Attachment B - Bid Specifications - Volume I R2.pdf
PDF 5 MB Posted
- Attached to
- Y1DB--Radiation Oncology Lab Renovation (Oct) Federal contract opportunity
- Solicitation number
- 36C24625B0001
About this file
This document is the bid specifications, volume I, for the Radiation Oncology Lab Renovation project at the Richmond VA Medical Center in Richmond, Virginia. The project involves selective demolition, general construction, necessary removal of existing structures and construction, and work on architectural modifications, equipment relocation, fire protection systems, plumbing systems, mechanical systems, electrical systems, and telecommunication systems. The work is to be substantially complete within 14 months (426 days) calendar days from Notice To Proceed. The bid includes a base bid and three alternates. The agency involved is the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 6. The document provides details on the construction phasing, construction security requirements, operations and storage areas, use of utilities, testing requirements, and photographic documentation.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 36C24625B0001 0007.docx | DOCX document | |
| 36C24625B0001 0006.docx | DOCX document | |
| Pre-Renovation Asbestos Report.pdf | ||
| 36C24625B0001 0005.docx | DOCX document | |
| 36C24625B0001 0004.docx | DOCX document | |
| 36C24625B0001 0003.docx | DOCX document | |
| 36C24625B0001.Site.Visit.Sign-in.Sheet.pdf | ||
| 36C24625B0001 0002.docx | DOCX document | |
| 36C24625B0001 0001.docx | DOCX document | |
| Attachment A - Wage Determination VA20240155 6.21.24.txt | TXT text file | |
| 36C24625B0001_1.docx | DOCX document | |
| Attachment D - Bid Drawings_R3.pdf | ||
| Attachment C - Bid Specifications - Volume II R2.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Charlotte Engineers, LLP 5838 Monroe Road Charlotte, NC 28212
Hunter Holmes McGuire Veterans Affairs Medical Center Radiation Oncology Lab Renovation
Richmond, VA
VA Project Number: 652-22-200 Final Bid Documents Submittal
SPECIFICATIONS – VOLUME I
November 07, 2022
RICVAMC- Richmond, VA VA Project 652-22-200 Radiation Oncology Lab Renovation 11-07-2022 1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249
CERTIFICATIONS PAGE
Architect and Coordinating Professional:
Typed or Printed Name: Thomas Olesak
License Number: 19148
License Expiration Date: 12/31/2022
Professional Engineer: (Mechanical and
Plumbing)
Typed or Printed Name: Gregory Turner, PE
License Number: 031465
Professional Engineer: (Fire)
Typed or Printed Name: John Callahan, PE
License Number: 0402039709
Professional Engineer: (Electrical)
Typed or Printed Name: John Edwards, PE
License Number:
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249
Professional Designer: (Technology)
Typed or Printed Name: Richard A. Sousa
License Number: 160377
License Expiration Date: 12/31/2024
Professional Engineer: (Structural)
Typed or Printed Name: Mark Rickher
License Number: 020984
- - - END - - -
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 07-04-22
00 01 10-1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 00 - SPECIAL SECTIONS
00 01 15 List of Drawing Sheets 05-20
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 11-21 01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 11-21 01 33 23 Shop Drawings, Product Data, and Samples 06-21 01 35 26 Safety Requirements 11-21 01 42 19 Reference Standards 11-20 01 45 00 Quality Control 02-21 01 45 29 Testing Laboratory Services 11-18 01 45 35 Special Inspections 06-21 01 57 19 Temporary Environmental Controls 01-21 01 58 16 Temporary Interior Signage 07-15 01 74 19 Construction Waste Management 04-22 01 81 13 Sustainable Construction Requirements 10-17 01 91 00 General Commissioning Requirements 04-22
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17
DIVISION 03 – CONCRETE
03 30 53 (Short-Form) Cast-in-Place Concrete 01-21
DIVISION 05 – METALS
05 50 00 Metal Fabrications 08-18
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 06 60 Plastic Fabrications 06 10 00 Rough Carpentry 10-17 06 61 16 Solid Surface Fabrication
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 Thermal Insulation 01-21 07 84 00 Firestopping 01-21
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 07-04-22
