ATTACHMENT E-Fillable-PERSONNEL COST BREAKDOWN-UPDATED101326.pdf
PDF 98 KB Posted
- Attached to
- 002-FY27 - CMAR - ALTAVISTA COMBINED SCHOOL RFP
- Solicitation number
- CMR-128999
- Issued by
- Caroline County, Virginia
About this file
This is a Personnel Cost Breakdown form for the Altavista Combined Schools Renovation Project, a Construction Manager At-Risk (CMAR) delivery project for Campbell County Public Schools in Virginia. The form requires proposers to provide detailed labor cost estimates for project personnel across multiple classifications, including three mandatory full-time positions: Senior Project Manager, Project Manager, and Field Superintendent. Additional positions to be costed include Assistant Project Manager, Assistant Superintendent, Foreman, Project Engineers (A/S/C and M/E/P), Field Secretary/Clerk, Clerk/Document Control Person, BIM Manager, Quality Control Manager, and Commissioning Coordinator. Proposers must calculate total estimated hours based on a standard 2,080-hour annual work year, apply hourly rates for each position, and provide not-to-exceed costs. The form includes a provision requiring proposers to identify alternative positions that will assume duties if any listed position remains unfilled, and designates that the Construction Manager must assign personnel capable of accessing and reviewing BIM models from the Architect/Engineer to coordinate with subcontractors.
The form establishes that total proposed hours must meet or exceed minimum technical evaluation thresholds specified elsewhere in the solicitation documents. All cost information is structured to support the evaluation of labor pricing and resource allocation for pre-construction and construction phases of the project. No specific funding amounts, budget constraints, or pricing restrictions are indicated in this attachment, allowing proposers flexibility in hourly rate development subject to reasonableness review during evaluation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROPOSER'S NAME:
POSITION
ESTIMATED TOTAL HOURS
(based on 2080 hours/year)
HOURLY
RATE
TOTAL
NOT-TO-EXCEED
COST
Senior Project Manager (must be full-time) Project Manager (must be full-time) Field Superintendent (must be full-time)
Assistant Project Manager
Assistant Superintendent
Foreman
Project Engineer (A/S/C)
Project Engineer (M/E/P)
Field Secretary/Clerk
Clerk/Document Control Person
BIM Manager* N/A
Quality Control Manager
Commissioning Coordinator
Totals:
* CM must designate someone who can access BIM models from the A/E to review and coordinate work with CM's subcontractors
If any of the positions noted below will not be filled by the Proposer, the Proposer is to note in the space provided what position will be handling the duties associated with the unfilled position.
ATTACHMENT E
GENERAL CONDITIONS PERSONNEL COST BREAKDOWN
PLEASE NOTE:
Total Hours must at a minimum match those provided for technical evaluation.
| Proposer's Name: |
| Sr: |
| Project Manager: |
| Project Manager-HOURLY RATE: |
| Project Manager-TOTAL NTE COST: |
| Field Superintendent: |
| Assistant Project Manager: |
| Asst Superintendent: |
| Foreman: |
| Project Engineer ASC: |
| Project Engineer MEP: |
| Field SecretaryClerk: |
| ClerkDocument Control Person: |
| Commissioning Coordinator: |
| Totals: |
| Asst Superintendent-HOURLY RATE: |
| Foreman-HOURLY RATE: |
| Project Engineer ASC-HOURLY RATE: |
| Field SecretaryClerk-HOURLY RATE: |
| ClerkDocument Control Person-HOURLY RATE: |
| Quality Control Manager-HOURLY RATE: |
| Commissioning Coordinator-HOURLY RATE: |
| Field Superintendent-TOTAL NTE COST: |
| Assistant Project Manager-TOTAL NTE COST: |
| Asst Superintendent-TOTAL NTE COST: |
| Foreman-TOTAL NTE COST: |
| Project Engineer ASC-TOTAL NTE COST: |
| Project Engineer MEP-TOTAL NTE COST: |
| Field SecretaryClerk-TOTAL NTE COST: |
| ClerkDocument Control Person-TOTAL NTE COST: |
| Quality Control Manager-TOTAL NTE COST: |
| Project Manager-HOURLY RATE: |
| Project Manager-TOTAL NTE COST: |
| Assistant Project Manager-HOURLY RATE: |
| Project Manager: |
| Quality Control Manager: |
| Project Engineer MEP-HOURLY RATE: |
| Field Superintendent-HOURLY RATE: |
File details come from the government source that posted it. Updated .