This federal solicitation requests proposals for the renovation and expansion of a Post-Anesthesia Care Unit (PACU) at the Durham VA Medical Center in Durham, North Carolina. The solicitation involves gutting and renovating approximately 4,400 square feet of space and expanding the existing 8-bed PACU into an adjoining area to provide 16 recovery bays and one isolation room. The estimated value is between $2 million and $5 million. The work must be completed within 245 calendar days of award. The solicitation is anticipated to be a total service-disabled veteran-owned small business set-aside under NAICS code 236220 with a size standard of $16.5 million. Proposals are due approximately 30 days after issuance of the solicitation on September 17, 2021. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6 is the contracting agency.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Renovate PACU - RFI Response.pdf | ||
| 00 SOW - Updated.pdf | ||
| 36C24621R0127 0001.docx | DOCX document | |
| Site Visit Sign-In Sheet - Renovate PACU.pdf | ||
| Attachment F - Base Proposal Item Price Breakdown.xlsx | XLSX spreadsheet | |
| Attachment A - Drawings.pdf | ||
| Attachment B - Specifications - VOL. 1.pdf | ||
| Attachment E - Past Performance Questionnaire.docx | DOCX document | |
| Attachment D - Wage Determination NC20210028.pdf | ||
| Attachment C - Specifications - VOL. 2.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
36C24621R0127
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5.
REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE
DOCUMENTS (
Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL
SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
1. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than ____ ___________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C24621R0127 X 09-17-2021 558-17-150 36C246 Department of Veterans Affairs Network Contracting Office 6 508 Fulton St Durham NC 27705 Department of Veterans Affairs Network Contracting Office 6 508 Fulton St Durham NC 27705 Schon Zwakman
(919) 286-0411 Request for Proposal: Renovate PACU Project Number: 558-17-150 Durham VA Medical Center, Durham, NC
Magnitude of Construction: Between $2,000,000 and $5,000,000 This is an SDVOSB set-aside.
NAICS Code: 236220 | Size Standard $39.5 Million Contractors must be registered in Vendor Information Pages (https://vetbiz.va.gov/vip/).
A site visit will be conducted: Monday, October 4, 2021 at 7:45AM ET.
Location: Durham VA Medical Center Building 6 Lobby 508 Fulton Street Durham, NC 27705
Participants interested in attending the site visit are required to RSVP by Friday, October 1, 2021 to the Contracting Officer Schon Zwakman at schon.zwakman@va.gov.
Surgical Masks are required for participants attending the site visit.
Participants attending the site visit are required to be screened for COVID-19 upon entrance to the facility.
Questions are due Friday, October 8, 2021 at 2PM ET. Answers will be posted by amendment.
Please submit all questions to the Contracting Officer via email at Schon.Zwakman@va.gov with a cop y to Marty Bost at Marty.Bost@va.gov.
LINE ITEM 0001: Contractor shall provide all labor, materials, tools, equipment, and supervision to perfor m all operations necessary to complete project number 558-17-150.All work shall be in strict accordance with the SOW, specifications, and drawings to include final clean up and completion of any punch list items.
Proposals are due no later than Friday, October 29, 2021 at3PM ET.
Please submit all proposals to the Contracting Officer via email schon.zwakman@va.gov with a copy to Marty Bost at Marty.Bost@va.gov.
X X 52.211-10 X
3:00 PM
EDT
10-29-2021 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any req uired performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23.
ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c)( 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT
WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-th is contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise s pecified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
LINE ITEM 0001: Contractor shall provide all labor, material, tools, equipment, and supervision to perform all operations necessary to complete project 558-17-150. All work shall be in strict accordance with the SOW, specifications, and drawings, to include final clean up and completion of any punch list items.
