Attachment D21 - Section F Lease -Escondido - updated Square Footage .pdf

PDF 1 MB Posted

Attached to
Q201--Escondido CBOC RFP
Solicitation number
36C26220R0128
Issued by

View the file

Other files

File Type Posted
Attachment D23 - VA Handbook 0730.pdf PDF
36C26220R0128 0007 - QandA and RFP Updates.pdf PDF
36C26220R0128 0007_1.docx DOCX document
Attachment 22 - Davis-Bascon Wage Determination.pdf PDF
Attachment D24 - Physical Security Design Manual for Life Safety Protected Facilities.pdf PDF
Attachment D25 - Physical Security Design Manual for Life Safety PG-18-3 Noise Transmission Control.pdf PDF
36C26220R0128 0006.pdf PDF
36C26220R0128 0006_1.docx DOCX document
36C26220R0128 0005_1.docx DOCX document
36C26220R0128 0005.pdf PDF
36C26220R0128 0004_1.docx DOCX document
36C26220R0128 0004 - QandA and PWS Update and Attachments.pdf PDF
36C26220R0128 0003.pdf PDF
36C26220R0128 0003_1.docx DOCX document
36C26220R0128 0002.pdf PDF
36C26220R0128 0002_1.docx DOCX document
36C26220R0128 0001.pdf PDF
36C26220R0128 0001_1.docx DOCX document
Attachment D2 - Price Work Sheet.pdf PDF
Attachment D20 - Mental Health No Show Policy.pdf PDF
Attachment D10 -Patients_ Rights Responsibilities and Conduct HSP 003-04.pdf PDF
Attachment D19 - Home Telehealth Manual.pdf PDF
Attachment D18 - Connected Care Telehealth Manual.pdf PDF
Attachment D9 - Wage Determination.pdf PDF
Attachment D5 - Contractor Security Requirements (Handbook 6500.6).pdf PDF
Attachment D3 - Past Performance Questionnaire.pdf PDF
36C26220R0128_2.docx DOCX document
Attachment D21 - Section F Lease -Escondido.docx DOCX document
Attachment D7 - Rules of Behavior.pdf PDF
Attachment D13 - VHA Directive 2011-012 - Medication Reconciliation.pdf PDF
Attachment D6 - Immigration and Nationality Act of 1952 Certification.pdf PDF
Attachment D17 - Anticoagulation Therapy.pdf PDF
S02 - RFP - 36C26220R0128 - ESCONDIDO CBOC.pdf PDF
Attachment D11 - Ancillary Testing Policy HSP 05-01.pdf PDF
Attachment D16 - HCS Policy 114-01 Attachment I.pdf PDF
Attachment D14 - Memorandum 11-99 Communicating Test Results.pdf PDF
Attachment D15 - MCM 00-18 Patient and Nursing Home Resident Rights and Responsibilities.pdf PDF
Attachment D4 - Conflict of Interest.pdf PDF
Attachment D1- Quality Assurance Surveillance Plan.pdf PDF
Attachment D12 - Pathology and Laboratory Medicine Service Procedures.pdf PDF
Attachment D8 - Proper Use of Email and Other Messaging Services.pdf PDF
Show all 41

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR

LEASE

PROPOSALS:

Escondido, California

Offers due by 10/16/2020

In order to be considered for award, offers conforming to the requirements of the RLP shall be received no later than 4:00P, PST on the date above. See “Receipt of Lease Proposals” herein for additional information.

This Request for Lease Proposals ("RLP") sets forth instructions and requirements for proposals for a Lease described in the RLP documents. Proposals conforming to the RLP requirements will be evaluated in accordance with the Method of Award set forth herein to select an Offeror for award. The Government will award the Lease to the selected Offeror, subject to the conditions herein.

The information collection requirements contained in this Solicitation/Contract, that are not required by the regulation, have been approved by the Office of Management and Budget pursuant to the Paperwork Reduction Act and assigned the OMB Control No.

3090-0163.

SIMPLIFIED RLP

GSA FORM R101A (10/18)

TABLE OF CONTENTS

SIMPLIFIED RLP

SECTION 1 STATEMENT OF REQUIREMENTS

1.01 GENERAL INFORMATION (SIMPLIFIED) (JUN 2012)

1.02 AMOUNT AND TYPE OF SPACE AND LEASE TERM (SIMPLIFIED) (SEP 2013)

1.03 NEIGHBORHOOD, PARKING, LOCATION AMENITIES, AND PUBLIC TRANSPORTATION (SEP 2013)

1.04 LIST OF RLP DOCUMENTS (SIMPLIFIED) (OCT 2017)

1.05 AMENDMENTS TO THE RLP (JUN 2012)

1.06 LEASE DESCRIPTION (SIMPLIFIED) (OCT 2016)

1.07 RELATIONSHIP OF RLP BUILDING MINIMUM REQUIREMENTS AND LEASE OBLIGATIONS (OCT 2016)

1.08 AUTHORIZED REPRESENTATIVES (JUN 2012)

1.09 PRICING OF SECURITY REQUIREMENTS (SIMPLIFIED) (OCT 2016)

1.10 NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND SMALL BUSINESS SIZE

STANDARD (OCT 2017)

1.11 DUNS NUMBER (OCT 2017)

SECTION 2 ELIGIBILITY AND PREFERENCES FOR AWARD

2.01 EFFICIENCY OF LAYOUT (SIMPLIFIED) (AUG 2011)

2.02 FLOOD PLAINS (OCT 2017)

2.03 SEISMIC SAFETY – MODERATE SEISMICITY (OCT 2017) .................................. Error! Bookmark not defined.

2.04 SEISMIC SAFETY – HIGH SEISMICITY (OCT 2017)

2.05 HISTORIC PREFERENCE (SIMPLIFIED) (SEP 2013)

2.06 ASBESTOS (JUN 2012)

2.07 ACCESSIBILITY (SEP 2013)

2.08 FIRE PROTECTION AND LIFE SAFETY (SEP 2013)

2.09 ENERGY INDEPENDENCE AND SECURITY ACT (OCT 2016)

2.10 DUE DILIGENCE AND NATIONAL ENVIRONMENTAL POLICY ACT REQUIREMENTS - RLP (SEP 2014) ..... Error!

Bookmark not defined.

2.11 NATIONAL HISTORIC PRESERVATION ACT REQUIREMENTS - RLP (OCT 2016)

SECTION 3 HOW TO OFFER

3.01 GENERAL INSTRUCTIONS (SIMPLIFIED) (SEP 2013)

3.02 RECEIPT OF LEASE PROPOSALS (SEP 2013) ..................................................... Error! Bookmark not defined.

3.03 PROPOSAL CONTENTS FOR SIMPLIFIED LEASES (OCT 2017)

3.04 FIRE PROTECTION AND LIFE SAFETY SUBMITTALS (SIMPLIFIED) (SEP 2013)

3.05 EISA SUBMITTALS (SIMPLIFIED) (MAR 2016)

3.06 TENANT IMPROVEMENTS INCLUDED IN OFFER (SIMPLIFIED) (JUN 2012)

3.07 OPERATING COSTS REQUIREMENTS INCLUDED IN OFFER (JUN 2012)

3.08 UTILITIES SEPARATE FROM RENTAL / BUILDING OPERATING PLAN (JUN 2012)

SECTION 4 METHOD OF AWARD

4.01 AWARD WITHOUT DISCUSSION (SIMPLIFIED) (MAR 2012) ............................ Error! Bookmark not defined.

4.02 HUBZONE SMALL BUSINESS CONCERN ADDITIONAL PERFORMANCE REQUIREMENTS (SIMPLIFIED) (SEP 2013) Error! Bookmark not defined.

4.03 AWARD BASED ON PRICE (SIMPLIFIED) (JUN 2012) ........................................ Error! Bookmark not defined.

4.04 PRESENT VALUE PRICE EVALUATION (SIMPLIFIED) (OCT 2016) ...................... Error! Bookmark not defined.

4.05 AWARD (SIMPLIFIED) (OCT 2017)

SECTION 5 ADDITIONAL TERMS AND CONDITIONS

5.01 MODIFIED RLP PARAGRAPHS (OCT 2016)

LEASE NO. GS-XXP-LXXXXXXX LESSOR: ______ GOVERNMENT: ________ GSA FORM L201A (10/18)

REQUEST FOR LEASE

PROPOSALS: Escondido, CA

SIMPLIFIED RLP GSA FORM R101A (October 2018)

STATEMENT OF REQUIREMENTS

GENERAL INFORMATION (SIMPLIFIED) (JUN 2012)

A. This Request for Lease Proposals (RLP) sets forth instructions and requirements for proposals for a Lease described in the RLP documents.

The Government will evaluate proposals conforming to the RLP requirements in accordance with the Method of Award set forth below to select an Offeror for award. The Government will award the Lease to the selected Offeror, subject to the conditions below.

B. Included in the RLP documents is a lease form (GSA Form L201A) setting forth the lease term and other terms and conditions of the Lease contemplated by this RLP, a Simplified Lease Proposal form (GSA Form 1364A), and a Simplified Lease Proposal Data form (GSA Form 1364A-1) on which Offerors shall submit its offered rent and other price data, together with required information and submissions. The Lease paragraph titled "Definitions and General Terms" shall apply to the terms of this RLP.

C. The Offeror's executed Lease shall constitute a firm offer. No Lease shall be formed until the Lease Contracting Officer (LCO) executes the Lease and delivers a signed copy to the Offeror.

AMOUNT AND TYPE OF SPACE AND LEASE TERM (SIMPLIFIED) (SEP 2013)

A. The Space shall be located in a modern quality Building of sound and substantial construction with a facade of stone, marble, brick, stainless steel, aluminum or other permanent materials in good condition and acceptable to the LCO. If not a new Building, the Space offered shall be in a Building that has undergone, or will complete by occupancy, modernization or adaptive reuse for the Space with modern conveniences.

SECTION 1

CITY, STATE ESCONDIDO, CALIFORNIA

DELINEATED AREA ESCONDIDO, CALIFORNIA

SPACE TYPE(S) GENERAL USE

MINIMUM SQ. FT. (ABOA) 3,910

MAXIMUM SQ. FT. (ABOA) 3,910

INITIAL FULL TERM TEN- YEAR

TERMINATION RIGHTS 180 DAYS

INITIAL FIRM TERM 5 - YEAR

ADDITIONAL REQUIREMENTS TURNKEY BUILD-OUT

SECTION 2

The Government may provide vending machines within the Government's leased area under the provisions of the Randolph-Sheppard Act (20 USC 107

et. seq.). If the Government chooses to provide vending facilities, the Government will control the number, kind, and locations of vending facilities and will control and receive income from all automatic vending machines. Offeror shall provide necessary utilities and make related alterations. The cost of the improvements is part of Tenant Improvement (TI) costs. The Government will not compete with other facilities having exclusive rights in the Building.

The Offeror shall advise the Government if such rights exist.

SECTION 3

NEIGHBORHOOD, PARKING, LOCATION AMENITIES, AND PUBLIC TRANSPORTATION (SEP 2013)

A. INSIDE CITY CENTER: Space shall be located in a prime commercial office district with attractive, prestigious, and professional surroundings with a prevalence of modern design and/or tasteful rehabilitation in modern use. Streets and public sidewalks shall be well maintained. The parking-to-square-foot ratio available on-site shall at least meet current local code requirements, or in the absence of a local code requirement, on-site parking shall be available at a ratio of one (1) space for every 250 RSF of Space.

B. OUTSIDE CITY CENTER: Space shall be located 1) in an office, research, technology, or business park that is modern in design with a campus-like atmosphere; or, 2) on an attractively landscaped site containing one or more modern office Buildings that are professional and prestigious in appearance with the surrounding development well maintained and in consonance with a professional image. The parking-to-square-foot ratio available on-site shall at least meet current local code requirements, or, in the absence of a local code requirement, on-site parking shall be available at a ratio of one (1) space for every 250 RSF of Space. Adequate eating facilities shall be located within the immediate vicinity of the Building, but generally not exceeding a walkable ½ mile, as determined by the LCO.

LIST OF RLP DOCUMENTS (SIMPLIFIED) (OCT 2017)

The following documents are attached to and included as part of this RLP package:

DOCUMENT NAME

Lease No. 36C26220L0005 (Form L201A)

Security Requirements for Level 2

GSA Form 3516A Solicitation Provisions

Proposal to Lease Space (GSA Form 1364A)

Simplified Lease Proposal Data (GSA Form 1364A-1)

GSA Form 12000 for Pre-lease Fire Protection and Life Safety Evaluation for an Office Building (Part A or Part B) (See Section 3 for applicable requirements)

Seismic Offer Forms

AMENDMENTS TO THE RLP (JUN 2012)

This RLP may be amended by notice from the LCO. Amendments may modify the terms of this RLP, or the terms, conditions, and requirements of the Lease contemplated by the RLP.

LEASE DESCRIPTION (SIMPLIFIED) (OCT 2016)

Offerors shall examine the Lease form included in the RLP documents to understand the Government's and the Lessor's respective rights and responsibilities under the contemplated Lease.

