This document is a comprehensive set of construction plans for water system improvements at the Kansas Department of Wildlife and Parks (KDWP) Operations Headquarters in Pratt, Kansas, prepared by civil engineers, land surveyors, and landscape architects. The project encompasses 19 base bid items including mobilization and demobilization, demolition and removal of existing infrastructure, earthwork and grading, construction of a 112 linear feet concrete retaining wall, extension of the existing public water supply well with new wellhead installation, construction of 596 square feet of ADA-compliant concrete sidewalk, installation of 1 to 3 inch HDPE water service lines (totaling approximately 310 linear feet across multiple sizes), gate valve settings, water utility connections to existing buildings and infrastructure, interior domestic water and electrical piping within a new chlorination building, exterior electrical improvements, installation of a 75 linear foot CMP culvert, and floor drain with French drain system (45 linear feet). Three bid alternates address the chlorination building structure options (pre-cast concrete or fiberglass), well pump removal and replacement, and related MEP (mechanical, electrical, plumbing) work. The project delivery deadline is June 30, 2027, with bids due November 5, 2026 at 2:00 p.m., and an optional pre-bid meeting scheduled for October 28, 2026 at 10:00 a.m. via Microsoft Teams.

The project requires contractors to furnish all labor, equipment, materials, and tools necessary to complete work in accordance with construction drawings and project specifications. Approximately 800 cubic yards of fill material must be obtained from off-site approved locations, and seeding and erosion control measures must be implemented throughout construction. The contractor is responsible for construction staking, utility coordination through the Kansas One-Call System, and adherence to Americans with Disabilities Act requirements for accessible facilities. A bid guaranty of 5 percent of the total bid amount and a Performance Bond equal to 100 percent of the contract amount are required, along with a Public Works Bond unless the contract price is below $100,000. All bidders must submit a current Tax Clearance Certificate from the Kansas Department of Revenue, certification regarding immigration reform and control, and other required documentation within 15 calendar days after award notification. Written questions are due November 3, 2026, and bids will be publicly read via teleconference at 2:30 p.m. on the closing date. Responses must be submitted electronically to Procurement@ks.gov or hand-delivered to the Kansas Department of Administration office in Topeka.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

C

IV

IL

E

N G

IN

EE

R S

| L

AN

D S

U R

VE

YO

R S

| L

AN

D

SC

AP

E

AR

C

H

IT

EC

TS

L

ED

G E

ST

O

N E

D R

IV

E, S U

IT

E

| M

AN

H

AT

TA

N

, K

AN

SA

S

| P . 7

.5

.4

W A

TE

R

S Y

S

TE

M

IM

P R

O V

E M

E N

TS

K D

W P

O P

E R

A

TI

O N

S H

E A

D Q

U A

R

TE

R S

P

R A

TT

, K

A N

S A

S K an sa s D ep ar tm en t o f W ild lif e an d P ar ks

O pe ra tio ns H ea dq ua rt er s

S E

5t h A ve nu e P ra tt, K an sa s

G1.0 Title Sheet

WATER SYSTEM IMPROVEMENTS

PRATT, KANSAS

PROJECT LOCATION MAP

February 2026

KDWP OPERATIONS HEADQUARTERS

PRATT COUNTY

PROJECT LOCATION

KDWP Operations Headquarters

Pratt Hatchery

City of Pratt

SE 10th St

S E

5t h A ve

PROJECT MANAGERS:

Brett Blackburn, Chief Engineer Kansas Dept. of Wildlife and Parks Engineering Services 1020 S. Kansas Ave, Room 200 Topeka, KS 66612

Office: (785) 296-8404

Melanie Levering, Project Manager Kansas Dept. of Wildlife and Parks Engineering Services 512 SE 25th Ave Pratt, KS 67124

Office: (785) 620-0716

FACILITY MANAGER:

Norman Bennett, Facilities Maintenance Supervisor Kansas Dept. of Wildlife and Parks 512 SE 25th Ave Pratt, KS 67124

Office: (620) 672-0732

SHEET INDEX:

US Route 400/Hwy 54

OWNER CONTACT INFORMATION:

SHEET INDEX

SHEET NO. SHEET TITLE

General Drawings

G1.0 Title Sheet G1.1 General Notes

Civil Drawings

C1.0 Existing Conditions & Demo Plan

C2.0 Site & Utilities Imp. Plan

C2.1 Grading & Staking Plan

C2.2 Utilities Staking Plan

C3.0 Chlorination Building Details

C3.1 Misc. Site Details C3.2 Retaining Wall Details

C3.3 Misc. Water Details MEP Drawings

ME1 Site Plan - Electical ME2 Basement Floor Plan ME3 New Work Plan - MEP Plan

AutoCAD SHX Text 24.1.0274

AutoCAD SHX Text February 2026

AutoCAD SHX Text

TS

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

PROJECT NO

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

JB

Survey Control Points

Point Northing Easting Elevation Description

Staking Points

Point Northing Easting Elevation Description

C

IV

IL

E

N G

IN

EE

R S

| L

AN

D S

U R

VE

YO

R S

| L

AN

D

SC

AP

E

AR

C

H

IT

EC

TS

L

ED

G E

ST

O

N E

D R

IV

E, S U

IT

E

| M

AN

H

AT

TA

N

, K

AN

SA

S

| P . 7

.5

.4

W A

TE

R

S Y

S

TE

M

IM

P R

O V

E M

E N

TS

K D

W P

O P

E R

A

TI

O N

S H

E A

D Q

U A

R

TE

R S

P

R A

TT

, K

A N

S A

S K an sa s D ep ar tm en t o f W ild lif e an d P ar ks

O pe ra tio ns H ea dq ua rt er s

S E

5t h A ve nu e P ra tt, K an sa s

G1.1 General Notes

SITE LEGEND:

Bar Found

Bar Set

Benchmark

Control Point

Cable TV Pedestal Deadman Anchor

Fire Hydrant

Flagpole

Gas Marker Gas Meter Gas Valve

Power Pole Electric Pedestal Electric MH

Round Inlet Square Inlet

Light Pole

Light Pole w/ Base

Mail Box

Power Pole w/ Transformer

San. Sewer MH

Section Corner Found

Section Corner Set

Sign

Telephone Marker

Telephone MH

Telephone Pedestal Telephone Pole Transformer

Well

Hydrant Water Meter

Water Valve

Sanitary Sewer Line Water Line Gas Line Telephone Cable Storm Sewer Line Fiber Optic Line

Chain Link Fence Underground Electric LIne

Tree

Barbed Wire Fence

Overhead Electric Line

Section Line Property Line Proposed Ground (5' Contour) Proposed Ground (1' Contour) Existing Ground (5' Contour) Existing Ground (1' Contour)

1. These notes, and other drawing notes contained herein, are provided to meet specific requirements and supplement the project specifications. These notes neither replace nor override the provisions and requirements of the project specifications.

2. All work shall be performed in accordance with local, state, and federal regulations.

3. The Owner shall be responsible for obtaining all construction permits required to perform the work.

4. The Contractor shall coordinate work with the Owner to not disrupt the Owner's daily operations.

Once the work has been started, the Contractor shall complete the work without any interruptions.

Construction activities are limited to the immediate work sites. A staging and storage area will be available for the Contractor's use on site.

5. The location, size, and depth of existing, buried utilities are illustrated based on available records from the Owner. Record locations shall be verified based on observable surface features such as manholes, valve boxes, evidence of trenches, field markings, etc. wherever possible. Excavations have not been made to verify locations or depth of buried utilities. The exact location and elevation of existing utilities must be determined by the Contractor. It shall be the duty of the Contractor to ascertain whether any additional facilities other than those shown on the plan may be present. The Contractor shall contact "Kansas One Call System, Inc." (1-800-344-7233) a minimum of two full working days prior to the start of construction for notification of utility owners and field location of all utilities. The Contractor shall verify the elevation of possible conflicting utilities prior to construction.

Overhead utilities and underground services generally are not shown.

6. The Contractor shall furnish all labor, equipment, materials, and tools necessary to completely perform the work in a safe, expeditious, and workmanlike manner. All work shall be done to the lines, slopes, and grades indicated on the Construction Drawings. The Contractor shall visit the site and familiarize himself/herself withe the existing conditions before submitting his/her bid.

7. If certain features are not fully shown or called for on the construction drawings or project specifications, their construction shall be of the same character as for similar conditions that are shown or called for, subject to the approval of the Engineer. Where sections vary, the Contractor shall provide smooth transitions between them, unless noted otherwise.

8. The Contractor shall install equipment and materials per the Manufacturer's recommendations unless noted otherwise. The Contractor accepts full responsibility for the proper handling and installation of equipment and materials.

9. All shop drawings provided shall be submitted to the Engineer for review prior to the fabrication of material or the purchase of non-returnable stock. Dimensional review is the Contractor's responsibility.

10. All materials are subject to the approval of the engineer.

11. The Contractor is responsible for the transportation, unloading, storage, and management of all equipment and materials unless noted otherwise. The Contractor shall coordinate onsite storage with the Owner. The Contractor shall be responsible for the proper safeguarding of materials and equipment stored on the site to prevent theft, vandalism, or damage.

12. Trees and shrubs within the construction limits shall be cleared and grubbed. The Contractor is responsible for the removal, management, storage, loading, transportation, and disposal of all demolished equipment and material unless noted otherwise.

13. Unless noted otherwise, existing utilities are to remain and shall be protected by the Contractor during construction. The Contractor shall exercise care to avoid damaging existing utilities during grading and construction activities. Existing facilities (utilities, pavements, etc.) damaged by the contractor shall be repaired or replaced by the Contractor at no additional expense to the Owner. The Contractor shall restore all disturbed areas to a condition equal to or better than pre-construction conditions.

14. All open excavations shall be protected with safety fence.

15. Positive drainage on the site is required throughout the project duration. The Contractor is responsible for the installation and removal of all sediment control practices required as a result of project activities. Such practice shall be in accordance with applicable federal and state regulations governing stormwater runoff from construction activities.

16. Traffic control devices must conform to the latest edition of the Manual on Uniform Traffic Control Devices (MUTCD) and standards established by the Kansas Department of Transportation (KDOT).

17. The Contractor is responsible for the protection and maintenance of all permanent survey monuments and property irons in the project vicinity. If monuments are disturbed by planned construction, the Contractor shall retain a Kansas-Licensed land surveyor to re-establish the monuments and irons at the Contractor's expense. Such monuments and irons shall be reestablished by a licensed sand surveyor in accordance with state laws.

18. Construction staking shall be the responsibility of the Contractor.

19. Seeding of disturbed areas shall be completed by the Contractor.

1. The means of the work and the safety of the Contractor's employees are solely the responsibility of the Contractor. The Contractor has a contractual obligation to comply with all applicable laws and regulations including those of OSHA. At no time will either the Owner or the Owner's representative take responsibility for either the means of the work or the safety of the Contractor's employees.

2. The Contractor is responsible for utilizing the appropriate level of PPE for the type of work being performed and the site conditions present at the time.

GENERAL NOTES:

HEALTH AND SAFETY:

SURVEY CONTROL POINTS:

CONSTRUCTION STAKING POINTS:

AutoCAD SHX Text 24.1.0274

AutoCAD SHX Text February 2026

AutoCAD SHX Text

TS

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

PROJECT NO

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

JB

AutoCAD SHX Text

CP 7A

AutoCAD SHX Text C

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text Gas

AutoCAD SHX Text Marker

AutoCAD SHX Text G

AutoCAD SHX Text w/ Base

AutoCAD SHX Text

MB

AutoCAD SHX Text w/ Trans.

AutoCAD SHX Text Tele

AutoCAD SHX Text Marker

AutoCAD SHX Text T

AutoCAD SHX Text T

AutoCAD SHX Text Trans.

AutoCAD SHX Text W

AutoCAD SHX Text Hyd.

AutoCAD SHX Text W

AutoCAD SHX Text 80"

AutoCAD SHX Text S

AutoCAD SHX Text W

AutoCAD SHX Text G

AutoCAD SHX Text T

AutoCAD SHX Text

ST

F.O.

IL

E

N G

IN

EE

R S

| L

AN

D S

U R

VE

YO

R S

| L

AN

D

SC

AP

E

AR

C

H

IT

EC

TS

L

ED

G E

ST

O

N E

D R

IV

E, S U

IT

E

| M

AN

H

AT

TA

N

, K

AN

SA

S

| P . 7

.5

.4

W A

TE

R

S Y

S

TE

M

IM

P R

O V

E M

E N

TS

K D

W P

O P

E R

A

TI

O N

S H

E A

D Q

U A

R

TE

R S

P

R A

TT

, K

A N

S A

S K an sa s D ep ar tm en t o f W ild lif e an d P ar ks

O pe ra tio ns H ea dq ua rt er s

S E

5t h A ve nu e P ra tt, K an sa s

C1.0 Existing Conditions

& Demo Plan

GENERAL NOTES:

1. The existing site information shown hereon is based on a topographic survey performed by Schwab Eaton, February 5, 2025.

2. The Contractor shall field verify the actual locations, bury depths and sizes of all existing utilities prior to commencing construction activities. He shall contact the Kansas One-Call system a minimum of two full business days prior to Work to request marking of utilities by the respective utility owners. He shall directly contact all utility owners not subscribing to the One-Call system.

3. Install and maintain initial erosion control BMPs along the drives and other areas as shown on the Erosion Control Plan prior to commencing any significant land disturbance operations. Mud and debris dropped or tracked along the roadway shall be cleaned up, keeping the public ways clear. Other BMPs shall be installed as construction progresses as part of the Erosion Control Plan.

4. Keep existing roadways open to the public. Maintain or make alternate provisions for pedestrian traffic in a manner acceptable to the Owner. Stage, coordinate and schedule demolition activities in a manner that minimizes disruption of vehicular and pedestrian traffic. Provide, install and maintain temporary fences, barricades, warning devices and other appropriate measures to protect the public.

DEMOLITION SCHEDULE:

1. Remove existing tree as necessary to facilitate construction (typ).

2. Decommission and remove existing 750-gallon underground pressure tank.

3. Decommission and remove existing valve and valve riser/vault (typ).

4. Decommission and abandon existing water line in-place (typ). Cut and cap existing water line as necessary.

5. Remove existing wellhead enclosure/structure, wellhead, pitless unit, and associated appurtenances as necessary to accommodate construction. See MEP plans for the removal/relocation of existing electrical infrastructure.

6. Remove existing concrete curb and asphalt/concrete pavement to the extents shown.

7. Relocate the existing gas line as necessary as necessary to facilitate construction (By Owner/Gas Company).

8. Decommission and abandon existing buried electric line (See MEP Plans).

9. Decommission and remove existing chlorination equipment (chemical dosing pump, chemical storage tank, piping/tubing, etc.)

following the installation of the new chlorination system (By Owner).

DEMOLITION NOTES:

1. Disconnect/remove and cap designated utilities within demolition areas.

2. Sawcut all limits of pavement demolition Work to clean, neat lines. Where practical, sawcut along nearest appropriate pavement joint or remove 1/2 panel.

3. Backfill and compact depressions, open pits and holes caused as a result of demolition. Backfill shall be placed and compacted in accordance with the project specifications.

ENLARGED VIEW - WELL #1

(Scale: 1"=5')

3.

2.

See Enlarged View - Well #1 (This Sheet)

3.

4.

4.

4.

4.

5.

6.

3.

1.

4.

4.

4.

7.

8.

EX. WELLHEAD ENCLOSURE

EXISTING WELLHEAD

Existing Ground (1' and 5' Contours) (Typ)

Existing Building (KDWP Headquarters)

Existing Building

(KDWP

Engineering)

Existing Building

(KDWP

Maintenance)

1.