36C246 Department of Veterans Affairs Network Contracting Office 6 508 Fulton St Durham NC 27705 Department of Veterans Affairs Financial Services Center
PO BOX 149971
Austin TX 78714-9971 1-866-372-1141 512-460-5432
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| A.3 PRICE/COST SCHEDULE | 5 |
| ITEM INFORMATION | 5 |
| DESCRIPTION/SPECIFICATIONS/WORK STATEMENT | 6 |
| 1.1 STATEMENT OF WORK | 6 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 7 |
| 2.1 INSTRUCTIONS TO OFFERORS | 7 |
| 2.2 EVALUATION FACTORS FOR AWARD | 10 |
| 2.3 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 18 |
| 2.4 52.216-1 TYPE OF CONTRACT (APR 1984) | 19 |
| 2.5 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) | 19 |
| 2.6 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) | 19 |
| 2.7 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) ALTERNATE I (MAY 2014) | 20 |
| 2.8 52.228-1 BID GUARANTEE (SEP 1996) | 21 |
| 2.9 52.233-2 SERVICE OF PROTEST (SEP 2006) | 22 |
| 2.10 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 22 |
| 2.11 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018) | 23 |
| 2.12 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 23 |
| REPRESENTATIONS AND CERTIFICATIONS | 24 |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020) (JUL 2020) (DEVIATION) | 24 |
| 3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020) | 27 |
| 3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 30 |
| 3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (FEB 2021) | 31 |
| 3.5 52.229-11 TAX ON CERTAIN FOREIGN PROCUREMENTS—NOTICE AND REPRESENTATION (JUN 2020) | 33 |
| GENERAL CONDITIONS | 35 |
| 4.1 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 35 |
| 4.2 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) | 38 |
| 4.3 52.219-14 LIMITATIONS ON SUBCONTRACTING (MAR 2020) | 38 |
| 4.4 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (NOV 2020) | 39 |
| 4.5 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS (SEP 2013) | 42 |
| 4.6 52.223-9 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-DESIGNATED ITEMS (MAY 2008) | 42 |
| 4.7 52.223-21 FOAMS (JUN 2016) | 43 |
| 4.8 52.225-9 BUY AMERICAN—CONSTRUCTION MATERIALS (FEB 2021) | 43 |
| 4.9 SUPPLEMENTAL INSURANCE REQUIREMENTS | 47 |
| 4.10 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 47 |
| 4.11 VAAR 852.204-70 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (MAY 2020) | 48 |
| 4.12 VAAR 852.219-10 VA NOTICE OF TOTAL SERVICE-DISABLED VETERAN-OWNED SMALL BUSINESS SET-ASIDE (JUL 2019) (DEVIATION) | 48 |
| 4.13 VAAR 852.219-74 LIMITATIONS ON SUBCONTRACTING—MONITORING AND COMPLIANCE (JUL 2018) | 50 |
| 4.14 VAAR 852.223-71 SAFETY AND HEALTH (SEP 2019) | 50 |
| 4.15 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008) | 52 |
| 4.16 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 52 |
| 4.17 VAAR 852.232-71 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (INCLUDING NAS– CPM) (NOV 2018) | 52 |
| 4.18 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 55 |
| 4.19 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) | 56 |
| 4.20 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 59 |
| 4.21 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) ALTERNATE I (APR 2019) | 60 |
| 4.22 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020) | 61 |
| 4.23 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 62 |
| 4.24 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019) | 62 |
| 4.25 VAAR 852.270-1 REPRESENTATIVES OF CONTRACTING OFFICERS (JAN 2008) | 63 |
| SECTION D - CONTRACT DOCUMENTS, EXHIBITS, OR ATTACHMENTS | 64 |
A.3 PRICE/COST SCHEDULE
ITEM INFORMATION
| ITEM NUMBER |
| DESCRIPTION OF SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1.00 |
| JB |
Contractor shall provide all labor, materials , tools , equipment , and supervision to perform all operations necessary to complete Project 558-17-150, Renovation and Expansion of PACU at the Durham VAMC.
All work shall be in strict accordance with the SOW, Drawings, and Specifications to include the final cleanup and completion of any punchlist items.
GRAND TOTAL
DESCRIPTION/SPECIFICATIONS/WORK STATEMENT
1.1 STATEMENT OF WORK
Renovate PACU (Construction) (Project 558-17-150)
STATEMENT OF WORK
(a) General: The work will consist of the gutting and renovation of approximately 4,400 square feet of space centrally located on the 4th floor of the existing medical center. To maintain adequate patient flow from 12 OR’s to PACU beds; the VA will expand the PACU into the adjoining pain care clinic. PACU expansion will provide 16 recovery bays and 1 isolation room. The existing Post Anesthesia Care Unit (PACU) has 8 recovery bays and 1 Isolation recovery room. The work is to be accomplished in phases.
| (b) | Construction Duration: Contractor shall have two hundred forty-five (245) days to complete the project. |
| (c) | Phasing: Project construction will be completed in phases as shown in design drawings. |
| (d) | Construction Services: Perform work as described above and in accordance with professionally developed design drawings and specifications. |
| (e) | Place of Performance: Tasks will be performed at the VA Medical Center Durham, NC. Work will be around an occupied healthcare facility in operation 24 hours a day. This area will require appropriate personal protective equipment and proper infection control measures. |
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
2.1 INSTRUCTIONS TO OFFERORS
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO OFFERORS
THIS SECTION IS FOR SOLICITATION PURPOSES ONLY. THIS SECTION WILL BE PHYSICALLY REMOVED FROM ANY RESULTANT AWARD BUT WILL BE DEEMED INCORPORATED BY REFERENCE.
