Attachment_A_-_Minimum_Requirements_Checklist_prepared.pdf
PDF 159 KB Posted
- Solicitation number
- 0000036466
- Issued by
- San Mateo County, San Mateo City, California
About this file
This document is an Attachment A: Minimum Requirements Checklist for an Exhibit Design and Fabrication Services contract. The checklist outlines comprehensive submission requirements for proposers, including mandatory documentation and forms to be submitted with their proposal. Key requirements include a proposal limited to 100 pages, a transmittal letter containing specific information such as proof of business licensure in California, identification of a Contract Manager, key personnel resumes, and references. Proposers must also submit a technical proposal demonstrating understanding of the Scope of Work, past performance evidence, and a cost proposal not exceeding $50,000.00.
The document details numerous forms and certifications that must be included, such as Bidder Declaration (GSPD 05-105), Disabled Veteran Business Enterprise Declarations (STD 843), Commercially Useful Function form (DPR 87), and a Generative Artificial Intelligence Disclosure Form (DPR 97B). Additional required certifications cover areas including the Darfur Contracting Act, Non-Collusion, California Civil Rights Laws, and Economic Sanctions. The checklist provides a comprehensive framework for evaluating proposal completeness, with checkboxes for "Yes" and "No" responses to each requirement, enabling a systematic review of submission compliance.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Exhibit Design and Fabrication Services Attachment A: Minimum Requirements Checklist
# Minimum Requirements Yes No
1. Was the Proposal received no later than the date and time listed in Table 1?
2. Is the Proposal typewritten and signed manually?
3. Is the Proposal no more than [100] pages in length, exclusive of the transmittal letter, resumes and references, and the Forms and Certifications?
4. Did the Proposer submit a Transmittal Letter with the following information?
a. Proof of valid and appropriate licensure as qualified to do business in the
State of California;
b. Identification of a Contract Manager;
c. Resumes for all identified Key Personnel;
d. All necessary information and forms required showing proof of small business participation;
e. Affirmation that Proposer has or is able to obtain the required insurance, specified in the Sample Agreement in Attachment C of this RFP;
f. Three references for the firm as required in Section 4.4.1.1;
g. Affirmation that Proposer has not been terminated from another contract for default and/or has not received a civil judgment or criminal conviction in the past five years; and
h. A letter of commitment from each identified Subcontractor, including relevant licenses and positions in which the Subcontractor is identified to work.
5. Did the Proposer submit all requirements of Past Performance and Experience per Section 4.4.1?
a. Three successfully completed projects demonstrating firm’s/company’s qualifications, unique capabilities and/or strengths;
b. (2) Writing Examples
c. Durability and Maintenance of Past Projects
6. Did the Proposer submit a Technical Proposal demonstrating understanding of the Scope of Work?
7. Did the Proposal submit the required Cost Proposal, separate from any other documents and not exceeding $50,000.00?
8. Form A: Bidder Declaration (GSPD 05-105)
9. Form B: Disabled Veteran Business Enterprise Declarations (STD 843)
10. Form C: Commercially Useful Function (DPR 87)
11. Form D: Generative Artificial Intelligence (GenAI) Disclosure Form (DPR 97B)
12. Cert. 1: CCC-04/2017 and DPR 88, STD 204 and/or STD 205
Exhibit Design and Fabrication Services
# Minimum Requirements Yes No
13. Cert. 2: Darfur Contracting Act Certification
14. Cert 3: Non-Collusion Certification
15. Cert 4: California Civil Rights Laws Certification
16. Cert. 5: P-05-22 Economic Sanctions Certification
Attachment A: Minimum Requirements Checklist
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Check Box9: Off |
| Check Box10: Off |
| Check Box11: Off |
| Check Box12: Off |
| Check Box13: Off |
| Check Box14: Off |
| Check Box15: Off |
| Check Box16: Off |
| Check Box17: Off |
| Check Box18: Off |
| Check Box19: Off |
| Check Box20: Off |
| Check Box21: Off |
| Check Box22: Off |
| Check Box23: Off |
| Check Box24: Off |
| Check Box25: Off |
| Check Box26: Off |
| Check Box27: Off |
| Check Box28: Off |
| Check Box29: Off |
| Check Box30: Off |
| Check Box31: Off |
| Check Box32: Off |
| Check Box33: Off |
File details come from the government source that posted it. Updated .