This document is an Attachment B for Exhibit Design and Fabrication Services, detailing the criteria for awarding points in a proposal evaluation process. The technical proposal will be scored across four key areas: Past Performance and Experience (18 points), Understanding of Project Requirements (12 points), Organization and Management Plan (5 points), and Key Personnel (5 points), for a total technical proposal score of 40 points. The cost proposal can earn up to 30 points, with the lowest cost proposal receiving the full points, and other proposals calculated proportionally. The combined proposal score totals 70 points.
The document also outlines additional incentive and preference points for Disabled Veteran Business Enterprises (DVBE) and Small Businesses (SB). DVBE incentives range from 1-5% of the lowest responsive bid, depending on the level of confirmed DVBE participation. Small businesses can receive a 5% bidding preference if they subcontract at least 25% of the work to certified small or minority businesses. These preference points are added to the Combined Proposal Score, potentially improving a bidder's final evaluation ranking. The evaluation methodology emphasizes not just cost, but also the proposer's experience, project understanding, organizational capabilities, and key personnel qualifications.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit Design and Fabrication Services
Attachment B: Criteria for Awarding Points for the Proposal
Attachment B: Criteria for Awarding Points for the Proposal
Maximum Score
Scoring Rubric Actual Score
1. PAST PERFORMANCE AND EXPERIENCE
• Has the Proposer successfully delivered on past projects of similar scope and complexity?
• Has the Proposer demonstrated sufficient experience on past projects performing the tasks required under the Scope of Work?
• Has the Proposer demonstrated applicable cost savings and schedule improvement methodologies utilized on past projects?
• Has the Proposer demonstrated a successful and repeatable past approach to delivering high-quality products with schedule constraints?
18 18 – Meets all criteria on Past Performance and Experience
12 – Meets most criteria on Past Performance and Experience (Either has full years of experience or demonstrated success on past projects, but not both)
6 – Meets some criteria on Past Performance and Experience (Has some experience or some demonstrated success, but neither the required amount)
0- Meets no criteria on Past Performance and Experience (Does not provide any experience or demonstrated success)
2. UNDERSTANDING OF PROJECT
REQUIREMENTS
Project Criteria
• Has the Proposer demonstrated a thorough knowledge of the project requirements?
• Is there sufficient evidence of analysis to lend credibility to the commitments made?
• Has the Proposer given clear evidence through narratives and examples of prior work that it has the capability to carry out the Exhibit Design and Fabrication Services for a project of this complexity and magnitude with innovation and autonomy?
12 12 – Fully understands project requirements through answering all three questions
8- Mostly understands project requirements, answers some but not all questions
4- Partially understands project requirements, answers one question
0 – Does not demonstrate understanding of project requirements
Attachment B: Criteria for Awarding Points for the Proposal
3. Organization and Management Plan
• Does the proposed project organization present a clear and logical framework?
• Is the management approach complementary and responsive to the RFP requirements? Does the staffing plan convey the proper level of response for the work at hand?
• Does it demonstrate a high level of commitment and resource availability?
• Does it address the full expanse of potential tasks in the scope?
5 5 – Organization and Management plan is fully defined and demonstrates ability to carry out
SOW
3- Organization and Management plan is defined or demonstrates ability to carry out SOW
0- Organization and Management Plan is not defined and does not demonstrate ability to carry out
SOW
4. Key Personnel
• Are the personal qualifications and professional skills of the Key Personnel nominees appropriate for the roles assigned?
• Is their past experience applicable and indicative of success on this project?
5 5- Key Personnel are appropriately assigned and have past successful applicable experience
3- Key Personnel are appropriately assigned or have past successful applicable experience
0- Key Personnel are not appropriately assigned and do not have past successful applicable experience
Total Technical Proposal Score 40 Total Cost Proposal Score 30 Lowest Cost Proposal will receive the full (30) points;
All other cost proposals will be calculated as follows:
(Lowest Cost Proposal/Other Cost Proposal) x 30 points = Other Cost Proposal Score
COMBINED PROPOSAL SCORE (Technical + Cost)
Preference and Incentive Points
FINAL PROPOSAL SCORE 70
See Section 5.2.3 of this RFP for calculation of the Cost Proposal Scores.
Attachment B: Criteria for Awarding Points for the Proposal
Incentive/ Preference Points Points Added
1.
DVBE Incentive The following calculation will be used in accordance with Section___ of this RFP.
Confirmed DVBE Participation of DVBE Incentive Amount for IFB
10% or more 5% of lowest responsive and responsible bid
9% - 9.99% 4% of lowest responsive and responsible bid
8% - 8.99% 3% of lowest responsive and responsible bid
7% - 7.99% 2% of lowest responsive and responsible bid
6.01% - 6.99% 1% of lowest responsive and responsible bid
Confirmed DVBE Participation of DVBE Incentive Amount for IFB
5% or more 5% of lowest responsive and responsible bid
4% - 4.99% 4% of lowest responsive and responsible bid
3% - 3.99% 3% of lowest responsive and responsible bid
2% - 2.99% 2% of lowest responsive and responsible bid
.01% - 1.99% 1% of lowest responsive and responsible bid
2.
SB Preference Proposers who subcontract at least 25% of the work proposed to a certified SB/MB will be awarded a 5% bidding preference based on the following calculation in accordance with Section___ of this RFP.
1. Five percent is applied to the highest responsive Combined Proposal Score.
2. The preference amount is added to the Combined Proposal Score of the
Certified SB/MB or non-SB Prime achieving at least 25% subcontracting from certified SB/MBs.
Total Preference and Incentive Points