ATTACHMENT D - Supplemental Pricing Breakdown.docx

DOCX document 21 KB Posted

Attached to
N039--36C26122R0017, Project No. 612A4-21-050, Install Pneumatic Tube System for the VANCHCS - Mather, CA 95655
Solicitation number
36C26122R0017
Issued by

About this file

This document contains a supplemental pricing breakdown attachment for a solicitation seeking the installation of pneumatic tube systems at two Department of Veterans Affairs facilities in California. The solicitation requests pricing for various construction divisions involving general requirements, existing conditions, thermal and moisture protection, finishes, furnishings, conveying equipment, electrical work, and communications. Offerors must provide fixed pricing for labor, materials, equipment, and other costs for each division and an overall total price. Subtotals are also required for overhead, profit, and bonds and insurance. The work involves installing pneumatic tube systems in Buildings 650 and 700 at the VA Northern California Health Care System campus in Mather, California. The NAICS code for this project is 333922 and the small business size standard is 500 employees. The anticipated value of the contract is between $2 million and $5 million.

View the file

Other files

Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFP No. 36C26122R0017 Attachment D – Supplemental Pricing Breakdown

DESCRIPTION
MATERIAL
LABOR
EQUIPMENT
OTHER (Specify)
TOTAL

Division 01 -General Requirements

$
$
$
$
$
$
$
$
Division Total
$
$

Division 02 – Existing Conditions

$
$
$
$
$
$
$
$
Division Total
$
$

Division 07 – Thermal Moisture Protection

$
$
$
$
$
$
$
$
Division Total
$
$

Division 09 – Finishes

$
$
$
$
$
$
$
$
Division Total
$
$

Division 12 – Furnishings

$
$
$
$
$
$
$
$
Division Total
$
$

Division 14 – Conveying Equipment

$
$
$
$
$
$
$
$

Division Total

Division 26 - Electrical

$
$
$
$
$
$
$
$
Division Total
$
$

Division 27 - Communications

$
$
$
$
$
$
Division Total
$
$

Total Design and Build

SUB TOTAL
$
$
Overhead
$
$
Profit
$
$
Bonds and Insurance
$
$
TOTAL Proposal
$
$

Note: All other costs may be included as a separate item and shall be specified in this breakdown.