Attachment A- Lake Tract.pdf
PDF 99 KB Posted
- Attached to
- RFQ Silvicultural Services
- Solicitation number
- S-X06001-00016378
- Issued by
- Oregon
About this file
This is a quote form attachment for the Lake Tract project associated with CTCLUSI (a state or local consortium). The document establishes a comprehensive pricing structure for vegetation and land management services organized into five primary categories: Vegetation Clearing, Slash Treatment, Planting, Herbicide Application, and Miscellaneous services. Vegetation Clearing services include mastication work for materials up to 4 and 8 inches in diameter, chainsaw work, and manual brushing, each priced on an hourly basis with a general lump-sum option available. Slash Treatment encompasses chipping services at different diameter capacities, general labor for chipping and pile management, and mechanized piling using excavators. Planting services cover installation of various plant types including bare root plants, containerized plants, plugs, and pole cuttings, as well as seeding and seedling protection activities. Herbicide Application services include multiple application methods such as backpack spraying, ATV-based applications, commercial truck application, and UAV/UAS application, each billable on an hourly basis.
The pricing structure allows contractors to submit hourly rates for labor-intensive services, lump-sum pricing for general work categories, and hourly equipment rates for specialized machinery. Material costs for native seed mixes, straw, plastics, flagging, fuel, and chemicals are reimbursable at actual cost plus a specified percentage markup when included in approved Work Orders. The form accommodates multiple equipment types with separate mobilization charges for each, and includes miscellaneous labor categories such as foreman oversight, tree climbing operations, fire watch services, and specialized equipment like portable cold storage. CTCLUSI explicitly limits reimbursement to only those materials and expenses included in an approved Work Order, with material costs not included considered incidental to project completion and the contractor's responsibility.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1 | P a g e
Attachment A:
Lake Tract Quote Form
Category Activity Unit Cost
Vegetation Clearing
Mastication up to 4" diameter (skid steer or excavator) Hr
Mastication up to 8" diameter (skid steer or excavator) Hr
Chainsaw work up to 7" DBH/diameter (PCT, fuel reduction)
Hr
Manual brushing/mulching of small or non-woody vegetation using metal blade
Hr
General Vegetation Clearing Work LS
PER
ORDER
Slash Treatment
Chipper up to 4" (hourly rate for chipper only) Hr
Chipper up to 8" (hourly rate for chipper only) Hr
General labor (chipping, piling, pile covering, pile burning) Hr
Mechanized piling using excavator Hr
General Slash Treatment Work LS
Planting Install 1-2 yr old bare root plants Hr
Install 1 gallon containerized plants Hr
Install plugs Hr
Harvest 48-inch pole cuttings Hr
Install 48-inch pole cuttings Hr
Hand or crank broadcast seeding and dry straw mulching Hr
Install seedling protection Hr
General Planting Work LS
Herbicide Application
Pesticide application crew person (backpack spraying) Hr
ATV-based spot/area herbicide application Hr
Commercial applicator and truck Hr
Roadside spraying Hr
Broadcast spraying Hr
UAV/UAS herbicide application Hr
General Herbicide Application Work LS
Misc. Foreman/Labor Type 1 Hr
Foreman/Labor Type 2 Hr
Tree climbing w/out saw work Hr
Tree climbing w/ saw work Hr
Transport extra materials Hr
2 | P a g e
Fire watch Hr
Fire line/trail construction Hr
Portable cold storage Day
Truck to pull cold storage Hr
Mountain beaver control (trapping/toxicants) Hr
Other (describe) Hr
Other (describe) Hr
Equipment Type 1 (describe) Hr
Type 1 Mobilization Hr
Type 2 (describe) Hr
Type 2 Mobilization Hr
Type 3 (describe) Hr
Type 3 Mobilization Hr
Type 4 (describe) Hr
Type 4 Mobilization Hr
*Materials Native seed mix cost plus
Native, weed-free straw
Plastic, flagging, fuel for burning
Chemicals
Other (describe)
* CTCLUSI will reimburse Contractor at cost plus a percentage for surfactants, herbicides, dyes, seed, straw and other materials when they are included in an approved Work Order. Contractor is not entitled to reimbursements for expenses not included in the Work Order. Material costs not included in the Work Order are considered incidental to completion of the work.
File details come from the government source that posted it. Updated .