This document outlines the requirements for haulout, inspection, maintenance, and repair services for the Research Vessel KAHO. The U.S. Geological Survey, Great Lakes Science Center is soliciting quotes under solicitation number 140G0122Q0068 to perform these services between mid-May 2022 through mid-July 2022. The Schedule of Work Items lists 38 specific tasks to be completed including hull inspection and coating repair, valve repair, propulsion system inspection, tank cleaning and inspection, deck and structural repairs, electrical and mechanical system upgrades, and other miscellaneous work. Quotes are due on or around March 29th, 2022 and award will be made to a small business on a firm-fixed price basis on or around April 12th, 2022. Offerors should monitor Sam.gov for release of the RFQ and any amendments. A pre-proposal site visit will be held on March 10th, 2022 for interested parties to inspect the vessel.

View the file

Other files for this federal contract opportunity

Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

July 10, 2014, Rev 3 Schedule of Pricing Maintenance and Repair of Research Vessel KAHO

Note: Under the priority heading,1 is the highest and 3 is the lowest.

Priority

Spec. Ref. *

WORK ITEM
PRICE
Base
4.1
Hauling, Blocking and Launching
Base
6.01
Hull High Pressure Wash and Visual Inspection
Base
6.02
Hull Appendage Leak Test
Base
6.03
Underwater Hull Coating Inspection
1
Option
6.04
Repair Underwater Hull Coating
2
Option
6.05
Repair Deck Coating
Base
7.01
Valve Repair
Base
7.02
Inspect Rudders, Bearings and Seals
Base
7.03
Inspect Propulsion Shafts
Base
7.04
Renew Propulsion Shaft Seals
1
Option
7.05
Renew Shaft Bearings
Base
7.06
Inspect, Clean, and Refurbish Propellers
Base
7.07
Inspect Bow Thruster
Base
8.01
Open, Clean and Inspect Tanks
Base
8.02
Load Test Lifting Gear
1
Option
8.03
Install Vibration Dampening Material in Lazarette
Base
8.04
Strengthen Steering Cylinder Mounting
Base
8.05
Reinforce Structure Around Prop Tunnels
1
Option
8.06
Upgrade Wire Rope on Center Winch
Base
8.07
Replace Trawl Winch Wire Rope
1
Option
8.08
Resiliently Mount Exhaust
2
Option
8.09
Modify HVAC System
3
Option
8.10
Relocate Pilothouse Battery Bank
1
Option
8.11
Install New Pilot House Door
Base
8.12
Upgrade Weather Instrumentation
Base
8.13
Upgrade Pilothouse Roof Cableways
Base
8.14
Upgrade Navigation Electronics
Base
8.15
Extend Yardarms On Mast
3
Option
8.16
Install New Air Horn.
Base
8.17
Relocate the Magnetic Compass
Base
8.18
Install Marport net monitoring system
2
Option
8.19
Upgrade Hydraulic Pipe Hangers
Base
8.20
Replace Hydraulic Tank
Base
8.21
Service Steering Gear Hydraulic Tank
1
Option
8.22
Upgrade Hydraulic Silencers
3
Option
8.23
Replace Berths
3
Option
8.24
Modify Interior Joiner Panels
1
Option
8.25
Modify Engine Room to Accommodations Bulkhead Lining
3
Option
8.26
Move Aft Draft Marks
3
Option
8.27
Modify Auxiliary Cooling Water System
2
Option
8.28
Repair Deck Plating and Support Structure in Engine Room
Base
8.29
Modify Diesel Fuel Piping
Base
8.30
Clean and Degrease all Bilge Surfaces
Base
8.31
Modify Electrical Switchboard Gauges
Base
8.32
Inspect Wash Down Pump System
Base
8.33
Install Battery Switches on Battery Banks
3
Option
8.34
Relocate Shore Power Receptacle
Base
8.35
Replace Aft Stack Louvers With Metal Louvers
1
Option
8.36
Repair Insulation on Exhaust Piping
2
Option
8.37
Replace Insulation on Exhaust Piping
Base
8.38
Upgrade Fire Suppression System
Base
8.39
Install Noise Treatments in Intake Fan Space
3
Option
8.40
Install 02 Deck Intake Trunk

TOTAL

LABOR RATES

Shipyard Labor
$/hr
Crane/forklift
$/hr
Material Markup
%
Subcontractor Markup
%

Shipyard Labor: The Contractor’s fully loaded man-hour rate will be used for negotiating change orders, if necessary. The contractor agrees that the number of man hours included in its price proposal for such modifications shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the journeyman level expended in direct production, inspection, repair, or installation as exemplified by the following functions:

140G0122Q0068 Attachment D Schedule of Work Items.0001 Foremen and Shop Supervisors General Labor Rigging Staging/scaffolding Welding Machinists (inside and outside) Fire Watch Burning Brazing Abrasive cleaning/blasting Tank cleaning Carpentry Electrical Work Lagging Ship-fitting Painting Sheet-metal Work Pipefitting Diesel Mechanics Marine Chemist Nondestructive Testing Navigation/Communications Electronics Hydraulic Crane and winch inspection and maintenance Material handling & Warehousing

Project Management & Engineering: Project Management & Engineering support functions shall be considered to be included in the Offeror’s fully loaded rate for direct production man-hours. Examples of support functions include:

Planning Quality Assurance Testing Engineering Design Lofting

G14PS00428
Attachment D Schedule of Pricing

Amendment 0002