This document includes a relevance matrix and details for a federal contract opportunity for logistics and transfer warehouses. The contract opportunity is a two-phase design-build solicitation from the Department of the Army Corps of Engineers Engineering District Middle East. The solicitation seeks a prime construction contractor to construct two pre-engineered metal building systems for warehouse and storage operations along with smaller administrative offices at Kuwait Military Complex at Subhan, Kuwait. The buildings are to include site infrastructure, earthworks, grading, drainage and other elements. The period of performance is anticipated to be 585 calendar days from notice to proceed. The estimated value of the logistics and transfer warehouses project is between $25,000,000 to $100,000,000. The solicitation also includes three optional one-year operations and maintenance periods that can be awarded.
View the file
Other files for this federal contract opportunity
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT D
RELEVANCE MATRIX
Relevant Projects:
Offeror:
Project
Design
Team/Firm:
Project 1
Project 2
Project 3
Similar Scope:
Design and/or construction of pre-engineered metal buildings and concrete masonry unit construction, including site infrastructure (electrical distribution system, fire protection system, administrative facilities, shelving and racking, communications, water, sewer, and pavement), earthworks, grading and drainage. While the greatest similarity will be attributed to projects with all of these elements, the most important of these elements for similarity will be design and construction of pre-engineered metal buildings.
Recently Completed:
A “recently completed” project is defined as a project which (1) has been completed within the last (5) five years of the RFP issuance date, or (2) is currently under construction and is at least 75% complete as of the RFP issuance date.
Similar Cost Magnitude: Similar cost magnitude is defined as a project with a total value of at least $10 million or more.