Attachment E - QASP Summary Report Template.pdf

PDF 281 KB Posted

Attached to
Q999--National Dialysis Services Contract (NDSC) Draft RFP
Solicitation number
36C10G25Q0021
Issued by

About this file

This is a Quality Assurance Surveillance Plan (QASP) Summary Report template for the Department of Veterans Affairs National Dialysis Services Contract (NDSC). The template is designed to document contractor performance against established metrics and includes sections for contract information, contract summary, QASP metrics reporting, risks and issues summary, and corrective actions/improvements.

The template requires contractors to provide detailed performance data, including network accreditation compliance (with a 98% performance threshold), along with other QASP elements to be inserted. It includes space for documenting contract details like the contractor's name, contract number, period of performance, and completion percentage. The report requires a high-level narrative of work status (limited to two paragraphs), risk assessments with probability and impact scores, and documentation of corrective actions taken to address previously identified issues. This is strictly a reporting template that outlines the format and structure for contractors to submit performance data - it does not contain actual performance information or specific requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Department of Veterans Affairs Integrated Veteran Care

Veterans’ Health Administration

National Dialysis Services Contract (NDSC)

QASP Summary Report

[INSERT CONTRACTOR NAME]

[INSERT REPORTING PERIOD (Ex. “July 2016”)]

CONTRACT INFORMATION

Contractor Name: [INSERT CONTRACTOR NAME]

Contract #: [INSERT CONTRACT NUMBER]

Contracting Officer’s Representative: [INSERT COR NAME]

Contractor’s Project Leader: [INSERT CONTRACTOR’S PL NAME]

Contract Period of Performance: [INSERT POP]

Elapsed Period of Performance: [INSERT PERCENTAGE COMPLETE (ex. Month 6 in a 12-month POP would read, “50%.” Month 8 = “75%”]

CONTRACT SUMMARY

In this section, the Contractor shall place a high-level summary narrative of the status of the work that is being performed, to include Optional CLINs. This section should contain no more than two (2) paragraphs. The narrative can be used for multiple submissions of the report unless there are material changes to the Contractor’s scope and/or contract modification

QASP SUMMARY REPORT

This section shall document the Contractor’s performance against the performance metrics identified in the QASP during the reporting period. The template below may be used:

PWS

Paragraph

Standards /

AQL

Frequency Performanc e Threshold

Actual Performance

Variance from Threshold

2.7:

Network Accreditatio n

Contractor shall maintain accreditation for the provider network or health network

Continuous with an Annual Review of accreditation and credentialing certificate (at a minimum)

98% compliance at any given time

[INSERT

ACTUAL

PERFORMA

NCE

THRESHOLD

; ex., “95%”]

[INSERT DIFFERENCE

OF ACTUAL

PERFORMANCE

THRESHOLD AND

PERFORMANCE

THRESHOLD. Ex. 95%- 98%. Field should report, “-3.”]

[INSERT

NEXT

QASP

ELEMENT]

[INSERT NEXT

QASP

ELEMENT]

[INSERT

NEXT QASP

ELEMENT]

[INSERT

NEXT

QASP

ELEMENT]

[INSERT

NEXT QASP

ELEMENT]

[INSERT NEXT QASP

ELEMENT]

RISKS AND ISSUES SUMMARY

The Contractor shall detail the risks and issues associated with their work during the reporting period.

This section includes the Risk Register, risk scores, probability, impact, and responses. The narrative shall also describe measures to either minimize or eliminate the potential impact on the Customer Service metrics.

CORRECTIVE ACTIONS AND IMPROVEMENTS

The Contractor shall list the corrective actions and improvements that were executed during the reporting period. The narrative shall map the corrective actions to issues that were identified in previous risk reports. The narrative shall also denote how the improvement yields a better outcome for the affected aspect of their solution or to VA communicable outcomes.