Attachment C - Price Breakdown.xlsx
XLSX spreadsheet 30 KB Posted
- Solicitation number
- 36C26127Q0082
About this file
This is a Price Breakdown template for a construction project to replace the roof at Building 347 at the Palo Alto VA Medical Center in Menlo Park, California (Project #640A0-27-104). The template is structured according to the MasterFormat classification system and includes 24 construction divisions covering areas such as general requirements, existing conditions, concrete, masonry, metals, wood and plastic, thermal and moisture protection, doors and windows, finishes, specialties, equipment, furnishings, special construction, conveying equipment, fire suppression, plumbing, HVAC, integrated automation, electrical, communications, electrical safety and security, earthwork, exterior improvements, utilities, transportation, and electrical power generation.
The spreadsheet provides line-item detail for labor and material costs within each division, with columns for number of personnel, hourly rates, hours of work, total labor costs, material quantities, unit material costs, and total material costs. All divisions and line items currently display zero values, indicating this is a blank template awaiting contractor cost inputs. The template culminates in a summary section showing division totals, overhead, subtotal, profit, insurance and taxes, bonding costs, and a grand total. Contractors responding to Solicitation No. 36C26127Q0082 must complete this pricing template with their actual labor rates, material costs, and associated expenses to submit their proposal by the November 19, 2026 deadline.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Site Visit Log 10-27-2026 B-347 Roof Replacement.pdf | ||
| Amendment to Solicitation No. 36C26127Q0082 0001.docx | DOCX document | |
| DBA General Decision CA20260018 09172026.docx | DOCX document | |
| S02 - RFQ No. 36C26127Q0082.docx | DOCX document | |
| Specifications REV2 - 640A0-27-104 Replace Roof At BLDG 347 Menlo Park.pdf | ||
| Statement of Work Including Exhibits - Revised 10-06-2026 - Replace Roof at Bldg 347 Menlo Park.docx | DOCX document | |
| Attachment A - Evaluation Criteria 2- Prior Experience.xlsx | XLSX spreadsheet | |
| 2026 Menlo Park Map ltr_ID908_5-26v2.pdf | ||
| Pre-proposal Site Visit Briefing Slide.pptx | PPTX presentation | |
| Attachment B - REQUEST FOR INFORMATION_RFI_FORM.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Project Title: Replace Roof at Building 347 - Menlo Park |
| Project #: 640A0-27-104 |
| Division Total: | $0.00 |
| Overhead: | $0.00 |
| Subtotal: | $0.00 |
| Profit: | $0.00 |
| Subtotal: | $0.00 |
| Insurance & Taxes: | $0.00 |
| Subtotal: | $0.00 |
| Bonding: | $0.00 |
| Grand Total: | $0.00 |
| Division Totals | |
| Division 01 - General Requirements | $0.00 |
| Division 02 - Existing Conditions | $0.00 |
| Division 03 - Concrete | $0.00 |
| Division 04 - Masonry | $0.00 |
| Division 05 - Metals | $0.00 |
| Division 06 - Wood and Plastic | $0.00 |
| Division 07 - Therm/Moisture Prot. | $0.00 |
| Division 08 - Doors and Windows | $0.00 |
| Division 09 - Finishes | $0.00 |
| Division 10 - Specialties | $0.00 |
| Division 11 - Equipment | $0.00 |
| Division 12 - Furnishings | $0.00 |
| Division 13 - Special Construction | $0.00 |
| Division 14 - Conveying Equipment | $0.00 |
| Division 21 - Fire Suppression | $0.00 |
| Division 22 - Plumbing | $0.00 |
| Division 23 - HVAC | $0.00 |
| Division 25 - Integrated Automation | $0.00 |
| Division 26 - Electrical | $0.00 |
| Division 27 - Communications | $0.00 |
| Division 28 - Elect. Safety/Security | $0.00 |
| Division 31 - Earthwork | $0.00 |
| Division 32 - Exterior Improvements | $0.00 |
| Division 33 - Utilities | $0.00 |
| Division 34 - Transportation | $0.00 |
| Division 48 - Electrical Power Gen. | $0.00 |
| Division 01 - General Requirements | Labor | Material | ||||||
| # OF PERSONNEL | HOURLY RATE | # OF HOURS | TOTAL LABOR COST | QUANTITY | MATERIAL COST | TOTAL MATERIAL COST | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| Total Labor Cost: | $0.00 | Total Material Cost: | $0.00 | |||||
| Division 01 Total: | $0.00 |
| Division 02 - Existing Conditions | Labor | Material | ||||||
| # OF PERSONNEL | HOURLY RATE | # OF HOURS | TOTAL LABOR COST | QUANTITY | MATERIAL COST | TOTAL MATERIAL COST | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| Total Labor Cost: | $0.00 | Total Material Cost: | $0.00 | |||||
| Division 02 Total: | $0.00 |
| Division 03 - Concrete | Labor | Material | ||||||
| # OF PERSONNEL | HOURLY RATE | # OF HOURS | TOTAL LABOR COST | QUANTITY | MATERIAL COST | TOTAL MATERIAL COST | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| Total Labor Cost: | $0.00 | Total Material Cost: | $0.00 | |||||
| Division 03 Total: | $0.00 |
| Division 04 - Masonry | Labor | Material | ||||||
| # OF PERSONNEL | HOURLY RATE | # OF HOURS | TOTAL LABOR COST | QUANTITY | MATERIAL COST | TOTAL MATERIAL COST | ||
| 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | $0.00 | $0.00 | 0 | $0.00 | $0.00 | ||
| Total Labor Cost: | $0.00 | Total Material Cost: | $0.00 | |||||
| Division 04 Total: | $0.00 |
| Division 05 - Metals | Labor | Material | ||||||
| # OF PERSONNEL | HOURLY RATE | # OF HOURS | TOTAL LABOR COST | QUANTITY | MATERIAL COST | TOTAL MATERIAL COST | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| Total Labor Cost: | $0.00 | Total Material Cost: | $0.00 | |||||
| Division 05 Total: | $0.00 |
| Division 06 - Wood and Plastic | Labor | Material | ||||||
| # OF PERSONNEL | HOURLY RATE | # OF HOURS | TOTAL LABOR COST | QUANTITY | MATERIAL COST | TOTAL MATERIAL COST | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| Total Labor Cost: | $0.00 | Total Material Cost: | $0.00 | |||||
| Division 06 Total: | $0.00 |
| Division 07 - Therm /Moisture Prot. | Labor | Material | ||||||
| # OF PERSONNEL | HOURLY RATE | # OF HOURS | TOTAL LABOR COST | QUANTITY | MATERIAL COST | TOTAL MATERIAL COST | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| Total Labor Cost: | $0.00 | Total Material Cost: | $0.00 | |||||
| Division 07 Total: | $0.00 |
| Division 08 - Doors and Windows | Labor | Material | ||||||
| # OF PERSONNEL | HOURLY RATE | # OF HOURS | TOTAL LABOR COST | QUANTITY | MATERIAL COST | TOTAL MATERIAL COST | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| Total Labor Cost: | $0.00 | Total Material Cost: | $0.00 | |||||
| Division 08 Total: | $0.00 |
| Division 09 - Finishes | Labor | Material | ||||||
| # OF PERSONNEL | HOURLY RATE | # OF HOURS | TOTAL LABOR COST | QUANTITY | MATERIAL COST | TOTAL MATERIAL COST | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| Total Labor Cost: | $0.00 | Total Material Cost: | $0.00 | |||||
| Division 09 Total: | $0.00 |
| Division 10 - Specialties | Labor | Material | ||||||
| # OF PERSONNEL | HOURLY RATE | # OF HOURS | TOTAL LABOR COST | QUANTITY | MATERIAL COST | TOTAL MATERIAL COST | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| Total Labor Cost: | $0.00 | Total Material Cost: | $0.00 | |||||
| Division 10 Total: | $0.00 |
| Division 11 - Equipment | Labor | Material | ||||||
| # OF PERSONNEL | HOURLY RATE | # OF HOURS | TOTAL LABOR COST | QUANTITY | MATERIAL COST | TOTAL MATERIAL COST | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| Total Labor Cost: | $0.00 | Total Material Cost: | $0.00 | |||||
| Division 11 Total: | $0.00 |
| Division 12 - Furnishings | Labor | Material | ||||||
| # OF PERSONNEL | HOURLY RATE | # OF HOURS | TOTAL LABOR COST | QUANTITY | MATERIAL COST | TOTAL MATERIAL COST | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| Total Labor Cost: | $0.00 | Total Material Cost: | $0.00 | |||||
| Division 12 Total: | $0.00 |
| Division 13 - Special Construction | Labor | Material | ||||||
| # OF PERSONNEL | HOURLY RATE | # OF HOURS | TOTAL LABOR COST | QUANTITY | MATERIAL COST | TOTAL MATERIAL COST | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| Total Labor Cost: | $0.00 | Total Material Cost: | $0.00 | |||||
| Division 13 Total: | $0.00 |
| Division 14 - Conveying Equipment | Labor | Material | ||||||
| # OF PERSONNEL | HOURLY RATE | # OF HOURS | TOTAL LABOR COST | QUANTITY | MATERIAL COST | TOTAL MATERIAL COST | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| Total Labor Cost: | $0.00 | Total Material Cost: | $0.00 | |||||
| Division 14 Total: | $0.00 |
| Division 21 - Fire Suppression | Labor | Material | ||||||
| # OF PERSONNEL | HOURLY RATE | # OF HOURS | TOTAL LABOR COST | QUANTITY | MATERIAL COST | TOTAL MATERIAL COST | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| Total Labor Cost: | $0.00 | Total Material Cost: | $0.00 | |||||
| Division 21 Total: | $0.00 |
| Division 22 - Plumbing | Labor | Material | ||||||
| # OF PERSONNEL | HOURLY RATE | # OF HOURS | TOTAL LABOR COST | QUANTITY | MATERIAL COST | TOTAL MATERIAL COST | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| Total Labor Cost: | $0.00 | Total Material Cost: | $0.00 | |||||
| Division 22 Total: | $0.00 |
| Division 23 - HVAC | Labor | Material | ||||||
| # OF PERSONNEL | HOURLY RATE | # OF HOURS | TOTAL LABOR COST | QUANTITY | MATERIAL COST | TOTAL MATERIAL COST | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| Total Labor Cost: | $0.00 | Total Material Cost: | $0.00 | |||||
| Division 23 Total: | $0.00 |
| Division 25 - Integrated Automation | Labor | Material | ||||||
| # OF PERSONNEL | HOURLY RATE | # OF HOURS | TOTAL LABOR COST | QUANTITY | MATERIAL COST | TOTAL MATERIAL COST | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| Total Labor Cost: | $0.00 | Total Material Cost: | $0.00 | |||||
| Division 25 Total: | $0.00 |
| Division 26 - Electrical | Labor | Material | ||||||
| # OF PERSONNEL | HOURLY RATE | # OF HOURS | TOTAL LABOR COST | QUANTITY | MATERIAL COST | TOTAL MATERIAL COST | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| Total Labor Cost: | $0.00 | Total Material Cost: | $0.00 | |||||
| Division 26 Total: | $0.00 |
| Division 27 - Communications | Labor | Material | ||||||
| # OF PERSONNEL | HOURLY RATE | # OF HOURS | TOTAL LABOR COST | QUANTITY | MATERIAL COST | TOTAL MATERIAL COST | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| Total Labor Cost: | $0.00 | Total Material Cost: | $0.00 | |||||
| Division 27 Total: | $0.00 |
| Division 28 - Elect. Safety/Security | Labor | Material | ||||||
| # OF PERSONNEL | HOURLY RATE | # OF HOURS | TOTAL LABOR COST | QUANTITY | MATERIAL COST | TOTAL MATERIAL COST | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| Total Labor Cost: | $0.00 | Total Material Cost: | $0.00 | |||||
| Division 28 Total: | $0.00 |
| Division 31 - Earthwork | Labor | Material | ||||||
| # OF PERSONNEL | HOURLY RATE | # OF HOURS | TOTAL LABOR COST | QUANTITY | MATERIAL COST | TOTAL MATERIAL COST | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| Total Labor Cost: | $0.00 | Total Material Cost: | $0.00 | |||||
| Division 31 Total: | $0.00 |
| Division 32 - Exterior Improvements | Labor | Material | ||||||
| # OF PERSONNEL | HOURLY RATE | # OF HOURS | TOTAL LABOR COST | QUANTITY | MATERIAL COST | TOTAL MATERIAL COST | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| Total Labor Cost: | $0.00 | Total Material Cost: | $0.00 | |||||
| Division 32 Total: | $0.00 |
| Division 33 - Utilities | Labor | Material | ||||||
| # OF PERSONNEL | HOURLY RATE | # OF HOURS | TOTAL LABOR COST | QUANTITY | MATERIAL COST | TOTAL MATERIAL COST | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| Total Labor Cost: | $0.00 | Total Material Cost: | $0.00 | |||||
| Division 33 Total: | $0.00 |
| Division 34 - Transportation | Labor | Material | ||||||
| # OF PERSONNEL | HOURLY RATE | # OF HOURS | TOTAL LABOR COST | QUANTITY | MATERIAL COST | TOTAL MATERIAL COST | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| Total Labor Cost: | $0.00 | Total Material Cost: | $0.00 | |||||
| Division 34 Total: | $0.00 |
| Division 48 - Electrical Power Gen. | Labor | Material | ||||||
| # OF PERSONNEL | HOURLY RATE | # OF HOURS | TOTAL LABOR COST | QUANTITY | MATERIAL COST | TOTAL MATERIAL COST | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| 0 | $0.00 | 0 | $0.00 | 0 | $0.00 | $0.00 | ||
| Total Labor Cost: | $0.00 | Total Material Cost: | $0.00 | |||||
| Division 48 Total: | $0.00 |
Sheet2
Sheet3
File details come from the government source that posted it. Updated .