Amendment_1_-_EVT0010965.pdf
PDF 414 KB Posted
- Attached to
- Pratt Water System Improvements
- Solicitation number
- EVT0010965
- Issued by
- Rawlins County, Kansas
About this file
This amendment document is issued by the Kansas Department of Administration, Office of Procurement and Contracts, on behalf of the Kansas Department of Wildlife, Parks and Tourism for the Pratt Water System Improvements project (Bid Event Number EVT0010965). The amendment, dated November 4, 2026, extends the bid closing date to December 1, 2026 at 2:00 PM and adds an optional site visit scheduled for Tuesday, November 10, 2026 at 10:00 AM at the Pratt Operations Office (512 SE 25th Ave, Pratt, KS 67124). The project encompasses water system improvements including well extensions, utility connections, concrete work, electrical improvements, and related site preparations. Bidders are strongly encouraged to attend the non-mandatory pre-bid site visit to tour the main building interior and understand current utility routing and available space for water and electrical service connections. The procurement officer is Ashley Evans, reachable at 1-785-296-8107 or Ashley.N.Evans@ks.gov.
The amendment provides critical project specifications and clarifications, including requirements for imported structural fill material (clean, inorganic soil free of debris and rocks exceeding 3 inches), traffic control measures maintaining a red lane for daily deliveries with blue areas designated for material and equipment storage, and utility service management protocols. The abandoned gas line shown on original plans has been rerouted, and contractors are responsible for locating and removing or disposing of abandoned lines during excavation. The contractor must minimize disruptions to building utilities during office hours (Monday-Friday, 8:00 AM-5:00 PM) and may have flexibility in routing interior electrical improvements and relocating the electrical service entry point to accommodate available space. A signed copy of this addendum must be submitted with all bid responses by the December 1, 2026 closing date.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Office of Procurement and Contracts 900 SW Jackson St., Room 451 South Topeka, KS 66612
Phone: 785-296-2376 Fax: 785-296-7240 https://admin.ks.gov/offices/procurement-contracts
Adam Proffitt, Secretary Todd Herman, Director Laura Kelly, Governor
AMENDMENT
Amendment Date: November 4, 2026 Amendment Number: 1
Bid Event Number: EVT0010965
Closing Date: December 1, 2026, 2:00 PM
Procurement Officer: Ashley Evans Telephone: 1-785-296-8107 E-Mail Address: Ashley.N.Evans@ks.gov
Agency: Kansas Department of Wildlife, Parks and Tourism Item: Pratt Water System Improvements
Conditions: Bid clarifications, Site Visit Added, Close Date Extended
An optional site visit has been scheduled for Tuesday, November 10th at 10:00AM at the following location:
Pratt Operations Office 512 SE 25th Ave, Pratt, KS 67124.
The meeting location will be outside the wellhouse.
A. Specifications for Imported Fill
Material Requirements
1. Imported fill shall consist of approved structural fill obtained from an off-site borrow source.
2. Material shall be clean, inorganic soil free from topsoil, organic matter, roots, vegetation, debris, construction waste, frozen material, asphalt, concrete, and other deleterious substances.
3. Fill shall be classified as a low- to moderate-plasticity soil suitable for structural support and compaction.
4. Material shall contain no rocks exceeding 3 inches (75 mm) in maximum dimension.
mailto:Ashley.N.Evans@ks.gov
Amendment 1 Event ID: EVT0010965
B. Traffic Control
RED – Lane must remain open for daily deliveries.
BLUE – Available area for material/equipment storage.
C. Gas Line The gas line shown on the plans under the new well house has been abandoned. A new gas service line has been re-routed. Contractor is responsible for locating the new gas service lines and remove/dispose abandoned lines when encountered during excavation.
D. Utility Service Disruptions KDWP campus office hours are Monday – Friday 8:00 am – 5:00 pm. Minimizing the overall disruption to the building's utilities is a priority and the Contractor will be required to utilize appropriate means and methods, including temporary service connections, to limit the overall length of service disruptions.
E. Electrical Service Contractors will be allowed a certain amount of latitude for adjustments to the routing of the interior electrical improvements, particularly the routing of the electrical service at the entrance to the building as shown on the site plans. The electrical service entry location can be moved to accommodate an alternate wiring path due to space availability inside the main building.
F. Site Visit Bidders are encouraged to visit the site to understand the current routing and interface with the main building utilities.
KDWP will hold a non-mandatory pre-bid meeting on site to allow bidders to tour the inside of the main building and provide information about the space available above the ceiling for routing the water and electrical to their respective service connections inside the main building.
A signed copy of this Addendum must be submitted with your bid. If your bid response has been returned, submit this Addendum by the closing date indicated above.
I (We) have read and understand this addendum and agree it is a part of my (our) bid response.
NAME OF COMPANY OR FIRM:
SIGNED BY:
TITLE: DATE:
It shall be the vendor's responsibility to monitor this website on a regular basis for any changes.
http://admin.ks.gov/offices/procurement-and-contract http://admin.ks.gov/offices/procurement-and-contract
File details come from the government source that posted it. Updated .