Attachment C - Price Breakdown.xlsx

XLSX spreadsheet 30 KB Posted

Attached to
Z1DZ--Project No. 640A0-27-104, Replace Roof at Building 347 - Menlo Park
Solicitation number
36C26127Q0082
Issued by

About this file

This is a Price Breakdown template for a construction project to replace the roof at Building 347 at the Palo Alto VA Medical Center in Menlo Park, California (Project #640A0-27-104). The template is structured according to the MasterFormat classification system and includes 24 construction divisions covering areas such as general requirements, existing conditions, concrete, masonry, metals, wood and plastic, thermal and moisture protection, doors and windows, finishes, specialties, equipment, furnishings, special construction, conveying equipment, fire suppression, plumbing, HVAC, integrated automation, electrical, communications, electrical safety and security, earthwork, exterior improvements, utilities, transportation, and electrical power generation.

The spreadsheet provides line-item detail for labor and material costs within each division, with columns for number of personnel, hourly rates, hours of work, total labor costs, material quantities, unit material costs, and total material costs. All divisions and line items currently display zero values, indicating this is a blank template awaiting contractor cost inputs. The template culminates in a summary section showing division totals, overhead, subtotal, profit, insurance and taxes, bonding costs, and a grand total. Contractors responding to Solicitation No. 36C26127Q0082 must complete this pricing template with their actual labor rates, material costs, and associated expenses to submit their proposal by the November 19, 2026 deadline.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

Project Title: Replace Roof at Building 347 - Menlo Park
Project #: 640A0-27-104
Division Total:$0.00
Overhead:$0.00
Subtotal:$0.00
Profit:$0.00
Subtotal:$0.00
Insurance & Taxes:$0.00
Subtotal:$0.00
Bonding:$0.00
Grand Total:$0.00
Division Totals
Division 01 - General Requirements$0.00
Division 02 - Existing Conditions$0.00
Division 03 - Concrete$0.00
Division 04 - Masonry$0.00
Division 05 - Metals$0.00
Division 06 - Wood and Plastic$0.00
Division 07 - Therm/Moisture Prot.$0.00
Division 08 - Doors and Windows$0.00
Division 09 - Finishes$0.00
Division 10 - Specialties$0.00
Division 11 - Equipment$0.00
Division 12 - Furnishings$0.00
Division 13 - Special Construction$0.00
Division 14 - Conveying Equipment$0.00
Division 21 - Fire Suppression$0.00
Division 22 - Plumbing$0.00
Division 23 - HVAC$0.00
Division 25 - Integrated Automation$0.00
Division 26 - Electrical$0.00
Division 27 - Communications$0.00
Division 28 - Elect. Safety/Security$0.00
Division 31 - Earthwork$0.00
Division 32 - Exterior Improvements$0.00
Division 33 - Utilities$0.00
Division 34 - Transportation$0.00
Division 48 - Electrical Power Gen.$0.00
Division 01 - General RequirementsLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 01 Total:$0.00
Division 02 - Existing ConditionsLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 02 Total:$0.00
Division 03 - ConcreteLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 03 Total:$0.00
Division 04 - MasonryLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.00$0.00$0.000$0.00$0.00
0$0.00$0.00$0.000$0.00$0.00
0$0.00$0.00$0.000$0.00$0.00
0$0.00$0.00$0.000$0.00$0.00
0$0.00$0.00$0.000$0.00$0.00
0$0.00$0.00$0.000$0.00$0.00
0$0.00$0.00$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 04 Total:$0.00
Division 05 - MetalsLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 05 Total:$0.00
Division 06 - Wood and PlasticLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 06 Total:$0.00
Division 07 - Therm /Moisture Prot.LaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 07 Total:$0.00
Division 08 - Doors and WindowsLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 08 Total:$0.00
Division 09 - FinishesLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 09 Total:$0.00
Division 10 - SpecialtiesLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 10 Total:$0.00
Division 11 - EquipmentLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 11 Total:$0.00
Division 12 - FurnishingsLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 12 Total:$0.00
Division 13 - Special ConstructionLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 13 Total:$0.00
Division 14 - Conveying EquipmentLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 14 Total:$0.00
Division 21 - Fire SuppressionLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 21 Total:$0.00
Division 22 - PlumbingLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 22 Total:$0.00
Division 23 - HVACLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 23 Total:$0.00
Division 25 - Integrated AutomationLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 25 Total:$0.00
Division 26 - ElectricalLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 26 Total:$0.00
Division 27 - CommunicationsLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 27 Total:$0.00
Division 28 - Elect. Safety/SecurityLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 28 Total:$0.00
Division 31 - EarthworkLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 31 Total:$0.00
Division 32 - Exterior ImprovementsLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 32 Total:$0.00
Division 33 - UtilitiesLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 33 Total:$0.00
Division 34 - TransportationLaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 34 Total:$0.00
Division 48 - Electrical Power Gen.LaborMaterial
# OF PERSONNELHOURLY RATE# OF HOURSTOTAL LABOR COSTQUANTITYMATERIAL COSTTOTAL MATERIAL COST
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
0$0.000$0.000$0.00$0.00
Total Labor Cost:$0.00Total Material Cost:$0.00
Division 48 Total:$0.00

Sheet2

Sheet3

File details come from the government source that posted it. Updated .