Attachment F - Base Proposal Item Price Breakdown.xlsx
XLSX spreadsheet 23 KB Posted
- Attached to
- Z2DA--Renovate PACU Federal contract opportunity
- Solicitation number
- 36C24621R0127
About this file
This document provides details for a federal contract solicitation to renovate a post-anesthesia care unit (PACU) at the Durham VA Medical Center in Durham, North Carolina. The solicitation is anticipated to be a total service-disabled veteran-owned small business set-aside with an estimated construction value between $2 million and $5 million under NAICS code 236220. The selected contractor will gut and renovate approximately 4,400 square feet of space to expand the existing 8-bed PACU into an adjoining area to provide a total of 16 recovery bays and one isolation room. The work will be completed in phases to maintain adequate patient flow from 12 operating rooms. The solicitation is expected to be issued on or around September 17, 2021 with proposals due approximately 30 days later. A pre-solicitation site visit date will be specified in the solicitation. Interested vendors should register on the website and check for any amendments. Offerors must have active SAM and VetBiz registrations to be eligible for award.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Renovate PACU - RFI Response.pdf | ||
| 00 SOW - Updated.pdf | ||
| 36C24621R0127 0001.docx | DOCX document | |
| Site Visit Sign-In Sheet - Renovate PACU.pdf | ||
| Attachment A - Drawings.pdf | ||
| 36C24621R0127_1.docx | DOCX document | |
| Attachment B - Specifications - VOL. 1.pdf | ||
| Attachment E - Past Performance Questionnaire.docx | DOCX document | |
| Attachment D - Wage Determination NC20210028.pdf | ||
| Attachment C - Specifications - VOL. 2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Base Offer
Base Offer Cost Breakdown
Project Number: 558-17-150 Edward L Roy: VA assigned project #
| Date: | |
| Project Title | Renovate PACU |
Edward L Roy: VA assigned Project Title
| Project Location | Durham VAMC | ||
| Offeror Name | |||
| Offeror Street | |||
| Offeror City | State | Zip |
Item Description Labor Cost Edward L Roy: Enter all Labor Costs by Division
| Material Cost | |
| Edward L Roy: Enter all Material Costs by Division | Total Cost |
Edward L Roy: This Column is the sum of the Division's Labor and Material Costs
| Division 1 | General Requirements | $ - 0 | $ - 0 | |
| Division 2 | Existing Conditions | - 0 | - 0 | - 0 |
| Division 3 | Concrete | - 0 | - 0 | - 0 |
| Division 4 | Masonry | - 0 | - 0 | - 0 |
| Division 5 | Metals | - 0 | - 0 | - 0 |
| Division 6 | Wood and Plastic | - 0 | - 0 | - 0 |
| Division 7 | Thermal & Moisture Protect | - 0 | - 0 | - 0 |
| Division 8 | Doors and Windows | - 0 | - 0 | - 0 |
| Division 9 | Finishes | - 0 | - 0 | - 0 |
| Division 10 | Specialties | - 0 | - 0 | - 0 |
| Division 11 | Equipment | - 0 | - 0 | - 0 |
| Division 12 | Furnishings | - 0 | - 0 | - 0 |
| Division 13 | Special Construction | - 0 | - 0 | - 0 |
| Division 14 | Conveying Equipment | - 0 | - 0 | - 0 |
| Division 21 | Fire Suppression | - 0 | - 0 | - 0 |
| Division 22 | Plumbing | - 0 | - 0 | - 0 |
| Division 23 | HVAC | - 0 | - 0 | - 0 |
| Division 26 | Electrical | - 0 | - 0 | - 0 |
| Division 27 | Communications | - 0 | - 0 | - 0 |
| Division 28 | Electronic Safety & Security | - 0 | - 0 | - 0 |
| Division 31 | Earthwork | - 0 | - 0 | - 0 |
| Division 32 | Exterior Improvements | - 0 | - 0 | - 0 |
| Division 33 | Utilities | - 0 | - 0 | - 0 |
| Division 34 | Transportation Subtotal | - 0 | - 0 | - 0 |
| Division Subtotals : | $ - 0 | $ - 0 | $ - 0 |
Overhead % 0.00% Edward L Roy: Enter Overhead % here. This % will be multiplied by the Division Total Cost Subtotal (cell F36).
Edward L Roy: Date Offer Prepared/Submitted
| - 0 | |||
| Profit % | 0.00% | ||
| Edward L Roy: Enter Profit % here.This % will be multiplied by the sum of the Division Total Cost subtotal (cell F36) plus the calculated Overhead (cell F38). | - 0 | ||
| Bond % | 0.00% |
Edward L Roy: Enter Bond % here. This % will be multiplied by the sum of the Division Total Cost Subtotal (cell F36), the amount of calculated Overhead (cell F38) and the amount of calculated Profit (cell F39).
Edward L Roy: Enter all Labor Costs by Division
| - 0 | ||
| Overhead/Profit Subtotals : | $ - 0 |
Edward L Roy: Sum of Overhead, Profit and Bond %.
Edward L Roy: Enter all Material Costs by Division Edward L Roy: This Column is the sum of the Division's Labor and Material Costs Total Base Offer Cost $ - 0 $ - 0 $ - 0
File details come from the government source that posted it. Updated .