This document is a set of bid drawings for the Radiation Oncology Lab Renovation project at the Richmond VA Medical Center. The project is part of solicitation number 36C24625B0001, an Invitation for Bid (IFB) issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. The project involves the construction portion of the renovation work. The bid drawings provide detailed specifications and schematics for the construction activities required. Key details include the project location, scope of work, and due dates for the solicitation. This document does not contain information about the pricing, set-asides, award dates, or other contractual terms, as it is focused solely on the technical specifications and drawings for the construction work.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24625B0001 0007.docx | DOCX document | |
| 36C24625B0001 0006.docx | DOCX document | |
| Pre-Renovation Asbestos Report.pdf | ||
| 36C24625B0001 0005.docx | DOCX document | |
| 36C24625B0001 0004.docx | DOCX document | |
| 36C24625B0001 0003.docx | DOCX document | |
| 36C24625B0001.Site.Visit.Sign-in.Sheet.pdf | ||
| 36C24625B0001 0002.docx | DOCX document | |
| 36C24625B0001 0001.docx | DOCX document | |
| Attachment B - Bid Specifications - Volume I R2.pdf | ||
| Attachment A - Wage Determination VA20240155 6.21.24.txt | TXT text file | |
| 36C24625B0001_1.docx | DOCX document | |
| Attachment C - Bid Specifications - Volume II R2.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT AREA
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
STAMPCONSULTANT / ARCHITECT OF RECORD
321 4 5 6 7 8 9 10
PROJECT NAME:
SITE ADDRESS:
VICINITY MAP:
ENGINEER OF RECORD
VA PROJECT NUMBER:
OWNER AND CONSULTANTS:
C U s e rs
\L C a m p o v e rd e -L o a y z a \D o c u m e n ts
\1
-R
L C a m p o v e rd e
-L o a y z a
.r v t
/2 /2
:0
:1
P
M
GI000
COVER SHEET RADIATION ONCOLOGY
LAB RENOVATION
VAMC RICHMOND
652-22-200
BLDG 500
11/07/2022 JU JT
RADIATION ONCOLOGY LAB RENOVATION
DEPARTMENT OF VETERAN AFFAIRS
RICHMOND VA MEDICAL CENTER
1201 BROAD ROCK BLVD
RICHMOND, VIRGINIA 23249
16511
652-22-200
VA COR:
CONTACT:
ADDRESS:
PHONE:
RICHARD STILES
DEPARTMENT OF VETERAN AFFAIRS
RICHMOND VA MEDICAL CENTER
1201 BROAD ROCK BLVD
RICHMOND, VIRGINIA 23249
804-675-6782
ARCHITECT:
NAME:
ADDRESS:
CONTACT:
ANDERSON ENGINEERING OF MN, LLC
13605 1ST AVE NORTH, SUITE 100
PLYMOUTH, MN 55441
TOM OLESAK
PHONE: 763-412-4000
STRUCTURAL ENGINEER:
NAME:
ADDRESS:
CONTACT:
BRITT PETERS & ASSOCIATES, INC.
8701 RED OAK BLVD., STE 500
CHARLOTTE, NC 28217
MARK RICKHER, PE
PHONE: 980-235-2624
MECHANICAL ENGINEER:
NAME:
ADDRESS:
CONTACT:
CHARLOTTE ENGINEERS
5838 MONROE RD.
CHARLOTTE, NC 28212
GREGORY TURNER, PE
PHONE: 704-531-3000
ELECTRICAL ENGINEER:
NAME:
ADDRESS:
CONTACT:
CHARLOTTE ENGINEERS
5838 MONROE RD.
CHARLOTTE, NC 28212
JOHN C. EDWARDS, PE
PHONE: 704-531-3000
PLAN
NORTH
TRUE
NORTH
TRUE
NORTH
TRUE
NORTH
SITE LOCATION MAP: KEY PLAN:
PROJECT SITE
PROJECT SITE
RICHARD STILES REGISTERED COMMUNICATIONS DISTRIBUTION
DESIGNER
NAME:
ADDRESS:
CONTACT:
VERTEX TECHNOLOGY CONSULTANTS, INC.
4700 LEBANON RD.
CHARLOTTE, NC 28227
RICK SOUSA
PHONE: 704-940-6989
FIRE PROTECTION ENGINEER:
NAME:
ADDRESS:
CONTACT:
CHARLOTTE ENGINEERS
5838 MONROE RD.
CHARLOTTE, NC 28212
JOHN CALLAHAN, PE
PHONE: 704-531-3000
Revisions: Date:
DAVID DAIGNAULT, PE
█ ISSUED
NOT ISSUED
ISSUED FOR REFERENCE ONLY
ISSUED AS NOTED
R
N
SHEET ABBREVIATION AND NUMBERING
AE 1 1 1 - 01
DI
SC
IP
LI
NE
D
ES
IG
NA
TO
R
SH
EE
T
TY
PE
D
ES
IG
NA
TO
R
FL
O
O R
LE
VE
L
SH
EE
T G
RO
UP
IN
G
ZO
NE
N
UM
BE
R
AE 111-01
ARCHITECTURAL ELEMENTS, PLAN, FIRST LEVEL, FLOOR PLAN, ZONE 1
QH 1 1 0 - 01
DI
SC
IP
LI
NE
D
ES
IG
NA
TO
R
SH
EE
T
TY
PE
D
ES
IG
NA
TO
R
FL
O
O R
LE
VE
L
SH
EE
T G
RO
UP
IN
G
ZO
NE
N
UM
BE
R
QH110-01
EQUIPMENT HOSPITAL, PLAN, FIRST LEVEL, ZONE 1
DISCIPLINE
DESIGNATOR
SHEET TYPE
DESIGNATOR
FLOOR
LEVEL
SHEET
GROUPING
GC - GENERAL CONTRACT
GI - GENERAL INFORMATION
AC - ARCHITECTURAL RCP
AD - ARCHITECTURAL DEMOLITION
AS - ARCHITECTURAL SITE
AE - ARCHITECTURAL ELEMENTS
AF - ARCHITECTURAL FINISHES
IF - INTERIOR FURNISHINGS
QC - EQUIPMENT LAUNDRY
QF - EQUIPMENT FOOD SERVICE
QH - EQUIPMENT HOSPITAL
QL - EQUIPMENT LABORATORY
0 - GENERAL
1 - PLANS
2 - ELEVATIONS
3 - SECTIONS
4 - LARGE SCALE VIEWS
5 - DETAILS
6 - SCHEDULES & DIAGRAMS
0 - LOWER LEVEL
1 - FIRST LEVEL
2 - SECOND LEVEL
3 - THIRD LEVEL
4 - FOURTH LEVEL
GENERAL:
00-10 - TITLE SHEET, NOTES,
ABBREVIATIONS, SYMBOLS,
SCHEDULES
PLANS:
1 - LEVEL FLOOR PLAN
2 - DIMENSION PLAN
ELEVATIONS:
01-10 - EXTERIOR ELEVATIONS
11-19 - INTERIOR ELEVATION
SECTIONS:
01-10 - BUILDING SECTIONS
11-19 - WALL SECTIONS
20-29 -STAIR SECTIONS & PLANS
DETAILS:
01-19 - EXTERIOR PLAN DETAILS
20-29 - EXTERIOR SECTION DETAILS
30-39 - ROOF DETAILS
40-49 - INTERIOR PLAN DETAILS
50-59 - INTERIOR SECTION DETAILS
60-69 - CEILING DETAILS
PLANS ONLY
AE 5 1 2
DI
SC
IP
LI
NE
D
ES
IG
NA
TO
R
SH
EE
T
TY
PE
D
ES
IG
NA
TO
R
SH
EE
T G
RO
UP
IN
G
AE 501
ARCHITECTURAL ELEMENTS, EXTERIOR PLAN DETAILS
AF 6 7 0
DI
SC
IP
LI
NE
D
ES
IG
NA
TO
R
SH
EE
T
TY
PE
D
ES
IG
NA
TO
R
SH
EE
T G
RO
UP
IN
G
AF 670
ARCHITECTURAL FINISHES, FINISH SCHEDULE
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMPCONSULTANT / ARCHITECT OF RECORD
321 4 5 6 7 8 9 10
C U s e rs
\L C a m p o v e rd e -L o a y z a \D o c u m e n ts
\1
-R
L C a m p o v e rd e
-L o a y z a
.r v t
/2 /2
:0
:1
P
M
GI001
SHEET INDEX RADIATION ONCOLOGY
LAB RENOVATION
VAMC RICHMOND
652-22-200
BLDG 500
11/07/2022 JU JT16511
SHEET INDEX - ARCHITECTURAL
SHEET NO. SHEET TITLE SD
5%
IS
SU
E
/1
6/
DD
5% Is su e
Da te
CD
5%
IS
SU
E
/2
2/
CD
IS
SU
E
/1 0/
FI
NA
L
BI
D
DO
CU
M
EN
TS
1/
/2
AD111 FIRST LEVEL DEMOLITION PLAN █ █ █ █ █
AE111 FIRST LEVEL PLAN █ █ █ █ █
AE112 FIRST LEVEL DIMENSION PLAN █ █ █ █
AC111 FIRST LEVEL REFLECTED CEILING PLAN █ █ █ █
AE411 ENLARGED PLANS AND INTERIOR ELEVATIONS █ █ █ █ █
AE601 PARTITION TYPES, CEILING, INTERIOR, & PLAN DETAILS █ █ █ █
AE602 OPENING SCHEDULE, TYPES, AND INTERIOR SECTION DETAILS █ █ █ █
AE640 MOUNTING HEIGHTS AND INTERIOR SECTIONS █ █ █ █
SHEET INDEX - EQUIPMENT
SHEET NO. SHEET TITLE S
D
IS
SU
E
/1 6/
5%
IS
SU
E
/0
4/
CD
5%
IS
SU
E
/2
2/
CD
IS
SU
E
/1 0/
FI
NA
L
BI
D
DO
CU
M
EN
TS
1/
/2
QH110 FIRST LEVEL EQUIPMENT PLAN █ █ █ █
SHEET INDEX - GENERAL
SHEET NO. SHEET TITLE SD
5%
IS
SU
E
/1
6/
5%
IS
SU
E
/0
4/
CD
5%
IS
SU
E
/2
2/
CD
IS
SU
E
/1 0/
FI
NA
L
BI
D
DO
CU
M
EN
TS
1/
/2
GI000 COVER SHEET █ █ █ █ █
GI001 SHEET INDEX █ █ █ █
GI002 ABBREVIATIONS █ █ █ █ █
GI110 FIRST LEVEL LIFE SAFETY PLAN █ █ █ █ █
GI111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN █ █ █ █ █
SHEET INDEX - INTERIOR
SHEET NO. SHEET TITLE S
D
IS
SU
E
/1 6/
5%
IS
SU
E
/0
4/
CD
5%
IS
SU
E
/2
2/
CD
IS
SU
E
/1 0/
FI
NA
L
BI
D
DO
CU
M
EN
TS
1/
/2
AF111 FIRST LEVEL FINISH PLAN AND FINISH DETAILS █ █ █ █ █
AF600 ROOM FINISH AND MATERIAL SCHEDULE █ █ █
AW111 FIRST LEVEL WAYFINDING PLAN & SCHEDULE █ █ █ █
AW601 SIGNAGE DETAILS █ █ █ █
IF110 FIRST LEVEL FURNITURE PLAN █ █ █ █
SHEET INDEX - MECHANICAL
SHEET NO. SHEET TITLE S
D
IS
SU
E
/1 6/
D
IS
SU
E
/0 4/
CD
5%
IS
SU
E
/2
2/
CD
IS
SU
E
/1 0/
FI
NA
L
BI
D
DO
CU
M
EN
TS
1/
/2
M001 MECHANICAL - SYMBOLS, LEGENDS, NOTES AND DRAWING INDEX █ █ █ █ █
M002 MECHANICAL - DETAILS AND SCHEDULES █ █ █ █ █
MD110 MECHANICAL - FIRST FLOOR - DEMOLITION █ █ █ █ █
MD210 MECHANICAL - FIRST FLOOR INTERSTITIAL - DEMOLITION - DUCTWORK █ █ █ █ █
MD211 MECHANICAL - FIRST FLOOR INTERSTITIAL - DEMOLITION - PIPING █ █ █ █ █
MD310 MECHANICAL - ROOF PLAN - DEMOLITION █ █ █ █
MH110 MECHANICAL - FIRST FLOOR - NEW WORK █ █ █ █
MH210 MECHANICAL - FIRST FLOOR INTERSTITIAL - NEW WORK - DUCTWORK █ █ █ █
MH310 MECHANICAL - ROOF PLAN - NEW WORK █ █ █ █
MP210 MECHANICAL - FIRST FLOOR INTERSTITIAL - NEW WORK - PIPING █ █ █ █ █
SHEET INDEX - ELECTRICAL
SHEET NO. SHEET TITLE S
D
IS
SU
E
/1 6/
IS
SU
E
/0 4/
CD
5%
IS
SU
E
/2
2/
CD
IS
SU
E
/1 0/
FI
NA
L
BI
D
DO
CU
M
EN
TS
1/
/2
E001 ELECTRICAL - SYMBOLS, LEGENDS, NOTES AND DRAWING INDEX █ █ █ █ █
E002 ELECTRICAL - DETAILS █ █ █ █ █
E003 ELECTRICAL - TELECOMMUNICATION DETAILS █ █
E004 ELECTRICAL - PARTIAL RISER DIAGRAM AND LUMINAIRE SCHEDULE █ █ █ █ █
E005 ELECTRICAL - PANEL SCHEDULES █ █ █ █ █
ED110 ELECTRICAL - FIRST FLOOR - DEMOLITION █ █ █ █ █
ED310 ELECTRICAL - ROOF PLAN - DEMOLITION █ █
EL110 ELECTRICAL - FIRST FLOOR - NEW WORK - LIGHTING █ █ █ █ █
EP110 ELECTRICAL - FIRST FLOOR - NEW WORK - POWER █ █ █ █ █
EP210 ELECTRICAL - FIRST FLOOR INERSTITIAL - NEW WORK - POWER █ █ █ █
EP310 ELECTRICAL - ROOF PLAN - NEW WORK - POWER █ █
EY110 ELECTRICAL - FIRST FLOOR - NEW WORK - TELECOM █ █ █ █ █
SHEET INDEX - PLUMBING
SHEET NO. SHEET TITLE S
D
IS
SU
E
/1 6/
IS
SU
E
/0 4/
CD
5%
IS
SU
E
/2
2/
CD
IS
SU
E
/1 0/
FI
NA
L
BI
D
DO
CU
M
EN
TS
1/
/2
P001 PLUMBING - NOTES, LEGEND AND DRAWING INDEX █ █ █ █ █
P002 PLUMBING - DETAILS █ █ █ █ █
PD110 PLUMBING - FIRST FLOOR - DEMOLITION - SANITARY █ █ █ █ █
PD111 PLUMBING - FIRST FLOOR - DEMOLITION - DOMESTIC █ █ █ █ █
PD112 PLUMBING - FIRST FLOOR - DEMOLITON - MEDICAL GAS █ █ █ █ █
PD210 PLUMBING - FIRST FLOOR INTERSTITIAL - DEMOLITION - SANITARY █ █ █ █
PD211 PLUMBING - FIRST FLOOR INTERSTITIAL - DEMOLITION - DOMESTIC █ █ █ █
PD212 PLUMBING - FIRST FLOOR INTERSTITIAL - DEMOLITION - MEDICAL GAS █ █ █ █
PP110 PLUMBING - FRIST FLOOR - NEW WORK - SANITARY █ █ █ █ █
PP111 PLUMBING - FIRST FLOOR - NEW WORK - DOMESTIC █ █ █ █ █
PP112 PLUMBING - FIRST FLOOR - NEW WORK - MEDICAL GAS █ █ █ █ █
PP210 PLUMBING - FIRST FLOOR INTERSTITIAL - NEW WORK - SANITARY █ █ █ █
PP211 PLUMBING - FIRST FLOOR INTERSTITIAL - NEW WORK - DOMESTIC █ █ █ █
PP212 PLUMBING - FIRST FLOOR INTERSTITIAL - NEW WORK - MEDICAL GAS █ █ █ █
SHEET INDEX - FIRE PROTECTION
SHEET NO. SHEET TITLE S
D
IS
SU
E 5/
/2
D D
IS
SU
E
/0 4/
CD
5%
IS
SU
E
/2
2/
CD
IS
SU
E
/1 0/
FI
NA
L
BI
D
DO
CU
M
EN
TS
1/
/2
FA001 FIRE DETECTION - SYMBOLS, NOTES AND DRAWING INDEX
FA002 FIRE DETECTION - DETAILS & DEMOLITION NOTES
FA003 FIRE DETECTION - UL & PIPE SLEEVE DETAILS
FA004 INPUT/OUTPUT MATRIX & TEMPORARY REQUIREMENTS
FA110 FIRE DETECTION - FIRST FLOOR - DEMOLITION
FA111 FIRE DETECTION - FIRST FLOOR - NEW WORK
FX001 FIRE SUPPRESSION - SYMBOLS, LEGENDS, NOTES AND DRAWING INDEX
FX002 FIRE SUPPRESSION - DETAILS
FX003 FIRE SUPPRESSION - TEMPORARY REQUIREMENTS & UL DETAILS
FX110 FIRE SUPPRESSION - FIRST FLOOR - DEMOLITION
FX111 FIRE SUPPRESSION - FIRST FLOOR - NEW WORK
ARCHITECTURAL ABBREVIATIONS
A/C
A/C UNIT
A/E
AAMA
AAP
AB
ABC
ACC
ACI
ACT
ACS DR
ACS FLR
ACS PNL
ACST
AD
ADA
ADC
ADDL
ADDN
ADH
ADJ
ADMIN
AFF
AFG
AFS
AGC
AGGR
AHJ
AHR
AHU
AIA
AISC
ALT
ALT NO
ALUM
AMT
ANOD
ANSI
ANT
AP
APA
APC
APPD
APPROX
AR
ARCH
ASB
ASI
ASKLR
ASPH
ASSN
ASTM
ATCH
ATM
AUTO
AUX
AV
AVG
AW
AWI
AWPA
AWS
B PL
BAT
BD
BD FT
BEV
BHMA
BI FLD DR
BITUM
BKG
BLD
BLDG
BM
BOT
BRCG
BRDG
BRDG JST
BRG
BRG PL
BRKT
BRZ
BSMT
BTWN
BUR
C CONC
C TO C
CAB
CAC
CB
CBB
CCD
CCTV
CCW
CD
CEM
CEM PLAS
CER
CF
CF/CI
CF/OI
CFLG
CFMF
CG
CGSFU
CH
CHEM
CHFR
CHK
CI
CIP
CIR
CIRC
CJ
CL
CLDG
CLG
CLR
CM
CMU
AIR CONDITION
AIR CONDITIONING UNIT
ARCHITECT/ENGINEER
AMERICAN ARCHITECTURAL MANUFACTURERS ASSN
ALARM ANNUNCIATOR PANEL
ANCHOR BOLT
AGGREGATE BASE COURSE
ACCESSIBLE
AMERICAN CONCRETE INSTITUTE
ACOUSTICAL CEILING TILE
ACCESS DOOR
ACCESS FLOOR
ACCESS PANEL
ACOUSTIC
AREA DRAIN
AMERICANS WITH DISABILITIES ACT
AUTOMATIC DOOR CLOSER
ADDITIONAL
ADDITION
ADHESIVE
ADJACENT, ADJOINING, OR ADJUSTABLE
ADMINISTRATION
ABOVE FINISHED FLOOR
ABOVE FINISHED GRADE
ABOVE FINISHED SLAB
ASSOCIATED GENERAL CONTRACTORS
AGGREGATE
AUTHORITY HAVING JURISDICTION
ANCHOR
AIR HANDLING UNIT
AMERICAN INSTITUTE OF ARCHITECTS
AMERICAN INSTITUTE OF STEEL CONSTRUCTION
ALTERNATE
ALTERNATE NUMBER
ALUMINUM
AMOUNT
ANODIZE
AMERICAN NATIONAL STANDARDS INSTITUTE
ANTENNA
ACCESS PANEL
AMERICAN PLYWOOD ASSOCIATION
ARCHITECTURAL PRECAST CONCRETE
APPROVED
APPROXIMATE
AS REQUIRED
ARCHITECT
ASBESTOS
ARCHITECT'S SUPPLEMENTAL INSTRUCTION
AUTOMATIC SPRINKLER
ASPHALT
ASSOCIATION
AMERICAN SOCIETY FOR TESTING AND MATERIALS
ATTACHMENT
AUTOMATIC TELLER MACHINE
AUTOMATIC
AUXILIARY
AUDIO VISUAL
AVERAGE
ACID WASTE
ARCHITECTURAL WOODWORKING INSTITUTE
AMERICAN WOOD PRESERVERS' ASSOCIATION
AMERICAN WELDING SOCIETY
BASE PLATE
BATTEN
BOARD
BOARD FEET (FOOT)
BEVEL
BUILDER'S HARDWARE MANUFACTURER'S ASSOCIATION
BIFOLDING DOORS
BITUMINOUS
BACKING
BUILD
BUILDING
BEAM OR BENCHMARK
BOTTOM
BRACING
BRIDGING
BRIDGING JOIST
BEARING
BEARING PLATE
BRACKET
BRONZE
BASEMENT
BETWEEN
BUILT-UP ROOFING
CAST CONCRETE
CENTER TO CENTER
CABINET
CEILING ATTENUATION CLASS
CATCH BASIN OR CORNER BEAD
CEMENTITIOUS (BACKER) BOARD
CONSTRUCTION CHANGE DIRECTIVE
CLOSED CIRCUIT TELEVISION
COUNTERCLOCKWISE
CONSTRUCTION DOCUMENTS OR CONTRACT DOCUMENTS
CEMENT
CEMENT PLASTER
CERAMIC
CONTRACTOR FURNISHED
CONTRACTOR FURNISHED/CONTRACTOR INSTALLED
CONTRACTOR FURNISHED/OWNER INSTALLED
COUNTERFLASHING
COLD-FORMED METAL FRAMING
CORNER GUARD
CERAMIC GLAZED STRUCTURAL FACING UNITS
COAT HOOK
CHEMICAL
CHAMFER
CHECK
CAST IRON
CAST-IN-PLACE
CIRCLE
CIRCULAR
CONSTRUCTION JOINT OR CONTROL JOINT
CENTER LINE
CLADDING
CEILING
CLEAR
CONSTRUCTION MANAGEMENT
CONCRETE MASONRY UNIT
CNR
CNTR
CRTP
CO
CO2
COL
COM
COMB
COMM
COMP
CONC
CONC FLR
COND
CONF
CONN
CONSTR
CONT
CONTR
COORD
CORR
CPM
CPRS
CR
CRS
CRSI
CSB
CSG
CSI
CSK
CSMT
CSWK
CTG
CTR
CTRL
CTV
CU FT
CU IN
CU YD
CURT
CYL
CYL L
D
DAT
DBL
DBL GLZ
DCS
DP
DEG
DEL
DEMO
DEPT
DET
DF
DIA
DIAG
DIFF
DIM
DIR
DISP
DIST
DIV
DL
DOC
DR
DR CL
DR FR
DR OPNG
DS
DSGN
DW
DWG
E
EA
EFF
EFS
EIFS
EJ
EL
ELAST
ELEC
ELEC DR OP
ELEV
EMER
EMER SHR
ENCL
ENGR
ENVIR
EO
EPA
EPDM
EPO
EPS
EQ
EQL SP
EQUIP
EQUIV
ERD
ESC
ESMT
ESP
EST
ETC
EW
EWC
EWS
EXH
EXIST
EXP
EXP BT
EXST GR
EXT
EXT GR
CORNER
COUNTER
COUNTERTOP
CARBON MONOXIDE
CARBON DIOXIDE
COLUMN
COMMON
COMBINATION, COMBINED
COMMUNICATION
COMPONENT
CONCRETE
CONCRETE FLOOR
CONDENSER OR CONDITION
CONFERENCE
CONNECT
CONSTRUCTION
CONTINUE
CONTRACTOR
COORDINATE
CORRIDOR
CRITICAL PATH METHOD
COMPRESSIBLE
CARD READER
COLD ROLLED STEEL
CONCRETE REINFORCING STEEL INSTITUTE
CONCRETE SPLASH BLOCK
CASING
CONSTRUCTION SPECIFICATIONS INSTITUTE
COUNTER SUNK
CASEMENT
CASEWORK
COATING
CENTER
CONTROL
CABLE TELEVISION
CUBIC FEET
CUBIC INCH
CUBIC YARD
CURTAIN
CYLINDER
CYLINDER LOCK
DEPTH OR PENNY (NAIL)
DATUM
DOUBLE
DOUBLE GLAZE
DIAPER CHANGING STATION
DECORATIVE PANEL
DEGREE
DELETE
DEMOLITION
DEPARTMENT
DETAIL
DRINKING FOUNTAIN
DIAMETER
DIAGONAL
DIFFERENCE OR DIFFUSER
DIMENSION
DIRECTION
DISPENSER
DISTANCE
DIVIDE OR DIVISION
DEAD LOAD
DOCUMENT
DOOR, DRAIN, DRESSING ROOM, OR DRIVE
DOOR CLOSER
DOOR FRAME
DOOR OPENING
DOWNSPOUT
DESIGN
DISHWASHER
DRAWING
EAST
EACH
EFFICIENCY
EXTERIOR FINISH SYSTEM
EXTERIOR INSULATION AND FINISH SYSTEM
EXPANSION JOINT
ELEVATION
ELASTOMERIC
ELECTRIC
ELECTRIC DOOR OPENER
ELEVATOR
EMERGENCY
EMERGENCY SHOWER
ENCLOSURE
ENGINEER
ENVIRONMENT
ELECTRICAL OUTLET
ENVIRONMENTAL PROTECTION AGENCY
ETHYLENE PROPYLENE DIENE MONOMER
EMERGENCY POWER OFF
EXPANDED POLYSTYRENE BOARD (INSULATION)
EQUAL
EQUALLY SPACED
EQUIPMENT
EQUIVALENT
EXISTING ROOF DRAIN
ESCAPE OR ESCUTCHEON
EASEMENT
ESPECIALLY
ESTIMATE
AND SO FORTH OR ET CETERA
EACH WAY
ELECTRIC WATER COOLER
EYE WASH STATION
EXHAUST
EXISTING
EXPANSION OR EXPOSED
EXPANSION BOLT
EXISTING GRADE
EXTERIOR, EXTERNAL, OR EXTINGUISHER
EXTERIOR GRADE
F
FA
FAB
FAC
FACIL
FAS
FAS BD
FCU
FCO
FCTY
FD
FDC
FDTN
FE
FEC
FF
FF EL
FF&E
FHC
FHP
FIG
FIL
FIN
FIN FLR
FIN GR
FIN WD
FIXT
FL
FLASH
FLDG
FLEX
FLG
FLR
FLR FIN
FLR SK
FLUOR
FLUOR FIX
FM
FM-G
FO
FOC
FOF
FOM
FOS
FOUNT
FOW
FP
FR
FR SNK
FREQ
FRMG
FRP
FRZ
FS
FSB
FSTNR
FT
FTG
FURG
FURN
FUT
FVC
GA
GAL
GALV
GALV STL
GB
GC
GD
GDR
GEN
GFRC
GFRG
GFRP
GI
GL
GL BLK
GLU LAM
GP
GR FL
GRAN
GRTG
GSB
GSM
GSU
GT
GUAR
GUT
GYP
GYP BD
GYP PLAS
H
HAZ MAT
HB
HC
HCWD
HDBD
HDO
HDR
HDW
HDWD
HEPA
HEX
HGR
HM
HMD
HMDF
HMF
HNDRL
HO
HORIZ
HOSP
HP
HPD
HPDL
HQ
HS
HSE
HSKPG
FAHRENHEIT OR FEMALE
FIRE ALARM
FABRIC
FACTOR
FACILITY
FASCIA
FASCIA BOARD
FAN COIL UNIT
FLOOR CLEANOUT
FACTORY
FLOOR DRAIN
FIRE DEPARTMENT CONNECTION
FOUNDATION
FIRE EXTINGUISHER
FIRE EXTINGUISHER CABINET
FINISH FACE
FINISH FLOOR ELEVATION
FURNITURE, FIXTURE, AND EQUIPMENT
FIRE HOSE CABINET
FULL HEIGHT PARTITION
FIGURE
FILLET
FINISH
FINISH FLOOR
FINISH GRADE
FINISH WOOD
FIXTURE
FLOORLINE
FLASHING
FOLDING
FLEXIBLE
FLOORING
FLOOR
FLOOR FINISH
FLOOR SINK
FLUORESCENT
FLUORESCENT FIXTURE
FACTORY MUTUAL
FACTORY MUTUAL GLOBAL
FINISHED OPENING
FACE OF CONCRETE OR FACE OF CURB
FACE OF FINISH
FACE OF MASONRY
FACE OF SLAB OR FACE OF STUD
FOUNTAIN
FACE OF WALL
FIRE PROTECTION OR FIREPROOF
FIRE RATING, FIRE RESISTANT, OR FRAME
FLUSHING RIM SINK
FREQUENCY
FRAMING
FIBERGLASS REINFORCED PLASTIC
FREEZER
FEDERAL SPECIFICATION
FOLDING SHOWER BENCH
FASTENER
FEET OR FOOT
FOOTING
FURRING
FURNISH OR FURNITURE
FUTURE
FIRE VALVE CABINET
GAGE OR GYPSUM ASSOCIATION
GALLON
GALVANIC OR GALVANIZED
GALVANIZED STEEL
GRAB BAR
GENERAL CONTRACTOR
GUARD
GUARD RAIL
GENERAL OR GENERATOR
GLASS-FIBER-REINFORCED CONCRETE
GLASS-FIBER-REINFORCED GYPSUM
GLASS-FIBER-REINFORCED PLASTIC
GALVANIZED IRON
GLASS
GLASS BLOCK
GLUED LAMINATED WOOD
GRAB BAR
GROUND FLOOR
GRANITE
GRATING
GYPSUM SHEATHING BOARD
GALVANIZED SHEET METAL
GLAZED STRUCTURAL UNIT
GROUT
GUARANTEE
GUTTER
GYPSUM
GYPSUM BOARD
GYPSUM PLASTER
HIGH OR HUMIDISTAT
HAZARDOUS MATERIALS
HOSE BIBB
HOLLOW CORE
HOLLOW CORE WOOD DOOR
HARDBOARD
HIGH DENSITY OVERLAY
HEADER
HARDWARE
HARDWOOD
HIGH EFFICIENCY PARTICULATE AIR (FILTER)
HEXAGON
HANGER
HOLLOW METAL
HOLLOW METAL DOOR
HOLLOW METAL DOOR AND FRAME
HOLLOW METAL FRAME
HANDRAIL
HOLD OPEN
HORIZONTAL
HOSPITAL
HIGH PRESSURE
HYGIENE PRODUCT DISPOSAL
HIGH PRESSURE DECORATIVE LAMINATE
HEADQUARTERS
HEAT-STRENGTHENED (GLASS) OR HIGH STRENGTH
HOUSE
HOUSEKEEPING
HST
HSS
HT
HVAC
HVY
HW
HYD
HYDR
IAQ
IBC
IC
ICW
ID
ID NO
ILLUM
INCL
IND
INFO
INSUL
INT
INTL
IWH
JAN
KD
KIT
KO
KPL
LAB
LAD
LAM
LAM GL
LAU
LAV
LBR
LBS
LCS
LD BRG
LDR
LED
LF
LIB
LIN
LIQ
LKR
LKR RM
LL
LMST
LRG
LRV
LS
LT
LT GA
LT WT
LTG
LTNG
LVD
LVR
LWC
LWIC
LYR
MACH
MACH RM
MAINT
MAN
MATL
MATV
MAX
MBD
MCB
MD
ME
MEAS
MECH
MECH RM
MED
MEK
MEMB
MEMO
MEZZ
MF
MFD
MFG
MFR
MFR REC
MGT
MIC
MID
MIL STD
MIN
MIR
MISC
MIT
MKR
ML
MLDG
MLWK
mm
MO
MOD
MOD BIT
MON
MOPR
MR
MS
MTD
MTG
MTL
MULL
MW
MWP
HOIST
HOLLOW STRUCTURAL STEEL
HEIGHT
HEATING, VENTILATING, AND AIR CONDITIONING
HEAVY
HOT WATER
HYDRANT
HYDRAULIC
INDOOR AIR QUALITY
INTERNATIONAL BUILDING CODE
INFECTION CONTROL
INFECTION CONTROL WALL
INSIDE DIAMETER
IDENTIFICATION NUMBER
ILLUMINATION
INCLUDED
INDEPENDENT OR INDUSTRIAL
INFORMATION
INSULATION
INTERIOR
INTERNATIONAL
INSTANTANEOUS WATER HEATER
JANITOR
KILN DRIED OR KNOCKED DOWN
KITCHEN
KNOCKOUT
KICKPLATE
ANGLE
LABORATORY
LADDER
LAMINATE
LAMINATED GLASS
LAUNDRY
LAVATORY
LUMBER
POUND
LOCKABLE CHARTING STATION/MED CABINET
LOAD-BEARING
LEADER
LIGHT EMITTING DIODE
LINEAR FEET (FOOT)
LIBRARY
LINEAR
LIQUID
LOCKER
LOCKER ROOM
LEAD LINED
LIMESTONE
LARGE
LOUVERED ROOF VENT
LIGHT SWITCH
LIGHT
LIGHT GAGE
LIGHTWEIGHT
LIGHTING
LIGHTNING
LOUVERED
LOUVER
LIGHTWEIGHT CONCRETE
LIGHTWEIGHT INSULATING CONCRETE
LAYER
MACHINE
MACHINE ROOM
MAINTENANCE
MANUAL
MATERIAL
MASTER ANTENNA TELEVISION SYSTEM
MAXIMUM
MARKER BOARD
METAL CORNER BEAD
DECK
MECHANICAL ENGINEER
MEASURE
MECHANICAL
MECHANICAL ROOM
MEDICAL, MEDIUM
METHYL ETHYL KETONE
MEMBRANE
MEMORANDUM
MEZZANINE
MILL FINISH
MANUFACTURED
MANUFACTURING
MANUFACTURER
MANUFACTURER'S RECOMMENDATION
MANAGEMENT
MICROPHONE
MIDDLE
MILITARY STANDARD
MINIMUM
MIRROR
MISCELLANEOUS
MITER
MARKER
METAL LATH
MOLDING (MOULDING)
MILLWORK
MILLIMETER
MASONRY OPENING
MODEL, MODIFY OR MODULE
MODIFIED BITUMEN
MONITOR
MOP RACK
MOISTURE RESISTANT
MOP SINK
MOUNTED
MOUNTING
METAL
MULLION
MICROWAVE
MEMBRANE WATERPROOFING
N
NA
NAT
NATL
NC
NCOMBL
NEC
NEG
NEMA
NEUT
NFC
NFPA
NIC
NO
NOM
NR
NRC
NRCA
NRP
NS
NUM
O/O O
OA
OC
OCC
OCT
OD
OD
OF/CI
OFD
OFF
OF/OI
OH
OH DR
OPH
OPNG
OPP
OPR
OPT
OR
ORD
ORG
ORIG
ORN
OSHA
OUT
OZ
P
PAR
PARA
PART
PAT
PB
PBD
PC
PCA
PCC
PCCP
PCD
PCF
PCP
PCT
PED
PEN
PEND
PERF
PERIM
PERP
PHAR
PHOTO
PKG
PL
PL GL
PLAM
PLAS
PLBG
PLYWD
PMTL
PNEU
PNL
PO
POLY
PP
PR
PRCST
PREFAB
PREFIN
PRELIM
PREP
PRESS
PREV
PRKG
PRMLD
PROJ
PROP
PSF
PSI
PT
PTD
PTN
PTS
PVC
PVG
PWR
QA
QC
QRY
QTR
QTY
QUAD
QUAL
R
RA
RAD
RBM
RBR
NORTH
NOT APPLICABLE
NATURAL
NATIONAL
NOISE CRITERIA OR NURSE CALL
NONCOMBUSTIBLE
NATIONAL ELECTRICAL CODE
NEGATIVE
NATIONAL ELECTRICAL MANUFACTURERS ASSN
NEUTRAL
NATIONAL FIRE CODE
NATIONAL FIRE PROTECTION ASSOCIATION
NOT IN CONTRACT
NUMBER
NOMINAL
NOISE REDUCTION
NOISE REDUCTION COEFFICIENT
NATIONAL ROOFING CONTRACTORS ASSOCIATION
NONREMOVABLE
NARROW STILE
NUMERAL
OUT TO OUT
OXYGEN
OUTSIDE AIR OR OVERALL
ON CENTER
OCCUPY
OCTAGON
OUTSIDE DIAMETER, OUTSIDE DIMENSION
OUTSIDE DIAMETER/OUTSIDE DIMENSION
OWNER FURNISHED/CONTRACTOR INSTALLED
OVERFLOW DRAIN
OFFICE
OWNER FURNISHED/OWNER INSTALLED
OVERHANG
OVERHEAD (COILING) DOOR
OPPOSITE HAND
OPENING
OPPOSITE
OPERABLE
OPTIONAL
OPERATING ROOM OR OUTSIDE RADIUS
ORDNANCE OR OVERFLOW ROOF DRAIN
ORGANIC
ORIGINAL
ORNAMENTAL
OCCUPATIONAL SAFETY AND HEALTH ADMINSTRATION
OUTLET
OUNCE
PAINT
PARALLEL OR PARAPET
PARAGRAPH
PARTIAL
PATTERN
PUSHBUTTON
PARTICLEBOARD
PIECE, POLYCARBONATE OR PORTLAND CEMENT
PORTLAND CEMENT ASSOCIATION
PRECAST CONCRETE
CONCRETE PAVEMENT
PAPER CUP DISPENSER
POUNDS PER CUBIC FOOT
PORTLAND CEMENT PLASTER
PRIVACY CURTAIN TRACK
PEDESTAL
PENETRATE
PENDANT
PERFORATED
PERIMETER
PERPENDICULAR
PHARMACY
PHOTOGRAPH
PACKAGE
PROPERTY LINE
PLATE GLASS
PLASTIC LAMINATE
PLASTER OR PLASTIC
PLUMBING
PLYWOOD
PAINTED METAL
PNEUMATIC
PANEL
POST OFFICE, PURCHASE ORDER
POLYETHYLENE (PLASTIC)
PUSH PLATE
PAIR
PRECAST
PREFABRICATE
PREFINISH
PRELIMINARY
PREPARATION
PRESSURE
PREVIOUS
PARKING
PREMOLDED
PROJECT
PROPERTY
POUNDS PER SQUARE FOOT
POUNDS PER SQUARE INCH
PORCELAIN TILE OR PRESSURE TREATED
PAPER TOWEL DISPENSER
PARTITION
PNEUMATIC TUBE STATION
POLYVINYL CHLORIDE (PLASTIC)
PAVING
POWER
QUALITY ASSURANCE
QUALITY CONTROL
QUARRY
QUARTER
QUANTITY
QUADRANT
QUALITY
RADIUS OR RISER
RETURN AIR
RADIATOR
REINFORCED BRICK MASONRY
RUBBER
RC
RCP
RCVR
RD
REC
RECD
RECPT
RECT
REF
REFR
REG
REINF
REP
REPL
REQ
REQD
RET
REV
RFG
RFI
RFP
RFS
RL
RLG
RM
RM LT
RND
RO
ROW
RS
RSV
RT
RV
RVS
RWL
S
SA
SALV
SAMP
SAN
SB
SBS
SBSTR
SC
SCH
SCHED
SCHEM
SCP
SCRN
SCT
SCWD
SD
SDG
SECT
SEG
SEL
SEP
SF
SFTWD
SGD
SGL
SHR
SHR HD
SHRD
SHT
SHTHG
SHV
SIM
SJ
SJI
SK
SKLT
SLDG
SLNT
SM
SMK
SND INS
SPEC
SPKLR
SPKR
SPLY
SPR
SQ
SQ IN
SQ YD
SST
ST
STC
STD
STIF
STL JST
STL LNTL
STL PL
STL RF DK
STL TB
STL TR
STNLS
STOR
STR
STRUCT
STRUCT STL
SUB
SURF
SUSP
SUSP CLG
SW
SWDR
SYM
SYNTH
SYS
REMOTE CONTROL
REFLECTED CEILING PLAN
RECEIVER
ROAD OR ROOF DRAIN
RECESSED
RECEIVED
RECEPTACLE
RECTANGLE
REFERENCE OR REFRIGERATOR
REFRACTORY, REFRIGERATION
REGISTER
REINFORCE
REPAIR
REPLACE
REQUIRE
REQUIRED
RETURN
REVISION
ROOFING
REQUEST FOR INFORMATION
REQUEST FOR PROPOSAL
ROOM FINISH SCHEDULE
ROOF LEADER
RAILING
ROOM
NURSE CALL LIGHT/ROOM LIGHT
ROUND
ROUGH OPENING
RIGHT OF WAY
ROUGH SAWN
RESILIENT SHEET VINYL
RIGHT
ROOF VENT
REVERSE
RAIN WATER LEADER
SOLID SURFACE
SUPPLY AIR
SALVAGE
SAMPLE
SANITARY
SPLASH BLOCK
STYRENE BUTADIEN STYRENE
SUBSTRATE
SHARPS CONTAINER
SCHOOL
SCHEDULE
SCHEMATIC
SCUPPER
SCREEN
SHOWER CURTAIN TRACK
SOLID CORE WOOD DOOR
SMOKE DETECTOR/SOAP DISPENSER
SIDING
SECTION
SEGMENT
SELECT
SEPARATE
SQUARE FOOT (FEET)
SOFTWOOD
SLIDING GLASS DOOR
SINGLE
SHOWER
SHOWER HEAD
SHOWER DRAIN
SHEET
SHEATHING
SHELVING
SIMILAR
SCORED JOINT
STEEL JOIST INSTITUTE
SKETCH
SKYLIGHT
SLIDING
SEALANT
SHEET METAL
SMOKE
SOUND INSULATION
SPECIFICATION
SPRINKLER
SPEAKER
SUPPLY
SINGLE PLY ROOF SYSTEM
SQUARE
SQUARE INCH
SQUARE YARD
STAINLESS STEEL
STAIRS OR STREET
SOUND TRANSMISSION CLASS
STANDARD
STIFFENER
STEEL JOIST
STEEL LINTEL
STEEL PLATE
STEEL ROOF DECK
STEEL TUBE
STEEL TRUSS
STAINLESS
STORAGE
STRINGERS
STRUCTURAL
STRUCTURAL STEEL
SUBSTITUTE
SURFACE
SUSPEND
SUSPENDED CEILING
SWITCH
SWING DOOR
SYMBOL
SYNTHETIC
SYSTEM
T T&M
TB
TBD
TECH
TEL
TEMP
THERM
THK
THRES
THRU
THRUOUT
TMPD
TMPD GL
TN
TO
TO FDN
TOB
TOM
TOP
TOS
TOW
TPD
TRANS
TRTD
TS
TSTAT
TV
TYP
U
UC
UGND
UL
ULT
UNFIN
UNO
UPS
UR
UTIL
UV
VAC
VAR
VEH
VENT
VERT
VEST
VFD
VIC
VID
VIF
VNR
VOC
VOL
VR
VTR
W/ W/O
WBL
WC
WD
WDW
WF
WFR
WFS
WH
WHSE
WP
WPM
WR
WS
WSCT
WT
X BRACE
XPS
YD
TREAD OR THERMOSTAT
TIME AND MATERIALS
TOWEL BAR
TACK BOARD
TECHNICAL
TELEPHONE
TEMPERATURE OR TEMPORARY
THERMAL
THICKNESS
THRESHOLD
THROUGH
THROUGHOUT
TEMPERED
TEMPERED GLASS
TRUE NORTH
TOP OF ___
TOP OF FOUNDATION
TOP OF BEAM
TOP OF MASONRY
TOP OF PARAPET
TOP OF STEEL
TOP OF WALL
TOILET PAPER DISPENSER
TRANSOM
TREATED
TUBE STEEL
THERMOSTAT
TELEVISION
TYPICAL
HEAT TRANSFER COEFFICIENT
UNDERCUT
UNDERGROUND
UNDERWRITERS LABORATORIES
ULTIMATE
UNFINISH
UNLESS NOTED OTHERWISE
UNINTERRUPTIBLE POWER SUPPLY
URINAL
UTILITY
ULTRAVIOLET
VACUUM
VARIES
VEHICLE
VENTILATION
VERTICAL
VESTIBULE
VARIABLE FREQUENCY DRIVE
VICINITY
VIDEO
VERIFY IN FIELD
VENEER
VOLATILE ORGANIC COMPOUND
VOLUME
VAPOR RETARDER
VENT THROUGH ROOF
WITH
WITHOUT
WOOD BLOCKING
WATER CLOSET
WOOD
WINDOW
WIDE FLANGE
WOOD FRAME
WOOD FURRING STRIPS
WATER HEATER
WAREHOUSE
WATERPROOFING
WATERPROOF MEMBRANE
WEATHER RESISTANT
WEATHERSTRIP OR WALL SCONCE
WAINSCOT
WEIGHT OR WINDOW TREATMENT
CROSS BRACE
EXTRUDED POLYSTYRENE BOARD
YARD
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMPCONSULTANT / ARCHITECT OF RECORD
321 4 5 6 7 8 9 10
C U s e rs
\L C a m p o v e rd e -L o a y z a \D o c u m e n ts
\1
-R
L C a m p o v e rd e
-L o a y z a
.r v t
/2 /2
:0
:1
P
M
GI002
ABBREVIATIONS RADIATION ONCOLOGY
LAB RENOVATION
VAMC RICHMOND
652-22-200
BLDG 500
11/07/2022 JU JT16511Revisions: Date:
BLK
MALE STAFF
TOILET
1G-187
MALE STAFF
LOCKER
1G-188
CORRIDOR
C1G-24
CORRIDOR
C1H-29
STORAGE
1G-197
SUPPLY RM
1G-196
SUPPLY RM
1G-195
PATIENT
TOILET
1G-192
BAR
PREP
1G-190
MALE
1G-201
FEMALE
1G-202
MALE STAFF
LOCKER
1G-200
FEMALE STAFF
LOCKER
1G-203
FEMALE
STAFF
TOILET
1H-137
OFFICE
1H-139B
FEMALE STAFF
LOCKER
1H-138
OFFICE
1H-139C
OFFICE
1H-139A
OFFICE
1H-141
1H-139
SECRETARY
1H-140
STAFF
TOILET
1H-142
VESTIBULE
1H-143
STAIR
OFFICE
1K-145
CORRIDOR
C1K-15
OFFICE
1K-144
OFFICE
1K-148
OFFICE
1K-149
OFFICE
1K-150
PRIMARY
CARE
1K-143
MECHANICAL
SVC BAY-H
1K-156
ELEVATOR
EQUIPMENT
1G-205F
F
D
A
A
A
A
1Z-212
1Z-208 1Z-223
1Z-222
1Z-217
Z
-2
1Z-E1
1Z-206
1Z-207
1Z-211
1Z-202
1Z-200
1Z-203
1Z-204
1Z-205
1Z-C2
Z
-C
1Z-201
1Z-210
1Z-216
1Z-219
1Z-221
1Z -C
1Z-218
BLK
MALE STAFF
TOILET
1G-187
MALE STAFF
LOCKER
1G-188
CORRIDOR
C1G-24
CORRIDOR
C1H-29
STORAGE
1G-197
SUPPLY RM
1G-196
SUPPLY RM
1G-195
PATIENT
TOILET
1G-192
BAR
PREP
1G-190
MALE
1G-201
FEMALE
1G-202
MALE STAFF
LOCKER
1G-200
FEMALE STAFF
LOCKER
1G-203
FEMALE
STAFF
TOILET
1H-137
OFFICE
1H-139B
FEMALE STAFF
LOCKER
1H-138
OFFICE
1H-139C
OFFICE
1H-139A
OFFICE
1H-141
1H-139
SECRETARY
1H-140
STAFF
TOILET
1H-142
VESTIBULE
1H-143
STAIR
OFFICE
1K-145
CORRIDOR
C1K-15
OFFICE
1K-144
OFFICE
1K-148
OFFICE
1K-149
OFFICE
1K-150
PRIMARY
CARE
1K-143
MECHANICAL
SVC BAY-H
1K-156
ELEVATOR
EQUIPMENT
1G-205F
F
D
A
A
A
A
1Z-212
1Z-208 1Z-223
1Z-222
1Z-217
Z
-2
1Z-E1
1Z-206
1Z-207
1Z-211
1Z-202
1Z-200
1Z-203
1Z-204
1Z-205
1Z-C2
Z
-C
1Z-201
1Z-210
1Z-216
1Z-219
1Z-221
1Z -C
1Z-218
252423222120
T
U
V
W CONSTRUCTION LIMITS
CO
NS
TR
UC
TI
O
N
LI
M
IT
S
CO
NS
TR
UC
TI
O
N
LI
M
IT
S
132 SF
1Z-100
COS OFFICE
84 SF
1Z-101
MD OFFICE
84 SF
1Z-102
MD OFFICE
85 SF
1Z-103
MD OFFICE
86 SF
1Z-109
PYST.
OFFICE
84 SF
1Z-110
PYST.
OFFICE
86 SF
1Z-111
PYST.
OFFICE
205 SF
1Z-106
CONFERENCE
ROOM
8 SF
1Z-107
ELEC
86 SF
1Z-108
PYST.
OFFICE
152 SF
1Z-105
SHARED
(NP) OFFICE
100 SF
1Z-104
CF PYST.
OFFICE
80 SF
1Z-130
CLEAN
SUPPLY
162 SF
1Z-123
ADMIN
111 SF
1Z-124
EQUIPMENT
STORAGE
66 SF
1Z-125
LOCKERS
29 SF
1Z-131
DRESS
241 SF
1Z-138
DOSIMETRY
1Z-129
STORAGE
1Z-133
PROCEDURE
ROOM
1Z-134
LINEAR
ACCELERATOR
1Z-132
CONTROL
1Z-142
STORAGE
1Z-141
LINEAR
ACCELERATOR
1Z-135
CONTROL
1Z-140
STORAGE
C1Z-4
CORRIDOR
1Z-139
MECHANICAL1Z-137
SIMULATOR
1Z-136
CONTROL
1Z-128
MED PREP
1Z-127
HAC
1Z-126
SOILED
UTILITY
C1Z-1
CORRIDOR
C1Z-2
CORRIDOR
530 SF
C1Z-3
CORRIDOR
138 SF
1Z-117
SHARED
OFFICE
65 SF
1Z-119
TOILET
66 SF
1Z-120
TOILET
53 SF
1Z-121
FILE
STORAGE93 SF
1Z-118
CF THRP
OFFICE
155 SF
1Z-122
NURSE
STATION
132 SF
1Z-112
EXAM
131 SF
1Z-113
EXAM
131 SF
1Z-114
EXAM
131 SF
1Z-115
EXAM
86 SF
1Z-116
SUB-WAIT
88 SF
1Z-153
BREAK
ROOM
PRINTER/COPIER
(RAD. ONC.)
NON-SLEEPING
SUITE (5,060 SF)
ED
EA
EA
HE
EA
CONSTRUCTION LIMITS
CO
NS
TR
UC
TI
O
N
LI
M
IT
S
CO
NS
TR
UC
TI
O
N
LI
M
IT
S
DEDUCT
ALTERNATE 1
DEDUCT
ALTERNATE 3
DEDUCT
ALTERNATE 2
NOYES
APPLICABLE REGULATIONS
GENERAL TYPE OF PROJECT
NFPA NATIONAL FIRE CODES (EXCEPTION: NFPA 5000 & 900)
2018 FGI GUIDELINES
2021 NFPA 101 (LIFE SAFETY CODE)
ABA STANDARDS (2015) (ABAAS)
2018 IBC
REMODEL
ADDITION
NEW BUILDING
PROJECT DESCRIPTION
CODE SUMMARY
Interior renovation of existing Radiation Oncology department to improve patent and staff function & efficiancy.
VA BARRIER FREE DESIGN STANDARD (PG-18-13)
NOYESAUTHORITIES HAVING JURISDICTION (AHJ's)
THE JOINT COMMISSION (TJC)
TESTRATING (HRS)
EXTERIOR DOORS AND WINDOWS
SHAFTS AND EXIT PASSAGEWAYS
OTHER
ROOF CONSTRUCTION
PRIME & SEC. FLOOR BEAMS, JOISTS
FLOOR/CEILING ASSEMBLY
FLOOR CONSTRUCTION
INTERIOR
NON-BEARING WALLS AND PARTITIONS
BEARING WALLS
COLUMNS
GIRDERS
TRUSSES
ROOF/CEILING ASSEMBLY
PRIME & SEC. ROOF BEAMS, JOISTS
EXTERIOR
INTERIOR BEARING WALLS
EXTERIOR BEARING WALLS
STRUCTURAL FRAME
AREA SEPARATIONS / FIRE WALLS
FIRE-RESISTIVE REQUIREMENTS
TYPE(S) OF CONSTRUCTION
CONSTRUCTION TYPE(S)
SEE LIFE SAFETY PLANS
See Life Safety Plans
PLUMBING FIXTURES
TOILETS
LAVATORIES
DRINKING FOUNTAINS
SERVICE SINKS
PROVIDED RQD FACTOR
2 1M, 1 F 1/25 for first 50 occupants, then 1/50
2 1 1/40 for first 80 occupants, then 1/80 1/100 occupants. 50% may be vending
URINALS 0 0 --
2 EXISTING
(IBC CH 29)
(NAPA 220 TABLE 4.1.1)
OSHA STANDARDS
VA SEISMIC DESIGN REQUIREMENTS H-18-8
NATIONAL ELECTRIC CODE (NEC)
ASME BOILER AND PRESSURE VESSEL CODE
ASME CODE FOR PRESSURE PIPING
BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE,
AMERICAN CONCRETE INSTITUTE AND COMETARY (ACI 318)
MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE
FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
ENERGY POLICY ACT OF 2005 (EPAct)
DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS
FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH-RISE
RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL
BUILDINGS, 10 CFR PARTS 433,434 AND 435
FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE
BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
EXECUTIVE ORDER 13834
THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED
IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE VA
MASTER CONSTRUCTION SPECIFICATION
VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY - ASHRAE
STANDARD 62.1-2004
SAFETY STANDARD FOR REFRIGERATION SYSTEMS - ASHRAE
STANDARD 15 -2007
VA FIRE PROTECTION DESIGN MANUAL
VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA
NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER
GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL)
NOYES
(Section 8.3)
CHANGE OF OCCUPANCY?
SEPARATED OCCUPANCIES?
FIRE BARRIER RATING(S) SEE LIFE SAFETY PLANS
OCCUPANCY CLASSIFICATION(S)
OCCUPANCIES
(If Remodeling)
2018 LSC (TABLE 6.1.14.1)
(LSC CH 12-42)
NOYES
FIRE RESISTIVE CORRIDORS?
SMOKE TIGHT CORRIDORS (SMOKE PARTITIONS)
INCIDENTAL USE AREA RATING(S) SEE PLANS
MISCELLANEOUS
INTERIOR FINISHES CLASSIFICATION A, BEXITS
A, BEXIT ACCESS CORRIDORS
A, B, COTHER SPACES
EXISTING
HEALTHCARE OCCP
TYPE 2
(222)
1.5
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
EXISTING
TRAVEL DISTANCE
ARRANGEMENT OF MEANS OF EGRESS
COMMON PATH OF TRAVEL
DEAD END
EXISTING AMBULATORY -- FULLY SPRINKLERED
HEALTH CARE OCCUPANCY
(NFPA 101 21.2.6.2.2)
(NFPA 101 21.2.5.1)
(NFPA 101 21.2.5.3)
200 FT
100 FT
50 FT
SUITE DESCRIPTION
SUITE NUMBER
SUITE NAME SUITE SIZE TYPE OF SUITE EXIT NUMBER
3RADIATION ONCOLOGY 5,060 Sq. Ft. NON SLEEPING PATIENT CARE
LIFE SAFETY SYMBOLS
SMOKE TIGHT
ASSEMBLY
1 HOUR FIRE
BARRIER
2 HOUR FIRE
BARRIER
3 HOUR FIRE
BARRIER
EXISTING
1 HOUR FIRE &
SMOKE BARRIER
EXISTING
2 HOUR FIRE &
SMOKE BARRIER
EXISTING
3 HOUR FIRE &
SMOKE BARRIER
HE
TRAVEL DISTANCE
100'-10"
TRAVEL DISTANCE
EA
EDEXIT EXIT
HORIZONTAL EXIT
EXIT DISCHARGE
EXIT ACCESS
FIRE
EXTINGUISHER
FE
FIRE
EXTINGUISHER
CABINET
FEC
LIMITS OF
CONSTRUCTION
SMOKE
COMPARTMENT
BOUNDARY
HEALTH CARE
SUITE
NOTE: NOT ALL SYMBOLS MY BE USED ON EACH PLAN
OCCUPANCY
SEPARATION
SHAFT
ADJACENT SYMBOLS SHOW PARTITION RATING AND
DAMPER REQUIREMENTS
HAZARDOUS USE
ADJACENT SYMBOLS SHOW PARTITION RATING.
OPENINGS REQUIRE CLOSER & LATCH
EXIT PASSAGEWAY
RATE AS STAIR
ALL OPENINGS TO BE RATED AS STAIR SHAFT
CORRIDOR
WALLS TO LIMIT THE TRANSFER OF SMOKE
ADJUNCT CORRIDOR or PSYCHIATRIC AREA or CONSTRUCTED WITH MIN. 4'-0" CLEAR
WITH (PER CHAPTER 19)
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMPCONSULTANT / ARCHITECT OF RECORD
321 4 5 6 7 8 9 10
C U s e rs
\L C a m p o v e rd e -L o a y z a \D o c u m e n ts
\1
-R
L C a m p o v e rd e
-L o a y z a
.r v t
/2 /2
:0
:2
P
M
GI110
FIRST LEVEL LIFE SAFETY PLAN RADIATION ONCOLOGY
LAB RENOVATION
VAMC RICHMOND
652-22-200
BLDG 500
11/07/2022 JU JT/JU16511
1/8" = 1'-0"1 FIRST LEVEL LIFE SAFETY PLAN
0 8' 16'4'
CORRIDOR
C1G-24
CORRIDOR
C1H-29
PATIENT
TOILET
1G-192
MALE
1G-201
MALE STAFF
LOCKER
1G-200 OFFICE
1H-139B
OFFICE
1H-139C
OFFICE
1H-141
STAFF
TOILET
1H-142
VESTIBULE
1H-143
STAIR
OFFICE
1K-145
OFFICE
1K-148
OFFICE
1K-149
OFFICE
1K-150
F
A
A
1Z-222
1Z-217
Z
-2
1Z-E1
1Z-206
1Z-207
1Z-202
1Z-200
1Z-203
1Z-204
1Z-205
1Z-C2
Z
-C
1Z-201
1Z-210
1Z-216
1Z-221
1Z-218
25.3
25.4
25.2
CORRIDOR
C1G-24
CORRIDOR
C1H-29
PATIENT
TOILET
1G-192
MALE
1G-201
MALE STAFF
LOCKER
1G-200 OFFICE
1H-139B
OFFICE
1H-139C
OFFICE
1H-141
STAFF
TOILET
1H-142
VESTIBULE
1H-143
STAIR
OFFICE
1K-145
OFFICE
1K-148
OFFICE
1K-149
OFFICE
1K-150
F
A
A
1Z-222
1Z-217
Z
-2
1Z-E1
1Z-206
1Z-207
1Z-202
1Z-200
1Z-203
1Z-204
1Z-205
1Z-C2
Z
-C
1Z-201
1Z-210
1Z-216
1Z-221
1Z-218
25.3
25.4
25.2
CORRIDOR
C1G-24
CORRIDOR
C1H-29
STORAGE
SUPPLY RM
1G-196
SUPPLY RM
1G-195
PATIENT
TOILET
1G-192
MALE
1G-201
MALE STAFF
LOCKER
1G-200 OFFICE
1H-139B
OFFICE
1H-139C
OFFICE
1H-141
STAFF
TOILET
1H-142
VESTIBULE
1H-143
STAIR
OFFICE
1K-145
OFFICE
1K-148
OFFICE
1K-149
OFFICE
1K-150
MECHANICAL
SVC BAY-H
F
A
1Z-222
1Z-217
Z
-2
1Z-E1
1Z-206
1Z-207
1Z-202
1Z-200
1Z-203
1Z-204
1Z-205
1Z-C2
Z
-C
1Z-201 1Z-216
1Z-221
1Z-218
CORRIDOR
C1G-24
CORRIDOR
C1H-29
STORAGE
SUPPLY RM
1G-196
SUPPLY RM
1G-195
PATIENT
TOILET
1G-192
MALE
1G-201
MALE STAFF
LOCKER
1G-200 OFFICE
1H-139B
OFFICE
1H-139C
OFFICE
1H-141
STAFF
TOILET
1H-142
VESTIBULE
1H-143
STAIR
OFFICE
1K-145
OFFICE
1K-148
OFFICE
1K-149
OFFICE
1K-150
MECHANICAL
SVC BAY-H
F
A
1Z-222
1Z-217
Z
-2
1Z-E1
1Z-206
1Z-207
1Z-202
1Z-200
1Z-203
1Z-204
1Z-205
1Z-C2
Z
-C
1Z-201 1Z-216
1Z-221
1Z-218
252423222120
T
U
V
W
1Z-129
OFFICE
1Z-117
WORK ROOM
PHYSICIAN
1Z-116
OFFICE
1Z-115
TOILET
MALE
1Z-114
TOILET
FEMALE
1Z-113
STOARGE
BRACHY
THERAPY
1Z-112
OFFICE
1Z-105
RESTROOM
KITCHEN/
1Z-106
TOILET
1Z-109
TOILET
1Z-108
LOCKER
1Z-107
ROOM
MECH
1Z-110
PHYSICIST
1Z-111
DOSIMETRY
C1Z-1
CORRIDOR
C1Z-3
CORRIDOR
1Z-118
RM-3
EXAM
1Z-119
RM-2
EXAM
1Z-120
RM-1
EXAM 1Z-121
OFFICE
1Z-122
RECEPTION
1Z-123
WAITING
OUTPATIENT
1Z-137
SIMULATOR
1Z-136
CONTROL
1Z-138
BRACHY 1Z-139
MECHANICAL
1Z-130
LINEN
1Z-131
DR
1Z-128
ROOM
EQUIPMENT
1Z-127
STORAGE
1Z-126
HAC
1Z-125
STORAGE
PHYSICAL
1Z-124
FILES
FILM
1Z-100
CHIEF
1Z-101
SECRETARY
1Z-102
OFFICE
ADMINISTRATIVE
1Z-103
OFFICE
1Z-104
CONFERENCE RM
C1Z-4
CORRIDOR
1Z-132
CONTROL
1Z-133
ACCELERATOR
LINEAR
STORAGE
1Z-134
ACCELERATOR
LINEAR
1Z-142
STORAGE
1Z-141
ACCELERATOR
LINEAR
1Z-135
CONTROL
1Z-140
STORAGE
C1Z-2
CORRIDOR
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
CO
NS
TR
UC
TI
O
N
LI
M
IT
S
CO
NS
TR
UC
TI
O
N
LI
M
IT
S
DE7
PHASE 2B
PHASE 3 PHASE 1
PHASE 1
PHASE 4
CONSTRUCTION LIMITS
CO
NS
TR
UC
TI
O
N
LI
M
IT
S
CO
NS
TR
UC
TI
O
N
LI
M
IT
S
PHASE 1
PHASE 1
4'
0"
PHASE 2A
252423222120
T
U
V
W CONSTRUCTION LIMITS
CO
NS
TR
UC
TI
O
N
LI
M
IT
S
CO
NS
TR
UC
TI
O
N
LI
M
IT
S
132 SF
1Z-100
COS OFFICE
84 SF
1Z-101
MD OFFICE
84 SF
1Z-102
MD OFFICE
85 SF
1Z-103
MD OFFICE
86 SF
1Z-109
PYST.
OFFICE
84 SF
1Z-110
PYST.
OFFICE
86 SF
1Z-111
PYST.
OFFICE
205 SF
1Z-106
CONFERENCE
ROOM
8 SF
1Z-107
ELEC
86 SF
1Z-108
PYST.
OFFICE
152 SF
1Z-105
SHARED
(NP) OFFICE
100 SF
1Z-104
CF PYST.
OFFICE
80 SF
1Z-130
CLEAN
SUPPLY
162 SF
1Z-123
ADMIN
111 SF
1Z-124
EQUIPMENT
STORAGE
66 SF
1Z-125
LOCKERS
29 SF
1Z-131
DRESS
241 SF
1Z-138
DOSIMETRY
1Z-129
STORAGE
1Z-133
PROCEDURE
ROOM
1Z-134
LINEAR
ACCELERATOR
1Z-132
CONTROL
1Z-142
STORAGE
1Z-141
LINEAR
ACCELERATOR
1Z-135
CONTROL
1Z-140
STORAGE
C1Z-4
CORRIDOR
1Z-139
MECHANICAL
1Z-137
SIMULATOR
1Z-136
CONTROL
1Z-128
MED PREP
1Z-127
HAC
1Z-126
SOILED
UTILITY
C1Z-1
CORRIDOR
C1Z-2
CORRIDOR
530 SF
C1Z-3
CORRIDOR
138 SF
1Z-117
SHARED
OFFICE
65 SF
1Z-119
TOILET
66 SF
1Z-120
TOILET
53 SF
1Z-121
FILE
STORAGE
93 SF
1Z-118
CF THRP
OFFICE 155 SF
1Z-122
NURSE
STATION
132 SF
1Z-112
EXAM
131 SF
1Z-113
EXAM
131 SF
1Z-114
EXAM
131 SF
1Z-115
EXAM
86 SF
1Z-116
SUB-WAIT
PHASE 2B
PHASE 3
PHASE 4
PHASE 1
CONSTRUCTION LIMITS
CO
NS
TR
UC
TI
O
N
LI
M
IT
S
CO
NS
TR
UC
TI
O
N
LI
M
IT
S
PHASE 1
PHASE 1
PHASE 1
PHASE 2A
CONSTRUCION PHASING
GENERAL NOTES
1. THE WORK UNDER THIS CONTRACT SHALL BE DIVIDED INTO PHASES. A PHASE
CAN INVOLVE MULTIPLE LOCATION AREAS. SEE SPECIFICATIONS SECTION 01 00 00
1.6.G PHASING.
2. THE GENERAL CONTRACTOR SHALL COORDINATE ALL PHASING AND SEQUENCING
WITH ALL TRADES AND THE OWNER. THE GENERAL CONTRACTOR SHALL PROVIDE
A WRITTEN NARRATIVE TO OUTLINE CONSTRUCTION PHASING AND SEQUENCE
PLANS, VALIDATING AND ELABORATING ON THIS PHASING DESCRIPTION.
3. THE GENERAL CONTRACTOR SHALL COOPERATE FULLY WITH THE OWNER SO
WORK MAY BE CARRIED OUT SMOOTHLY, WITHOUT INTERFERING WITH OR
DELAYING WORK UNDER THIS CONTRACT, OR OTHER CONTRACTS ON THE
PROJECT SITE OR WORK BY OWNER.
4. THE GENERAL CONTRACTOR'S CONSTRUCTION SCHEDULE SHALL INDICATE THE
SEQUENCE, COMMENCEMENT AND COMPLETION DATES, OWNER INSPECTION AND
APPROVAL DATES AND MOVE-OUT AND MOVE-IN DATES OF OWNER'S PERSONNEL
FOR ALL PHASES OF THE WORK.
5. THE GENERAL CONTRACTOR SHALL PERFORM THE WORK IN EACH PHASE IN THE
SEQUENCE SHOWN ON THE PHASING PLAN DRAWING(S) AND CONSTRUCTION
PHASING DESCRIPTION.
6. THE GENERAL CONTRACTOR MUST COMPLETE ALL WORK IN EACH PHASE WITH
THE VA INSPECTING AND ACCEPTING THE WORK PRIOR TO VA OCCUPANCY AND
THE CONTRACTOR PROCEEDING TO THE NEXT SCHEDULED PHASE. UPON
COMPLETION OF A PARTICULAR PHASE, THE ENTIRE AREA COVERED BY THAT
PHASE CAN BE OCCUPIED BY THE VA PERSONNEL WITH ALL SYSTEMS
FUNCTIONING PROPERLY.
7. BEFORE COMMENCING WORK ON EACH SUCCESSIVE PHASE, THE GENERAL
CONTRACTOR SHALL SUBMIT AN UPDATED COPY OF THE SCHEDULE.
8. ANY DUST PARTITIONS OR ICRA-CONSTRUCION BARRIERS CONSTRUCTED BY THE
CONTRACTOR PRIOR TO THE START OF DEMOLITION MUST REMAIN IN PLACE UNTIL
THE COMPLETION OF THAT PHASE OR SUBSEQUENT PHASE WHERE REQUIRED.
9. THE CONTRACTOR SHALL PERFORM ALL WORK ADJACENT TO VA OCCUPIED
AREAS IN SUCH A MANNER TO ENSURE THE CONTINUOUS AND UNINTERRUPTED
USE OF ALL OCCUPIED AREAS, INCLUDING THE APPLICABLE MECHANICAL AND
ELECTRICAL SYSTEMS SERVING THESE AREAS.
10. FOR ADDITIONAL NOTES AND INFORMATION REFER TO INFECTION CONTROL
DRAWING(S) AND DEMOLITION PLANS.
11. ANY INFORMATION REGARDING SEQUENCING PROVIDED IN THE DOCUMENTS IS
FOR ARCHITECT-OWNER PLANNING PURPOSES ONLY.
12. THE CONTRACTOR DURING CONSTRUCTION SHALL MAINTAIN REQUIRED MEANS
OF EGRESS THROUGHOUT ALL PHASING.
13. THE CONTRACTOR SHALL PLAN FOR A MINIMUM OF 4 WEEKS' TIME BETWEEN
PHASES TO ALLOW THE VA TO OCCUPY THE NEWLY ACCEPTED SPACE AND
VACATE THE FOLLOW-ON PHASES. THE VA WILL ACCELERATE THIS TIME WHEN
POSSIBLE AND WILL NOTIFY THE CONTRACTOR IF THIS OCCURS.
INFECTION CONTROL &
CONSTRUCTION BARRIER
GENERAL NOTES
1. SEE SPEC SECTION 01 35 26 SAFETY REQUIREMENTS FOR ADDITIONAL
INFORMATION
2. THE INTENT OF INFECTION CONTROL ISOLATION IS TO CONTAIN DUST AND
PARTICULATE MATTER TO THE CONSTRUCTION AREA. CONSTRUCTION AREA
PERIMETER NEEDS TO BE SEALED COMPLETELY WITH SHEET PLASTIC AS
SPECIFIED AND DUCT TAPE DURING OPERATIONS, WHERE PERMITTED BY CLASS.
ICRA - CONSTRUCTION BARRIER TO BE PROVIDED AS SPECIFIED AND LISTED IN
ICRA CLASS.
3. PROVIDE NEGATIVE PRESSURE MONITORS DURING CONSTRUCTION OPERATIONS
AS SPECIFIED. MONITOR TO MEASURE PRESSURE DIFFERENTIAL BETWEEN
CONSTRUCTION AREA AND ADJACENT CORRIDOR OR ROOM AS DIRECTED BY VA.
4. AS CONSTRUCTION PROGRESSES, FROM TYPE D TO TYPE C AND THEREON,
PROVIDE A REQUEST VIA "INFECTION CONTROL CONSTRUCTION PERMIT" TO THE
VA INFECTION CONTROL NURSE. UPON AUTHORIZATION, PROCEED TO NEXT TYPE
OF CONSTRUCTION. PROVIDE AT LEAST TEN (10) WORKING DAYS NOTICE FOR
EACH PERMIT.
5. CONSTRUCT IC (INFECTION CONTROL) CONSTRUCTION BARRIER(S) FROM FLOOR
TO DECK/FLOOR ABOVE. EXCEPTION. IF BARRIER IS ADJACENT TO SMOKE, FIRE,
OR EXISTING WALL CONSTRUCTION WHICH WILL NOT BE DEMOLISHED AND
TERMINATES TO FLOOR/DECK ABOVE, THEN CONSTRUCT DUST PROOF IC
BARRIER, SEE DETAIL(S). TAPE, MUD, SAND JOINTS AND PAINT ON NON-
CONSTRUCTION SIDE OF BARRIER.
6. CONTROL BARRIERS ARE TO BE INSTALLED AND REMOVED ONLY BEFORE 7:00 AM
AND AFTER 8:00 PM OR DIRECTED BY COR
7. DURING CONSTRUCTION OPERATIONS IN EACH ENCLOSED AREA PROVIDE
NEGATIVE PRESSURE MONITORS, MINIMUM (1) ONE IN AREAS LESS THAN 1000 SF,
(2) TWO MINIMUM IN AREAS BETWEEN 1000 SF AND 5000 SF, AND (3) THREE FOR
AREAS BETWEEN 5000 SF AND 10000 SF.
8. LIFE SAFETY EGRESS IS TO BE MAINTAINED AT ALL TIMES.
9. THE CONTRACTOR SHALL PROVIDE ENOUGH NEGATIVE AIR MACHINES TO
COMPLETELY EXCHANGE THE REGULATED AREA AIR VOLUME (4) FOUR ACTUAL
TIMES PER HOUR. THE COMPETENT PERSON SHALL DETERMINE THE NUMBER OF
UNITS NEEDED FOR EACH REGULATED AREA BY DIVIDING THE CUBIC FEET IN THE
REGULATED AREA BY (15) FIFTEEN AND THEN DIVIDING THAT RESULT BY THE
ACTUAL CUBIC FEET PER MINUTE (CFM) FOR EACH UNIT TO DETERMINE THE
NUMBER OF UNITS NEEDED TO EFFECT (4) FOUR AIR CHANGES PER HOUR.
PROVIDE A STANDBY UNIT IN THE EVENT OF MACHINE FAILURE AND/OR
EMERGENCY IN AN ADJACENT AREA.
10. PRIOR TO ANY REMOVAL OF SMOKE BARRIER FIRE RATED PARTITIONS,
CONSTRUCT NEW SMOKE BARRIER/APPROPRIATE FIRE RATED PARTITIONS PER
PLANS OR CONSTRUCT INFECTION CONTROL BARRIER TO ACT AS SMOKE
BARRIER.
CONSTRUCTION INFECTION CONTROL RISK ASSESSMENT (ICRA)
TYPE A
TYPE B
TYPE C
TYPE D
INSPECTIONS AND NON-INVASIVE ACTIVITIES. INCLUDES, BUT NOT
LIMITED TO, REMOVAL OF CEILING TILES FOR VISUAL INSPECTION
LIMITED TO 1 TILE PER 50 SQUARE FEET, PAINTING BUT NOT SANDING
WALL COVERING, ELECTRICAL TRIM WORK, MINOR PLUMBING, AND
ACTIVITIES WHICH DO NOT GENERATE DUST OR REQUIRE CUTTING OF
WALLS OR ACCESS TO CEILINGS OTHER THAN FOR VISUAL INSPECTION.
SMALL SCALE, SHORT DURATION ACTIVITIES WHICH CREATE MINIMAL
DUST. INCLUDES, BUT IS NOT LIMITED TO, INSTALLATION OF TELEPHONE
AND COMPUTER CABLING, ACCESS TO CHASE SPACES, CUTTING OF
WALLS OR CEILING WHERE DUST MIGRATION CAN BE CONTROLLED.
FLOOR COVERING REMOVAL (WITHOUT SANDING OR GRINDING).
ANY WORK THAT GENERATES A MODERATE TO HIGH LEVEL OF DUST OR
REQUIRES DEMOLITION OR REMOVAL OF ANY FIXED BUILDING
COMPONENTS OR ASSEMBLIES. INCLUDES, BUT IS NOT LIMITED TO,
SANDING OF WALL FOR PAINTING OR WALLCOVERING, REMOVAL OF
FLOOR COVERINGS, CEILING TILES AND CASEWORK, NEW WALL
CONSTRUCTION, MINOR DUCTWORK OR ELECTRICAL WORK ABOVE
CEILINGS, MAJOR CABLING ACTIVITIES, AND ANY ACTIVITY WHICH
CANNOT BE COMPLETED WITHIN A SINGLE WORK SHIFT. FLOOR
COVERING REMOVAL (WITH SANDING OR GRINDING).
MAJOR DEMOLITION AND CONSTRUCTION PROJECTS. INCLUDES, BUT IS
NOT LIMITED TO, ACTIVITIES WHICH REQUIRE CONSECUTIVE WORK
SHIFTS, REQUIRE HEAVY DEMOLITION OR REMOVAL OF A COMPLETE
CEILING SYSTEM, FLOORING AND NEW CONSTRUCTION.
GROUP 1
LOW RISK
• MECHANICAL SPACES: AREAS NOT DIRECTLY ADJACENT TO PATIENT
CARE, INCLUDING INTERSTITIAL SPACES.
• ENGINEERING OR EMS OFFICE/WORK AREAS
• OFFICE AREAS: AREAS NOT ATTACHED TO/ADJOINING PATIENT CARE
AREAS, NOT USED FOR PATIENT INTERVIEWS, EVALUATIONS OR
EXAMINATIONS.
• PUBLIC CORRIDORS: SPACES NOT ON OR DIRECTLY ATTACHED TO
PATIENT UNITS OR TREATMENT LOCATIONS.
GROUP 2
MEDIUM
RISK
• OUTPATIENT AREAS:
1. PRIMARY CARE OR SPECIALTY CARE CLINIC AREAS
2. BEHAVIORAL/MENTAL HEALTH AREAS
3. EXTENDED CARE / REHAB CLINIC AREAS
4. COMMUNITY BASED OUT PATIENT CLINICS (CBOC’S)
GROUP 3
HIGH RISK
• IN-PATIENT UNITS:
1. INCLUDING, BUT NOT LIMITED TO: EMERGENCY DEPT.; NURSING
UNITS; RADIOLOGY/MRI/CT/ULTRASOUND; NUCLEAR MEDICINE;
CAFETERIA/KITCHEN/CANTEEN; LABORATORIES; RADIATION /
ONCOLOGY; DIALYSIS
GROUP 4
HIGHEST
RISK
• ICU/SICU
• OR/PACU/ENDOSCOPY
• GI
• STERILE PROCESSING SERVICES (SPS)
• PHARMACY
• CATH LAB
CLASS
I
KEEP AREAS FREE OF DEBRIS, TRASH
EXECUTE WORK TO MINIMIZE OF DUST MIGRATION (E.G. WET MOPPING, HEPA VACUUM)
IMMEDIATELY REPLACE ANY CEILING TILE DISPLACED FOR VISUAL INSPECTION
(INVOLVING MINOR DEMOLITION IN MAINTENANCE OR REMODELING.)
CLASS
II
SAME AS CLASS I PLUS:
1. ESTABLISH MATERIAL AND DEBRIS ROUTE USING NON-PATIENT/VISITOR PATHWAY
2. WATER MIST WORK SURFACE TO CONTROL DUST WHILE CUTTING OR DRILLING.
3. BLOCK OFF AND SEAL AIR VENTS
4. SEAL UNUSED DOORS WITH PLASTIC SHEATHING AND DUCT TAPE.
5. CREATE BARRIERS AS DEFINED BY INFECTION PREVENTION
6. CONTAIN CONSTRUCTION WASTE BEFORE TRANSPORT IN TIGHTLY COVERED CONTAINER; TAPE COVERING UNLESS SOLID LID.
7. WET MOP AND/OR VACUUM WITH HEPA FILTERED VACUUM BEFORE LEAVING WORK AREA.
8. PLACE STICKY MAT AT ALL WORK AREA ENTRANCES AND EXITS.
9. REMOVE OR ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA
CLASS
III
SAME AS CLASS I AND II PLUS:
1. ISOLATE HVAC SYSTEM IN CONSTRUCTION AREA TO PREVENT DUCT SYSTEM CONTAMINATION
2. COMPLETE CRITICAL BARRIERS (I.E. SHEETROCK, PLYWOOD, PLASTIC) AT ALL CONSTRUCTION ENTRIES AND EXITS; MONITOR FOR SEAL AND TAKE IMMEDIATE
CORRECTIVE ACTION AS NEEDED
3. MAINTAIN AND MONITOR NEGATIVE AIR PRESSURE WITHIN CONSTRUCTION SITE UTILIZING HEPA EQUIPPED AIR FILTRATION UNITS.
4. REMOVE OR ISOLATE HVAC SYSTEMS IN AREA WHERE WORK IS BEING PERFORMED.
5. CHECK AND REPLACE AIR FILTERS AS NEEDED REGULARLY
6. DO NOT REMOVE BARRIERS FROM WORK SITE UNTIL PROJECT IS COMPLETE & HAS BEEN THOROUGHLY CLEANED; REMOVE BARRIERS CAREFULLY TO MINIMIZE
SPREADING DUST. DEBRIS.
7. VACUUM WORK WITH HEPA FILTERED VACUUM.
8. WET MOP AREA WITH CLEANER/DISINFECTANT.
9. MITIGATE VIBRATION AND NOISE TO LOWEST IMPACT WHERE POSSIBLE.
10. DISPLAY ICRA AT SITE
11. SEAL HOLES, PIPES, CONDUITS AND PUNCTURES.
CLASS
IV
SAME AS CLASS I, II AND III PLUS:
1. INSPECT ADJACENT AREAS FOR DUST MIGRATION; TAKE IMMEDIATE CORRECTIVE AS NEEDED
2. USE HEPA VACUUM IN AREA PRIOR TO START OF CONSTRUCTION
3. CONSTRUCT ANTE ROOM; ALL PERSONNEL MUST ENTER THROUGH IT TO BE VACUUMED USING HEPA VACUUM BEFORE LEAVING OR TO DON/DOFF PPE
PHASING PLAN NOTES
PHASE 1
THIS PHASE SHALL CONSIST OF RENOVATION EXISTING HDR PROCEDURE ROOM TO CREATE THE NEW DOSIMETRY ROOM. THE REMAINING AREAS OF THE CLINIC WILL STAY IN NORMAL OPERATION. ALL CONSTRUCTION SHALL COMMENCE IN A MANNER THAT
MINIMIZES DISRUPTION TO PATINET CARE.
PHASE 2
THIS PHASE SHALL CONSIST OF RENOVATION OF THE EXISTING OFFICE, STAFF BREAK AND TOILET ROOMS. THIS AREA SHALL ONLY BE ACCESSIBLE BY CONSTRCUTION STAFF. THIS PHASE KEEPS ALL EXISTING EXAM ROOMS, RECEPTION & WAITING INTACT.
RICVAMC STAFF AND PATINETS SHALL CONTINUE USE THE EXISTING CORRIDOR ACCESS AND CAN AVOID THE CONSTRUCTION ZONE.
ALL CONSTRUCTION SHALL COMMENCE IN A MANNER THAT MINIMIZES DISRUPTION TO PATINET CARE.
PHASE 3
THIS PHASE SHALL CONSIST OF RENOVATION OF THE EXISTING OFFICES, ONE TOILET ROOM, STOARGE, DRESSING AND PROCEDURE ROOM. ACCESS TO THESE AREAS SHALL INDEPENDANT FOR EACH AREA. THIS PHASE KEEPS ALL EXISTING EXAM ROOMS, ONE TOILET ROOM, RECEPTION & WAITING INTACT. RICVAMC STAFF AND PATINETS SHALL BEGIN TO USE THE NEW CANCER CENTER RECEPTION & WAITING TO ACCESS THE DEPARTMENT. CONSTRUCTION STAFF CAN UTILIZE THE SOUTH CORRIDOR ACCESS AND SHALL TRY AVOID PATINET CARE AREAS. ALL CONSTRUCTION SHALL COMMENCE IN A MANNER THAT MINIMIZES DISRUPTION TO
PATINET CARE.
PHASE 4
THIS PHASE SHALL CONSIST OF RENOVATION OF THE EXISTING EXAM ROOMS, ONE TOILET ROOM, RECEPTION & WAITING. RICVAMC STAFF AND PATINETS SHALL BEGIN TO USE TWO NEW EXAM ROOMS AND CONTINUE TO USE THE CANCER CENTER RECEPTION & WAITING TO ACCESS THE DEPARTMENT. CONSTRUCTION ACCESS CAN BE LIMITED TO THE SOUTH CORRIDOR. CONSTRUCTION STAFF SHALL TRY AVOID PATINET CARE AREAS. ALL CONSTRUCTION SHALL COMMENCE IN A MANNER THAT MINIMIZES DISRUPTION
TO PATINET CARE.
PHASE 5
THIS PHASE SHALL CONSIST OF RENOVATION OF THE EXISTING REMAINING CORRIODR. THIS PHASE SHALL HAPPEN IN OFF HOURS
TO AVOID DISRUPTION TO PATINET CARE.
GENERAL CONTRACTOR NOTE:
DURING EACH PHASE THE GC SHALL NOTIFY AND COORDINATE WITH THE VA COR/SHOP SUPERVISORS A SCHEDULED A TIME FOR AN IN WALL INSPECTION TO OBSERVE AS BUILT CONDITIONS BEFORE GYPSUMBOARD IS INSTALLED.
PHASE 1:
CONSTRUCTION PROJECT ACTIVITY TYPE - D
INFECTION CONTROL RISK GROUP - GROUP 4: HIGHEST RISK
CONTROL PROCEDURE CLASS - III
PHASE 2 :
CONSTRUCTION PROJECT ACTIVITY TYPE - D
INFECTION CONTROL RISK GROUP - GROUP 4: HIGHEST RISK
CONTROL PROCEDURE CLASS - III
PHASE 3:
CONSTRUCTION PROJECT ACTIVITY TYPE - D
INFECTION CONTROL RISK GROUP - GROUP 4: HIGHEST RISK
CONTROL PROCEDURE CLASS - III
PHASE 4:
CONSTRUCTION PROJECT ACTIVITY TYPE - D
INFECTION CONTROL RISK GROUP - GROUP 4: HIGHEST RISK
CONTROL PROCEDURE CLASS - III
PHASE 5:
CONSTRUCTION PROJECT ACTIVITY TYPE - D
INFECTION CONTROL RISK GROUP - GROUP 4: HIGHEST RISK
CONTROL PROCEDURE CLASS - III
INFECTION CONTROL RISK ASSESSMENT (ICRA) BY
PROJECT AREA USE AND PHASE
SEALANT WITH FOAM
ROD BACKUP
EXISTING CEILING
CONTINUOUS DUCT
TAPE SEAL EACH SIDE
AT CEILING
COMPRESSIBLE
INSULATION
CONTINUOUS DUCT
TAPE SEAL EACH
SIDE
EXISTING FINISHED
FLOOR
(1) LAYER 5/8" GYP BD EACH
SIDE. FINISH OCCUPIED SIDE
WITH GLOSS PAINT
3 5/8" STEEL STUDS @ 16"
OC WITH FULL BATT SOUND
ATTENUATING INSULATION
CLOSE INTERSTITIAL SPACE
WITH
6 MIL POLYETHYLENE
BARRIER. SEAL ALL JOINTS,
PENETRATIONS AND ENTIRE
PERIMETER OF BARRIER
WITH CONTINUOUS DUCT
TAPE
CLOSE OPEN DUCTS
WITH
6 MIL POLYETHYLENE
BARRIER. SEAL EDGES
WITH CONTINUOUS DUCT
TAPE
"WORK" SIDE OF BARRIER OCCUPIED SIDE OF
BARRIER
3 5/8" STEEL STUDS @ 16"
OC WITH FULL BATT SOUND
ATTENUATING INSULATION
3 5/8" STEEL STUDS @ 16"
OC WITH FULL BATT SOUND
ATTENUATING INSULATION
UP TO 1 HR FIRE
RATINIG UL
DESIGN U419
STC 49
SEALANT JOINT (BOTH SIDES)
BOTTOM OF STRUCTURE- EL VARIES
(CONCRETE SLAB, BEAMS & JOISTS)
FIRE SAFING AT METAL DECK
TOP OF METAL DECK- EL VARIES
GYP BD FASTENERS ATTACHED TO
VERTICAL STUDS ONLY
TOP OF STUDS- DO NOT ATTACH TO STUD
RUNNER
STUD RUNNER SECURED TO STRUCTURE
3" 1'
0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
FINAL BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ENGINEER OF RECORD STAMPCONSULTANT / ARCHITECT OF RECORD
321 4 5 6 7 8 9 10
C U s e rs
\L C a m p o v e rd e -L o a y z a \D o c u m e n ts
\1
-R
L C a m p o v e rd e
-L o a y z a
.r v t
/2 /2
:0
:3
P
M
GI111
FIRST LEVEL INFECTION CONTROL
& PHASING PLAN
RADIATION ONCOLOGY
LAB RENOVATION
VAMC RICHMOND
652-22-200
BLDG 500
11/07/2022 JU JU16511
3/32" = 1'-0"1 FIRST LEVEL PHASING EXISTING PLAN
3/32" = 1'-0"2 FIRST LEVEL FLOOR PLAN
1/2" = 1'-0"3 TYPICAL DUST PROOF CONSTRUCTION BARRIER _TYPE A3b (1 HOUR RATED)
STAFF
1Y-118
MAMMOGRAPHY
1Y-122
DRESSING
RM
1Y-123
LAB-1
1Y-128
RADIOLOGIST
1Y-127
EQUIPMENT RM
1Y-132
CORRIDOR
C1G-20
FEMALE STAFF
LOCKER
1G-157
FEMALE STAFF
TOILET
1G-158
MALE STAFF
TOILET
1G-187
MALE STAFF
LOCKER
1G-188
CARDIOLOGY
STORAGE RM
1Y-125
MECHANICAL
1Y-133
CORRIDOR
C1G-24
CORRIDOR
C1H-29
STORAGE
1G-197
SUPPLY RM
1G-196
SUPPLY RM
1G-195CONTROL
XRAY
1G-194
PATIENT
TOILET
1G-192
XRAY
1G-191
BAR
PREP
1G-190
MALE
1G-201
MALE STAFF
LOCKER
1G-200 OFFICE
1H-139B
OFFICE
1H-139C
OFFICE
1H-141
STAFF
TOILET
1H-142
VESTIBULE
1H-143
STAIR
OFFICE
1K-145
OFFICE
1K-148
OFFICE
1K-149
OFFICE
1K-150
MECHANICAL
SVC BAY-H
Q
F
D
D
A
E
A
A
A
A
A
A
1Z-228
1Z-227
1Z-225
1Z-230
1Z-237
1Z-2141Z-213
1Z-212
1Z-209
1Z-208
1Z-224
1Z-223
1Z-222
1Z-220
1Z-217
1Z-226
1Z-231
Z
-2
1Z-E1
1Z-206
1Z-207
1Z-S1
1Z-211
1Z-202
1Z-200
1Z-203
1Z-204
1Z-205
1Z-C2
Z
-C
1Z-201
1Z-210
1Z-216
1Z-219
1Z-235
1Z-236
Z
-C
1Z-221
1Z -C
1Z-218
T
R
Q 20
R.1
21.1 22.1
Q.2
20.1
R.2
S.2
23.1 24.1 25.1
25.3
25.4
21.2
Q.1
25.2
R.3
UP
STAFF
1Y-118
MAMMOGRAPHY
1Y-122
DRESSING
RM
1Y-123
LAB-1
1Y-128
RADIOLOGIST
1Y-127
EQUIPMENT RM
1Y-132
CORRIDOR
C1G-20
FEMALE STAFF
LOCKER
1G-157
FEMALE STAFF
TOILET
1G-158
MALE STAFF
TOILET
1G-187
MALE STAFF
LOCKER
1G-188
CARDIOLOGY
STORAGE RM
1Y-125
MECHANICAL
1Y-133
CORRIDOR
C1G-24
CORRIDOR
C1H-29
STORAGE
1G-197
SUPPLY RM
1G-196
SUPPLY RM
1G-195CONTROL
XRAY
1G-194
PATIENT
TOILET
1G-192
XRAY
1G-191
BAR
PREP
1G-190
MALE
1G-201
MALE STAFF
LOCKER
1G-200 OFFICE
1H-139B
OFFICE
1H-139C
OFFICE
1H-141
STAFF
TOILET
1H-142
VESTIBULE
1H-143
STAIR
OFFICE
1K-145
OFFICE
1K-148
OFFICE
1K-149
OFFICE
1K-150
MECHANICAL
SVC BAY-H
Q
F
D
D
A
E
A
A
A
A
A
A
1Z-228
1Z-227
1Z-225
1Z-230
1Z-237
1Z-2141Z-213
1Z-212
1Z-209
1Z-208
1Z-224
1Z-223
1Z-222
1Z-220
1Z-217
1Z-226
1Z-231
Z
-2
1Z-E1
1Z-206
1Z-207
1Z-S1
1Z-211
1Z-202
1Z-200
1Z-203
1Z-204
1Z-205
1Z-C2
Z
-C
1Z-201
1Z-210
1Z-216
1Z-219
1Z-235
1Z-236
Z
-C
1Z-221
1Z -C
1Z-218
T
R
Q 20
R.1
21.1 22.1
Q.2
20.1
R.2
S.2
23.1 24.1 25.1
25.3
25.4
21.2
Q.1
25.2
R.3
UP
OFFICE
1H-139C
OFFICE
1H-141
STAFF
TOILET
1H-142
VESTIBULE
1H-143
STAIR
12OFFICE
1H-139C
OFFICE
1H-141
STAFF
TOILET
1H-142
VESTIBULE
1H-143
STAIR
1Z-129
OFFICE1Z-117
WORK ROOM
PHYSICIAN
1Z-116
OFFICE
1Z-115
TOILET
MALE
1Z-114
TOILET
FEMALE
1Z-113
STOARGE
BRACHY
THERAPY
1Z-112
OFFICE
1Z-105
RESTROOM
KITCHEN/
1Z-106
TOILET
1Z-109
TOILET
1Z-108
LOCKER
1Z-107
ROOM
MECH
1Z-110
PHYSICIST
1Z-111
DOSIMETRY
C1Z-1
CORRIDOR
C1Z-3
CORRIDOR
1Z-118
RM-3
EXAM
1Z-119
RM-2
EXAM
1Z-120
RM-1
EXAM
1Z-121
OFFICE
1Z-122
RECEPTION
1Z-123
WAITING
OUTPATIENT
1Z-137
SIMULATOR
1Z-136
CONTROL
1Z-138
BRACHY 1Z-139
MECHANICAL
1Z-130
LINEN
1Z-131
DR
1Z-128
ROOM
EQUIPMENT
1Z-127
STORAGE
1Z-126
HAC
1Z-125
STORAGE
PHYSICAL
1Z-124
FILES
FILM
1Z-100
CHIEF
1Z-101
SECRETARY
1Z-102
OFFICE
ADMINISTRATIVE
1Z-103
OFFICE
1Z-104
CONFERENCE RM
C1Z-4
CORRIDOR
1Z-132
CONTROL
1Z-133
ACCELERATOR
LINEAR
STORAGE
1Z-134
ACCELERATOR
LINEAR
1Z-142
STORAGE
1Z-141
ACCELERATOR
LINEAR
1Z-135
CONTROL
1Z-140
STORAGE
C1Z-2
CORRIDOR
252423222120
T
U
V
W
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
CONSTRUCTION LIMITS
CO
NS
TR
UC
TI
O
N
LI
M
IT
S
CO
NS
TR
UC
TI
O
N
LI
M
IT
S
DE5
DE5
DE3DE3
DE3 DE3
DE3
DE3
DE3
DE3 DE3
DE3
DE1
DE2
DE4
DE6 DE1
DE2
DE4
DE6
DE1
DE2
DE4
DE6 DE1
DE2
DE4
DE6 DE1
DE2
DE4
DE6
DE1
DE2
DE4
DE6
DE1
DE2
DE4
DE6
DE1
DE2
DE4
DE6 DE1
DE2
DE4
DE6
DE1
DE2
DE4
DE6 DE1
DE2
DE4
DE6DE1
DE2
DE4
DE6
DE1
DE2
DE4
DE6
DE7
DE8
DE6
DE8
DE1
DE2
DE4
DE3
DE9
DE10
DE1
DE2
DE6
DE14 DE14
DE15 DE15
DE1
DE2
DE4
DE6
DE13
DE14
DE14DE15 DE15
DE12
DE12
DE12
DE12
DE12
DE1 DE1
DE2 DE2
DE4 DE4
DE6 DE6 DE6
DE4 DE3
DE2
DE1
DE11
CONSTRUCTION LIMITS
CO
NS
TR
UC
TI
O
N
LI
M
IT
S
CO
NS
TR
UC
TI
O
N
LI
M
IT
S
DE17
DE18
DE16
DE19
DE19
DE19
DE19
DE19
DE19
DE19 DE19
DE19
AD111
DE19
AD111
DEDUCT ALTERNATE
DE22
DEMOLITION GENERAL NOTES
1. GENERAL CONTRACTOR SHALL COORDINATE ALL DEMOLITION WORK, PHASING
AND SEQUENCING WITH THE OWNER.