Attachment_D_-_Cost_Proposal.pdf
PDF 234 KB Posted
- Solicitation number
- 0000036466
- Issued by
- San Mateo County, San Mateo City, California
About this file
This document is a Cost Proposal for Pescadero Marsh Exhibit Design and Fabrication Services, issued by the Department of Parks and Recreation (DPR). The proposal outlines a project for creating interpretive exhibit panels and trail guides for the Pescadero Marsh area, with a total budget not to exceed $50,000.00. The project is divided into two main components: Project Start-Up (including a start-up meeting and management tools) and Interpretive Exhibit Panels (encompassing concept design, panel artwork, fabrication, and delivery). The scope includes creating schematic studies, final artwork, panel fabrication, and producing both English and Spanish trail guides in print and digital ADA-remediated formats.
The cost proposal requires proposers to include all labor, equipment, materials, supplies, taxes, travel, and associated expenses for the exhibit design and fabrication services. The document provides a detailed breakdown of tasks with designated spaces for proposers to fill in their proposed amounts for each task. DPR will audit the computations to ensure accuracy, with specific provisions that individual task amounts will prevail if sub-totals do not match, and the actual sum of sub-total amounts will be used if the total amount is incorrect. Proposers are instructed to refer to the Detailed Scope of Work (SOW) in Attachment C and are warned that illegible amounts may result in proposal disqualification.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit B, Attachment 1 – C25830001 Pescadero Marsh Exhibit Design and Fabrication Services
COST PROPOSAL
If applicable, proposer must initial all changes made to this cost proposal.
DPR will audit computations to ensure sums are correct, indicated by proposer. If the Sub-Total Amount does not equal the sum of tasks 1-2 and 3-5, the individual task amounts will prevail. Additionally, if the Total Amount does not equal the sum of the two Sub-Total Amounts, the actual sum of the Sub-Total Amounts will prevail. Illegible amounts may be cause for proposal disqualification.
Proposers should refer to Attachment C's "Exhibit A, Attachment 1 - Detailed Scope of Work (SOW)” for all work to be performed.
Proposers shall include ALL labor, equipment, materials, supplies, applicable taxes, travel and direct or indirect expenses in the performance of providing the Pescadero Marsh Exhibit Design and Fabrication services.
A. B. C.
Task Project Start-Up Proposal Amount
Project Start-Up
• Start Up Meeting
• Management Tools $________________________
Reconnaissance
• Site Visit/Walk through
• Site Meeting $________________________
Project Start Up Sub-Total Proposal (fee proposal shall not exceed sub-total proposal) $________________________
Task Interpretive Exhibit Panels Proposal Amount
Concept Design
• Schematic Study
• Concept Design $________________________
4 Panel Artwork
• Final Artwork $________________________
Fabrication, Language Translation, and Panel Delivery
• Panels fabrication, delivery, and tax
• English and Spanish Interpretive Trail Guide in both print form and ADA-remediated digital representations (pdf) for park webpage
• Trailhead weather-resistant durable trail guide housing
Interpretive Panels /Sub-Total Proposal (fee proposal shall not exceed sub-total proposal) $________________________
Total Proposal Amount (Fee Proposal shall not exceed $50,000.00) $________________________
| Text1: |
| Text2: |
| Text3: |
| Text4: |
| Text5: |
| Text6: |
| Text7: |
| Text8: |
File details come from the government source that posted it. Updated .