ATTACHMENT D MATERIAL PRICE ADJUSTMENT SHEET AND EXAMPLE (2).pdf

PDF 2 MB Posted

Attached to
1941-26-R-IFBD-00018
Solicitation number
3160007693
Issued by
Jefferson County, Mississippi

About this file

This document is a Material Price Adjustment Worksheet from the Mississippi Department of Transportation (MDOT) in Jackson, Mississippi, specifically for a highway project (HrSP-0022-00(023)) located in Jasper County. The worksheet details material pricing for two hot mix asphalt items: 10,000 tons of 12.5mm Hot Mix MT and 15,000 tons of 19mm Hot Mix MT, with the estimated project period running from 7/1/2017 to 7/25/2017.

The document shows a contract base price for AC-30 material at $3.1258, with a current period base price of $3.3253, resulting in a price differential of $0.1995. The total material quantity is 1,270 tons, and the total material price adjustment calculation yields $253.37. The worksheet is designed for site managers to perform fuel and material adjustments, with a specific note that the form can be used manually to correct data entry errors. The pricing adjustment appears to be a standard method for accounting for material price fluctuations during the project period.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AT,T TD

MATERIAL PRICE ADJUSTMENT

SHEETAND EXAMPLE

CSD-881 MISSISSIPPI DEPARTMENT OF TRANSPORTATION

Rev' 6-17

Jackson, Mississippi

WORKSHEET FOR MATERIAL PRICE ADJUSTMENT

PROJECT NUMBER

COUNW

MATERIAL

CONTRACT BASE PRICE

ESTIMATED PERIOD

BASE PRICE FOR CURRENT PERIOD

PRICE DIFFERENTIALS

ADJUSTMENTS = TOTAL MATERIAL X PRICE DIFFERENTIALS

ADJUSTMENT FOR FUEL AND OTHER MATERIALS

TOTAL ADJUSTMENT

NOTE: SITE MANAGER PERFORMS ALL REQUIRED FUEL AND MATERIAL

ADJUSTMENTS. THIS FORM IS ONLY USED TO CORRECT THE FUEL

ADJUSTMENT MANUALLY IF DATA ENTRY ERRORS WERE MADE.

TO

ITEM NO ITEM DESCRIPTION QUANTITY UNIT

MATERIAL PER

UNIT

TOTAL MATERIAL

PER ITEM

TOTAL MATERIAL 0

CSD-881 MISSISSIPPI DEPARTMENT OF TRANSPORTATION

Rev' 5-17

Jackson, Mississippi

WORKSHEET FOR MATERIAL PRICE ADJUSTMENT

PROJECT NUMBER HrSP-0022-00(023) 301301-100

COUNTY Jasper

MATERIAL AC-30

CONTRACT BASE PRICE 3.1258

ESTTMATED PERTOD 7lLl20L7 TO 7/2s/20L7

BASE PRICE FOR CURRENT PERIOD

PRICE DIFFERENTIALS

ADJUSTMENTS = TOTAL MATERIAL X PRICE DIFFERENTIALS

ADJUSTMENT FOR FUEL AND OTHER MATERIALS

TOTAL ADJUSTMENT

NOTE: SITE MANAGER PERFORMS ALL REQUIRED FUEL AND MATERIAL

ADJUSTMENTS. THIS FORM IS ONLY USED TO CORRECT THE FUEL

ADJUSTMENT MANUALLY IF DATA ENTRY ERRORS WERE MADE.

3.3253

0.1995 s 2s3.37

5 2s3.37

ITEM NO ITEM DESCRIPTION QUANTITY UNIT

MATERIAL PER

UNIT

TOTAL MATERIAL

PER ITEM

403-B Hot Mix 12.5mm MT 10,000.00 Ton 0.055 5s0

401-C Hot Mix 19mm MT 15,000.00 Ton 0.048 720

TOTAL MATERIAL L270