(a) GENERAL INSTRUCTIONS:
1. All proposal preparation cost will be the sole responsibility of the Offeror. The Government will not reimburse any firm for their proposal preparation cost.
2. The price, technical response and past performance of each Offeror will be evaluated independently. Offerors shall separately document each of the three factors. Each of the three offer sections shall therefore be labeled with the Offerors name, business address, and VA Solicitation Number.
3. To assure timely and equitable evaluation of proposals, Offerors must follow the instructions contained herein. Offerors are required to meet all solicitation requirements, including these instructions, the terms and conditions, representations and certifications, and technical and past performance requirements. Failure to meet a requirement may result in an offer being ineligible for award. Offerors must clearly identify any exception to the solicitation terms and conditions and provide complete accompanying rationale.
The offer shall consist of three (3) separate parts:
· Part I – TECHNICAL CAPABILITY
· Part II – PAST PERFORMANCE
· Part III – PRICE
(b) SPECIFIC INSTRUCTIONS
1. PART I - TECHNICAL PROPOSAL – Submit electronic PDF document(s) by email.
Management Approach, Corporate Experience, Key Personnel Qualifications, and Quality Control Plan.
Format as follows:
TAB A: General Information
a. Cover page with Solicitation Number and Project Title
b. Table of Contents
c. Company information to include: DUNS Number, Cage Code, Tax ID Number, Principle points of contact with addresses, phone numbers and email addresses.
d. In accordance with VHA Directive 7715, Safety and Health During Construction, the offeror shall have no more than three (3) serious, or one (1) repeat or one (1) willful OSHA or any EPA violation(s) in the past three years, and a current Experience Modification Rate (EMR) equal to or less than 1.0. Offeror shall provide (1.) completed OSHA Form 300A for the three (3) year period, (2.) a memorandum statement regarding OSHA and EPA violations, and a (3.) letter from their worker’s compensation insurer disclosing their Experience Modification Rate (EMR) rating. Documentation submitted with the offer must be complete and must demonstrate compliance to be considered acceptable.
TAB B: TECHNICAL CAPABILITY
a. Management Approach – Subfactor 1
b. Corporate Experience – Subfactor 2
c. Key Personnel Qualifications – Subfactor 3
d. Quality Control Plan – Subfactor 4
2. PART II – PAST PERFORMANCE - Submit Past Performance Questionnaires to references. (Solicitation Attachment E)
a. Past Performance Questionnaires: The contractor shall send out the attached past performance questionnaires to each of their references listed under the Corporate Experience technical factor or any other references that the Offeror deems necessary. The Government will evaluate the quality and extent of Offeror’s performance deemed relevant and recent to the requirements of this solicitation.
b. The references must return the survey directly to the Government Contracting Officer listed on the survey, via email, by the due date for proposals.
3. PART III - PRICE PROPOSAL - Submit electronic PDF document(s) by email.
TAB A: General Information
a. Cover page with Solicitation Number and Project Title
b. Table of Contents
c. Company information to include: DUNS Number, Cage Code, Tax ID Number, Principle points of contact with addresses, phone numbers and email addresses.
TAB B: Offer, Guarantee, and Certifications
a. Complete the SF 1442, Blocks 14, 15, 17, 19, 20A, 20B, 20C and 30. An official having the authority to bind your company contractually must sign and date the SF 1442 Block 30b. One copy of the SF 1442 must bear an original, authorized signature. In doing so, the Offeror accedes to the contract terms and conditions as written in the RFP. All sections of the RFP, excluding Instructions to Offerors and Evaluation Procedures Sections, constitute the model contract.
b. Complete the PROPOSAL ITEM LIST. As part of their proposal, each Offeror shall be required to complete the attached Base Proposal Item Price Breakdown Form. (Solicitation Attachment F)
c. Complete 52.204-8 Annual Representations and Certifications, paragraph (d) applies to this contract. 52.209-5--complete sections (a) (1) and (2), and 52.209-7 paragraph (b). Print out these provisions in their entirety and submit it with the proposal. Offerors shall submit only those pages that require fill-in.
d. Acknowledgement of Amendments
e. Copy of VetBiz Registry printout showing your firm as a verified SDVOSB.
(c) GENERAL INFORMATION
1. Format for proposal Part I & II shall be as follows:
a. A page is defined as one face of an 8 ½” x 11” sheet of paper containing information.
b. Typing shall not be less than font size 11.
