Attachment_D_Schedule_of_Work_Items.docx

DOCX document 32 KB Posted

Attached to
KAHO HAULOUT Federal contract opportunity
Solicitation number
140G0122Q0068
Issued by
Department of the Interior US Geological Survey Office of Acquisitions and Grants

About this file

This document contains a schedule of work items and pricing terms for haulout, inspection, maintenance, and repair services for the Research Vessel KAHO owned by the U.S. Geological Survey. Services will be solicited under Request for Quotes 140G0122Q0068 to be issued on or around March 3rd 2022, with quotations due on or around March 29th 2022. Award is anticipated to be a firm fixed price contract issued on or around April 12th 2022. The work must be performed between mid-May and mid-July 2022. The NAICS code is 336611 and the solicitation will be set aside for small businesses with 1,250 employees or fewer. A pre-bid site visit will be held at the Lake Ontario Biological Station in Oswego, NY on March 10th 2022 for interested parties who confirm attendance by March 8th. The schedule of work items lists over 40 individual maintenance, repair, and upgrade services required along with standard labor rates and pricing terms.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

July 10, 2014, Rev 3 Schedule of Work Items Maintenance and Repair of Research Vessel KAHO

Spec. Ref. *

WORK ITEM
PRICE
4.1
Hauling, Blocking and Launching
6.01
Hull High Pressure Wash and Visual Inspection
6.02
Hull Appendage Leak Test
6.03
Underwater Hull Coating Inspection
Option
6.04
Repair Underwater Hull Coating
Option
6.05
Repair Deck Coating
7.01
Valve Repair
7.02
Inspect Rudders, Bearings and Seals
7.03
Inspect Propulsion Shafts
Option
7.04
Renew Propulsion Shaft Seals
Option
7.05
Renew Shaft Bearings
7.06
Inspect, Clean, and Refurbish Propellers
7.07
Inspect Bow Thruster
8.01
Open, Clean and Inspect Tanks
8.02
Load Test Lifting Gear
8.03
Install Vibration Dampening Material in Lazarette
8.04
Strengthen Steering Cylinder Mounting
8.05
Reinforce Structure Around Prop Tunnels
8.06
Upgrade Wire Rope on Center Winch
8.07
Replace Trawl Winch Wire Rope
8.08
Resiliently Mount Exhaust
8.09
Modify HVAC System
8.10
Relocate Pilothouse Battery Bank
8.11
Install New Pilot House Door
8.12
Upgrade Weather Instrumentation
8.13
Upgrade Pilothouse Roof Cableways
8.14
Upgrade Navigation Electronics
8.15
Extend Yardarms On Mast
8.16
Install New Air Horn.
8.17
Relocate the Magnetic Compass
8.18
Install Marport net monitoring system
8.19
Upgrade Hydraulic Pipe Hangers
8.20
Replace Hydraulic Tank
8.21
Service Steering Gear Hydraulic Tank
8.22
Upgrade Hydraulic Silencers
8.23
Replace Berths
8.24
Modify Interior Joiner Panels
8.25
Modify Engine Room to Accommodations Bulkhead Lining
8.26
Move Aft Draft Marks
8.27
Modify Auxiliary Cooling Water System
8.28
Repair Deck Plating and Support Structure in Engine Room
8.29
Modify Diesel Fuel Piping
8.30
Clean and Degrease all Bilge Surfaces
8.31
Modify Electrical Switchboard Gauges
8.32
Inspect Wash Down Pump System
8.33
Install Battery Switches on Battery Banks
8.34
Relocate Shore Power Receptacle
8.35
Replace Aft Stack Louvers With Metal Louvers
Option
8.36
Repair Insulation on Exhaust Piping
Option
8.37
Replace Insulation on Exhaust Piping
8.38
Upgrade Fire Suppression System
8.39
Install Noise Treatments in Intake Fan Space
8.40
Install 02 Deck Intake Trunk

TOTAL

LABOR RATES

Shipyard Labor
$/hr
Crane/forklift
$/hr
Material Markup
%
Subcontractor Markup
%

Shipyard Labor: The Contractor’s fully loaded man-hour rate will be used for negotiating change orders, if necessary. The contractor agrees that the number of man hours included in its price proposal for such modifications shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the journeyman level expended in direct production, inspection, repair, or installation as exemplified by the following functions:

140G0122Q0068 Attachment D Schedule of Work Items Foremen and Shop Supervisors General Labor Rigging Staging/scaffolding Welding Machinists (inside and outside) Fire Watch Burning Brazing Abrasive cleaning/blasting Tank cleaning Carpentry Electrical Work Lagging Ship-fitting Painting Sheet-metal Work Pipefitting Diesel Mechanics Marine Chemist Nondestructive Testing Navigation/Communications Electronics Hydraulic Crane and winch inspection and maintenance Material handling & Warehousing

Project Management & Engineering: Project Management & Engineering support functions shall be considered to be included in the Offeror’s fully loaded rate for direct production man-hours. Examples of support functions include:

Planning Quality Assurance Testing Engineering Design Lofting

G14PS00428
Attachment D Schedule of Pricing

Amendment 0002

File details come from the government source that posted it. Updated .