Attachment E - Cost Price Excel Example Workbook.xlsx

XLSX spreadsheet 3 MB Posted

Attached to
Maritime Workforce and Industrial Base
Solicitation number
47QFCA23S0002
Issued by

About this file

This document contains a cost template and guidance for responding to a federal contract solicitation. The solicitation from the General Services Administration seeks proposals to support the maritime workforce and industrial base. Offerors must submit pricing for various contract line item numbers, including cost reimbursement labor, travel, and other direct costs across multiple periods. Proposed indirect rates and escalation rates by fiscal year must be included. Templates require key personnel labor rates and categorization of prime and subcontractor labor. Subcontracting plans need a breakdown by task. The guidance details the level of cost breakdown and supporting documentation required from offerors in their response.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Total Price Summary

Total Price Summary
Company Name:
CLINCLIN TypeDescriptionAmount
BASE Period
0001CPFFLabor - Tasks 1-7$ - 0
0002NTELong-Distance Travel$ - 0
0003NTEODCs$ - 0
0004 (non-severable)CPFFLabor - Tasks 1-7$ - 0
0005 (non-severable)NTELong-Distance Travel$ - 0
0006 (non-severable)NTEODCs$ - 0
Total Base Period$ - 0
Option Period One
1001CPFFLabor - Tasks 1-7$ - 0
1002NTELong-Distance Travel$ - 0
1003NTEODCs$ - 0
Total Option Period One$ - 0
Option Period Two
2001CPFFLabor - Tasks 1-7$ - 0
2002NTELong-Distance Travel$ - 0
2003NTEODCs$ - 0
Total Option Period Two$ - 0
Option Period Three
3001CPFFLabor - Tasks 1-7$ - 0
3002NTELong-Distance Travel$ - 0
3003NTEODCs$ - 0
Total Option Period Three$ - 0
Option Period Four
4001CPFFLabor - Tasks 1-7$ - 0
4002NTELong-Distance Travel$ - 0
4003NTEODCs$ - 0
Total Option Period Four$ - 0
CLIN TOTALSCPFFLabor - Tasks 1-7$ - 0
NTELong-Distance Travel$ - 0
NTEODCs$ - 0
GRAND TOTAL$ - 0

Direct Labor Summary

Direct Labor Rate Summary
Company Name:
KEY PERSONNEL
TaskIndividuals NameKey Postion as Indentified in Section H.3 of the RFPLabor Category IdentifierCorporate Labor CategoryBase Year: Proposed Unburdened Direct Labor Rate ($)
Applicable Task number or numbers 1,2,3, Etc..e.g. Contract Program ManagerIf possible please provide the internal identifier number, job code etc.. that a DCAA audit or cognizant agency uses to identify an individual labor rates if a rate recommendation or forward price rate agreement is established. This information will assist the Evaluator in mapping labor rates - OR - identify that the rate is based on actual salarye.g. SME - Manager Group 1
ALL Other Labor Rates (Non-Key)
TaskIndividuals Name if applicableLabor Category IdentifierCorporate Labor CategoryBase Year: Proposed Unburdened Direct Labor Rate ($)
Applicable Task number or numbers 1,2,3, Etc..If possible please provide the internal identifier number, job code etc.. that a DCAA audit or cognizant agency uses to identify an individual labor rates if a rate recommendation or forward price rate agreement is established. This information will assist the Evaluator in mapping labor rates - OR - identify that the rate is based on actual salarye.g. SME - Manager Group 1

Escalation Rate Summary

Escalation Rate Summary
Company Name:
Base PeriodOption Period OneOption Period TwoOption Period ThirdOption Period Four
%%%%%

Indirect Cost Summary

Indirect Cost Summary
Company Name:
Proposed Indirect Rates (%)Proposed Indirect Rates (%)Proposed Indirect Rates (%)Proposed Indirect Rates (%)Proposed Indirect Rates (%)
Cost Center/Pool ID: XIndirect Cost CategoryFiscal Year 2022Fiscal Year 2023Fiscal Year 2024Fiscal Year 2025Fiscal Year 2026
Pool NameFringe
Overhead
Associated Tasks:General & Administrative
(e.g. 1, 4, 5)Material Handling
Others

Indirect Handling Rates Cost Reimbursement (CR) CLINs Costs incurred may be burdened with the contractor’s indirect/material handling rate in accordance with RFP Section B.4 All costs shall be fully supported by the narrative in the Cost/Price Supporting Documentation.

CLINDescriptionBase PeriodFirst Option PeriodSecond Option PeriodThird Option PeriodFourth Option Period
X002, 0005CR Long-Distance Travel[insert rate %][insert rate %][insert rate %][insert rate %][insert rate %]
X003, 0006CR ODCs[insert rate %][insert rate %][insert rate %][insert rate %][insert rate %]

Labor Hour Summary

Labor Hour Summary
Company Name:
CLIN TypeNumber of Hours
Base Period
CLIN 0001 Task 1CPFF
CLIN 0001 Task 2CPFF
CLIN 0001 Task 3CPFF
CLIN 0001 Task 4CPFF
CLIN 0001 Task 5CPFF
CLIN 0001 Task 6CPFF
CLIN 0001 Task 7CPFF

Base Period Total Hours 0

Option Period One
CLIN 1001 Task 1CPFF
CLIN 1001 Task 2CPFF
CLIN 1001 Task 3CPFF
CLIN 1001 Task 4CPFF
CLIN 1001 Task 5CPFF
CLIN 1001 Task 6CPFF
CLIN 1001 Task 7CPFF

Option Period One Total Hours 0

Option Period Two
CLIN 2001 Task 1CPFF
CLIN 2001 Task 2CPFF
CLIN 2001 Task 3CPFF
CLIN 2001 Task 4CPFF
CLIN 2001 Task 5CPFF
CLIN 2001 Task 6CPFF
CLIN 2001 Task 7CPFF

Option Period Two Total Hours 0

Option Period Three
CLIN 3001 Task 1CPFF
CLIN 3001 Task 2CPFF
CLIN 3001 Task 3CPFF
CLIN 3001 Task 4CPFF
CLIN 3001 Task 5CPFF
CLIN 3001 Task 6CPFF
CLIN 3001 Task 7CPFF

Option Period Three Total Hours 0

Option Period Four
CLIN 4001 Task 1CPFF
CLIN 4001 Task 2CPFF
CLIN 4001 Task 3CPFF
CLIN 4001 Task 4CPFF
CLIN 4001 Task 5CPFF
CLIN 4001 Task 6CPFF
CLIN 4001 Task 7CPFF

Option Period Four Total Hours 0

Non-Severable CLINs
CLIN 0004 Task 1CPFF
CLIN 0004 Task 2CPFF
CLIN 0004 Task 3CPFF
CLIN 0004 Task 4CPFF
CLIN 0004 Task 5CPFF
CLIN 0004 Task 6CPFF
CLIN 0004 Task 7CPFF

Non-Severable Total Hours 0

Total Hours N/A 0

Subcontracts Summary

Subcontracts Summary
Company Name:

Subcontractor Small Business (SB) Concern Category if SB (i.e SB, WOSB etc.) Subcontract Type (e.g. T&M, CPFF etc..) Estimated Value ($) Estimated Value (%) (of Total Labor Costs)

TOTAL $ - 0 0%

Elements of Cost Summary

Elements of Cost
Company Name:
SUPPLIES OR SERVICES AND PRICES/COSTS

In accordance with RFP Section L.4.3.3, provide a summary total for each element of cost (e.g., direct labor, overhead, fringe, General and Administrative (G&A), Facilities Capital Cost of Money (FCCM), fee, etc.).

CLINDirect Labor DollarsLabor OverheadSubcontract DollarsCost for Travel, Tools, ODCsMaterial HandlingG&AFringeFCCMTotal CostFeeTotal Price
0001$ - 0
0002$ - 0
0003$ - 0
0004$ - 0
0005$ - 0
0006$ - 0
1001$ - 0
1002$ - 0
1003$ - 0
2001$ - 0
2002$ - 0
2003$ - 0
3001$ - 0
3002$ - 0
3003$ - 0
4001$ - 0
4002$ - 0
4003$ - 0
Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0

SUBCONTRACTOR SUPPORTING DOCUMENTATION

In accordance with RFP Section L.4.3.3, provide the proposed contract type of each subcontract, the total value of each proposed subcontract, as well as a breakdown of the total cost by task.

(Subcontractor Name)(Subcontractor Name)(Subcontractor Name)(Subcontractor Name)(Subcontractor Name)(Subcontractor Name)(Subcontractor Name)
(Proposed Contract Type)(Proposed Contract Type)(Proposed Contract Type)(Proposed Contract Type)(Proposed Contract Type)(Proposed Contract Type)(Proposed Contract Type)
BASE PERIODTotal Price
TASK 1$ - 0
TASK 2$ - 0
TASK 3$ - 0
TASK 4$ - 0
TASK 5$ - 0
TASK 6$ - 0
TASK 7$ - 0
Base Period Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
FIRST OPTION PERIOD
TASK 1$ - 0
TASK 2$ - 0
TASK 3$ - 0
TASK 4$ - 0
TASK 5$ - 0
TASK 6$ - 0
TASK 7$ - 0
First Option Period Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
SECOND OPTION PERIOD
TASK 1$ - 0
TASK 2$ - 0
TASK 3$ - 0
TASK 4$ - 0
TASK 5$ - 0
TASK 6$ - 0
TASK 7$ - 0
Second Option Period Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
THIRD OPTION PERIOD
TASK 1$ - 0
TASK 2$ - 0
TASK 3$ - 0
TASK 4$ - 0
TASK 5$ - 0
TASK 6$ - 0
TASK 7$ - 0
Third Option Period Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
FOURTH OPTION PERIOD
TASK 1$ - 0
TASK 2$ - 0
TASK 3$ - 0
TASK 4$ - 0
TASK 5$ - 0
TASK 6$ - 0
TASK 7$ - 0
Fourth Option Period Total$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
TOTAL PROPOSED SUBCONTRACT VALUE$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0$ - 0
% OF TOTAL CONTRACT VALUEERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!ERROR:#DIV/0!

CLIN 0001 SUMMARY

Labor CLIN 0001 Summary
Base Period
ABCDE
Task AreaTotal hoursTotal Estimated CostFixed Fee AmountTotal Estimated

Cost-Plus-Fixed-Fee

(CPFF)

1 Insert total hours per task area for labor. Insert proposed total estimated cost per task area for labor. Insert proposed total Fixed Fee Amount. Insert proposed total estimated CPFF for labor.

(Sum of Columns C and D)

2$ - 0
3$ - 0
4$ - 0
5$ - 0
6$ - 0
7$ - 0
Labor Total:0$ - 0$ - 0$ - 0

Number of hours in a Man-Year:

CLIN 0001 - TASK 1

CLIN 0001 - Direct Labor (Task 1)
Base Period
ABCDEFGHIJKLMN
Task/ SubtaskLabor Category Description and Level (I, II, III, etc.)Key PersonnelPrime Contractor or Subcontractor?Applicable Indirect
Rate Cost CenterProposed Direct
Labor RateRate Buildup (Direct Labor plus all applicable loads)Proposed Fully Burdened Labor RateTotal hours for Task XExtended ValueFixed Fee Percentage (%)Fixed Fee
Amount ($)Total Estimated CostNotes
Insert the Task/ SubtaskInsert applicable labor categories and level below.Indicate whether this is a Key Personnel.
(Yes/No)Insert the name of the company this individual works for.Insert the applicable indirect rate cost center.Insert the proposed direct labor rate.The offeror shall insert new columns as appropriate to completely show all applicable loads and the cost buildup. The offeror shall ensure all loads are clearly labeled. It shall be clear how the offeror progressed from the Proposed Direct Labor Rate to the Proposed Fully Burdened Rate.Insert the proposed fully burdened labor rate.Insert total hours.ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Insert additional rows as necessaryTotal hours for Task X, Total Extended Value for Task X, Fixed Fee, and Total Estimated Cost:Insert Total HoursInsert Total Extended ValueInsert Fixed Fee PercentageInsert Fixed Fee Amount for this Task AreaInsert Total Extended Value plus Fixed Fee Amount for this Task Area

CLIN 0001 - TASK 2

CLIN 0001 - Direct Labor (Task 2)
Base Period
ABCDEFGHIJKLMN
Task/ SubtaskLabor Category Description and Level (I, II, III, etc.)Key PersonnelPrime Contractor or Subcontractor?Applicable Indirect
Rate Cost CenterProposed Direct
Labor RateRate Buildup (Direct Labor plus all applicable loads)Proposed Fully Burdened Labor RateTotal hours for Task XExtended ValueFixed Fee Percentage (%)Fixed Fee
Amount ($)Total Estimated CostNotes
Insert the Task/ SubtaskInsert applicable labor categories and level below.Indicate whether this is a Key Personnel.
(Yes/No)Insert the name of the company this individual works for.Insert the applicable indirect rate cost center.Insert the proposed direct labor rate.The offeror shall insert new columns as appropriate to completely show all applicable loads and the cost buildup. The offeror shall ensure all loads are clearly labeled. It shall be clear how the offeror progressed from the Proposed Direct Labor Rate to the Proposed Fully Burdened Rate.Insert the proposed fully burdened labor rate.Insert total hours.ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Insert additional rows as necessaryTotal hours for Task X, Total Extended Value for Task X, Fixed Fee, and Total Estimated Cost:Insert Total HoursInsert Total Extended ValueInsert Fixed Fee PercentageInsert Fixed Fee Amount for this Task AreaInsert Total Extended Value plus Fixed Fee Amount for this Task Area

CLIN 0001 - TASK 3

CLIN 0001 - Direct Labor (Task 3)
Base Period
ABCDEFGHIJKLMN
Task/ SubtaskLabor Category Description and Level (I, II, III, etc.)Key PersonnelPrime Contractor or Subcontractor?Applicable Indirect
Rate Cost CenterProposed Direct
Labor RateRate Buildup (Direct Labor plus all applicable loads)Proposed Fully Burdened Labor RateTotal hours for Task XExtended ValueFixed Fee Percentage (%)Fixed Fee
Amount ($)Total Estimated CostNotes
Insert the Task/ SubtaskInsert applicable labor categories and level below.Indicate whether this is a Key Personnel.
(Yes/No)Insert the name of the company this individual works for.Insert the applicable indirect rate cost center.Insert the proposed direct labor rate.The offeror shall insert new columns as appropriate to completely show all applicable loads and the cost buildup. The offeror shall ensure all loads are clearly labeled. It shall be clear how the offeror progressed from the Proposed Direct Labor Rate to the Proposed Fully Burdened Rate.Insert the proposed fully burdened labor rate.Insert total hours.ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Insert additional rows as necessaryTotal hours for Task X, Total Extended Value for Task X, Fixed Fee, and Total Estimated Cost:Insert Total HoursInsert Total Extended ValueInsert Fixed Fee PercentageInsert Fixed Fee Amount for this Task AreaInsert Total Extended Value plus Fixed Fee Amount for this Task Area

CLIN 0001 - TASK 4

CLIN 0001 - Direct Labor (Task 4)
Base Period
ABCDEFGHIJKLMN
Task/ SubtaskLabor Category Description and Level (I, II, III, etc.)Key PersonnelPrime Contractor or Subcontractor?Applicable Indirect
Rate Cost CenterProposed Direct
Labor RateRate Buildup (Direct Labor plus all applicable loads)Proposed Fully Burdened Labor RateTotal hours for Task XExtended ValueFixed Fee Percentage (%)Fixed Fee
Amount ($)Total Estimated CostNotes
Insert the Task/ SubtaskInsert applicable labor categories and level below.Indicate whether this is a Key Personnel.
(Yes/No)Insert the name of the company this individual works for.Insert the applicable indirect rate cost center.Insert the proposed direct labor rate.The offeror shall insert new columns as appropriate to completely show all applicable loads and the cost buildup. The offeror shall ensure all loads are clearly labeled. It shall be clear how the offeror progressed from the Proposed Direct Labor Rate to the Proposed Fully Burdened Rate.Insert the proposed fully burdened labor rate.Insert total hours.ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Insert additional rows as necessaryTotal hours for Task X, Total Extended Value for Task X, Fixed Fee, and Total Estimated Cost:Insert Total HoursInsert Total Extended ValueInsert Fixed Fee PercentageInsert Fixed Fee Amount for this Task AreaInsert Total Extended Value plus Fixed Fee Amount for this Task Area

CLIN 0001 - TASK 5

CLIN 0001 - Direct Labor (Task 5)
Base Period
ABCDEFGHIJKLMN
Task/ SubtaskLabor Category Description and Level (I, II, III, etc.)Key PersonnelPrime Contractor or Subcontractor?Applicable Indirect
Rate Cost CenterProposed Direct
Labor RateRate Buildup (Direct Labor plus all applicable loads)Proposed Fully Burdened Labor RateTotal hours for Task XExtended ValueFixed Fee Percentage (%)Fixed Fee
Amount ($)Total Estimated CostNotes
Insert the Task/ SubtaskInsert applicable labor categories and level below.Indicate whether this is a Key Personnel.
(Yes/No)Insert the name of the company this individual works for.Insert the applicable indirect rate cost center.Insert the proposed direct labor rate.The offeror shall insert new columns as appropriate to completely show all applicable loads and the cost buildup. The offeror shall ensure all loads are clearly labeled. It shall be clear how the offeror progressed from the Proposed Direct Labor Rate to the Proposed Fully Burdened Rate.Insert the proposed fully burdened labor rate.Insert total hours.ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Insert additional rows as necessaryTotal hours for Task X, Total Extended Value for Task X, Fixed Fee, and Total Estimated Cost:Insert Total HoursInsert Total Extended ValueInsert Fixed Fee PercentageInsert Fixed Fee Amount for this Task AreaInsert Total Extended Value plus Fixed Fee Amount for this Task Area

CLIN 0001 - TASK 6

CLIN 0001 - Direct Labor (Task 6)
Base Period
ABCDEFGHIJKLMN
Task/ SubtaskLabor Category Description and Level (I, II, III, etc.)Key PersonnelPrime Contractor or Subcontractor?Applicable Indirect
Rate Cost CenterProposed Direct
Labor RateRate Buildup (Direct Labor plus all applicable loads)Proposed Fully Burdened Labor RateTotal hours for Task XExtended ValueFixed Fee Percentage (%)Fixed Fee
Amount ($)Total Estimated CostNotes
Insert the Task/ SubtaskInsert applicable labor categories and level below.Indicate whether this is a Key Personnel.
(Yes/No)Insert the name of the company this individual works for.Insert the applicable indirect rate cost center.Insert the proposed direct labor rate.The offeror shall insert new columns as appropriate to completely show all applicable loads and the cost buildup. The offeror shall ensure all loads are clearly labeled. It shall be clear how the offeror progressed from the Proposed Direct Labor Rate to the Proposed Fully Burdened Rate.Insert the proposed fully burdened labor rate.Insert total hours.ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Insert additional rows as necessaryTotal hours for Task X, Total Extended Value for Task X, Fixed Fee, and Total Estimated Cost:Insert Total HoursInsert Total Extended ValueInsert Fixed Fee PercentageInsert Fixed Fee Amount for this Task AreaInsert Total Extended Value plus Fixed Fee Amount for this Task Area

CLIN 0001 - TASK 7

CLIN 0001 - Direct Labor (Task 7)
Base Period
ABCDEFGHIJKLMN
Task/ SubtaskLabor Category Description and Level (I, II, III, etc.)Key PersonnelPrime Contractor or Subcontractor?Applicable Indirect
Rate Cost CenterProposed Direct
Labor RateRate Buildup (Direct Labor plus all applicable loads)Proposed Fully Burdened Labor RateTotal hours for Task XExtended ValueFixed Fee Percentage (%)Fixed Fee
Amount ($)Total Estimated CostNotes
Insert the Task/ SubtaskInsert applicable labor categories and level below.Indicate whether this is a Key Personnel.
(Yes/No)Insert the name of the company this individual works for.Insert the applicable indirect rate cost center.Insert the proposed direct labor rate.The offeror shall insert new columns as appropriate to completely show all applicable loads and the cost buildup. The offeror shall ensure all loads are clearly labeled. It shall be clear how the offeror progressed from the Proposed Direct Labor Rate to the Proposed Fully Burdened Rate.Insert the proposed fully burdened labor rate.Insert total hours.ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Insert additional rows as necessaryTotal hours for Task X, Total Extended Value for Task X, Fixed Fee, and Total Estimated Cost:Insert Total HoursInsert Total Extended ValueInsert Fixed Fee PercentageInsert Fixed Fee Amount for this Task AreaInsert Total Extended Value plus Fixed Fee Amount for this Task Area

CLIN 0004 Summary

Labor CLIN 0004 Summary
Non-Severable CLIN
ABCDE
Task AreaTotal hoursTotal Estimated CostFixed Fee AmountTotal Estimated

Cost-Plus-Fixed-Fee

(CPFF)

1 Insert total hours per task area for labor. Insert proposed total estimated cost per task area for labor. Insert proposed total Fixed Fee Amount. Insert proposed total estimated CPFF for labor.

(Sum of Columns C and D)

2$ - 0
3$ - 0
4$ - 0
5$ - 0
6$ - 0
7$ - 0
Labor Total:0$ - 0$ - 0$ - 0

Number of hours in a Man-Year:

CLIN 1001 SUMMARY

Labor CLIN 1001 Summary
First Option Period
ABCDE
Task AreaTotal hoursTotal Estimated CostFixed Fee AmountTotal Estimated

Cost-Plus-Fixed-Fee

(CPFF)

1 Insert total hours per task area for labor. Insert proposed total estimated cost per task area for labor. Insert proposed total Fixed Fee Amount. Insert proposed total estimated CPFF for labor.

(Sum of Columns C and D)

2$ - 0
3$ - 0
4$ - 0
5$ - 0
6$ - 0
7$ - 0
Labor Total:0$ - 0$ - 0$ - 0

Number of hours in a Man-Year:

CLIN 1001 - TASK 1

CLIN 1001 - Direct Labor (Task 1)
First Option Period
ABCDEFGHIJKLMN
Task/ SubtaskLabor Category Description and Level (I, II, III, etc.)Key PersonnelPrime Contractor or Subcontractor?Applicable Indirect
Rate Cost CenterProposed Direct
Labor RateRate Buildup (Direct Labor plus all applicable loads)Proposed Fully Burdened Labor RateTotal hours for Task XExtended ValueFixed Fee Percentage (%)Fixed Fee
Amount ($)Total Estimated CostNotes
Insert the Task/ SubtaskInsert applicable labor categories and level below.Indicate whether this is a Key Personnel.
(Yes/No)Insert the name of the company this individual works for.Insert the applicable indirect rate cost center.Insert the proposed direct labor rate.The offeror shall insert new columns as appropriate to completely show all applicable loads and the cost buildup. The offeror shall ensure all loads are clearly labeled. It shall be clear how the offeror progressed from the Proposed Direct Labor Rate to the Proposed Fully Burdened Rate.Insert the proposed fully burdened labor rate.Insert total hours.ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Insert additional rows as necessaryTotal hours for Task X, Total Extended Value for Task X, Fixed Fee, and Total Estimated Cost:Insert Total HoursInsert Total Extended ValueInsert Fixed Fee PercentageInsert Fixed Fee Amount for this Task AreaInsert Total Extended Value plus Fixed Fee Amount for this Task Area

CLIN 1001 - TASK 2

CLIN 1001 - Direct Labor (Task 2)
First Option Period
ABCDEFGHIJKLMN
Task/ SubtaskLabor Category Description and Level (I, II, III, etc.)Key PersonnelPrime Contractor or Subcontractor?Applicable Indirect
Rate Cost CenterProposed Direct
Labor RateRate Buildup (Direct Labor plus all applicable loads)Proposed Fully Burdened Labor RateTotal hours for Task XExtended ValueFixed Fee Percentage (%)Fixed Fee
Amount ($)Total Estimated CostNotes
Insert the Task/ SubtaskInsert applicable labor categories and level below.Indicate whether this is a Key Personnel.
(Yes/No)Insert the name of the company this individual works for.Insert the applicable indirect rate cost center.Insert the proposed direct labor rate.The offeror shall insert new columns as appropriate to completely show all applicable loads and the cost buildup. The offeror shall ensure all loads are clearly labeled. It shall be clear how the offeror progressed from the Proposed Direct Labor Rate to the Proposed Fully Burdened Rate.Insert the proposed fully burdened labor rate.Insert total hours.ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Insert additional rows as necessaryTotal hours for Task X, Total Extended Value for Task X, Fixed Fee, and Total Estimated Cost:Insert Total HoursInsert Total Extended ValueInsert Fixed Fee PercentageInsert Fixed Fee Amount for this Task AreaInsert Total Extended Value plus Fixed Fee Amount for this Task Area

CLIN 1001 - TASK 3

CLIN 1001 - Direct Labor (Task 3)
First Option Period
ABCDEFGHIJKLMN
Task/ SubtaskLabor Category Description and Level (I, II, III, etc.)Key PersonnelPrime Contractor or Subcontractor?Applicable Indirect
Rate Cost CenterProposed Direct
Labor RateRate Buildup (Direct Labor plus all applicable loads)Proposed Fully Burdened Labor RateTotal hours for Task XExtended ValueFixed Fee Percentage (%)Fixed Fee
Amount ($)Total Estimated CostNotes
Insert the Task/ SubtaskInsert applicable labor categories and level below.Indicate whether this is a Key Personnel.
(Yes/No)Insert the name of the company this individual works for.Insert the applicable indirect rate cost center.Insert the proposed direct labor rate.The offeror shall insert new columns as appropriate to completely show all applicable loads and the cost buildup. The offeror shall ensure all loads are clearly labeled. It shall be clear how the offeror progressed from the Proposed Direct Labor Rate to the Proposed Fully Burdened Rate.Insert the proposed fully burdened labor rate.Insert total hours.ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Insert additional rows as necessaryTotal hours for Task X, Total Extended Value for Task X, Fixed Fee, and Total Estimated Cost:Insert Total HoursInsert Total Extended ValueInsert Fixed Fee PercentageInsert Fixed Fee Amount for this Task AreaInsert Total Extended Value plus Fixed Fee Amount for this Task Area

CLIN 1001 - TASK 4

CLIN 1001 - Direct Labor (Task 4)
First Option Period
ABCDEFGHIJKLMN
Task/ SubtaskLabor Category Description and Level (I, II, III, etc.)Key PersonnelPrime Contractor or Subcontractor?Applicable Indirect
Rate Cost CenterProposed Direct
Labor RateRate Buildup (Direct Labor plus all applicable loads)Proposed Fully Burdened Labor RateTotal hours for Task XExtended ValueFixed Fee Percentage (%)Fixed Fee
Amount ($)Total Estimated CostNotes
Insert the Task/ SubtaskInsert applicable labor categories and level below.Indicate whether this is a Key Personnel.
(Yes/No)Insert the name of the company this individual works for.Insert the applicable indirect rate cost center.Insert the proposed direct labor rate.The offeror shall insert new columns as appropriate to completely show all applicable loads and the cost buildup. The offeror shall ensure all loads are clearly labeled. It shall be clear how the offeror progressed from the Proposed Direct Labor Rate to the Proposed Fully Burdened Rate.Insert the proposed fully burdened labor rate.Insert total hours.ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Insert additional rows as necessaryTotal hours for Task X, Total Extended Value for Task X, Fixed Fee, and Total Estimated Cost:Insert Total HoursInsert Total Extended ValueInsert Fixed Fee PercentageInsert Fixed Fee Amount for this Task AreaInsert Total Extended Value plus Fixed Fee Amount for this Task Area

CLIN 1001 - TASK 5

CLIN 1001 - Direct Labor (Task 5)
First Option Period
ABCDEFGHIJKLMN
Task/ SubtaskLabor Category Description and Level (I, II, III, etc.)Key PersonnelPrime Contractor or Subcontractor?Applicable Indirect
Rate Cost CenterProposed Direct
Labor RateRate Buildup (Direct Labor plus all applicable loads)Proposed Fully Burdened Labor RateTotal hours for Task XExtended ValueFixed Fee Percentage (%)Fixed Fee
Amount ($)Total Estimated CostNotes
Insert the Task/ SubtaskInsert applicable labor categories and level below.Indicate whether this is a Key Personnel.
(Yes/No)Insert the name of the company this individual works for.Insert the applicable indirect rate cost center.Insert the proposed direct labor rate.The offeror shall insert new columns as appropriate to completely show all applicable loads and the cost buildup. The offeror shall ensure all loads are clearly labeled. It shall be clear how the offeror progressed from the Proposed Direct Labor Rate to the Proposed Fully Burdened Rate.Insert the proposed fully burdened labor rate.Insert total hours.ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Insert additional rows as necessaryTotal hours for Task X, Total Extended Value for Task X, Fixed Fee, and Total Estimated Cost:Insert Total HoursInsert Total Extended ValueInsert Fixed Fee PercentageInsert Fixed Fee Amount for this Task AreaInsert Total Extended Value plus Fixed Fee Amount for this Task Area

CLIN 1001 - TASK 6

CLIN 1001 - Direct Labor (Task 6)
First Option Period
ABCDEFGHIJKLMN
Task/ SubtaskLabor Category Description and Level (I, II, III, etc.)Key PersonnelPrime Contractor or Subcontractor?Applicable Indirect
Rate Cost CenterProposed Direct
Labor RateRate Buildup (Direct Labor plus all applicable loads)Proposed Fully Burdened Labor RateTotal hours for Task XExtended ValueFixed Fee Percentage (%)Fixed Fee
Amount ($)Total Estimated CostNotes
Insert the Task/ SubtaskInsert applicable labor categories and level below.Indicate whether this is a Key Personnel.
(Yes/No)Insert the name of the company this individual works for.Insert the applicable indirect rate cost center.Insert the proposed direct labor rate.The offeror shall insert new columns as appropriate to completely show all applicable loads and the cost buildup. The offeror shall ensure all loads are clearly labeled. It shall be clear how the offeror progressed from the Proposed Direct Labor Rate to the Proposed Fully Burdened Rate.Insert the proposed fully burdened labor rate.Insert total hours.ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Insert additional rows as necessaryTotal hours for Task X, Total Extended Value for Task X, Fixed Fee, and Total Estimated Cost:Insert Total HoursInsert Total Extended ValueInsert Fixed Fee PercentageInsert Fixed Fee Amount for this Task AreaInsert Total Extended Value plus Fixed Fee Amount for this Task Area

CLIN 1001 - TASK 7

CLIN 1001 - Direct Labor (Task 7)
First Option Period
ABCDEFGHIJKLMN
Task/ SubtaskLabor Category Description and Level (I, II, III, etc.)Key PersonnelPrime Contractor or Subcontractor?Applicable Indirect
Rate Cost CenterProposed Direct
Labor RateRate Buildup (Direct Labor plus all applicable loads)Proposed Fully Burdened Labor RateTotal hours for Task XExtended ValueFixed Fee Percentage (%)Fixed Fee
Amount ($)Total Estimated CostNotes
Insert the Task/ SubtaskInsert applicable labor categories and level below.Indicate whether this is a Key Personnel.
(Yes/No)Insert the name of the company this individual works for.Insert the applicable indirect rate cost center.Insert the proposed direct labor rate.The offeror shall insert new columns as appropriate to completely show all applicable loads and the cost buildup. The offeror shall ensure all loads are clearly labeled. It shall be clear how the offeror progressed from the Proposed Direct Labor Rate to the Proposed Fully Burdened Rate.Insert the proposed fully burdened labor rate.Insert total hours.ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Insert additional rows as necessaryTotal hours for Task X, Total Extended Value for Task X, Fixed Fee, and Total Estimated Cost:Insert Total HoursInsert Total Extended ValueInsert Fixed Fee PercentageInsert Fixed Fee Amount for this Task AreaInsert Total Extended Value plus Fixed Fee Amount for this Task Area

CLIN 2001 SUMMARY

Labor CLIN 2001 Summary
Second Option Period
ABCDE
Task AreaTotal hoursTotal Estimated CostFixed Fee AmountTotal Estimated

Cost-Plus-Fixed-Fee

(CPFF)

1 Insert total hours per task area for labor. Insert proposed total estimated cost per task area for labor. Insert proposed total Fixed Fee Amount. Insert proposed total estimated CPFF for labor.

(Sum of Columns C and D)

2$ - 0
3$ - 0
4$ - 0
5$ - 0
6$ - 0
7$ - 0
Labor Total:0$ - 0$ - 0$ - 0

Number of hours in a Man-Year:

CLIN 2001 - TASK 1

CLIN 2001 - Direct Labor (Task 1)
Second Option Period
ABCDEFGHIJKLMN
Task/ SubtaskLabor Category Description and Level (I, II, III, etc.)Key PersonnelPrime Contractor or Subcontractor?Applicable Indirect
Rate Cost CenterProposed Direct
Labor RateRate Buildup (Direct Labor plus all applicable loads)Proposed Fully Burdened Labor RateTotal hours for Task XExtended ValueFixed Fee Percentage (%)Fixed Fee
Amount ($)Total Estimated CostNotes
Insert the Task/ SubtaskInsert applicable labor categories and level below.Indicate whether this is a Key Personnel.
(Yes/No)Insert the name of the company this individual works for.Insert the applicable indirect rate cost center.Insert the proposed direct labor rate.The offeror shall insert new columns as appropriate to completely show all applicable loads and the cost buildup. The offeror shall ensure all loads are clearly labeled. It shall be clear how the offeror progressed from the Proposed Direct Labor Rate to the Proposed Fully Burdened Rate.Insert the proposed fully burdened labor rate.Insert total hours.ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Insert additional rows as necessaryTotal hours for Task X, Total Extended Value for Task X, Fixed Fee, and Total Estimated Cost:Insert Total HoursInsert Total Extended ValueInsert Fixed Fee PercentageInsert Fixed Fee Amount for this Task AreaInsert Total Extended Value plus Fixed Fee Amount for this Task Area

CLIN 2001 - TASK 2

CLIN 2001 - Direct Labor (Task 2)
Second Option Period
ABCDEFGHIJKLMN
Task/ SubtaskLabor Category Description and Level (I, II, III, etc.)Key PersonnelPrime Contractor or Subcontractor?Applicable Indirect
Rate Cost CenterProposed Direct
Labor RateRate Buildup (Direct Labor plus all applicable loads)Proposed Fully Burdened Labor RateTotal hours for Task XExtended ValueFixed Fee Percentage (%)Fixed Fee
Amount ($)Total Estimated CostNotes
Insert the Task/ SubtaskInsert applicable labor categories and level below.Indicate whether this is a Key Personnel.
(Yes/No)Insert the name of the company this individual works for.Insert the applicable indirect rate cost center.Insert the proposed direct labor rate.The offeror shall insert new columns as appropriate to completely show all applicable loads and the cost buildup. The offeror shall ensure all loads are clearly labeled. It shall be clear how the offeror progressed from the Proposed Direct Labor Rate to the Proposed Fully Burdened Rate.Insert the proposed fully burdened labor rate.Insert total hours.ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Insert additional rows as necessaryTotal hours for Task X, Total Extended Value for Task X, Fixed Fee, and Total Estimated Cost:Insert Total HoursInsert Total Extended ValueInsert Fixed Fee PercentageInsert Fixed Fee Amount for this Task AreaInsert Total Extended Value plus Fixed Fee Amount for this Task Area

CLIN 2001 - TASK 3

CLIN 2001 - Direct Labor (Task 3)
Second Option Period
ABCDEFGHIJKLMN
Task/ SubtaskLabor Category Description and Level (I, II, III, etc.)Key PersonnelPrime Contractor or Subcontractor?Applicable Indirect
Rate Cost CenterProposed Direct
Labor RateRate Buildup (Direct Labor plus all applicable loads)Proposed Fully Burdened Labor RateTotal hours for Task XExtended ValueFixed Fee Percentage (%)Fixed Fee
Amount ($)Total Estimated CostNotes
Insert the Task/ SubtaskInsert applicable labor categories and level below.Indicate whether this is a Key Personnel.
(Yes/No)Insert the name of the company this individual works for.Insert the applicable indirect rate cost center.Insert the proposed direct labor rate.The offeror shall insert new columns as appropriate to completely show all applicable loads and the cost buildup. The offeror shall ensure all loads are clearly labeled. It shall be clear how the offeror progressed from the Proposed Direct Labor Rate to the Proposed Fully Burdened Rate.Insert the proposed fully burdened labor rate.Insert total hours.ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Insert additional rows as necessaryTotal hours for Task X, Total Extended Value for Task X, Fixed Fee, and Total Estimated Cost:Insert Total HoursInsert Total Extended ValueInsert Fixed Fee PercentageInsert Fixed Fee Amount for this Task AreaInsert Total Extended Value plus Fixed Fee Amount for this Task Area

CLIN 2001 - TASK 4

CLIN 2001 - Direct Labor (Task 4)
Second Option Period
ABCDEFGHIJKLMN
Task/ SubtaskLabor Category Description and Level (I, II, III, etc.)Key PersonnelPrime Contractor or Subcontractor?Applicable Indirect
Rate Cost CenterProposed Direct
Labor RateRate Buildup (Direct Labor plus all applicable loads)Proposed Fully Burdened Labor RateTotal hours for Task XExtended ValueFixed Fee Percentage (%)Fixed Fee
Amount ($)Total Estimated CostNotes
Insert the Task/ SubtaskInsert applicable labor categories and level below.Indicate whether this is a Key Personnel.
(Yes/No)Insert the name of the company this individual works for.Insert the applicable indirect rate cost center.Insert the proposed direct labor rate.The offeror shall insert new columns as appropriate to completely show all applicable loads and the cost buildup. The offeror shall ensure all loads are clearly labeled. It shall be clear how the offeror progressed from the Proposed Direct Labor Rate to the Proposed Fully Burdened Rate.Insert the proposed fully burdened labor rate.Insert total hours.ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Insert additional rows as necessaryTotal hours for Task X, Total Extended Value for Task X, Fixed Fee, and Total Estimated Cost:Insert Total HoursInsert Total Extended ValueInsert Fixed Fee PercentageInsert Fixed Fee Amount for this Task AreaInsert Total Extended Value plus Fixed Fee Amount for this Task Area

CLIN 2001 - TASK 5

CLIN 2001 - Direct Labor (Task 5)
Second Option Period
ABCDEFGHIJKLMN
Task/ SubtaskLabor Category Description and Level (I, II, III, etc.)Key PersonnelPrime Contractor or Subcontractor?Applicable Indirect
Rate Cost CenterProposed Direct
Labor RateRate Buildup (Direct Labor plus all applicable loads)Proposed Fully Burdened Labor RateTotal hours for Task XExtended ValueFixed Fee Percentage (%)Fixed Fee
Amount ($)Total Estimated CostNotes
Insert the Task/ SubtaskInsert applicable labor categories and level below.Indicate whether this is a Key Personnel.
(Yes/No)Insert the name of the company this individual works for.Insert the applicable indirect rate cost center.Insert the proposed direct labor rate.The offeror shall insert new columns as appropriate to completely show all applicable loads and the cost buildup. The offeror shall ensure all loads are clearly labeled. It shall be clear how the offeror progressed from the Proposed Direct Labor Rate to the Proposed Fully Burdened Rate.Insert the proposed fully burdened labor rate.Insert total hours.ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Insert additional rows as necessaryTotal hours for Task X, Total Extended Value for Task X, Fixed Fee, and Total Estimated Cost:Insert Total HoursInsert Total Extended ValueInsert Fixed Fee PercentageInsert Fixed Fee Amount for this Task AreaInsert Total Extended Value plus Fixed Fee Amount for this Task Area

CLIN 2001 - TASK 6

CLIN 2001 - Direct Labor (Task 6)
Second Option Period
ABCDEFGHIJKLMN
Task/ SubtaskLabor Category Description and Level (I, II, III, etc.)Key PersonnelPrime Contractor or Subcontractor?Applicable Indirect
Rate Cost CenterProposed Direct
Labor RateRate Buildup (Direct Labor plus all applicable loads)Proposed Fully Burdened Labor RateTotal hours for Task XExtended ValueFixed Fee Percentage (%)Fixed Fee
Amount ($)Total Estimated CostNotes
Insert the Task/ SubtaskInsert applicable labor categories and level below.Indicate whether this is a Key Personnel.
(Yes/No)Insert the name of the company this individual works for.Insert the applicable indirect rate cost center.Insert the proposed direct labor rate.The offeror shall insert new columns as appropriate to completely show all applicable loads and the cost buildup. The offeror shall ensure all loads are clearly labeled. It shall be clear how the offeror progressed from the Proposed Direct Labor Rate to the Proposed Fully Burdened Rate.Insert the proposed fully burdened labor rate.Insert total hours.ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Insert additional rows as necessaryTotal hours for Task X, Total Extended Value for Task X, Fixed Fee, and Total Estimated Cost:Insert Total HoursInsert Total Extended ValueInsert Fixed Fee PercentageInsert Fixed Fee Amount for this Task AreaInsert Total Extended Value plus Fixed Fee Amount for this Task Area

CLIN 2001 - TASK 7

CLIN 2001 - Direct Labor (Task 7)
Second Option Period
ABCDEFGHIJKLMN
Task/ SubtaskLabor Category Description and Level (I, II, III, etc.)Key PersonnelPrime Contractor or Subcontractor?Applicable Indirect
Rate Cost CenterProposed Direct
Labor RateRate Buildup (Direct Labor plus all applicable loads)Proposed Fully Burdened Labor RateTotal hours for Task XExtended ValueFixed Fee Percentage (%)Fixed Fee
Amount ($)Total Estimated CostNotes
Insert the Task/ SubtaskInsert applicable labor categories and level below.Indicate whether this is a Key Personnel.
(Yes/No)Insert the name of the company this individual works for.Insert the applicable indirect rate cost center.Insert the proposed direct labor rate.The offeror shall insert new columns as appropriate to completely show all applicable loads and the cost buildup. The offeror shall ensure all loads are clearly labeled. It shall be clear how the offeror progressed from the Proposed Direct Labor Rate to the Proposed Fully Burdened Rate.Insert the proposed fully burdened labor rate.Insert total hours.ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Insert additional rows as necessaryTotal hours for Task X, Total Extended Value for Task X, Fixed Fee, and Total Estimated Cost:Insert Total HoursInsert Total Extended ValueInsert Fixed Fee PercentageInsert Fixed Fee Amount for this Task AreaInsert Total Extended Value plus Fixed Fee Amount for this Task Area

CLIN 3001 SUMMARY

Labor CLIN 3001 Summary
Third Option Period
ABCDE
Task AreaTotal hoursTotal Estimated CostFixed Fee AmountTotal Estimated

Cost-Plus-Fixed-Fee

(CPFF)

1 Insert total hours per task area for labor. Insert proposed total estimated cost per task area for labor. Insert proposed total Fixed Fee Amount. Insert proposed total estimated CPFF for labor.

(Sum of Columns C and D)

2$ - 0
3$ - 0
4$ - 0
5$ - 0
6$ - 0
7$ - 0
Labor Total:0$ - 0$ - 0$ - 0

Number of hours in a Man-Year:

CLIN 3001 - TASK 1

CLIN 3001 - Direct Labor (Task 1)
Third Option Period
ABCDEFGHIJKLMN
Task/ SubtaskLabor Category Description and Level (I, II, III, etc.)Key PersonnelPrime Contractor or Subcontractor?Applicable Indirect
Rate Cost CenterProposed Direct
Labor RateRate Buildup (Direct Labor plus all applicable loads)Proposed Fully Burdened Labor RateTotal hours for Task XExtended ValueFixed Fee Percentage (%)Fixed Fee
Amount ($)Total Estimated CostNotes
Insert the Task/ SubtaskInsert applicable labor categories and level below.Indicate whether this is a Key Personnel.
(Yes/No)Insert the name of the company this individual works for.Insert the applicable indirect rate cost center.Insert the proposed direct labor rate.The offeror shall insert new columns as appropriate to completely show all applicable loads and the cost buildup. The offeror shall ensure all loads are clearly labeled. It shall be clear how the offeror progressed from the Proposed Direct Labor Rate to the Proposed Fully Burdened Rate.Insert the proposed fully burdened labor rate.Insert total hours.ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Insert additional rows as necessaryTotal hours for Task X, Total Extended Value for Task X, Fixed Fee, and Total Estimated Cost:Insert Total HoursInsert Total Extended ValueInsert Fixed Fee PercentageInsert Fixed Fee Amount for this Task AreaInsert Total Extended Value plus Fixed Fee Amount for this Task Area

CLIN 3001 - TASK 2

CLIN 3001 - Direct Labor (Task 2)
Third Option Period
ABCDEFGHIJKLMN
Task/ SubtaskLabor Category Description and Level (I, II, III, etc.)Key PersonnelPrime Contractor or Subcontractor?Applicable Indirect
Rate Cost CenterProposed Direct
Labor RateRate Buildup (Direct Labor plus all applicable loads)Proposed Fully Burdened Labor RateTotal hours for Task XExtended ValueFixed Fee Percentage (%)Fixed Fee
Amount ($)Total Estimated CostNotes
Insert the Task/ SubtaskInsert applicable labor categories and level below.Indicate whether this is a Key Personnel.
(Yes/No)Insert the name of the company this individual works for.Insert the applicable indirect rate cost center.Insert the proposed direct labor rate.The offeror shall insert new columns as appropriate to completely show all applicable loads and the cost buildup. The offeror shall ensure all loads are clearly labeled. It shall be clear how the offeror progressed from the Proposed Direct Labor Rate to the Proposed Fully Burdened Rate.Insert the proposed fully burdened labor rate.Insert total hours.ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
Insert additional rows as necessaryTotal hours for Task X, Total Extended Value for Task X, Fixed Fee, and Total Estimated Cost:Insert Total HoursInsert Total Extended ValueInsert Fixed Fee PercentageInsert Fixed Fee Amount for this Task AreaInsert Total Extended Value plus Fixed Fee Amount for this Task Area

CLIN 3001 - TASK 3

CLIN 3001 - Direct Labor (Task 3)
Third Option Period
ABCDEFGHIJKLMN
Task/ SubtaskLabor Category Description and Level (I, II, III, etc.)Key PersonnelPrime Contractor or Subcontractor?Applicable Indirect
Rate Cost CenterProposed Direct
Labor RateRate Buildup (Direct Labor plus all applicable loads)Proposed Fully Burdened Labor RateTotal hours for Task XExtended ValueFixed Fee Percentage (%)Fixed Fee
Amount ($)Total Estimated CostNotes
Insert the Task/ SubtaskInsert applicable labor categories and level below.Indicate whether this is a Key Personnel.
(Yes/No)Insert the name of the company this individual works for.Insert the applicable indirect rate cost center.Insert the proposed direct labor rate.The offeror shall insert new columns as appropriate to completely show all applicable loads and the cost buildup. The offeror shall ensure all loads are clearly labeled. It shall be clear how the offeror progressed from the Proposed Direct Labor Rate to the Proposed Fully Burdened Rate.Insert the proposed fully burdened labor rate.Insert total hours.ERROR:#VALUE!ERROR:#VALUE!ERROR:#VALUE!
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0
$ - 0$ - 0$ - 0

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .