Attachment D21 - Section F Lease -Escondido.docx
DOCX document 1005 KB Posted
- Attached to
- Q201--Escondido CBOC RFP
- Solicitation number
- 36C26220R0128
View the file
Other files
Show all 41
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR LEASE PROPOSALS:
Escondido, California Offers due by 07/30/2020
In order to be considered for award, offers conforming to the requirements of the RLP shall be received no later than 4:00P, PST on the date above. See “Receipt of Lease Proposals” herein for additional information.
This Request for Lease Proposals ("RLP") sets forth instructions and requirements for proposals for a Lease described in the RLP documents. Proposals conforming to the RLP requirements will be evaluated in accordance with the Method of Award set forth herein to select an Offeror for award. The Government will award the Lease to the selected Offeror, subject to the conditions herein.
The information collection requirements contained in this Solicitation/Contract, that are not required by the regulation, have been approved by the Office of Management and Budget pursuant to the Paperwork Reduction Act and assigned the OMB Control No. 3090-0163.
SIMPLIFIED RLP
GSA FORM R101A (10/18)
Template revised 10/2018
INSTRUCTIONS FOR CREATING LEASE AND REQUEST FOR LEASE PROPOSAL (RLP) DOCUMENTS
ALL INSTRUCTIONS FOR CREATING THESE DOCUMENTS ARE TYPED IN BLUE “HIDDEN” TEXT. YOU SHOULD WORK WITH THE HIDDEN TEXT SHOWING, EXCEPT WHEN THE FINISHED DOCUMENT IS BEING PRINTED.
THIS TEMPLATE WAS UPDATED AS OF THE DATE SHOWN IN THE HEADER. THE DATE WILL NOT PRINT IF YOU TURN OFF THE HIDDEN TEXT PER THE INSTRUCTIONS BELOW. THE MOST UP-TO-DATE LEASE REFORM TEMPLATES ARE LOCATED ON THE NATIONAL OFFICE OF LEASING GOOGLE SITE.
HOW TO REVEAL HIDDEN TEXT IN THE DOCUMENT—
1. CLICK ON THE MSWORD LOGO AT THE TOP OF THE COMPUTER SCREEN (FAR LEFT).
2. CLICK ON “WORD OPTIONS” AT THE BOTTOM OF THE SCREEN.
3. CLICK ON “DISPLAY” IN THE LEFT-HAND COLUMN OF THE SCREEN.
4. IN THE RIGHT-HAND COLUMN, UNDER “ALWAYS SHOW THESE FORMATTING MARKS ON THE SCREEN,”—IF THERE IS NO CHECKMARK IN THE “HIDDEN TEXT” BOX—CLICK ON THE “HIDDEN TEXT” BOX. NOTE: A CHECKMARK WILL APPEAR IN THE BOX.
5. CLICK ON “OK.” TO CLOSE OUT THE WORD OPTIONS SCREEN.
TO TURN OFF HIDDEN TEXT: FOLLOW INSTRUCTIONS (1) THRU (5), ABOVE. WHEN YOU CLICK ON THE “HIDDEN TEXT” BOX, THE CHECKMARK WILL DISAPPEAR AND THE HIDDEN TEXT WILL NOT SHOW ON SCREEN OR IN PRINTED VERSIONS OF THE DOCUMENT.
TO INPUT DATA: IF A PARAGRAPH HAS BOLD RED Xs, A DOLLAR SIGN ($) FOLLOWED BY UNDERSCORING, OR EMPTY UNDERSCORING (_______), INPUT THE REQUIRED INFORMATION AND CHANGE FONT TO BLACK TEXT PRIOR TO ISSUANCE.
TO DELETE AND MODIFY PARAGRAPHS*
ALL PARAGRAPHS ARE STANDARDIZED AND MANDATORY UNLESS OTHERWISE NOTED IN THE HEADING “ACTION REQUIRED,” “OPTIONAL,” OR “NOTE.” IF IT IS DETERMINED TO DELETE A PARAGRAPH OR SUB-PARAGRAPH, TAKE THE FOLLOWING STEPS:
TO DELETE A PARAGRAPH—
1. USING YOUR CURSOR, CAREFULLY SELECT THE PARAGRAPH TEXT. (NOTE: DO NOT SELECT THE PARAGRAPH NUMBER.)
2. CLICK ON THE DELETE KEY TO DELETE THE TEXT.
3. YOU HAVE A CHOICE REGARDING THE TITLE. YOU MAY EITHER STRIKE THROUGH THE TITLE AND ADD THE WORDS “INTENTIONALLY DELETED” AFTER THE STRICKEN TITLE, OR YOU MAY DELETE THE TITLE AND REPLACE IT WITH “INTENTIONALLY DELETED.” IN EITHER CASE, LEAVE THE PARAGRAPH NUMBER INTACT SO THE PARAGRAPH NUMBERING WILL REMAIN THE SAME FOR THE PARAGRAPHS THAT FOLLOW.
4. TO STRIKE THROUGH THE TITLE, USING YOUR CURSOR, CAREFULLY SELECT THE PARAGRAPH TITLE. (NOTE: DO NOT SELECT THE PARAGRAPH NUMBER.) CLICK ON THE “STRIKETHROUGH” KEY (abc). THEN PLACE THE CURSOR TO THE RIGHT OF THE STRUCK-OUT PARAGRAPH TITLE AND TYPE “INTENTIONALLY DELETED.” NOTE: THE TEXT WILL BE DELETED AND THE PARAGRAPH NUMBER AND STRUCK-OUT TITLE WILL REMAIN.
EXAMPLE: 2.05 OPERATING COST ADJUSTMENT INTENTIONALLY DELETED
5. ALTERNATELY, YOU MAY DELETE THE TITLE ALTOGETHER. USING YOUR CURSOR, CAREFULLY SELECT THE PARAGRAPH TITLE. OVERTYPE WITH THE WORDS “INTENTIONALLY DELETED.”
EXAMPLE: 2.05 INTENTIONALLY DELETED
TO DELETE A SUB-PARAGRAPH—
1. USING YOUR CURSOR, CAREFULLY SELECT THE SUB-PARAGRAPH TEXT. (NOTE: DO NOT SELECT THE PARAGRAPH NUMBER, LETTER, OR TITLE, IF ANY.) DELETE THE TEXT BY CLICKING ON THE “DELETE” KEY.
2. PLACE THE CURSOR WHERE THE TEXT WAS AND TYPE “INTENTIONALLY DELETED.”
TO MODIFY ALL OR PART OF A PARAGRAPH—
1. GO TO THE LAST SECTION OF THIS LEASE TITLED "ADDITIONAL TERMS AND CONDITIONS"
2. CREATE A LIST OF “MODIFIED PARAGRAPHS” WITH THE HEADING: “THE FOLLOWING PARAGRAPHS HAVE BEEN MODIFIED IN THIS LEASE:”
3. SELECT AND COPY THE MODIFIED PARAGRAPH TITLE AND PARAGRAPH NUMBER).
4. GO TO THE END OF THE LAST PARAGRAPH AND CLICK ON YOUR MOUSE TO PLACE THE CURSOR BELOW THE LAST ENTRY).
5. PASTE THE TITLE YOU JUST COPIED.
6. MAKE YOUR CHANGES, ADDITIONS, DELETIONS, ETC., TO THE PARAGRAPH IN ITS ORIGINAL LOCATION IN THE DOCUMENT.
7. SAVE YOUR CHANGES.
TO UPDATE THE TABLE OF CONTENTS AND PAGE REFERENCES WHEN YOU ARE FINISHED REVISING A DOCUMENT:
1. GO TO AND CLICK IN THE TABLE OF CONTENTS.
2. RIGHT CLICK TO VIEW DROP-DOWN WINDOW.
3. FROM THE DROP-DOWN MENU, CLICK ON “UPDATE FIELD.”
4. CLICK ON “UPDATE ENTIRE TABLE.” NOTE: TABLE WILL UPDATE ANY HEADINGS THAT WERE CHANGED DURING THE REVIEW. NOTE: YOU SHOULD VERIFY ONE OR TWO CHANGES TO CONFIRM THE TOC WAS UPDATED PROPERLY *THE ABOVE PRACTICES WILL INCREASE STANDARDIZATION AND FAMILIARITY OF THE DOCUMENT FOR THE PRACTITIONER BY ALLOWING CONSISTENT NUMBERING THROUGHOUT THE DOCUMENT.
TO ADD SECURITY REQUIREMENTS
ATTACH THE APPROPRIATE DOCUMENT TITLED SECURITY REQUIREMENTS AFTER CONSULTING WITH FPS AND THE AGENCY TO DETERMINE THEIR SPECIFIC REQUIREMENTS USING THE APPROPRIATE FACILITY SECURITY LEVEL (FSL) I OR II.
FOR ACTIONS 10,000 RSF OR LESS, DO NOT CONTACT FPS BUT INSTEAD USE FSL I UNLESS CLIENT AGENCY REQUESTS A HIGHER LEVEL. IF THE AGENCY REQUIRES A HIGHER FSL, THE RESPONSIBLE PBS ASSOCIATE SHOULD REACH OUT TO FPS TO CONFIRM THAT THIS HIGHER FSL IS APPROPRIATE.
THE FOLLOWING INSTRUCTIONS APPLY TO SIMPLIFIED MODEL ONLY:
· NOTE THAT THIS IS A TURNKEY MODEL; ALL REQUIRED IMPROVEMENTS MUST BE INCLUDED BY THE LCO AS PART OF THE LEASE (ASR, PROTOTYPE LAYOUT, ETC.). THERE IS NO STATED TI ALLOWANCE.
· ALL APPROPRIATE GENERAL CLAUSES ARE ALREADY INCORPORATED INTO THE LEASE DOCUMENT (L201A). DO NOT ATTACH A SEPARATE GSA FORM 3517, 3517A, 3517B, OR 3517C.
· SOLICITATION PROVISIONS (FOR SIMPLIFIED ACQUISITION OF LEASEHOLD INTERESTS IN REAL PROPERTY), GSA FORM 3516A, ARE NOT INCORPORATED INTO THE RLP (R101A) AND MUST BE INCLUDED AS A SEPARATE ATTACHMENT.
TABLE OF CONTENTS
| SIMPLIFIED RLP | 1 | |
| SECTION 1 | STATEMENT OF REQUIREMENTS | 1 |
| 1.01 | GENERAL INFORMATION (SIMPLIFIED) (JUN 2012) | 1 |
| 1.02 | AMOUNT AND TYPE OF SPACE AND LEASE TERM (SIMPLIFIED) (SEP 2013) | 1 |
| 1.03 | NEIGHBORHOOD, PARKING, LOCATION AMENITIES, AND PUBLIC TRANSPORTATION (SEP 2013) | 1 |
| 1.04 | LIST OF RLP DOCUMENTS (SIMPLIFIED) (OCT 2017) | 2 |
| 1.05 | AMENDMENTS TO THE RLP (JUN 2012) | 2 |
| 1.06 | LEASE DESCRIPTION (SIMPLIFIED) (OCT 2016) | 2 |
| 1.07 | RELATIONSHIP OF RLP BUILDING MINIMUM REQUIREMENTS AND LEASE OBLIGATIONS (OCT 2016) | 3 |
| 1.08 | AUTHORIZED REPRESENTATIVES (JUN 2012) | 3 |
| 1.09 | PRICING OF SECURITY REQUIREMENTS (SIMPLIFIED) (OCT 2016) | 4 |
| 1.10 | NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND SMALL BUSINESS SIZE STANDARD (OCT 2017) | 4 |
| 1.11 | DUNS NUMBER (OCT 2017) | 4 |
| SECTION 2 | ELIGIBILITY AND PREFERENCES FOR AWARD | 5 |
| 2.01 | EFFICIENCY OF LAYOUT (SIMPLIFIED) (AUG 2011) | 5 |
| 2.02 | FLOOD PLAINS (OCT 2017) | 5 |
| 2.03 | SEISMIC SAFETY – MODERATE SEISMICITY (OCT 2017) | 5 |
| 2.04 | SEISMIC SAFETY – HIGH SEISMICITY (OCT 2017) | 6 |
| 2.05 | HISTORIC PREFERENCE (SIMPLIFIED) (SEP 2013) | 7 |
| 2.06 | ASBESTOS (JUN 2012) | 8 |
| 2.07 | ACCESSIBILITY (SEP 2013) | 8 |
| 2.08 | FIRE PROTECTION AND LIFE SAFETY (SEP 2013) | 8 |
| 2.09 | ENERGY INDEPENDENCE AND SECURITY ACT (OCT 2016) | 8 |
| 2.10 | DUE DILIGENCE AND NATIONAL ENVIRONMENTAL POLICY ACT REQUIREMENTS - RLP (SEP 2014) | 10 |
| 2.11 | NATIONAL HISTORIC PRESERVATION ACT REQUIREMENTS - RLP (OCT 2016) | 10 |
| SECTION 3 | HOW TO OFFER | 12 |
| 3.01 | GENERAL INSTRUCTIONS (SIMPLIFIED) (SEP 2013) | 12 |
| 3.02 | RECEIPT OF LEASE PROPOSALS (SEP 2013) | 12 |
| 3.03 | PROPOSAL CONTENTS FOR SIMPLIFIED LEASES (OCT 2017) | 12 |
| 3.04 | FIRE PROTECTION AND LIFE SAFETY SUBMITTALS (SIMPLIFIED) (SEP 2013) | 13 |
| 3.05 | EISA SUBMITTALS (SIMPLIFIED) (MAR 2016) | 13 |
| 3.06 | TENANT IMPROVEMENTS INCLUDED IN OFFER (SIMPLIFIED) (JUN 2012) | 14 |
| 3.07 | OPERATING COSTS REQUIREMENTS INCLUDED IN OFFER (JUN 2012) | 14 |
| 3.08 | UTILITIES SEPARATE FROM RENTAL / BUILDING OPERATING PLAN (JUN 2012) | 14 |
| SECTION 4 | METHOD OF AWARD | 15 |
| 4.01 | AWARD WITHOUT DISCUSSION (SIMPLIFIED) (MAR 2012) | 15 |
| 4.02 | HUBZONE SMALL BUSINESS CONCERN ADDITIONAL PERFORMANCE REQUIREMENTS (SIMPLIFIED) (SEP 2013) | 15 |
| 4.03 | AWARD BASED ON PRICE (SIMPLIFIED) (JUN 2012) | 15 |
| 4.04 | PRESENT VALUE PRICE EVALUATION (SIMPLIFIED) (OCT 2016) | 15 |
| 4.05 | AWARD (SIMPLIFIED) (OCT 2017) | 16 |
| SECTION 5 | ADDITIONAL TERMS AND CONDITIONS | 17 |
| 5.01 | MODIFIED RLP PARAGRAPHS (OCT 2016) | 17 |
RLP TABLE OF CONTENTS GSA FORM R101C (JANUARY 2012)
ALL PARAGRAPHS ARE STANDARDIZED FOR THIS MODEL AND MANDATORY UNLESS OTHERWISE NOTED IN THE HEADING.
TYPE IN RLP NO. AND DATE. EDIT FOOTERS TO INCLUDE RLP NO.
| REQUEST FOR LEASE PROPOSALS: Escondido, CA |
| SIMPLIFIED RLP GSA FORM R101A (October 2018) |
STATEMENT OF REQUIREMENTS
GENERAL INFORMATION (SIMPLIFIED) (JUN 2012)
A. This Request for Lease Proposals (RLP) sets forth instructions and requirements for proposals for a Lease described in the RLP documents. The Government will evaluate proposals conforming to the RLP requirements in accordance with the Method of Award set forth below to select an Offeror for award. The Government will award the Lease to the selected Offeror, subject to the conditions below.
B. Included in the RLP documents is a lease form (GSA Form L201A) setting forth the lease term and other terms and conditions of the Lease contemplated by this RLP, a Simplified Lease Proposal form (GSA Form 1364A), and a Simplified Lease Proposal Data form (GSA Form 1364A-1) on which Offerors shall submit its offered rent and other price data, together with required information and submissions. The Lease paragraph titled "Definitions and General Terms" shall apply to the terms of this RLP.
C. The Offeror's executed Lease shall constitute a firm offer. No Lease shall be formed until the Lease Contracting Officer (LCO) executes the Lease and delivers a signed copy to the Offeror.
ACTION REQUIRED: INPUT THE REQUIREMENTS BELOW, INCLUDING REQUIRED ABOA SF AND PARKING. ADD OR DELETE ITEMS AS NEEDED.
AMOUNT AND TYPE OF SPACE AND LEASE TERM (SIMPLIFIED) (SEP 2013)
A. The Space shall be located in a modern quality Building of sound and substantial construction with a facade of stone, marble, brick, stainless steel, aluminum or other permanent materials in good condition and acceptable to the LCO. If not a new Building, the Space offered shall be in a Building that has undergone, or will complete by occupancy, modernization or adaptive reuse for the Space with modern conveniences.
SECTION 1
| CITY, STATE |
| ESCONDIDO, CALIFORNIA |
| DELINEATED AREA |
| ESCONDIDO, CALIFORNIA |
| SPACE TYPE(S) |
| GENERAL USE |
| MINIMUM SQ. FT. (ABOA) |
| 2575 |
| MAXIMUM SQ. FT. (ABOA) |
| 2575 |
| INITIAL FULL TERM |
| TEN- YEAR |
| TERMINATION RIGHTS |
| 180 DAYS |
| INITIAL FIRM TERM |
| 5 - YEAR |
| ADDITIONAL REQUIREMENTS |
| TURNKEY BUILD-OUT |
ACTION REQUIRED: SELECT THE APPROPRIATE SUB-PARAGRAPH B. MANDATORY SUB-PARAGRAPH WHEN VENDING FACILITIES WILL BE PROVIDED UNDER THE RANDOLPH-SHEPPARD ACT.
VERSION 1: THIS SUB-PARAGRAPH IS REQUIRED IN THE RLP WHENEVER THE REQUIREMENT 1) INVOLVES 100 OR MORE OCCUPANTS; OR, 2) AT LEAST 15,000 RSF OF SPACE.
A MINIMUM OF 250 ABOA SF MUST BE OFFERED TO THE BLIND. CONTACT THE REGIONAL CONCESSIONS GROUP FOR AMOUNT OF SPACE TO BE ENTERED.
EXCEPTION INFORMATION CAN BE FOUND AT 20 USC § 107A(D) [34 CFR 395.31(F)]
NOTE: FOR MULTI-TENANT LEASES, CONCESSIONS AREAS ARE CLASSIFIED AS JOINT USE AND EITHER GSA PBS OR THE LESSOR SHALL FUND THE ALTERATIONS. PLEASE CONSULT REGIONAL PRICING POINT OF CONTACT FOR GUIDANCE ON HOW TO REVISE FUNDING LANGUAGE BELOW.
NOTE: SPACE DOES NOT NEED TO BE SET ASIDE FOR RANDOLPH-SHEPPARD FACILITIES IF THE STATE AGENCY FOR THE BLIND HAS DECLINED THE OFFER TO ESTABLISH A FACILITY, IN WRITING. WHEN REQUIRED, THE SQUARE FOOTAGE LISTED FOR RANDOLPH-SHEPPARD VENDING FACILITIES BELOW MUST BE INCLUDED IN THE ABOA SF IDENTIFIED UNDER SUB-PARAGRAPH A.
SECTION 2
VERSION 2: THIS SUB-PARAGRAPH IS REQUIRED IN THE RLP WHENEVER THE REQUIREMENT 1) INVOLVES LESS THAN 100 OCCUPANTS; AND, 2) UNDER 15,000 RSF OF SPACE.
The Government may provide vending machines within the Government's leased area under the provisions of the Randolph-Sheppard Act (20 USC 107 et. seq.). If the Government chooses to provide vending facilities, the Government will control the number, kind, and locations of vending facilities and will control and receive income from all automatic vending machines. Offeror shall provide necessary utilities and make related alterations. The cost of the improvements is part of Tenant Improvement (TI) costs. The Government will not compete with other facilities having exclusive rights in the Building. The Offeror shall advise the Government if such rights exist.
SECTION 3
ACTION REQUIRED: OPTIONAL PARAGRAPH
CHOOSE SUB-PARAGRAPH A, SUB-PARAGRAPH- B, BOTH A AND B, OR DELETE ALTOGETHER, DEPENDING UPON THE CHARACTERISTICS OF THE DELINEATED AREA.
AS NEEDED, SUBSTITUTE MILES OR FEET FOR THE DISTANCE VARIABLES IN THE PARAGRAPHS BELOW. THESE ARE STANDARD MEASUREMENTS. CITY BLOCKS VARY IN LENGTH AND DO NOT ALLOW USEFUL COMPARISONS OF DISTANCE. THE 2,640 FEET (½ MILE) VARIABLE IN THE PARAGRAPH IS PREDICATED ON USGBC CRITERIA FOR LEED BUILDINGS.
LEASING CO/SPECIALIST MUST FILL IN THE PARKING VARIABLE, BELOW, WITH A REASONABLE AMOUNT, IN CONFORMANCE WITH LOCAL MARKET PRACTICE.
NEIGHBORHOOD, PARKING, LOCATION AMENITIES, AND PUBLIC TRANSPORTATION (SEP 2013)
A. INSIDE CITY CENTER: Space shall be located in a prime commercial office district with attractive, prestigious, and professional surroundings with a prevalence of modern design and/or tasteful rehabilitation in modern use. Streets and public sidewalks shall be well maintained. The parking-to-square-foot ratio available onsite shall at least meet current local code requirements, or in the absence of a local code requirement, onsite parking shall be available at a ratio of one (1) space for every 250 RSF of Space.
B. OUTSIDE CITY CENTER: Space shall be located 1) in an office, research, technology, or business park that is modern in design with a campus-like atmosphere; or, 2) on an attractively landscaped site containing one or more modern office Buildings that are professional and prestigious in appearance with the surrounding development well maintained and in consonance with a professional image. The parking-to-square-foot ratio available onsite shall at least meet current local code requirements, or, in the absence of a local code requirement, onsite parking shall be available at a ratio of one (1) space for every 250 RSF of Space. Adequate eating facilities shall be located within the immediate vicinity of the Building, but generally not exceeding a walkable ½ mile, as determined by the LCO.
ACTION REQUIRED: THE LIST OF ATTACHMENTS IS NOT COMPREHENSIVE. ADD OR DELETE ITEMS ON THE LIST AS APPROPRIATE FOR THE SPECIFIC TRANSACTION (E.G. SEISMIC OFFER FORMS). THE GENERAL CLAUSES GSA FORM 3517 APPLICABLE TO THE SIMPLIFIED LEASE ARE EITHER INCLUDED AS TEXT OR INCORPORATED BY REFERENCE INTO THE LEASE DOCUMENT AND DO NOT NEED TO BE ATTACHED.
NOTE: EXHIBITS SHOULD BE LABELED WITH SEQUENTIAL LETTERS.
NOTE: SEE SEISMIC PARAGRAPH INSTRUCTIONS IN SECTION 2 TO DETERMINE WHETHER SEISMIC SUBMITTALS ARE REQUIRED.
LIST OF RLP DOCUMENTS (SIMPLIFIED) (OCT 2017)
The following documents are attached to and included as part of this RLP package:
DOCUMENT NAME
Lease No. 36C26220L0005 (Form L201A)
Security Requirements for Level 2
GSA Form 3516A Solicitation Provisions
Proposal to Lease Space (GSA Form 1364A)
Simplified Lease Proposal Data (GSA Form 1364A-1)
GSA Form 12000 for Pre-lease Fire Protection and Life Safety Evaluation for an Office Building (Part A or Part B) (See Section 3 for applicable requirements)
Seismic Offer Forms
AMENDMENTS TO THE RLP (JUN 2012)
This RLP may be amended by notice from the LCO. Amendments may modify the terms of this RLP, or the terms, conditions, and requirements of the Lease contemplated by the RLP.
LEASE DESCRIPTION (SIMPLIFIED) (OCT 2016)
Offerors shall examine the Lease form included in the RLP documents to understand the Government's and the Lessor's respective rights and responsibilities under the contemplated Lease.
The Lease contemplated by this RLP includes:
| A. | The term of the Lease, and renewal option, if any. |
| B. | Terms and Conditions of the Lease, including Definitions, Standards, and Formulas applicable to the Lease and this RLP. |
| C. | Building Shell standards and requirements. |
| D. | Agency Specific Requirements (ASR) describing the tenant improvements (TI) to be completed by the Lessor prior to occupancy. |
| E. | Security Requirements. |
| F. | A description of all services to be provided by the Lessor. |
Should the Offeror be awarded the Lease, the terms of the Lease will be binding upon the Lessor without regard to any statements contained in this RLP.
The Lease contemplated by this RLP is a fully serviced, turnkey Lease with a fixed rent that covers all Lessor costs, including all shell upgrades, TIs, operating costs, taxes, and security upgrades. Rent will be based upon a proposed rental rate per rentable square foot (RSF), limited by the offered rate and the maximum ABOA SF solicited under this RLP. The Tenant Improvements to be delivered by the Lessor will be based upon information provided with this RLP and Lease, including Agency Specific Requirements. The Lessor will be required to design and build the TIs and will be compensated for the TI costs based upon turnkey pricing established under the Lease without further compensation other than the rent. Offerors are encouraged to consider the use of existing fit-out and other improvements to minimize waste. However, any existing improvements must be deemed equivalent to Lease requirements for new installation, and Offerors are cautioned to consider those requirements before assuming efficiencies in its TI costs resulting from use of existing improvements.
After award, the Lessor must prepare Design Intent Drawings (DIDs) for the leased space conforming to the Agency Specific Requirements. The Government will have the opportunity to review the Lessor's DIDs to determine that the Lessor's design meets the requirements of the Lease. Only after the Government approves the DIDs will the Lessor be released to proceed with buildout. The Lease also provides that the Government may modify the TI requirements, subject to the Lessor's right to receive compensation for such changes. Upon completion and acceptance of the leased Space, the Space will be measured for establishing the actual annual rent, and the lease term shall commence.
The security pricing process is described in a separate paragraph.
RELATIONSHIP OF RLP BUILDING MINIMUM REQUIREMENTS AND LEASE OBLIGATIONS (OCT 2016)
The Lease establishes various requirements relating to the Building shell. Such requirements are not deemed TIs. There are certain Building requirements that are established as minimum requirements in this RLP. If the Lessor's Building does not meet the requirements at the time of award, the Lessor may still be awarded the Lease. However, as a condition of award, the Government will require Lessor to identify those Building improvements that will bring the Building into compliance with RLP requirements. Upon award of the Lease, completion of those Building improvements will become Lease obligations.
ACTION REQUIRED: INSERT INFORMATION FOR LCO AND ALTERNATE GOVERNMENT CONTACT.
AUTHORIZED REPRESENTATIVES (JUN 2012)
With respect to all matters relating to this RLP, only the Government's LCO designated below shall have the authority to amend the RLP and award a Lease. The Government shall have the right to substitute its LCO by notice, without an express delegation by the prior LCO.
Lease LCO:
Alan Trinh 4811 Airport Plaza Dr., Suite 600, Long Beach, CA 90815 562-766-2271 562-481-5283 (C) alan.trinh@va.gov
As to all other matters, Offerors may contact the Alternate Government Contact designated below.
Alternate Government Contact:
Alice McGruder 4811 Airport Plaza, Dr., Suite 600, Long Beach, CA 90815 562-766-2238 Alice.McGruder@va.gov
ACTION REQUIRED: INCLUDE THIS PARAGRAPH ONLY IF THE BROKER CONTRACT WAS USED. OTHERWISE, DELETE.
PRICING OF SECURITY REQUIREMENTS (SIMPLIFIED) (OCT 2016)
A. The proposed Lease contains an attachment with the security requirements and obligations for the building, which are based on the facility security level (FSL). The Federal Government determines the facility’s FSL rating, which ranges from FSL I to FSL IV. The FSL is based on client agency mix, required size of space, number of employees, use of the space, location, configuration of the site and lot, and public access into and around the facility.
B. The security requirements attached to this Lease includes a list of security countermeasures that must be installed in the leased Space. The Offeror shall itemize costs of these security counter measures and shall amortize the cost of any Building Specific Amortized Capital (BSAC) into the rent.
C. There shall be no charge to the Government for any items that already exist in the offered Building or facility.
NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND SMALL BUSINESS SIZE STANDARD (OCT 2017)
A. The North American Industry Classification System (NAICS) code for this acquisition is 531120, unless the real property is self-storage (#531130), land (#531190), or residential (#531110).
B. The small business size standard is 38.5 Million in annual average gross revenue of the concern for the last 3 fiscal years.
C. The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
DUNS NUMBER (OCT 2017)
An offeror may obtain a DUNS number (i) via the Internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or (ii) If located outside the United States, by contacting the local Dun and Bradstreet Office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.
<<<<<<REMAINDER OF THE PAGE INTENTIONALLY LEFT BLANK>>>>>>
ELIGIBILITY AND PREFERENCES FOR AWARD
EFFICIENCY OF LAYOUT (SIMPLIFIED) (AUG 2011)
In order to be acceptable for award, the offered Space must provide for an efficient layout as determined by the LCO. To demonstrate potential for efficient layout, GSA may request the Offeror to provide a test fit layout at the Offeror’s expense.
ACTION REQUIRED: PARAGRAPH DEFAULTS TO A “BASE” STANDARD OF “100-YEAR” FLOODPLAIN DESIGNATION. IF AGENCY DESIGNATES THIS AS A CRITICAL ACTION (DEFINED AS ANY ACTIVITY OR ACTION FOR WHICH EVEN A SLIGHT CHANCE OF FLOODING WOULD BE TOO GREAT), USE 500-YEAR FLOODPLAIN INSTEAD. EXAMPLES OF CRITICAL ACTIONS INCLUDE, BUT ARE NOT LIMITED TO: STORAGE OF IRREPLACEABLE RECORDS; STORAGE OF VOLATILE, TOXIC, OR WATER-REACTIVE MATERIALS; CONSTRUCTION OR OPERATION OF HOSPITALS AND SCHOOLS; CONSTRUCTION AND OPERATION OF UTILITIES AND EMERGENCY SERVICES THAT WOULD BE INOPERATIVE IF FLOODED; STORAGE OF NATIONAL STRATEGIC AND CRITICAL MATERIALS; ACQUISITION OF HEALTH FACILITIES FOR CLIENT AGENCIES; CHILD CARE FACILITIES; AND PUBLIC BENEFIT CONVEYANCES FOR SCHOOLS, PRISONS, AND SOME OTHER INSTITUTIONAL USES.
FLOOD PLAINS (OCT 2017)
A Lease will not be awarded for any offered Property located within a 100-year floodplain unless the Government has determined that there is no practicable alternative. An Offeror may offer less than its entire site in order to exclude a portion of the site that falls within a floodplain, so long as the portion offered meets all the requirements of this RLP and does not impact the Government’s full use and enjoyment of the Premises. If an Offeror intends that the offered Property that will become the Premises for purposes of this Lease will be something other than the entire site as recorded in tax or other property records the Offeror shall clearly demarcate the offered Property on its site plan/map submissions and shall propose an adjustment to property taxes on an appropriate pro rata basis. For such an offer, the LCO may, in his or her sole discretion, determine that the offered Property does not adequately avoid development in a 100-year floodplain.
In addition, a Lease will not be awarded for any offered Property adjacent to 100-year floodplain, where such an adjacency would, as determined by the LCO, in his or her sole discretion, restrict ingress or egress to the Premises in the event of a flood, unless there is no practicable alternative.
THE FOLLOWING ARE EXEMPT FROM THE SEISMIC STANDARDS AND ALL SEISMIC LEASING PARAGRAPHS, AND THE ATTACHMENTS CAN BE DELETED:
· THE LEASE IS FOR LESS THAN FIVE (5) YEARS,
· THE LEASE IS FOR BUILDING STRUCTURES THAT ARE INTENDED ONLY FOR INCIDENTAL HUMAN OCCUPANCY (OCCUPIED BY PEOPLE FOR TWO HOURS OR LESS PER DAY),
· DETACHED ONE- AND TWO-FAMILY DWELLINGS LOCATED WHERE SDS < 0.4 G.
(CHECK WITH THE REGIONAL SEISMIC ENGINEER TO DETERMINE THE SEISMICITY OF THE DELINEATED AREA), OR
· THE DELINEATED AREA IS IN THE GREEN AREA (LOW AND VERY LOW SEISMICITY) IN THE SEISMIC LEASING REQUIREMENTS MAP
· (SEE BELOW FOR MAP AND ADDITIONAL INSTRUCTIONS).
THE ABOVE MAP DESIGNATES THE LEASING SEISMIC AREAS.
LOCATE THE DELINEATED AREA ON THE SEISMIC LEASING REQUIREMENTS MAP, WHICH IS AVAILABLE AT WWW.GSA.GOV/PORTAL/CONTENT/101286. IF IT IS CLEARLY IN THE GREEN, YELLOW, OR RED AREAS, FOLLOW THE INSTRUCTIONS BELOW. IF THE LOCATION IS CLOSE TO A BORDER OF TWO AREAS, CONTACT THE REGIONAL SEISMIC ENGINEER FOR ASSISTANCE WITH DETERMINING WHICH AREA THE BUILDING IS LOCATED IN.
GREEN AREA
IF THE DELINEATED AREA LIES IN AN AREA OF LOW AND VERY LOW SEISMICITY, THE PROJECT IS EXEMPT FROM THE REQUIREMENTS OF RP 8.
ACTION REQUIRED: DELETE THE FOLLOWING PARAGRAPHS FROM THE RLP:
· SEISMIC SAFETY FOR EXISTING CONSTRUCTION – MODERATE SEISMICITY
· SEISMIC SAFETY FOR EXISTING CONSTRUCTION – HIGH SEISMICITY
DO NOT ATTACH THE OFFER FORM PACKAGE, SEISMIC REQUIREMENTS, TO THE RLP/LEASE OFFER PACKAGE.
YELLOW AREA
IF THE DELINEATED AREA LIES IN AN AREA OF MODERATE SEISMICITY, THE PROJECT IS SUBJECT TO THE REQUIREMENTS OF RP 8. THE ONE EXCEPTION IS THAT A BUILDING CONTAINING LESS THAN 10,000 ABOA SF RENTED BY THE GOVERNMENT IS EXEMPT. BECAUSE THE FEDERAL GOVERNMENT, INCLUDING GSA, AGENCIES WITH DELEGATED AUTHORITY, OR AGENCIES WITH STATUTORY AUTHORITY, MAY HAVE OTHER ONGOING PROCUREMENTS OR EXISTING LEASES IN THE DELINEATED AREA, OFFERORS MUST REPRESENT THAT, IF AWARDED THIS LEASE, THE OFFERED BUILDING WILL HAVE LESS THAN 10,000 ABOA SF OF SPACE LEASED TO THE FEDERAL GOVERNMENT. THIS IS COVERED IN THE MODERATE SEISMICITY PARAGRAPH, SUB-PARAGRAPH B.1.
ACTION REQUIRED:
INCLUDE IN THE RLP:
· SEISMIC SAFETY FOR EXISTING CONSTRUCTION – MODERATE SEISMICITY
DELETE FROM THE RLP:
· SEISMIC SAFETY FOR EXISTING CONSTRUCTION – HIGH SEISMICITY
ACTION REQUIRED: ATTACH THE OFFER FORM PACKAGE, SEISMIC REQUIREMENTS, TO THE RLP/LEASE OFFER PACKAGE:
RED AREA
IF THE DELINEATED AREA LIES IN AN AREA OF HIGH AND VERY HIGH SEISMICITY, THE PROJECT IS SUBJECT TO THE REQUIREMENTS OF RP 8. THE ONE EXCEPTION IS THAT A ONE-STORY BUILDING OF STEEL LIGHT FRAME OR WOOD CONSTRUCTION WITH LESS THAN 3,000 ABOA SF OF SPACE IN THE BUILDING IS EXEMPT. THIS IS COVERED IN THE HIGH SEISMICITY PARAGRAPH, SUB-PARAGRAPH B.1.
ACTION REQUIRED: DELETE THE FOLLOWING FROM THE RLP:
· SEISMIC SAFETY FOR EXISTING CONSTRUCTION – MODERATE SEISMICITY
INCLUDE IN THE RLP:
· SEISMIC SAFETY FOR EXISTING CONSTRUCTION – HIGH SEISMICITY
ACTION REQUIRED: ATTACH THE OFFER FORM PACKAGE, SEISMIC REQUIREMENTS, TO THE RLP/LEASE OFFER PACKAGE:
SEISMIC SAFETY – HIGH SEISMICITY (OCT 2017)
A. The Government intends to award a Lease to an Offeror of a Building that is in compliance with the Seismic Standards. If an offer is received which is in compliance with the Seismic Standards and the other requirements of this RLP, then other offers which do not comply with the Seismic Standards must not be considered. If none of the offers is in compliance with the Standards, the LCO will make the award to the Offeror whose offer meets the other requirements of this RLP and provides the best value to the Government, taking into account price, seismic safety and any other award factors specified in this RLP.
B. An offered Building will be considered to be in compliance with the Seismic Standards if it meets one of the following conditions:
1. The offer includes a representation that the Premises will be in a one-story Building of steel light frame or wood construction with less than 3,000 ABOA SF of space in the Building (Seismic Form D).
2. The offer includes a Seismic Certificate certifying that the Building is a Benchmark Building (Seismic Form A).
3. The offer includes a Seismic Certificate based on a Tier I Evaluation showing that the Building meets the Seismic Standards (Seismic Form B). The submission must include the checklists and backup calculations from the Tier 1 Evaluation.
4. The offer includes a Seismic Certificate based on a Tier 2 or Tier 3 Evaluation showing that the Building complies with the Seismic Standards (Seismic Form B). If the certificate is based on a Tier 2 or Tier 3 Evaluation, the data, working papers, calculations and reports from the evaluation must be made available to the Government.
5. The offer includes a commitment to retrofit the Building to satisfy all of the Basic Safety Objective requirements of ASCE/SEI 41 (Seismic Form C, Part 1). If the Offeror proposes to retrofit the Building, the offer must include a Tier 1 report with all supporting documents, a narrative explaining the process and scope of retrofit and a schedule for the seismic retrofit. The Offeror shall provide a construction schedule, concept design for the seismic upgrade and supporting documents for the retrofit, including structural calculations, drawings, specifications, and geotechnical report to the Government for review and approval prior to award. The documentation must demonstrate the seismic retrofit will meet the seismic standards and be completed within the time frame required.
6. The offer includes a pre-award commitment to construct a new Building, using local building codes (Seismic Form C, Part 2).
C. The LCO may allow an Offeror to submit a Seismic Certificate after the deadline for final proposal revisions. However, the LCO is not obligated to delay award in order to enable an Offeror to submit a Seismic Certificate.
D. Definitions. For the purpose of this paragraph:
· “ASCE/SEI 31” means the American Society of Civil Engineers standard, Seismic Evaluation of Existing Buildings. You can purchase ASCE/SEI from ASCE at (800) 548-2723 or by visiting HTTP://WWW.ASCE.ORG/PUBLICATIONS/.
· “ASCE/SEI 41” means American Society of Civil Engineers standard, Seismic Rehabilitation of Existing Buildings. You can purchase ASCE/SEI from ASCE at (800) 548-2723 or by visiting HTTP://WWW.ASCE.ORG/PUBLICATIONS/.
· “Benchmark Building” means a building that was designed and built, or retrofitted, in accordance with the seismic provisions of the applicable codes specified in Section 1.3.1 of RP 8.
· “Engineer” means a professional engineer who is licensed in Civil or Structural Engineering and qualified in the structural design of buildings. They must be licensed in the state where the property is located.
· “RP 8” means “Standards of Seismic Safety for Existing Federally Owned and Leased Buildings ICSSC Recommended Practice 8 (RP 8),” issued by the Interagency Committee on Seismic Safety in Construction as ICSSC RP 8 and the National Institute of Standards and Technology as NIST GCR 11-917-12. RP 8 can be obtained from HTTP://WWW.WBDG.ORG/CCB/NIST/NIST_GCR11_917_12.PDF
· “Seismic Certificate” means a certificate executed and stamped by an Engineer on the appropriate Certificate of Seismic Compliance form included with this RLP together with any required attachments.
· “Seismic Standards” means the requirements of RP 8 Section 2.2 for Life Safety Performance Level in ASCE/SEI 31 or the Basic Safety Objective in ASCE/SEI 41, unless otherwise specified.
· “Tier 1 Evaluation” means an evaluation by an Engineer in accordance with Chapters 2.0 and 3.0 of ASCE/SEI 31. A Tier 1 Evaluation must include the appropriate Structural, Nonstructural and Geologic Site Hazards and Foundation Checklists.
· “Tier 2 Evaluation” means an evaluation by an Engineer in accordance with Chapter 4.0 of ASCE/SEI 31.
· “Tier 3 Evaluation” means an evaluation by an Engineer in accordance with Chapter 5.0 of ASCE/SEI 31.
ACTION REQUIRED: MAY BE DELETED ONLY WHEN MARKET SURVEY INDICATES THAT SPACE IS NOT AVAILABLE IN HISTORIC PROPERTIES OR DISTRICTS AS DESCRIBED BELOW OR WHEN PROCURING SPACE IN RURAL AREAS (SEE FMR PART 102-83).
ASBESTOS (JUN 2012)
SECTION 4
Government requests space with no asbestos-containing materials (ACM), or with ACM in a stable, solid matrix (e.g., asbestos flooring or asbestos cement panels), which is not damaged or subject to damage by routine operations. For purposes of this paragraph, “space” includes the 1) space offered for lease; 2) common building area; 3) ventilation systems and zones serving the space offered; and 4) the area above suspended ceilings and engineering space in the same ventilation zone as the space offered. If no offers are received for such space, the Government may consider space with thermal system insulation ACM (e.g., wrapped pipe or boiler lagging), which is not damaged or subject to damage by routine operations.
SECTION 5
ACM is defined as any materials with a concentration of greater than 1 percent by dry weight of asbestos.
SECTION 6
Space with ACM of any type or condition may be upgraded by the Offeror to meet conditions described in paragraph A by abatement (removal, enclosure, encapsulation, or repair) of ACM not meeting those conditions. If any offer involving abatement of ACM is accepted by the Government, the successful Offeror will be required to successfully complete the abatement in accordance with OSHA, EPA, Department of Transportation (DOT), state, and local regulations and guidance prior to occupancy.
SECTION 7
Management Plan. If space is offered which contains ACM, the Offeror shall submit an asbestos-related management plan for acceptance by the Government prior to lease award. This plan shall conform to EPA guidance.
ACCESSIBILITY (SEP 2013)
The Lease contemplated by this RLP contains requirements for Accessibility. In order to be eligible for award, Offeror must either:
| A. | Verify in the Lease proposal that the Building, offered Space, and areas serving the offered Space meet the Lease accessibility requirements, or |
| B. | Include as a specific obligation in its Lease proposal that improvements to bring the Building, offered Space, and areas serving the offered Space into compliance with Lease accessibility requirements will be completed prior to acceptance of the Space. |
FIRE PROTECTION AND LIFE SAFETY (SEP 2013)
The Lease contemplated by this RLP contains Building requirements for Means of Egress, Automatic Fire Sprinkler System, and Fire Alarm System. In order to be eligible for award, Offeror must either:
SECTION 8
Verify in the lease proposal that the Building in which Space is offered meets the Means of Egress, Automatic Fire Sprinkler System, and Fire Alarm System requirements of the Lease; or
SECTION 9
Include as a specific obligation in its Lease proposal that improvements to bring the Building into compliance with Lease requirements will be completed prior to acceptance of the Space.
ENERGY INDEPENDENCE AND SECURITY ACT (OCT 2016)
A. The Energy Independence and Security Act (EISA) establishes requirements for Government leases relating to energy efficiency standards and potential cost-effective energy efficiency and conservation improvements.
B. Unless one of the statutory exceptions listed in sub-paragraph C below applies, GSA may award a lease for a Building only if the Building has earned the ENERGY STAR® label conferred by the U.S. Environmental Protection Agency (EPA) within the most recent year prior to the due date for final proposal revisions. The term “most recent year” means that the date of award of the ENERGY STAR® label by EPA must not be more than 1 year prior to the due date of final proposal revisions. For example, an ENERGY STAR® label awarded by EPA on October 1, 2010, is valid for all lease procurements where final proposal revisions are due on or before September 30, 2011. In lieu of the above, all new Buildings being specifically constructed for the Government must achieve an ENERGY STAR® label within 18 months after occupancy by the Government. In addition, Offerors of the following Buildings shall also have up to 18 months after occupancy by the Government, or as soon thereafter as the Building is eligible for Energy Star® consideration, to achieve an Energy Star® label: 1) All existing Buildings that have had an Energy Star® label but are unable to obtain a label in the most recent year (i.e., within 12 months prior to the due date for final proposal revisions) because of insufficient occupancy; 2) Newly built Buildings that have used Energy® Star’s Target Finder tool and either achieved a “Designed to Earn the Energy Star®” certification or received an unofficial score (in strict adherence to Target Finder’s usage instructions, including the use of required energy modeling) of 75 or higher prior to the due date for final proposal revisions and who are unable to obtain a label in the most recent year because of insufficient occupancy; 3) An existing Building that is unable to obtain a label because of insufficient occupancy but that can produce an indication, through the use of energy modeling or past utility and occupancy data input into Energy Star’s® Portfolio Manager tool or Target Finder, that it can receive an unofficial score of 75 or higher using all other requirements of Target Finder or Portfolio Manager, except for actual data from the most recent year. ENERGY STAR® tools and resources can be found at HTTPS://WWW.ENERGYSTAR.GOV/.
C. EISA allows a Federal agency to lease Space in a Building that does not have an ENERGY STAR® Label if:
1. No Space is offered in a Building with an ENERGY STAR® Label that meets RLP requirements, including locational needs;
2. The agency will remain in a Building it currently occupies;
3. The Lease will be in a Building of historical, architectural, or cultural significance listed or eligible to be listed on the National Register of Historic Places; or
4. The Lease is for 10,000 RSF or less.
D. If one or more of the statutory exceptions applies, and the offered Space is not in a Building that has earned the ENERGY STAR® Label within one year prior to the due date for final proposal revisions, Offerors are required to include in their lease proposal an agreement to renovate the Building for all energy efficiency and conservation improvements that it has determined would be cost effective over the Firm Term of the Lease, if any, prior to acceptance of the Space (or not later than one year after the Lease Award Date of a succeeding or superseding lease). Such improvements may consist of, but are not limited to, the following:
1. Heating, Ventilating, and Air Conditioning (HVAC) upgrades, including boilers, chillers, and Building Automation System (BAS)/Monitoring/Control System (EMCS).
2. Lighting Improvements.
3. Building Envelope Modifications.
NOTE: Additional information can be found on http://www.gsa.gov/leasing under “Green Leasing.”
E. The term "cost effective" means an improvement that will result in substantial operational cost savings to the landlord by reducing electricity or fossil fuel consumption, water, or other utility costs. The term "operational cost savings" means a reduction in operational costs to the landlord through the application of Building improvements that achieve cost savings over the Firm Term of the Lease sufficient to pay the incremental additional costs of making the Building improvements.
F. Instructions for obtaining an ENERGY STAR® Label are provided at http://www.energystar.gov/buildings/facility-owners-and-managers/existing-buildings/earn-recognition/energy-star-certification (use “Portfolio Manager” to apply). ENERGY STAR® tools and resources can be found at HTTPS://WWW.ENERGYSTAR.GOV/. The ENERGY STAR® Building Upgrade Manual (http://www.energystar.gov/buildings/facility-owners-and-managers/existing-buildings/save-energy/comprehensive-approach/energy-star) and Building Upgrade Value Calculator (http://www.energystar.gov/buildings/tools-and-resources/building-upgrade-value-calculator) are tools which can be useful in considering energy efficiency and conservation improvements to Buildings.
G. If one or more of the statutory exceptions applies, and the offered Space is not in a Building that has earned the ENERGY STAR® Label within one year prior to the due date for final proposal revisions, the successful Offeror will be excused from performing any agreed-to energy efficiency and conservation renovations, and benchmarking with public disclosure (as provided in (I) below, if it obtains the ENERGY STAR® Label prior to the Government’s acceptance of the Space (or not later than one year after the Lease Award Date for succeeding and superseding leases).
H. If no improvements are proposed, the Offeror must demonstrate to the Government using the ENERGY STAR® Online Tools why no energy efficiency and conservation improvements are cost effective. If such explanation is unreasonable, the offer may be rejected.
I. As described in Section 3 of the Lease, successful Offerors meeting one of the statutory exceptions above must agree to benchmark and publicly disclose the Building’s current ENERGY STAR® score, using EPA’s Portfolio Manager online software application. See the Lease for additional details.
J. All new Buildings being specifically constructed for the Government must achieve the ENERGY STAR® Label within 18 months after occupancy by the Government.
ACTION REQUIRED: USE SUB-PARAGRAPH K ONLY FOR SOLE SOURCE SUCCEEDING OR SUPERSEDING LEASES AT THE CURRENT LOCATION. OTHERWISE, DELETE.
INCLUDE THE FOLLOWING PARAGRAPH, IN CONSULTATION WITH THE REGIONAL ENVIRONMENTAL QUALITY ADVISOR OR THE REGIONAL NEPA EXPERT. APPLICABLE SITUATIONS INCLUDE:
· OFFERS INVOLVING NEW CONSTRUCTION OR GROUND DISTURBING ACTIVITY (THIS REFERS TO EXCAVATION AND DOES NOT INCLUDE BUILDING MAINTENANCE ACTIVITIES SUCH AS LANDSCAPING).
· SUBSTANTIAL CHANGE IN BUILDING USE THAT WOULD AFFECT NEIGHBORHOOD TRAFFIC PATTERNS.
· PRIOR USE OF SPACE WAS NOT GENERAL PURPOSE OFFICE-TYPE OCCUPANCY AND THERE WAS A POTENTIAL FOR THE PRESENCE OF HAZARDOUS SUBSTANCES.
OTHERWISE, DELETE.
INCLUDE THE FOLLOWING PARAGRAPH, IN CONSULTATION WITH THE REGIONAL HISTORIC PRESERVATION OFFICER, WHEN ANTICIPATING OFFERS THAT COULD EITHER AFFECT HISTORIC PROPERTIES (FOR EXAMPLE, ANY LEASE IN A HISTORIC BUILDING OR DISTRICT) OR INVOLVE GROUND DISTURBING ACTIVITY (FOR EXAMPLE, EXCAVATION). OTHERWISE, DELETE.
HOW TO OFFER
GENERAL INSTRUCTIONS (SIMPLIFIED) (SEP 2013)
Offeror shall prepare a complete signed lease document, including all required exhibits, using the forms provided with this RLP. Offeror's submission constitutes its offer to enter into a binding lease. A Lease is binding when the LCO countersigns the Offeror's signed lease document and mails or otherwise furnishes written notification of the executed lease to the successful offeror. Offerors are advised that the Government may make award without negotiations. ACTION REQUIRED: ENTER APPROPRIATE INFORMATION BELOW, INCLUDING TIME AND TIME ZONE. MUST MATCH COVER PAGE.
ACTION REQUIRED: THIS LIST IS NOT COMPREHENSIVE. ADD OR DELETE ITEMS APPROPRIATE FOR YOUR SPECIFIC ACQUISITION.
PROPOSAL CONTENTS FOR SIMPLIFIED LEASES (OCT 2017)
The proposal shall consist of the following documents:
DOCUMENT NAME OR DESCRIPTION
Lease No. 36C26220L0005 (Form L201A), signed and initialed by Offeror
Simplified Lease Proposal (GSA Form 1364A), completed and signed by Offeror
Simplified Lease Proposal Data (GSA Form 1364A-1), completed and signed by Offeror
Security Requirements, initialed by Offeror
Fire Protection and Life Safety information and documents (See Fire Protection and Life Safety paragraphs in RLP and Lease for applicable requirements
Auto CAD or scaled floor plans delineating the Premises proposed by the Offeror
Seismic Form(s) KEEP ONLY IF USING SEISMIC PARAGRAPH IN SECTION 2 (YELLOW OR RED ZONE); OTHERWISE DELETE
Registration in the System for Award Management (SAM). Offerors must be registered for purposes of “All Awards,” including completion of all required representations and certifications within SAM. This registration service is free of charge.
EISA compliance information (See Energy Independence and Security Act paragraphs in RLP and Lease for applicable requirements)
Evidence of ownership or control of Building or site
Authorization from the ownership entity to submit an offer on the ownership entity’s behalf, if offeror is not the owner of the Property.
FIRE PROTECTION AND LIFE SAFETY SUBMITTALS (SIMPLIFIED) (SEP 2013)
A. The Offeror must submit the Fire Protection and Life Safety (FPLS) Submittal Information in A.1 through A.5, unless the Building meets either exemption in sub-paragraph B or C below.
1. Completed GSA Form 12000, Prelease Fire Protection and Life Safety Evaluation for an Office Building (Part A or Part B, as applicable).
2. A copy of the previous year’s fire alarm system maintenance record showing compliance with the requirements in NFPA 72 (if a system is installed in the Building).
3. A copy of the previous year’s automatic fire sprinkler system maintenance record showing compliance with the requirements in NFPA 25 (if a system is installed in the Building).
4. First generation plans scaled at a minimum of 1/8" = 1'0" (preferred) shall be submitted for review and consideration. Plans submitted for consideration shall include floor plan(s) for which Space is being offered and floor plan(s) of the floor(s) of exit discharge (e.g., street level(s)). Each plan submitted shall include the locations of all exit stairs, elevators, and the Space(s) being offered to the Government. In addition, where Building exit stairs are interrupted or discontinued before the level of exit discharge, additional floor plans for the level(s) where exit stairs are interrupted or discontinued must also be provided.
5. A valid Building Certificate of Occupancy (C of O) issued by the local jurisdiction. If the Building C of O is not available or the local jurisdiction does not issue a Building C of O, a report prepared by a licensed fire protection engineer with their assessment of the offered Space regarding compliance with all applicable local Fire Protection and Life Safety-related codes and ordinances must be provided.
B. If the Space offered is 10,000 RSF or less in area and is located on the 1st floor of the Building, Offeror is not required to submit to GSA the Fire Protection and Life Safety (FPLS) Submittal Information listed in A.1 through A.5 above.
C. If the Offeror provides a Building C of O obtained under any edition of the International Building Code (IBC), and the offered Space meets or will meet all the requirements of the Lease with regard to Means of Egress, Automatic Fire Sprinkler System, and Fire Alarm System prior to occupancy, then Offeror is not required to submit to GSA the FPLS Submittal Information in A.1 through A.5 above.
EISA SUBMITTALS (SIMPLIFIED) (MAR 2016)
A. No later than the due date for final proposal revisions, the Offeror must submit to the LCO:
1. Evidence of an Energy Star® label obtained within the 12 months prior to the due date of final proposal revisions,
2. Offerors falling under a statutory exception must also indicate by the due date for final proposal revisions what cost effective energy efficiency and conservation improvements they are proposing to make; and if no improvements are cost effective, the Offeror shall so indicate and provide supporting evidence of the lack of any cost effective improvements,
3. If the Offeror is claiming eligibility for additional time to obtain the Energy Star® label per sub-paragraph B of the RLP paragraph entitled “Energy Independence and Security Act,” then the Offeror shall provide such indication with its initial offer and also must provide by the due date for final proposal revisions evidence substantiating their claim for additional time to obtain the Energy Star® label and substantiating their capability of earning the Energy Star®, or
B. If the offered existing building will not have an ENERGY STAR® label by the date of final proposal revisions, then in accordance with one of the statutory exceptions listed in the “Energy Independence and Security Act” paragraph herein, a written statement addressing which energy efficiency and conservation improvements (per the Energy Independence and Security Act paragraph) can be made to the building must be submitted. If no cost-effective improvements can be made, the Offeror must demonstrate to the Government using the ENERGY STAR® Online Tools referenced in the RLP paragraph, entitled “ENERGY INDEPENDENCE AND SECURITY ACT,” why no energy efficiency and conservation improvements are cost effective. This explanation will be subject to review by the LCO. If the explanation is considered unreasonable, the offer may be considered technically unacceptable.
C. If more than 5,000 square feet of land area is to be disturbed in order to meet the Government’s requirements, (as more fully described in the lease paragraph named ENERGY INDEPENDENCE AND SECURITY ACT, sub-paragraph (B)(1)(b)), a statement from Offeror that the Offeror is aware of and will comply with the specific lease requirements concerning maintenance and restoration of the real property’s…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .