ATTACHMENT E - Experience Information Sheet.pdf
PDF 789 KB Posted
- Solicitation number
- 36C24821R0191
About this file
This solicitation is seeking proposals for design-build services for a site preparation project at a Department of Veterans Affairs medical facility. The solicitation requests proposals to provide all design and construction services for site preparation at the Lake Baldwin VA Outpatient Clinic in Orlando, Florida, with a period of performance of 270 calendar days from notice to proceed. The project budget is between $500,000 and $1,000,000. The solicitation is set aside exclusively for verified Service-Disabled Veteran-Owned Small Businesses and uses NAICS code 236220 with a small business size standard of $39.5 million. Proposals will be evaluated using a two-phase design-build source selection process and best value determination. Interested firms must be registered in the System for Award Management and VetBiz databases by the time of proposal submission.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Bldg 500 Low Bay AHUs.pdf | ||
| PHASE ONE-RFIs Tracking Log 11.24.2021.pdf | ||
| Lake Baldwin Asbestos Survey Bldg 500 pictures only.pdf | ||
| 36C24821R0191 0002.docx | DOCX document | |
| Lake Baldwin Asbestos Survey Bldg 500.pdf | ||
| AMENDMENT 36C24821R0191 0001.docx | DOCX document | |
| ATTACHMENT C - Contract Progress Schedule.docx | DOCX document | |
| 36C24821R0191_1.docx | DOCX document | |
| SOLICITATION 36C24821R0191.pdf | ||
| ATTACHMENT B - DBA WD FL20210218 10.01.2021.pdf | ||
| ATTACHMENT A - Lake Baldwin MRI Site Reference Drawings.pdf | ||
| ATTACHMENT D - EMR.pdf | ||
| ATTACHMENT F - Past Performance Questionnaire.docx | DOCX document |
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EXPERIENCE INFORMATION SHEET
PROJECT NO. [ ] Page 1
a. Contractor Information of awarded contract (Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)
b. Contract and/or Task Order Number and Award Date (mm/dd/yyyy)
c. Project Title/Name and Location
d. Work Performed as: Prime Contractor, Subcontractor, Joint Venture, Other (explain)
e. Percent (%) of project work performed by your company
f. If you work as subcontractor, who was the prime?
(Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)
g. Government Agency/Company which awarded contract to offeror, and Contact Information, such Contracting Officer/Procurement Official/Point of Contract (Name, Title, Email, Phone Number).
ATTACHMENT E {3 PAGES}
PROJECT NO. [ ] Page 2
h. Description of project’s scope of work and the offeror’s specific roles and responsibilities in the project:
Describe work performed in sufficient detail to permit evaluation of project relevancy to this procurement. Detail how work performed is relevant to the effort required by the solicitation? Use continuation sheet for additional information, if necessary
ATTACHMENT F {3 PAGES}
PROJECT NO. [ ] Page 3
i. Describe any difficulties and/or obstacles encountered during performance; steps taken toward resolution
j. Describe unforeseen conditions and how each were resolved
k. Performance Period, including contract start date (mm/dd/yyyy), and original completion date, if not completed, projected date (mm/dd/yyyy) contract start date: original completion date, if not completed, projected completion date (mm/dd/yyyy)
l. Actual Completion Date (mm/dd/yyyy), and if not completed, why?
Actual Completion Date:
If not completed, Why?
m. Project is 50% or more complete? YES [ ] No [ ]. If “No” explain percentage of completion, if not 50% completed for any reason, rating may be lower.
n. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.
o. Original Contract Price (Award Amount), Final Contract Price (to include all modifications, if applicable), Explain Differences.
Original Contract Price: Final Contract Price:
Explain Differences:
ATTACHMENT F {3 PAGES}
File details come from the government source that posted it. Updated .