The Lease contemplated by this RLP includes:

A. The term of the Lease, and renewal option, if any.

B. Terms and Conditions of the Lease, including Definitions, Standards, and Formulas applicable to the Lease and this RLP.

C. Building Shell standards and requirements.

D. Agency Specific Requirements (ASR) describing the tenant improvements (TI) to be completed by the Lessor prior to occupancy.

E. Security Requirements.

F. A description of all services to be provided by the Lessor.

Should the Offeror be awarded the Lease, the terms of the Lease will be binding upon the Lessor without regard to any statements contained in this

RLP.

The Lease contemplated by this RLP is a fully serviced, turnkey Lease with a fixed rent that covers all Lessor costs, including all shell upgrades, TIs, operating costs, taxes, and security upgrades. Rent will be based upon a proposed rental rate per rentable square foot (RSF), limited by the offered rate and the maximum ABOA SF solicited under this RLP. The Tenant Improvements to be delivered by the Lessor will be based upon information provided with this RLP and Lease, including Agency Specific Requirements. The Lessor will be required to design and build the TIs and will be compensated for the TI costs based upon turnkey pricing established under the Lease without further compensation other than the rent. Offerors are encouraged to consider the use of existing fit-out and other improvements to minimize waste. However, any existing improvements must be deemed equivalent to Lease requirements for new installation, and Offerors are cautioned to consider those requirements before assuming efficiencies in its TI costs resulting from use of existing improvements.

After award, the Lessor must prepare Design Intent Drawings (DIDs) for the leased space conforming to the Agency Specific Requirements. The Government will have the opportunity to review the Lessor's DIDs to determine that the Lessor's design meets the requirements of the Lease. Only after the Government approves the DIDs will the Lessor be released to proceed with buildout. The Lease also provides that the Government may modify the TI requirements, subject to the Lessor's right to receive compensation for such changes. Upon completion and acceptance of the leased Space, the Space will be measured for establishing the actual annual rent, and the lease term shall commence.

The security pricing process is described in a separate paragraph.

RELATIONSHIP OF RLP BUILDING MINIMUM REQUIREMENTS AND LEASE OBLIGATIONS (OCT 2016)

The Lease establishes various requirements relating to the Building shell. Such requirements are not deemed TIs. There are certain Building requirements that are established as minimum requirements in this RLP. If the Lessor's Building does not meet the requirements at the time of award, the Lessor may still be awarded the Lease. However, as a condition of award, the Government will require Lessor to identify those Building improvements that will bring the Building into compliance with RLP requirements. Upon award of the Lease, completion of those Building improvements will become Lease obligations.

AUTHORIZED REPRESENTATIVES (JUN 2012)

With respect to all matters relating to this RLP, only the Government's LCO designated below shall have the authority to amend the RLP and award a Lease. The Government shall have the right to substitute its LCO by notice, without an express delegation by the prior LCO.

Lease LCO:

Alan Trinh 4811 Airport Plaza Dr., Suite 600, Long Beach, CA 90815

562-766-2271 562-481-5283 (C) alan.trinh@va.gov

As to all other matters, Offerors may contact the Alternate Government Contact designated below.

Alternate Government Contact:

Alice McGruder 4811 Airport Plaza, Dr., Suite 600, Long Beach, CA 90815 562-766-2238 Alice.McGruder@va.gov

PRICING OF SECURITY REQUIREMENTS (SIMPLIFIED) (OCT 2016)

A. The proposed Lease contains an attachment with the security requirements and obligations for the building, which are based on the facility security level (FSL). The Federal Government determines the facility’s FSL rating, which ranges from FSL I to FSL IV. The FSL is based on client agency mix, required size of space, number of employees, use of the space, location, configuration of the site and lot, and public access into and around the facility.

B. The security requirements attached to this Lease includes a list of security countermeasures that must be installed in the leased Space. The

Offeror shall itemize costs of these security counter measures and shall amortize the cost of any Building Specific Amortized Capital (BSAC) into the rent.

C. There shall be no charge to the Government for any items that already exist in the offered Building or facility.

NORTH AMERICAN INDUSTRY CLASSIFICATION SYSTEM (NAICS) CODE AND SMALL BUSINESS SIZE STANDARD (OCT 2017)

A. The North American Industry Classification System (NAICS) code for this acquisition is 531120, unless the real property is self-storage

(#531130), land (#531190), or residential (#531110).

B. The small business size standard is 38.5 Million in annual average gross revenue of the concern for the last 3 fiscal years.

C. The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.

DUNS NUMBER (OCT 2017)

An offeror may obtain a DUNS number (i) via the Internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or (ii) If located outside the United States, by contacting the local Dun and Bradstreet Office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.

<<<<<<REMAINDER OF THE PAGE INTENTIONALLY LEFT BLANK>>>>>>

http://fedgov.dnb.com/webform

ELIGIBILITY AND PREFERENCES FOR AWARD

EFFICIENCY OF LAYOUT (SIMPLIFIED) (AUG 2011)

In order to be acceptable for award, the offered Space must provide for an efficient layout as determined by the LCO. To demonstrate potential for efficient layout, GSA may request the Offeror to provide a test fit layout at the Offeror’s expense.

FLOOD PLAINS (OCT 2017)

A Lease will not be awarded for any offered Property located within a 100-year floodplain unless the Government has determined that there is no practicable alternative. An Offeror may offer less than its entire site in order to exclude a portion of the site that falls within a floodplain, so long as the portion offered meets all the requirements of this RLP and does not impact the Government’s full use and enjoyment of the Premises. If an Offeror intends that the offered Property that will become the Premises for purposes of this Lease will be something other than the entire site as recorded in tax or other property records the Offeror shall clearly demarcate the offered Property on its site plan/map submissions and shall propose an adjustment to property taxes on an appropriate pro rata basis. For such an offer, the LCO may, in his or her sole discretion, determine that the offered Property does not adequately avoid development in a 100-year floodplain.

In addition, a Lease will not be awarded for any offered Property adjacent to 100-year floodplain, where such an adjacency would, as determined by the LCO, in his or her sole discretion, restrict ingress or egress to the Premises in the event of a flood, unless there is no practicable alternative.

SEISMIC SAFETY – HIGH SEISMICITY (OCT 2017)

A. The Government intends to award a Lease to an Offeror of a Building that is in compliance with the Seismic Standards. If an offer is received which is in compliance with the Seismic Standards and the other requirements of this RLP, then other offers which do not comply with the Seismic Standards must not be considered. If none of the offers is in compliance with the Standards, the LCO will make the award to the Offeror whose offer meets the other requirements of this RLP and provides the best value to the Government, taking into account price, seismic safety and any other award factors specified in this RLP.

B. An offered Building will be considered to be in compliance with the Seismic Standards if it meets one of the following conditions:

1. The offer includes a representation that the Premises will be in a one-story Building of steel light frame or wood construction with less than 3,000 ABOA SF of space in the Building (Seismic Form D).

2. The offer includes a Seismic Certificate certifying that the Building is a Benchmark Building (Seismic Form A).

3. The offer includes a Seismic Certificate based on a Tier I Evaluation showing that the Building meets the Seismic Standards (Seismic Form

B). The submission must include the checklists and backup calculations from the Tier 1 Evaluation.

4. The offer includes a Seismic Certificate based on a Tier 2 or Tier 3 Evaluation showing that the Building complies with the Seismic Standards

(Seismic Form B). If the certificate is based on a Tier 2 or Tier 3 Evaluation, the data, working papers, calculations and reports from the evaluation must be made available to the Government.

5. The offer includes a commitment to retrofit the Building to satisfy all of the Basic Safety Objective requirements of ASCE/SEI 41 (Seismic Form C, Part 1). If the Offeror proposes to retrofit the Building, the offer must include a Tier 1 report with all supporting documents, a narrative explaining the process and scope of retrofit and a schedule for the seismic retrofit. The Offeror shall provide a construction schedule, concept design for the seismic upgrade and supporting documents for the retrofit, including structural calculations, drawings, specifications, and geotechnical report to the Government for review and approval prior to award. The documentation must demonstrate the seismic retrofit will meet the seismic standards and be completed within the time frame required.

6. The offer includes a pre-award commitment to construct a new Building, using local building codes (Seismic Form C, Part 2).

C. The LCO may allow an Offeror to submit a Seismic Certificate after the deadline for final proposal revisions. However, the LCO is not obligated to delay award in order to enable an Offeror to submit a Seismic Certificate.

D. Definitions. For the purpose of this paragraph:

• “ASCE/SEI 31” means the American Society of Civil Engineers standard, Seismic Evaluation of Existing Buildings. You can purchase ASCE/SEI from ASCE at (800) 548-2723 or by visiting HTTP://WWW.ASCE.ORG/PUBLICATIONS/.

• “ASCE/SEI 41” means American Society of Civil Engineers standard, Seismic Rehabilitation of Existing Buildings. You can purchase ASCE/SEI from ASCE at (800) 548-2723 or by visiting HTTP://WWW.ASCE.ORG/PUBLICATIONS/.

• “Benchmark Building” means a building that was designed and built, or retrofitted, in accordance with the seismic provisions of the applicable codes specified in Section 1.3.1 of RP 8.

• “Engineer” means a professional engineer who is licensed in Civil or Structural Engineering and qualified in the structural design of buildings.

They must be licensed in the state where the property is located.

• “RP 8” means “Standards of Seismic Safety for Existing Federally Owned and Leased Buildings ICSSC Recommended Practice 8 (RP 8),” issued by the Interagency Committee on Seismic Safety in Construction as ICSSC RP 8 and the National Institute of Standards and Technology as NIST GCR 11-917-12. RP 8 can be obtained from HTTP://WWW.WBDG.ORG/CCB/NIST/NIST_GCR11_917_12.PDF http://www.asce.org/publications/ http://www.asce.org/publications/ http://www.wbdg.org/ccb/NIST/nist_gcr11_917_12.pdf

• “Seismic Certificate” means a certificate executed and stamped by an Engineer on the appropriate Certificate of Seismic Compliance form included with this RLP together with any required attachments.

• “Seismic Standards” means the requirements of RP 8 Section 2.2 for Life Safety Performance Level in ASCE/SEI 31 or the Basic Safety Objective in ASCE/SEI 41, unless otherwise specified.

• “Tier 1 Evaluation” means an evaluation by an Engineer in accordance with Chapters 2.0 and 3.0 of ASCE/SEI 31. A Tier 1 Evaluation must include the appropriate Structural, Nonstructural and Geologic Site Hazards and Foundation Checklists.

• “Tier 2 Evaluation” means an evaluation by an Engineer in accordance with Chapter 4.0 of ASCE/SEI 31.

• “Tier 3 Evaluation” means an evaluation by an Engineer in accordance with Chapter 5.0 of ASCE/SEI 31.

ASBESTOS (JUN 2012)

SECTION 4

Government requests space with no asbestos-containing materials (ACM), or with ACM in a stable, solid matrix (e.g., asbestos flooring or asbestos cement panels), which is not damaged or subject to damage by routine operations. For purposes of this paragraph, “space” includes the 1) space offered for lease; 2) common building area; 3) ventilation systems and zones serving the space offered; and 4) the area above suspended ceilings and engineering space in the same ventilation zone as the space offered. If no offers are received for such space, the Government may consider space with thermal system insulation ACM (e.g., wrapped pipe or boiler lagging), which is not damaged or subject to damage by routine operations.

SECTION 5

ACM is defined as any materials with a concentration of greater than 1 percent by dry weight of asbestos.

SECTION 6

Space with ACM of any type or condition may be upgraded by the Offeror to meet conditions described in paragraph A by abatement (removal, enclosure, encapsulation, or repair) of ACM not meeting those conditions. If any offer involving abatement of ACM is accepted by the Government, the successful Offeror will be required to successfully complete the abatement in accordance with OSHA, EPA, Department of Transportation (DOT), state, and local regulations and guidance prior to occupancy.

SECTION 7

Management Plan. If space is offered which contains ACM, the Offeror shall submit an asbestos-related management plan for acceptance by the Government prior to lease award. This plan shall conform to EPA guidance.

ACCESSIBILITY (SEP 2013)

The Lease contemplated by this RLP contains requirements for Accessibility. In order to be eligible for award, Offeror must either:

A. Verify in the Lease proposal that the Building, offered Space, and areas serving the offered Space meet the Lease accessibility requirements, or

B. Include as a specific obligation in its Lease proposal that improvements to bring the Building, offered Space, and areas serving the offered Space into compliance with Lease accessibility requirements will be completed prior to acceptance of the Space.

FIRE PROTECTION AND LIFE SAFETY (SEP 2013)

The Lease contemplated by this RLP contains Building requirements for Means of Egress, Automatic Fire Sprinkler System, and Fire Alarm System. In order to be eligible for award, Offeror must either:

SECTION 8

Verify in the lease proposal that the Building in which Space is offered meets the Means of Egress, Automatic Fire Sprinkler System, and Fire Alarm System requirements of the Lease; or

SECTION 9

Include as a specific obligation in its Lease proposal that improvements to bring the Building into compliance with Lease requirements will be completed prior to acceptance of the Space.

ENERGY INDEPENDENCE AND SECURITY ACT (OCT 2016)

A. The Energy Independence and Security Act (EISA) establishes requirements for Government leases relating to energy efficiency standards and potential cost-effective energy efficiency and conservation improvements.