2. Offers shall be submitted via email to the Contracting Officer Schon Zwakman at schon.zwakman@va.gov with a copy to Marty Bost at marty.bost@va.gov prior to the due date and time identified in the solicitation. Multiple emails will likely be required to submit all attachments. Server capacity is 10MB for file attachments, per email.
3. Each response shall address each factor in the sequence listed and clearly identify which factor is being addressed.
4. There shall be no mention of costs in the Technical Proposal.
5. FEDERAL HOLIDAYS: The following Federal Legal Holidays are observed by the Contracting Office and Hampton VA Medical Center:
· New Year’s Day – 1 January
· Martin Luther King’s Birthday – Third Monday in January
· Presidents Day – Third Monday in February
· Memorial Day – Last Monday in May
· Independence Day – 4 July
· Labor Day – First Monday in September
· Columbus Day – Second Monday in October
· Veterans Day – 11 November
· Thanksgiving Day – Fourth Thursday in November
· Christmas Day – 25 December
· Any other Federal Holiday granted by the President of the United States
2.2 EVALUATION FACTORS FOR AWARD
THIS SECTION IS FOR SOLICITATION PURPOSES ONLY. THIS SECTION WILL BE PHYSICALLY REMOVED FROM ANY RESULTANT AWARD BUT WILL BE DEEMED INCORPORATED BY REFERENCE.
(a) The Government will award a contract resulting from this solicitation to the responsible Offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
Part I – TECHNICAL CAPABILITY Part II – PAST PERFORMANCE Part III –PRICE
(b) BASIS FOR CONTRACT AWARD: This is a competitive Best Value Tradeoff (Tradeoff) source selection in which technically acceptable competing Offerors will be assigned a Past Performance Confidence Assessment Rating and will then be evaluated for Price fairness and reasonableness. All evaluation factors other than price, when combined, are significantly more important than price alone. The government reserves the right to award a contract to other than the lowest priced offer if the lowest priced Offeror is determined to have a performance confidence assessment of "Satisfactory Confidence" or lower. In that event, the Source Selection Authority shall make an integrated assessment best value award decision, where the perceived benefits of the higher priced proposal, and the rationale for tradeoffs, shall be documented in the contract file in accordance with FAR 15.406.
(c) By submission of its offer, the Offeror accedes to all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements. Failure to meet a requirement may result in an offer being determined unacceptable. The evaluation process shall proceed as follows:
PART I – TECHNICAL CAPABILITY
Offers will first be evaluated for responsiveness to the solicitation requirements, by the Contracting Officer, without regard to evaluation of specific technical capability, past performance or price factors. Exchanges may occur to identify/confirm missing documentation and a determination will be made regarding whether the Offeror should/can be allowed to submit any missing/deficient documentation. Responsive offers will be provided to the Technical Evaluation Board (TEB) for the next evaluation stage. The technical capability of all offers will be evaluated on strengths and weaknesses. Management Approach, Corporate Experience, Key Personnel Qualifications, and Quality Control Plan sub-factors will be evaluated equally.
NOTE: Offerors that do not receiving ratings of Satisfactory or higher for all technical sub-factors will not be evaluated for Past Performance and will not be considered for award (i.e., fail to meet minimums as defined by attached Specifications). Management Approach, Corporate Experience, Key Personnel Qualifications, and Quality Control Plan sub-factors will be weighted equally, and all areas must have SATISFACTORY rating or better. The Technical capability sub-factors ratings of SATISFACTORY or better will be required in order to be considered for award.
Evaluators shall assign a rating based on the minimum requirements stated below.
A. Sub-Factor 1 - Management Approach
| Types of Rating Methods |
| Rating Descriptors |
Adjectival
| Excellent |
| Proposal demonstrates superior understanding of requirements and approach that exceeds performance or capability standards. Has one or more strengths that will significantly benefit the government. Risk of unsuccessful performance is extremely low. |
| Good |
| Proposal demonstrates good understanding of requirements and approach that meets performance or capability standards. Has one or more strengths that will benefit the government. Risk is very low. |
| Satisfactory |
| Proposal demonstrates acceptable understanding of requirements and approach that meets performance or capability standards. Acceptable solutions are identified. No major strengths are identified. Risk is minimal. |
| Marginal |
| Proposal demonstrates shallow understanding of requirements and approach that only marginally meets performance or capability standards necessary for acceptable contract performance. Several moderate-range risk elements are identified. |
| Unsatisfactory |
| Proposal fails to meet performance or capability standards. Requirements can only be met with major changes to the proposal. Risk of unsuccessful performance is high. |
A description of the organization’s program management policies and procedures to include project planning approach(es) and management approach(es) for multi-discipline, phased projects.
1. MINIMUM STANDARD OF ACCEPTABILITY: The minimum standard of acceptability is met when the Offeror provides a brief narrative outlining the following:
a. The Offeror has clearly demonstrated that they have established project planning approaches, specifically the Offeror has identified the principal business concepts used and principle technologies deployed.
b. The Offeror has clearly demonstrated that they have experience with project management approaches for multidiscipline, phased projects, specifically identifying the principal business concepts used and principle technologies deployed.
B. Sub-Factor 2 – Corporate Experience
| Types of Rating Methods |
| Rating Descriptors |
Adjectival
| Excellent |
| Demonstration that the Company has extensive experience, as a Prime Contractor, in renovations or expansion projects within the Department of Veteran Affairs Medical Centers. Level of experience can be directly tied to strengths that will significantly benefit the Government. The Scope of previous projects are nearly identical to the scope of this project. Risk of unsuccessful performance is extremely low. |
| Good |
| Demonstration that the Company has some experience in the renovations of Medical Centers within the Federal Government (VA or DoD) or Commercial Hospitals as a Prime contractor. Level of experience can be directly tied to strengths that will benefit the government. Risk of unsuccessful performance is very low. |
| Satisfactory |
| Demonstration that the Company has some experience in the renovations and expansions of Government Buildings as a Prime Contractor. Risk of unsuccessful performance is minimal. |
| Marginal |
| Demonstration that the Company has some experience in the renovations and expansions of Government Buildings operating in subcontractor capacity. |
| Unsatisfactory |
| Contractor fails to make any disclosure with regards to experience in construction whether it can be deemed relevant or irrelevant and fails to provide any references for works previously performed. |
1. CRITERIA: Offerors must provide a minimum of five (5) and a maximum of eight (8) references of their choice of completed projects, similar in size and scope (minimum threshold: Projects where the principle objective was structural repair/structural renovations of hospitals within the United States, with a total contract value exceeding $500,000) to the requirement being solicited. Experience of subcontractors may be used to fulfill this requirement, but future unavailability of the subcontractor to perform work may result in contract termination.
2. MINIMUM STANDARD OF ACCEPTABILITY: The minimum standard of acceptability is met when the Offeror provides a minimum of five (5) and a maximum of eight (8) examples of their choice of completed projects or in progress of similar contracts in size and scope (minimum threshold: Projects where the principle objective was interior architectural, mechanical, electrical and plumbing upgrade renovations and building additions of hospitals within the United States, with a total contract value exceeding $500,000). In describing the construction experience, provide the following information:
a. Project title, location and brief description of the project and contracting method (design-build, design-bid-construct, CM at risk, Turnkey, etc.).
b. Project owner and name and telephone number of owner’s contact person.
c. Indicate your firm’s role as a prime contractor or subcontractor, etc.
d. Project Prime Contractor and Major Subcontractors and name and telephone number of contact person(s).
e. Project Statistics including start and completion dates (original vs. actual) for design and construction; cost (with brief explanation of what is included in the cost); square footage; and any awards (prizes) received.
f. Please use the Corporate Experience Form (Solicitation Attachment) included with the solicitation to provide the requested information for Experience.
g. Confirmation that the prime contractor and subcontractors are licensed for the work being performed in the state where the project is located, where specified, or otherwise in the state from which the contractor or subcontractor originates. Work requiring license in the State of North Carolina includes all Contractors, HVAC, Plumbing, Electrical work, and Asbestos/lead Project Monitoring.
C. Sub-Factor 3 – Key Personnel Qualifications
| Types of Rating Methods |
| Rating Descriptors |
Adjectival
| Excellent |
| Proposal demonstrates superior understanding of key personnel requirements regarding relevant experience and education/certification requirements. Intended Personnel have a vast background in performance of exact works of this project for a Department of Veterans Affairs Medical Center. Strengths of Personnel have been clearly articulated how experiences to bring significant benefit to the success of this project. Risk of unsuccessful performance is extremely low. |
| Good |
| Proposal demonstrates understanding of key personnel requirements regarding relevant experience and education/certification requirements. Intended Personnel have some background in performance of similar works of this project at the Dept of Veterans Affairs Medical Center, DoD Medical Center or Commercial Medical Center. Strengths of Personnel articulate benefit to the success of this project. Risk is very low. |
| Satisfactory |
| Proposal demonstrates understanding of key personnel requirements regarding relevant experience and personnel meet the education/certification requirements. Articulation of the experience of Personnel bring benefit to the success of this project. |
| Marginal |
| Contractor addresses Key Personnel Requirements by only providing information that demonstrates minimum acceptability and fails to address relevancy of experiences and fails to articulate how the personnel aid in the successful and timely completion of the project. |
| Unsatisfactory |
| Contractor fails to fully address Key Personnel Requirements by failing to proffer evidence of understanding of the Key Personnel Requirements, fails to proffer evidence of minimum education and certifications of proposed Key Personnel and fails to articulate how the personnel aid in the successful and timely completion of the project. |
1. CRITERIA: Offeror must provide an organizational chart identifying key on-site personnel with a description of their work experience relating to projects similar in size and scope (multidiscipline construction projects with a minimum threshold value of $500,000) to the requirement being solicited. The key personnel required for this contract are the Superintendent, Site Safety and Health Officer, and Quality Control Manager.
2. MINIMUM STANDARD OF ACCEPTABILITY: The minimum standard of acceptability is met when the Offeror provides:
a. An organizational block identifying on-site key personnel associated with this requirement to include:
i. Each individual’s name, title, duty, years of experience and experience level relating to similar contracts in size and scope (multidiscipline construction projects with a minimum threshold value of $500,000).
ii. Narratives for the key personnel identified shall have experience for projects of similar size and scope (multidiscipline construction projects with a minimum threshold value of $500,000), showing project history with these key personnel in relations to the project’s description. The Quality Control Manager and the Site Safety and Health Officer may not be the same individual.
D. Sub-Factor 4 – Quality Control Plan
| Types of Rating Methods |
| Rating Descriptors |
Adjectival
| Excellent |
| Proposal demonstrates superior understanding of requirements and approach that exceeds performance or capability standards. Has one or more strengths that will significantly benefit the government. Risk of unsuccessful performance is extremely low. |
| Good |
| Proposal demonstrates good understanding of requirements and approach that meets performance or capability standards. Has one or more strengths that will benefit the government. Risk is very low. |
| Satisfactory |
| Proposal demonstrates acceptable understanding of requirements and approach that meets performance or capability standards. Acceptable solutions are identified. No major strengths are identified. Risk is minimal. |
| Marginal |
| Proposal demonstrates shallow understanding of requirements and approach that only marginally meets performance or capability standards necessary for acceptable contract performance. Several moderate-range risk elements are identified. |
| Unsatisfactory |
| Proposal fails to meet performance or capability standards. Requirements can only be met with major changes to the proposal. Failure in demonstration of understanding of requirements is such that it can be assumed the intent of the contractor is for Government Personnel to perform quality control for the contractor in lieu of Quality Assurance. |
1. CRITERIA: Offeror must provide a plan to implement the requirements of Contract Clause 52.246-12, Inspection of Construction, and specifications. The plan shall identify personnel, procedures, control, and instructions. A finalized, more detailed Quality Control Plan (QCP) will be required to be submitted and approved after contract award, which include the identification of all contract submittals, tests, records, and forms.
2. MINIMUM STANDARD OF ACCEPTABILITY: The minimum standards of acceptability are met when the Offeror provides:
a. A description of the quality control system, including a chart showing lines of authority and acknowledgement that the Quality Control (QC) Manager shall implement the three-phase control system for all aspects of work specified. The Quality Control Manager shall report to the project manager or someone higher in the Contractor’s organization. Project Manager in this context shall mean the individual with responsibility for the overall management of the project including quality and production. The proposal provides a Quality Control approach that effectively addresses the internal processes to identify and prevent deficiencies in the quality of construction. This approach shall also show the plans for implementation ensuring the compliance of regulatory and Specification statutes are strictly adhered to. The approach shall also clearly address the QC organizational lines of authority and the Offeror’s approach to monitor corrective actions ensuring successful and timely problem resolution. The detailed QC approach shall identify how quality inspections will meet the minimum requirements of the Specifications. The QCP shall effectively address how the Offeror will correct identified discrepancies found during QC checks and the process to provide resolution to the CO/COR for any discrepancies identified in the Specifications or design. The QCP shall include the Offeror’s method for identifying subcontractors to meet the specific requirements of all trades specifications included in the project, see each specification section for QC details.
PART II – PAST PERFORMANCE
Next, the Government will evaluate the Offeror’s demonstrated past performance of recent and relevant projects for those Offerors that received Satisfactory or better technical ratings for all technical sub-factors, in order to determine the Offeror’s ability to perform the contract successfully and help determine responsibility. Past performance information shall include, but not be limited to: evaluation of past performance of the firm having experience in construction or renovation of hospitals, quality, timely performance, management effectiveness, and safety. An overall Past Performance Confidence Assessment Rating will be assigned, but each past performance reference will first be evaluated for “recency” and “relevancy”. Therefore, the following ratings tables will be used. “Recent” past performance is defined as projects completed within the last five years, from the date of issuance of solicitation. Past Performance references meeting the “minimum threshold” criteria, but not related to hospital renovations, will be rated “Somewhat Relevant”. Past Performance references meeting the “minimum threshold” criteria, which included hospital renovations will be assigned a relevancy rating based on the below rating definitions, with regard to the tasks outlined in the Specification of similar scope and complexity.
Past Performance Relevancy Rating Method
| Adjectival Rating |
| Description |
| Very Relevant |
| Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires. |
| Relevant |
| Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires. |
| Somewhat Relevant |
| Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires. |
| Not Relevant |
| Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires. |
Performance Confidence Assessment Rating Method
| Adjectival Rating |
| Description |
| Substantial Confidence |
| Based on the Offeror’s recent/relevant performance record, the Government has a high expectation that the Offeror will successfully perform the required effort. |
| Satisfactory Confidence |
| Based on the Offeror’s recent/relevant performance record, the Government has a |
reasonable expectation that the Offeror will successfully perform the required effort.
| Limited Confidence |
| Based on the Offeror’s recent/relevant performance record, the Government has a low expectation that the Offeror will successfully perform the required effort. |
| No Confidence |
| Based on the Offeror’s recent/relevant performance record, the Government has no expectation that the Offeror will be able to successfully perform the required effort. |
| Unknown Confidence |
| No recent/relevant performance record is available, or the Offeror’s performance record is so sparse that no meaningful confidence assessment rating can be |
reasonably assigned.
A. CRITERIA: Offerors must provide a minimum of five (5) and a maximum of eight (8) references of their choice of completed projects, similar in size and scope (minimum threshold: Projects where the principle objective was renovations to hospital facilities within the United States, with a total contract value exceeding $500,000). The Offeror must provide for each reference, the reference's company name, POCs, address, contact information to include phone number and e-mail address, project description, dollar value and period of performance. SEE NOTE BELOW, regarding the past performance questionnaire. Past Performance of subcontractors may be used, but future unavailability of the subcontractor to perform work may result in contract termination.
B. EVALUATION AND PERFORMANCE CONFIDENCE ASSESSMENT RATING: The Government will consider and evaluate the Offeror's past performance information, to include the completed past performance questionnaire surveys and the Past Performance Information Retrieval System (PPIRS), which are deemed recent and relevant for the requirements of this RFP, including evaluation of the Offeror’s adherence to period of performance/time of construction and construction according to contract specifications and design without deficiencies. The Government may also use information submitted by the Offeror, to included references, and other sources such as other Federal Government offices to include the Past Performance Information Retrieval System (PPIRS), and commercial sources, to assess performance. “Recent” past performance is defined as projects completed within the last five years, from the date of issuance of solicitation.
C. Relevance ratings and Performance Confidence Assessment ratings will be assigned, as defined in the above tables.
NOTE: The contractor shall send out the attached past performance questionnaires (Solicitation Attachment) to each of their references listed under the Experience technical factor or any other references that the Offeror deems necessary. The Government will evaluate the quality and extent of Offeror’s performance deemed relevant and recent to the requirements of this solicitation.
The references must return the survey directly to the Government Contracting Officer identified on the survey, via email, by the due date for proposals.
PART III – PRICE PROPOSAL
Finally, offers that received Satisfactory or better technical ratings and assigned a Performance Confidence Assessment rating will be evaluated for fairness and reasonableness of price. The Offeror’s price proposal will be submitted in a separate volume. No price information is to be included in the technical sections of the proposal. Price will not receive a technical rating.
A. The Government will evaluate offers for award purposes by reviewing the total price offered for Proposal Item 1 (Base Proposal Item). The Government will use the committed funds amount as the control amount for price evaluation. The control amount will not be made publicly available during evaluation and selection, due to the use of FAR Part 15 procedures, as it represents both the committed funds amount and the Government Estimate. The Government Estimate is source selection sensitive information and its release during evaluation and selection would negatively affect later negotiations, if held (see FAR 36.203(c)).
B. The Government intends to evaluate proposals and award a contract without discussions with offerors (Ref: FAR 52.215-1 and exception of clarifications as described in FAR 15.306(a)). Therefore, the offeror’s initial proposal should contain the offeror’s best terms from a cost or price and past performance. The Government reserves the right to conduct discussions if the Contracting Officer later determines them to be necessary. If the Contracting Officer determines that the number of proposals that would otherwise be in the competitive range exceeds the number at which an efficient competition can be conducted, the Contracting Officer may limit the number of proposals in the competitive range to the greatest number that will permit an efficient competition among the most highly rated proposals.
C. Offers that are not technically acceptable cannot be selected, regardless of price.
2.3 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
http://www.acquisition.gov/far/index.html http://www.va.gov/oal/library/vaar/
(End of Provision)
| FAR Number |
| Title |
| Date |
| 52.204-7 |
| SYSTEM FOR AWARD MANAGEMENT |
| OCT 2018 |
| 52.204-16 |
| COMMERCIAL AND GOVERNMENT ENTITY CODE REPORTING |
| AUG 2020 |
| 52.204-22 |
| ALTERNATIVE LINE ITEM PROPOSAL |
| JAN 2017 |
| 52.215-1 |
| INSTRUCTIONS TO OFFERORS—COMPETITIVE ACQUISITION |
| JAN 2017 |
| 52.223-1 |
| BIOBASED PRODUCT CERTIFICATION |
| MAY 2012 |
| 52.223-4 |
| RECOVERED MATERIAL CERTIFICATION |
| MAY 2008 |
| 52.228-17 |
| INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) |
| FEB 2021 |
| 52.236-28 |
| PREPARATION OF PROPOSALS—CONSTRUCTION |
| OCT 1997 |
2.4 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of Provision)
2.5 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
2.6 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
| Goals for minority participation for each trade |
| Goals for female participation for each trade |
| 22.8 % |
| 6.9 % |
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any contract resulting from this solicitation, the "covered area" is Raleigh - Durham
(End of Provision)
2.7 52.225-10 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS (MAY 2014) ALTERNATE I (MAY 2014)
(a) Definitions. "Commercially available off-the-shelf (COTS) item," "construction material," "domestic construction material," and "foreign construction material," as used in this provision, are defined in the clause of this solicitation entitled "Buy American—Construction Materials" (Federal Acquisition Regulation (FAR) clause 52.225-9).
(b) Requests for determinations of inapplicability. An offeror requesting a determination regarding the inapplicability of the Buy American statute shall submit the request with its offer, including the information and applicable supporting data required by paragraphs (c) and (d) of the clause at FAR 52.225-9.
(c) Evaluation of offers.
(1) The Government will evaluate an offer requesting exception to the requirements of the Buy American statute, based on claimed unreasonable cost of domestic construction material, by adding to the offered price the appropriate percentage of the cost of such foreign construction material, as specified in paragraph (b)(3)(i) of the clause at FAR 52.225-9.
(2) If evaluation results in a tie between an offeror that requested the substitution of foreign construction material based on unreasonable cost and an offeror that did not request an exception, the Contracting Officer will award to the offeror that did not request an exception based on unreasonable cost.
(d) Alternate offers.
(1) When an offer includes foreign construction material not listed by the Government in this solicitation in paragraph (b)(2) of the clause at FAR 52.225-9, the offeror also may submit an alternate offer based on use of equivalent domestic construction material.
(2) If an alternate offer is submitted, the offeror shall submit a separate Standard Form 1442 for the alternate offer, and a separate price comparison table prepared in accordance with paragraphs (c) and (d) of the clause at FAR 52.225-9 for the offer that is based on the use of any foreign construction material for which the Government has not yet determined an exception applies.
(3) If the Government determines that a particular exception requested in accordance with paragraph (c) of the clause at FAR 52.225-9 does not apply, the Government will evaluate only those offers based on use of the equivalent domestic construction material, and the offeror shall be required to furnish such domestic construction material. An offer based on use of the foreign construction material for which an exception was requested—
(i) Will be rejected as nonresponsive if this acquisition is conducted by sealed bidding; or
(ii) May be accepted if revised during negotiations.
(End of Provision)
2.8 52.228-1 BID GUARANTEE (SEP 1996)
(a) Failure to furnish a bid guarantee in the proper form and amount, by the time set for opening of bids, may be cause for rejection of the bid.
(b) The bidder shall furnish a bid guarantee in the form of a firm commitment, e.g., bid bond supported by good and sufficient surety or sureties acceptable to the Government, postal money order, certified check, cashier's check, irrevocable letter of credit, or, under Treasury Department regulations, certain bonds or notes of the United States. The Contracting Officer will return bid guarantees, other than bid bonds—
(1) To unsuccessful bidders as soon as practicable after the opening of bids; and
(2) To the successful bidder upon execution of contractual documents and bonds (including any necessary coinsurance or reinsurance agreements), as required by the bid as accepted.
(c) The amount of the bid guarantee shall be 20…