Attachment C- Tioga Tract.pdf
PDF 98 KB Posted
- Attached to
- RFQ Silvicultural Services
- Solicitation number
- S-X06001-00016378
- Issued by
- Oregon
About this file
This is a quote form attachment for the Tioga Tract project under CTCLUSI (Collaborative Tribal-Cooperative Land Use and Stewardship Initiative). The document establishes a comprehensive pricing structure for vegetation management and restoration activities across multiple service categories including vegetation clearing, slash treatment, planting, herbicide application, and miscellaneous labor and equipment services. Specific line items cover mastication work at varying diameter thresholds, chainsaw operations, manual brushing, chipping services, installation of bare root plants and containerized vegetation, seeding and mulching, herbicide application methods including backpack spraying and UAV/UAS application, and specialized labor such as tree climbing and fire watch services. The quote form also includes provisions for equipment mobilization, transport of materials, portable cold storage, and mountain beaver control operations.
The pricing structure requires contractors to submit hourly rates for labor, equipment, and services, daily rates for portable cold storage, and lump sum rates for general work categories. CTCLUSI will reimburse contractors at cost plus an agreed-upon percentage markup for materials including native seed mixes, weed-free straw, plastics, flagging, fuel for burning, chemicals, and other supplies, provided these materials are included in an approved Work Order. Contractors are not entitled to reimbursement for expenses outside the approved Work Order scope, and material costs not specified in the Work Order are considered incidental to project completion.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 | P a g e
Attachment C:
Tioga Tract Quote Form
Category Activity Unit Cost
Vegetation Clearing
Mastication up to 4" diameter (skid steer or excavator) Hr
Mastication up to 8" diameter (skid steer or excavator) Hr
Chainsaw work up to 7" DBH/diameter (PCT, fuel reduction)
Hr
Manual brushing/mulching of small or non-woody vegetation using metal blade
Hr
General Vegetation Clearing Work LS
PER
ORDER
Slash Treatment
Chipper up to 4" (hourly rate for chipper only) Hr
Chipper up to 8" (hourly rate for chipper only) Hr
General labor (chipping, piling, pile covering, pile burning) Hr
Mechanized piling using excavator Hr
General Slash Treatment Work LS
Planting Install 1-2 yr old bare root plants Hr
Install 1 gallon containerized plants Hr
Install plugs Hr
Harvest 48-inch pole cuttings Hr
Install 48-inch pole cuttings Hr
Hand or crank broadcast seeding and dry straw mulching Hr
Install seedling protection Hr
General Planting Work LS
Herbicide Application
Pesticide application crew person (backpack spraying) Hr
ATV-based spot/area herbicide application Hr
Commercial applicator and truck Hr
Roadside spraying Hr
Broadcast spraying Hr
UAV/UAS herbicide application Hr
General Herbicide Application Work LS
Misc. Foreman/Labor Type 1 Hr
Foreman/Labor Type 2 Hr
Tree climbing w/out saw work Hr
Tree climbing w/ saw work Hr
Transport extra materials Hr
2 | P a g e
Fire watch Hr
Fire line/trail construction Hr
Portable cold storage Day
Truck to pull cold storage Hr
Mountain beaver control (trapping/toxicants) Hr
Other (describe) Hr
Other (describe) Hr
Equipment Type 1 (describe) Hr
Type 1 Mobilization Hr
Type 2 (describe) Hr
Type 2 Mobilization Hr
Type 3 (describe) Hr
Type 3 Mobilization Hr
Type 4 (describe) Hr
Type 4 Mobilization Hr
*Materials Native seed mix cost plus
Native, weed-free straw
Plastic, flagging, fuel for burning
Chemicals
Other (describe)
* CTCLUSI will reimburse Contractor at cost plus a percentage for surfactants, herbicides, dyes, seed, straw and other materials when they are included in an approved Work Order. Contractor is not entitled to reimbursements for expenses not included in the Work Order. Material costs not included in the Work Order are considered incidental to completion of the work.
File details come from the government source that posted it. Updated .