Attachment D - Price Schedule.xlsx

XLSX spreadsheet 29 KB Posted

Attached to
Department of Veterans Affairs Office of Administration Office Moves
Solicitation number
36C10X25Q0037
Issued by

About this file

This is a price schedule template (Attachment D) for an office relocation services contract with the VA Strategic Acquisition Center Frederick. The schedule covers a base period and four option periods, with identical line items in each period including labor categories (Site Supervisor, IT Technician, Electrician, Mover, Lift Gate Truck Driver, and Tractor Trailer Truck Driver) and materials (various sizes of plastic cartons, chair bags, packing supplies, and moving materials).

The labor hours are specified for each category, with Site Supervisor requiring 780 hours, Movers 750 hours, Lift Gate Truck Driver 360 hours, and other positions ranging from 150-200 hours per period. Materials quantities include 1,000 plastic cartons (2.0 cu ft), 800 plastic cartons (3.0 cu ft), 700 chair bags, 1,500 keyboard bags, and various quantities of packing supplies like bubble wrap, tape, and shrink wrap. The template requires offerors to input their company name and unit prices, with separate breakdowns for each contract period.

View the file

Other files

File Type Posted
36C10X25Q0037 QnA Sheet 0002.xlsx XLSX spreadsheet
Attachment D - Price Schedule 0002.xlsx XLSX spreadsheet
36C10X25Q0037 0002.pdf PDF
36C10X25Q0037 0001.pdf PDF
Attachment D - Price Schedule 001.xlsx XLSX spreadsheet
36C10X25Q0037 QnA Sheet.xlsx XLSX spreadsheet
Attachment B - PAST PERFORMANCE REFERENCES.pdf PDF
36C10X25Q0037.pdf PDF
Attachment A Wage Determination.pdf PDF
ATTACHMENT C - PAST PERFORMANCE QUESTIONNAIRE.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Price Schedule

Attachment D Price Schedule
OFFEROR NAME: _________________________________________________
Insert offeror name above and complete the following Price Schedule.
BASE PERIOD
Item No.DescriptionEstimated QuantityUnitUnit Price
0001Pre-Planning Meeting
0001AASite Supervisor150HR$0.00
0001ABIT Technician150HR$0.00
0002Office Relocation
0002AASite Supervisor780HR$0.00
0002ABIT Technician200HR$0.00
0002ACElectrician200HR$0.00
0002ADMover750HR$0.00
0002AELift Gate Truck w/Driver360HR$0.00
0002AFTractor Trailer Truck w/Driver150HR$0.00
0003Materials
0003AAPlastic Carton (each) approx. 2.0 CU. FT.1000EA$0.00
0003ABPlastic Size Carton (each) approx. 3.0 CU. FT.800EA$0.00
0003ACPicture Carton (each)250EA$0.00
0003ADChair Bags (each)700BG$0.00
0003AEPaper Pads (each)1000EA$0.00
0003AFComputer Bins (each)200EA$0.00
0003AGBubble Wrap (each)100EA$0.00
0003AHPacking Paper (each)500EA$0.00
0003AJDuct Tape (per roll)500EA$0.00
0003AKFiber Tape (per roll)200EA$0.00
0003ALMasking Tape (per roll)500EA$0.00
0003AMClear Tape (per roll)250EA$0.00
0003ANShrink Wrap 17"x1500'150EA$0.00
0003APShrink Wrap Back 18"x1500'150EA$0.00
0003AQKeyboard Bags (min .50)1500BG$0.00
0003ARPeanuts150BG$0.00
BASE PERIOD TOTAL
Option PERIOD 1
Item No.DescriptionEstimated QuantityUnitUnit Price
1001Pre-Planning Meeting
1001AASite Supervisor150HR$0.00
1001ABIT Technician150HR$0.00
1002Office Relocation
1002AASite Supervisor780HR$0.00
1002ABIT Technician200HR$0.00
1002ACElectrician200HR$0.00
1002ADMover750HR$0.00
1002AELift Gate Truck w/Driver360HR$0.00
1002AFTractor Trailer Truck w/Driver150HR$0.00
1003Materials
1003AAPlastic Carton (each) approx. 2.0 CU. FT.1000EA$0.00
1003ABPlastic Size Carton (each) approx. 3.0 CU. FT.800EA$0.00
1003ACPlastic Carton (each)250EA$0.00
1003ADChair Bags700BG$0.00
1003AEPaper Pads (each)1000EA$0.00
1003AFComputer Bins (each)200EA$0.00
1003AGBubble Wrap (each)100EA$0.00
1003AHPacking Paper (each)500EA$0.00
1003AJDuct Tape (per roll)500EA$0.00
1003AKFiber Tape (per roll)200EA$0.00
1003ALMasking Tape (per roll)500EA$0.00
1003AMClear Tape (per roll)250EA$0.00
1003ANShrink Wrap 17"x1500'150EA$0.00
1003APShrink Wrap Back 18"x1500'150EA$0.00
1003AQKeyboard Bags (min .50)1500BG$0.00
1003ARPeanuts150BG$0.00
Option PERIOD 1 TOTAL
Option PERIOD 2
Item No.DescriptionEstimated QuantityUnitUnit Price
2001Pre-Planning Meeting
2001AASite Supervisor150HR$0.00
2001ABIT Technician150HR$0.00
2002Office Relocation
2002AASite Supervisor780HR$0.00
2002ABIT Technician200HR$0.00
2002ACElectrician200HR$0.00
2002ADMover750HR$0.00
2002AELift Gate Truck w/Driver360HR$0.00
2002AFTractor Trailer Truck w/Driver150HR$0.00
2003Materials
2003AAPlastic Carton (each) approx. 2.0 CU. FT.1000EA$0.00
2003ABPlastic Size Carton (each) approx. 3.0 CU. FT.800EA$0.00
2003ACPlastic Carton (each)250EA$0.00
2003ADChair Bags700BG$0.00
2003AEPaper Pads (each)1000EA$0.00
2003AFComputer Bins (each)200EA$0.00
2003AGBubble Wrap (each)100EA$0.00
2003AHPacking Paper (each)500EA$0.00
2003AJDuct Tape (per roll)500EA$0.00
2003AKFiber Tape (per roll)200EA$0.00
2003ALMasking Tape (per roll)500EA$0.00
2003AMClear Tape (per roll)250EA$0.00
2003ANShrink Wrap 17"x1500'150EA$0.00
2003APShrink Wrap Back 18"x1500'150EA$0.00
2003AQKeyboard Bags (min .50)1500BG$0.00
2003ARPeanuts150BG$0.00
Option PERIOD 2 TOTAL
Option PERIOD 3 TOTAL
Item No.DescriptionEstimated QuantityUnitUnit Price
3001Pre-Planning Meeting
3001AASite Supervisor150HR$0.00
3001ABIT Technician150HR$0.00
3002Office Relocation$0.00
3002AASite Supervisor780HR$0.00
3002ABIT Technician200HR$0.00
3002ACElectrician200HR$0.00
3002ADMover750HR$0.00
3002AELift Gate Truck w/Driver360HR$0.00
3002AFTractor Trailer Truck w/Driver150HR$0.00
3003Materials
3003AAPlastic Carton (each) approx. 2.0 CU. FT.1000EA$0.00
3003ABPlastic Size Carton (each) approx. 3.0 CU. FT.800EA$0.00
3003ACPlastic Carton (each)250EA$0.00
3003ADChair Bags700BG$0.00
3003AEPaper Pads (each)1000EA$0.00
3003AFComputer Bins (each)200EA$0.00
3003AGBubble Wrap (each)100EA$0.00
3003AHPacking Paper (each)500EA$0.00
3003AJDuct Tape (per roll)500EA$0.00
3003AKFiber Tape (per roll)200EA$0.00
3003ALMasking Tape (per roll)500EA$0.00
3003AMClear Tape (per roll)250EA$0.00
3003ANShrink Wrap 17"x1500'150EA$0.00
3003APShrink Wrap Back 18"x1500'150EA$0.00
3003AQKeyboard Bags (min .50)1500BG$0.00
3003ARPeanuts150BG$0.00
Option PERIOD 3 TOTAL
Option PERIOD 4
Item No.DescriptionEstimated QuantityUnitUnit Price
4001Pre-Planning Meeting
4001AASite Supervisor150HR$0.00
4001ABIT Technician150HR$0.00
4002Office Relocation
4002AASite Supervisor780HR$0.00
4002ABIT Technician200HR$0.00
4002ACElectrician200HR$0.00
4002ADMover750HR$0.00
4002AELift Gate Truck w/Driver360HR$0.00
4002AFTractor Trailer Truck w/Driver150HR$0.00
4003Materials
4003AAPlastic Carton (each) approx. 2.0 CU. FT.1000EA$0.00
4003ABPlastic Size Carton (each) approx. 3.0 CU. FT.800EA$0.00
4003ACPlastic Carton (each)250EA$0.00
4003ADChair Bags700BG$0.00
4003AEPaper Pads (each)1000EA$0.00
4003AFComputer Bins (each)200EA$0.00
4003AGBubble Wrap (each)100EA$0.00
4003AHPacking Paper (each)500EA$0.00
4003AJDuct Tape (per roll)500EA$0.00
4003AKFiber Tape (per roll)200EA$0.00
4003ALMasking Tape (per roll)500EA$0.00
4003AMClear Tape (per roll)250EA$0.00
4003ANShrink Wrap 17"x1500'150EA$0.00
4003APShrink Wrap Back 18"x1500'150EA$0.00
4003AQKeyboard Bags (min .50)1500BG$0.00
4003ARPeanuts150BG$0.00
Option PERIOD 4 TOTAL

Labor Breakdown

Attachment D Price Schedule
OFFEROR NAME: _________________________________________________
Insert offeror name above and complete the following Price Schedule.
Contract Line Item Number (CLIN)DescriptionLabor Categories
Base PeriodPlease insert proposed labor categories.[Labor Category]
HoursHoursHoursHoursCLIN Price
0001Pre-Planning Meeting- 0
0001AASite Supervisor- 0
0001ABIT Technician- 0
0002Office Relocation- 0
0002AASite Supervisor- 0
0002ABIT Technician- 0
0002ACElectrician- 0
0002ADMover- 0
0002AELift Gate Truck w/Driver- 0
0002AFTractor Trailer Truck w/Driver- 0
0003Materials- 0
0003AAPlastic Carton (each) approx. 2.0 CU. FT.- 0
0003ABPlastic Size Carton (each) approx. 3.0 CU. FT.- 0
0003ACPicture Carton (each)- 0
0003ADChair Bags (each)- 0
0003AEPaper Pads (each)- 0
0003AFComputer Bins (each)- 0
0003AGBubble Wrap (each)- 0
0003AHPacking Paper (each)- 0
0003AJDuct Tape (per roll)- 0
0003AKFiber Tape (per roll)- 0
0003ALMasking Tape (per roll)- 0
0003AMClear Tape (per roll)- 0
0003ANShrink Wrap 17"x1500'- 0
0003APShrink Wrap Back 18"x1500'- 0
0003AQKeyboard Bags (min .50)- 0
0003ARPeanuts- 0
Labor Category Hourly Rate
Contract Line Item Number (CLIN)DescriptionLabor Categories
Option Period 1Please insert proposed labor categories.Senior Data Analyst[Labor Category]
CLINHoursHoursHoursHoursCLIN Price
1001Pre-Planning Meeting- 0
1001AASite Supervisor- 0
1001ABIT Technician- 0
1002Office Relocation- 0
1002AASite Supervisor- 0
1002ABIT Technician- 0
1002ACElectrician- 0
1002ADMover- 0
1002AELift Gate Truck w/Driver- 0
1002AFTractor Trailer Truck w/Driver- 0
1003Materials- 0
1003AAPlastic Carton (each) approx. 2.0 CU. FT.- 0
1003ABPlastic Size Carton (each) approx. 3.0 CU. FT.- 0
1003ACPlastic Carton (each)- 0
1003ADChair Bags- 0
1003AEPaper Pads (each)- 0
1003AFComputer Bins (each)- 0
1003AGBubble Wrap (each)- 0
1003AHPacking Paper (each)- 0
1003AJDuct Tape (per roll)- 0
1003AKFiber Tape (per roll)- 0
1003ALMasking Tape (per roll)- 0
1003AMClear Tape (per roll)- 0
1003ANShrink Wrap 17"x1500'- 0
1003APShrink Wrap Back 18"x1500'- 0
1003AQKeyboard Bags (min .50)- 0
1003ARPeanuts- 0
Labor Category Hourly Rate
Contract Line Item Number (CLIN)DescriptionLabor Categories
Option Period 2Please insert proposed labor categories.[Labor Category]
CLINHoursHoursHoursHoursCLIN Price
2001Pre-Planning Meeting- 0
2001AASite Supervisor- 0
2001ABIT Technician- 0
2002Office Relocation- 0
2002AASite Supervisor- 0
2002ABIT Technician- 0
2002ACElectrician- 0
2002ADMover- 0
2002AELift Gate Truck w/Driver- 0
2002AFTractor Trailer Truck w/Driver- 0
2003Materials- 0
2003AAPlastic Carton (each) approx. 2.0 CU. FT.- 0
2003ABPlastic Size Carton (each) approx. 3.0 CU. FT.- 0
2003ACPlastic Carton (each)- 0
2003ADChair Bags- 0
2003AEPaper Pads (each)- 0
2003AFComputer Bins (each)- 0
2003AGBubble Wrap (each)- 0
2003AHPacking Paper (each)- 0
2003AJDuct Tape (per roll)- 0
2003AKFiber Tape (per roll)- 0
2003ALMasking Tape (per roll)- 0
2003AMClear Tape (per roll)- 0
2003ANShrink Wrap 17"x1500'- 0
2003APShrink Wrap Back 18"x1500'- 0
2003AQKeyboard Bags (min .50)- 0
2003ARPeanuts- 0
Labor Category Hourly Rate
Contract Line Item Number (CLIN)DescriptionLabor Categories
Option Period 3Please insert proposed labor categories.[Labor Category]
CLINHoursHoursHoursHoursCLIN Price
3001Pre-Planning Meeting- 0
3001AASite Supervisor- 0
3001ABIT Technician- 0
3002Office Relocation- 0
3002AASite Supervisor- 0
3002ABIT Technician- 0
3002ACElectrician- 0
3002ADMover- 0
3002AELift Gate Truck w/Driver- 0
3002AFTractor Trailer Truck w/Driver- 0
3003Materials- 0
3003AAPlastic Carton (each) approx. 2.0 CU. FT.- 0
3003ABPlastic Size Carton (each) approx. 3.0 CU. FT.- 0
3003ACPlastic Carton (each)- 0
3003ADChair Bags- 0
3003AEPaper Pads (each)- 0
3003AFComputer Bins (each)- 0
3003AGBubble Wrap (each)- 0
3003AHPacking Paper (each)- 0
3003AJDuct Tape (per roll)- 0
3003AKFiber Tape (per roll)- 0
3003ALMasking Tape (per roll)- 0
3003AMClear Tape (per roll)- 0
3003ANShrink Wrap 17"x1500'- 0
3003APShrink Wrap Back 18"x1500'- 0
3003AQKeyboard Bags (min .50)- 0
3003ARPeanuts- 0
Labor Category Hourly Rate
Contract Line Item Number (CLIN)DescriptionLabor Categories
Option Period 4Please insert proposed labor categories.[Labor Category]
CLINHoursHoursHoursHoursCLIN Price
4001Pre-Planning Meeting- 0
4001AASite Supervisor- 0
4001ABIT Technician- 0
4002Office Relocation- 0
4002AASite Supervisor- 0
4002ABIT Technician- 0
4002ACElectrician- 0
4002ADMover- 0
4002AELift Gate Truck w/Driver- 0
4002AFTractor Trailer Truck w/Driver- 0
4003Materials- 0
4003AAPlastic Carton (each) approx. 2.0 CU. FT.- 0
4003ABPlastic Size Carton (each) approx. 3.0 CU. FT.- 0
4003ACPlastic Carton (each)- 0
4003ADChair Bags- 0
4003AEPaper Pads (each)- 0
4003AFComputer Bins (each)- 0
4003AGBubble Wrap (each)- 0
4003AHPacking Paper (each)- 0
4003AJDuct Tape (per roll)- 0
4003AKFiber Tape (per roll)- 0
4003ALMasking Tape (per roll)- 0
4003AMClear Tape (per roll)- 0
4003ANShrink Wrap 17"x1500'- 0
4003APShrink Wrap Back 18"x1500'- 0
4003AQKeyboard Bags (min .50)- 0
4003ARPeanuts- 0
Labor Category Hourly Rate

File details come from the government source that posted it. Updated .