00 01 10-2
SECTION NO. DIVISION AND SECTION TITLES DATE
07 92 00 Joint Sealants 04-22
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Frames 01-21 08 14 00 Interior Wood Doors 01-21 08 31 13 Access Doors and Frames 04-22 08 71 00 Door Hardware 05-22 08 71 13 Automatic Door Operators 01-21 08 80 00 Glazing 01-21
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 01-21 09 22 16 Non-Structural Metal Framing 06-18 09 29 00 Gypsum Board 04-20 09 30 00 Specialty Moldings and Trims 09 30 13 Ceramic/Porcelain Tiling 01-21 09 51 00 Acoustical Ceilings 12-18 09 65 13 Resilient Base and Accessories 01-21 09 65 16 Resilient Sheet Flooring 05-18 09 65 19 Resilient Tile Flooring 05-18 09 68 00 Carpeting 01-21 09 91 00 Painting 01-21 09 96 59 Resinous Specialty Glazed Coating Systems for Walls, Ceilings, Wallboard, and Block CMU (RES-W1, RES-W2) 01-21
DIVISION 10 – SPECIALTIES
10 14 00 Signage 01-21 10 21 23 Cubicle Curtain Tracks 01-21 10 26 00 Wall and Door Protection 01-21 10 26 23.11 Decorative Protection Panels 10 28 00 Toilet, Bath, and Laundry Accessories 01-21 10 44 13 Fire Extinguisher Cabinets 08-18 10 51 13 Metal Lockers
DIVISION 12 – FURNISHINGS
12 32 00 Manufactured Wood Casework 01-21 12-18
DIVISION 13 - SPECIAL CONSTRUCTION
13 49 00 Radiation Protection 01-21
DIVISION 21- FIRE SUPPRESSION
21 08 00 Commissioning of Fire Suppression System 11-16
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 07-04-22
00 01 10-3
SECTION NO. DIVISION AND SECTION TITLES DATE
21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 09-20 22 05 19 Meters and Gages for Plumbing Piping 09-20 22 05 23 General-Duty Valves for Plumbing Piping 09-20 22 07 11 Plumbing Insulation 09-19 22 08 00 Commissioning of Plumbing Systems 11-16 22 11 00 Facility Water Distribution 05-21 22 13 00 Facility Sanitary and Vent Piping 09-20 22 40 00 Plumbing Fixtures 09-15 22 62 00 Vacuum Systems for Laboratory and Healthcare Facilities 09-15 22 63 00 Gas Systems for Laboratory and Healthcare Facilities 09-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 04-22 23 05 12 General Motor Requirements for HVAC and Steam
Generation Equipment 02-20
23 05 41 Noise and Vibration Control for HVAC Piping and Equipment
02-20
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-20 23 07 11 HVAC and Boiler Plant Insulation 02-20 23 08 00 Commissioning of HVAC Systems 04-22 23 09 23 Direct-Digital Control System for HVAC 09-11 23 21 13 Hydronic Piping 02-20 23 25 00 HVAC Water Treatment 02-20 23 31 00 HVAC Ducts and Casings 02-20 23 34 00 HVAC Fans 02-20 23 36 00 Air Terminal Units 02-20 23 37 00 Air Outlets and Inlets 02-20
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16 26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17 26 05 26 Grounding and Bonding for Electrical Systems 01-17 26 05 33 Raceway and Boxes for Electrical Systems 01-18 26 08 00 Commissioning of Electrical Systems 11-16 26 09 23 Lighting Controls 01-18 26 24 16 Panelboards 01-18 26 27 26 Wiring Devices 01-18 26 29 21 Enclosed Switches and Circuit Breakers 01-17 26 51 00 Interior Lighting 01-18
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 07-04-22
00 01 10-4
SECTION NO. DIVISION AND SECTION TITLES DATE
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 09-19 27 05 26 Grounding and Bonding for Communications Systems 06-15 27 05 33 Raceways and Boxes for Communications Systems 10-18 27 08 00 Commissioning of Communications Systems 11-16 27 10 00 Control, Communication and Signal Wiring 06-15 27 15 00 Communications Structured Cabling 01-16 27 51 16 Public Address and Mass Notification Systems 10-18 27 52 23 Nurse Call and Code Blue Systems 10-18
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 05 00 Common Work Results for Electronic Safety and Security 04-18 28 05 13 Conductors and Cables for Electronic Safety and
Security 10-18
28 05 26 Grounding and Bonding for Electronic Safety and Security
09-11
28 05 28.33 Conduits and Backboxes for Electronic Safety and Security
09-11
28 08 00 Commissioning of Electronic Safety and Security Systems 11-16 28 31 00 Fire Detection and Alarm 10-11
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 05-01-20
00 01 15 - 1
SECTION 00 01 15
LIST OF DRAWING SHEETS
The drawings listed below accompanying this specification form a part of the contract.
