Attachment B- Smith Tract.pdf
PDF 96 KB Posted
- Attached to
- RFQ Silvicultural Services
- Solicitation number
- S-X06001-00016378
- Issued by
- Oregon
About this file
This is a quote form attachment for the Smith Tract project under CTCLUSI (Collaborative Landscape Stewardship Program), establishing the pricing structure and scope of work categories for environmental restoration and vegetation management services. The document outlines comprehensive labor and equipment rate categories across five primary work categories: Vegetation Clearing (including mastication, chainsaw work, and manual brushing), Slash Treatment (chipping, piling, and burning operations), Planting (installation of bare root plants, containerized plants, plugs, and pole cuttings), Herbicide Application (spray crew, ATV-based application, commercial applicator services, and UAV/UAS application), and Miscellaneous services (foreman/labor types, tree climbing, transport, fire watch, and equipment mobilization). The form provides line items for contractors to submit hourly rates for labor, daily rates for equipment such as portable cold storage, and lump-sum pricing for general category work as needed per work order.
Pricing is structured on a cost-plus basis for materials, with CTCLUSI reimbursing contractors at cost plus a designated percentage for surfactants, herbicides, dyes, native seed mix, weed-free straw, plastic, flagging, fuel for burning, chemicals, and other specified materials included in approved work orders. Contractors are not entitled to reimbursement for expenses not explicitly included in issued work orders, with material costs outside the work order scope considered incidental to project completion. The form requires contractors to specify cost-plus percentages for each material category, establishing the financial framework for project execution and cost control.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 | P a g e
Attachment B:
Smith Tract Quote Form
Category Activity Unit Cost
Vegetation Clearing
Mastication up to 4" diameter (skid steer or excavator) Hr
Mastication up to 8" diameter (skid steer or excavator) Hr
Chainsaw work up to 7" DBH/diameter (PCT, fuel reduction) Hr
Manual brushing/mulching of small or non-woody vegetation using metal blade
Hr
General Vegetation Clearing Work LS
PER
ORDER
Slash Treatment Chipper up to 4" (hourly rate for chipper only) Hr
Chipper up to 8" (hourly rate for chipper only) Hr
General labor (chipping, piling, pile covering, pile burning) Hr
Mechanized piling using excavator Hr
General Slash Treatment Work LS
ORDER
Planting Install 1-2 yr old bare root plants Hr
Install 1 gallon containerized plants Hr
Install plugs Hr
Harvest 48-inch pole cuttings Hr
Install 48-inch pole cuttings Hr
Hand or crank broadcast seeding and dry straw mulching Hr
Install seedling protection Hr
General Planting Work LS
ORDER
Herbicide Application
Pesticide application crew person (backpack spraying) Hr
ATV-based spot/area herbicide application Hr
Commercial applicator and truck Hr
Roadside spraying Hr
Broadcast spraying Hr
UAV/UAS herbicide application Hr
General Herbicide Application Work LS
ORDER
Misc. Foreman/Labor Type 1 Hr
Foreman/Labor Type 2 Hr
Tree climbing w/out saw work Hr
Tree climbing w/ saw work Hr
Transport extra materials Hr
2 | P a g e
Fire watch Hr
Fire line/trail construction Hr
Portable cold storage Day
Truck to pull cold storage Hr
Mountain beaver control (trapping/toxicants) Hr
Other (describe) Hr
Other (describe) Hr
Equipment Type 1 (describe) Hr
Type 1 Mobilization Hr
Type 2 (describe) Hr
Type 2 Mobilization Hr
Type 3 (describe) Hr
Type 3 Mobilization Hr
Type 4 (describe) Hr
Type 4 Mobilization Hr
*Materials Native seed mix cost plus
Native, weed-free straw
Plastic, flagging, fuel for burning
Chemicals
Other (describe)
* CTCLUSI will reimburse Contractor at cost plus a percentage for surfactants, herbicides, dyes, seed, straw and other materials when they are included in an approved Work Order. Contractor is not entitled to reimbursements for expenses not included in the Work Order. Material costs not included in the Work Order are considered incidental to completion of the work.
File details come from the government source that posted it. Updated .