This document is a comprehensive set of construction plans for water system improvements at the Kansas Department of Wildlife and Parks (KDWP) Operations Headquarters in Pratt, Kansas, prepared by civil engineers, land surveyors, and landscape architects. The project encompasses 19 base bid items including mobilization and demobilization, demolition and removal of existing infrastructure, earthwork and grading, construction of a 112 linear feet concrete retaining wall, extension of the existing public water supply well with new wellhead installation, construction of 596 square feet of ADA-compliant concrete sidewalk, installation of 1 to 3 inch HDPE water service lines (totaling approximately 310 linear feet across multiple sizes), gate valve settings, water utility connections to existing buildings and infrastructure, interior domestic water and electrical piping within a new chlorination building, exterior electrical improvements, installation of a 75 linear foot CMP culvert, and floor drain with French drain system (45 linear feet). Three bid alternates address the chlorination building structure options (pre-cast concrete or fiberglass), well pump removal and replacement, and related MEP (mechanical, electrical, plumbing) work. The project delivery deadline is June 30, 2027, with bids due November 5, 2026 at 2:00 p.m., and an optional pre-bid meeting scheduled for October 28, 2026 at 10:00 a.m. via Microsoft Teams.
The project requires contractors to furnish all labor, equipment, materials, and tools necessary to complete work in accordance with construction drawings and project specifications. Approximately 800 cubic yards of fill material must be obtained from off-site approved locations, and seeding and erosion control measures must be implemented throughout construction. The contractor is responsible for construction staking, utility coordination through the Kansas One-Call System, and adherence to Americans with Disabilities Act requirements for accessible facilities. A bid guaranty of 5 percent of the total bid amount and a Performance Bond equal to 100 percent of the contract amount are required, along with a Public Works Bond unless the contract price is below $100,000. All bidders must submit a current Tax Clearance Certificate from the Kansas Department of Revenue, certification regarding immigration reform and control, and other required documentation within 15 calendar days after award notification. Written questions are due November 3, 2026, and bids will be publicly read via teleconference at 2:30 p.m. on the closing date. Responses must be submitted electronically to Procurement@ks.gov or hand-delivered to the Kansas Department of Administration office in Topeka.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
C
IV
IL
E
N G
IN
EE
R S
| L
AN
D S
U R
VE
YO
R S
| L
AN
D
SC
AP
E
AR
C
H
IT
EC
TS
L
ED
G E
ST
O
N E
D R
IV
E, S U
IT
E
| M
AN
H
AT
TA
N
, K
AN
SA
S
| P . 7
.5
.4
W A
TE
R
S Y
S
TE
M
IM
P R
O V
E M
E N
TS
K D
W P
O P
E R
A
TI
O N
S H
E A
D Q
U A
R
TE
R S
P
R A
TT
, K
A N
S A
S K an sa s D ep ar tm en t o f W ild lif e an d P ar ks
O pe ra tio ns H ea dq ua rt er s
S E
5t h A ve nu e P ra tt, K an sa s
G1.0 Title Sheet
WATER SYSTEM IMPROVEMENTS
PRATT, KANSAS
PROJECT LOCATION MAP
February 2026
KDWP OPERATIONS HEADQUARTERS
PRATT COUNTY
PROJECT LOCATION
KDWP Operations Headquarters
Pratt Hatchery
City of Pratt
SE 10th St
S E
5t h A ve
PROJECT MANAGERS:
Brett Blackburn, Chief Engineer Kansas Dept. of Wildlife and Parks Engineering Services 1020 S. Kansas Ave, Room 200 Topeka, KS 66612
Office: (785) 296-8404
Melanie Levering, Project Manager Kansas Dept. of Wildlife and Parks Engineering Services 512 SE 25th Ave Pratt, KS 67124
Office: (785) 620-0716
FACILITY MANAGER:
Norman Bennett, Facilities Maintenance Supervisor Kansas Dept. of Wildlife and Parks 512 SE 25th Ave Pratt, KS 67124
Office: (620) 672-0732
SHEET INDEX:
US Route 400/Hwy 54
OWNER CONTACT INFORMATION:
SHEET INDEX
SHEET NO. SHEET TITLE
General Drawings
G1.0 Title Sheet G1.1 General Notes
Civil Drawings
C1.0 Existing Conditions & Demo Plan
C2.0 Site & Utilities Imp. Plan
C2.1 Grading & Staking Plan
C2.2 Utilities Staking Plan
C3.0 Chlorination Building Details
C3.1 Misc. Site Details C3.2 Retaining Wall Details
C3.3 Misc. Water Details MEP Drawings
ME1 Site Plan - Electical ME2 Basement Floor Plan ME3 New Work Plan - MEP Plan
AutoCAD SHX Text 24.1.0274
AutoCAD SHX Text February 2026
AutoCAD SHX Text
TS
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
PROJECT NO
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
JB
Survey Control Points
Point Northing Easting Elevation Description
Staking Points
Point Northing Easting Elevation Description
C
IV
IL
E
N G
IN
EE
R S
| L
AN
D S
U R
VE
YO
R S
| L
AN
D
SC
AP
E
AR
C
H
IT
EC
TS
L
ED
G E
ST
O
N E
D R
IV
E, S U
IT
E
| M
AN
H
AT
TA
N
, K
AN
SA
S
| P . 7
.5
.4
W A
TE
R
S Y
S
TE
M
IM
P R
O V
E M
E N
TS
K D
W P
O P
E R
A
TI
O N
S H
E A
D Q
U A
R
TE
R S
P
R A
TT
, K
A N
S A
S K an sa s D ep ar tm en t o f W ild lif e an d P ar ks
O pe ra tio ns H ea dq ua rt er s
S E
5t h A ve nu e P ra tt, K an sa s
G1.1 General Notes
SITE LEGEND:
Bar Found
Bar Set
Benchmark
Control Point
Cable TV Pedestal Deadman Anchor
Fire Hydrant
Flagpole
Gas Marker Gas Meter Gas Valve
Power Pole Electric Pedestal Electric MH
Round Inlet Square Inlet
Light Pole
Light Pole w/ Base
Mail Box
Power Pole w/ Transformer
San. Sewer MH
Section Corner Found
Section Corner Set
Sign
Telephone Marker
Telephone MH
Telephone Pedestal Telephone Pole Transformer
Well
Hydrant Water Meter
Water Valve
Sanitary Sewer Line Water Line Gas Line Telephone Cable Storm Sewer Line Fiber Optic Line
Chain Link Fence Underground Electric LIne
Tree
Barbed Wire Fence
Overhead Electric Line
Section Line Property Line Proposed Ground (5' Contour) Proposed Ground (1' Contour) Existing Ground (5' Contour) Existing Ground (1' Contour)
1. These notes, and other drawing notes contained herein, are provided to meet specific requirements and supplement the project specifications. These notes neither replace nor override the provisions and requirements of the project specifications.
2. All work shall be performed in accordance with local, state, and federal regulations.
3. The Owner shall be responsible for obtaining all construction permits required to perform the work.
4. The Contractor shall coordinate work with the Owner to not disrupt the Owner's daily operations.
Once the work has been started, the Contractor shall complete the work without any interruptions.
Construction activities are limited to the immediate work sites. A staging and storage area will be available for the Contractor's use on site.
5. The location, size, and depth of existing, buried utilities are illustrated based on available records from the Owner. Record locations shall be verified based on observable surface features such as manholes, valve boxes, evidence of trenches, field markings, etc. wherever possible. Excavations have not been made to verify locations or depth of buried utilities. The exact location and elevation of existing utilities must be determined by the Contractor. It shall be the duty of the Contractor to ascertain whether any additional facilities other than those shown on the plan may be present. The Contractor shall contact "Kansas One Call System, Inc." (1-800-344-7233) a minimum of two full working days prior to the start of construction for notification of utility owners and field location of all utilities. The Contractor shall verify the elevation of possible conflicting utilities prior to construction.
Overhead utilities and underground services generally are not shown.
6. The Contractor shall furnish all labor, equipment, materials, and tools necessary to completely perform the work in a safe, expeditious, and workmanlike manner. All work shall be done to the lines, slopes, and grades indicated on the Construction Drawings. The Contractor shall visit the site and familiarize himself/herself withe the existing conditions before submitting his/her bid.
7. If certain features are not fully shown or called for on the construction drawings or project specifications, their construction shall be of the same character as for similar conditions that are shown or called for, subject to the approval of the Engineer. Where sections vary, the Contractor shall provide smooth transitions between them, unless noted otherwise.
8. The Contractor shall install equipment and materials per the Manufacturer's recommendations unless noted otherwise. The Contractor accepts full responsibility for the proper handling and installation of equipment and materials.
9. All shop drawings provided shall be submitted to the Engineer for review prior to the fabrication of material or the purchase of non-returnable stock. Dimensional review is the Contractor's responsibility.
10. All materials are subject to the approval of the engineer.
11. The Contractor is responsible for the transportation, unloading, storage, and management of all equipment and materials unless noted otherwise. The Contractor shall coordinate onsite storage with the Owner. The Contractor shall be responsible for the proper safeguarding of materials and equipment stored on the site to prevent theft, vandalism, or damage.
12. Trees and shrubs within the construction limits shall be cleared and grubbed. The Contractor is responsible for the removal, management, storage, loading, transportation, and disposal of all demolished equipment and material unless noted otherwise.
13. Unless noted otherwise, existing utilities are to remain and shall be protected by the Contractor during construction. The Contractor shall exercise care to avoid damaging existing utilities during grading and construction activities. Existing facilities (utilities, pavements, etc.) damaged by the contractor shall be repaired or replaced by the Contractor at no additional expense to the Owner. The Contractor shall restore all disturbed areas to a condition equal to or better than pre-construction conditions.
14. All open excavations shall be protected with safety fence.
15. Positive drainage on the site is required throughout the project duration. The Contractor is responsible for the installation and removal of all sediment control practices required as a result of project activities. Such practice shall be in accordance with applicable federal and state regulations governing stormwater runoff from construction activities.
16. Traffic control devices must conform to the latest edition of the Manual on Uniform Traffic Control Devices (MUTCD) and standards established by the Kansas Department of Transportation (KDOT).
17. The Contractor is responsible for the protection and maintenance of all permanent survey monuments and property irons in the project vicinity. If monuments are disturbed by planned construction, the Contractor shall retain a Kansas-Licensed land surveyor to re-establish the monuments and irons at the Contractor's expense. Such monuments and irons shall be reestablished by a licensed sand surveyor in accordance with state laws.
18. Construction staking shall be the responsibility of the Contractor.
19. Seeding of disturbed areas shall be completed by the Contractor.
1. The means of the work and the safety of the Contractor's employees are solely the responsibility of the Contractor. The Contractor has a contractual obligation to comply with all applicable laws and regulations including those of OSHA. At no time will either the Owner or the Owner's representative take responsibility for either the means of the work or the safety of the Contractor's employees.
2. The Contractor is responsible for utilizing the appropriate level of PPE for the type of work being performed and the site conditions present at the time.
GENERAL NOTES:
HEALTH AND SAFETY:
SURVEY CONTROL POINTS:
CONSTRUCTION STAKING POINTS:
AutoCAD SHX Text 24.1.0274
AutoCAD SHX Text February 2026
AutoCAD SHX Text
TS
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
PROJECT NO
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
JB
AutoCAD SHX Text
CP 7A
AutoCAD SHX Text C
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text Gas
AutoCAD SHX Text Marker
AutoCAD SHX Text G
AutoCAD SHX Text w/ Base
AutoCAD SHX Text
MB
AutoCAD SHX Text w/ Trans.
AutoCAD SHX Text Tele
AutoCAD SHX Text Marker
AutoCAD SHX Text T
AutoCAD SHX Text T
AutoCAD SHX Text Trans.
AutoCAD SHX Text W
AutoCAD SHX Text Hyd.
AutoCAD SHX Text W
AutoCAD SHX Text 80"
AutoCAD SHX Text S
AutoCAD SHX Text W
AutoCAD SHX Text G
AutoCAD SHX Text T
AutoCAD SHX Text
ST
F.O.
IL
E
N G
IN
EE
R S
| L
AN
D S
U R
VE
YO
R S
| L
AN
D
SC
AP
E
AR
C
H
IT
EC
TS
L
ED
G E
ST
O
N E
D R
IV
E, S U
IT
E
| M
AN
H
AT
TA
N
, K
AN
SA
S
| P . 7
.5
.4
W A
TE
R
S Y
S
TE
M
IM
P R
O V
E M
E N
TS
K D
W P
O P
E R
A
TI
O N
S H
E A
D Q
U A
R
TE
R S
P
R A
TT
, K
A N
S A
S K an sa s D ep ar tm en t o f W ild lif e an d P ar ks
O pe ra tio ns H ea dq ua rt er s
S E
5t h A ve nu e P ra tt, K an sa s
C1.0 Existing Conditions
& Demo Plan
GENERAL NOTES:
1. The existing site information shown hereon is based on a topographic survey performed by Schwab Eaton, February 5, 2025.
2. The Contractor shall field verify the actual locations, bury depths and sizes of all existing utilities prior to commencing construction activities. He shall contact the Kansas One-Call system a minimum of two full business days prior to Work to request marking of utilities by the respective utility owners. He shall directly contact all utility owners not subscribing to the One-Call system.
3. Install and maintain initial erosion control BMPs along the drives and other areas as shown on the Erosion Control Plan prior to commencing any significant land disturbance operations. Mud and debris dropped or tracked along the roadway shall be cleaned up, keeping the public ways clear. Other BMPs shall be installed as construction progresses as part of the Erosion Control Plan.
4. Keep existing roadways open to the public. Maintain or make alternate provisions for pedestrian traffic in a manner acceptable to the Owner. Stage, coordinate and schedule demolition activities in a manner that minimizes disruption of vehicular and pedestrian traffic. Provide, install and maintain temporary fences, barricades, warning devices and other appropriate measures to protect the public.
DEMOLITION SCHEDULE:
1. Remove existing tree as necessary to facilitate construction (typ).
2. Decommission and remove existing 750-gallon underground pressure tank.
3. Decommission and remove existing valve and valve riser/vault (typ).
4. Decommission and abandon existing water line in-place (typ). Cut and cap existing water line as necessary.
5. Remove existing wellhead enclosure/structure, wellhead, pitless unit, and associated appurtenances as necessary to accommodate construction. See MEP plans for the removal/relocation of existing electrical infrastructure.
6. Remove existing concrete curb and asphalt/concrete pavement to the extents shown.
7. Relocate the existing gas line as necessary as necessary to facilitate construction (By Owner/Gas Company).
8. Decommission and abandon existing buried electric line (See MEP Plans).
9. Decommission and remove existing chlorination equipment (chemical dosing pump, chemical storage tank, piping/tubing, etc.)
following the installation of the new chlorination system (By Owner).
DEMOLITION NOTES:
1. Disconnect/remove and cap designated utilities within demolition areas.
2. Sawcut all limits of pavement demolition Work to clean, neat lines. Where practical, sawcut along nearest appropriate pavement joint or remove 1/2 panel.
3. Backfill and compact depressions, open pits and holes caused as a result of demolition. Backfill shall be placed and compacted in accordance with the project specifications.
ENLARGED VIEW - WELL #1
(Scale: 1"=5')
3.
2.
See Enlarged View - Well #1 (This Sheet)
3.
4.
4.
4.
4.
5.
6.
3.
1.
4.
4.
4.
7.
8.
EX. WELLHEAD ENCLOSURE
EXISTING WELLHEAD
Existing Ground (1' and 5' Contours) (Typ)
Existing Building (KDWP Headquarters)
Existing Building
(KDWP
Engineering)
Existing Building
(KDWP
Maintenance)
1.
3.
3.
5.
5.
3.
3.
3.
ENLARGED VIEW - IRRIG. VAULT
(Scale: 1"=5')
See Enlarged View - Irrig. Vault (This Sheet)
4.
4.
Cut & Cap
1.
Existing Gas Line (typ)
Existing Fiber Optic Line (typ)
Existing San. Sewer (typ)
Existing Water Line (to be abandoned) (typ)
Existing Tree (typ)
8.
7.
9.
EX. CHLORINATION EQUIP.
9.
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text E
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text
YH
AutoCAD SHX Text Press
AutoCAD SHX Text Tank
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc
AutoCAD SHX Text House
AutoCAD SHX Text Shed
AutoCAD SHX Text Shop
AutoCAD SHX Text Porch
AutoCAD SHX Text Deck
AutoCAD SHX Text Conc
AutoCAD SHX Text Office
AutoCAD SHX Text Shop
AutoCAD SHX Text Gravel
AutoCAD SHX Text Gravel
AutoCAD SHX Text Gravel
AutoCAD SHX Text Trees
AutoCAD SHX Text Landscape
AutoCAD SHX Text Landscape
AutoCAD SHX Text Landscape
AutoCAD SHX Text Conc Landing
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc
AutoCAD SHX Text Shed
AutoCAD SHX Text W
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc
AutoCAD SHX Text Gravel
AutoCAD SHX Text Trees
AutoCAD SHX Text Trees
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc
AutoCAD SHX Text Asphalt
AutoCAD SHX Text Asphalt
AutoCAD SHX Text Asphalt
AutoCAD SHX Text Asphalt
AutoCAD SHX Text Asphalt
AutoCAD SHX Text V
AutoCAD SHX Text W
AutoCAD SHX Text V
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text Press
AutoCAD SHX Text Tank
AutoCAD SHX Text W
AutoCAD SHX Text Conc
AutoCAD SHX Text
YH
AutoCAD SHX Text V
AutoCAD SHX Text W
AutoCAD SHX Text 24.1.0274
AutoCAD SHX Text February 2026
AutoCAD SHX Text
TS
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
PROJECT NO
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
JB
AutoCAD SHX Text 20'
AutoCAD SHX Text
AutoCAD SHX Text 20'
AutoCAD SHX Text Existing Well Reference Point Elev.=1816.47'
AutoCAD SHX Text 24'±
15'±
IL
E
N G
IN
EE
R S
| L
AN
D S
U R
VE
YO
R S
| L
AN
D
SC
AP
E
AR
C
H
IT
EC
TS
L
ED
G E
ST
O
N E
D R
IV
E, S U
IT
E
| M
AN
H
AT
TA
N
, K
AN
SA
S
| P . 7
.5
.4
W A
TE
R
S Y
S
TE
M
IM
P R
O V
E M
E N
TS
K D
W P
O P
E R
A
TI
O N
S H
E A
D Q
U A
R
TE
R S
P
R A
TT
, K
A N
S A
S K an sa s D ep ar tm en t o f W ild lif e an d P ar ks
O pe ra tio ns H ea dq ua rt er s
S E
5t h A ve nu e P ra tt, K an sa s
C2.0 Site & Utilities
Imp. Plan
IMPROVEMENTS SCHEDULE:
1. Construct cast-in-place concrete retaining wall and earthen backfill. See Sheet C2.1 and
Details, Sheet C3.2.
2. Extend the existing public water supply well (casing, drop pipe, etc.) and install new wellhead (with well seal, vent, etc.) and aboveground discharge (to be housed in the new pre-cast concrete chlorination building). See Sheet C2.1 and Details, Sheet C3.0.
See MEP plans for electrical improvements.
3. Remove and replace the existing public water supply well pump (Bid Alternate 1).
4. Install chlorination building (pre-cast concrete or fiberglass), internal piping, pressure tanks, chlorine disinfection equipment, floor drain, and related appurtenances.
See Sheet C2.1 and Details, Sheet C3.0. See MEP plans for electrical improvements.
5. Construct 6" reinforced concrete sidewalk. See Sheet C2.1 and Details, Sheet C3.1.
6. Install 3" water service line. See Sheet C2.2 and Details, Sheet C3.3. Note: Installation under paved and landscaped areas shall be performed via directional drilling.
7. Install 2" water service line. See Sheet C2.2 and Details, Sheet C3.3. Note: Installation under paved and landscaped areas shall be performed via directional drilling.
8. Install 1" water service line to existing yard hydrant/irrigation infrastructure. See Sheet C2.2 and Details, Sheet C3.3.
9. Install 2" MJ gate valve. See Sheet C2.2 and Details, Sheet C3.3.
10. Install 3" MJ gate valve. See Sheet C2.2 and Details, Sheet C3.3.
11. Connect new water service line to existing water service/infrastructure. Note: Contractor to field locate existing services and make the connections to buildings within five (5) feet of building foundation. See Sheet C2.2. Verify proper backflow prevention downstream of connection and install as necessary.
12. Install 12" CMP culvert. See Sheet C2.1.
13. Install electrical service line and associated infrastructure. See MEP Plans.
GENERAL NOTES:
1. The existing site information shown hereon is based on a topographic survey performed by Schwab Eaton, February 5, 2025.
2. Portions of the Work (A.D.A. parking area and sidewalk work) will be subject to meeting the intent and requirements of the Americans with Disabilities Act (A.D.A.) and any field modifications shall be performed in a manner that does not compromise accessibility requirements.
3. Construction activities shall be coordinated to make every reasonable effort to avoid disrupting safe public access into existing facilities surrounding the work area.
Coordinate site access, mobilization, equipment storage, and project scheduling with KDWP personnel.
4. The Contractor shall field verify the actual locations, bury depths, and sizes of all existing utilities prior to commencing construction activities. He shall contact the Kansas One-Call system a minimum of two full business days prior to Work to request marking of utilities by the respective utility owners. He shall directly contact all utility owners not subscribing to the One-Call system.The Contractor is responsible for any damage to existing structures and facilities.
5. Install and maintain initial erosion control BMPs prior to commencing any significant land disturbance activities. Mud and debris dropped or tracked along the roadway shall be cleaned up, keeping the public ways clear. Disturbed areas shall be restored to pre-construction conditions (as applicable). All areas with unimproved surfacing (gravel, concrete, or asphalt) shall be seeded. Seeding and mulching operations shall be in accordance with the Project Specifications.
6. Keep existing roadways open to the public. Maintain or make alternate provision for pedestrian traffic in a manner acceptable to KDWP. Stage, coordinate, and schedule construction activities in a manner than minimizes disruption of vehicular and pedestrian traffic.
7. Provide, install, and maintain temporary fences, barricades, warning devices, and other appropriate measures to protect the public.Traffic control devices must conform to the latest edition of the Manual on Uniform Traffic Control Devices (MUTCD) and Standards established by the Kansas Department of Transportation.
8. Utilities, including electrical and communication services, shall be installed underground, unless otherwise noted.
9. Water and sewer utility lines shall maintain minimum 10' horizontal separation and 2' vertical separation in accordance with KDHE standards. If 2' vertical separation cannot be maintained at a crossing location, pipe segments shall be centered at the crossing and concrete encased.
10. Coordinate with KDWP regarding the time of the removal or relocation of old utility service lines and installation/relocation of new lines. Minimize the time of disturbance to existing utilities.
11. See Layout and Grading Plans for general dimensions and survey coordinates locating major site improvements.
12. See Sheet G1.1 for additional project information.
Approximate Grading Extents
Existing Building (KDWP Headquarters)
Existing Building
(KDWP
Engineering)
1.
2/3.
4.
5.
6.
6.
7.
7.
7.
8.
7.
10.9.
11.
11.
11.
11.
12.
11.
9.
Existing Gas Line (typ)
Existing Fiber Optic Line (typ)
Existing San. Sewer (typ)
Proposed Water Line (typ)
Existing Tree (typ)
13.
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text E
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text
YH
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc
AutoCAD SHX Text House
AutoCAD SHX Text Shed
AutoCAD SHX Text Shop
AutoCAD SHX Text Porch
AutoCAD SHX Text Deck
AutoCAD SHX Text Conc
AutoCAD SHX Text Office
AutoCAD SHX Text Trees
AutoCAD SHX Text Landscape
AutoCAD SHX Text Landscape
AutoCAD SHX Text Conc
AutoCAD SHX Text W
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc
AutoCAD SHX Text Asphalt
AutoCAD SHX Text Asphalt
AutoCAD SHX Text Asphalt
AutoCAD SHX Text V
AutoCAD SHX Text W
AutoCAD SHX Text V
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text V
AutoCAD SHX Text W
AutoCAD SHX Text V
AutoCAD SHX Text W
AutoCAD SHX Text 24.1.0274
AutoCAD SHX Text February 2026
AutoCAD SHX Text
TS
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
PROJECT NO
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
JB
AutoCAD SHX Text 10'
AutoCAD SHX Text
10'
L1
L2
11+12
10+00 10+
10+
10+
10+
10+50
10+60
10+70
10+80
10+90
11+00
11+10
9+90 10+00 10+10 10+20 10+30 10+40 10+50 10+60 10+70 10+80 10+90 11+00 11+10 11+20
Retaining Wall Alignment Data
Line Number
Length
(ft) Bearing Start
Station End
Station Start Coordinate End Coordinate
C
IV
IL
E
N G
IN
EE
R S
| L
AN
D S
U R
VE
YO
R S
| L
AN
D
SC
AP
E
AR
C
H
IT
EC
TS
L
ED
G E
ST
O
N E
D R
IV
E, S U
IT
E
| M
AN
H
AT
TA
N
, K
AN
SA
S
| P . 7
.5
.4
W A
TE
R
S Y
S
TE
M
IM
P R
O V
E M
E N
TS
K D
W P
O P
E R
A
TI
O N
S H
E A
D Q
U A
R
TE
R S
P
R A
TT
, K
A N
S A
S K an sa s D ep ar tm en t o f W ild lif e an d P ar ks
O pe ra tio ns H ea dq ua rt er s
S E
5t h A ve nu e P ra tt, K an sa s
C2.1 Grading & Staking
Plan
GENERAL NOTES:
1. The existing site information shown hereon is based on a topographic survey performed by Schwab Eaton, February 5, 2025.
2. The Contractor shall field verify the actual locations, bury depths and sizes of all existing utilities prior to commencing construction activities.
He shall contact the Kansas One-Call system a minimum of two full business days prior to Work to request marking of utilities by the respective utility owners. He shall directly contact all utility owners not subscribing to the One-Call system.
3. The Contractor shall adjust all valve boxes, water meter covers, manhole lids, etc. as required to match finish grades in a clean, neat manner.
GRADING NOTES:
1. Protect existing slopes and vegetation from unnecessary disturbance, erosion and pollution discharges throughout construction.
2. Gradients and cross-slopes of all ramps and pedestrian pavements shall conform with requirements of the Americans with Disabilities Act. Do not exceed 1/4 inch per foot cross-slope.
Do not exceed 5.0% longitudinal slope on all pedestrian pavements with the exception of ramps. Do not exceed 8.33% longitudinal slope on all ramps.
3. The proposed grades shown depict the finished grade (top of asphalt/concrete pavement) of the proposed improvements. A summary of the estimated earthwork is as follows:
Earthwork Required to Reach Finished Grade Elevations:
Cut = 0± CY Fill = 800± CY (RAW)
*Note: All fill shall be obtained from offsite locations approved by the Engineer.
4. The Contractor shall excavate, haul, and stockpile (as necessary) suitable fill materials for installation in the new construction.
5. The Contractor shall take into account rock excavation, soil shrinkage, swelling, topsoil segregation, and general grading operations in the final earthwork considerations.
6. Excess excavation shall be wasted or stockpiled onsite, in a manner acceptable to the Owner.
7. See Sheet G1.1 for construction staking points.
Existing Ground (1' and 5' Contours) (Typ)
Proposed Ground (1' and 5' Contours) (Typ)
Approximate Grading Extents
Proposed Water Service Line (Typ) Proposed Concrete
Retaining Wall
Proposed Concrete Retaining Wall Footing Extents
Proposed Concrete Sidewalk
Existing Well #1
Proposed Chlorination Building (FFE = 1821.5')
Proposed CMP Culvert
Proposed Floor Drain Piping & French Drain
1815'
Existing Building (KDWP Headquarters)
1816'
1817'
1818'
1819'
1819'
1820'
1818'
1817'
1816'
1821'
Existing Ground (typ)
Top of Retaining Wall (typ)
Proposed Ground at Top of Retaining Wall (typ)
Proposed Ground at Bottom of Retaining Wall (typ)
Top of Retaining Wall Elev. (typ)
Existing Ground Elev. (typ)
Existing Gas Line (typ)
Existing Fiber Optic Line (typ)
Existing San. Sewer (typ)
Existing Tree (typ)
Proposed Electrical (typ)
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text E
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text
YH
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text House
AutoCAD SHX Text Shed
AutoCAD SHX Text Porch
AutoCAD SHX Text Conc
AutoCAD SHX Text Landscape
AutoCAD SHX Text Landscape
AutoCAD SHX Text Conc
AutoCAD SHX Text W
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc
AutoCAD SHX Text Asphalt
AutoCAD SHX Text Asphalt
AutoCAD SHX Text V
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text V
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text V
AutoCAD SHX Text W
AutoCAD SHX Text V
AutoCAD SHX Text W
AutoCAD SHX Text 24.1.0274
AutoCAD SHX Text February 2026
AutoCAD SHX Text
TS
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
PROJECT NO
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
JB
AutoCAD SHX Text 10'
AutoCAD SHX Text
10'
IL
E
N G
IN
EE
R S
| L
AN
D S
U R
VE
YO
R S
| L
AN
D
SC
AP
E
AR
C
H
IT
EC
TS
L
ED
G E
ST
O
N E
D R
IV
E, S U
IT
E
| M
AN
H
AT
TA
N
, K
AN
SA
S
| P . 7
.5
.4
W A
TE
R
S Y
S
TE
M
IM
P R
O V
E M
E N
TS
K D
W P
O P
E R
A
TI
O N
S H
E A
D Q
U A
R
TE
R S
P
R A
TT
, K
A N
S A
S K an sa s D ep ar tm en t o f W ild lif e an d P ar ks
O pe ra tio ns H ea dq ua rt er s
S E
5t h A ve nu e P ra tt, K an sa s
C2.2 Utilities Staking
Plan
Existing Ground (1' and 5' Contours) (Typ)
Approximate Grading Extents
Proposed Concrete Retaining Wall
Proposed Concrete Sidewalk
Existing Well #1
Proposed Chlorination Building
Proposed CMP Culvert
Proposed Floor Drain Piping & French Drain
Existing Building (KDWP Headquarters)
Existing Building
(KDWP
Engineering)
Existing Building
(KDWP
Maintenance)
GENERAL NOTES:
1. The existing site information shown hereon is based on a topographic survey performed by Schwab Eaton, February 5, 2025.
2. The Contractor shall field verify the actual locations, bury depths and sizes of all existing utilities prior to commencing construction activities. He shall contact the Kansas One-Call system a minimum of two full business days prior to Work to request marking of utilities by the respective utility owners. He shall directly contact all utility owners not subscribing to the One-Call system.
3. Utilities, including electrical and communication services, shall be installed underground, unless otherwise noted.
4. Water and sewer utility lines shall maintain minimum 10' horizontal separation and 2' vertical separation in accordance with KDHE standards. If 2' vertical separation cannot be maintained at a crossing location, pipe segments shall be centered at the crossing and concrete encased.
5. Coordinate with KDWP regarding the time of the removal or relocation of old utility service lines and installation/relocation of new lines. Minimize the time of disturbance to existing utilities.
6. See Sheet G1.1 for construction staking points.
Install 130± L.F. 2" HDPE DR 9 Water Line
Install 15± L.F. 2" HDPE DR 9 Water Line
Existing Gas Line (typ)
Existing Fiber Optic Line (typ)
Existing San. Sewer (typ)
Existing Tree (typ)
Proposed Electrical (typ)
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text E
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text
AC
AutoCAD SHX Text
AC
AutoCAD SHX Text
YH
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc Walk
AutoCAD SHX Text House
AutoCAD SHX Text Shed
AutoCAD SHX Text Shop
AutoCAD SHX Text Porch
AutoCAD SHX Text Deck
AutoCAD SHX Text Conc
AutoCAD SHX Text Shop
AutoCAD SHX Text Gravel
AutoCAD SHX Text Trees
AutoCAD SHX Text Landscape
AutoCAD SHX Text Landscape
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc
AutoCAD SHX Text W
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc
AutoCAD SHX Text Conc
AutoCAD SHX Text Asphalt
AutoCAD SHX Text Asphalt
AutoCAD SHX Text Asphalt
AutoCAD SHX Text V
AutoCAD SHX Text W
AutoCAD SHX Text E
AutoCAD SHX Text E
AutoCAD SHX Text V
AutoCAD SHX Text W
AutoCAD SHX Text W
AutoCAD SHX Text V
AutoCAD SHX Text W
AutoCAD SHX Text V
AutoCAD SHX Text W
AutoCAD SHX Text 24.1.0274
AutoCAD SHX Text February 2026
AutoCAD SHX Text
TS
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
PROJECT NO
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
JB
AutoCAD SHX Text 10'
AutoCAD SHX Text
AutoCAD SHX Text 10'
AutoCAD SHX Text Install 80± L.F. of 3" HDPE DR 9 Water Line
AutoCAD SHX Text Install 25± L.F. of 1" HDPE DR 9 Water Line
AutoCAD SHX Text Install 45± L.F. of 3" HDPE DR 9 Water Line
Install 15± L.F. of 2" HDPE DR 9 Water Line
A A
B
B
10' Min. Horizontal Separation
C
IV
IL
E
N G
IN
EE
R S
| L
AN
D S
U R
VE
YO
R S
| L
AN
D
SC
AP
E
AR
C
H
IT
EC
TS
L
ED
G E
ST
O
N E
D R
IV
E, S U
IT
E
| M
AN
H
AT
TA
N
, K
AN
SA
S
| P . 7
.5
.4
W A
TE
R
S Y
S
TE
M
IM
P R
O V
E M
E N
TS
K D
W P
O P
E R
A
TI
O N
S H
E A
D Q
U A
R
TE
R S
P
R A
TT
, K
A N
S A
S K an sa s D ep ar tm en t o f W ild lif e an d P ar ks
O pe ra tio ns H ea dq ua rt er s
S E
5t h A ve nu e P ra tt, K an sa s
C3.0 Chlorination
Building DetailsNote: Underground piping not shown for clarity.
CHLORINATION BUILDING (SOUTH ELEVATION VIEW)
Scale: Not to Scale
CHLORINATION BUILDING (SECTION VIEW A-A)
Scale: Not to Scale
CHLORINATION BUILDING (PLAN VIEW)
Scale: Not to Scale
CHLORINATION BUILDING (SECTION VIEW B-B)
Scale: Not to Scale
Note: Underground piping not shown for clarity.
FURRING DETAIL (COLD WEATHER PACKAGE)
Scale: Not to Scale
General Notes:
1. The building shown hereon is based on a pre-cast concrete building (Bid Alternate 1). A fiberglass building (Bid Alternate 2) with equivalent insulation system (R-value) shall be considered an acceptable alternative to the building shown.
2. The Contractor shall be responsible for the design of the insulation system and foundation for the fiberglass building (Bid Alternate 2).
3. The Contractor shall submit detailed plan drawings for the fiberglass building (Bid Alternate 2) for Owner/Engineer review and approval prior to fabrication.
AutoCAD SHX Text 5'-0" Sidewalk
AutoCAD SHX Text 16'-0"
AutoCAD SHX Text 11'-6"
AutoCAD SHX Text 5'-0" (Min)(Typ)
AutoCAD SHX Text Chlorination Building (Pre-Cast Concrete or Fiberglass). See Specifications
AutoCAD SHX Text 2'-6"
AutoCAD SHX Text 4" MJ 90° Bend/4" DIP Floor Drain Pipe 1% (Min) Slope
AutoCAD SHX Text 5' Wide, 6" Thick Sidewalk. See Details, Sheet C3.1.C3.1..
AutoCAD SHX Text Slope 1.5%
AutoCAD SHX Text Galvanized Pipe Support (As Required)
AutoCAD SHX Text 90° Bend
AutoCAD SHX Text Sample Tap & 12" Ball Valve (Raw Water)
AutoCAD SHX Text 4" Floor Drain w/ Screened Cover
AutoCAD SHX Text 2" C.V.
AutoCAD SHX Text 2" Turbine Meter w/ Strainer (if Req'd)
AutoCAD SHX Text Liquid Sodium Hypochlorite Solution Tank, 30 Gallon (Min) with Secondary Gallon (Min) with Secondary Spill Containment (Sized to be at Least 110% of the Tank Volume)
AutoCAD SHX Text Install Tank-Mounted Chemical Injection Pump
AutoCAD SHX Text Vent Chlorine Tank to Exterior of Building (Near Building Roof) with Down Turned Tubing and a #24 Type 304 Stainless Screen at Tube End
AutoCAD SHX Text DIP to PVC Transition Coupling
AutoCAD SHX Text 4" DIP Drain line
AutoCAD SHX Text 3'-6" (3' Min. CLR From Borehole - All Directions)
AutoCAD SHX Text 2" G.V. (Typ)
AutoCAD SHX Text 2"x10" Spool
AutoCAD SHX Text 2"x6" Spool
AutoCAD SHX Text Existing Well
AutoCAD SHX Text 90° Bend
AutoCAD SHX Text 90° Bend
AutoCAD SHX Text Tee
AutoCAD SHX Text Static Mixer
AutoCAD SHX Text 90° Bend
AutoCAD SHX Text 90° Bend
AutoCAD SHX Text Extend Existing Well/Well Casing (See Detail, Sheet C3.3)C3.3))
AutoCAD SHX Text 2" C.V.
AutoCAD SHX Text 2"x10" Spool
AutoCAD SHX Text 2"x6" Spool
AutoCAD SHX Text 2" G.V.
AutoCAD SHX Text Tee
AutoCAD SHX Text 12" Ball Valve and Liquid Chlorine Injector
AutoCAD SHX Text 14" Brass Ball Valve, Pressure Switch and 4" Dia Pressure Gauge
AutoCAD SHX Text 7'-5 "12"
AutoCAD SHX Text Liquid Chlorine Tubing
AutoCAD SHX Text 36" Double Doors
AutoCAD SHX Text Install New Wellhead/Well Seal with Vent (See Detail, Sheet C3.3)C3.3))
AutoCAD SHX Text 2" Distribution Piping
AutoCAD SHX Text Chlorination Building (Pre-Cast Concrete or Fiberglass)
AutoCAD SHX Text 2" PVC Distribution Pipe
AutoCAD SHX Text 2" PVC Distribution Pipe
AutoCAD SHX Text 4" PVC Floor Drain Pipe 1% (Min) Slope.
AutoCAD SHX Text 425± GallonVertical, Bladder-Style Pressure Tank
AutoCAD SHX Text 425± GallonVertical, Bladder-Style Pressure Tank
AutoCAD SHX Text 34" Air Release Valve with " 34" Isolation Ball Valve. Terminate Vent 24" from Floor and Screen Outlet
AutoCAD SHX Text 2" Turbine Meter with Strainer (if Req'd)
AutoCAD SHX Text PVC to HDPE Reducer and Transition Coupling
AutoCAD SHX Text 3" HDPE Distribution Pipe
AutoCAD SHX Text PVC to HDPE Reducer and Transition Coupling
AutoCAD SHX Text 2" HDPE Distribution Pipe
AutoCAD SHX Text
FFE 1821.5'
AutoCAD SHX Text Floor Block- Out (Typ)
AutoCAD SHX Text 6" Typ
AutoCAD SHX Text
6" CL
AutoCAD SHX Text Typ
AutoCAD SHX Text Floor Block-Out (Typ) Note: Joint Between Well Casing and Concrete Floor Shall Be Watertight
AutoCAD SHX Text 2" Pipe to Pressure Tanks
AutoCAD SHX Text Floor Thickness per Building Manufacturer (4" Min.)
AutoCAD SHX Text Slope 1% (Min.)
AutoCAD SHX Text Slope 1% (Min.)
AutoCAD SHX Text Slope 1% (Min.)
AutoCAD SHX Text Slope 1% (Min.)
AutoCAD SHX Text Tee
AutoCAD SHX Text Static Mixer
AutoCAD SHX Text 4 Legged Stand Alone Sink
AutoCAD SHX Text Sample Tap w/ 12" Ball Valve (Raw Water)
AutoCAD SHX Text 34" Raw Water Line
AutoCAD SHX Text 34" Treated Water Line
AutoCAD SHX Text 90° Bend
AutoCAD SHX Text 34" SDR 9 HDPE Treated Water Line
AutoCAD SHX Text Stainless Steel Vent near Top of Wall (2 Required) (Provide 4" thick High Density Board Insulation, Cut to Fit Opening)(2 Required)
AutoCAD SHX Text Tee
AutoCAD SHX Text Sample Tap w/ " Ball 12" Ball Valve (Treated Water)
AutoCAD SHX Text 2'X2' Access Hatch for Well Pump Removal
AutoCAD SHX Text 8'-0"
AutoCAD SHX Text 7'-6"
AutoCAD SHX Text 12"
AutoCAD SHX Text 5 #4 Horizontal Bars @ Equal Spacing (Each Face) (Typ)
AutoCAD SHX Text 11'-6"
AutoCAD SHX Text #4 Vertical Bars @ 18" Centers (Each Face) (Typ)
AutoCAD SHX Text Backfill Inside Building Footing with Compacted Fill Sand
AutoCAD SHX Text
FFE 1821.5'
AutoCAD SHX Text Ceiling: 2"x6" @ 24" O.C. Minimum System Insulation Rating R-30 Rigid Insulation with " Fiberglass Reinforced 18" Fiberglass Reinforced Panel on " Fire Rated OBS 12" Fire Rated OBS Sheathing and Vapor Barrier. Caulk All Interior Seams.
AutoCAD SHX Text Walls: 2"x4" @ 24" O.C. Minimum Wall System Insulation Rating R-19 Rigid Insulation with " Fiberglass Reinforced 18" Fiberglass Reinforced Panel on " Fire Rated OBS 12" Fire Rated OBS Sheathing and Vapor Barrier. Caulk All Interior Seams.
AutoCAD SHX Text Slab-On-Grade Insulation: 2" R-13 Rigid Insulation
AutoCAD SHX Text Seal All Joints of Outside Panels with Exterior Grade Sealant
AutoCAD SHX Text Exterior Panel
AutoCAD SHX Text Footing
AutoCAD SHX Text Backfill Inside Building Footing with Compacted Fill Sand
AutoCAD SHX Text 24.1.0274
AutoCAD SHX Text February 2026
AutoCAD SHX Text
TS
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
PROJECT NO
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
JB
AutoCAD SHX Text 5:1
AutoCAD SHX Text Existing Ground
AutoCAD SHX Text To Distribution
AutoCAD SHX Text System
AutoCAD SHX Text 6.5'%%128
AutoCAD SHX Text 10'%%P
AutoCAD SHX Text Chlorination Building
AutoCAD SHX Text 6068 Double Steel Door
AutoCAD SHX Text W/ South Leaf Active
AutoCAD SHX Text & North Leaf Passive
AutoCAD SHX Text SS Wall Vent w/ SS
AutoCAD SHX Text Screen (Two Rqr'd -
AutoCAD SHX Text Opposite Sides)
AutoCAD SHX Text Fill Area Surrounding
AutoCAD SHX Text Chlorination Building w/
AutoCAD SHX Text Select Soil & Compact
AutoCAD SHX Text to 95%%% Max. Dry Density.
AutoCAD SHX Text 5%%%%%P
AutoCAD SHX Text To Distribution
AutoCAD SHX Text System
AutoCAD SHX Text 10'%%P
AutoCAD SHX Text 5%%%%%P
AutoCAD SHX Text 3.5'%%128
AutoCAD SHX Text
FFE 1821.5'
AutoCAD SHX Text 12"
Min.
TYP. CONTRACTION JOINTA
"T
"T 1"
"T 2"
6"
"E"
6" "T
2" "T
1"
"T
6" "T
2" "T
1"
"T
6" "T
2" "T
1"
"T
TYP. CONSTRUCTION JOINT
TYP. EXPANSION JOINT
TYP. EXPANSION JOINT
AGAINST EXIST. CONC. PVG.
Joint sealer reservior.
Induced crack.
Reinforcing Steel. See Table.
Conc. pavement.
Aggregate base.
Scarify & re-compact subgrade.
Subsoil.
Subsoil.
Scarify & re-compact subgrade.
Aggregate base.
Conc. pavement.
Deformed dowel bar @ 12" o.c. See Table.
Cold joint w/ bonding compound.
Joint sealer reservior.
Subsoil.
Scarify & re-compact subgrade.
Aggregate base.
Conc. pavement.
1/2" th. joint filler.
Joint sealer reservior.
Subsoil.
Exist. conc. pavement.
(Verify thickness).
Joint sealer reservior.
Reinforcing Steel. See Table.
Reinforcing Steel. See Table.
Smooth dowel bar @ 12" o.c. See Table.
1/2" th. joint filler.
Smooth dowel bar @ 12" o.c. See Table.
New reinf. conc. pavement w/ aggregate base & subgrade prep.
Joint tooled to 1/4 pvmt.
depth. See Specifications.
Slip cap.
Lubricate this end. "E"
Slip cap.
Lubricate this end. "E" min.
min.
min.
A
B
C
D Scale: Not to Scale
Scale: Not to Scale
Scale: Not to Scale
Scale: Not to Scale
THICKNESS "T":
"T1" = 6" for sidewalk, driving, and parking areas.
"T2" = 4" for sidewalk, 6" for driving and parking areas.
DOWEL BAR SIZE
"T" Dia. "E" Length 6" #6 6" 14"
REINFORCING STEEL
Area Reinforcing Steel Sidewalk #4 rebar on 18" centers.
Driving/Parking #4 rebar on 18" centers.
ASPHALT PATCH REPLACEMENTE Scale: Not to Scale
Note:
Where existing asphalt is overlaid on concrete #4 bars 18" long shall be drilled into concrete on 36" centers.
Min. 2 bars per side.
CONCRETE PATCH REPLACEMENTF Scale: Not to Scale
Note:
Rebars shall be staggered on 36" centers with a min. of 2 bars per side. Concrete shall be finished with " edger and all joints shall be sealed.
C
IV
IL
E
N G
IN
EE
R S
| L
AN
D S
U R
VE
YO
R S
| L
AN
D
SC
AP
E
AR
C
H
IT
EC
TS
L
ED
G E
ST
O
N E
D R
IV
E, S U
IT
E
| M
AN
H
AT
TA
N
, K
AN
SA
S
| P . 7
.5
.4
W A
TE
R
S Y
S
TE
M
IM
P R
O V
E M
E N
TS
K D
W P
O P
E R
A
TI
O N
S H
E A
D Q
U A
R
TE
R S
P
R A
TT
, K
A N
S A
S K an sa s D ep ar tm en t o f W ild lif e an d P ar ks
O pe ra tio ns H ea dq ua rt er s
S E
5t h A ve nu e P ra tt, K an sa s
C3.1 Misc. Site Details
AutoCAD SHX Text Saw Cut
AutoCAD SHX Text Saw Cut
AutoCAD SHX Text 8"
AutoCAD SHX Text 8"
AutoCAD SHX Text Trench Width
AutoCAD SHX Text #4 Rebar 18" Length
AutoCAD SHX Text Drilled in 9"
AutoCAD SHX Text min.
AutoCAD SHX Text min.
AutoCAD SHX Text Concrete
AutoCAD SHX Text 3"
AutoCAD SHX Text Match Exist.
AutoCAD SHX Text Pvmt. 6"min.
AutoCAD SHX Text Undisturbed
AutoCAD SHX Text Material
AutoCAD SHX Text to 95%%%
AutoCAD SHX Text Backfill Compacted
AutoCAD SHX Text Saw Cut
AutoCAD SHX Text Saw Cut
AutoCAD SHX Text
1%%141" BM 2
AutoCAD SHX Text 8"
AutoCAD SHX Text Trench Width
AutoCAD SHX Text 8"
AutoCAD SHX Text min.
AutoCAD SHX Text min.
AutoCAD SHX Text Match Exist.
AutoCAD SHX Text Pvmt. 6" min.
AutoCAD SHX Text Concrete
AutoCAD SHX Text to 95%%%
AutoCAD SHX Text Backfill Compacted
AutoCAD SHX Text Undisturbed
AutoCAD SHX Text Material
AutoCAD SHX Text 24.1.0274
AutoCAD SHX Text February 2026
AutoCAD SHX Text
TS
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
PROJECT NO
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHECKED BY
2'-0"
2' -0
Granular Backfill
FINISH GRADE
Geotextile Fabric
6"
6"
Foundation Stabilization or AB-3 Base (Typ.)
Notes:
-Place a 34" chamfer on all exposed edges.
-Maintain 2" concrete cover over reinforcing bars.
-Maintain 3" concrete coverover reinforcing where concrete is poured against earth or rock.
-Concrete shall be grade 4.0 (f'c = 4,000 psi).
-Reinforcing steel shall be grade 60 (fy = 60,000 psi).
-Dimensions on bending diagrams are out-to-out of bars.
2'-7"
5' -3
#7 F3 Bars
#4 F8 Bars#6 F7 Bars
2'-7" 9"
2' -6
"4' -0
#5 F9 Bars
2'-1"
3' -3
#4 F12 Bars
2'-1"
2' -9
#4 S11 Bars
1'-7 1/2"
1' -6
#4 S12 Bars
1'-1"
1' -6
4" Dia. Weep Hole
6"
G CANTILEVER RETAINING WALL (TYPICAL SECTION)
Scale: Not to Scale
I RETAINING WALL DRAINAGE BACKFILL (TYPICAL)
Scale: Not to Scale
J BENDING DIAGRAMS
Scale: Not to Scale
H RETAINING WALL HANDRAIL
Scale: Not to Scale
(PLAN - CORNER REINFORCEMENT)
3'
-6
1'-0"
V ar ie s
(S ee
P ro fil e)
2' -6
V ar ie s
(S ee
P ro fil e)
1'-6"
1' -0
5'-0"
7'-6"
2' -6
#4 H2 Horizontal Bars @ 12" Sp.
#5 V5 Vertical Bars @ 12" Sp.
#4 V6 Vertical Bars @ 12" SP.
#5 F10 Bars @ 12" Sp.
#5 F9 Bars @ 12" Sp.
#4 F5 Bars @ 12" Sp. (top and bottom)
(TYP. SECTION)
#4 F8 Dowel Bar @ 12" Sp.
#4 F16 Bars @ 18" Sp.
#4 C1 horizontal bars @ 12" Sp.
#4 C2 horizontal bars @ 12" Sp.
6" Ø Perforated Drain Pipe 1% Minimum Slope Outlet to daylight at end of wall.
C
IV
IL
E
N G
IN
EE
R S
| L
AN
D S
U R
VE
YO
R S
| L
AN
D
SC
AP
E
AR
C
H
IT
EC
TS
L
ED
G E
ST
O
N E
D R
IV
E, S U
IT
E
| M
AN
H
AT
TA
N
, K
AN
SA
S
| P . 7
.5
.4
W A
TE
R
S Y
S
TE
M
IM
P R
O V
E M
E N
TS
K D
W P
O P
E R
A
TI
O N
S H
E A
D Q
U A
R
TE
R S
P
R A
TT
, K
A N
S A
S K an sa s D ep ar tm en t o f W ild lif e an d P ar ks
O pe ra tio ns H ea dq ua rt er s
S E
5t h A ve nu e P ra tt, K an sa s
C3.2 Retaining Wall
Details
AutoCAD SHX Text Minimum Splice Lengths
AutoCAD SHX Text #4
AutoCAD SHX Text #5
AutoCAD SHX Text 1'-6"
AutoCAD SHX Text 1'-9"
AutoCAD SHX Text 1%%141" %%C Handrail (Typ)
AutoCAD SHX Text 8'-0"
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text 4'-0"
AutoCAD SHX Text Retaining Wall
AutoCAD SHX Text Retaining Wall
AutoCAD SHX Text 1%%141" %%C Hanrail (Typ)
AutoCAD SHX Text 24.1.0274
AutoCAD SHX Text February 2026
AutoCAD SHX Text
TS
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
PROJECT NO
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHECKED BY
IL
E
N G
IN
EE
R S
| L
AN
D S
U R
VE
YO
R S
| L
AN
D
SC
AP
E
AR
C
H
IT
EC
TS
L
ED
G E
ST
O
N E
D R
IV
E, S U
IT
E
| M
AN
H
AT
TA
N
, K
AN
SA
S
| P . 7
.5
.4
W A
TE
R
S Y
S
TE
M
IM
P R
O V
E M
E N
TS
K D
W P
O P
E R
A
TI
O N
S H
E A
D Q
U A
R
TE
R S
P
R A
TT
, K
A N
S A
S K an sa s D ep ar tm en t o f W ild lif e an d P ar ks
O pe ra tio ns H ea dq ua rt er s
S E
5t h A ve nu e P ra tt, K an sa s
C3.3 Misc. Water Details
2" Pipe = 8" Min.
TRENCH WIDTHS
Pipe
NOTES:
1. Pipe may be bedded and covered with native soil materials provided they are free from rocks or other objectionable materials.
2. In the event that the trench bottom becomes soft or mucky and cannot provide uniform bearing for the pipe the trench shall be over excavated a minimum of 4" below and on either side of the pipe and the pipe shall be bedded in compacted select soil material or fill sand.
3. In the event that rocky subgrade materials are encountered the trench shall be over excavated a minimum of 6" below the pipe and on either side of the pipe and all materials so removed shall be replaced with compacted select soil material or fill sand.
NOTES:
1. Extend well as shown above. Concrete floor elevation to be 1821.5' at the well (100-Year Elevation = 1819.4' & 500-Year Elevation = 1820.4')
K WELLHEAD TERMINATION DETAIL
Scale: Not to Scale
M CONCRETE THRUST BLOCK DETAILS
Scale: Not to Scale N WATER LINE TRENCH DETAIL
Scale: Not to Scale O
TYPICAL GATE VALVE SETTING
Scale: Not to Scale
L FLOOR DRAIN FRENCH DRAIN
Scale: Not to Scale
AutoCAD SHX Text 24.1.0274
AutoCAD SHX Text February 2026
AutoCAD SHX Text
TS
AutoCAD SHX Text
REVISION
AutoCAD SHX Text
SHEET
AutoCAD SHX Text
PROJECT NO
AutoCAD SHX Text
DRAWN BY
AutoCAD SHX Text
DATE
AutoCAD SHX Text
CHECKED BY
AutoCAD SHX Text
JB
AutoCAD SHX Text
THRUST BLOCK BEARING AREA
AutoCAD SHX Text
PIPE SIZE
AutoCAD SHX Text 90%%d BEND
AutoCAD SHX Text 45%%d BEND
AutoCAD SHX Text
22 %%DBEND
AutoCAD SHX Text
TEE
AutoCAD SHX Text 4" or Smaller
AutoCAD SHX Text 6"
AutoCAD SHX Text Sq.Ft.
AutoCAD SHX Text Sq.Ft.
AutoCAD SHX Text Sq.Ft.
AutoCAD SHX Text Sq.Ft.
AutoCAD SHX Text Sq.Ft.
AutoCAD SHX Text Sq.Ft.
AutoCAD SHX Text Sq.Ft.
AutoCAD SHX Text Sq.Ft.
AutoCAD SHX Text Sq.Ft.
AutoCAD SHX Text Sq.Ft.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Blocking of tees is to be placed opposite the branch and area is based on
AutoCAD SHX Text branch size. All material, labor, & equipment required to construct concrete
AutoCAD SHX Text thrust blocks shall be considered subsidiary to other items of work.
AutoCAD SHX Text Concrete Thrust
AutoCAD SHX Text Block
AutoCAD SHX Text
TYPICAL BEND
AutoCAD SHX Text Bearing Area
AutoCAD SHX Text Undisturbed
AutoCAD SHX Text Earth
AutoCAD SHX Text
STANDARD TEE
AutoCAD SHX Text a
AutoCAD SHX Text e
AutoCAD SHX Text r
AutoCAD SHX Text A
AutoCAD SHX Text g
AutoCAD SHX Text n
AutoCAD SHX Text i
AutoCAD SHX Text r
AutoCAD SHX Text a
AutoCAD SHX Text e
AutoCAD SHX Text B
AutoCAD SHX Text 8"
AutoCAD SHX Text Sq.Ft.
AutoCAD SHX Text Sq.Ft.
AutoCAD SHX Text Sq.Ft.
AutoCAD SHX Text Sq.Ft.
AutoCAD SHX Text Sq.Ft.
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text Concrete Thrust
AutoCAD SHX Text Block
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
11 %%DBEND
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text 3.5' Min. Depth
AutoCAD SHX Text 6"
AutoCAD SHX Text Varies
AutoCAD SHX Text Varies
AutoCAD SHX Text As Shown In Table
AutoCAD SHX Text 3" Min.
AutoCAD SHX Text Trench Wall
AutoCAD SHX Text Existing Grade
AutoCAD SHX Text Backfill Material
AutoCAD SHX Text Cover Material
AutoCAD SHX Text Bedding Material
AutoCAD SHX Text Undisturbed
AutoCAD SHX Text Trench Bottom
AutoCAD SHX Text Concrete
AutoCAD SHX Text Support Block
AutoCAD SHX Text Asphalt Surface
AutoCAD SHX Text Edges Except in
AutoCAD SHX Text Round Conc.
AutoCAD SHX Text Concrete Collar
AutoCAD SHX Text 3' Square Protective
AutoCAD SHX Text Gate Valve
AutoCAD SHX Text Valve box
AutoCAD SHX Text (Typ.)
AutoCAD SHX Text Slope
AutoCAD SHX Text 6"
AutoCAD SHX Text Extend Existing 8" Well Casing
AutoCAD SHX Text Terminate Under Vent Cap
AutoCAD SHX Text
2" PVC SCH 80
AutoCAD SHX Text Screened
AutoCAD SHX Text Well Vent
AutoCAD SHX Text Min.
AutoCAD SHX Text 12"
AutoCAD SHX Text Piping
AutoCAD SHX Text
FFE. 1821.5'
AutoCAD SHX Text Earthen Fill/Compacted Sand
AutoCAD SHX Text Install New Wellhead/ Well Seal with Screened
AutoCAD SHX Text Well Vent and Top Discharge
AutoCAD SHX Text Install New Drawdown Tube
AutoCAD SHX Text Existing Pump Elevation
AutoCAD SHX Text Install New 2" R.J. PVC Drawdown Tube to
AutoCAD SHX Text to Existing Pump Elevation
AutoCAD SHX Text (Note: Match Material and Wall Thickness)
AutoCAD SHX Text (Note: Sand-Cement or Neat Cement Grout
AutoCAD SHX Text for Annular Space Between Casing and Soil)
AutoCAD SHX Text Install Watertight Seal Between
AutoCAD SHX Text Casing and Concrete Floor
AutoCAD SHX Text 1'-0"
AutoCAD SHX Text 4"x4"x2" Tees Tilted 30°± Downword
AutoCAD SHX Text Finished Grade
AutoCAD SHX Text 18" of 2" PVC Pipes with Sawcut Perforations
AutoCAD SHX Text Place Plastic Sheet over Gravel before Backfilling
AutoCAD SHX Text 2" PVC Caps with Drill Holes
AutoCAD SHX Text Provide 36 C.F. of Gravel for Drainage (2'x3'x6')
AutoCAD SHX Text Wrap Gravel with 8oz Non-Woven Geotextile Fabric
NOTE: Install 3 Tees with perforated drains at 1' spacing at the end of the chlorination building drain pipe.
IL
E
N G
IN
EE
R S
| L
AN
D S
U R
VE
YO
R S
| L
AN
D
SC
AP
E
AR
C
H
IT
EC
TS
L
ED
G E
ST
O
N E
D R
IV
E, S U
IT
E
| M
AN
H
AT
TA
N
, K
AN
SA
S
| P . 7
.5
.4
W A
TE
R
S Y
S
TE
M
IM
P R
O V
E M
E N
TS
K D
W P
O P
E R
A
TI
O N
S H
E A
D Q
U A
R
TE
R S
P
R A
TT
, K
A N
S A
S K an sa s D ep ar tm en t o f W ild lif e an d P ar ks
O pe ra tio ns H ea dq ua rt er s
S E
5t h A ve nu e P ra tt, K an sa s
ME1
SITE PLAN
IL
E
N G
IN
EE
R S
| L
AN
D S
U R
VE
YO
R S
| L
AN
D
SC
AP
E
AR
C
H
IT
EC
TS
L
ED
G E
ST
O
N E
D R
IV
E, S U
IT
E
| M
AN
H
AT
TA
N
, K
AN
SA
S
| P . 7
.5
.4
W A
TE
R
S Y
S
TE
M
IM
P R
O V
E M
E N
TS
K D
W P
O P
E R
A
TI
O N
S H
E A
D Q
U A
R
TE
R S
P
R A
TT
, K
A N
S A
S K an sa s D ep ar tm en t o f W ild lif e an d P ar ks
O pe ra tio ns H ea dq ua rt er s
S E
5t h A ve nu e P ra tt, K an sa s
ME2
BASEMENT FLOOR
PLAN
LIGHT FIXTURE SCHEDULE
IV
IL
E
N G
IN
EE
R S
| L
AN
D S
U R
VE
YO
R S
| L
AN
D
SC
AP
E
AR
C
H
IT
EC
TS
L
ED
G E
ST
O
N E
D R
IV
E, S U
IT
E
| M
AN
H
AT
TA
N
, K
AN
SA
S
| P . 7
.5
.4
W A
TE
R
S Y
S
TE
M
IM
P R
O V
E M
E N
TS
K D
W P
O P
E R
A
TI
O N
S H
E A
D Q
U A
R
TE
R S
P
R A
TT
, K
A N
S A
S K an sa s D ep ar tm en t o f W ild lif e an d P ar…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .