About this file
This document package includes plans and specifications for the construction of three grassed waterways at the ARS-Blackland farm in Bell County, Texas. The plans show dimensions, materials requirements, and design details for each of the three trapezoidal channel waterways to be built to convey runoff from surrounding fields. The longest waterway is 600 feet, while the other two are 350 and 300 feet in length. Construction will involve excavation, grading, seeding, and installing erosion controls according to the specifications. The operation and maintenance documents provide guidance on post-construction care activities such as mowing, weed control, and repair of damage. This appears to be design documents for a local project not a federal procurement.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| REVISED Clauses and Provisions - Temple Grassed Waterways.docx | DOCX document | |
| REVISED Questions.docx | DOCX document | |
| Questions.docx | DOCX document | |
| Attachment B Temple South Field Drawing.pdf | ||
| Clauses and Provisions - Temple Grassed Waterways.docx | DOCX document | |
| Attachment F - Statement of Work.docx | DOCX document | |
| Attachment A Temple North Field Drawing.pdf | ||
| Attachment D Grassed Waterway Specification.pdf | ||
| Attachment G - ARS-371.pdf | ||
| Attachment H - ARS-372.pdf | ||
| Attachment C Grassed Waterway Standard.pdf | ||
| Attachment I - Bid Schedule.xlsx | XLSX spreadsheet | |
| Attachment J - Wage Determination - Bell County.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TX-ENG-38-XL, Page 1 Waterway_TX_2020_R1.xlsm, 10/21/2020
USDA, NRCS, Texas
Grassed Waterway Data Sheet - WWCALC Cooperator: County:
I.D. #: Location:
Job Class: I Field #: 1 Waterway #:
Additional Notes:
Date
II 10/12/2021
All Bermuda
17.3 Inputs
43.86
Parabolic
24.00
1.00
0.5
2.2
2.4
C
D
2.74 3.50
Design for Capacity Units
1.00 ft.
24.00 ft.
16.03 sqft
24.11 ft.
0.66 ft.
2.74 fps 1.82
0.061 5.60
C Critical Depth, ft.
24.00 ft. 0.70
1.50 ft. Critical Velocity, fps
29.38 ft. 3.89
Area, acres
#VALUE!
0.44
Calculations: I:\CHUCK9718\COMPUTER\AAW22\ARS-SOUTH FIELD\LAYERS\WW-1\[ARS_Waterway_TX_2020_R1-WW1-SF2-NORTH.xlsm
Design for Stability
3. Computed with a parabolic top width, varied depth and velocities.
0.85 22.10 12.52 22.19 0.56 3.50 1.98
0.045
Final Base Area:
Planned Construction Area:
Planned Base Area:
Final Construction Area:
Average Width, ft
1.35 Top Width with Freeboard
Manning's N factor CI, Cover Index
Manning's Retardance Class 4.44
D 22.10
Total Length, ft.Area
Depth with Freeboard Top Width
27.86
Vegetation
Stability Velocity, fps
Capacity Channel Grade, %
Field map: sketch of waterway, benchmark, and north arrow.
Capacity Retardance / CI
Stability Retardance / CI
Drainage Area Acres
Capacity Velocity, fps
Top Width,ft.
Depth,ft.
Side Slope, ratio
I have EJAA ClassEngineering Approval
CHUCK TONN
Signature
Designed by
Computations Checked by
Wetted Perimeter Hydraulic Radius
Velocity VR factor
Design Certification: With my signature below, I certify to the best of my professional knowledge, judgement, and belief, these plans meet applicable NRCS Standards.
WW 1. NORTH
BLACKLAND RD.
Bell TX_BASR-BLACKLAND SOUTH FIELD
Parameters
Cross Section Area Top Width
Depth
Shape: Trapezoid/Parabolic
Approved by
Parameters
Design Review by
Flow rate, cfs
Free Board, ft.
Stability Channel Grade, %
Stations
N
CENTRAL TEXAS
ARS-BLACKLAND
PLACE SPOIL TO LOW SIDE OF CHANNEL.
BELTON
BLACKLAND RD.
2. SOUTH OF
STATION:
1. NORTH .44 TENTHS AC.
ALL
32 FT.
1.5 FT.
1.125FT. 1.125FT.
8 FT. 8 FT.
ESTIMATED LENGTH = 600 FT.
CDT
12/6/2021
GS-412-1
NATURAL RESOURCES CONSERVATION SERVICE
CONSERVATION PRACTICE GENERAL SPECIFICATIONS
GRASSED WATERWAY
(Acre)
CODE 412
Conservation practice general specifications are reviewed periodically, and updated if needed. To obtain the current version of this standard, contact the Natural Resources Conservation Service.
NRCS, TEXAS
June, 2002
1. SCOPE
Work shall consist of shaping the waterway channel and placing excavated material as specified.
2. LOCATION
The planned location of the waterway shall be as shown on furnished drawings or as staked in the field.
3. PUBLIC AND PRIVATE UTILITIES
Utilities are defined to be overhead and underground power or communication lines, and pipelines. All utilities discovered to be in the work area are shown on the drawings or sketches.
However, the absence of indicators on the drawings or sketches does not assure the nonexistence of utilities in the work area. The contractor is alerted to conduct his/her own search and discovery for utilities in order to lessen or avoid potential damages. The owner/operator shall complete TX-ENG-80, UTILITIES INVENTORY prior to layout or any ground disturbance and return it to an NRCS representative.
4. SITE PREPARATION
All trees stumps, brush, and other objectionable material that will interfere with construction or proper functioning of the waterway shall be removed from the site and disposed of in a manner consistent with environmental concerns and proper functioning of the waterway.
5. DIMENSIONS OF INSTALLATION
Waterways shall be constructed to the grade and dimensions shown on the plans, specified on furnished drawings, or as staked in the field.
6. MATERIAL
Excavated material will be used to construct side banks, roads, or other fills as specified. Topsoil shall be stockpiled and re-spread where necessary to provide a seedbed for the grass. Seedbed preparation; time of seeding; seeding mixture and rate; stabilizing crop; mulching; or mechanical means of stabilization; and fertilizer and lime requirements shall be provided to the owner/operator for the waterway and other disturbed areas after construction is complete.
Any spoil shall be spread where it will not interfere with flow into the waterway. If necessary, excess water shall be diverted away until vegetation is established. Any protective measures shall then be removed, and the disturbed areas that are not to be farmed shall be seeded to permanent grass.
7. MEASUREMENT
E. ESTIMATED CHANNEL AREA = 0.44 AC.
0-6+00FT.
32 FT.
1.5 FT.
16/16 FT.
32 FT.
1.5 FT.
ARS-BLACKLAND Grass Waterway 1. NORTH Method 1. Above will be used in Checkout of Waterway Construction.
FIELD 2. SOUTH OF STATION.
W.W. # 1. NORTH by Blackland Road.
Chuck.Tonn Highlight
Chuck.Tonn Highlight
412-1
NRCS, TEXAS
November 2015
UNITED STATES DEPARTMENT OF
AGRICULTURE NATURAL RESOURCES
CONSERVATION SERVICE BELL COUNTY, TEXAS
OPERATION AND MAINTENANCE PLAN
GRASSED WATERWAY
Date: 12-6-2021 Producer/Land user: ARS-BLACKLAND
Address: Address 1
Address 2
Description of practice location: Tract No. Farm No. Field No. 2. SOUTH OF STATION
A properly operated and maintained Grassed Waterway is an asset to your farm. This Grassed Waterway was designed and installed to stabilize an eroding area and to safely convey runoff from the drainage area. The estimated life span of this installation is at least 10 years. The life of this practice can be assured and usually increased by developing and carrying out a good operation and maintenance program.
This practice will require you to perform periodic maintenance and may also require operational items to maintain satisfactory performance. Here are some recommendations to help you develop a good operation and maintenance program.
GENERAL RECOMMENDATIONS
• Establish a maintenance program to maintain waterway capacity, vegetative cover, and outlet stability. Vegetation damaged by machinery, herbicides, or erosion must be repaired promptly.
• Protect the waterway from concentrated flow by using diversion of runoff or mechanical means of stabilization such as silt fences, mulching, hay bale barriers and etc. to stabilize grade during vegetation establishment.
• Minimize damage to vegetation by excluding livestock whenever possible, especially during wet periods. Permit grazing in the waterway only when a controlled grazing system is being implemented.
• Inspect grassed waterways regularly, especially following heavy rains. Fill, compact, and reseed damaged areas immediately. Remove sediment deposits to maintain capacity of grassed waterway.
412-2
Contact your local Natural Resources Conservation Service office for any additional technical assistance you might need for implementation of this Operation and Maintenance Plan for your conservation practice.
NRCS, TEXAS
November 2015
• Avoid use of herbicides that would be harmful to the vegetation or pollinating insects in and adjacent to the waterway area.
• Avoid using waterways as turn-rows during tillage and cultivation operations.
• Mow or periodically graze vegetation to maintain capacity and reduce sediment deposition. Mowing may be appropriate to enhance wildlife values, but must be conducted to avoid peak nesting seasons and reduced winter cover.
• Apply supplemental nutrients as needed to maintain the desired species composition and stand density of the waterway.
• Control noxious weeds.
• Do not use waterways as a field road. Avoid crossing with heavy equipment when wet.
• Lift tillage equipment off the waterway when crossing and turn off chemical application equipment.
• Remove all foreign debris that hinders system operation.
• Eradicate or otherwise remove all rodents or burrowing animals. Immediately repair any damage caused by their activity.
SPECIFIC RECOMMENDATIONS FOR YOUR INSTALLATION
• Specific Recommendations
USDA, NRCS, Texas Grassed Waterway Data Sheet - WWCALC
Cooperator: County:
I.D. #: Location:
Job Class: I Field #: 2 Waterway #:
Additional Notes:
Date
II 12/6/2021
All Bermuda
12.6 Inputs 48.64
Parabolic 28.50 1.02
0.5 1.9 C D
2.50 3.18
Design for Capacity Units
1.02 ft.
28.50 ft.
19.44 sqft
28.60 ft.
0.68 ft.
2.50 fps 1.70 0.063 5.60
C Critical Depth, ft.
28.50 ft. 0.67
1.52 ft. Critical Velocity, fps
34.77 ft. 3.80
Area, acres
#VALUE!
0.30
Calculations: I:\CHUCK9718\COMPUTER\AAW22\ARS-SOUTH FIELD\LAYERS\WW-2\[ARS_Waterway_TX_2020_R1-WW2-MIDDLE.xlsm
Design for Stability
3. Computed with a parabolic top width, varied depth and velocities.
0.87 26.32 15.31 26.40 0.58 3.18 1.84 0.046
Final Base Area:
Planned Construction Area:
Planned Base Area:
Final Construction Area:
Average Width, ft
1.37 Top Width with Freeboard
Manning's N factor CI, Cover Index
Manning's Retardance Class 4.44
D 26.32
Total Length, ft.Area
Depth with Freeboard Top Width
33.01
Vegetation
Stability Velocity, fps
Capacity Channel Grade, %
Field map: sketch of waterway, benchmark, and north arrow.
Capacity Retardance / CI Stability Retardance / CI
Drainage Area Acres
Capacity Velocity, fps
Top Width,ft.
Depth,ft.
Side Slope, ratio
I have EJAA ClassEngineering Approval
CHUCK TONN
Signature
Designed by Computations Checked by
Wetted Perimeter Hydraulic Radius
Velocity VR factor
Design Certification: With my signature below, I certify to the best of my professional knowledge, judgement, and belief, these plans meet applicable NRCS Standards.
SOUTH FIELD WW 2. MIDDLE
BLACKLAND RD.
Bell TX_BASR-BLACKLAND
Parameters
Cross Section Area Top Width
Depth
Shape: Trapezoid/Parabolic
Approved by
Parameters
Design Review by
Flow rate, cfs
Free Board, ft.
Stability Channel Grade, %
PLACE SPOIL TO LOW SIDE OF CHANNEL.
BELTON
BLACKLAND RD.
2. SOUTH OF
STATION:
2. MIDDLE .3 TENTHS AC.
ALL
35 FT.
1.5 FT.
1.125FT. 1.125FT.
8.75 FT. 8.75 FT.
ESTIMATED LENGTH = 350 FT.
CONSERVATION PRACTICE GENERAL SPECIFICATIONS
GRASSED WATERWAY
(Acre)
CODE 412
Conservation practice general specifications are reviewed periodically, and updated if needed. To obtain the current version of this standard, contact the Natural Resources Conservation Service.
NRCS, TEXAS
June, 2002
1. SCOPE
Work shall consist of shaping the waterway channel and placing excavated material as specified.
2. LOCATION
The planned location of the waterway shall be as shown on furnished drawings or as staked in the field.
3. PUBLIC AND PRIVATE UTILITIES
Utilities are defined to be overhead and underground power or communication lines, and pipelines. All utilities discovered to be in the work area are shown on the drawings or sketches.
However, the absence of indicators on the drawings or sketches does not assure the nonexistence of utilities in the work area. The contractor is alerted to conduct his/her own search and discovery for utilities in order to lessen or avoid potential damages. The owner/operator shall complete TX-ENG-80, UTILITIES INVENTORY prior to layout or any ground disturbance and return it to an NRCS representative.
4. SITE PREPARATION
All trees stumps, brush, and other objectionable material that will interfere with construction or proper functioning of the waterway shall be removed from the site and disposed of in a manner consistent with environmental concerns and proper functioning of the waterway.
5. DIMENSIONS OF INSTALLATION
Waterways shall be constructed to the grade and dimensions shown on the plans, specified on furnished drawings, or as staked in the field.
6. MATERIAL
Excavated material will be used to construct side banks, roads, or other fills as specified. Topsoil shall be stockpiled and re-spread where necessary to provide a seedbed for the grass. Seedbed preparation; time of seeding; seeding mixture and rate; stabilizing crop; mulching; or mechanical means of stabilization; and fertilizer and lime requirements shall be provided to the owner/operator for the waterway and other disturbed areas after construction is complete.
Any spoil shall be spread where it will not interfere with flow into the waterway. If necessary, excess water shall be diverted away until vegetation is established. Any protective measures shall then be removed, and the disturbed areas that are not to be farmed shall be seeded to
0-3+50FT.
35 FT.
1.5 FT.
17/18 FT.
E. ESTIMATED CHANNEL AREA = 0.30 AC.
35 FT.
1.5 FT.
ARS-BLACKLAND Grass Waterway 2. MIDDLE Method 1. Above will be used in Checkout of Waterway Construction.
FIELD 2. SOUTH OF STATION.
W.W. # 2. MIDDLE of Field West Side.
Chuck.Tonn Highlight
November 2015
UNITED STATES DEPARTMENT OF
AGRICULTURE NATURAL RESOURCES
CONSERVATION SERVICE BELL COUNTY, TEXAS
OPERATION AND MAINTENANCE PLAN
GRASSED WATERWAY
Date: 12-6-2021 Producer/Land user: ARS-BLACKLAND
Address: Address 1
Address 2
Description of practice location: Tract No. Farm No. Field No. 2. SOUTH OF STATION
A properly operated and maintained Grassed Waterway is an asset to your farm. This Grassed Waterway was designed and installed to stabilize an eroding area and to safely convey runoff from the drainage area. The estimated life span of this installation is at least 10 years. The life of this practice can be assured and usually increased by developing and carrying out a good operation and maintenance program.
This practice will require you to perform periodic maintenance and may also require operational items to maintain satisfactory performance. Here are some recommendations to help you develop a good operation and maintenance program.
GENERAL RECOMMENDATIONS
• Establish a maintenance program to maintain waterway capacity, vegetative cover, and outlet stability. Vegetation damaged by machinery, herbicides, or erosion must be repaired promptly.
• Protect the waterway from concentrated flow by using diversion of runoff or mechanical means of stabilization such as silt fences, mulching, hay bale barriers and etc. to stabilize grade during vegetation establishment.
• Minimize damage to vegetation by excluding livestock whenever possible, especially during wet periods. Permit grazing in the waterway only when a controlled grazing system is being implemented.
• Inspect grassed waterways regularly, especially following heavy rains. Fill, compact, assistance you might need for implementation of this Operation and Maintenance Plan for your conservation practice.
NRCS, TEXAS
November 2015
• Avoid use of herbicides that would be harmful to the vegetation or pollinating insects in and adjacent to the waterway area.
• Avoid using waterways as turn-rows during tillage and cultivation operations.
• Mow or periodically graze vegetation to maintain capacity and reduce sediment deposition. Mowing may be appropriate to enhance wildlife values, but must be conducted to avoid peak nesting seasons and reduced winter cover.
• Apply supplemental nutrients as needed to maintain the desired species composition and stand density of the waterway.
• Control noxious weeds.
• Do not use waterways as a field road. Avoid crossing with heavy equipment when wet.
• Lift tillage equipment off the waterway when crossing and turn off chemical application equipment.
• Remove all foreign debris that hinders system operation.
• Eradicate or otherwise remove all rodents or burrowing animals. Immediately repair any damage caused by their activity.
USDA, NRCS, Texas Grassed Waterway Data Sheet - WWCALC
Cooperator: County:
I.D. #: Location:
Job Class: I Field #: 2 Waterway #:
Additional Notes:
Date
II 5/30/2021
All Bermuda
3.5 Inputs 25.00
Parabolic 24.00 0.73
0.5 3.6 3.7 C D
2.15 2.82
Design for Capacity Units
0.73 ft.
24.00 ft.
11.62 sqft
24.06 ft.
0.48 ft.
2.15 fps 1.04 0.081 5.60
C Critical Depth, ft.
24.00 ft. 0.48
1.23 ft. Critical Velocity, fps
31.19 ft. 3.22
Area, acres
#VALUE!
0.25
Calculations: I:\CHUCK9718\COMPUTER\AAW22\ARS-SOUTH FIELD\LAYERS\WW-3\[ARS_Waterway_TX_2020_R1-WW3-SOUTH.xlsm
Design for Stability
3. Computed with a parabolic top width, varied depth and velocities.
0.61 21.92 8.86 21.97 0.40 2.82 1.14 0.055
Final Base Area:
Planned Construction Area:
Planned Base Area:
Final Construction Area:
Average Width, ft
1.11 Top Width with Freeboard
Manning's N factor CI, Cover Index
Manning's Retardance Class 4.44
D 21.92
Total Length, ft.Area
Depth with Freeboard Top Width
29.62
Vegetation
Stability Velocity, fps
Capacity Channel Grade, %
Field map: sketch of waterway, benchmark, and north arrow.
Capacity Retardance / CI Stability Retardance / CI
Drainage Area Acres
Capacity Velocity, fps
Top Width,ft.
Depth,ft.
Side Slope, ratio
I have EJAA ClassEngineering Approval
CHUCK TONN
Signature
Designed by Computations Checked by
Wetted Perimeter Hydraulic Radius
Velocity VR factor
Design Certification: With my signature below, I certify to the best of my professional knowledge, judgement, and belief, these plans meet applicable NRCS Standards.
SOUTH FIELD WW 3. SOUTH
BLACKLAND RD.
Bell TX_B
Designed for a 25 year storm event.
ASR-BLACKLAND
Parameters
Cross Section Area Top Width
Depth
Shape: Trapezoid/Parabolic
Approved by
Parameters
Design Review by
Flow rate, cfs
Free Board, ft.
Stability Channel Grade, %
PLACE SPOIL TO LOW SIDE OF CHANNEL.
BELTON
BLACKLAND RD.
2. SOUTH OF
STATION:
3. SOUTH .25 TENTHS AC.
ALL
32 FT.
1.2 FT.
.9 FT. .9 FT.
8 FT. 8 FT.
ESTIMATED LENGTH = 300 FT.
CONSERVATION PRACTICE GENERAL SPECIFICATIONS
GRASSED WATERWAY
(Acre)
CODE 412
Conservation practice general specifications are reviewed periodically, and updated if needed. To obtain the current version of this standard, contact the Natural Resources Conservation Service.
NRCS, TEXAS
June, 2002
1. SCOPE
Work shall consist of shaping the waterway channel and placing excavated material as specified.
2. LOCATION
The planned location of the waterway shall be as shown on furnished drawings or as staked in the field.
3. PUBLIC AND PRIVATE UTILITIES
Utilities are defined to be overhead and underground power or communication lines, and pipelines. All utilities discovered to be in the work area are shown on the drawings or sketches.
However, the absence of indicators on the drawings or sketches does not assure the nonexistence of utilities in the work area. The contractor is alerted to conduct his/her own search and discovery for utilities in order to lessen or avoid potential damages. The owner/operator shall complete TX-ENG-80, UTILITIES INVENTORY prior to layout or any ground disturbance and return it to an NRCS representative.
4. SITE PREPARATION
All trees stumps, brush, and other objectionable material that will interfere with construction or proper functioning of the waterway shall be removed from the site and disposed of in a manner consistent with environmental concerns and proper functioning of the waterway.
5. DIMENSIONS OF INSTALLATION
Waterways shall be constructed to the grade and dimensions shown on the plans, specified on furnished drawings, or as staked in the field.
6. MATERIAL
Excavated material will be used to construct side banks, roads, or other fills as specified. Topsoil shall be stockpiled and re-spread where necessary to provide a seedbed for the grass. Seedbed preparation; time of seeding; seeding mixture and rate; stabilizing crop; mulching; or mechanical means of stabilization; and fertilizer and lime requirements shall be provided to the owner/operator for the waterway and other disturbed areas after construction is complete.
Any spoil shall be spread where it will not interfere with flow into the waterway. If necessary, excess water shall be diverted away until vegetation is established. Any protective measures shall then be removed, and the disturbed areas that are not to be farmed shall be seeded to
0-3+00FT.
32 FT.
1.2 FT.
16/16 FT.
E. ESTIMATED CHANNEL AREA = 0.25 AC.
32 FT.
1.2 FT.
ARS-BLACKLAND Grass Waterway 3. SOUTH Method 1. Above will be used in Checkout of Waterway Construction.
FIELD 2. SOUTH OF STATION.
W.W. # 3. SOUTH
Chuck.Tonn Highlight
November 2015
UNITED STATES DEPARTMENT OF
AGRICULTURE NATURAL RESOURCES
CONSERVATION SERVICE BELL COUNTY, TEXAS
OPERATION AND MAINTENANCE PLAN
GRASSED WATERWAY
Date: 12-6-2021 Producer/Land user: ARS-BLACKLAND
Address: Address 1
Address 2
Description of practice location: Tract No. Farm No. Field No. 2. SOUTH OF STATION
A properly operated and maintained Grassed Waterway is an asset to your farm. This Grassed Waterway was designed and installed to stabilize an eroding area and to safely convey runoff from the drainage area. The estimated life span of this installation is at least 10 years. The life of this practice can be assured and usually increased by developing and carrying out a good operation and maintenance program.
This practice will require you to perform periodic maintenance and may also require operational items to maintain satisfactory performance. Here are some recommendations to help you develop a good operation and maintenance program.
GENERAL RECOMMENDATIONS
• Establish a maintenance program to maintain waterway capacity, vegetative cover, and outlet stability. Vegetation damaged by machinery, herbicides, or erosion must be repaired promptly.
• Protect the waterway from concentrated flow by using diversion of runoff or mechanical means of stabilization such as silt fences, mulching, hay bale barriers and etc. to stabilize grade during vegetation establishment.
• Minimize damage to vegetation by excluding livestock whenever possible, especially during wet periods. Permit grazing in the waterway only when a controlled grazing system is being implemented.
• Inspect grassed waterways regularly, especially following heavy rains. Fill, compact, assistance you might need for implementation of this Operation and Maintenance Plan for your conservation practice.
NRCS, TEXAS
November 2015
• Avoid use of herbicides that would be harmful to the vegetation or pollinating insects in and adjacent to the waterway area.
• Avoid using waterways as turn-rows during tillage and cultivation operations.
• Mow or periodically graze vegetation to maintain capacity and reduce sediment deposition. Mowing may be appropriate to enhance wildlife values, but must be conducted to avoid peak nesting seasons and reduced winter cover.
• Apply supplemental nutrients as needed to maintain the desired species composition and stand density of the waterway.
• Control noxious weeds.
• Do not use waterways as a field road. Avoid crossing with heavy equipment when wet.
• Lift tillage equipment off the waterway when crossing and turn off chemical application equipment.
• Remove all foreign debris that hinders system operation.
• Eradicate or otherwise remove all rodents or burrowing animals. Immediately repair any damage caused by their activity.
| CONTRACTOR-PACKET-South Field-WW-1NORTH |
| Grassed Waterway General Specification 412 WW1.pdf |
| 1.SCOPE |
| 2.LOCATION |
| 3.PUBLIC AND PRIVATE UTILITIES |
| 4.SITE PREPARATION |
| 5.DIMENSIONS OF INSTALLATION |
| 6.MATERIAL |
| 7.MEASUREMENT |
| CONTRACTOR-PACKET-South Field-WW-2MIDDLE |
| WWCALC |
| CONTRACTOR-PACKET-South Field-WW-3SOUTH |
| WWCALC |
File details come from the government source that posted it. Updated .