Attachment A - Drawings.pdf
PDF 38 MB Posted
- Attached to
- Z2DA--Renovate PACU Federal contract opportunity
- Solicitation number
- 36C24621R0127
About this file
This document provides details for a federal contract opportunity to renovate the Post-Anesthesia Care Unit (PACU) at the Durham VA Medical Center in Durham, North Carolina. The Department of Veterans Affairs is soliciting proposals to gut and renovate approximately 4,400 square feet of space and expand the PACU into an adjoining pain care clinic to provide sixteen recovery bays and one isolation room. The estimated construction value is between $2,000,000 and $5,000,000. The solicitation number is 36C24621R0127 and is anticipated to be a Total Service-Disabled Veteran-Owned Small Business set-aside. An attachment with relevant drawings is included. The solicitation will be issued on or around September 17, 2021 with proposals due approximately 30 days after issuance. A pre-solicitation site visit date will be specified in the solicitation. Questions regarding the opportunity must be emailed to the identified point of contact.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Renovate PACU - RFI Response.pdf | ||
| 00 SOW - Updated.pdf | ||
| 36C24621R0127 0001.docx | DOCX document | |
| Site Visit Sign-In Sheet - Renovate PACU.pdf | ||
| Attachment E - Past Performance Questionnaire.docx | DOCX document | |
| Attachment D - Wage Determination NC20210028.pdf | ||
| Attachment C - Specifications - VOL. 2.pdf | ||
| Attachment F - Base Proposal Item Price Breakdown.xlsx | XLSX spreadsheet | |
| 36C24621R0127_1.docx | DOCX document | |
| Attachment B - Specifications - VOL. 1.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. ALL DIMENSIONS SHALL BE VERIFIED CAREFULLY AND ANY DISCREPANCIES BROUGHT TO THE IMMEDIATE ATTENTION
OF THE VA COR.
2. GENERAL CONTRACTOR SHALL PROTECT EXISTING CORRIDORS, ELEVATORS, DOORS, ETC. AND REPAIR ANY DAMAGE RESULTING FROM RENOVATION, DEMOLITION OR TRANSPORTATION OF MATERIALS ASSOCIATED WITH THIS PROJECT.
3. NOTIFY THE VA COR PRIOR TO ANY HAMMER DRILLING, SAW CUTTING, OR CORE DRILLING. THIS MUST BE SCHEDULED 7
DAYS IN ADVANCE.
4. THE VA COR SHALL BE GIVEN THREE WEEKS NOTICE, IN WRITING, BEFORE ANY UTILITY SYSTEM SHUTDOWN IS
REQUIRED.
5. REPAIR OR REPLACE ALL PROPERTY OF THE OWNER DAMAGED BY CONSTRUCTION, INCLUDING BUT NOT LIMITED TO:
EQUIPMENT, FLOORS, BASES, CEILING TILES, AND WALLS.
6. IT WILL BE THE RESPONSIBILITY OF THE CONTRACTOR TO IMMEDIATELY REPAIR ANY DAMAGED FIRE SPRINKLER PIPING
DURING DEMOLITION AND CONSTRUCTION.
7. THE DRAWINGS AND SPECIFICATIONS ARE INTENDED TO BE FOR ASSISTANCE AND GUIDANCE, BUT EXACT LOCATIONS, DISTANCES, LEVELS, QUANTITIES SHALL BE GOVERNED BY ACTUAL CONDITIONS FOUND AT THE JOB SITE AND MUST BE VERIFIED BY THE CONTRACTOR. THE CONTRACTOR SHALL FIELD VERIFY ALL DIMENSIONS AND BECOME FAMILIAR WITH ALL AREAS OF THE EXISTING BUILDING AFFECTED BY THE WORK, PRIOR TO COMMENCING THE WORK.
GENERAL NOTES :
GENERAL
1. CONTRACTOR IS RESPONSIBLE FOR BECOMING FAMILIAR WITH THE WORK AND ALL AREAS OF THE EXISTING BUILDING AFFECTED BY THE WORK, CAREFULLY VERIFYING ALL DIMENSIONS, AND BRINGING ANY DISCREPANCIES TO THE
IMMEDIATE ATTENTION OF THE COR.
2. CONTRACTOR WILL INCLUDE INFORMATION DESCRIBING COMPLIANCE WITH ICRA REQUIREMENTS IN THE NARRATIVE.
3. CONTRACTOR WILL OBTAIN A PERMIT PRIOR TO BEGINNING WORK ABOVE CEILINGS.
4. CONTRACTOR MUST OBTAIN HOT WORK PERMITS DAILY FOR WELDING, SOLDERING, TORCH CUTTING, AND BURNING 24 HOURS PRIOR TO THE START OF WORK FROM THE COR. FIRE WATCH IS REQUIRED. CONTRACTOR WILL FURNISH FIRE EXTINGUISHERS. CONTRACTOR MUST ACQUIRE AND HOLD THESE PERMITS AT THE WORK SITE AT ALL TIMES.
5. NO SMOKING EXCEPT IN DESIGNATED AREAS OUTSIDE OF BUILDING AS DEFINED IN SPECIFICATIONS SECTION 01 00 00.
6. CONTRACTOR SHALL PROTECT THE EXISTING FACILITY AND REPAIR ANY DAMAGE RESULTING FROM THE WORK.
7. CONTRACTOR WILL NOTIFY THE COR SEVEN DAYS PRIOR TO ANY CORE DRILLING.
8. CONTRACTOR WILL PROVIDE THREE WEEKS NOTICE IN WRITING PRIOR THE SHUT DOWN OF ANY UTILITY.
9. CONTRACTOR WILL NOTIFY THE COR OF ANY DAMAGED FIRE SPRINKLER COMPONENTS AND REPAIR IMMEDIATELY.
10.CONTRACTOR WILL LEGALLY REMOVE AND DISPOSE OF ALL DEBRIS.
GENERAL NOTES - DURHAM VAMC SPECIFIC :
PROTECTION COORDINATION & REQUIREMENTS
1. CONTRACTOR SHALL MAINTAIN ALL SITE AREAS IN A SAFE CONDITION AT ALL TIMES.
2. CONTRACTOR IS RESPONSIBLE FOR PROVIDING PROTECTION FOR BUILDING, SYSTEMS, OCCUPANTS, AND
PEDESTRIANS AT ALL TIMES DURING CONSTRUCTION.
3. CONTRACTOR SHALL SUBMIT SAFETY PLAN TO COR FOR REVIEW INDICATING ALL SAFETY MEASURES TO BE
IMPLEMENTED DURING CONSTRUCTION.
4. CONTRACTOR IS RESPONSIBLE FOR PROVIDING SAFE WORKING CONDITIONS FOR ALL WORKERS PER OSHA
REQUIREMENTS.
POWER
1. COR WILL DETERMINE AVAILABILITY OF POWER SUPPLY (IF ANY) AT THE TIME OF THE AWARD OF THE CONSTRUCTION
CONTRACT.
2. IF THE VA IS UNABLE TO PROVIDE A TEMPORARY ELECTRICAL CONNECTION DURING CONSTRUCTION, THE CONTRACTOR WILL BE REQUIRED TO PROVIDE ELECTRICITY TO SUPPORT THE WORK. CONTRACTOR WILL REQUEST AN AREA TO USE THE GENERATOR AT LEAST SEVEN (7) CALENDAR DAYS PRIOR TO USE. CONTRACTOR IS RESPONSIBLE FOR PROTECTING
OUTSIDE BUILDING AIR INTAKES FROM EXHAUST FOR THE DURATION OF THE PROJECT.
3. CONTRACTOR SHALL REQUEST POWER SHUTDOWNS OF EQUIPMENT THROUGH COR. CONTRACTOR SHALL NOT SHUTDOWN EQUIPMENT OR ENGAGE WITH VA BREAKERS OR DISCONNECTS ON ACTIVE EQUIPMENT.
MECHANICAL SYSTEMS
1. CONTRACTOR SHALL PROTECT MECHANICAL UNITS INCLUDING AIR HANDLERS, COMPRESSORS, AND PIPING AS NECESSARY, AND CONTRACTOR SHALL MAINTAIN AIR FLOW (INTAKE & EXHAUST) AT EQUIPMENT AT ALL TIMES. INTAKES ADJACENT TO WORK AREAS SHALL BE FILTERED FROM DUST AND DEBRIS WITH MINIMUM MERV13 FILTER CLOTH.
ACCESS AND MATERIAL STAGING
1. ROOF ACCESS WILL BE COORDINATED WITH THE COR.
2. COR WILL DETERMINE AVAILABILITY OF ACCESS AND STAGING AREAS AND IDENTIFY POTENTIAL LOCATIONS (IF ANY) AT THE TIME OF THE ISSUANCE OF THE NOTICE TO PROCEED. AREA FOR STAGING OR STORAGE MAY NOT BE AVAILABLE TO
THE CONTRACTOR DURING CONSTRUCTION.
3. STORAGE IS NOT PERMITTED AROUND AHU INTAKES.
4. ALL HOIST MOVEMENTS MUST TAKE PLACE AFTER HOURS OR ON WEEKENDS.
5. CONTRACTOR SHALL PLAN STAGING AND STORAGE AREAS TO MINIMIZE IMPACT TO EXISTING INFRASTRUCTURE AND
ALLOW FOR ACCESS TO EXISTING EQUIPMENT.
6. CONTRACTOR SHALL INCLUDE REQUESTS FOR ACCESS AND STAGING AREAS IN THE NARRATIVE AND SCHEDULE.
SECURITY REQUIREMENTS
1. ROOF ACCESS POINTS / DOORS SHALL BE KEPT LOCKED AT ALL TIMES TO PREVENT UNAUTHORIZED PERSONS FROM ENTERING ROOF OR MECHANICAL ROOMS / STAIRS LEADING TO ROOF. DOORS SHALL NOT BE PROPPED OPEN.
2. ALL MATERIAL AND EQUIPMENT SHALL BE KEPT IN A SECURED STATE AT ALL TIMES.
3. EXTERIOR STORAGE AREAS SHALL BE SECURED AND KEPT LOCKED AT ALL TIMES EXCEPT WHEN ADDING OR REMOVING
MATERIALS.
4. CONTRACTOR SHALL SUPPLY TEMPORARY GUARD RAILS ON ROOFTOP WHERE GUARD RAILS ARE NOT ALREADY
INSTALLED AS REQUIRED.
MEDICAL CENTER OPERATIONS
1. BUILDING AREAS WILL BE OCCUPIED AT ALL TIMES. CONTRACTOR WILL SCHEDULE THE WORK TO MINIMIZE DISRUPTION
TO PATIENT COMFORT AND MEDICAL CENTER OPERATIONS.
2. CONTRACTOR SHALL PROVIDE A SCHEDULE THAT PROJECTS THE WORK FOR TWO WEEKS EACH WEEK FOR COR APPROVAL THROUGHOUT THE DURATION OF THE PROJECT. CONTRACTOR SHOULD INCLUDE STAGING/STORAGE AREA
AND TEMPORARY POWER REQUESTS IN THE SCHEDULE INFORMATION.
WORK AREA PREPARATION & PROTECTION
1. CONTRACTOR MUST PROVIDE WALK-OFF MATS AND ANY OTHER METHODS OF PROTECTION NEEDED DURING THE CONSTRUCTION/REPAIR PROCESS, IN ORDER TO PROTECT STAIRWELLS AND CORRIDORS FROM DIRT AND DEBRIS.
2. CONTRACTOR MUST INSTALL FILTERS OVER ROOF DRAINS TO PREVENT DEBRIS FROM ENTERING ROOF DRAIN. REMOVE
DEBRIS FROM ROOFS ON A DAILY BASIS.
3. CONTRACTOR SHALL PROVIDE WALK-OFF MATS AT ROOF SURFACES WHERE CONSTRUCTION TRAFFIC AND DEBRIS WILL
AFFECT EXISTING ROOF.
4. ALL PROTECTION MEASURES MUST BE APPROVED BY COR PRIOR TO START OF WORK.
5. REFERENCE SPECIFICATION SECTION 01.35.26, SUBSECTION 1.2, FOR INFECTION CONTROL RISK ASSESSMENT
PROCEDURES.
115 Fifth Avenue New York, NY 10003 T. +1 212 353 7200 F. +1 212 353 7676
DRAWING SCHEDULE
PROJECT No.
Owner: Structural: Mechanical & Plumbing: Electrical: Fire Protection: Telecom: Interior:Architectural:
558-17-150
12/22/2020100 % BID DOCUMENTS
VA DURHAM - PACU RENOVATION
RENOVATION & EXPANSION TO EXISTING BUILDING
DURHAM VAMC DURHAM, NC
Durham, NC 27705
Laurene, Rickher & Sorrel, P.C.
8701 Red Oak Blvd, Suit 500, Charlotte, NC 28217
AME Consultant Engineers, PC
705 E Morehead St, Charlotte, NC 28202
AME Consultant Engineers, PC
705 E Morehead St, Charlotte, NC 28202
Durham VAMC AME Consultant Engineers, PC
705 E Morehead St, Charlotte, NC 28202
AME Consultant Engineers, PC
705 E Morehead St, Charlotte, NC 28202
Atriax Group
102 3rd Ave NE 28601, Hickory, NC 28603-1629
Perkins Eastman Architects
520 West Sixth Street, Charlotte NC, 28202
G-001
SHEET # DRAWING TITLE
SHEET
ISSUE
DATE
CURRENT
REVISION
CURRENT
REVISION
DATE
DWG OF DWG
GENERAL
G-001 COVER & SHEET INDEX 12/22/2020 1 77
G-002 CODE SUMMARY 12/22/2020 2 77
G-100 PHASING PLAN 12/22/2020 3 77
G-101 LIFE SAFETY PLAN - PHASE 1A.1 12/22/2020 4 77
G-102 LIFE SAFETY PLAN - PHASE 1A.2 12/22/2020 5 77
G-103 LIFE SAFETY PLAN - PHASE 1B 12/22/2020 6 77
G-104 LIFE SAFETY PLAN - PHASE 2A 12/22/2020 7 77
G-105 LIFE SAFETY PLAN - COMPLETE 12/22/2020 8 77
F-001 FIRE PROTECTION - GENERAL NOTES, DETAILS, LEGEND 12/22/2020
F-002 FIRE PROTECTION - DETAILS 12/22/2020
F-601 FIRE ALARM - RISER 12/22/2020
FD101 FIRE PROTECTION - FOURTH FLOOR PLAN - DEMOLITION 12/22/2020
FD102 FIRE ALARM - FOURTH FLOOR PLAN - DEMOLITION 12/22/2020
M-001 MECHANICAL - GENERAL NOTES AND LEGENDS 12/22/2020
M-501 MECHANICAL - CONTROLS 12/22/2020
M-601 MECHANICAL - SCHEDULES & CALCULATIONS 12/22/2020
M-701 MECHANICAL - DETAILS 12/22/2020
M-702 MECHANICAL - DETAILS 12/22/2020
MD101 MECHANICAL - FOURTH FLOOR PLAN - DEMOLITION 12/22/2020
MH200 MECHANICAL - FOURTH FLOOR PLAN - PHASING 12/22/2020
MH201 MECHANICAL - FOURTH FLOOR PLAN - DUCT 12/22/2020
MH202 MECHANICAL - ELEVATOR TOWER PLAN - DUCT 12/22/2020
MP201 MECHANICAL - FOURTH FLOOR PLAN - PIPE & CONTROLS 12/22/2020
MP202 MECHANICAL - SECOND & THIRD FLOOR PLAN - PIPE &
CONTROLS
12/22/2020
P-001 PLUMBING - GENERAL NOTES, SCHEDULES AND
LEGENDS
12/22/2020
P-501 PLUMBING - RISERS 12/22/2020
P-701 PLUMBING - DETAILS 12/22/2020
PD101 PLUMBING - FOURTH FLOOR PLAN - WASTE AND VENT -
DEMOLITION
12/22/2020
PD102 PLUMBING - FOURTH FLOOR PLAN - WATER SUPPLY -
DEMOLITION
12/22/2020
PD103 PLUMBING - FOURTH FLOOR PLAN - MEDICAL GAS -
DEMOLITION
12/22/2020
PL201 PLUMBING - FOURTH FLOOR PLAN - WASTE & VENT - NEW
WORK
12/22/2020
PL301 PLUMBING - FOURTH FLOOR PLAN - WATER SUPPLY -
NEW WORK
12/22/2020
PL302 PLUMBING - SECOND FLOOR PLAN - WATER SUPPLY -
NEW WORK
12/22/2020
PL401 PLUMBING - FOURTH FLOOR PLAN - MEDICAL GAS - NEW
WORK
12/22/2020
E-001 ELECTRICAL - GENERAL NOTES AND LEGENDS 12/22/2020
E-501 ELECTRICAL - DETAILS 12/22/2020
E-601 ELECTRICAL - RISER DIAGRAM 12/22/2020
E-602 ELECTRICAL - SCHEDULES 12/22/2020
E-603 ELECTRICAL - PANEL SCHEDULES 12/22/2020
ED101 ELECTRICAL - FOURTH FLOOR - DEMOLITION PLAN 12/22/2020
EL101 ELECTRICAL - FOURTH FLOOR - LIGHTING PLAN 12/22/2020
EP101 ELECTRICAL - FOURTH FLOOR - POWER PLAN 12/22/2020
EY101 ELECTRICAL - FOURTH FLOOR - NURSE CALL PLAN 12/22/2020
T-001 TELECOM - GENERAL NOTES, LEGENDS, AND DETAILS 12/22/2020
T-501 TELECOM - DETAILS 12/22/2020
T-601 TELECOM - RISER DIAGRAMS 12/22/2020
TD101 TELECOM - FOURTH FLOOR PLAN- DEMOLITION 12/22/2020
TN101 TELECOM - FOURTH FLOOR PLAN - DATA 12/22/2020
TY101 TELECOM - FOURTH FLOOR PLAN - SECURITY/MEDICAL
SYSTEMS
12/22/2020
LOCATION MAP
AERIAL VIEW
FIRE PROTECTION
MECHANICAL
PLUMBING
ELECTRICAL
TELECOM
IN101 FOURTH FLOOR FINISH PLANS AND SCHEDULE 12/22/2020
S-100 FRAMING PLANS 12/22/2020
STRUCTURE
ARCHITECTURAL EXISTING
AE101 FOURTH FLOOR PLAN - EXISTING 12/22/2020 9 77
AE102 EXISTING MECH ROOM & ELEV MACH ROOM & ROOF
PLAN
12/22/2020 10 77
ARCHITECTURAL DEMOLITION
AD101 FOURTH FLOOR PLAN - DEMOLITION 12/22/2020 11 77
ARCHITECTURAL
A-001 NOTES, ABBREVIATIONS, LEGENDS 12/22/2020 12 77
A-002 PARTITION TYPES 12/22/2020 13 77
A-003 UL DESIGN ASSEMBLY 12/22/2020 14 77
A-004 UL DESIGN ASSEMBLY 12/22/2020 15 77
A-005 UL DESIGN ASSEMBLY 12/22/2020 16 77
A-006 TYPICAL DETAILS 12/22/2020 17 77
A-101 FOURTH FLOOR PLAN - NEW CONSTRUCTION 12/22/2020 18 77
A-102 ENLARGED FOURTH FLOOR PLAN - NEW CONSTRUCTION 12/22/2020 19 77
A-201 FOURTH FLOOR REFLECTED CEILING PLAN 12/22/2020 20 77
A-301 SECTIONS 12/22/2020 21 77
A-401 INTERIOR ELEVATIONS 12/22/2020 22 77
A-402 INTERIOR ELEVATIONS 12/22/2020 23 77
A-501 TYPICAL MILLWORK DETAIL 12/22/2020 24 77
A-601 DOOR FRAMES AND SCHEDULE 12/22/2020 25 77
INTERIOR
EQUIPMENT
A-701 FOURTH FLOOR EQUIPMENT PLAN 12/22/2020 26 77
A-702 EQUIPMENT SCHEDULE 12/22/2020 27 77
A-703 EQUIPMENT SCHEDULE 12/22/2020 28 77
A-704 EQUIPMENT SCHEDULE 12/22/2020 29 77
A-705 EQUIPMENT SCHEDULE 12/22/2020 30 77
A-706 EQUIPMENT SCHEDULE 12/22/2020 31 77
A-707 EQUIPMENT SCHEDULE 12/22/2020 32 77
MEDICAL CENTER DIRECTOR:
ASSISTANT DIRECTOR:
ASSOCIATE DIRECTOR:
CHIEF OF STAFF:
DIRECTOR OF PATIENT SERVICES:
CHIEF OF FACILITIES MANAGEMENT:
INFECTION CONTROL PRACTITIONER:
SAFETY OFFICER:
INTEGRATED PROJECT TEAM
APPROVAL SIGNATURES
FA201 FIRE ALARM - FOURTH FLOOR PLAN - FIRE ALARM 12/22/2020
FX201 FIRE PROTECTION - FOURTH FLOOR PLAN - NEW WORK 12/22/2020
SHEET # DRAWING TITLE ISSUE
DATE
CURRENT
REVISION
CURRENT
REVISION
DATE
DWG OF DWG
33 77
34 77
35 77 36 77 37 77
39 77 40 77 41 77
38 77
42 77 43 77 44 77 45 77 46 77 47 77 48 77 49 77 50 77 51 77 52 77
63 77 64 77 65 77 66 77 67 77 68 77 69 77 70 77 71 77
73 77 74 77 75 77 76 77 77 77
72 77
53 77
54 77 55 77 56 77
57 77
58 77
59 77
60 77
61 77
62 77
C O N S U L T I N G E N G I N E E R S
705 EAST MOREHEAD STREET
CHARLOTTE, NC 28202•704-295-4263
NC LICENSE NO.: C-2848
AME PROJECT NO.: 17116
Approved: Andreka Watlington
AB101 FOURTH FLOOR PLAN - ASBESTOS ABATEMENT 08/11/2021
Zoe Typewritten Text
Atriax Rectangle
Atriax Rectangle
Atriax Text Box
Atriax Rectangle
Atriax Rectangle
Atriax Rectangle
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
Atriax Text Box
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
(check all that apply)
1 BUSINESS UL
UL
UL
NA
162 (EXISTING)
162 (EXISTING)
2018 APPENDIX B
BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS
ELECTRICAL DESIGN
(PROVIDE ON THE ELECTRICAL SHEETS IF APPLICABLE)
ELECTRICAL SUMMARY
ELECTRICAL SYSTEM AND EQUIPMENT
Method of Compliance: Energy Code
ASHRAE 90.1
Performance Performance
Prescriptive Prescriptive
Lighting schedule (each fixture type) lamp type required in fixture number of lamps in fixture ballast type used in the fixture number of ballasts in fixture total wattage per fixture total interior wattage specified vs. allowed (whole building or space by space) total exterior wattage specified vs. allowed
Additional Efficiency Package Options (When using the 2018 NCECC; not required for ASHRAE 90.1)
C406.2 More Efficient HVAC Equipment Performance C406.3 Reduced Lighting Power Density C406.4 Enhanced Digital Lighting Controls C406.5 On-Site Renewable Energy C406.6 Dedicated Outdoor Air System C406.7 Reduced Energy Use in Service Water Heating
2018 APPENDIX B
BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS
MECHANICAL DESIGN
(PROVIDE ON THE MECHANICAL SHEETS IF APPLICABLE)
MECHANICAL SUMMARY
MECHANICAL SYSTEMS, SERVICE SYSTEMS AND EQUIPMENT
Thermal Zone winter dry bulb: ___________ summer dry bulb: ___________
Interior design conditions winter dry bulb: ___________ summer dry bulb: ___________ relative humidity: ___________
Building heating load: ___________
Building cooling load: ___________
Mechanical Spacing Conditioning System
Unitary description of unit:
heating efficiency:
cooling efficiency:
Boiler size category of unit: ___________
Size category. If oversized, state reason.:
Chiller
Size category. If oversized, state reason.:
List equipment efficiencies: ___________
2018 APPENDIX B
BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS
STRUCTURAL DESIGN
(PROVIDE ON THE STRUCTURAL SHEETS IF APPLICABLE)
DESIGN LOADS:
Importance Factors:
Live Loads:
Ground Snow Load:
Wind Load:
Snow (IS) _________ Seismic (IE) _________
Roof Mezzanine Floor _________ psf
Ultimate Wind Speed
SEISMIC DESIGN CATEGORY:
I
A
Provide the following Seismic Design Parameters:
Risk Category (Table 1604.5) Spectral Response Acceleration
Site Classification (ASCE 7) Data Source:
Basic structural system
Analysis Procedure:
A
B
II
B Field Test Bearing Wall Building Frame Moment Frame Simplified
Architectural, Mechanical, Components anchored?
LATERAL DESIGN CONTROL: Earthquake
_________ mph (ASCE-7) Exposure Category _________
C
III
SS_________ %g
C
D
IV
D
Presumptive
S1_________ %g
E F Historical Data
Dual w/Special Moment Frame Dual w/Intermediate R/C or Special Steel Inverted Pendulum
Equivalent Lateral Force Yes No
Wind
SOIL BEARING CAPACITIES:
Field Test (provide copy of test report) ___________________ psf Presumptive Bearing capacity _________________________ psf Pile size, type, and capacity ______________________________________
Dynamic
_________ psf _________ psf _________ psf
ENERGY SUMMARY
ENERGY REQUIREMENTS:
The following data shall be considered minimum and any special attribute required to meet the energy code shall also be provided. Each Designer shall furnish the required portions of the project information for the plan data sheet.
If performance method, state the annual energy cost for the standard reference design vs annual energy cost for the proposed design.
Existing building envelope complies with code:
Exempt Building: No
Climate Zone: 3A 4A
No
5A
Method of Compliance: Energy Code
ASHRAE 90.1
Performance Performance
(If “Other” specify source here) THERMAL ENVELOPE (Prescriptive method only)
Roof Assembly (each assembly)
Description of assembly:
U-Value of total assembly:
R-Value of insulation:
Skylights in each assembly: ___________ U-Value of skylight: ___________ total square footage of skylights in each assembly:
Exterior Walls (each assembly)
Description of assembly:
U-Value of total assembly:
R-Value of insulation:
Openings (windows or doors with glazing) U-Value of assembly:
Door R-Values:
Walls below grade (each assembly)
Description of assembly:
U-Value of total assembly:
R-Value of insulation:
Solar heat gain coefficient: ___________ projection factor: ___________
Floors slab on grade
Description of assembly:
U-Value of total assembly:
R-Value of insulation:
Horizontal/vertical requirement: ___________ slab heated: ___________
Prescriptive Prescriptive
Yes (The remainder of this section is not applicable)
Yes (Provide code or statutory reference): ______________________
Ceiling Assembly (each assembly)
Description of assembly:
U-Value of total assembly:
R-Value of insulation:
Skylights in each assembly: ___________ U-Value of skylight: ___________ total square footage of skylights in each assembly: ___________
ACCESSIBLE DWELLING UNITS
(SECTION 1107)
TOTAL
UNITS
ACCESSIBLE
UNITS
REQUIRED
ACCESSIBLE
UNITS
PROVIDED
TYPE A
UNITS
REQUIRED
TYPE A
UNITS
PROVIDED
TYPE B
UNITS
REQUIRED
TYPE B
UNITS
PROVIDED
TOTAL
ACCESSIBLE UNITS
PROVIDED
ACCESSIBLE PARKING
(SECTION 1106)
LOT OR PARKING
AREA
TOTAL # OF PARKING SPACES
REQUIRED PROVIDED REGULAR WITH
5' ACCESS AISLE
# OF ACCESSIBLE SPACES PROVIDED
VAN SPACES WITH
132” ACCESS
AISLE
8' ACCESS
AISLE
TOTAL #
ACCESSIBLE
PROVIDED
TOTAL
PLUMBING FIXTURE REQUIREMENTS
(TABLE 2902.1)
USE
SPACE EXIST’G
NEW
REQ’D
WATERCLOSETS
MALE FEMALE UNISEX
URINALS LAVATORIES
MALE FEMALE UNISEX
SHOWERS
/ TUBS
DRINKING FOUNTAINS
REGULAR ACCESSIBLE
SPECIAL APPROVALS
Special approval: (Local Jurisdiction, Department of Insurance, OSC, DPI, DHHS, etc., describe below)
PERCENTAGE OF WALL OPENING CALCULATIONS
FIRE SEPARATION DISTANCE
(FEET) FROM PROPERTY LINES
DEGREE OF OPENINGS
PROTECTION
(TABLE 705.8)
ALLOWABLE AREA
ACTUAL SHOWN ON PLANS
Emergency Lighting:
Exit Signs:
Fire Alarm:
Smoke Detection Systems:
Carbon Monoxide Detection:
LIFE SAFETY SYSTEM REQUIREMENTS
No No No No No
Yes Yes Yes Yes Yes
Partial _______
LIFE SAFETY PLAN REQUIREMENTS
Life Safety Plan Sheet #: _____________________
Fire and/or smoke rated wall locations (Chapter 7) Assumed and real property line locations (if not on the site plan) Exterior wall opening area with respect to distance to assumed property lines (705.8) Occupancy Use for each area as it relates to occupant load calculation (Table 1004.1.2) Occupant loads for each area Exit access travel distances (1017) Common path of travel distances (Tables 1006.2.1 & 1006.3.2(1)) Dead end lengths (1020.4) Clear exit widths for each exit door Maximum calculated occupant load capacity each exit door can accommodate based on egress width (1005.3) Actual occupant load for each exit door
A separate schematic plan indicating where fire rated floor/ceiling and/or roof structure is provided for purposes of occupancy separation Location of doors with panic hardware (1010.1.10) Location of doors with delayed egress locks and the amount of delay (1010.1.9.7) Location of doors with electromagnetic egress locks (1010.1.9.9)
Location of doors equipped with hold-open devices Location of emergency escape windows (1030) The square footage of each fire area (202) The square footage of each smoke compartment for Occupancy Classification I-2 (407.5) Note any code exceptions or table notes that may have been utilized regarding the items above
FIRE PROTECTION REQUIREMENTS
BUILDING ELEMENT FIRE
SEPARATION
DISTANCE
(FEET)
Structural Frame, including columns, girders, trusses
Bearing Walls Exterior
North East West South
Interior
Nonbearing Walls and Partitions
Exterior walls North East West South
Interior walls and partitions
Floor Construction Including supporting beams and joists
Floor Ceiling Assembly Columns Supporting Floors
Roof Construction, including supporting beams and joists Roof Ceiling Assembly Columns Supporting Roof
Shaft Enclosures - Exit Shaft Enclosures - Other
Corridor Separation Occupancy/Fire Barrier Separation Party/Fire Wall Separation Smoke Barrier Separation Smoke Partition Tenant/Dwelling Unit/ Sleeping Unit Separation Incidental Use Separation
* Indicate section number permitting reduction
REQ'D
RATING
PROVIDED
(W/_________*
REDUCTION)
DETAIL #
AND
SHEET #
DESIGN #
FOR
RATED
ASSEMBLY
SHEET # FOR
RATED
PENETRATION
SHEET #
FOR
RATED
JOINTS
2018 NC Administrative Code and Policies
STORY
NO.
DESCRIPTION AND
USE
(A) (B)
BLDG AREA PER
STORY (ACTUAL)
TABLE 506.24
AREA
(C)
AREA FOR FRONTAGE
INCREASE1,5
(D)
ALLOWABLE AREA PER
STORY OR UNLIMITED2,3
ALLOWABLE HEIGHT
ALLOWABLE
Building Height in Feet (Table 504.3) 2
Building Height in Stories (Table 504.4) 3
1 Provide code reference if the “Shown on Plans” quantity is not based on Table 504.3 or 504.4.
2 The maximum height of air traffic control towers must comply with Table 412.3.1.
3 The maximum height of open parking garages must comply with Table 406.5.4.
SHOWN ON PLANS CODE REFERENCE 1
1 Frontage area increases from Section 506.3 are computed thus:
a. Perimeter which fronts a public way or open space having 20 feet minimum width = _______ (F)
b. Total Building Perimeter = ________ (P)
c. Ratio (F/P) = ___________ (F/P)
d. W = Minimum width of public way = ________ (W)
e. Percent of frontage increase If = 100[F/P – 0.25] x W/30 = ________ (%)
2 Unlimited area applicable under conditions of Section 507.
3 Maximum Building Area = total number of stories in the building x D (maximum3 stories) (506.2).
4 The maximum area of open parking garages must comply with Table 406.5.4.
5 Frontage increase is based on the unsprinklered area value in Table 506.2.
FLOOR EXISTING (SQ FT)
Fourth Floor
TOTAL
ALLOWABLE AREA
Primary Occupancy Classification(s):
Assembly A-1 Business Educational Factory Hazardous Institutional
A-2
F-1 Moderate H-1 Detonate I-1 Condition I-2 Condition I-3 Condition I-4
Mercantile
Residential Storage
R-1
Utility and Miscellaneous
Accessory Occupancy Classification(s):
Incidental Uses (Table 509):
Special Uses (Chapter 4 – List Code Sections):
Special Provisions: (Chapter 5 – List Code Sections):
Mixed Occupancy: No Yes
R-2 S-1 Moderate
Parking Garage
A-3
F-2 Low
H-2 Deflagrate H-3 Combust H-4 Health H-5 HPM
R-3 S-2 Low
Open
R-4 High-piled
Enclosed Repair Garage
3 4 5
A-4 A-5
Gross Building Area Table
NEW (SQ FT) SUB-TOTAL
Separation: _____ Hr.
Exception: _____________________
Non-Separated Use (508.3) - The required type of construction for the building shall be determined by applying the height and area limitations for each of the applicable occupancies to the entire building. The most restrictive type of construction, so determined, shall apply to the entire building.
Separated Use (508.4) - See below for area calculations for each story, the area of the occupancy shall be such that the sum of the ratios of the actual floor area of each use divided by the allowable floor area for each use shall not exceed 1.
Actual Area of Occupancy A + Actual Area of Occupancy B Allowable Area of Occupancy A
Allowable Area of Occupancy B
< 1
< 1.00
2018 APPENDIX B
BUILDING CODE SUMMARY FOR ALL COMMERCIAL PROJECTS
(EXCEPT 1 AND 2-FAMILY DWELLINGS AND TOWNHOUSES)
(Reproduce the following data on the building plans sheet 1 or 2)
Name of Project: _______________________________________________________________________
Address: _________________________________________________________________________ Zip Code _______
Owner/Authorized Agent: ___________________ Phone # ( ___ ) ___ - _____
Owned By: City/County
Code Enforcement Jurisdiction: City____________
Private
County_________
E-Mail ________________
State
State
CONTACT: ___________________________________________________________________________
DESIGNER FIRM
Architectural
Electrical
Plumbing
NAME LICENSE # TELEPHONE # E-MAIL
New Building Addition Renovation
2018 NC BUILDING CODE:
1st Time Interior Completion Shell/Core - Contact the local inspection jurisdiction for possible additional procedures and requirements Phased Construction
2018 NC EXISTING BUILDING CODE: EXISTING:
Alteration:
CONSTRUCTED: (date) __________
(date) __________RENOVATED:
RISK CATEGORY (Table 1604.5):
BASIC BUILDING DATA
Construction Type:
Sprinklers:
Standpipes:
Fire District:
No
No
No
Prescriptive Level I
Historic Property
Current:
Proposed:
I-A I-B
Partial
Special Inspections Required: No
Yes
Yes Class
Yes
I
II-A
II-B
II
II
III
III
IV
IV
Repair Level II
Chapter 14 Level III
Change of Use
CURRENT OCCUPANCY(S) (Ch. 3): __________________
PROPOSED OCCUPANCY(S) (Ch. 3): __________________
I I
III-A
III-B
NFPA 13
II
Flood Hazard Area:
III
No
IV
NFPA 13R
Dry
Yes
Yes (Contact the local inspection jurisdiction for additional procedures and requirements.)
V-A V-B
NFPA 13D
EXISTING / NOT APPLICABLE
EXISTING
EXISTING
Fire Protection Mechanical
Structural
VA DURHAM - PACU RENOVATION
508 FULTON ST. DURHAM, NC 27705
Telecom
AME Consulting Engineers, PC Farzad F. Roberts NC# 018549 704-295-4263 froberts@ame-pc.com
AME Consulting Engineers, PC David R. Adams RCCD #181099R 704-295-4263 dadams@ame-pc.com
AME Consulting Engineers, PC Joshua D. Henderson NC #033398 704-295-4263 jhenderson@ame-pc.com
Laurene Rickher Sorrell, PC Mark Rickher NC# 15464 704-522-0495 mrickher@lrspc.net
Wet
BUSINESS
BUSINESS
2,599 1,797 4,396
4,396
REFER TO ELECTRICAL
DRAWINGS FOR LUMINAIRE
SCHEDULE
Prescriptive
17.5*F 93.2*F
70*F 75*F 50% R.H.
EXISTING - NO CHANGE
EXISTING - NO CHANGE
MODULAR ROOFTOP AIR HANDLING UNIT
REFER TO MECHANICAL DRAWING SCHEDULES
REFER TO MECHANICAL DRAWING SCHEDULES
REFER TO MECHANICAL DRAWING SCHEDULES
Perkins Eastman Architects Bruce Moore NC# 5248 704-927-1541 b.moore@perkinseastman.com
Andreka Watlington 919 286 0411 Andreka.Watlington@va.gov
4,396
Atriax Group, PLLC Edward Henson NC# 8631 828-315-9962 ed.henson@atriaxgroup.com
520 WEST SIXTH STREET
CHARLOTTE, NC 28202
T. 704.940.0501 F. 704.362.4602
520 WEST SIXTH STREET
CHARLOTTE, NC 28202
T. 704.940.0501 F. 704.362.4602
C O N S U L T I N G E N G I N E E R S
705 EAST MOREHEAD STREET
CHARLOTTE, NC 28202•704-295-4263
NC LICENSE NO.: C-2848
AME PROJECT NO.: 17116
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
CONSTRUCTION
DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
100% BID DOCUMENTS
CONSULTANT
12/22/2020C :\R ev it lo ca l\V A-
D ur ha m
_I N
T- R
_h op ea da re
.rv t
/1
7/
0:
:1
PM
G-002
CODE SUMMARY EXPAND PACU
DURHAM VAMC DURHAM, NC
558-17-150
12/22/2020 EH HPRevisions: Date: 2 of 77 Andreka Watlington
Atriax Text Box G-002
A4012
A4018
A4016 A4020
A4032 A4034 A4036
A4051
A4045
A4021CA4021D
A4021A
A4017A
A4047A
A4047B
A4017
A4019
A4021
A4023
A4027A4031
A4025A4033
A4035
A4030
A4037
A4041
A4043 A4038
A4038A
A4040
A4042
A4060
A4058
A4056
C4007 C4014
C4002
C4004
E4006
E4003
E4004 E4001
B4000
C4019
A4018A A4018B
A4018C
E4002
E4006A
E4001A
A4030A A4034A
A4030
STAIR-2
STAIR-1
STAFF
STORAGE
MEDICATION
PATIENT RM PATIENT RM
SICU BED-11
CLOSET
MACHINE
PAIN CLINIC
OFFICE OFFICE
NURSES STATION
CLEAN
LINEN
SUPPLY
OFFICE
OFFICE
OFFICE
ELEVATOR
ELEVATOR
ELEVATOR
ICE
PROTECTION
FIRE
PROTECTION
FIRE
TOILET
MENS
TOILET
WOMENS
SHAFT
DUMB WAITER
ST
FEC
LINEN/
TRASH CHUTE
CLOSET
HOUSE KEEPING
SURG
CONSULTATION
LAB
LABLAB
SURG
OFFICE OFFICE
CALL RM
KEEPING
HOUSE
LOCKER
CONSULTATION
SUPPLY RM
TUBE SYSTEM
SUPPLY/
STORAGE
ANTE RM
HEAD NURSE
STAFF LOUNGE
ELECTRICAL
ENGG
ISOLATION BED
ELEVATOR ELEVATOR
ELEVATOR ELEVATOR
ELEVATOR
CORRIDOR
TOILET
PAIN CLINIC
PAIN CLINIC PAIN CLINIC
PAIN CLINIC
PAIN CLINIC
TOILET
TOILET
STAFF
TOILET/LOCKER
TOILET/LOCKER
STAFF
REST RM
REST RM
STAFF TOILET
/LOCKER
DUMB WAITER
IRM
10-BED3-BED
PATIENT RM
2-BED
PATIENT RM
2-BED
STORAGE
PROTECTION
FIRE
F.
E.
C
F.E.C.
PP
W P
PP
PP
AD
O
ADO
C R
PP
PP
HO
HO
W P
WP
17 19 20 21 23 24 25 26 271615
Q Q
P P
M M
K
J
H
R R
PHASE 1A.1
AFTER HOURS
10 HOUSEKEEPING
STAFF LOUNGE
ISOLATION ROOM
WAITING RM
CARE TEAM
NOURISH
ALCOVE
PACU STOR
MEDS
ANTE
REC BAY 16 REC BAY 15 REC BAY 14
REC BAY 13
REC BAY 12 REC BAY 11 REC BAY 10 REC BAY 9 REC BAY 8
TOILET
REC BAY 7REC BAY 6
REC BAY 5
REC BAY 4REC BAY 3REC BAY 2REC BAY 1
ALCOVE
NURSE ST
PACU
PACU
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
CORRIDOR
1 1
FILTERS
TEMP AC
VA
1A.1
PHASE 1A.1
AFTER HOURS
PHASE 1A.2
AFTER HOURS
PHASE 1B
TFE
TF
E
T-1
T-2
T-3
T-4
T-5
C 2A&B
C 1A&B
MAINTAIN EGRESS PATH DURING
VA OCCUPIED HOURS
THE VA WILL MOVE THE PAIN CLINIC OUT OF THIS WING DURING
CONSTRUCTION.
THE CORRIDOR AREA PAIN CLINIC ROOMS WILL NOT BE
AVAILABLE FOR CONSTRUCTION MATERIAL STORAGE.
USE OF OFFICE SPACE IS NOT ALLOWED EXCEPT AS SHOWN
FOR TEMPORARY HVAC EQUIPMENT.
CONTRACTOR ELEVATOR
SEE THE VA FOR USE RESTRICTIONS
PROVIDE PROTECTIVE PADS ON WALLS AND
PROVIDE FLOOR PROTECTION.
OTHER CONTRACTORS AND STAFF MAY BE
USING THIS ELEVATOR AT THE SAME TIME VA
1A.2 - 1B
VA
2A & 2B
EGRESS DURING
PHASE 1A.1
EGRESS DURING
PHASE 1A.1
EGRESS DURING
PHASES 1A.2 - 2B
PHASE 1B
PHASE 1B
PHASE 2APHASE 2A
PHASE 2A
PHASE 1B
4' - 0" 4' - 10 1/4"
CONTRACTOR NOTES:
1. ALWAYS MAINTAIN A SAFE AND SECURE SITE.
2. PROVIDE ACTIVE CONSTRUCTION SIGNAGE AT EACH CONSTRUCTION POINT OF ENTRY
3. REFER TO ICRA REQUIREMENTS.
PHASE 1B DO NOT DISTURB
PACU - AFTER HOURS
PHASE 2A
T-6
T-7
CONSTRUCTION
VESTIBULE
CONSTRUCTION
VESTIBULE
ADHESIVE WALK-
OFF MATT
PHASE 2A &B
ADHESIVE WALK-
OFF MATT
PHASE 1A & 1B
CONTRACTOR ROUTE
T-8
PHASING KEYED NOTES
PHASE 1A.1
1 M AINTAIN EXISTING HVAC INTO EXISTING PACU, SEE MECHANICAL FOR TEMPORARY HEATING
AND AIR CONDITIONING REQUIRED DUE TO CEILING CONGESTION. MEANS AND METHODS BY
CONTRACTOR
2 RELOCATE EXISTING ELECTRICAL PANELS INTO NEW FURRED WALL, PROVIDE TEMPORARY
MOBILE CONSTRUCTION DUST WALLS TO ISOLATE CONSTRUCTION. VA ACCESS TO EXISTING
PACU SHALL BE THRU THE EXISTING WEST DOOR IN PHASE 1A.1
3 CLOSE OFF ACCESS TO WAITING ROOM WITH TEMPORARY MOBILE CONSTRUCTION DUST
WALLS AND INSTALL NEW CORRIDOR LINK ON WEEKEND WORK.
PHASE 1A.2
4 WORK IN THIS CORRIDOR WILL BE WEEKEND WORK. MAINTAIN EGRESS AT ALL OCCUPIED
PERIODS. WHEN ITEM 3 ABOVE IS COMPLETE, EGRESS SHIFTS NORTH
5 TEMPORARY MOBILE CONSTRUCTION DUST WALLS, PHASE 1A & 1B
11 NEW DOOR & WALL TO SEPARATE PACU CONSTRUCTION FROM CORRIDOR.
12 TEMPORARY 1 HOUR RATED CONSTRUCTION BARRIER WITH CONTRACTOR DOOR - AFTER
HOURS ONLY, DO NOT DISTURB PACU OPERATIONS.
13 UPGRADE EXISTING WALL TO 1 HOUR
14 CONSTRUCT 8 NEW TREATMENT BAYS, PATIENT LIFTS, SMALL NURSE STATION, AND RENOVATE
PATIENT TOILET,(NOURISHMENT MILLWORK INSTALLED AT LAST PHASE)
15 INSTALL 48" TEMPORARY DOOR IN NEW PARTITION TO PROVIDE ACCESS TO PACU PHASE 1B
16 DISCONNECT TEMPORARY HVAC IN PACU EXPANSION AREA 1B AND RUN OFF NEW ROOF TOP
UNIT. TEMPORARY HVAC CONTINUES IN PHASE 2A AREA.
PHASE 2A SUMMARY:
17 OPEN UP 8 NEW TREATMENT BAYS FROM PHASE 1B AND CLOSE DOWN EXISTING PACU
18 TEMPORARY CONSTRUCTION BARRIERS TO CLOSE OFF THE EXISTING PACU. CONTRACTOR
ACCESS THRU EXISTING WEST PACU SINGLE DOOR .
19 RENOVATE EXISTING PACU AREA
20 COMPLETE ROOF TOP ISOLATION FAN AND DUCT ROUTE TO ISOLATION ROOM
21 SEE MECHANICAL FOR SHAFT CONSIDERATIONS
25 TEMPORARY MOBILE CONSTRUCTION DUST WALLS
PHASE 2B SUMMARY:
22 OPEN UP RENOVATED EXISTING PACU
23 ADD TEMPORARY MOBILE CONSTRUCTION DUST WALL TO INSTALL NOURISHMENT MILLWORK
24 INSTALL NOURISHMENT MILLWORK AND SECURE OR REMOVE DOOR TO CORRIDOR
EXISTING SUMMARY:
EXISTING PACU = 9 TREATMENT BAYS AND A SMALL ISO ROOM
PHASE 1B
6 INSTALL 1 HR RATED CONSTRUCTION BARRIER AND 45 MIN DOOR, SEE DOORS BELOW
7 INSTALL CROSS CORRIDOR SMOKE BARRIER DOOR
8 CLOSES SMALL STORAGE ROOM, SHOWER ROOM, 1 OFFICE, PART OF CORRIDOR AND WAITING
TO BUILD A REAR CORRIDOR CONNECTION, HOUSE KEEPING, PACU STORAGE AND DUCT CHASE
9 INSTALL NEW ROOF TOP UNIT, CONNECT TO ELECTRICAL, CHILLED WATER ETC. EXTEND DUCT
THRU EXTERIOR WINDOW AND INFILL WITH BRICK.
10 REBUILD SOUTH PACU WALL (INTO THE EXISTING CORRIDOR) SO THAT IT DOES NOT DISTURB
EXISTING PACU
SYMBOL LEGEND
VA
1A.1
VA ROUTE FROM OR TO PACU DURING
PHASE 1A.1
(PHASES 1A.2, 1A.3, 1B, 2A & 2B SIMILAR)
C 1A & 1B
CONTRACTOR ROUTE FROM ELEVATORS
TO CONSTRUCTION ZONE DURING
PHASE 1A & 1B
(PHASES 2A & 2B SIMILAR)
TEMPORARY CONSTRUCTION BARRIER
1 HR RATED GYPSUM PARTITION TO
DECK ABOVE
MOBILE CONSTRUCTION DUST BARRIER
NON-RATED METAL STUD AND FIRE RETARDANT
PLASTIC PARTITION TO CEILING ABOVE
T-1 TEMPORARY CONSTRUCTION DOOR IN
HOLLOW METAL FRAME
TEMPORARY CONSTRUCTION FIRE
EXTINGUISHER AND WALL LABEL
TFE
TEMPORARY CONSTRUCTION BARRIER
2 HR RATED GYPSUM PARTITION TO DECK ABOVE
SHAFTWALL CONSTRUCTION SIMILAR TO PARTITION F42
PHASE 1A.1 AND 1A.2
PHASE 1B
PHASE 2A
PHASE 2B
PHASING TEMPORARY DOORS
T-1 HM OR SOLID CORE WD DOOR, 4'-0" X 7'-0" X 1 3/4", 45 MIN RATED WITH NARROW
LITE, CLOSER, STOREROOM FUNCTION, CONTRACTOR KEY, RATED HOLLOW
METAL FRAME, SMOKE/SOUND SEALS, 1 1/2 PR 5" X 4 1/2" BALL BEARING HINGES.
SET IN 1 HOUR RATED TEMPORARY CONSTRUCTION BARRIER SIMILAR TO
PARTITION TYPE A41 WITH 3" SOUND BATTS. BARRIER TO EXTEND TO DECK
ABOVE
T-2 HM OR SOLID CORE WD DOOR, 3'-6" X 7'-0" X 1 3/4", 45 MIN RATED WITH NARROW
LITE, CLOSER, STOREROOM FUNCTION, CONTRACTOR KEY, RATED HOLLOW
METAL FRAME, SMOKE/SOUND SEALS, 1 1/2 PR 5" X 4 1/2" BALL BEARING HINGES.
SET IN NEW 1 HOUR RATED SMOKE BARRIER PARTITION TYPE A41 WITH 3"
SOUND BATTS. PARTITION TO EXTEND TO DECK ABOVE. SEE PARTITION
SCHEDULE SHEET A-002
T-3 HM OR SOLID CORE WD DOOR, 4'-0" X 7'-0" X 1 3/4", 45 MIN RATED WITH NARROW
LITE, CLOSER, STOREROOM FUNCTION, CONTRACTOR KEY, RATED HOLLOW
METAL FRAME, SMOKE/SOUND SEALS, 1 1/2 PR 5" X 4 1/2" BALL BEARING HINGES.
SET IN 1 HOUR RATED TEMPORARY CONSTRUCTION BARRIER SIMILAR TO
PARTITION TYPE --- WITH 3" SOUND BATTS. BARRIER TO EXTEND TO DECK ABOVE.
4'-0" WIDTH TO ACCOMMODATE EQUIPMENT MOVEMENT BETWEEN PHASE 1 & 2
THIS WORK SHALL NOT DISTURB PACU OPERATIONS, SHALL BE AFTER HOURS
T-4 HM OR SOLID CORE WD DOOR, 4'-0" X 7'-0" X 1 3/4", 45 MIN RATED WITH NARROW
LITE, AUTO DOOR OPERATOR, CR/PUSH PAD ACTIVATORS, STOREROOM
FUNCTION, ELECTRIC STRIKE, CONTRACTOR AND VA KEYS, RATED HOLLOW
METAL FRAME, SMOKE/SOUND SEALS, 1 1/2 PR 5" X 4 1/2" BALL BEARING HINGES.
SET IN NEW 1 HOUR RATED SMOKE BARRIER PARTITION TYPE A41 WITH 3"
SOUND BATTS. PARTITION TO EXTEND TO DECK ABOVE
T-5 HM OR SOLID CORE WD DOOR, 4'-0" X 7'-0" X 1 3/4", 45 MIN RATED WITH NARROW
LITE, CLOSER, STOREROOM FUNCTION, CONTRACTOR KEY, RATED HOLLOW
METAL FRAME, SMOKE/SOUND SEALS, 1 1/2 PR 5" X 4 1/2" BALL BEARING HINGES.
SET IN 1 HOUR RATED TEMPORARY CONSTRUCTION BARRIER SIMILAR TO
PARTITION TYPE A41 WITH 3" SOUND BATTS. BARRIER TO EXTEND TO DECK
ABOVE
T-6 TEMPORARY CONSTRUCTION VESTIBULE DOOR, DUST TIGHT PER ICRAT-7
T-8 HM DOOR, 3'-0" X 7'-0" X 1 3/4", 90 MIN RATED WITH, CLOSER, STOREROOM
FUNCTION, CONTRACTOR KEY, RATED HOLLOW METAL FRAME, 1 1/2 PR 4 1/2" X 4
1/2" HINGES. SET IN 2 HOUR RATED TEMPORARY CONSTRUCTION BARRIER
SIMILAR TO PARTITION TYPE F42 (5 1/4" THICKNESS). BARRIER TO EXTEND TO
DECK ABOVE. REMOVE EXISTING PAIN CLINIC DOOR AND RE-INSTALL AT THE END
OF CONSTRUCTION.
ICRA REQUIREMENTS REFER TO SPECIFICATION SECTION 01.35.26
INFECTION CONTROL
A. INFECTION CONTROL IS CRITICAL IN ALL MEDICAL CENTER FACILITIES. INTERIOR CONSTRUCTION ACTIVITIES CAUSING DISTURBANCE OF EXISTING DUST OR CREATING NEW DUST SHALL BE CONDUCTED WITHIN VENTILATION-CONTROLLED AREAS THAT MINIMIZE THE FLOW OF AIRBORNE PARTICLES INTO PATIENT AREAS. EXTERIOR CONSTRUCTION ACTIVITIES CAUSING DISTURBANCE OF SOIL OR CREATING DUST IN SOME
OTHER MANNER SHALL BE CONTROLLED.
B. AN AHA ASSOCIATED WITH INFECTION CONTROL SHALL BE PERFORMED BY VA PERSONNEL IN ACCORDANCE WITH FGI GUIDELINES (I.E. INFECTION CONTROL RISK ASSESSMENT [ICRA]). THE ICRA PROCEDURE FOUND ON THE AMERICAN SOCIETY FOR HEALTHCARE ENGINEERING (ASHE) WEBSITE WILL BE UTILIZED. RISK CLASSIFICATIONS OF CLASS II OR LOWER WILL REQUIRE APPROVAL BY THE COR BEFORE BEGINNING ANY CONSTRUCTION WORK. RISK CLASSIFICATIONS OF CLASS III OR HIGHER WILL REQUIRE A PERMIT BEFORE BEGINNING ANY CONSTRUCTION WORK. THE INFECTION CONTROL PERMITS WILL BE POSTED OUTSIDE THE APPROPRIATE CONSTRUCTION AREAS DURING THE ENTIRE LENGTH OF THE PROJECT.
MORE THAN ONE PERMIT MAY BE ISSUED FOR A CONSTRUCTION PROJECT IF THE WORK IS LOCATED IN SEPARATE AREAS REQUIRING SEPARATE CLASSES. THE REQUIRED INFECTION CONTROL PRECAUTIONS WITH
EACH CLASS ARE AS FOLLOWS:
4. CLASS IV REQUIREMENTS:
A. DURING CONSTRUCTION WORK:
I. OBTAIN PERMIT FROM THE COR.
II. ISOLATE HVAC SYSTEM IN AREA WHERE WORK IS BEING DONE TO PREVENT CONTAMINATION OF DUCT SYSTEM. ENSURE THAT THE HVAC DEPARTMENT IS NOTIFIED BEFORE ANY WORK BEGINS THAT INVOLVES
REMOVING OR ISOLATING THE HVAC SYSTEM.
III. COMPLETE ALL CRITICAL BARRIERS I.E. SHEETROCK, PLYWOOD, PLASTIC, TO SEAL AREA FROM NON- WORK AREA OR IMPLEMENT CONTROL CUBE METHOD (CART WITH PLASTIC COVERING AND SEALED CONNECTION TO WORK SITE WITH HEPA VACUUM FOR VACUUMING PRIOR TO EXIT) BEFORE CONSTRUCTION BEGINS. INSTALL CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY, OUTSIDE OF NORMAL
WORK HOURS.
IV. MAINTAIN NEGATIVE AIR PRESSURE WITHIN WORK SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.
V. SEAL HOLES, PIPES, CONDUITS, AND PUNCTURES.
VI. CONSTRUCT ANTEROOM AND REQUIRE ALL PERSONNEL TO PASS THROUGH THIS ROOM SO THEY CAN BE VACUUMED USING A HEPA VACUUM CLEANER BEFORE LEAVING WORK SITE OR THEY CAN WEAR CLOTH OR
PAPER COVERALLS THAT ARE REMOVED EACH TIME THEY LEAVE WORK SITE.
VII. ALL PERSONNEL ENTERING WORK SITE ARE REQUIRED TO WEAR SHOE COVERS. SHOE COVERS SHALL BE
CHANGED EACH TIME THE WORKER EXITS THE WORK AREA.
B. UPON COMPLETION:
I. DO NOT REMOVE BARRIERS FROM WORK AREA UNTIL COMPLETED PROJECT IS INSPECTED BY THE COR.
II. REMOVE CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY TO MINIMIZE SPREADING OF
DIRT AND DEBRIS ASSOCIATED WITH CONSTRUCTION, OUTSIDE OF NORMAL WORK HOURS.
III. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINERS.
IV. COVER TRANSPORT RECEPTACLES OR CARTS. TAPE COVERING UNLESS SOLID LID. DISPOSE OF WASTE IN
COR APPROVED OUTSIDE TRASH/ROLL-OFF DUMPSTER.
V. VACUUM WORK AREA WITH HEPA FILTERED VACUUMS.
VI. WET MOP AREA WITH CLEANER/DISINFECTANT.
VII. UPON COMPLETION, RESTORE HVAC SYSTEM WHERE WORK WAS PERFORMED.
VIII. RETURN PERMIT TO THE COR.
C. BARRIERS SHALL BE ERECTED AS REQUIRED BASED UPON CLASSIFICATION (CLASS III AND IV REQUIRES
BARRIERS) AND SHALL BE CONSTRUCTED AS FOLLOWS:
1. CLASS III AND IV - CLOSED DOOR WITH MASKING TAPE APPLIED OVER THE FRAME AND DOOR IS
ACCEPTABLE FOR PROJECTS THAT CAN BE CONTAINED IN A SINGLE ROOM.
2. CONSTRUCTION, DEMOLITION OR RECONSTRUCTION NOT CAPABLE OF CONTAINMENT WITHIN A SINGLE ROOM SHALL HAVE THE FOLLOWING BARRIERS ERECTED AND MADE PRESENTABLE ON HOSPITAL OCCUPIED
SIDE:
I. CLASS III AND IV (WHERE DUST CONTROL IS THE ONLY HAZARD, AND AN AGREEMENT IS REACHED WITH THE COR AND MEDICAL CENTER) - AIRTIGHT FLAME RETARDANT 6 MIL OR GREATER PLASTIC BARRIER THAT EXTENDS FROM THE FLOOR TO CEILING. SEAMS SHALL BE SEALED WITH DUCT TAPE TO PREVENT DUST AND
DEBRIS FROM ESCAPING
II. CLASS III AND IV - DRYWALL BARRIER ERECTED WITH JOINTS COVERED OR SEALED TO PREVENT DUST
AND DEBRIS FROM ESCAPING.
III. CLASS III AND IV - SEAL ALL PENETRATIONS IN EXISTING BARRIER AIRTIGHT
IV. CLASS III AND IV - BARRIERS AT PENETRATION OF CEILING ENVELOPES, CHASES AND CEILING SPACES TO
STOP MOVEMENT AIR AND DEBRIS
V. CLASS IV ONLY - ANTEROOM OR DOUBLE ENTRANCE OPENINGS THAT ALLOW WORKERS TO REMOVE
PROTECTIVE CLOTHING OR VACUUM OFF EXISTING CLOTHING
VI. CLASS III AND IV - AT ELEVATORS SHAFTS OR STAIRWAYS WITHIN THE FIELD OF CONSTRUCTION, OVERLAPPING FLAP MINIMUM OF TWO FEET WIDE OF POLYETHYLENE ENCLOSURES FOR PERSONNEL
ACCESS.
D. PRODUCTS AND MATERIALS:
1. SHEET PLASTIC: FIRE RETARDANT POLYSTYRENE, 6-MIL THICKNESS MEETING LOCAL FIRE CODES. HAS
FOAM ROLL AT THE BOTTOM TO ASSIST WITH NEGATIVE PRESSURE SEAL.
2. BARRIER DOORS: SELF CLOSING, ONE-HOUR, TWO-HOUR, FIRE-RATED, SOLID CORE WOOD IN STEEL
FRAME, PAINTED.
3. DUST PROOF, ONE-HOUR, TWO-HOUR, FIRE-RATED, DRYWALL.
4. HIGH EFFICIENCY PARTICULATE AIR-EQUIPPED FILTRATION MACHINE RATED AT 95% CAPTURE OF 0.3 MICRONS INCLUDING POLLEN, MOLD SPORES AND DUST PARTICLES. HEPA FILTERS SHOULD HAVE ASHRAE 85 OR OTHER PREFILTER TO EXTEND THE USEFUL LIFE OF THE HEPA. PROVIDE BOTH PRIMARY AND SECONDARY FILTRATIONS UNITS. MAINTENANCE OF EQUIPMENT AND REPLACEMENT OF THE HEPA FILTERS
AND OTHER FILTERS WILL BE IN ACCORDANCE WITH MANUFACTURER’S INSTRUCTIONS.
5. EXHAUST HOSES: HEAVY DUTY, FLEXIBLE STEEL REINFORCED; VENTILATION BLOWER HOSE
6. ADHESIVE WALK-OFF MATS (I.E., STICKY MATS): PROVIDE MINIMUM SIZE MATS OF 24 INCHES X 36 INCHES.
THE COR, UPON EVALUATION OF THE PROJECT, MAY REQUIRE DRY MAT/WET MAT/STICKY MAT COMBO TO
PREVENT CONTAMINATES FROM BEING INTRODUCED IN PATIENT SENSITIVE AREAS.
7. DISINFECTANT: HOSPITAL-APPROVED DISINFECTANT OR EQUIVALENT PRODUCT
8. PORTABLE CEILING ACCESS MODULE
E. BEFORE ANY CONSTRUCTION ON SITE BEGINS, ALL CONTRACTOR PERSONNEL INVOLVED IN THE CONSTRUCTION OR RENOVATION ACTIVITY SHALL BE EDUCATED AND TRAINED IN INFECTION PREVENTION
MEASURES ESTABLISHED BY THE MEDICAL CENTER.
F. A DUST CONTROL PROGRAM WILL BE ESTABLISH AND MAINTAINED AS PART OF THE CONTRACTOR’S
INFECTION PREVENTIVE MEASURES IN ACCORDANCE WITH THE FGI
GUIDELINES FOR DESIGN AND CONSTRUCTION OF HEALTHCARE FACILITIES. PRIOR TO START OF WORK, PREPARE A PLAN DETAILING PROJECT-SPECIFIC DUST PROTECTION MEASURES WITH ASSOCIATED PRODUCT DATA, INCLUDING PERIODIC STATUS REPORTS, AND SUBMIT FOR REVIEW FOR COMPLIANCE WITH CONTRACT
REQUIREMENTS IN ACCORDANCE WITH SECTION 01 33 23, SHOP DRAWINGS,
PRODUCT DATA AND SAMPLES.
G. MEDICAL CENTER INFECTION CONTROL PERSONNEL WILL MONITOR FOR AIRBORNE DISEASE (E.G.
ASPERGILLOSIS) DURING CONSTRUCTION. A BASELINE OF CONDITIONS WILL BE ESTABLISHED BY THE MEDICAL CENTER PRIOR TO THE START OF WORK AND PERIODICALLY DURING THE CONSTRUCTION STAGE TO DETERMINE IMPACT OF CONSTRUCTION ACTIVITIES ON INDOOR AIR QUALITY WITH SAFE THRESHOLDS
ESTABLISHED.
H. IN GENERAL, THE FOLLOWING PREVENTIVE MEASURES SHALL BE ADOPTED DURING CONSTRUCTION TO
KEEP DOWN DUST AND PREVENT MOLD.
1. CONTRACTOR SHALL VERIFY THAT CONSTRUCTION EXHAUST TO EXTERIOR IS NOT REINTRODUCED TO THE MEDICAL CENTER THROUGH INTAKE VENTS, OR BUILDING OPENINGS. HEPA FILTRATION IS REQUIRED WHERE
THE EXHAUST DUST MAY REENTER THE MEDICAL CENTER.
2. EXHAUST HOSES SHALL BE EXHAUSTED SO THAT DUST IS NOT REINTRODUCED TO THE MEDICAL CENTER.
3. ADHESIVE WALK-OFF/CARPET WALK-OFF MATS SHALL BE USED AT ALL INTERIOR TRANSITIONS FROM THE CONSTRUCTION AREA TO OCCUPIED MEDICAL CENTER AREA. THESE MATS SHALL BE CHANGED AS OFTEN AS REQUIRED TO MAINTAIN CLEAN WORK AREAS DIRECTLY OUTSIDE CONSTRUCTION AREA AT ALL TIMES.
4. VACUUM AND WET MOP ALL TRANSITION AREAS FROM CONSTRUCTION TO THE OCCUPIED MEDICAL CENTER AT THE END OF EACH WORKDAY. VACUUM SHALL UTILIZE HEPA FILTRATION. MAINTAIN SURROUNDING AREA
FREQUENTLY.
REMOVE DEBRIS AS IT IS CREATED. TRANSPORT THESE OUTSIDE THE CONSTRUCTION AREA IN CONTAINERS
WITH TIGHTLY FITTING LIDS.
5. THE CONTRACTOR SHALL NOT HAUL DEBRIS THROUGH PATIENT-CARE AREAS WITHOUT PRIOR APPROVAL OF THE COR AND THE MEDICAL CENTER. WHEN, APPROVED, DEBRIS SHALL BE HAULED IN ENCLOSED DUST PROOF CONTAINERS OR WRAPPED IN PLASTIC AND SEALED WITH DUCT TAPE. NO SHARP OBJECTS SHOULD BE ALLOWED TO CUT THROUGH THE PLASTIC. WIPE DOWN THE EXTERIOR OF THE CONTAINERS WITH A DAMP RAG TO REMOVE DUST. ALL EQUIPMENT, TOOLS, MATERIAL, ETC. TRANSPORTED THROUGH OCCUPIED
AREAS SHALL BE MADE FREE FROM DUST AND MOISTURE BY VACUUMING AND WIPE DOWN.
6. THERE SHALL BE NO STANDING WATER DURING CONSTRUCTION. THIS INCLUDES WATER IN EQUIPMENT DRIP PANS AND OPEN CONTAINERS WITHIN THE CONSTRUCTION AREAS. ALL ACCIDENTAL SPILLS SHALL BE CLEANED UP AND DRIED WITHIN 12 HOURS. REMOVE AND DISPOSE OF POROUS MATERIALS THAT REMAIN
DAMP FOR MORE THAN 72 HOURS.
7. AT COMPLETION, REMOVE CONSTRUCTION BARRIERS AND CEILING PROTECTION CAREFULLY, OUTSIDE OF
NORMAL WORK HOURS. VACUUM AND CLEAN ALL SURFACES FREE OF DUST AFTER THE REMOVAL.
I. FINAL CLEANUP:
1. UPON COMPLETION OF PROJECT, OR AS WORK PROGRESSES, REMOVE ALL CONSTRUCTION DEBRIS FROM ABOVE CEILING, VERTICAL SHAFTS AND UTILITY CHASES THAT HAVE BEEN PART OF THE CONSTRUCTION.
2. PERFORM HEPA VACUUM CLEANING OF ALL SURFACES IN THE CONSTRUCTION AREA. THIS INCLUDES WALLS, CEILINGS, CABINETS, FURNITURE (BUILT-IN OR FREE STANDING), PARTITIONS, FLOORING, ETC.
3. ALL NEW AIR DUCTS SHALL BE CLEANED PRIOR TO FINAL INSPECTION.
J. EXTERIOR CONSTRUCTION
1. CONTRACTOR SHALL VERIFY THAT DUST WILL NOT BE INTRODUCED INTO THE MEDICAL CENTER THROUGH INTAKE VENTS, OR BUILDING OPENINGS. HEPA FILTRATION ON INTAKE VENTS IS REQUIRED WHERE DUST
MAY BE INTRODUCED.
2. DUST CREATED FROM DISTURBANCE OF SOIL SUCH AS FROM VEHICLE MOVEMENT WILL BE WETTED WITH
USE OF A WATER TRUCK AS NECESSARY
3. ALL CUTTING, DRILLING, GRINDING, SANDING, OR DISTURBANCE OF MATERIALS SHALL BE ACCOMPLISHED WITH TOOLS EQUIPPED WITH EITHER LOCAL EXHAUST VENTILATION (I.E. VACUUM
SYSTEMS) OR WET SUPPRESSION CONTROLS.
C O N S U L T I N G E N G I N E E R S
CHARLOTTE| 704.295.4263
705 EAST MOREHEAD STREET, 28202
RALEIGH| 919.816.2907
3737 GLENWOOD AVENUE, SUITE 100, 27612
NC License No: C‐2848
520 WEST SIXTH STREET
CHARLOTTE, NC 28202
T. 704.940.0501 F. 704.362.4602
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
321 4 5 6 7 8 9 10
100% BID DOCUMENTS
100% BID DOCUMENTS
12/22/2020
C :\R
EV
IT
L O
C
AL
\V A-
D ur ha m
_A R
C H
_R
_m .k er am at i.r vt
/1 4/
:4
4:
P M
G-100
PHASING PLAN VA DURHAM - PACU RENOVATION
DURHAM VAMC DURHAM, NC
558-17-150
12/22/2020 BM MK
1/8" = 1'-0"1 FOURTH FLOOR PLAN - PHASING
PHASING LEGEND
Revisions: Date:
Andreka Watlington
Zoe Typewritten Text
FP
PROTECTION
FIRE
A4012
D4008A
D4008
D4006
D4016A
D4018
D4005A
D4003
D4013
D4015A
D4002D4010D4012D4014 D4016D4020
D4001D4005D4007D4009D4011D4015
C4017
C4015
C4013AC4011
C4020A C4018
C4013C4020
C4009
A4018
A4016 A4020
A4032 A4034 A4036
A4051
A4045
A4021CA4021D
A4021A
A4017A
A4047A
A4047B
A4017
A4019
A4021
A4023
A4027A4031
A4025A4033
A4035
A4044 A4054
A4030
A4037
A4041
A4043 A4038
A4038A
A4040
A4042
A4060
A4058
A4056
A4054A A4044A A4046A4048A4050A4052
C4016
C4007 C4014
C4012
C4010
C4006
C4008
C4002
C4004
E4005
E4006
E4003
E4004 E4001
B4000B4002
B4001
B4003
B4004B4006B4008
B4017 B4007
B4005B4009
B4015AB4015
B4010 B4012
B4024
B4026
B4018
B4014
B4018A
B4016
B4018B
B4020
B4022
B4019B4021B4023B4025B4027B4029
B4028B4030B4032B4034B4036B4038
C4019
A4018A A4018B
A4018C
B4027A B4023A
B4036A B4032A B4030A
B4019A
B4028A
B4009A B4007B
B4007A
D4004
E4002
E4006A
E4001A
A4030A A4034A
E4006
FP
EXP. JT.
EX
P.
J T.
EX
P.
J T.
EXP. JT. EXP. JT.
C
LG
H
GT
C H A N
GE
C
LG
H
GT
C H A N
GE
C
LG
H
GT
C H A N
GE
CLG. HGT. CHANGE
EX
P.
J T.
5" WIDE BULKHEAD
@ CEILING
C
LG
H
GT
C H A N
GE
CRAWL SPACE
STAIR -5STAIR-4
STAIR-2
STAIR-1
STAIR-3
STAFF LOUNGE
OFFICE
NURSE OFFICE
STORAGE
STORAGE
STORAGE
STORAGE
STORAGEANEST LAB
TELEPHONE
STAFF
STORAGE
MEDICATION
PATIENT RM
5-BED PATIENT RM 6-BED PATIENT RM 7-BED PATIENT RM 8-BED PATIENT RM
PATIENT RM
SICU BED-11
CLOSET
NURSES STATION
HEART/LUNG/STORAGE
INTAKE
MEDICATION
MACHINE
OR-1
OR-2
3-BED PATIENT RM MULTIPURPOSE RM WAITING RM
PAIN CLINIC
OFFICE OFFICE
OR-6
NURSES STATION
CLEAN
LINEN
SUPPLY
ELECTRICAL
OFFICE
OFFICE
OFFICE
SOILED
UTILITY
LINEN
WORK RM/ANESTOR-04
ELEVATOR
ELEVATOR
ELEVATOR
ICE
PATIENT RMPATIENT RM
PROTECTION
FIRE
PATIENT RM PATIENT RM
PROTECTION
FIRE
PROTECTION
FIRE
EXAM RM/
EXAM RM/
SUPPLY RM
SUPPLY RM
CLOSET
RM
CLOSET CLOSET
PATIENT RM PATIENT RM
KEEPING
HOUSE
COPY RM
UTILITY
SOILED
NURSES
NURSE MGR
UTILITY
DUMB WAITER DUMB WAITER
TOILET
MENS
STORAGE
HOUSE
KEEPING
DUMB WAITER
TOILET
MENS
TOILET
WOMENS
GAS STORAGE
SHAFT
STORAGE
DUMB WAITER
PGM SUPPORT ASST
FEC
STERILISZATION
STORAGE
FIRE PROTECTION CLOSET
OR-3
STERILISATION
RM
STERILISATION
RM OR-5 CLEAN CORE
OR-7
STORAGE STERILIZATION RM
OR-8
LINEN/
TRASH CHUTE
CLOSET
STORAGE
STORAGE
HOUSE
STERILISATION
RM
HOUSE KEEPING
SURG
CONSULTATION
LAB
LABLAB
SURG
RESEARCH
LAB/OFFICELAB
OFFICE OFFICE
CALL RM
KEEPING
HOUSE
LOCKER
ANTE RM
CONSULTATION
SUPPLY RM
TUBE SYSTEM
SUPPLY/
STORAGE
ANTE RM
ANTE RM
HEAD NURSE
STAFF LOUNGE
ELECTRICAL
ENGG
ISOLATION BED
CLOSET
STATION
ELEVATOR ELEVATOR
ELEVATOR ELEVATOR
ELEVATOR
WAITING RM
INTAKE
EXAM RM/
INTAKE
EXAM RM/
INTAKE
EXAM RM/
CORRIDOR
CORRIDOR
CORRIDOR
TOILET
CORRIDORCORRIDOR
CORRIDOR
CORRIDOR
PAIN CLINIC
PAIN CLINIC PAIN CLINIC
PAIN CLINIC
PAIN CLINIC
TOILET
TOILET
TOILET
TOILETTOILET
ISOLATION BED ISOLATION BED
KEEPING
TOILET
REST RM
TOILET TOILET
STAFF
TOILET/LOCKER
TOILET/LOCKER
STAFF
REST RM
REST RM
TOILET
STAFF TOILET
/LOCKER
EXAM RM/ EXAM RM/ EXAM RM/
INTAKEINTAKEINTAKEINTAKE
RM
DUMB WAITER
RM
3-BED PATIENT
RM
3-BED PATIENT
DUMB WAITER
IRM
10-BED3-BED
PATIENT RM
2-BED
PATIENT RM
2-BED
STORAGE
UP
ICU SUITE
7030 SF
7030/240= 30 OCC
SMOKE ZONE 4N
8,141 SF GROSS
8141/24…
This is the start of the file's text. The full file is on GovTribe.