Drawing No. Title
GENERAL
GI000 COVER SHEET
GI001 SHEET INDEX
GI002 ABBREVIATIONS
GI110 FIRST LEVEL LIFE SAFETY PLAN
GI111 FIRST LEVEL INFECTION CONTROL & PHASING PLAN
ARCHITECTURAL
AD111 FIRST LEVEL DEMOLITION PLAN
AE111 FIRST LEVEL PLAN
AE112 FIRST LEVEL DIMENSION PLAN
AC111 FIRST LEVEL REFLECTED CEILING PLAN
AE411 ENLARGED PLANS AND INTERIOR ELEVATIONS
AE601 INTERIOR PARTITION TYPES, CEILING DETAILS,
INTERIOR SECTION & PLAN DETAILS
AE602 OPENING SCHEDULE, TYPES, AND INTERIOR SECTION
DETAILS
AE640 MOUNTING HEIGHTS AND INTERIOR SECTIONS
INTERIOR
AF111 FIRST LEVEL FINISH PLAN AND FINISH DETAILS
AF600 ROOM FINISH AND MATERIAL SCHEDULE
AW111 FIRST LEVEL WAYFINDING PLAN & SCHEDULE
AW601 SIGNAGE DETAILS
IF110 FIRST LEVEL FURNITURE PLAN
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 05-01-20
00 01 15 - 2
EQUIPMENT
QH110 FIRST LEVEL EQUIPMENT PLAN
FIRE PROTECTION
FA001 FIRE DETECTION – SYMBOLS, NOTES AND DRAWING
INDEX
FA002 FIRE DETECTIONS - DETAILS & DEMOLITION NOTES
FA003 FIRE ALARM – UL & PIPE SLEEVE DETAILS
FA004 INPUT/OUTPUT MATRIX & TEMPORARY REQUIREMENTS
FA110 FIRE DETECTION – FIRST FLOOR - DEMOLITION
FA111 FIRE DETECTION – FIRST FLOOR – NEW WORK
FX001 FIRE SUPPRESSION – SYMBOLS, LEGENDS, NOTES AND
DRAWING INDEX
FX002 FIRE SUPPRESSION – DETAILS
FX003 FIRE SUPPRESSION – TEMPORARY REQUIREMENTS & UL
DETAILS
FX110 FIRE SUPPRESSION – FIRST FLOOR - DEMOLITION
FX111 FIRE SUPPRESSION – FIRST FLOOR – NEW WORK
MECHANICAL
M001 MECHANICAL - SYMBOLS, LEGENDS, NOTES AND
DRAWING INDEX
M002 MECHANICAL – DETAILS AND SCHEDULES
MD110 MECHANICAL - FIRST FLOOR – DEMOLITION
MD210 MECHANICAL - FIRST FLOOR INTERSTITIAL -
DEMOLITION – DUCTWORK
MD211 MECHANICAL - FIRST FLOOR INTERSTITIAL -
DEMOLITION – PIPING
MD310 MECHANICAL - ROOF PLAN – DEMOLITION
MH110 MECHANICAL - FIRST FLOOR - NEW WORK
MH210 MECHANICAL - FIRST FLOOR INTERSTITIAL - NEW
WORK – DUCTWORK
MH310 MECHANICAL - ROOF PLAN - NEW WORK
MP210 MECHANICAL - FIRST FLOOR INTERSTITIAL - NEW
WORK - PIPING
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 05-01-20
00 01 15 - 3
PLUMBING
P001 PLUMBING - NOTES, LEGEND, AND DRAWING INDEX
P002 PLUMBING – DETAILS
PD110 PLUMBING - FIRST FLOOR - DEMOLITION - SANITARY
PD111 PLUMBING - FIRST FLOOR - DEMOLITION - DOMESTIC
PD112 PLUMBING - FIRST FLOOR - DEMOLITON - MEDICAL
GAS
PD210 PLUMBING - FIRST FLOOR INTERSTITIAL -
DEMOLITION - SANITARY
PD211 PLUMBING - FIRST FLOOR INTERSTITIAL -
DEMOLITION - DOMESTIC
PD212 PLUMBING - FIRST FLOOR INTERSTITIAL -
DEMOLITION - MEDICAL GAS
PP110 PLUMBING - FRIST FLOOR - NEW WORK - SANITARY
PP111 PLUMBING - FIRST FLOOR - NEW WORK - DOMESTIC
PP112 PLUMBING - FIRST FLOOR - NEW WORK - MEDICAL GAS
PP210 PLUMBING - FIRST FLOOR INTERSTITIAL - NEW WORK
- SANITARY
PP211 PLUMBING - FIRST FLOOR INTERSTITIAL - NEW WORK
- DOMESTIC
PP212 PLUMBING - FIRST FLOOR INTERSTITIAL - NEW WORK
- MEDICAL GAS
ELECTRICAL
E001 ELECTRICAL - SYMBOLS, LEGENDS, NOTES AND
DRAWING INDEX
E002 ELECTRICAL – DETAILS
E003 ELECTRICAL – TELECOMMUNICATION DETAILS
E004 ELECTRICAL - PARTIAL RISER DIAGRAM AND
LUMINAIRE SCHEDULE
E005 ELECTRICAL - PANEL SCHEDULES
ED110 ELECTRICAL - FIRST FLOOR - DEMOLITION
ED310 ELECTRICAL – ROOF PLAN - DEMOLITION
EL110 ELECTRICAL - FIRST FLOOR - NEW WORK - LIGHTING
EP110 ELECTRICAL - FIRST FLOOR - NEW WORK - POWER
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 05-01-20
00 01 15 - 4
EP210 ELECTRICAL - FIRST FLOOR INERSTITIAL - NEW WORK
– POWER
EP310 ELECTRICAL – ROOF PLAN - NEW WORK - POWER
EY110 ELECTRICAL - FIRST FLOOR - NEW WORK - TELECOM
- - - END - - -
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 11-01-21
01 00 00 -1
SECTION 01 00 00
GENERAL REQUIREMENTS
GENERAL
1.1 SAFETY REQUIREMENTS
A. Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.
1.2 GENERAL INTENTION
Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for RICVAMC Richmond, VA –
Radiation Oncology Lab Renovation as required by drawings and specifications.
Visits to the site by Bidders may be made only by appointment with the Medical Center Engineering Officer.
A. Offices of Anderson Engineering of MN, LLC, as
Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.
B. Before placement and installation of work subject to tests by testing laboratory retained by Department of Veterans Affairs, the Contractor shall notify the COR in sufficient time to enable testing laboratory personnel to be present at the site in time for proper taking and testing of specimens and field inspection.
Such prior notice shall be not less than three workdays unless otherwise designated by the COR.
C. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 11-01-21
01 00 00 -2 of the VA police, be identified by project and employer, and restricted from unauthorized access.
1.3 STATEMENT OF BID ITEM(S)
A. ITEM I, GENERAL CONSTRUCTION: Work includes selective demolition, general construction, necessary removal of existing structures and construction and certain other items. Work includes all labor, material, equipment, and supervision to perform the demolition and construction work on this project including
Architectural Modifications, Equipment relocation, Fire
Protection Systems, Plumbing Systems, Mechanical Systems, Electrical Systems, and Telecommunication Systems as described in the Basis of Design and Indicated on the Construction Documents.
Work is to be substantially complete within 14 months (426 days) calendar days from Notice To Proceed.
B. ALTERNATE NO.1: BASE BID except delete work for the Film Files and Physical Storage areas.
C. ALTERNATE NO.2: BASE BID except delete work Clean Supply 1Z-130 and Dress 1Z-131 areas.
1.4 ALTERNATE NO 3.: BASE BID EXCEPT DELETE WORK FOR THE OUTPATIENT
WAITING 1Z-123 AREA WITH THE EXCEPTION OF SOME FINISH MODIFICATIONS AS
SHOWN ON DRAWINGS. SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR
A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at
Contractor's expense.
1.5 CONSTRUCTION SECURITY REQUIREMENTS
A. Security Plan:
1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 11-01-21
01 00 00 -3
2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.
B. Security Procedures:
1. No photography of VA premises is allowed without written permission of the Contracting Officer. Patients and staff are not to be photographed at any time.
2. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the
Contracting Officer.
C. Key Control:
1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.
2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See
Section 08 71 00, DOOR HARDWARE and coordinate.
D. Document Control:
1. Before starting any work, the General Contractor/Sub
Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of “sensitive information”.
2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.
3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or
“Sensitive Unclassified”. Secure such information in separate
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 11-01-21
01 00 00 -4 containers and limit the access to only those who will need it for the project. Return the information to the Contracting
Officer upon request.
4. These security documents shall not be removed or transmitted from the project site without the written approval of
Contracting Officer.
5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the
VA.
6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.
7. All electronic information shall be stored in specified location following VA standards and procedures using an
Engineering Document Management Software (EDMS).
a) Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the EDMS system.
b) “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.
E. Motor Vehicle Restrictions
1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted
24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.
2. A limited number of permits shall be issued for General
Contractor and its employees for parking in designated areas only. Contractor to coordinate with VA Medical Center Facility
Manager.
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 11-01-21
01 00 00 -5
1.6 OPERATIONS AND STORAGE AREAS (FAR 52.236-10)
A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.
B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the
Government. The temporary buildings and utilities shall remain the property of the Contractor and shall be removed by the
Contractor at its expense upon completion of the work. With the written consent of the Contracting Officer, the buildings and utilities may be abandoned and need not be removed.
C. The Contractor shall, under regulations prescribed by the
Contracting Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the
Contractor shall protect them from damage. The Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.
D. Working space and space available for storing materials shall be as determined by the COR .
E. Workers are subject to rules of Medical Center applicable to their conduct.
F. Execute work in such a manner as to interfere as little as possible with work being done by others. Keep roads clear of
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 11-01-21
01 00 00 -6 construction materials, debris, standing construction equipment and vehicles at all times.
G. Execute work so as to interfere as little as possible with normal functioning of Medical Center as a whole, including operations of utility services, fire protection systems and any existing equipment, and with work being done by others. Use of equipment and tools that transmit vibrations and noises through the building structure, are not permitted in buildings that are occupied, during construction, jointly by patients or medical personnel, and Contractor's personnel, except as permitted by COR where required by limited working space.
1. Do not store materials and equipment in other than assigned areas.
2. Schedule delivery of materials and equipment to immediate construction working areas within buildings in use by
Department of Veterans Affairs in quantities sufficient for not more than two workdays. Provide unobstructed access to
Medical Center areas required to remain in operation.
3. Where access by Medical Center personnel to vacated portions of buildings is not required, storage of Contractor's materials and equipment will be permitted subject to fire and safety requirements.
H. Utilities Services: Where necessary to cut existing pipes, electrical wires, conduits, cables, etc., of utility services, or of fire protection systems or communications systems (except telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR .
All such actions shall be coordinated with the COR or Utility
Company involved:
1. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, 1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 11-01-21
01 00 00 -7 electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
I. Phasing:
1. The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur. It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:
2. To ensure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the
Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to ensure accomplishment of this work in successive phases mutually agreeable to Medical Center Director, Director, COR and
Contractor, as follows:
Phase I: This phase shall consist of renovation existing HDR procedure room to create the new dosimetry room, existing admin & subwait, clean supply, dressing room, and electrical room. The remaining areas of the clinic will stay in normal operation. All construction shall commence in a manner that m
Minimizes disruption to patient care.
Phase II: this phase shall consist of renovation of the existing office; staff break and toilet rooms. This area shall only
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 11-01-21
01 00 00 -8
Be accessible by construction staff. This phase keeps all existing exam rooms, reception & waiting intact. RICVAMC staff and patients shall continue to use the existing corridor access and can avoid the construction zone. All construction shall commence in a manner that minimizes disruption to patient care.
Phase III: This phase shall consist of renovation of the existing office and work room. Access to these areas shall be independent for each area. This phase keeps all existing exam rooms, one
Toilet room, reception & waiting intact. RICVAMC staff will use new offices. Patients will continue to use the existing Exam Rooms.
Reception & waiting to access the department. Construction staff can utilize the south corridor access and shall try avoiding patient care areas. All construction shall commence in a manner that minimizes disruption to patient care.
Phase IV: this phase shall consist of renovation of the existing exam rooms, one toilet room, and remaining corridor. RICVAMC Staff and patients shall begin to use two new exam rooms and continue to use the cancer center reception & waiting to access the department.
Construction access can be limited to the south corridor.
Construction Staff shall try avoiding patient care areas. All construction shall commence in a manner that minimizes disruption
To patient care.
J. Building No. 1Z Radiation Oncology Addition Part of main Bldg.
SPacewill be vacated by Government in accordance with above phasing beginning immediately after date of receipt of Notice to
Proceed and turned over to Contractor.
1. Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical
Centers operations will not be hindered. Contractor shall
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 11-01-21
01 00 00 -9 permit access to Department of Veterans Affairs personnel and patients through other construction areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting etc. to facilitate patient and staff access. Coordinate alteration work in areas occupied by
Department of Veterans Affairs so that Medical Center operations will continue during the construction period.
2. Immediate areas of alterations not mentioned in preceding
Subparagraph 1 will be temporarily vacated while alterations are performed when mutually agreeable by Medical Center, COR, and Contractor.
K. When a building and/or construction site is turned over to
Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:
1. Contractor shall maintain a minimum temperature of 4 degrees C
(40 degrees F) at all times, except as otherwise specified.
2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company
(Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from Contractor's employee or watchman.
L. Utilities Services: Maintain existing utility services for
Medical Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services. Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 11-01-21
01 00 00 -10 and capped at suitable places where shown; or, in absence of such indication, where directed by COR.
1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR
[Chief Engineer] [Chief of Facilities Management]. Electrical work shall be accomplished with all affected circuits or equipment de-energized. When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical
Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR
ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR
COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS
FOR ELECTRONIC SAFETY AND SECURITY for additional requirements.
2. Contractor shall submit a request to interrupt any such services to COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.
3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical
Center . Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.
4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.
5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.
6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 11-01-21
01 00 00 -11 construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.
M. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, shall be removed back to their source. Those which are indicated to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.
N. To minimize interference of construction activities with flow of
Medical Center traffic, comply with the following:
1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.
Wherever excavation for new utility lines cross existing roads, at least one lane must be open to traffic at all times with approval.
2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.
O. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF
ROADWAYS.
1.7 ALTERATIONS
A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR and a representative of VA Supply
Service, of areas of buildings in which alterations occur and
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 11-01-21
01 00 00 -12 areas which are anticipated routes of access, and furnish a report, signed by all three, to the Contracting Officer. This report shall list by rooms and spaces:
1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.
2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.
3. Shall note any discrepancies between drawings and existing conditions at site.
4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.
B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR and/or Supply Representative, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by
Government. Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS"
(FAR 52.236-2) and "CHANGES" (FAR 52.243-4).
C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 11-01-21
01 00 00 -13
1. Re-survey report shall also list any damage caused by
Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of Contractor to restore damage caused by Contractor's workers in executing work of this contract.
D. Protection: Provide the following protective measures:
1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.
2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.
A. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.
B. Hot Work: Perform and safeguard hot work operations in accordance with NFPA 241 and NFPA 51B. Contractor is responsible for coordination with the VA for shutdown of the fire alarm 48 hours in advance. Contractor may be charged for false alarm responses by the Iowa City Fire Departments. Obtain hot work permits from the COR. Designate contractor’s responsible project-site fire prevention program manager to permit hot work.
C. Fire Alarm contractor to provide updated chime list and updated electronic copy of fire alarm system.
1.
1.8 DISPOSAL AND RETENTION
A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 11-01-21
01 00 00 -14
1. Reserved items which are to remain property of the Government are identified by attached tags or noted on drawings or in specifications as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.
2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center
3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.
1.10 RESTORATION
A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.
B. Upon completion of contract, deliver work complete and undamaged.
Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 11-01-21
01 00 00 -15 refinished and left in as good condition as existed before commencing work.
C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workers to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems
(including telephone) which are not scheduled for discontinuance or abandonment.
D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES" (FAR 52.243-4) and "DIFFERING SITE CONDITIONS"
(FAR 52.236-2).
1.11 AS-BUILT DRAWINGS
A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.
B. All variations shall be shown in the same general detail as used in the contract drawings. To ensure compliance, as-built drawings shall be made available for the COR review, as often as requested.
C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.
D. Paragraphs A, B, & C shall also apply to all shop drawings.
1.12 WARRANTY MANAGEMENT
A. Warranty Management Plan: Develop a warranty management plan which contains information relevant to FAR 52.246-21 Warranty of
Construction in at least 30 days before the planned pre-warranty conference, submit four sets of the warranty management plan.
Include within the warranty management plan all required actions
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 11-01-21
01 00 00 -16 and documents to assure that the Government receives all warranties to which it is entitled. The plan must be in narrative form and contain sufficient detail to render it suitable for use by future maintenance and repair personnel, whether tradesman, or of engineering background, not necessarily familiar with this contract. The term “status” as indicated below must include due date and whether item has been submitted or was approved.
Warranty information made available during the construction phase must be submitted to the Contracting Officer for approval prior to each monthly invoice for payment. Assemble approved information in a binder and turn over to the Government upon acceptance of the work. The construction warranty period will begin on the date of the project acceptance and continue for the product warranty period. A joint 4 month and 9 month warranty inspection will be conducted, measured from time of acceptance, by the Contactor and the Contracting Officer. Include in the warranty management plan, but not limited to, the following:
1. Roles and responsibilities of all personnel associated with the warranty process, including points of contact and telephone numbers within the company of the Contractor, subcontractors, manufacturers or suppliers involved.
2. Furnish with each warranty the name, address and telephone number of each of the guarantor’s representatives nearest project location.
3. Listing and status of delivery of all Certificates of Warranty for extended warranty items, to include roofs, HVAC balancing, pumps, motors, transformers and for all commissioned systems such as fire protection and alarm systems, sprinkler systems and lightning protection systems, etc.
4. A list for each warranted equipment item, feature of construction or system indicating:
a. Name of item.
b. Model and serial numbers.
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 11-01-21
01 00 00 -17
c. Location where installed.
d. Name and phone numbers of manufacturers and suppliers.
e. Name and phone numbers of manufacturers or suppliers.
f. Names, addresses and phone numbers of sources of spare parts.
g. Warranties and terms of warranty. Include one-year overall warranty of construction, including the starting date of warranty of construction. Items which have extended warranties must be indicated with separate warranty expiration dates.
h. Starting point and duration of warranty period.
i. Summary of maintenance procedures required to continue the warranty in force.
j. Cross-reference to specific pertinent Operation and
Maintenance manuals.
k. Organizations, names and phone numbers of persons to call for warranty service.
l. Typical response time and repair time expected for various warranted equipment.
5. The plans for attendance at the 4 and 9-month post construction warranty inspections conducted by the government.
6. Procedure and status of tagging of all equipment covered by extended warranties.
7. Copies of instructions to be posted near selected pieces of equipment where operation is critical for warranty and/or safety reasons.
B. Performance & Payment Bonds: The Performance & Payment Bonds must remain effective throughout the construction period
1. In the event the Contractor fails to commence and diligently pursue any construction warranty work required, the
Contracting Officer will have the work performed by others, and after completion of the work, will charge the remaining construction warranty funds of expenses incurred by the
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 11-01-21
01 00 00 -18
Government while performing the work, including, but not limited to administrative expenses.
2. In the event sufficient funds are not available to cover the construction warranty work performed by the Government at the contractor’s expenses, the Contracting Officer will have the right to recoup expenses from the bonding company.
3. Following oral or written notification of required construction warranty repair work, the Contractor shall respond in a timely manner. Written verification will follow oral instructions. Failure to respond will be cause for the
Contracting Officer to proceed against the Contractor.
C. Pre-Warranty Conference: Prior to contract completion, and at a time designated by the Contracting Officer, the Contractor shall meet with the Contracting Officer to develop a mutual understanding with respect to the requirements of this section.
Communication procedures for Contractor notification of construction warranty defects, priorities with respect to the type of defect, reasonable time required for Contractor response, and other details deemed necessary by the Contracting Officer for the execution of the construction warranty will be established/ reviewed at this meeting. In connection with these requirements and at the time of the Contractor’s quality control completion inspection, furnish the name, telephone number and address of a licensed and bonded company which is authorized to initiate and pursue construction warranty work action on behalf of the
Contractor. This point of contract will be located within the local service area of the warranted construction, be continuously available and be responsive to Government inquiry on warranty work action and status. This requirement does not relieve the
Contractor of any of its responsibilities in conjunction with other portions of this provision.
D. Contractor’s Response to Construction Warranty Service
Requirements:
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 11-01-21
01 00 00 -19
E. Following oral or written notification by the Contracting
Officer, the Contractor shall respond to construction warranty service requirements in accordance with the “Construction
Warranty Service Priority List” and the three categories of priorities listed below. Submit a report on any warranty item that has been repaired during the warranty period. Include within the report the cause of the problem, date reported, corrective action taken, and when the repair was completed. If the
Contractor does not perform the construction warranty within the timeframe specified, the Government will perform the work and back charge the construction warranty payment item established.
1. First Priority Code 1. Perform onsite inspection to evaluate situation, and determine course of action within 4 hours, initiate work within 6 hours and work continuously to completion or relief.
2. Second Priority Code 2. Perform onsite inspection to evaluate situation, and determine course of action within 8 hours, initiate work within 24 hours and work continuously to completion or relief.
3. Third Priority Code 3. All other work to be initiated within 3 work days and work continuously to completion or relief.
The “Construction Warranty Service Priority List” is as follows:
a) Code 1-Life Safety Systems
1) Fire suppression systems.
2) Fire alarm system(s).
b) Code 1-Air Conditioning Systems
1) Air conditioning leak in part of the building, if causing damage.
2) Air conditioning system not cooling properly.
c) Code 1 Doors
1) Overhead doors not operational, causing a security, fire or safety problem.
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 11-01-21
01 00 00 -20
1) Interior, exterior personnel doors or hardware, not functioning properly, causing security, fire or safety problem.
d) Code 3-Doors
1) Overhead doors not operational.
2) Interior/exterior personnel doors or hardware not functioning properly.
e) Code 1-Electrical
1) Power failure (entire area or any building operational after 1600 hours).
2) Security lights.
3) Smoke detectors.
f) Code 2-Electrical
1) Power failure (no power to a room or part of building).
Receptacle and lights not operational (in a room or part of building).
g) Code 3-Electrical
1) Exterior lights not operational.
h) Code 1-Gas
1) Leaks and pipeline breaks.
i) Code 1-Heat
1) Power failure affecting heat.
j) Code 1-Plumbing
1) Hot water heater failure.
2) Leaking water supply pipes
k) Code 2-Plumbing
1) Flush valves not operating properly
2) Fixture drain, supply line or any water pipe leaking.
3) Toilet leaking at base.
l) Code 3- Plumbing
1) Leaky faucets.
m) Code 3-Interior
1) Floors damaged.
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 11-01-21
01 00 00 -21
2) Paint chipping or peeling.
3) Casework damaged.
n) Code 1-Roof Leaks
1) Damage to property is occurring.
o) Code 2-Water (Exterior)
1) No water to facility.
p) Code 2-Water (Hot)
1) No hot water in portion of building listed.
q) Code 3
1) All work not listed above.
F. Warranty Tags: At the time of installation, tag each warranted item with a durable, oil and water-resistant tag approved by the
Contracting Officer. Attach each tag with a copper wire and spray with a silicone waterproof coating. Also submit two record copies of the warranty tags showing the layout and design. The date of acceptance and the QC signature must remain blank until the project is accepted for beneficial occupancy. Show the following information on the tag.
Warranty Tags
Type of product/material
Model number
Serial number
Contract number
Warranty period from/to
Inspector’s signature
Construction Contractor
Address
Telephone number
Warranty Contact
Address
Telephone number
Warranty response time priority code
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 11-01-21
01 00 00 -22
SPEC WRITER NOTE: Determine necessary paragraphs from below and delete non-applicable portions.
1.13 USE OF ROADWAYS
A. For hauling, use only established public roads and roads on
Medical Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed and restoration performed by the Contractor at Contractor's expense.
When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.
1.14 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT
A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:
1. Permission to use each unit or system must be given by COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the COR will withdraw permission for use of the equipment.
2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted.
Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical Code, (2014 Edition), Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded. The electrical equipment shall be thoroughly
1201 Broad Rock Blvd FINAL BID DOCUMENTS Richmond, Virginia 23249 VERSION 11-01-21
01 00 00 -23 cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.
3. Units shall be properly lubricated, balanced, and aligned.
Vibrations must be eliminated.
4. Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freeze-up damage.
5. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system.
6. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .