Attachment C Plans and Drawings.pdf
PDF 10 MB Posted
- Solicitation number
- S-10700-00014480
- Issued by
- Marion County, Oregon
About this file
This is a set of plans and drawings for the Salem Motor Pool Solar Panel Array Project, prepared by design professionals for the State of Oregon's Department of Administrative Services. The project involves installation of a 257.6 kilowatt DC solar photovoltaic system with 448 Canadian Solar modules rated at 575 watts each, configured with Solar Edge optimizers and four 50-kilowatt Solar Edge inverters to back feed the electrical grid and offset costs associated with electric vehicle charging stations at the Salem Motor Pool facility located at 1100 Airport Road SE, Salem, Oregon. The solar array will be mounted on ground-mounted racking systems using helical auger-type footings with a 20-degree tilt oriented 180 degrees south. The electrical system includes an AC-PV combiner panel, 800-amp bus, main breaker switchboard with 2,500-amp capacity, and interconnection to the existing utility infrastructure through Pacific Gas and Electric (PGE), with provisions for a net utility meter and exterior disconnect switch per utility requirements. The project documentation includes architectural site plans showing property boundaries, existing utilities, wetland areas, and access points; detailed erosion prevention and sediment control specifications; electrical one-line diagrams showing conductor sizing and distribution configuration; and technical legends for both civil and electrical components. The site plan indicates the project area encompasses multiple parcels with existing infrastructure including storm drains, sanitary sewers, water lines, electrical service, fiber optic lines, and gas lines that require protection and potential relocation.
The erosion prevention and sediment control requirements mandate comprehensive environmental protection measures during construction, including pre-construction delineation of clearing limits, installation of sediment fences and inlet protection, construction entrance controls, and maintenance of vegetated buffers. The contractor bears sole responsibility for managing all sediment, hazardous materials, and pollutants on-site, with requirements for spill prevention procedures, proper waste disposal, and compliance with City of Salem and state regulatory standards. Temporary stabilization of disturbed areas must occur within 14 days of inactivity or prior to forecasted rainfall, with permanent vegetation re-established by October 15 or covered with erosion control blankets through April 30. Electrical work specifications reference delegated design by the solar contractor, requiring coordination with utility interconnection requirements and compliance with National Electrical Code standards, including auxiliary grounding electrodes at each ground mount structure and bonding according to NEC 690.47(B). Bid Alternate 1 addresses potential additional requirements from PGE for exterior lockable visible knife-blade disconnect switches and external metering configurations, requiring contractors to confirm final interconnection specifications with the utility provider.
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
191192
JOB NO. 2100576
RY
AN
D
RI
VE
S
E
NOTES:
1.) VERTICAL DATUM: NAVD 88 (GEOID 12A)
ELEVATION WAS ESTABLISHED THROUGH A GPS OBSERVATION ON CONTROL POINT NO. 1 USING THE
OREGONREAL-TIME GPS NETWORK
(ORGN).
2.) BASIS OF BEARINGS FOR THIS SURVEY IS THE OREGON COORDINATE REFERENCE SYSTEM (OCRS), SALEM ZONE. THE RESULTANT BEARING OF THE EASTERLY RIGHT-OF-WAY OF RYAN DRIVE SE IS NORTH 00°01'23"
WEST.
3.) THIS MAP DOES NOT REPRESENT A BOUNDARY SURVEY. RIGHT OF WAY LINES SHOWN HEREON ARE
APPROXIMATEAND FOR REFERENCE ONLY.
4.) UTILITY LOCATIONS SHOWN ARE PER FIELD LOCATED UTILITY PAINT MARKS & REFERENCE MAPS MADE AVAILABLE BYTHE VARIOUS UTILITY PROVIDERS. UNLESS INDICATED, DEPTHS OF UTILITY LINES ARE NOT AVAILABLE. ALL
UTILITYLOCATIONS SHOULD BE FIELD VERIFIED (POTHOLED) PRIOR TO
CONSTRUCTION.
CURB INLET
RIM = 192.75'
FLOW LINE = 192.14'
IE 10" OUT (N) = 189.65'
CATCH BASIN
RIM = 190.63'
IE 6" OUT (N) = 189.13'
SANITARY MANHOLE
RIM = 191.60'
IE 8" IN (SW) = 181.18'
IE 24" IN (S) = 180.81'
IE 24" OUT (N) = 180.50'
STORM TABLE:
SANITARY TABLE:
GV
GV
D
CO
S
S
9"X2
CONCRETE SURFACE
EXISTING CONDITIONS LEGEND:
FIBER OPTIC LINE
ELECTRICAL LINE
SANITARY SEWER LINE
GAS LINE
WATER LINE
STORM LINE
CURB LINE
PROPERTY LINE
EDGE OF ASPHALT
DRIVEWAY ENTRY
DOUBLE POST SIGN
ELECTRICAL VAULT
CURB INLET
STORM MANHOLE WITH STRUCTURE
SANITARY/STORM STRUCTURE #
SANITARY/STORM CLEAN OUT
WATER VALVE
FIRE HYDRANT
CATCH BASIN
SIGN
SANITARY MANHOLE WITH STRUCTURE
FIBER OPTIC VAULT
GAS VALVE
FOUND MONUMENT
PROJECT CONTROL POINT
HANDICAP RAMP
LOT LINE
EASEMENT LINE
RIGHT-OF-WAY LINE
ASPHALT SURFACE
DECIDUOUS TREE
-PERIMETER REPRESENTS DRIPLINE
CONIFEROUS TREE
-PERIMETER REPRESENTS DRIPLINE
UNDERGROUND LINE PER AS-BUILTS
NORTH
603015030
1 INCH = 30 FEET
SCALE
111 SW Fifth Ave., Suite 2400 Portland, OR 97204 O: 503.227.3251 F: 503.224.4681 www.kpff.com
PROJECT CONTROL:
STATION
DESCRIPTION
MAG NAIL W/ WASHER "KPFF CONTROL"
1-1/8" BRASS CAP "KPFF CONTROL"
NORTHING
214662.40
214288.16
EASTING
184771.14
184803.58
ELEVATION
192.34'
193.04'
20'
19'
10'
4'
6'
6'
4'
6'
6'
6'
6'
8'
6'
12'
10'
19'
20'
20'
20'
15'
50'
50'
N 3
EXISTING CONDUIT
PANEL AC-PV
INVERTER
INVERTERS
INVERTER
EXISTING JUNCTION
BOX
EXISTING
GUARDRAIL
EXTENT OF
EXISTING
ASPHALT PAVING
EXISTING
CONCRETE CURB
AND SIDEWALK
EXISTING
CHAIN LINK
FENCE
EXTENT OF
EXISTING
ASPHALT PAVING
EXISTING
SLIDING
GATE
SLIDING GATE, SEE
2/A-100
EXISTING
HYDRANT
EXISTING CHAIN
LINK FENCE
DASH LINE INDICATES
EXTENT OF EXISTING
WETLAND
DASH LINE INDICATES
EXTENT OF EXISTING
WETLAND
NEW BURIED
ELECTRICAL
SERVICE
EXISTING
CONCRETE CURB
RAMP
FENCE
ENCLOSURE,
SEE 3/A100
20'-0"
6' -0
4-INCH OD POST (3)
GATE LATCH
SET POSTS IN
CONCRETE FOOTING
TENSION BAND AT
15-INCH OC
DOME CAP
2 7/8-INCH OD
CORNER/END POST
TENSION BAR
TENSION BAND AT
15-INCH OC
TENSION WIRE
SET POSTS IN
CONCRETE FOOTING
POST CAP
6' -0
MAX
10'-0" OC
2 3/8-INCH OD LINE POST
CHAIN LINK FABRIC
1 1/2-INCH TOP RAIL
LINE POST LOOP CAP
BRACE BAND
BRACE BAND
1 1/2-INCH OD
BRACE
CHECKED BY:
DRAWN BY:
SCALE:
JOB NO.
DATE:
SHEET NUMBER:
SHEET TITLE:
SET TITLE:
STAMP:
7/ 9/
0:
:2
AM
C :\U se rs
\s po th en
\O ne
D riv e
- C an no nD es ig n\
D es kt op
\M od el s\
D
AS
P V
AR
R
AY
-4
.rv t
As indicated
A
IR
PO
RT
R
OA
D
SE
SA
LE
M, O
R
1-6
OR
EG
ON
D
AS
FL
EE
T
SE
RV
IC
ES
A-100
ARCHITECTURAL SITE
PLAN AND
ELEVATIONS
BJC
SSP
25-1233
07/09/2025
BID SET
1" = 30'-0"A-100
1 SITE PLAN
1/4" = 1'-0"A-100
2 SLIDE GATE ELEVATION
1/4" = 1'-0"A-100
3 TYPICAL FENCE ELEVATION
NO. REVISION DATE
NO. REVISION DATE
CHECKED BY:
DRAWN BY:
SCALE:
JOB NO.
DATE:
SHEET NUMBER:
SHEET TITLE:
SET TITLE:
STAMP:
A
IR
PO
RT
R D
SE
SA
LE
M, O R
1-6
OR
EG
ON
D
AS
FL
EE
T
SE
RV
IC
ES
BID SET
GP
NC
07/09/2025
25-1233
EROSION PREVENTION
AND SEDIMENT
CONTROL - NOTES
C-400
(a) PRE-CONSTRUCTION
(1). PRIOR TO ANY LAND DISTURBING ACTIVITIES, THE BOUNDARIES OF THE CLEARING AND GRADING LIMITS, VEGETATED BUFFERS, AND ANY SENSITIVE AREAS SHOWN ON THIS PLAN SHALL BE CLEARLY DELINEATED IN THE FIELD. UNLESS OTHERWISE APPROVED, NO DISTURBANCE IS PERMITTED BEYOND THE CLEARING LIMITS.
THE CONTRACTOR MUST MAINTAIN THE DELINEATION FOR THE DURATION OF THE PROJECT. NOTE: VEGETATED CORRIDORS TO BE DELINEATED WITH ORANGE
CONSTRUCTION FENCE OR APPROVED EQUAL.
(2). BMPS THAT MUST BE INSTALLED PRIOR TO LAND DISTURBING ACTIVITIES ARE CONSTRUCTION ENTRANCE, PERIMETER SEDIMENT CONTROL, AND INLET
PROTECTION.
(3). HOLD A PRECONSTRUCTION CONFERENCE TO REVIEW THE EPSCP AND WITH THE CITY'S PROJECT MANAGER AND INSPECTOR.
(b) CONSTRUCTION
(1). ALL SEDIMENT IS REQUIRED TO STAY ON SITE. SEDIMENT AMOUNTS GREATER THAN ½ CUBIC FOOT WHICH LEAVE THE SITE MUST BE CLEANED UP WITHIN 24 HOURS AND PLACED BACK ON THE SITE AND STABILIZED OR PROPERLY DISPOSED. VACUUMING OR DRY SWEEPING MUST BE USED TO CLEAN UP RELEASED SEDIMENT AND IT MUST NOT BE SWEPT OR WASHED INTO STORM SEWERS, DRAINAGE WAYS, OR WATER BODIES. THE CAUSE OF THE SEDIMENT RELEASE MUST BE FOUND AND PREVENTED FROM CAUSING A RECURRENCE OF THE DISCHARGE WITHIN THE SAME 24 HOURS. ANY IN-STREAM CLEAN UP OF SEDIMENT SHALL BE PERFORMED
ACCORDING TO THE DSL REQUIRED TIME FRAME.
(2). CONSTRUCTION, MAINTENANCE, REPLACEMENT, AND UPGRADING OF EROSION PREVENTION AND SEDIMENT CONTROL FACILITIES IS THE SOLE RESPONSIBILITY OF THE CONTRACTOR UNTIL ALL CONSTRUCTION IS COMPLETED, APPROVED, AND PERMANENT EROSION CONTROL (I.E., VEGETATION/LANDSCAPING) IS ESTABLISHED ON
ALL DISTURBED AREAS.
(3). ALL RECOMMENDED EROSION PREVENTION AND SEDIMENT CONTROL PROCEDURES ARE DEPENDENT ON CONSTRUCTION METHODS, STAGING, SITE CONDITIONS, WEATHER, AND SCHEDULING. DURING THE CONSTRUCTION PERIOD, EROSION CONTROL FACILITIES SHALL BE REVISED, UPGRADED, REPLACED, OR ADDED, TO COMPLY WITH SRC AND STATE AND FEDERAL REGULATORY REQUIREMENTS.
(4). THE CONTRACTOR IS SOLELY RESPONSIBLE FOR PROTECTION OF ALL ADJACENT PROPERTY AND DOWNSTREAM FACILITIES FROM EROSION AND SILTATION DURING PROJECT CONSTRUCTION. ANY DAMAGE RESULTING FROM SUCH EROSION AND SILTATION SHALL BE CORRECTED AT THE SOLE EXPENSE OF THE CONTRACTOR.
(5). WHEN SATURATED SOIL IS PRESENT, WATER-TIGHT TRUCKS MUST BE USED TO TRANSPORT SATURATED SOILS FROM THE CONSTRUCTION SITE. SOIL MAY BE DRAINED ON SITE AT A DESIGNATED LOCATION, USING APPROPRIATE BMPS. SOIL MUST BE DRAINED SUFFICIENTLY TO DRIP LESS THAN ONE GALLON PER HOUR PRIOR
TO LEAVING THE SITE.
(6). ALL MATERIALS SPILLED, DROPPED, OR WASHED INTO STORM DRAINS MUST BE REMOVED IMMEDIATELY, AND THE CONTRACTOR SHALL PROVIDE PROTECTION OF DOWNSTREAM INLETS AND CATCH BASINS TO ENSURE SEDIMENT-LADEN WATER DOES NOT ENTER THE STORM DRAIN SYSTEM.
(7). ALL DISCHARGE OF SEDIMENT-LADEN WATER MUST BE TREATED WITH AN APPROPRIATE BMP TO REMOVE SEDIMENT FROM DISCHARGE WATERS AND TO
COMPLY WITH SRC AND STATE AND FEDERAL REGULATORY PERMITS.
(8). IN AREAS SUBJECT TO WIND EROSION, APPROPRIATE BMPS MUST BE USED WHICH MAY INCLUDE THE APPLICATION OF FINE WATER SPRAYING, PLASTIC
SHEETING, MULCHING, OR OTHER APPROVED MEASURES.
(9). THE EPSC MEASURES AND BMPS SHOWN ON THIS PLAN ARE THE MINIMUM REQUIREMENTS FOR ANTICIPATED SITE CONDITIONS. DURING THE CONSTRUCTION PERIOD, THESE MEASURES SHALL BE UPGRADED AS NEEDED TO MAINTAIN COMPLIANCE WITH ALL REGULATIONS.
(10). THE CONTRACTOR SHALL PROVIDE ONSITE WATER OR OTHER APPROPRIATE BMPS TO PREVENT DUST AND WIND EROSION OF FINE GRAIN SOILS.
(11). DISTURBED AREAS MUST BE STABILIZED AFTER 14 DAYS OF INACTIVITY, OR IMMEDIATELY IF RAIN IS FORECASTED. SEE SUBSECTION 7A.1(D)―WET WEATHER
PERIOD.
(12). DURING THE WET WEATHER WORK PERIOD OR WHEN RAIN IS FORECASTED, ALL ACTIVE AND INACTIVE SOIL STOCK PILES MUST BE COVERED WITH APPROPRIATE PLASTIC SHEETING. PLASTIC SHEETING MUST COVER THE ENTIRE STOCK PILE AND BE SUFFICIENTLY ANCHORED.
(c) POLLUTANTS, SOLID WASTE AND HAZARDOUS MATERIALS MANAGEMENT
(1). ANY USE OF TOXIC OR OTHER HAZARDOUS MATERIALS MUST INCLUDE PROPER STORAGE, APPLICATION, AND DISPOSAL.
(2). THE CONTRACTOR IS SOLELY RESPONSIBLE TO PROPERLY MANAGE POLLUTANTS, HAZARDOUS WASTES, USED OILS, CONTAMINATED SOILS, CONCRETE WASTE, SANITARY WASTE, LIQUID WASTE, OR OTHER TOXIC SUBSTANCES DISCOVERED OR GENERATED DURING CONSTRUCTION TO PREVENT LEAKAGE, SPILLS OR RELEASE OF
POLLUTANTS TO THE ENVIRONMENT AND SURFACE WATERS.
(3). CONTRACTOR SHALL DEVELOP A PROJECT SPECIFIC WRITTEN SPILL PREVENTION AND RESPONSE PROCEDURES THAT INCLUDES EMPLOYEE TRAINING ON SPILL PREVENTION AND PROPER DISPOSAL PROCEDURES; REGULAR MAINTENANCE SCHEDULE FOR VEHICLES AND
MACHINERY; AND MATERIAL DELIVERY AND STORAGE CONTROLS, SIGNAGE, MATERIAL USE, AND USE OF COVERED STORAGE AREAS FOR WASTE AND SUPPLIES. THE PLAN SHALL COMPLY WITH SRC AND FEDERAL AND STATE REQUIREMENTS, AND SHALL BE AVAILABLE ON SITE AT ALL TIMES.
(d) WET WEATHER PERIOD (OCTOBER 15 THROUGH APRIL 30)
(1). CONSTRUCTION ACTIVITIES MUST AVOID OR MINIMIZE THE DURATION OF DISTURBED AREAS.
(2). TEMPORARY STABILIZATION OF THE SITE INCLUDING COVERING OF BARE SOILS WITH APPROVED BMPS, MUST BE INSTALLED AT THE END OF THE SHIFT BEFORE A HOLIDAY OR WEEKEND, OR AT THE END OF EACH WORKDAY IF RAINFALL IS FORECAST IN THE NEXT 24 HOURS.
(3). TEMPORARY STABILIZATION OR COVERING OF SOIL STOCKPILES AND PROTECTION OF STOCKPILES LOCATED AWAY FROM CONSTRUCTION ACTIVITY MUST
OCCUR AT THE END OF EACH WORKDAY.
(e) MAINTENANCE
(1). EROSION CONTROL MEASURES SHALL BE MAINTAINED IN SUCH A MANNER AS TO ENSURE THAT EROSION IS PREVENTED AND SEDIMENT-LADEN WATER DOES NOT ENTER A DRAINAGE SYSTEM, ROADWAY, OR VIOLATE APPLICABLE WATER QUALITY STANDARDS.
(2). SEDIMENT SHALL NOT BE WASHED OR SWEPT INTO STORM SEWERS, DRAINAGE WAYS, OR WATER BODIES.
(3). SEDIMENT MUST BE REMOVED FROM BEHIND ALL SEDIMENT CONTROL MEASURES WHEN IT HAS REACHED A HEIGHT OF⅓ THE BARRIER HEIGHT, AND PRIOR TO
THE CONTROL MEASURES REMOVAL.
(4). REMOVAL OF TRAPPED SEDIMENT IN A SEDIMENT BASIN OR SEDIMENT TRAP OR CATCH BASINS MUST OCCUR WHEN THE SEDIMENT RETENTION CAPACITY HAS BEEN REDUCED BY 50 PERCENT; IS NOT FUNCTIONING PROPERLY AND/OR AT THE COMPLETION OF PROJECT.
(5). CLEANING OF ALL STRUCTURES, INLET PROTECTION BMPS, AND SUMP PUMPS MUST BE COMPLETED REGULARLY AND AS REQUIRED TO ENSURE STRUCTURES
AND INLETS FUNCTION PROPERLY AND FLOW FREELY.
(6). CONSTRUCTION SITE EXITS SHALL BE MAINTAINED IN A CONDITION THAT WILL PREVENT TRACKING OR FLOW OF MUD ONTO THE ROW OR APPROVED ACCESS POINT. THE ENTRANCE MAY REQUIRE PERIODIC TOP DRESSING AS CONDITIONS DEMAND, AND REPAIR AND/OR CLEANOUT OF ANY STRUCTURES USED TO TRAP SEDIMENT. WHEEL WASHING SHALL BE REQUIRED TO PREVENT SEDIMENT AND MATERIAL TRACKING ON ROAD SURFACES IF PASSIVE BMPS ARE NOT EFFECTIVE.
(f) INSPECTION
(1). THE EPSCP MUST BE KEPT ONSITE AT ALL TIMES. ALL MEASURES SHOWN ON THE PLAN MUST BE INSTALLED PROPERLY TO ENSURE COMPLIANCE WITH SRC AND STATE AND REGULATORY PERMITS, AND THAT SEDIMENT DOES NOT ENTER A SURFACE WATER SYSTEM, ROADWAY, OR OTHER PROPERTIES.
(2). WRITTEN EPSC INSPECTION LOGS SHALL BE MAINTAINED ONSITE AND AVAILABLE TO CITY INSPECTORS UPON REQUEST.
(3). ALL BMPS SHALL BE INSPECTED AT LEAST EVERY WEEK. WHEN A RAINFALL EVENT EXCEEDS ½″ IN A 24-HOUR PERIOD, DAILY INSPECTION OF THE EROSION CONTROLS, SEDIMENT CONTROLS, AND DISCHARGE OUTFALLS MUST BE CONDUCTED AND DOCUMENTED. INSPECTIONS SHALL BE DONE BY A REPRESENTATIVE OF THE PERMIT REGISTRANT WHO IS KNOWLEDGEABLE AND EXPERIENCED IN THE PRINCIPLES, PRACTICES, INSTALLATION, AND MAINTENANCE OF EROSION AND SEDIMENT
CONTROLS.
(g) INACTIVE CONSTRUCTION PERIODS AND POST-CONSTRUCTION
(1). SHOULD WORK CEASE IN ANY AREA FOR 14 DAYS, THE INACTIVE AREA MUST BE STABILIZED WITH APPROPRIATE SOIL STABILIZATION BMPS. IF ALL CONSTRUCTION ACTIVITY CEASES THE ENTIRE SITE MUST BE TEMPORARILY STABILIZED USING VEGETATION, HEAVY MULCH LAYER, TEMPORARY SEEDING, OR OTHER
METHOD.
(2). ALL TEMPORARY EROSION PREVENTION AND SEDIMENT CONTROL FACILITIES SHALL BE REMOVED BY THE CONTRACTOR WITHIN 30 DAYS AFTER PERMANENT LANDSCAPING/VEGETATION IS ESTABLISHED AND THE THREAT OF EROSION AND SEDIMENT TRANSPORT HAS BEEN MITIGATED.
(3). TEMPORARY GRASS COVER MEASURES MUST BE FULLY ESTABLISHED BY OCTOBER 15 OR OTHER COVER MEASURES (I.E., EROSION CONTROL BLANKETS WITH ANCHORS, ONE-INCH OF STRAW MULCH, SIX MIL HDPE PLASTIC SHEET, ETC.) SHALL BE IN PLACE OVER ALL DISTURBED SOIL AREAS UNTIL APRIL 30. TO ESTABLISH AN ADEQUATE GRASS STAND FOR CONTROLLING EROSION BY OCTOBER 15, IT IS RECOMMENDED THAT SEEDING AND MULCHING OCCUR BY SEPTEMBER 1.
(4). PERMANENT EROSION CONTROL VEGETATION ON ALL EMBANKMENTS AND DISTURBED AREAS SHALL BE RE-ESTABLISHED AS SOON AS CONSTRUCTION IS
COMPLETED.
(h) SPECIFICATIONS
(1). SOIL PREPARATION. TOPSOIL SHOULD BE PREPARED ACCORDING TO THE LANDSCAPE PLANS, IF AVAILABLE, OR RECOMMENDATIONS OF THE GRASS SEED SUPPLIER. SLOPES SHALL BE TEXTURED BEFORE SEEDING BY RACK WALKING (I.E., DRIVING A CRAWLING TRACTOR UP AND DOWN THE SLOPES TO LEAVE A PATTERN OF CLEAT IMPRINTS PARALLEL TO SLOPE CONTOURS) OR OTHER METHOD TO PROVIDE STABLE AREAS FOR SEEDS TO REST.
(2). SEEDING. EROSION CONTROL GRASS SEED MIX SHALL BE AS FOLLOWS: DWARF GRASS MIX (LOW HEIGHT, LOW MAINTENANCE) CONSISTING OF DWARF PERENNIAL RYEGRASS (80 PERCENT BY WEIGHT), CREEPING RED FESCUE (20 PERCENT BY WEIGHT). APPLICATION RATE SHALL BE 100 POUNDS PER ACRE MINIMUM.
(3). GRASS SEED SHALL BE FERTILIZED AT A RATE OF TEN POUNDS PER 1,000 SQUARE FEET WITH 16- 16-16 SLOW RELEASE TYPE FERTILIZER. DISTURBED AREAS WITHIN 50 FEET OF WATER BODIES AND WETLANDS MUST USE A NON-PHOSPHOROUS FERTILIZER.
(4). THE APPLICATION RATE OF FERTILIZERS USED TO REESTABLISH VEGETATION SHALL FOLLOW MANUFACTURER'S RECOMMENDATIONS. NUTRIENT RELEASES FROM FERTILIZERS TO SURFACE WATERS SHALL BE MINIMIZED. TIME RELEASE FERTILIZERS SHALL BE USED. CARE SHALL BE MADE IN THE APPLICATION OF FERTILIZERS
WITHIN ANY WATERWAY RIPARIAN ZONE TO PREVENT LEACHING INTO THE WATERWAY.
(5). WHEN USED, HYDROMULCH SHALL BE APPLIED WITH GRASS SEED AT A RATE OF 2,000 POUNDS PER ACRE BETWEEN APRIL 30 AND JUNE 10, OR BETWEEN SEPTEMBER 1 AND OCTOBER 1. ON SLOPES STEEPER THAN TEN PERCENT, HYDROSEED AND MULCH SHALL BE APPLIED WITH A BONDING AGENT (TACKIFIER).
APPLICATION RATE AND METHODOLOGY SHALL BE IN ACCORDANCE WITH SEED SUPPLIER RECOMMENDATIONS.
(6). WHEN USED IN LIEU OF HYDROMULCH, DRY, LOOSE, WEED-FREE STRAW USED AS MULCH SHALL BE APPLIED AT A RATE OF 4,000 POUNDS PER ACRE (DOUBLE THE HYDROMULCH APPLICATION REQUIREMENT). ANCHOR STRAW BY WORKING IN BY HAND OR WITH EQUIPMENT (ROLLERS, CLEAT TRACKERS, ETC.). MULCH SHALL BE
SPREAD UNIFORMLY IMMEDIATELY FOLLOWING SEEDING.
(7). WHEN CONDITIONS ARE NOT FAVORABLE TO GERMINATION AND ESTABLISHMENT OF THE GRASS SEED, THE CONTRACTOR SHALL IRRIGATE THE SEEDED AND
MULCHED AREAS AS REQUIRED TO ESTABLISH THE GRASS COVER.
(8). SEDIMENT FENCES SHALL BE CONSTRUCTED OF CONTINUOUS FILTER FABRIC TO AVOID USE OF JOINTS. WHEN JOINTS ARE NECESSARY, FILTER CLOTH SHALL BE SPLICED TOGETHER ONLY AT A SUPPORT POST, WITH A MINIMUM SIX-INCH OVERLAP, AND BOTH ENDS SECURELY FASTENED TO A POST.
(9). THE STANDARD STRENGTH FILTER FABRIC SHALL BE FASTENED SECURELY TO STITCHED LOOPS INSTALLED ON THE UPSLOPE SIDE OF THE POSTS, AND SIX INCHES OF THE FABRIC SHALL BE EXTENDED INTO THE TRENCH. THE FABRIC SHALL NOT EXTEND MORE THAN 30 INCHES ABOVE THE ORIGINAL GROUND SURFACE.
FILTER FABRIC SHALL NOT BE STAPLED TO EXISTING TREES.
(10). BIO-FILTER BAGS SHALL BE CLEAN 100 PERCENT WOOD PRODUCT WASTE. BAGS SHALL BE 18-INCH X 18-INCH X 30-INCH, WEIGH APPROXIMATELY 45 POUNDS, AND BE CONTAINED IN A BAG MADE OF ½ INCH PLASTIC MESH.
(11). MINIMUM WET WEATHER SLOPE PROTECTION. FOR 3H:1V OR STEEPER SLOPES USE BON TERRA TYPE C2 OR NORTH AMERICAN GREEN TYPE C125 EROSION CONTROL BLANKETS. USE A MINIMUM OF TWO INCHES STRAW MULCH OR NORTH AMERICAN GREEN TYPE S150 FOR SLOPES FLATTER THAN 3H:1V AND GREATER THAN 6H:1V. SLOPES FLATTER THAN 6H:1V USE ONE INCH STRAW MULCH, HYDROSEED WITH HYDROMULCH AND TACKIFIER. SLOPE PROTECTION SHALL BE PLACED ON ALL DISTURBED AREAS IMMEDIATELY AFTER COMPLETION OF EACH SECTION OF CONSTRUCTION ACTIVITY, UNTIL THE EROSION CONTROL SEEDING HAS BEEN ESTABLISHED.
AS AN OPTION DURING TEMPORARY OR SEASONAL WORK STOPPAGES, A SIX-MIL HDPE PLASTIC SHEET MAY BE PLACED ON EXPOSED SLOPES. THE PLASTIC SHEET SHALL BE PROVIDED WITH AN ANCHOR TRENCH AT THE TOP AND BOTTOM OF THE SLOPE, AND SHALL BE SANDBAGGED ON THE SLOPES AS REQUIRED TO PREVENT
DAMAGE OR DISPLACEMENT BY WIND.
CITY OF SALEM EROSION CONTROL NOTES - CITY OF SALEM PWSD SECTION 007
1"=20'
1 CONSTRUCTION ENTRANCE
2 SEDIMENT FENCE
3 BIO-FILTER BAG AT INLTETS
NO. REVISION DATE
CHECKED BY:
DRAWN BY:
SCALE:
JOB NO.
DATE:
SHEET NUMBER:
SHEET TITLE:
SET TITLE:
STAMP:
A
IR
PO
RT
R D
SE
SA
LE
M, O R
1-6
OR
EG
ON
D
AS
FL
EE
T
SE
RV
IC
ES
BID SET
GP
NC
07/09/2025
25-1233
EROSION PREVENTION
AND SEDIMENT
CONTROL - DETAILS
C-403
N/A
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
NTS
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
NTS
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
NTS
NL NIGHT LIGHT CIRCUIT
PUBLIC ADDRESS
NEW, POINT OF CONNECTION
EQUIPMENT DESIGNATOR SEE SCHEDULE.
TRANSFORMERXFMR
WEATHERPROOFWP
WATTSW
VAPORPROOFVP
VOLT-AMPEREVA
VOLTAGEV
UNINTERRUPTIBLE POWER SUPPLYUPS
UNDERGROUNDUG
TYPICALTYP
TELEVISIONTV
TELEPHONE TERMINAL CABINETTTC
TELEPHONE TERMINAL BOARDTTB
TAMPERPROOFTP
TIME DELAYTD
SWITCHSW
SOLENOID VALVESV
STARTERSTR
SUB-DISTRIBUTION PANELSDP
POWERPWR
POLYVINYL CHLORIDEPVC
PANELBOARDPNL
POWER FACTORPF
PHOTOELECTRIC CELLPE
PA
NOT IN CONTRACTNIC
MANUAL TRANSFER SWITCHMTS
MEDIUM VOLTAGEMV
MAIN LUGS ONLYMLO
METAL HALIDEMH
MECHANICALMECH
MAIN DISTRIBUTION PANELMDP
MOTOR CONTROL CENTERMCC
MAIN CIRCUIT BREAKERMCB
MINIMUM CIRCUIT AMPACITYMCA
MASTER ANTENNA TELEVISIONMATV
LOW VOLTAGELV
LIGHTINGLTG
LIGHTNING ARRESTORLA
KILOVOLT-AMPERE REACTIVEKVAR
KILOVOLT-AMPEREKVA
KILOVOLTKV
KILOWATT HOURKWH
KILOWATTKW
JUNCTION BOXJB
INCANDESCENTINC
ISOLATED GROUNDIG
HERTZHZ
HIGH VOLTAGEHV
HIGH PRESSURE SODIUMHPS
HORSEPOWERHP
GROUNDGND
GALVANIZED RIGID CONDUITGRC
GROUND FAULT CIRCUIT INTERRUPTERGFCI
GROUND FAULT INDICATORGFI
GROUND FAULT PROTECTIONGFP
INSTALLED BY OWNER
FURNISHED BY OWNERFOIO
INSTALLED BY CONTRACTOR
FURNISHED BY OWNERFOIC
INSTALLED BY CONTRACTOR
FURNISHED BY CONTRACTORFCIC
FLUORESCENTFLUOR
FULL LOAD AMPSFLA
FIRE ALARMFA
ELECTRIC WATER COOLEREWC
EMERGENCY POWER OFFEPO
EXPLOSION PROOFEP
ELECTRICAL METALLIC TUBINGEMT
EMERGENCYEM
DOWNDN
COPPERCU
CURRENT TRANSFORMERCT
CEILINGCLG
CIRCUITCKT
CLOSED CIRCUIT TELEVISIONCCTV
CONDUITC
CIRCUIT BREAKERCB
AUTOMATIC TRANSFER SWITCHATS
ARCHITECT / ARCHITECTURALARCH
ALUMINUMAL
AMPERE (AMP)A
AMERICANS DISABILITIES ACTADA
NOTE
EXISTING TO BE RELOCATED, FUTURE
EXISTING TO REMAIN, EXISTING TO BE REMOVED
AMERICAN WIRE GAUGEAWG
ABOVE FINISHED FLOORAFF
LIGHT EMITTING DIODELED
MAXIMUM OVERCURRENT PROTECTIONMOCP
VARIABLE FREQUENCY DRIVEVFD
MAXIMUMMAX
MINIMUMMIN
INVERTERINV
LIGHTING RELAY CONTROL PANELLRC
CATEGORY CABLECAT
GENERATORGEN
DESIGNATION SYMBOLS
ABBREVIATIONS - ELECTRICAL
GENERAL NOTES:
A. THIS IS A STANDARD LEGEND SHEET, THEREFORE, SOME SYMBOLS MAY APPEAR ON THIS SHEET
THAT DO NOT APPEAR ON THE DRAWINGS.
F
X
N
R
E
DISHWASHERDW
GARBAGE DISPOSALGD
MICROWAVEMW
REFRIGERATORREF
CIRCUIT BREAKER, WITH GROUND FAULT PROTECTION, DRAW OUT
GFP
DISTRIBUTION SWITCHBOARD / PANELBOARD, WITH INTERNAL BUS
T T SERVICE TRANSFORMER, WITH VAULT
XXXX FEEDER CONTINUATION CALLOUT, FEEDER TAG
METER: UTILITY, BASIC, ADVANCED, POWER QUALITY
SPD
SWITCH, FUSED SWITCH
SURGE PROTECTIVE DEVICE, PUSH BUTTON
F DISCONNECT, FUSED DISCONNECT
MOTOR, MOTOR WITH CONTROLLER, MOTOR WITH STARTER
UTILITY POLE
PV ARRAY, INVERTER
FEEDER: DROP, RISE, CAP, BREAK, CONTINUATION
POWER - SINGLE LINE DIAGRAM & RISER
X
XX.XX
M M
TRANSDUCER: CURRENT, POTENTIAL (VOLTAGE), COMBINED
M M
B A PQ
CT PT
T
PANEL
NAME
TRANSFORMER
MCB
PANELBOARD
PANEL INCOMING DESIGNATOR: MLO UNLESS MARKED MCB
AMPACITY (AMPS)
CALCULATED AVAILABLE SHORT-CIRCUIT CURRENTXX,XXX
SECONDARY DAYLIGHT ZONESDZ
PRIMARY DAYLIGHT ZONEPDZ
CHECKED BY:
DRAWN BY:
SCALE:
JOB NO.
DATE:
SHEET NUMBER:
SHEET TITLE:
SET TITLE:
STAMP:
/9
/2
:3
:1
A
M A u to d e s k D o c s /2
-2
O re g o n D
A S
F le e t
S e rv ic e s S o la r/ -2
O re g o n D
A S
F le e t
S e rv ic e s
E le c .r v t
NONE
A
IR
P O
R T
R D
S E
S A
LE
M
, O R
-6
O R
E G
O N
D A
S F
LE
E
T S
E R
V
IC
E S
E0.01
SYMBOLS, LEGENDS
AND ABBREVIATIONS -
ELECTRICAL
JAK
CJF
25-1233
07/09/2025
BID SET
NO. REVISION DATE
ELECTRICAL SHEET LIST
SHEET # SHEET NAME
E0.01 SYMBOLS, LEGENDS AND ABBREVIATIONS - ELECTRICAL
E0.10 SITE PLAN - ELECTRICAL
E7.01 ONE LINE DIAGRAM - ELECTRICAL
Grand total: 3
L
R E
N
G
O
R
I
E
I
S
ST
S
E E
N
ER
F
E
E
G
OD R
N
EXPIRES: 06/30/2027
P
A
I
86436PE
OREGON
J
A N . 10 , 2
0 17JE
SSICA A . KAPLA
N
07/09/2025
D/W
HCR
30FT GATE
R
Y A
N D
R
IV
E S
E
#2
F O
V
LT
EVLT
EXISTING CONDUIT
PANEL AC-PV
INVERTER
INVERTERS
INVERTER
EXISTING JUNCTION
BOX
N 3
REFERENCE CIVIL PLAN FOR TOPOGRAPHY
CHECKED BY:
DRAWN BY:
SCALE:
JOB NO.
DATE:
SHEET NUMBER:
SHEET TITLE:
SET TITLE:
STAMP:
/9
/2
:3
:1
A
M A u to d e s k D o c s /2
-2
O re g o n D
A S
F le e t
S e rv ic e s S o la r/ -2
O re g o n D
A S
F le e t
S e rv ic e s
E le c .r v t
1" = 20'-0"
A
IR
P O
R T
R D
S E
S A
LE
M
, O R
-6
O R
E G
O N
D A
S F
LE
E
T S
E R
V
IC
E S
E0.10
SITE PLAN -
ELECTRICAL
JAK
CJF
25-1233
07/09/2025
BID SET
NO. REVISION DATE
1" = 20'-0"
1 SITE PLAN - ELECTRICAL
1. PROVIDE AUXILIARY GROUNDING ELECTRODE AT
EACH PV GROUND MOUNT STRUCTURE. BOND
ELECTRODE ACCORDING TO NEC 690.47.(B).
2. CONTRACTOR TO PROVIDE GROUND MOUNT PV
RACKING SYSTEM (BASIS OF DESIGN: SUNMODO SUN
TURF) WITH HELICAL AUGER TYPE FOOTINGS.
3. PROVIDE NEW CONDUIT FROM EXISTING JUNCTION
BOX. REFER TO ONE LINE DIAGRAM FOR CONDUIT AND
CONDUCTOR SIZING INFORMATION.
4. MOUNT AC-PV PANELBOARD TO THE BACK OF THE
GROUND MOUNT RACKING SYSTEM.
NOTES:
GENERAL NOTES:
A. SOLAR PHOTOVOLTAIC SYSTEM IS DELEGATED
DESIGN BY SOLAR DESIGN BUILD CONTRACTOR. SEE
ONE-LINE DIAGRAM FOR NOMINAL RATED POWER
OUTPUT OF ARRAY AND SPECIFICATION 263100 FOR
MINIMUM EXPECTED ANNUAL ENERGY PRODUCTION.
B. TILT: 20 DEGREES. AZIMUTH: 180 DEGREES (SOUTH).
L
R E
N
G
O
R
I
E
I
S
ST
S
E E
N
ER
F
E
E
G
OD R
N
EXPIRES: 06/30/2027
P
A
I
86436PE
OREGON
J
A N . 10 , 2
0 17JE
SSICA A . KAPLA
PV INVERTER
50KW
139.5A MAX AC
CURRENT OUTPUT
PV INVERTER
50KW
139.5A MAX AC
CURRENT OUTPUT
PV INVERTER
50KW
139.5A MAX AC
CURRENT OUTPUT
PV INVERTER
50KW
139.5A MAX AC
CURRENT OUTPUT
700A 3P
M 2500A 3P
T
EV2 MDP
2500A
208/3PH
4 WIRE
175A 3P
175A 3P
175A 3P
175A 3P
700A 3P
(4) STRINGS OF 12
MODULES EACH
(4) STRINGS OF 14
MODULES EACH
(8) STRINGS
OF 15
MODULES
EACH
(8) STRINGS
OF 15
MODULES
EACH
448 MODULES
BASIS OF DESIGN:
CANADIAN SOLAR
CS6Y-575
(1500V)
(575W EACH)
OPTIMIZERS
BASIS OF DESIGN:
SOLAR EDGE
TWO PER MODULE
INVERTERS
BASIS OF DESIGN:
SOLAR EDGE
SE50KUS
CELLULAR CONNECTED OPTION
AC-PV
COMBINER PANEL
208/120V
800 AMP BUS
NEMA 3R
INCOMING
SECTION
NET
UTILITY
METER
PV
BREAKER
SWITCHBOARD
MAIN BREAKER
...ETC
E
E
A. ALL EQUIPMENT IS NEW UNLESS OTHERWISE NOTED
AS EXISTING.
B. BASIS OF DESIGN PV SYSTEM SHOWN IS 257.6 KW DC.
GENERAL NOTES:
PROVIDE NEW
BREAKER IN
EXISTING SPACE
USE EXISTING 4"
CONDUIT
EXTEND EXISTING
CONDUIT
(12) 350 MCM
(1) 2/0 AWG GROUND
(3) 3" (MIN.) CONDUIT
(4) 2/0 AWG
(1) 6 AWG GROUND
(1) 2" (MIN.) CONDUIT
(4) 2/0 AWG
(1) 6 AWG GROUND
(1) 2" (MIN.) CONDUIT
(4) 2/0 AWG
(1) 6 AWG GROUND
(1) 2" (MIN.) CONDUIT
(4) 2/0 AWG
(1) 6 AWG GROUND
(1) 2" (MIN.) CONDUIT
PV AC DISCONNECT
800AS
208V, 3-PHASE
NEMA 3R
BID ALTERNATE 1
1. CONTRACTOR TO CONFIRM FINAL INTERCONNECTION
CONFIGURATION WITH PGE. PROVIDE ALTERNATE
PRICING FOR ADDITIONAL EXTERIOR LOCKABLE
VISIBLE KNIFE-BLADE DISCONNECT SWITCH AND
EXTERIOR NET UTILITY METER IF REQUIRED BY PGE.
NOTES:
(4) STRINGS OF 12
MODULES EACH
(4) STRINGS OF 14
MODULES EACH
200A
200A
200A
CHECKED BY:
DRAWN BY:
SCALE:
JOB NO.
DATE:
SHEET NUMBER:
SHEET TITLE:
SET TITLE:
STAMP:
/9
/2
:3
:1
A
M A u to d e s k D o c s /2
-2
O re g o n D
A S
F le e t
S e rv ic e s S o la r/ -2
O re g o n D
A S
F le e t
S e rv ic e s
E le c .r v t
NONE
A
IR
P O
R T
R D
S E
S A
LE
M
, O R
-6
O R
E G
O N
D A
S F
LE
E
T S
E R
V
IC
E S
E7.01
ONE LINE DIAGRAM -
ELECTRICAL
JAK
CJF
25-1233
07/09/2025
BID SET
NO. REVISION DATE
L
R E
N
G
O
R
I
E
I
S
ST
S
E E
N
ER
F
E
E
G
OD R
N
EXPIRES: 06/30/2027
P
A
I
86436PE
OREGON
J
A N . 10 , 2
0 17JE
SSICA A . KAPLA
| DAS Fleet Solar - Bid Set - Civil.pdf |
| C-100 COVER SHEET |
| C-200 EXISTING CONDITIONS AND DEMOLITION PLAN |
| C-300 SITE AND GRADING PLAN |
| C-400 EROSION PREVENTION AND SEDIMENT CONTROL - NOTES |
| C-401 EROSION PREVENTION AND SEDIMENT CONTROL - PRE |
| C-402 EROSION PREVENTION AND SEDIMENT CONTROL - POST |
| C-403 EROSION PREVENTION AND SEDIMENT CONTROL - DETAILS |
| C-500 CIVIL DETAILS |
| DAS Fleet Solar - Bid Set - Electrical.pdf |
| Sheets |
| E0.01 - SYMBOLS, LEGENDS AND ABBREVIATIONS - ELECTRICAL |
| E0.10 - SITE PLAN - ELECTRICAL |
| E7.01 - ONE LINE DIAGRAM - ELECTRICAL |
File details come from the government source that posted it. Updated .