B. Unless one of the statutory exceptions listed in sub-paragraph C below applies, GSA may award a lease for a Building only if the Building has earned the ENERGY STAR® label conferred by the U.S. Environmental Protection Agency (EPA) within the most recent year prior to the due date for final proposal revisions. The term “most recent year” means that the date of award of the ENERGY STAR® label by EPA must not be more than 1 year prior to the due date of final proposal revisions. For example, an ENERGY STAR® label awarded by EPA on October 1, 2010, is valid for all lease procurements where final proposal revisions are due on or before September 30, 2011. In lieu of the above, all new Buildings being specifically constructed for the Government must achieve an ENERGY STAR® label within 18 months after occupancy by the Government. In addition, Offerors of the following Buildings shall also have up to 18 months after occupancy by the Government, or as soon thereafter as the Building is eligible for Energy Star® consideration, to achieve an Energy Star® label: 1) All existing Buildings that have had an Energy Star® label but are unable to obtain a label in the most recent year (i.e., within 12 months prior to the due date for final proposal revisions) because of insufficient occupancy; 2) Newly built Buildings that have used Energy® Star’s Target Finder tool and either achieved a “Designed to Earn the Energy Star®” certification or received an unofficial score (in strict adherence to Target Finder’s usage instructions, including the use of required energy modeling) of 75 or higher prior to the due date for final proposal revisions and who are unable to obtain a label in the most recent year because of insufficient occupancy; 3) An existing Building that is unable to obtain a label because of insufficient occupancy but that can produce an indication, through the use of energy modeling or past utility and occupancy data input into Energy Star’s® Portfolio Manager tool or Target Finder, that it can receive an unofficial score of 75 or higher us ing all other requirements of Target Finder or Portfolio Manager, except for actual data from the most recent year. ENERGY STAR® tools and resources can be found at HTTPS://WWW.ENERGYSTAR.GOV/.

C. EISA allows a Federal agency to lease Space in a Building that does not have an ENERGY STAR® Label if:

1. No Space is offered in a Building with an ENERGY STAR® Label that meets RLP requirements, including locational needs;

2. The agency will remain in a Building it currently occupies;

3. The Lease will be in a Building of historical, architectural, or cultural significance listed or eligible to be listed on the National Register of Historic Places; or

4. The Lease is for 10,000 RSF or less.

D. If one or more of the statutory exceptions applies, and the offered Space is not in a Building that has earned the ENERGY STAR® Label within one year prior to the due date for final proposal revisions, Offerors are required to include in their lease proposal an agreement to renovate the Building for all energy efficiency and conservation improvements that it has determined would be cost effective over the Firm Term of the Lease, if any, prior to acceptance of the Space (or not later than one year after the Lease Award Date of a succeeding or superseding lease). Such improvements may consist of, but are not limited to, the following:

1. Heating, Ventilating, and Air Conditioning (HVAC) upgrades, including boilers, chillers, and Building Automation System (BAS)

/Monitoring/Control System (EMCS).

2. Lighting Improvements.

3. Building Envelope Modifications.

NOTE: Additional information can be found on http://www.gsa.gov/leasing under “Green Leasing.”

E. The term "cost effective" means an improvement that will result in substantial operational cost savings to the landlord by reducing electricity or fossil fuel consumption, water, or other utility costs. The term "operational cost savings" means a reduction in operational costs to the landlord through the application of Building improvements that achieve cost savings over the Firm Term of the Lease sufficient to pay the incremental additional costs of making the Building improvements.

F. Instructions for obtaining an ENERGY STAR® Label are provided at http://www.energystar.gov/buildings/facility-owners-and-managers/existing-buildings/earn-recognition/energy-star-certification (use “Portfolio Manager” to apply). ENERGY STAR® tools and resources can be found at HTTPS://WWW.ENERGYSTAR.GOV/. The ENERGY STAR® Building Upgrade Manual (http://www.energystar.gov/buildings/facility-owners-and-managers/existing-buildings/save-energy/comprehensive-approach/energy-star) and Building Upgrade Value Calculator (http://www.energystar.gov/buildings/tools-and-resources/building-upgrade-value-calculator) are tools which can be useful in considering energy efficiency and conservation improvements to Buildings.

G. If one or more of the statutory exceptions applies, and the offered Space is not in a Building that has earned the ENERGY STAR® Label within one year prior to the due date for final proposal revisions, the successful Offeror will be excused from performing any agreed-to energy efficiency and conservation renovations, and benchmarking with public disclosure (as provided in (I) below, if it obtains the ENERGY STAR® Label prior to the Government’s acceptance of the Space (or not later than one year after the Lease Award Date for succeeding and superseding leases).

H. If no improvements are proposed, the Offeror must demonstrate to the Government using the ENERGY STAR® Online Tools why no energy efficiency and conservation improvements are cost effective. If such explanation is unreasonable, the offer may be rejected.

I. As described in Section 3 of the Lease, successful Offerors meeting one of the statutory exceptions above must agree to benchmark and publicly disclose the Building’s current ENERGY STAR® score, using EPA’s Portfolio Manager online software application. See the Lease for additional details.

https://www.energystar.gov/ http://www.energystar.gov/buildings/facility-https://www.energystar.gov/

J. All new Buildings being specifically constructed for the Government must achieve the ENERGY STAR® Label within 18 months after occupancy by the Government.

HOW TO OFFER

GENERAL INSTRUCTIONS (SIMPLIFIED) (SEP 2013)

Offeror shall prepare a complete signed lease document, including all required exhibits, using the forms provided with this RLP. Offeror's submission constitutes its offer to enter into a binding lease. A Lease is binding when the LCO countersigns the Offeror's signed lease document and mails or otherwise furnishes written notification of the executed lease to the successful offeror. Offerors are advised that the Government may make award without negotiations.

PROPOSAL CONTENTS FOR SIMPLIFIED LEASES (OCT 2017)

The proposal shall consist of the following documents:

DOCUMENT NAME OR DESCRIPTION

Lease No. 36C26220L0005 (Form L201A), signed and initialed by Offeror

Simplified Lease Proposal (GSA Form 1364A), completed and signed by Offeror

Simplified Lease Proposal Data (GSA Form 1364A-1), completed and signed by Offeror

Security Requirements, initialed by Offeror

Fire Protection and Life Safety information and documents (See Fire Protection and Life Safety paragraphs in RLP and Lease for applicable requirements

Auto CAD or scaled floor plans delineating the Premises proposed by the Offeror

Seismic Form(s)

Registration in the System for Award Management (SAM). Offerors must be registered for purposes of “All Awards,” including completion of all required representations and certifications within SAM. This registration service is free of charge.

EISA compliance information (See Energy Independence and Security Act paragraphs in RLP and Lease for applicable requirements)

Evidence of ownership or control of Building or site Authorization from the ownership entity to submit an offer on the ownership entity’s behalf, if offeror is not the owner of the Property.

FIRE PROTECTION AND LIFE SAFETY SUBMITTALS (SIMPLIFIED) (SEP 2013)

A. The Offeror must submit the Fire Protection and Life Safety (FPLS) Submittal Information in A.1 through A.5, unless the Building meets either exemption in sub-paragraph B or C below.

1. Completed GSA Form 12000, Prelease Fire Protection and Life Safety Evaluation for an Office Building (Part A or Part B, as applicable).

2. A copy of the previous year’s fire alarm system maintenance record showing compliance with the requirements in NFPA 72 (if a system is installed in the Building).

3. A copy of the previous year’s automatic fire sprinkler system maintenance record showing compliance with the requirements in NFPA 25 (if a system is installed in the Building).

4. First generation plans scaled at a minimum of 1/8" = 1'-0" (preferred) shall be submitted for review and consideration. Plans submitted for consideration shall include floor plan(s) for which Space is being offered and floor plan(s) of the floor(s) of exit discharge (e.g., street level(s)). Each plan submitted shall include the locations of all exit stairs, elevators, and the Space(s) being offered to the Government. In addition, where Building exit stairs are interrupted or discontinued before the level of exit discharge, additional floor plans for the level(s) where exit stairs are interrupted or discontinued must also be provided.

5. A valid Building Certificate of Occupancy (C of O) issued by the local jurisdiction. If the Building C of O is not available or the local jurisdiction does not issue a Building C of O, a report prepared by a licensed fire protection engineer with their assessment of the offered Space regarding compliance with all applicable local Fire Protection and Life Safety-related codes and ordinances must be provided.

B. If the Space offered is 10,000 RSF or less in area and is located on the 1st floor of the Building, Offeror is not required to submit to GSA the Fire Protection and Life Safety (FPLS) Submittal Information listed in A.1 through A.5 above.

C. If the Offeror provides a Building C of O obtained under any edition of the International Building Code (IBC), and the offered Space meets or will meet all the requirements of the Lease with regard to Means of Egress, Automatic Fire Sprinkler System, and Fire Alarm System prior to occupancy, then Offeror is not required to submit to GSA the FPLS Submittal Information in A.1 through A.5 above.

EISA SUBMITTALS (SIMPLIFIED) (MAR 2016)

A. No later than the due date for final proposal revisions, the Offeror must submit to the LCO:

1. Evidence of an Energy Star® label obtained within the 12 months prior to the due date of final proposal revisions,

2. Offerors falling under a statutory exception must also indicate by the due date for final proposal revisions what cost effective energy efficiency and conservation improvements they are proposing to make; and if no improvements are cost effective, the Offeror shall so indicate and provide supporting evidence of the lack of any cost effective improvements,

3. If the Offeror is claiming eligibility for additional time to obtain the Energy Star® label per sub-paragraph B of the RLP paragraph entitled

“Energy Independence and Security Act,” then the Offeror shall provide such indication with its initial offer and also must provide by the due date for final proposal revisions evidence substantiating their claim for additional time to obtain the Energy Star® label and substantiating their capability of earning the Energy Star®, or

B. If the offered existing building will not have an ENERGY STAR® label by the date of final proposal revisions, then in accordance with one of the statutory exceptions listed in the “Energy Independence and Security Act” paragraph herein, a written statement addressing which energy efficiency and conservation improvements (per the Energy Independence and Security Act paragraph) can be made to the building must be submitted. If no cost-effective improvements can be made, the Offeror must demonstrate to the Government using the ENERGY STAR® Online Tools referenced in the RLP paragraph, entitled “ENERGY INDEPENDENCE AND SECURITY ACT,” why no energy efficiency and conservation improvements are cost effective.

This explanation will be subject to review by the LCO. If the explanation is considered unreasonable, the offer may be considered technically unacceptable.

C. If more than 5,000 square feet of land area is to be disturbed in order to meet the Government’s requirements, (as more fully described in the lease paragraph named ENERGY INDEPENDENCE AND SECURITY ACT, sub-paragraph (B)(1)(b)), a statement from Offeror that the Offeror is aware of and will comply with the specific lease requirements concerning maintenance and restoration of the real property’s hydrology must be submitted.

TENANT IMPROVEMENTS INCLUDED IN OFFER (SIMPLIFIED) (JUN 2012)

A. TIs are those costs required for building out the Government demised area in accordance with Agency Specific Requirements and Security Requirements as developed in Government approved DIDs. All TIs required by the Government for occupancy must be performed by the successful offeror as part of the rental consideration as turnkey pricing. All improvements shall meet the quality standards and requirements of this RLP package and its attachments.

B. The TI pricing must include all the Offeror’s administrative costs, general contractor fees, subcontractor’s profit and overhead costs, Offeror's profit and overhead, design costs, and other associated project fees necessary to complete the TIs. It is the successful offeror’s responsibility to prepare all documentation (working/construction drawings, etc.) required to receive construction permits. NO COSTS ASSOCIATED WITH THE BUILDING SHELL

SHALL BE INCLUDED IN THE TI PRICING.

OPERATING COSTS REQUIREMENTS INCLUDED IN OFFER (JUN 2012)

The Government requires a fully serviced Lease as part of the rental consideration. The base for the operating costs adjustment will be established during negotiations based upon rentable SF. The proposed methodology for operating costs adjustment shall include all items specified in the attached Lease document. The minimum requirements for normal hours, utilities, and janitorial services are specified in the attached Lease document. The offer shall clearly state whether the rental is firm throughout the term of the Lease or if it is subject to annual adjustment of operating costs as indicated above.

If operating costs will be subject to adjustment, those costs shall be specified in the proposal.

METHOD OF AWARD

AWARD (SIMPLIFIED) (OCT 2017)

A. To document the agreement between the parties, the successful Offeror and the GSA LCO will execute a Lease prepared by GSA, which incorporates the agreement of the parties. The Lease shall consist of the following:

SECTION 10

1. Lease No. 36C26220L0005 and any associated Lease amendments.

2. Any Agency Specific Requirements (ASR)

3. General Clauses included with the Lease and incorporated by reference.

4. The pertinent provisions of the offer, including the 1364A.

5. Floor plans of the offered Space.

SECTION 11

The acceptance of the offer and award of the Lease by the Government occurs upon execution of the Lease by the LCO and mailing or otherwise furnishing written notification of the executed Lease to the successful Offeror.

SECTION 12

ADDITIONAL TERMS AND CONDITIONS

MODIFIED RLP PARAGRAPHS (OCT 2016)

The following paragraphs have been modified in this RLP: None

LEASE FORM GSA FORM L201A (OCTOBER 2018)

LEASE NO.: 36C26220L0005 Simplified Lease GSA FORM L201A (October 2018)

INSTRUCTIONS TO OFFERORS: Fill in this form with the required information where appropriate, initial each page, sign on this page (type in name and title), and have a witness to your signature sign also. Upon selection for award, GSA will countersign the Lease document.

This Lease is made and entered into between

Lessor’s Full Legal Name (exactly as registered in the System for Award Management (SAM))

(Lessor), whose principal place of business address is _____________________________________________________________________

_____________________________________________and whose interest in the Property described herein is that of Fee Owner, and

The United States of America

(Government), acting by and through the designated representative of the General Services Administration (GSA), upon the terms and conditions set forth herein.

Witnessed: The parties hereto, for the consideration hereinafter mentioned, covenant and agree as follows:

Lessor hereby leases to the Government the Premises described herein, being all or a portion of the Property located at and more fully described in Section 1, together with rights to the use of parking and other areas as set forth herein, to be used for such purposes as determined by GSA.

LEASE TERM

To Have and To Hold the said Premises with its appurtenances for the term beginning upon acceptance of the Premises as required by this Lease and continuing for a period of

5 Year Firm Term.

Subject to termination and renewal rights as may be hereinafter set forth. The commencement date of this Lease is projected to be October 15, 2020, along with any applicable termination and renewal rights, shall be more specifically be set forth in a Lease Amendment upon substantial completion and acceptance of the Space by the Government.

In Witness Whereof, the parties to this Lease evidence their agreement to all terms and conditions set forth herein by their signatures below, to be effective as of the date of delivery of the fully executed Lease to the Lessor.

FOR THE LESSOR:

Name: ____________________________________

Title: ____________________________________

Entity Name: ____________________________________

Date: ______________________________________________

FOR THE GOVERNMENT:

NAME: Alan Trinh

Lease Contracting Officer

General Services Administration, Public Buildings Service

Date: ______________________________________________

WITNESSED FOR THE LESSOR BY:

Name:

Title:

Date: ______________________________________________

The information collection requirements contained in this Solicitation/Contract, that are not required by the regulation, have been approved by the Office of Management and Budget pursuant to the Paperwork Reduction Act and assigned the OMB Control No. 3090-0163.

LEASE NO. GS-XXP-LXXXXXXX LESSOR: ______ GOVERNMENT: ________ GSA FORM L201A (10/18)

TABLE OF CONTENTS

SECTION 1 THE PREMISES, RENT, AND OTHER TERMS

1.01 THE PREMISES (SIMPLIFIED) (SEP 2013) .......................................................................................... Error! Bookmark not defined.

1.02 EXPRESS APPURTENANT RIGHTS (SIMPLIFIED) (JUN 2012) .......................................................... Error! Bookmark not defined.

1.03 RENTAL CONSIDERATION FOR SIMPLIFIED LEASES (SEP 2013) ................................................... Error! Bookmark not defined.

1.04 BROKER COMMISSION AND COMMISSION CREDIT (SIMPLIFIED) (OCT 2016) .............................. Error! Bookmark not defined.

1.05 TERMINATION RIGHTS (SIMPLIFIED) (OCT 2016) ............................................................................. Error! Bookmark not defined.

1.06 RENEWAL RIGHTS (SIMPLIFIED) (OCT 2016) .................................................................................... Error! Bookmark not defined.

1.07 DOCUMENTS INCORPORATED IN THE LEASE (SIMPLIFIED) (OCT 2017)

1.08 PERCENTAGE OF OCCUPANCY FOR TAX ADJUSTMENT (SIMPLIFIED) (OCT 2018) ..................... Error! Bookmark not defined.

1.09 OPERATING COST BASE (OCT 2016) ................................................................................................. Error! Bookmark not defined.

1.10 ADJUSTMENT FOR REDUCED SERVICES (OCT 2018) ..................................................................... Error! Bookmark not defined.

1.11 BUILDING IMPROVEMENTS (MAR 2016) ............................................................................................ Error! Bookmark not defined.

1.12 HUBZONE SMALL BUSINESS CONCERNS ADDITIONAL PERFORMANCE REQUIREMENTS (SIMPLIFIED) (MAR 2012)Error! Bookmark not defined.

1.13 LESSOR’S DUNS NUMBER (OCT 2017)

SECTION 2 GENERAL TERMS, CONDITIONS, AND STANDARDS

2.01 DEFINITIONS AND GENERAL TERMS (OCT 2016)

2.02 AUTHORIZED REPRESENTATIVES (OCT 2016)

2.03 ALTERATIONS REQUESTED BY THE GOVERNMENT (OCT 2018)

2.04 WAIVER OF RESTORATION (OCT 2018)

2.05 PAYMENT OF BROKER (JUL 2011) ..................................................................................................... Error! Bookmark not defined.

2.06 CHANGE OF OWNERSHIP (SIMPLIFIED) (OCT 2018)

2.07 REAL ESTATE TAX ADJUSTMENT (JUN 2012) ................................................................................... Error! Bookmark not defined.

2.08 ADJUSTMENT FOR VACANT PREMISES (SIMPLIFIED) (OCT 2017)

2.09 OPERATING COSTS ADJUSTMENT (JUN 2012) ................................................................................. Error! Bookmark not defined.

2.10 FIRE AND CASUALTY DAMAGE (SIMPLIFIED LEASE) (SEP 2011)

2.11 DEFAULT BY LESSOR (APR 2012)

2.12 INTEGRATED AGREEMENT (JUN 2012) ............................................................................................. Error! Bookmark not defined.

2.13 MUTUALITY OF OBLIGATION (SIMPLIFIED) (APR 2011)

2.14 CHANGES (SIMPLIFIED) (SEP 2011)

2.15 COMPLIANCE WITH APPLICABLE LAW (JAN 2011)

2.16 MAINTENANCE OF THE PROPERTY, RIGHT TO INSPECT (SIMPLIFIED) (APR 2015)

2.17 CLAUSES INCORPORATED BY REFERENCE (SIMPLIFIED) (APR 2015)

SECTION 3 CONSTRUCTION STANDARDS AND SHELL COMPONENTS

3.01 WORK PERFORMANCE (JUN 2012)

3.02 ENVIRONMENTALLY PREFERABLE PRODUCTS REQUIREMENTS (OCT 2017)

3.03 EXISTING FIT-OUT, SALVAGED, OR REUSED BUILDING MATERIAL (JUN 2012)

3.04 WOOD PRODUCTS (OCT 2016)

3.05 ADHESIVES AND SEALANTS (OCT 2017)

3.06 BUILDING SHELL REQUIREMENTS (OCT 2016)

3.07 RESPONSIBILITY OF THE LESSOR AND LESSOR’S ARCHITECT/ENGINEER (SIMPLIFIED) (JUN 2012)

3.08 QUALITY AND APPEARANCE OF BUILDING (JUN 2012)

3.09 VESTIBULES (APR 2011)

3.10 MEANS OF EGRESS (MAY 2015)

3.11 AUTOMATIC FIRE SPRINKLER SYSTEM (SEP 2013)

3.12 FIRE ALARM SYSTEM (SEP 2013)

3.13 ENERGY INDEPENDENCE AND SECURITY ACT SIMPLIFIED (MAR 2016)

3.14 ELEVATORS (SIMPLIFIED) (OCT 2016)

3.15 DEMOLITION (JUN 2012)

3.16 ACCESSIBILITY (FEB 2007)

3.17 CEILINGS (SIMPLIFIED) (OCT 2017)

3.18 EXTERIOR AND COMMON AREA DOORS AND HARDWARE (SEP 2013)

3.19 WINDOWS (SIMPLIFIED) (AUG 2011)

3.20 PARTITIONS: PERMANENT (APR 2015)

3.21 INSULATION: THERMAL, ACOUSTIC, AND HVAC (SEP 2013)

3.22 PAINTING – SHELL (OCT 2017)

3.23 FLOORS AND FLOOR LOAD (APR 2015)

3.24 FLOOR COVERING AND PERIMETERS – SHELL (SIMPLIFIED) (JUN 2012)

3.25 MECHANICAL, ELECTRICAL, PLUMBING: GENERAL (APR 2011)

3.26 ELECTRICAL (SIMPLIFIED) (JUN 2012)

3.27 ADDITIONAL ELECTRICAL CONTROLS (JUN 2012) ........................................................................... Error! Bookmark not defined.

3.28 PLUMBING (JUN 2012)

3.29 DRINKING FOUNTAINS (OCT 2018)

3.30 RESTROOMS (OCT 2016)

3.31 PLUMBING FIXTURES: WATER CONSERVATION (OCT 2016)

3.32 HEATING, VENTILATION, AND AIR CONDITIONING – SHELL (SIMPLIFIED) (OCT 2016)

3.33 TELECOMMUNICATIONS: DISTRIBUTION AND EQUIPMENT (SIMPLIFIED) (SEP 2013)

3.34 TELECOMMUNICATIONS: LOCAL EXCHANGE ACCESS (SIMPLIFIED) (JUN 2012)

3.35 LIGHTING: INTERIOR AND PARKING – SHELL (SIMPLIFIED) (OCT 2016)

3.36 INDOOR AIR QUALITY DURING CONSTRUCTION (OCT 2017)

3.37 DUE DILIGENCE AND NATIONAL ENVIRONMENTAL POLICY ACT REQUIREMENTS – LEASE (SEP 2014)Error! Bookmark not defined.

3.38 NATIONAL HISTORIC PRESERVATION ACT REQUIREMENTS - LEASE (SEP 2014) ....................... Error! Bookmark not defined.

SECTION 4 DESIGN, CONSTRUCTION, AND POST AWARD ACTIVITIES

4.01 SCHEDULE FOR COMPLETION OF SPACE (SIMPLIFIED) (SEP 2013)

4.02 GREEN LEASE SUBMITTALS (SIMPLIFIED) (OCT 2017)

4.03 CONSTRUCTION SCHEDULE AND INITIAL CONSTRUCTION MEETING (SIMPLIFIED) (SEPT 2011)Error! Bookmark not defined.

4.04 ACCESS BY THE GOVERNMENT PRIOR TO ACCEPTANCE (SIMPLIFIED) (APR 2011)

4.05 CONSTRUCTION INSPECTIONS (APR 2011)

4.06 ACCEPTANCE OF SPACE AND CERTIFICATE OF OCCUPANCY (SIMPLIFIED) (MAY 2015)

4.07 LEASE TERM COMMENCEMENT DATE AND RENT RECONCILIATION (SIMPLIFIED) (JUN 2012)

4.08 AS-BUILT DRAWINGS (SIMPLIFIED) (OCT 2017)................................................................................ Error! Bookmark not defined.

4.09 SEISMIC RETROFIT (SEP 2013)

SECTION 5 TENANT IMPROVEMENT COMPONENTS

5.01 TENANT IMPROVEMENT REQUIREMENTS (SIMPLIFIED) (OCT 2016)

5.02 FINISH SELECTIONS (SIMPLIFIED) (SEP 2013) ................................................................................. Error! Bookmark not defined.

5.03 WINDOW COVERINGS (SIMPLIFIED) (AUG 2011)

5.04 DOORS: SUITE ENTRY (SEP 2013)

5.05 DOORS: INTERIOR (SEP 2013)

5.06 DOORS: HARDWARE (SEP 2013)

5.07 DOORS: IDENTIFICATION (JUN 2012)

5.08 PARTITIONS: SUBDIVIDING (SEP 2015)

5.09 WALL FINISHES (JUN 2012)

5.10 PAINTING – TI (OCT 2017)

5.11 FLOOR COVERINGS AND PERIMETERS (SIMPLIFIED) (OCT 2017)

5.12 HEATING AND AIR CONDITIONING (JUN 2012)

5.13 ELECTRICAL: DISTRIBUTION (JUN 2012)

5.14 TELECOMMUNICATIONS: DISTRIBUTION AND EQUIPMENT (JUN 2012)

5.15 TELECOMMUNICATIONS: LOCAL EXCHANGE ACCESS (AUG 2008)

5.16 DATA DISTRIBUTION (JUN 2012)

5.17 ELECTRICAL, TELEPHONE, DATA FOR SYSTEMS FURNITURE (JUN 2012)

5.18 LIGHTING: INTERIOR AND PARKING – TI (SIMPLIFIED) (SEP 2013)

5.19 AUTOMATIC FIRE SPRINKLER SYSTEM - TI (OCT 2016)

SECTION 6 UTILITIES, SERVICES, AND OBLIGATIONS DURING THE LEASE TERM

6.01 PROVISION OF SERVICES, ACCESS, AND NORMAL HOURS (SIMPLIFIED) (JUN 2012)

6.02 UTILITIES (APR 2011)

6.03 UTILITIES SEPARATE FROM RENTAL (SIMPLIFIED) (MAR 2013) ..................................................... Error! Bookmark not defined.

6.04 UTILITY CONSUMPTION REPORTING (OCT 2016)