | | | | | | | | | | | | |
| Labor | | | | | | | | | | | | | |
| Labor Position(s) | "Prime" or "Sub" | | | | | | | | | | | | |
| Sult, Christopher M CIV USARMY USAMRAA (USA): Please list labor for the Prime Performer then any Sub Performers. | Labor Hours | No of FTEs | Unburdened hourly rate ($) | Fringe ($) | Overhead ($) | Labor G&A ($) | Fee | Fully Burdened Hourly Rate (Cost) ($) | | Cost ($) | Fixed Fee ($) | TOTAL (Cost + FF) | | |
| Example: Computer Tech I | Prime | 1,980 | 1 | $50.00 | $7.50 | $8.63 | $9.92 | $7.60 | $76.04 | | $150,566.63 | $15,056.66 | $165,623.29 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| | | 0 | 0 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | $0.00 | | $0.00 | $0.00 | $0.00 |
| TOTAL | N/A | 1980.00 | 1.00 | N/A | $7.50 | $8.63 | $9.92 | | N/A | | $150,566.63 | $15,056.66 | $165,623.29 |
| Other Direct Costs (ODCs) |
| ODCs |
Burns, Julia L (Julie) CIV USARMY USAMRAA (USA): ODCs: "Cost" only. (No Fee added to the cost of ODCs)
| Sult, Christopher M CIV USARMY USAMRAA (USA): Please list labor for the Prime Performer then any Sub Performers. | | Quantity | Cost ($) | G&A ($) | | Fully Burdened Cost ($) | | TOTAL Cost | |
| Example: Hardware for development | | | 25 | $65.00 | $74.75 | $139.75 | | $3,493.75 |
| | | | 0 | $0.00 | $0.00 | $0.00 | | $0.00 |
| | | | 0 | $0.00 | $0.00 | $0.00 | | $0.00 |
| | | | 0 | $0.00 | $0.00 | $0.00 | | $0.00 |
| | | | 0 | $0.00 | $0.00 | $0.00 | | $0.00 |
| | | | 0 | $0.00 | $0.00 | $0.00 | | $0.00 |
| TOTAL | | | N/A | $65.00 | $74.75 | $139.75 | | $3,493.75 |
| Indirect Rates | | | | | |
| Fringe | Overhead | Labor G&A / G&A | Fee | Escalation Rate |
| Objective 4 - FY31 Labor | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Objective 4 - FY31 ODCs | N/A | N/A | 0.00% | N/A | 0.00% |
| Objective 4 - FY32 Labor | 0.00% | 0.00% | 0.00% | 0.00% | 0.00% |
| Objective 4 - FY32 ODCs | N/A | N/A | 0.00% | N/A | 0.00% |
| Cost ($) | Fixed Fee ($) | Total Cost ($) |
| Objective 4 - FY31 Labor | $150,566.63 | $15,056.66 | $165,623.29 |
| Objective 4 - FY31 ODCs | $3,493.75 | N/A | $3,493.75 |
| Objective 4 - FY32 Labor | $150,566.63 | $15,056.66 | $165,623.29 |
| Objective 4 - FY32 ODCs | $3,493.75 | N/A | $3,493.75 |
| Total | $308,120.75 | $30,113.33 | $338,234.08 |
Milestones Objective 1 - 4 (01 April 2024 - 30 September 2031)
Sult, Christopher M CIV USARMY USAMRAA (USA): Please expand the milestone table as needed.
| SOW Objective No. | |
| Sult, Christopher M CIV USARMY USAMRAA (USA): Enter the applicable Objective for the milestone | Activity Type/Task No. | Significant Event / Accomplishments |
Sult, Christopher M CIV USARMY USAMRAA (USA): Events/Accomplishments should be listed in the order that they will be completed.
| Due Date | Govt' Funding | Total Funding | | | | |
| 1 | Objective 3 | 3 | Miscellaneous Testing | 08/25/24 | $150,000.00 | $150,000.00 |
Totals $150,000.00 $150,000.00
Obj Months (Reference Only)
| Objective 1 (24 Months) | | | Objective 2 (12 Months) | | | Objective 3 (42 Months) | | | Objective 4 (12 Months) | | |
| Months | FY24 | | Months | FY26 | | Months | FY27 | | Months | FY31 | |
| 1 | August | 2024 | 1 | August | 2026 | 1 | August | 2027 | 1 | February | 2031 |
| 2 | September | 2024 | 2 | September | 2026 | 2 | September | 2027 | 2 | March | 2031 |
| | | | | | | | | 3 | April | 2031 |
| FY25 | | | FY27 | | | FY28 | | 4 | May | 2031 |
| 3 | October | 2024 | 3 | October | 2026 | 3 | October | 2027 | 5 | June | 2031 |
| 4 | November | 2024 | 4 | November | 2026 | 4 | November | 2027 | 6 | July | 2031 |
| 5 | December | 2024 | 5 | December | 2026 | 5 | December | 2027 | 7 | August | 2031 |
| 6 | January | 2025 | 6 | January | 2027 | 6 | January | 2028 | 8 | September | 2031 |
| 7 | February | 2025 | 7 | February | 2027 | 7 | February | 2028 | | | |
| 8 | March | 2025 | 8 | March | 2027 | 8 | March | 2028 | Months | FY32 | |
| 9 | April | 2025 | 9 | April | 2027 | 9 | April | 2028 | 9 | October | 2031 |
| 10 | May | 2025 | 10 | May | 2027 | 10 | May | 2028 | 10 | November | 2031 |
| 11 | June | 2025 | 11 | June | 2027 | 11 | June | 2028 | 11 | December | 2031 |
| 12 | July | 2025 | 12 | July | 2027 | 12 | July | 2028 | 12 | January | 2032 |
| 13 | August | 2025 | | | | 13 | August | 2028 | | | |
| 14 | September | 2025 | | | | 14 | September | 2028 | | | |
| FY26 | | | | | | FY29 | | | | |
| 15 | October | 2025 | | | | 15 | October | 2028 | | | |
| 16 | November | 2025 | | | | 16 | November | 2028 | | | |
| 17 | December | 2025 | | | | 17 | December | 2028 | | | |
| 18 | January | 2026 | | | | 18 | January | 2029 | | | |
| 19 | February | 2026 | | | | 19 | February | 2029 | | | |
| 20 | March | 2026 | | | | 20 | March | 2029 | | | |
| 21 | April | 2026 | | | | 21 | April | 2029 | | | |
| 22 | May | 2026 | | | | 22 | May | 2029 | | | |
| 23 | June | 2026 | | | | 23 | June | 2029 | | | |
| 24 | July | 2026 | | | | 24 | July | 2029 | | | |
| | | | | | 25 | August | 2029 | | | |
| | | | | | 26 | September | 2029 | | | |
| | | | | | | FY30 | | | | |
| | | | | | 27 | October | 2029 | | | |
| | | | | | 28 | November | 2029 | | | |
| | | | | | 29 | December | 2029 | | | |
| | | | | | 30 | January | 2030 | | | |
| | | | | | 31 | February | 2030 | | | |
| | | | | | 32 | March | 2030 | | | |
| | | | | | 33 | April | 2030 | | | |
| | | | | | 34 | May | 2030 | | | |
| | | | | | 35 | June | 2030 | | | |
| | | | | | 36 | July | 2030 | | | |
| | | | | | 37 | August | 2030 | | | |
| | | | | | 38 | September | 2030 | | | |
| | | | | | | FY31 | | | | |
| | | | | | 39 | October | 2030 | | | |
| | | | | | 40 | November | 2030 | | | |
| | | | | | 41 | December | 2030 | | | |
| | | | | | 42 | January | 2031 | | | |