July 10, 2014, Rev 3 Schedule of Pricing Maintenance and Repair of Research Vessel KAHO
Note: Under the priority heading,1 is the highest and 3 is the lowest.
Priority
Spec. Ref. *
| Base |
| 4.1 |
| Hauling, Blocking and Launching |
| Base |
| 6.01 |
| Hull High Pressure Wash and Visual Inspection |
| Base |
| 6.02 |
| Hull Appendage Leak Test |
| Base |
| 6.03 |
| Underwater Hull Coating Inspection |
| 1 |
| Option |
| 6.04 |
| Repair Underwater Hull Coating |
| 2 |
| Option |
| 6.05 |
| Repair Deck Coating |
| Base |
| 7.02 |
| Inspect Rudders, Bearings and Seals |
| Base |
| 7.03 |
| Inspect Propulsion Shafts |
| Base |
| 7.04 |
| Renew Propulsion Shaft Seals |
| 1 |
| Option |
| 7.05 |
| Renew Shaft Bearings |
| Base |
| 7.06 |
| Inspect, Clean, and Refurbish Propellers |
| Base |
| 7.07 |
| Inspect Bow Thruster |
| Base |
| 8.01 |
| Open, Clean and Inspect Tanks |
| Base |
| 8.02 |
| Load Test Lifting Gear |
| 1 |
| Option |
| 8.03 |
| Install Vibration Dampening Material in Lazarette |
| Base |
| 8.04 |
| Strengthen Steering Cylinder Mounting |
| Base |
| 8.05 |
| Reinforce Structure Around Prop Tunnels |
| 1 |
| Option |
| 8.06 |
| Upgrade Wire Rope on Center Winch |
| Base |
| 8.07 |
| Replace Trawl Winch Wire Rope |
| 1 |
| Option |
| 8.08 |
| Resiliently Mount Exhaust |
| 2 |
| Option |
| 8.09 |
| Modify HVAC System |
| 3 |
| Option |
| 8.10 |
| Relocate Pilothouse Battery Bank |
| 1 |
| Option |
| 8.11 |
| Install New Pilot House Door |
| Base |
| 8.12 |
| Upgrade Weather Instrumentation |
| Base |
| 8.13 |
| Upgrade Pilothouse Roof Cableways |
| Base |
| 8.14 |
| Upgrade Navigation Electronics |
| Base |
| 8.15 |
| Extend Yardarms On Mast |
| 3 |
| Option |
| 8.16 |
| Install New Air Horn. |
| Base |
| 8.17 |
| Relocate the Magnetic Compass |
| Base |
| 8.18 |
| Install Marport net monitoring system |
| 2 |
| Option |
| 8.19 |
| Upgrade Hydraulic Pipe Hangers |
| Base |
| 8.20 |
| Replace Hydraulic Tank |
| Base |
| 8.21 |
| Service Steering Gear Hydraulic Tank |
| 1 |
| Option |
| 8.22 |
| Upgrade Hydraulic Silencers |
| 3 |
| Option |
| 8.23 |
| Replace Berths |
| 3 |
| Option |
| 8.24 |
| Modify Interior Joiner Panels |
| 1 |
| Option |
| 8.25 |
| Modify Engine Room to Accommodations Bulkhead Lining |
| 3 |
| Option |
| 8.26 |
| Move Aft Draft Marks |
| 3 |
| Option |
| 8.27 |
| Modify Auxiliary Cooling Water System |
| 2 |
| Option |
| 8.28 |
| Repair Deck Plating and Support Structure in Engine Room |
| Base |
| 8.29 |
| Modify Diesel Fuel Piping |
| Base |
| 8.30 |
| Clean and Degrease all Bilge Surfaces |
| Base |
| 8.31 |
| Modify Electrical Switchboard Gauges |
| Base |
| 8.32 |
| Inspect Wash Down Pump System |
| Base |
| 8.33 |
| Install Battery Switches on Battery Banks |
| 3 |
| Option |
| 8.34 |
| Relocate Shore Power Receptacle |
| Base |
| 8.35 |
| Replace Aft Stack Louvers With Metal Louvers |
| 1 |
| Option |
| 8.36 |
| Repair Insulation on Exhaust Piping |
| 2 |
| Option |
| 8.37 |
| Replace Insulation on Exhaust Piping |
| Base |
| 8.38 |
| Upgrade Fire Suppression System |
| Base |
| 8.39 |
| Install Noise Treatments in Intake Fan Space |
| 3 |
| Option |
| 8.40 |
| Install 02 Deck Intake Trunk |
TOTAL
LABOR RATES
Shipyard Labor: The Contractor’s fully loaded man-hour rate will be used for negotiating change orders, if necessary. The contractor agrees that the number of man hours included in its price proposal for such modifications shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the journeyman level expended in direct production, inspection, repair, or installation as exemplified by the following functions:
140G0122Q0068 Attachment D Schedule of Work Items.0001 Foremen and Shop Supervisors General Labor Rigging Staging/scaffolding Welding Machinists (inside and outside) Fire Watch Burning Brazing Abrasive cleaning/blasting Tank cleaning Carpentry Electrical Work Lagging Ship-fitting Painting Sheet-metal Work Pipefitting Diesel Mechanics Marine Chemist Nondestructive Testing Navigation/Communications Electronics Hydraulic Crane and winch inspection and maintenance Material handling & Warehousing
Project Management & Engineering: Project Management & Engineering support functions shall be considered to be included in the Offeror’s fully loaded rate for direct production man-hours. Examples of support functions include:
Planning Quality Assurance Testing Engineering Design Lofting
| G14PS00428 |
| Attachment D Schedule of Pricing |
Amendment 0002