3.

3.

5.

5.

3.

3.

3.

ENLARGED VIEW - IRRIG. VAULT

(Scale: 1"=5')

See Enlarged View - Irrig. Vault (This Sheet)

4.

4.

Cut & Cap

1.

Existing Gas Line (typ)

Existing Fiber Optic Line (typ)

Existing San. Sewer (typ)

Existing Water Line (to be abandoned) (typ)

Existing Tree (typ)

8.

7.

9.

EX. CHLORINATION EQUIP.

9.

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text E

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

YH

AutoCAD SHX Text Press

AutoCAD SHX Text Tank

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc

AutoCAD SHX Text House

AutoCAD SHX Text Shed

AutoCAD SHX Text Shop

AutoCAD SHX Text Porch

AutoCAD SHX Text Deck

AutoCAD SHX Text Conc

AutoCAD SHX Text Office

AutoCAD SHX Text Shop

AutoCAD SHX Text Gravel

AutoCAD SHX Text Gravel

AutoCAD SHX Text Gravel

AutoCAD SHX Text Trees

AutoCAD SHX Text Landscape

AutoCAD SHX Text Landscape

AutoCAD SHX Text Landscape

AutoCAD SHX Text Conc Landing

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc

AutoCAD SHX Text Shed

AutoCAD SHX Text W

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc

AutoCAD SHX Text Gravel

AutoCAD SHX Text Trees

AutoCAD SHX Text Trees

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc

AutoCAD SHX Text Asphalt

AutoCAD SHX Text Asphalt

AutoCAD SHX Text Asphalt

AutoCAD SHX Text Asphalt

AutoCAD SHX Text Asphalt

AutoCAD SHX Text V

AutoCAD SHX Text W

AutoCAD SHX Text V

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text Press

AutoCAD SHX Text Tank

AutoCAD SHX Text W

AutoCAD SHX Text Conc

AutoCAD SHX Text

YH

AutoCAD SHX Text V

AutoCAD SHX Text W

AutoCAD SHX Text 24.1.0274

AutoCAD SHX Text February 2026

AutoCAD SHX Text

TS

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

PROJECT NO

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

JB

AutoCAD SHX Text 20'

AutoCAD SHX Text

AutoCAD SHX Text 20'

AutoCAD SHX Text Existing Well Reference Point Elev.=1816.47'

AutoCAD SHX Text 24'±

15'±

IL

E

N G

IN

EE

R S

| L

AN

D S

U R

VE

YO

R S

| L

AN

D

SC

AP

E

AR

C

H

IT

EC

TS

L

ED

G E

ST

O

N E

D R

IV

E, S U

IT

E

| M

AN

H

AT

TA

N

, K

AN

SA

S

| P . 7

.5

.4

W A

TE

R

S Y

S

TE

M

IM

P R

O V

E M

E N

TS

K D

W P

O P

E R

A

TI

O N

S H

E A

D Q

U A

R

TE

R S

P

R A

TT

, K

A N

S A

S K an sa s D ep ar tm en t o f W ild lif e an d P ar ks

O pe ra tio ns H ea dq ua rt er s

S E

5t h A ve nu e P ra tt, K an sa s

C2.0 Site & Utilities

Imp. Plan

IMPROVEMENTS SCHEDULE:

1. Construct cast-in-place concrete retaining wall and earthen backfill. See Sheet C2.1 and

Details, Sheet C3.2.

2. Extend the existing public water supply well (casing, drop pipe, etc.) and install new wellhead (with well seal, vent, etc.) and aboveground discharge (to be housed in the new pre-cast concrete chlorination building). See Sheet C2.1 and Details, Sheet C3.0.

See MEP plans for electrical improvements.

3. Remove and replace the existing public water supply well pump (Bid Alternate 1).

4. Install chlorination building (pre-cast concrete or fiberglass), internal piping, pressure tanks, chlorine disinfection equipment, floor drain, and related appurtenances.

See Sheet C2.1 and Details, Sheet C3.0. See MEP plans for electrical improvements.

5. Construct 6" reinforced concrete sidewalk. See Sheet C2.1 and Details, Sheet C3.1.

6. Install 3" water service line. See Sheet C2.2 and Details, Sheet C3.3. Note: Installation under paved and landscaped areas shall be performed via directional drilling.

7. Install 2" water service line. See Sheet C2.2 and Details, Sheet C3.3. Note: Installation under paved and landscaped areas shall be performed via directional drilling.

8. Install 1" water service line to existing yard hydrant/irrigation infrastructure. See Sheet C2.2 and Details, Sheet C3.3.

9. Install 2" MJ gate valve. See Sheet C2.2 and Details, Sheet C3.3.

10. Install 3" MJ gate valve. See Sheet C2.2 and Details, Sheet C3.3.

11. Connect new water service line to existing water service/infrastructure. Note: Contractor to field locate existing services and make the connections to buildings within five (5) feet of building foundation. See Sheet C2.2. Verify proper backflow prevention downstream of connection and install as necessary.

12. Install 12" CMP culvert. See Sheet C2.1.

13. Install electrical service line and associated infrastructure. See MEP Plans.

GENERAL NOTES:

1. The existing site information shown hereon is based on a topographic survey performed by Schwab Eaton, February 5, 2025.

2. Portions of the Work (A.D.A. parking area and sidewalk work) will be subject to meeting the intent and requirements of the Americans with Disabilities Act (A.D.A.) and any field modifications shall be performed in a manner that does not compromise accessibility requirements.

3. Construction activities shall be coordinated to make every reasonable effort to avoid disrupting safe public access into existing facilities surrounding the work area.

Coordinate site access, mobilization, equipment storage, and project scheduling with KDWP personnel.

4. The Contractor shall field verify the actual locations, bury depths, and sizes of all existing utilities prior to commencing construction activities. He shall contact the Kansas One-Call system a minimum of two full business days prior to Work to request marking of utilities by the respective utility owners. He shall directly contact all utility owners not subscribing to the One-Call system.The Contractor is responsible for any damage to existing structures and facilities.

5. Install and maintain initial erosion control BMPs prior to commencing any significant land disturbance activities. Mud and debris dropped or tracked along the roadway shall be cleaned up, keeping the public ways clear. Disturbed areas shall be restored to pre-construction conditions (as applicable). All areas with unimproved surfacing (gravel, concrete, or asphalt) shall be seeded. Seeding and mulching operations shall be in accordance with the Project Specifications.

6. Keep existing roadways open to the public. Maintain or make alternate provision for pedestrian traffic in a manner acceptable to KDWP. Stage, coordinate, and schedule construction activities in a manner than minimizes disruption of vehicular and pedestrian traffic.

7. Provide, install, and maintain temporary fences, barricades, warning devices, and other appropriate measures to protect the public.Traffic control devices must conform to the latest edition of the Manual on Uniform Traffic Control Devices (MUTCD) and Standards established by the Kansas Department of Transportation.

8. Utilities, including electrical and communication services, shall be installed underground, unless otherwise noted.

9. Water and sewer utility lines shall maintain minimum 10' horizontal separation and 2' vertical separation in accordance with KDHE standards. If 2' vertical separation cannot be maintained at a crossing location, pipe segments shall be centered at the crossing and concrete encased.

10. Coordinate with KDWP regarding the time of the removal or relocation of old utility service lines and installation/relocation of new lines. Minimize the time of disturbance to existing utilities.

11. See Layout and Grading Plans for general dimensions and survey coordinates locating major site improvements.

12. See Sheet G1.1 for additional project information.

Approximate Grading Extents

Existing Building (KDWP Headquarters)

Existing Building

(KDWP

Engineering)

1.

2/3.

4.

5.

6.

6.

7.

7.

7.

8.

7.

10.9.

11.

11.

11.

11.

12.

11.

9.

Existing Gas Line (typ)

Existing Fiber Optic Line (typ)

Existing San. Sewer (typ)

Proposed Water Line (typ)

Existing Tree (typ)

13.

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text E

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

YH

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc

AutoCAD SHX Text House

AutoCAD SHX Text Shed

AutoCAD SHX Text Shop

AutoCAD SHX Text Porch

AutoCAD SHX Text Deck

AutoCAD SHX Text Conc

AutoCAD SHX Text Office

AutoCAD SHX Text Trees

AutoCAD SHX Text Landscape

AutoCAD SHX Text Landscape

AutoCAD SHX Text Conc

AutoCAD SHX Text W

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc

AutoCAD SHX Text Asphalt

AutoCAD SHX Text Asphalt

AutoCAD SHX Text Asphalt

AutoCAD SHX Text V

AutoCAD SHX Text W

AutoCAD SHX Text V

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text V

AutoCAD SHX Text W

AutoCAD SHX Text V

AutoCAD SHX Text W

AutoCAD SHX Text 24.1.0274

AutoCAD SHX Text February 2026

AutoCAD SHX Text

TS

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

PROJECT NO

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

JB

AutoCAD SHX Text 10'

AutoCAD SHX Text

10'

L1

L2

11+12

10+00 10+

10+

10+

10+

10+50

10+60

10+70

10+80

10+90

11+00

11+10

9+90 10+00 10+10 10+20 10+30 10+40 10+50 10+60 10+70 10+80 10+90 11+00 11+10 11+20

Retaining Wall Alignment Data

Line Number

Length

(ft) Bearing Start

Station End

Station Start Coordinate End Coordinate

C

IV

IL

E

N G

IN

EE

R S

| L

AN

D S

U R

VE

YO

R S

| L

AN

D

SC

AP

E

AR

C

H

IT

EC

TS

L

ED

G E

ST

O

N E

D R

IV

E, S U

IT

E

| M

AN

H

AT

TA

N

, K

AN

SA

S

| P . 7

.5

.4

W A

TE

R

S Y

S

TE

M

IM

P R

O V

E M

E N

TS

K D

W P

O P

E R

A

TI

O N

S H

E A

D Q

U A

R

TE

R S

P

R A

TT

, K

A N

S A

S K an sa s D ep ar tm en t o f W ild lif e an d P ar ks

O pe ra tio ns H ea dq ua rt er s

S E

5t h A ve nu e P ra tt, K an sa s

C2.1 Grading & Staking

Plan

GENERAL NOTES:

1. The existing site information shown hereon is based on a topographic survey performed by Schwab Eaton, February 5, 2025.

2. The Contractor shall field verify the actual locations, bury depths and sizes of all existing utilities prior to commencing construction activities.

He shall contact the Kansas One-Call system a minimum of two full business days prior to Work to request marking of utilities by the respective utility owners. He shall directly contact all utility owners not subscribing to the One-Call system.

3. The Contractor shall adjust all valve boxes, water meter covers, manhole lids, etc. as required to match finish grades in a clean, neat manner.

GRADING NOTES:

1. Protect existing slopes and vegetation from unnecessary disturbance, erosion and pollution discharges throughout construction.

2. Gradients and cross-slopes of all ramps and pedestrian pavements shall conform with requirements of the Americans with Disabilities Act. Do not exceed 1/4 inch per foot cross-slope.

Do not exceed 5.0% longitudinal slope on all pedestrian pavements with the exception of ramps. Do not exceed 8.33% longitudinal slope on all ramps.

3. The proposed grades shown depict the finished grade (top of asphalt/concrete pavement) of the proposed improvements. A summary of the estimated earthwork is as follows:

Earthwork Required to Reach Finished Grade Elevations:

Cut = 0± CY Fill = 800± CY (RAW)

*Note: All fill shall be obtained from offsite locations approved by the Engineer.

4. The Contractor shall excavate, haul, and stockpile (as necessary) suitable fill materials for installation in the new construction.

5. The Contractor shall take into account rock excavation, soil shrinkage, swelling, topsoil segregation, and general grading operations in the final earthwork considerations.

6. Excess excavation shall be wasted or stockpiled onsite, in a manner acceptable to the Owner.

7. See Sheet G1.1 for construction staking points.

Existing Ground (1' and 5' Contours) (Typ)

Proposed Ground (1' and 5' Contours) (Typ)

Approximate Grading Extents

Proposed Water Service Line (Typ) Proposed Concrete

Retaining Wall

Proposed Concrete Retaining Wall Footing Extents

Proposed Concrete Sidewalk

Existing Well #1

Proposed Chlorination Building (FFE = 1821.5')

Proposed CMP Culvert

Proposed Floor Drain Piping & French Drain

1815'

Existing Building (KDWP Headquarters)

1816'

1817'

1818'

1819'

1819'

1820'

1818'

1817'

1816'

1821'

Existing Ground (typ)

Top of Retaining Wall (typ)

Proposed Ground at Top of Retaining Wall (typ)

Proposed Ground at Bottom of Retaining Wall (typ)

Top of Retaining Wall Elev. (typ)

Existing Ground Elev. (typ)

Existing Gas Line (typ)

Existing Fiber Optic Line (typ)

Existing San. Sewer (typ)

Existing Tree (typ)

Proposed Electrical (typ)

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text E

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

YH

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text House

AutoCAD SHX Text Shed

AutoCAD SHX Text Porch

AutoCAD SHX Text Conc

AutoCAD SHX Text Landscape

AutoCAD SHX Text Landscape

AutoCAD SHX Text Conc

AutoCAD SHX Text W

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc

AutoCAD SHX Text Asphalt

AutoCAD SHX Text Asphalt

AutoCAD SHX Text V

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text V

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text V

AutoCAD SHX Text W

AutoCAD SHX Text V

AutoCAD SHX Text W

AutoCAD SHX Text 24.1.0274

AutoCAD SHX Text February 2026

AutoCAD SHX Text

TS

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

PROJECT NO

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

JB

AutoCAD SHX Text 10'

AutoCAD SHX Text

10'

IL

E

N G

IN

EE

R S

| L

AN

D S

U R

VE

YO

R S

| L

AN

D

SC

AP

E

AR

C

H

IT

EC

TS

L

ED

G E

ST

O

N E

D R

IV

E, S U

IT

E

| M

AN

H

AT

TA

N

, K

AN

SA

S

| P . 7

.5

.4

W A

TE

R

S Y

S

TE

M

IM

P R

O V

E M

E N

TS

K D

W P

O P

E R

A

TI

O N

S H

E A

D Q

U A

R

TE

R S

P

R A

TT

, K

A N

S A

S K an sa s D ep ar tm en t o f W ild lif e an d P ar ks

O pe ra tio ns H ea dq ua rt er s

S E

5t h A ve nu e P ra tt, K an sa s

C2.2 Utilities Staking

Plan

Existing Ground (1' and 5' Contours) (Typ)

Approximate Grading Extents

Proposed Concrete Retaining Wall

Proposed Concrete Sidewalk

Existing Well #1

Proposed Chlorination Building

Proposed CMP Culvert

Proposed Floor Drain Piping & French Drain

Existing Building (KDWP Headquarters)

Existing Building

(KDWP

Engineering)

Existing Building

(KDWP

Maintenance)

GENERAL NOTES:

1. The existing site information shown hereon is based on a topographic survey performed by Schwab Eaton, February 5, 2025.

2. The Contractor shall field verify the actual locations, bury depths and sizes of all existing utilities prior to commencing construction activities. He shall contact the Kansas One-Call system a minimum of two full business days prior to Work to request marking of utilities by the respective utility owners. He shall directly contact all utility owners not subscribing to the One-Call system.

3. Utilities, including electrical and communication services, shall be installed underground, unless otherwise noted.

4. Water and sewer utility lines shall maintain minimum 10' horizontal separation and 2' vertical separation in accordance with KDHE standards. If 2' vertical separation cannot be maintained at a crossing location, pipe segments shall be centered at the crossing and concrete encased.

5. Coordinate with KDWP regarding the time of the removal or relocation of old utility service lines and installation/relocation of new lines. Minimize the time of disturbance to existing utilities.

6. See Sheet G1.1 for construction staking points.

Install 130± L.F. 2" HDPE DR 9 Water Line

Install 15± L.F. 2" HDPE DR 9 Water Line

Existing Gas Line (typ)

Existing Fiber Optic Line (typ)

Existing San. Sewer (typ)

Existing Tree (typ)

Proposed Electrical (typ)

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text E

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text

AC

AutoCAD SHX Text

AC

AutoCAD SHX Text

YH

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc Walk

AutoCAD SHX Text House

AutoCAD SHX Text Shed

AutoCAD SHX Text Shop

AutoCAD SHX Text Porch

AutoCAD SHX Text Deck

AutoCAD SHX Text Conc

AutoCAD SHX Text Shop

AutoCAD SHX Text Gravel

AutoCAD SHX Text Trees

AutoCAD SHX Text Landscape

AutoCAD SHX Text Landscape

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc

AutoCAD SHX Text W

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc

AutoCAD SHX Text Conc

AutoCAD SHX Text Asphalt

AutoCAD SHX Text Asphalt

AutoCAD SHX Text Asphalt

AutoCAD SHX Text V

AutoCAD SHX Text W

AutoCAD SHX Text E

AutoCAD SHX Text E

AutoCAD SHX Text V

AutoCAD SHX Text W

AutoCAD SHX Text W

AutoCAD SHX Text V

AutoCAD SHX Text W

AutoCAD SHX Text V

AutoCAD SHX Text W

AutoCAD SHX Text 24.1.0274

AutoCAD SHX Text February 2026

AutoCAD SHX Text

TS

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

PROJECT NO

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

JB

AutoCAD SHX Text 10'

AutoCAD SHX Text

AutoCAD SHX Text 10'

AutoCAD SHX Text Install 80± L.F. of 3" HDPE DR 9 Water Line

AutoCAD SHX Text Install 25± L.F. of 1" HDPE DR 9 Water Line

AutoCAD SHX Text Install 45± L.F. of 3" HDPE DR 9 Water Line

Install 15± L.F. of 2" HDPE DR 9 Water Line

A A

B

B

10' Min. Horizontal Separation

C

IV

IL

E

N G

IN

EE

R S

| L

AN

D S

U R

VE

YO

R S

| L

AN

D

SC

AP

E

AR

C

H

IT

EC

TS

L

ED

G E

ST

O

N E

D R

IV

E, S U

IT

E

| M

AN

H

AT

TA

N

, K

AN

SA

S

| P . 7

.5

.4

W A

TE

R

S Y

S

TE

M

IM

P R

O V

E M

E N

TS

K D

W P

O P

E R

A

TI

O N

S H

E A

D Q

U A

R

TE

R S

P

R A

TT

, K

A N

S A

S K an sa s D ep ar tm en t o f W ild lif e an d P ar ks

O pe ra tio ns H ea dq ua rt er s

S E

5t h A ve nu e P ra tt, K an sa s

C3.0 Chlorination

Building DetailsNote: Underground piping not shown for clarity.

CHLORINATION BUILDING (SOUTH ELEVATION VIEW)

Scale: Not to Scale

CHLORINATION BUILDING (SECTION VIEW A-A)

Scale: Not to Scale

CHLORINATION BUILDING (PLAN VIEW)

Scale: Not to Scale

CHLORINATION BUILDING (SECTION VIEW B-B)

Scale: Not to Scale

Note: Underground piping not shown for clarity.

FURRING DETAIL (COLD WEATHER PACKAGE)

Scale: Not to Scale

General Notes:

1. The building shown hereon is based on a pre-cast concrete building (Bid Alternate 1). A fiberglass building (Bid Alternate 2) with equivalent insulation system (R-value) shall be considered an acceptable alternative to the building shown.

2. The Contractor shall be responsible for the design of the insulation system and foundation for the fiberglass building (Bid Alternate 2).

3. The Contractor shall submit detailed plan drawings for the fiberglass building (Bid Alternate 2) for Owner/Engineer review and approval prior to fabrication.

AutoCAD SHX Text 5'-0" Sidewalk

AutoCAD SHX Text 16'-0"

AutoCAD SHX Text 11'-6"

AutoCAD SHX Text 5'-0" (Min)(Typ)

AutoCAD SHX Text Chlorination Building (Pre-Cast Concrete or Fiberglass). See Specifications

AutoCAD SHX Text 2'-6"

AutoCAD SHX Text 4" MJ 90° Bend/4" DIP Floor Drain Pipe 1% (Min) Slope

AutoCAD SHX Text 5' Wide, 6" Thick Sidewalk. See Details, Sheet C3.1.C3.1..

AutoCAD SHX Text Slope 1.5%

AutoCAD SHX Text Galvanized Pipe Support (As Required)

AutoCAD SHX Text 90° Bend

AutoCAD SHX Text Sample Tap & 12" Ball Valve (Raw Water)

AutoCAD SHX Text 4" Floor Drain w/ Screened Cover

AutoCAD SHX Text 2" C.V.

AutoCAD SHX Text 2" Turbine Meter w/ Strainer (if Req'd)

AutoCAD SHX Text Liquid Sodium Hypochlorite Solution Tank, 30 Gallon (Min) with Secondary Gallon (Min) with Secondary Spill Containment (Sized to be at Least 110% of the Tank Volume)

AutoCAD SHX Text Install Tank-Mounted Chemical Injection Pump

AutoCAD SHX Text Vent Chlorine Tank to Exterior of Building (Near Building Roof) with Down Turned Tubing and a #24 Type 304 Stainless Screen at Tube End

AutoCAD SHX Text DIP to PVC Transition Coupling

AutoCAD SHX Text 4" DIP Drain line

AutoCAD SHX Text 3'-6" (3' Min. CLR From Borehole - All Directions)

AutoCAD SHX Text 2" G.V. (Typ)

AutoCAD SHX Text 2"x10" Spool

AutoCAD SHX Text 2"x6" Spool

AutoCAD SHX Text Existing Well

AutoCAD SHX Text 90° Bend

AutoCAD SHX Text 90° Bend

AutoCAD SHX Text Tee

AutoCAD SHX Text Static Mixer

AutoCAD SHX Text 90° Bend

AutoCAD SHX Text 90° Bend

AutoCAD SHX Text Extend Existing Well/Well Casing (See Detail, Sheet C3.3)C3.3))

AutoCAD SHX Text 2" C.V.

AutoCAD SHX Text 2"x10" Spool

AutoCAD SHX Text 2"x6" Spool

AutoCAD SHX Text 2" G.V.

AutoCAD SHX Text Tee

AutoCAD SHX Text 12" Ball Valve and Liquid Chlorine Injector

AutoCAD SHX Text 14" Brass Ball Valve, Pressure Switch and 4" Dia Pressure Gauge

AutoCAD SHX Text 7'-5 "12"

AutoCAD SHX Text Liquid Chlorine Tubing

AutoCAD SHX Text 36" Double Doors

AutoCAD SHX Text Install New Wellhead/Well Seal with Vent (See Detail, Sheet C3.3)C3.3))

AutoCAD SHX Text 2" Distribution Piping

AutoCAD SHX Text Chlorination Building (Pre-Cast Concrete or Fiberglass)

AutoCAD SHX Text 2" PVC Distribution Pipe

AutoCAD SHX Text 2" PVC Distribution Pipe

AutoCAD SHX Text 4" PVC Floor Drain Pipe 1% (Min) Slope.

AutoCAD SHX Text 425± GallonVertical, Bladder-Style Pressure Tank

AutoCAD SHX Text 425± GallonVertical, Bladder-Style Pressure Tank

AutoCAD SHX Text 34" Air Release Valve with " 34" Isolation Ball Valve. Terminate Vent 24" from Floor and Screen Outlet

AutoCAD SHX Text 2" Turbine Meter with Strainer (if Req'd)

AutoCAD SHX Text PVC to HDPE Reducer and Transition Coupling

AutoCAD SHX Text 3" HDPE Distribution Pipe

AutoCAD SHX Text PVC to HDPE Reducer and Transition Coupling

AutoCAD SHX Text 2" HDPE Distribution Pipe

AutoCAD SHX Text

FFE 1821.5'

AutoCAD SHX Text Floor Block- Out (Typ)

AutoCAD SHX Text 6" Typ

AutoCAD SHX Text

6" CL

AutoCAD SHX Text Typ

AutoCAD SHX Text Floor Block-Out (Typ) Note: Joint Between Well Casing and Concrete Floor Shall Be Watertight

AutoCAD SHX Text 2" Pipe to Pressure Tanks

AutoCAD SHX Text Floor Thickness per Building Manufacturer (4" Min.)

AutoCAD SHX Text Slope 1% (Min.)

AutoCAD SHX Text Slope 1% (Min.)

AutoCAD SHX Text Slope 1% (Min.)

AutoCAD SHX Text Slope 1% (Min.)

AutoCAD SHX Text Tee

AutoCAD SHX Text Static Mixer

AutoCAD SHX Text 4 Legged Stand Alone Sink

AutoCAD SHX Text Sample Tap w/ 12" Ball Valve (Raw Water)

AutoCAD SHX Text 34" Raw Water Line

AutoCAD SHX Text 34" Treated Water Line

AutoCAD SHX Text 90° Bend

AutoCAD SHX Text 34" SDR 9 HDPE Treated Water Line

AutoCAD SHX Text Stainless Steel Vent near Top of Wall (2 Required) (Provide 4" thick High Density Board Insulation, Cut to Fit Opening)(2 Required)

AutoCAD SHX Text Tee

AutoCAD SHX Text Sample Tap w/ " Ball 12" Ball Valve (Treated Water)

AutoCAD SHX Text 2'X2' Access Hatch for Well Pump Removal

AutoCAD SHX Text 8'-0"

AutoCAD SHX Text 7'-6"

AutoCAD SHX Text 12"

AutoCAD SHX Text 5 #4 Horizontal Bars @ Equal Spacing (Each Face) (Typ)

AutoCAD SHX Text 11'-6"

AutoCAD SHX Text #4 Vertical Bars @ 18" Centers (Each Face) (Typ)

AutoCAD SHX Text Backfill Inside Building Footing with Compacted Fill Sand

AutoCAD SHX Text

FFE 1821.5'

AutoCAD SHX Text Ceiling: 2"x6" @ 24" O.C. Minimum System Insulation Rating R-30 Rigid Insulation with " Fiberglass Reinforced 18" Fiberglass Reinforced Panel on " Fire Rated OBS 12" Fire Rated OBS Sheathing and Vapor Barrier. Caulk All Interior Seams.

AutoCAD SHX Text Walls: 2"x4" @ 24" O.C. Minimum Wall System Insulation Rating R-19 Rigid Insulation with " Fiberglass Reinforced 18" Fiberglass Reinforced Panel on " Fire Rated OBS 12" Fire Rated OBS Sheathing and Vapor Barrier. Caulk All Interior Seams.

AutoCAD SHX Text Slab-On-Grade Insulation: 2" R-13 Rigid Insulation

AutoCAD SHX Text Seal All Joints of Outside Panels with Exterior Grade Sealant

AutoCAD SHX Text Exterior Panel

AutoCAD SHX Text Footing

AutoCAD SHX Text Backfill Inside Building Footing with Compacted Fill Sand

AutoCAD SHX Text 24.1.0274

AutoCAD SHX Text February 2026

AutoCAD SHX Text

TS

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

PROJECT NO

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

JB

AutoCAD SHX Text 5:1

AutoCAD SHX Text Existing Ground

AutoCAD SHX Text To Distribution

AutoCAD SHX Text System

AutoCAD SHX Text 6.5'%%128

AutoCAD SHX Text 10'%%P

AutoCAD SHX Text Chlorination Building

AutoCAD SHX Text 6068 Double Steel Door

AutoCAD SHX Text W/ South Leaf Active

AutoCAD SHX Text & North Leaf Passive

AutoCAD SHX Text SS Wall Vent w/ SS

AutoCAD SHX Text Screen (Two Rqr'd -

AutoCAD SHX Text Opposite Sides)

AutoCAD SHX Text Fill Area Surrounding

AutoCAD SHX Text Chlorination Building w/

AutoCAD SHX Text Select Soil & Compact

AutoCAD SHX Text to 95%%% Max. Dry Density.

AutoCAD SHX Text 5%%%%%P

AutoCAD SHX Text To Distribution

AutoCAD SHX Text System

AutoCAD SHX Text 10'%%P

AutoCAD SHX Text 5%%%%%P

AutoCAD SHX Text 3.5'%%128

AutoCAD SHX Text

FFE 1821.5'

AutoCAD SHX Text 12"

Min.

TYP. CONTRACTION JOINTA

"T

"T 1"

"T 2"

6"

"E"

6" "T

2" "T

1"

"T

6" "T

2" "T

1"

"T

6" "T

2" "T

1"

"T

TYP. CONSTRUCTION JOINT

TYP. EXPANSION JOINT

TYP. EXPANSION JOINT

AGAINST EXIST. CONC. PVG.

Joint sealer reservior.

Induced crack.

Reinforcing Steel. See Table.

Conc. pavement.

Aggregate base.

Scarify & re-compact subgrade.

Subsoil.

Subsoil.

Scarify & re-compact subgrade.

Aggregate base.

Conc. pavement.

Deformed dowel bar @ 12" o.c. See Table.

Cold joint w/ bonding compound.

Joint sealer reservior.

Subsoil.

Scarify & re-compact subgrade.

Aggregate base.

Conc. pavement.

1/2" th. joint filler.

Joint sealer reservior.

Subsoil.

Exist. conc. pavement.

(Verify thickness).

Joint sealer reservior.

Reinforcing Steel. See Table.

Reinforcing Steel. See Table.

Smooth dowel bar @ 12" o.c. See Table.

1/2" th. joint filler.

Smooth dowel bar @ 12" o.c. See Table.

New reinf. conc. pavement w/ aggregate base & subgrade prep.

Joint tooled to 1/4 pvmt.

depth. See Specifications.

Slip cap.

Lubricate this end. "E"

Slip cap.

Lubricate this end. "E" min.

min.

min.

A

B

C

D Scale: Not to Scale

Scale: Not to Scale

Scale: Not to Scale

Scale: Not to Scale

THICKNESS "T":

"T1" = 6" for sidewalk, driving, and parking areas.

"T2" = 4" for sidewalk, 6" for driving and parking areas.

DOWEL BAR SIZE

"T" Dia. "E" Length 6" #6 6" 14"

REINFORCING STEEL

Area Reinforcing Steel Sidewalk #4 rebar on 18" centers.

Driving/Parking #4 rebar on 18" centers.

ASPHALT PATCH REPLACEMENTE Scale: Not to Scale

Note:

Where existing asphalt is overlaid on concrete #4 bars 18" long shall be drilled into concrete on 36" centers.

Min. 2 bars per side.

CONCRETE PATCH REPLACEMENTF Scale: Not to Scale

Note:

Rebars shall be staggered on 36" centers with a min. of 2 bars per side. Concrete shall be finished with " edger and all joints shall be sealed.

C

IV

IL

E

N G

IN

EE

R S

| L

AN

D S

U R

VE

YO

R S

| L

AN

D

SC

AP

E

AR

C

H

IT

EC

TS

L

ED

G E

ST

O

N E

D R

IV

E, S U

IT

E

| M

AN

H

AT

TA

N

, K

AN

SA

S

| P . 7

.5

.4

W A

TE

R

S Y

S

TE

M

IM

P R

O V

E M

E N

TS

K D

W P

O P

E R

A

TI

O N

S H

E A

D Q

U A

R

TE

R S

P

R A

TT

, K

A N

S A

S K an sa s D ep ar tm en t o f W ild lif e an d P ar ks

O pe ra tio ns H ea dq ua rt er s

S E

5t h A ve nu e P ra tt, K an sa s

C3.1 Misc. Site Details

AutoCAD SHX Text Saw Cut

AutoCAD SHX Text Saw Cut

AutoCAD SHX Text 8"

AutoCAD SHX Text 8"

AutoCAD SHX Text Trench Width

AutoCAD SHX Text #4 Rebar 18" Length

AutoCAD SHX Text Drilled in 9"

AutoCAD SHX Text min.

AutoCAD SHX Text min.

AutoCAD SHX Text Concrete

AutoCAD SHX Text 3"

AutoCAD SHX Text Match Exist.

AutoCAD SHX Text Pvmt. 6"min.

AutoCAD SHX Text Undisturbed

AutoCAD SHX Text Material

AutoCAD SHX Text to 95%%%

AutoCAD SHX Text Backfill Compacted

AutoCAD SHX Text Saw Cut

AutoCAD SHX Text Saw Cut

AutoCAD SHX Text

1%%141" BM 2

AutoCAD SHX Text 8"

AutoCAD SHX Text Trench Width

AutoCAD SHX Text 8"

AutoCAD SHX Text min.

AutoCAD SHX Text min.

AutoCAD SHX Text Match Exist.

AutoCAD SHX Text Pvmt. 6" min.

AutoCAD SHX Text Concrete

AutoCAD SHX Text to 95%%%

AutoCAD SHX Text Backfill Compacted

AutoCAD SHX Text Undisturbed

AutoCAD SHX Text Material

AutoCAD SHX Text 24.1.0274

AutoCAD SHX Text February 2026

AutoCAD SHX Text

TS

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

PROJECT NO

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CHECKED BY

2'-0"

2' -0

Granular Backfill

FINISH GRADE

Geotextile Fabric

6"

6"

Foundation Stabilization or AB-3 Base (Typ.)

Notes:

-Place a 34" chamfer on all exposed edges.

-Maintain 2" concrete cover over reinforcing bars.

-Maintain 3" concrete coverover reinforcing where concrete is poured against earth or rock.

-Concrete shall be grade 4.0 (f'c = 4,000 psi).

-Reinforcing steel shall be grade 60 (fy = 60,000 psi).

-Dimensions on bending diagrams are out-to-out of bars.

2'-7"

5' -3

#7 F3 Bars

#4 F8 Bars#6 F7 Bars

2'-7" 9"

2' -6

"4' -0

#5 F9 Bars

2'-1"

3' -3

#4 F12 Bars

2'-1"

2' -9

#4 S11 Bars

1'-7 1/2"

1' -6

#4 S12 Bars

1'-1"

1' -6

4" Dia. Weep Hole

6"

G CANTILEVER RETAINING WALL (TYPICAL SECTION)

Scale: Not to Scale

I RETAINING WALL DRAINAGE BACKFILL (TYPICAL)

Scale: Not to Scale

J BENDING DIAGRAMS

Scale: Not to Scale

H RETAINING WALL HANDRAIL

Scale: Not to Scale

(PLAN - CORNER REINFORCEMENT)

3'

-6

1'-0"

V ar ie s

(S ee

P ro fil e)

2' -6

V ar ie s

(S ee

P ro fil e)

1'-6"

1' -0

5'-0"

7'-6"

2' -6

#4 H2 Horizontal Bars @ 12" Sp.

#5 V5 Vertical Bars @ 12" Sp.

#4 V6 Vertical Bars @ 12" SP.

#5 F10 Bars @ 12" Sp.

#5 F9 Bars @ 12" Sp.

#4 F5 Bars @ 12" Sp. (top and bottom)

(TYP. SECTION)

#4 F8 Dowel Bar @ 12" Sp.

#4 F16 Bars @ 18" Sp.

#4 C1 horizontal bars @ 12" Sp.

#4 C2 horizontal bars @ 12" Sp.

6" Ø Perforated Drain Pipe 1% Minimum Slope Outlet to daylight at end of wall.

C

IV

IL

E

N G

IN

EE

R S

| L

AN

D S

U R

VE

YO

R S

| L

AN

D

SC

AP

E

AR

C

H

IT

EC

TS

L

ED

G E

ST

O

N E

D R

IV

E, S U

IT

E

| M

AN

H

AT

TA

N

, K

AN

SA

S

| P . 7

.5

.4

W A

TE

R

S Y

S

TE

M

IM

P R

O V

E M

E N

TS

K D

W P

O P

E R

A

TI

O N

S H

E A

D Q

U A

R

TE

R S

P

R A

TT

, K

A N

S A

S K an sa s D ep ar tm en t o f W ild lif e an d P ar ks

O pe ra tio ns H ea dq ua rt er s

S E

5t h A ve nu e P ra tt, K an sa s

C3.2 Retaining Wall

Details

AutoCAD SHX Text Minimum Splice Lengths

AutoCAD SHX Text #4

AutoCAD SHX Text #5

AutoCAD SHX Text 1'-6"

AutoCAD SHX Text 1'-9"

AutoCAD SHX Text 1%%141" %%C Handrail (Typ)

AutoCAD SHX Text 8'-0"

AutoCAD SHX Text 4'-0"

AutoCAD SHX Text 4'-0"

AutoCAD SHX Text Retaining Wall

AutoCAD SHX Text Retaining Wall

AutoCAD SHX Text 1%%141" %%C Hanrail (Typ)

AutoCAD SHX Text 24.1.0274

AutoCAD SHX Text February 2026

AutoCAD SHX Text

TS

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

PROJECT NO

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CHECKED BY

IL

E

N G

IN

EE

R S

| L

AN

D S

U R

VE

YO

R S

| L

AN

D

SC

AP

E

AR

C

H

IT

EC

TS

L

ED

G E

ST

O

N E

D R

IV

E, S U

IT

E

| M

AN

H

AT

TA

N

, K

AN

SA

S

| P . 7

.5

.4

W A

TE

R

S Y

S

TE

M

IM

P R

O V

E M

E N

TS

K D

W P

O P

E R

A

TI

O N

S H

E A

D Q

U A

R

TE

R S

P

R A

TT

, K

A N

S A

S K an sa s D ep ar tm en t o f W ild lif e an d P ar ks

O pe ra tio ns H ea dq ua rt er s

S E

5t h A ve nu e P ra tt, K an sa s

C3.3 Misc. Water Details

2" Pipe = 8" Min.

TRENCH WIDTHS

Pipe

NOTES:

1. Pipe may be bedded and covered with native soil materials provided they are free from rocks or other objectionable materials.

2. In the event that the trench bottom becomes soft or mucky and cannot provide uniform bearing for the pipe the trench shall be over excavated a minimum of 4" below and on either side of the pipe and the pipe shall be bedded in compacted select soil material or fill sand.

3. In the event that rocky subgrade materials are encountered the trench shall be over excavated a minimum of 6" below the pipe and on either side of the pipe and all materials so removed shall be replaced with compacted select soil material or fill sand.

NOTES:

1. Extend well as shown above. Concrete floor elevation to be 1821.5' at the well (100-Year Elevation = 1819.4' & 500-Year Elevation = 1820.4')

K WELLHEAD TERMINATION DETAIL

Scale: Not to Scale

M CONCRETE THRUST BLOCK DETAILS

Scale: Not to Scale N WATER LINE TRENCH DETAIL

Scale: Not to Scale O

TYPICAL GATE VALVE SETTING

Scale: Not to Scale

L FLOOR DRAIN FRENCH DRAIN

Scale: Not to Scale

AutoCAD SHX Text 24.1.0274

AutoCAD SHX Text February 2026

AutoCAD SHX Text

TS

AutoCAD SHX Text

REVISION

AutoCAD SHX Text

SHEET

AutoCAD SHX Text

PROJECT NO

AutoCAD SHX Text

DRAWN BY

AutoCAD SHX Text

DATE

AutoCAD SHX Text

CHECKED BY

AutoCAD SHX Text

JB

AutoCAD SHX Text

THRUST BLOCK BEARING AREA

AutoCAD SHX Text

PIPE SIZE

AutoCAD SHX Text 90%%d BEND

AutoCAD SHX Text 45%%d BEND

AutoCAD SHX Text

22 %%DBEND

AutoCAD SHX Text

TEE

AutoCAD SHX Text 4" or Smaller

AutoCAD SHX Text 6"

AutoCAD SHX Text Sq.Ft.

AutoCAD SHX Text Sq.Ft.

AutoCAD SHX Text Sq.Ft.

AutoCAD SHX Text Sq.Ft.

AutoCAD SHX Text Sq.Ft.

AutoCAD SHX Text Sq.Ft.

AutoCAD SHX Text Sq.Ft.

AutoCAD SHX Text Sq.Ft.

AutoCAD SHX Text Sq.Ft.

AutoCAD SHX Text Sq.Ft.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Blocking of tees is to be placed opposite the branch and area is based on

AutoCAD SHX Text branch size. All material, labor, & equipment required to construct concrete

AutoCAD SHX Text thrust blocks shall be considered subsidiary to other items of work.

AutoCAD SHX Text Concrete Thrust

AutoCAD SHX Text Block

AutoCAD SHX Text

TYPICAL BEND

AutoCAD SHX Text Bearing Area

AutoCAD SHX Text Undisturbed

AutoCAD SHX Text Earth

AutoCAD SHX Text

STANDARD TEE

AutoCAD SHX Text a

AutoCAD SHX Text e

AutoCAD SHX Text r

AutoCAD SHX Text A

AutoCAD SHX Text g

AutoCAD SHX Text n

AutoCAD SHX Text i

AutoCAD SHX Text r

AutoCAD SHX Text a

AutoCAD SHX Text e

AutoCAD SHX Text B

AutoCAD SHX Text 8"

AutoCAD SHX Text Sq.Ft.

AutoCAD SHX Text Sq.Ft.

AutoCAD SHX Text Sq.Ft.

AutoCAD SHX Text Sq.Ft.

AutoCAD SHX Text Sq.Ft.

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Concrete Thrust

AutoCAD SHX Text Block

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

11 %%DBEND

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text 3.5' Min. Depth

AutoCAD SHX Text 6"

AutoCAD SHX Text Varies

AutoCAD SHX Text Varies

AutoCAD SHX Text As Shown In Table

AutoCAD SHX Text 3" Min.

AutoCAD SHX Text Trench Wall

AutoCAD SHX Text Existing Grade

AutoCAD SHX Text Backfill Material

AutoCAD SHX Text Cover Material

AutoCAD SHX Text Bedding Material

AutoCAD SHX Text Undisturbed

AutoCAD SHX Text Trench Bottom

AutoCAD SHX Text Concrete

AutoCAD SHX Text Support Block

AutoCAD SHX Text Asphalt Surface

AutoCAD SHX Text Edges Except in

AutoCAD SHX Text Round Conc.

AutoCAD SHX Text Concrete Collar

AutoCAD SHX Text 3' Square Protective

AutoCAD SHX Text Gate Valve

AutoCAD SHX Text Valve box

AutoCAD SHX Text (Typ.)

AutoCAD SHX Text Slope

AutoCAD SHX Text 6"

AutoCAD SHX Text Extend Existing 8" Well Casing

AutoCAD SHX Text Terminate Under Vent Cap

AutoCAD SHX Text

2" PVC SCH 80

AutoCAD SHX Text Screened

AutoCAD SHX Text Well Vent

AutoCAD SHX Text Min.

AutoCAD SHX Text 12"

AutoCAD SHX Text Piping

AutoCAD SHX Text

FFE. 1821.5'

AutoCAD SHX Text Earthen Fill/Compacted Sand

AutoCAD SHX Text Install New Wellhead/ Well Seal with Screened

AutoCAD SHX Text Well Vent and Top Discharge

AutoCAD SHX Text Install New Drawdown Tube

AutoCAD SHX Text Existing Pump Elevation

AutoCAD SHX Text Install New 2" R.J. PVC Drawdown Tube to

AutoCAD SHX Text to Existing Pump Elevation

AutoCAD SHX Text (Note: Match Material and Wall Thickness)

AutoCAD SHX Text (Note: Sand-Cement or Neat Cement Grout

AutoCAD SHX Text for Annular Space Between Casing and Soil)

AutoCAD SHX Text Install Watertight Seal Between

AutoCAD SHX Text Casing and Concrete Floor

AutoCAD SHX Text 1'-0"

AutoCAD SHX Text 4"x4"x2" Tees Tilted 30°± Downword

AutoCAD SHX Text Finished Grade

AutoCAD SHX Text 18" of 2" PVC Pipes with Sawcut Perforations

AutoCAD SHX Text Place Plastic Sheet over Gravel before Backfilling

AutoCAD SHX Text 2" PVC Caps with Drill Holes

AutoCAD SHX Text Provide 36 C.F. of Gravel for Drainage (2'x3'x6')

AutoCAD SHX Text Wrap Gravel with 8oz Non-Woven Geotextile Fabric

NOTE: Install 3 Tees with perforated drains at 1' spacing at the end of the chlorination building drain pipe.

IL

E

N G

IN

EE

R S

| L

AN

D S

U R

VE

YO

R S

| L

AN

D

SC

AP

E

AR

C

H

IT

EC

TS

L

ED

G E

ST

O

N E

D R

IV

E, S U

IT

E

| M

AN

H

AT

TA

N

, K

AN

SA

S

| P . 7

.5

.4

W A

TE

R

S Y

S

TE

M

IM

P R

O V

E M

E N

TS

K D

W P

O P

E R

A

TI

O N

S H

E A

D Q

U A

R

TE

R S

P

R A

TT

, K

A N

S A

S K an sa s D ep ar tm en t o f W ild lif e an d P ar ks

O pe ra tio ns H ea dq ua rt er s

S E

5t h A ve nu e P ra tt, K an sa s

ME1

SITE PLAN

IL

E

N G

IN

EE

R S

| L

AN

D S

U R

VE

YO

R S

| L

AN

D

SC

AP

E

AR

C

H

IT

EC

TS

L

ED

G E

ST

O

N E

D R

IV

E, S U

IT

E

| M

AN

H

AT

TA

N

, K

AN

SA

S

| P . 7

.5

.4

W A

TE

R

S Y

S

TE

M

IM

P R

O V

E M

E N

TS

K D

W P

O P

E R

A

TI

O N

S H

E A

D Q

U A

R

TE

R S

P

R A

TT

, K

A N

S A

S K an sa s D ep ar tm en t o f W ild lif e an d P ar ks

O pe ra tio ns H ea dq ua rt er s

S E

5t h A ve nu e P ra tt, K an sa s

ME2

BASEMENT FLOOR

PLAN

LIGHT FIXTURE SCHEDULE

IV

IL

E

N G

IN

EE

R S

| L

AN

D S

U R

VE

YO

R S

| L

AN

D

SC

AP

E

AR

C

H

IT

EC

TS

L

ED

G E

ST

O

N E

D R

IV

E, S U

IT

E

| M

AN

H

AT

TA

N

, K

AN

SA

S

| P . 7

.5

.4

W A

TE

R

S Y

S

TE

M

IM

P R

O V

E M

E N

TS

K D

W P

O P

E R

A

TI

O N

S H

E A

D Q

U A

R

TE

R S

P

R A

TT

, K

A N

S A

S K an sa s D ep ar tm en t o f W ild lif e an d P ar…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .