This is a Bid Form for Invitation for Bids DCAM-26-CS-IFB-0007 issued by the District of Columbia Department of General Services for generator replacement at eight Fire and Emergency Medical Services (FEMS) facilities. The project encompasses replacement and installation of generator systems and automatic transfer switch systems at Engine Houses 3, 7, 9, 14, 16, and 20, plus Training South Lower and Ready Reserve North E24 throughout Washington, DC. The scope includes removal of existing equipment, installation of new natural gas-fueled generators ranging from 75 to 400 kilowatts, structural reinforcements, utility coordination, load bank testing, building automation system integration, commissioning, and training. The bid form requires contractors to submit lump-sum pricing for general work requirements and generators for each of the eight locations, with base bids evaluated separately for each facility. The pre-bid conference was scheduled for April 13, 2026, at 2:00 PM via Microsoft Teams, with the final question deadline on April 15, 2026, at 4:00 PM. Bids are due April 28, 2026, at 12:00 PM with opening at 3:30 PM the same day. Substantial completion is required by October 30, 2026, with final completion by November 30, 2026.

The bid form includes a $10,000 DGS-controlled contingency allowance per engine house for unforeseen conditions. Bidders must provide detailed pricing for base work, diesel-fueled generator alternates (where applicable), and for Engine 16, the option to upgrade from a 300 kilowatt to a 350 kilowatt natural gas generator, with pricing clearly delineated for each component. Award will be based on the lowest responsive and responsible lump-sum bid price for each facility. The solicitation requires compliance with Davis-Bacon prevailing wage determinations with rates ranging from $13.04 to $57.16 per hour, the District's Living Wage Act minimum of $17.50 per hour (increasing to $18.00 per hour on July 1, 2025), and First Source Employment Agreement provisions requiring good faith efforts to ensure 51 percent of new hires are District residents. Contractors must also comply with the District's subcontracting plan requiring 35 percent of contract volume be subcontracted to Small Business Enterprises or Certified Business Enterprises. Certified Business Enterprises are eligible for bid price reductions ranging from 2 percent to 12 percent depending on certification type. Liquidated damages of $500 per day apply for failure to meet the substantial completion date.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Form of Offer Letter and Bid Form

Form of Offer Letter and Price Schedule/Bid Form

[Contractor’s Letterhead] [Insert Date]

Ms. Kianna Shepherd Contracting Officer District of Columbia Department of General Services 3924 Minnesota Avenue, NE Washington, DC 20019

Reference:Invitation for Bids DCAM-26-CS-IFB-0007,
Generator Replacement for Various FEMS Engine Houses And Facilities Project

Dear Ms. Shepherd:

On behalf of [INSERT NAME OF BIDDER] (the “Bidder”), I am pleased to submit this bid in response to the Department of General Services’ (the “Department” or “DGS”) Invitation for Bid (the “IFB”) for the Generator Replacement for Various FEMS Engine Houses And Facilities Project.

The Bidder has reviewed the IFB and the attachments thereto, any addenda thereto, and the proposed Form of Contract (collectively, the “Bid Documents” or “Contract Documents”) and has conducted such due diligence and analysis as the Bidder, in its sole judgment, has deemed necessary in order to submit its bid in response to the IFB.

The Bidder’s Bid is as follows:

CLIN
Generator Replacement for Engine 3

as described in the Scope of Work:

Bid Price

001
General Work Requirements
$_________
002
Natural Gas-Fueled Generator
$_________
Total
Base Bid for Evaluation (CLIN 001 +

CLIN 002)

DGS Controlled Allowance
Allowance Contingency
$10,000.00
Total Bid Price Plus Allowance:
Total Bid Price Plus Allowance:

(CLIN 001 +CLIN 002 + Allowance)

Alternate 01: Replace Natural Gas with Diesel [ ] Add [ ] Deduct

TOTAL CONSTRUCTION FOR DCFEMS ENGINE 3 TOTAL BID PRICE IN WORDS:

CLIN
Generator Replacement for Engine 7

as described in the Scope of Work:

Bid Price

004
General Work Requirements
$_________
005
Natural Gas-Fueled Generator
$_________
Total
Base Bid for Evaluation (CLIN 004+

CLIN 005)

DGS Controlled Allowance
Allowance Contingency
$10,000.00
Total Bid Price Plus Allowance:
Total Bid Price Plus Allowance:

(CLIN 004 +CLIN 005 + Allowance)

006
Alternate 01: Replace Natural Gas with Diesel
[ ] Add [ ] Deduct

TOTAL CONSTRUCTION FOR DCFEMS ENGINE 7 TOTAL BID PRICE IN WORDS:

CLIN
Generator Replacement for Engine 9

as described in the Scope of Work:

Bid Price

007
General Work Requirements
$_________
008
Natural Gas-Fueled Generator
$_________
Total
Base Bid for Evaluation (CLIN 007+

CLIN 008)

DGS Controlled Allowance
Allowance Contingency
$10,000.00
Total Bid Price Plus Allowance:
Total Bid Price Plus Allowance:

(CLIN 007 +CLIN 008 + Allowance)

009
Alternate 01: Replace Natural Gas with Diesel
[ ] Add [ ] Deduct

TOTAL CONSTRUCTION FOR DCFEMS ENGINE 9 TOTAL BID PRICE IN WORDS:

CLIN
Generator Replacement for Engine 14

as described in the Scope of Work:

Bid Price

010
General Work Requirements
$_________
011
Natural Gas-Fueled Generator
$_________
Total
Base Bid for Evaluation (CLIN 010+

CLIN 011)

DGS Controlled Allowance
Allowance Contingency
$10,000.00
Total Bid Price Plus Allowance:
Total Bid Price Plus Allowance:

(CLIN 010 +CLIN 011 + Allowance)

012
Alternate 01: Replace Natural Gas with Diesel
[ ] Add [ ] Deduct

TOTAL CONSTRUCTION FOR DCFEMS ENGINE 14 TOTAL BID PRICE IN WORDS:

CLIN
Generator Replacement for Engine 16

as described in the Scope of Work:

Bid Price

013
General Work Requirements
$_________
014
Natural Gas-Fueled Generator – 300 KW
$_________
Total
Base Bid for Evaluation (CLIN 013+

CLIN 014)

DGS Controlled Allowance
Allowance Contingency
$10,000.00
Total Bid Price Plus Allowance:
Total Bid Price Plus Allowance:

(CLIN 013 +CLIN 014 + Allowance)

015
Alternate 01: Replace Natural Gas-Fueled Generator 300 KW with Natural Gas-Fueled Generator 350KW
[ ] Add [ ] Deduct

TOTAL CONSTRUCTION FOR DCFEMS ENGINE 16 TOTAL BID PRICE IN WORDS:

CLIN
Generator Replacement for Engine 20

as described in the Scope of Work:

Bid Price

016
General Work Requirements
$_________
017
Natural Gas-Fueled Generator
$_________
Total
Base Bid for Evaluation (CLIN 016+

CLIN 017)

DGS Controlled Allowance
Allowance Contingency
$10,000.00
Total Bid Price Plus Allowance:
Total Bid Price Plus Allowance:

(CLIN 016 +CLIN 017 + Allowance)

018
Alternate 01: Replace Natural Gas with Diesel
[ ] Add [ ] Deduct

TOTAL CONSTRUCTION FOR DCFEMS ENGINE 20 TOTAL BID PRICE IN WORDS:

CLIN
Generator Replacement for Training Lower South as described in the Scope of Work:
Bid Price
019
General Work Requirements
$_________
020
Natural Gas-Fueled Generator
$_________
Total
Base Bid for Evaluation (CLIN 019+

CLIN 020)

DGS Controlled Allowance
Allowance Contingency
$10,000.00
Total Bid Price Plus Allowance:
Total Bid Price Plus Allowance:

(CLIN 019 +CLIN 020 + Allowance)

021
Alternate 01: Replace Natural Gas with Diesel
[ ] Add [ ] Deduct

TOTAL CONSTRUCTION FOR DCFEMS TRAINING SOUTH LOWER TOTAL BID PRICE IN WORDS:

CLIN
Generator Replacement for Ready Reserve North E24 as described in the Scope of Work:
Bid Price
022
General Work Requirements
$_________
023
Natural Gas-Fueled Generator
$_________
Total
Base Bid for Evaluation (CLIN 022+

CLIN 023)

DGS Controlled Allowance
Allowance Contingency
$10,000.00
Total Bid Price Plus Allowance:
Total Bid Price Plus Allowance:

(CLIN 022 +CLIN 023+ Allowance)

024
Alternate 01: Replace Natural Gas with Diesel
[ ] Add [ ] Deduct

TOTAL CONSTRUCTION FOR DCFEMS READY RESERVE NORTH E24 TOTAL BID PRICE IN WORDS:

The Bidder’s Bid is based on and subject to the following conditions:

1. The Bidder agrees to hold its bid open for a period of at least one hundred twenty (120) days after the IFB closing date.

2. Assuming the Bidder is selected by the Department, the Bidder agrees to enter into a contract with the Department on the terms and conditions described in the Bid Documents within ten (10) days of the notice of the award.

3. Both the Bidder and the undersigned represent and warrant that the undersigned has the full legal authority to submit this bid form and bind the Bidder to the terms of the Bidder’s bid. The Bidder further represents and warrants that no further action or approval must be obtained by the Bidder in order to authorize the terms of the Bidder’s bid.

4. The Bidder and its principal team members hereby represent and warrant that they have not: (i) colluded with any other group or person that is submitting a bid in response to the IFB in order to fix or set prices; (ii) acted in such a manner so as to discourage any other group or person from submitting a bid in response to the IFB; or (iii) otherwise engaged in conduct that would violate applicable anti-trust law.

5. The Bidder hereby certifies that neither it nor any of its team members have entered into any agreement (written or oral) that would prohibit any contractor, subcontractor or subconsultant that is certified by the District of Columbia Office of Department of Small and Local Business Enterprises as a Local, Small, Resident Owned or Disadvantaged Business Enterprise (collectively, “LSDBE Certified Companies”) from participating in the work if another company is awarded the contract.

6. The Bidder shall provide detailed pricing for the diesel-fueled generator in accordance with the scope of work Section C of the IFB. The Bidder shall also submit pricing for add alternate 01, specifying the premium cost associated with upgrading to a natural gas fired generator. The Lowest Evaluated bid will be determined based on the combined pricing for the standard work requirements, diesel-fueled generator, and add alternate 01. Bidders are required to clearly outline the pricing for each in its bid. Failure to provide detailed pricing for each component may result in the bid being deemed non-responsive. By submitting a bid, the bidder acknowledges and agrees to the terms outlined in this provision and the IFB.

7. This Form of Offer Letter and Bid Form are being submitted on behalf of [INSERT FULL LEGAL NAME, TYPE OF ORGANIZATION, AND STATE OF FORMATION FOR THE BIDDER].

Sincerely, Company: Name: Title: Date: Signature:

Exhibit 1 - Price Schedule Bid Form

CLIN 001-002 – Engine 3
Alternate 01:

Replace Natural Gas with Diesel Add [ ] Deduct [ ]

DIVISION NO.
DESCRIPTION
DIVISION COST
Div. 01
General Requirements
Div. 02
Existing Conditions (incl. abatement/demo)
Div. 03
Concrete
Div. 04
Masonry
Div. 05
Metals
Div. 06
Woods and Plastics
Div. 07
Thermal and Moisture Protection
Div. 08
Openings
Div. 09
Finishes
Div. 10
Specialties
Div. 11
Equipment
Div. 12
Furnishings
Div. 13
Special Construction
Div. 14
Conveying Systems
Div. 21
Fire Suppressions
Div. 22
Plumbing
Div. 23
Heating, Ventilation and Air Conditioning
Div. 26
Electrical
Div. 27
Communications
Div. 28
Electronic Safety and Security
Div. 31
Earthwork
Div. 32
Exterior Improvements
Div. 33
Utilities

Total Bid Price Excluding allowance:

Exhibit 2 - Price Schedule Bid Form

CLIN 004-005 –Engine 7
Alternate 01:

Replace Natural Gas with Diesel Add [ ] Deduct [ ]

DIVISION NO.
DESCRIPTION
DIVISION COST
Div. 01
General Requirements
Div. 02
Existing Conditions (incl. abatement/demo)
Div. 03
Concrete
Div. 04
Masonry
Div. 05
Metals
Div. 06
Woods and Plastics
Div. 07
Thermal and Moisture Protection
Div. 08
Openings
Div. 09
Finishes
Div. 10
Specialties
Div. 11
Equipment
Div. 12
Furnishings
Div. 13
Special Construction
Div. 14
Conveying Systems
Div. 21
Fire Suppressions
Div. 22
Plumbing
Div. 23
Heating, Ventilation and Air Conditioning
Div. 26
Electrical
Div. 27
Communications
Div. 28
Electronic Safety and Security
Div. 31
Earthwork
Div. 32
Exterior Improvements
Div. 33
Utilities

Total Bid Price Excluding allowance:

Exhibit 3 - Price Schedule Bid Form

CLIN 007-008 –Engine 9
Alternate 01:

Replace Natural Gas with Diesel Add [ ] Deduct [ ]

DIVISION NO.
DESCRIPTION
DIVISION COST
Div. 01
General Requirements
Div. 02
Existing Conditions (incl. abatement/demo)
Div. 03
Concrete
Div. 04
Masonry
Div. 05
Metals
Div. 06
Woods and Plastics
Div. 07
Thermal and Moisture Protection
Div. 08
Openings
Div. 09
Finishes
Div. 10
Specialties
Div. 11
Equipment
Div. 12
Furnishings
Div. 13
Special Construction
Div. 14
Conveying Systems
Div. 21
Fire Suppressions
Div. 22
Plumbing
Div. 23
Heating, Ventilation and Air Conditioning
Div. 26
Electrical
Div. 27
Communications
Div. 28
Electronic Safety and Security
Div. 31
Earthwork
Div. 32
Exterior Improvements
Div. 33
Utilities

Total Bid Price Excluding allowance:

Exhibit 4 - Price Schedule Bid Form

CLIN 010-011–Engine 14
Alternate 01:

Replace Natural Gas with Diesel Add [ ] Deduct [ ]

DIVISION NO.
DESCRIPTION
DIVISION COST
Div. 01
General Requirements
Div. 02
Existing Conditions (incl. abatement/demo)
Div. 03
Concrete
Div. 04
Masonry
Div. 05
Metals
Div. 06
Woods and Plastics
Div. 07
Thermal and Moisture Protection
Div. 08
Openings
Div. 09
Finishes
Div. 10
Specialties
Div. 11
Equipment
Div. 12
Furnishings
Div. 13
Special Construction
Div. 14
Conveying Systems
Div. 21
Fire Suppressions
Div. 22
Plumbing
Div. 23
Heating, Ventilation and Air Conditioning
Div. 26
Electrical
Div. 27
Communications
Div. 28
Electronic Safety and Security
Div. 31
Earthwork
Div. 32
Exterior Improvements
Div. 33
Utilities

Total Bid Price Excluding allowance:

Exhibit 5 - Price Schedule Bid Form

CLIN 013-014 –Engine 16
Replace Natural Gas-Fueled Generator 300 KW with Natural Gas-Fueled Generator 350KW

Add [ ] Deduct [ ]

DIVISION NO.
DESCRIPTION
DIVISION COST
Div. 01
General Requirements
Div. 02
Existing Conditions (incl. abatement/demo)
Div. 03
Concrete
Div. 04
Masonry
Div. 05
Metals
Div. 06
Woods and Plastics
Div. 07
Thermal and Moisture Protection
Div. 08
Openings
Div. 09
Finishes
Div. 10
Specialties
Div. 11
Equipment
Div. 12
Furnishings
Div. 13
Special Construction
Div. 14
Conveying Systems
Div. 21
Fire Suppressions
Div. 22
Plumbing
Div. 23
Heating, Ventilation and Air Conditioning
Div. 26
Electrical
Div. 27
Communications
Div. 28
Electronic Safety and Security
Div. 31
Earthwork
Div. 32
Exterior Improvements
Div. 33
Utilities

Total Bid Price Excluding allowance:

Exhibit 6 - Price Schedule Bid Form

CLIN 016-017 –Engine 20
Alternate 01:

Replace Natural Gas with Diesel Add [ ] Deduct [ ]

DIVISION NO.
DESCRIPTION
DIVISION COST
Div. 01
General Requirements
Div. 02
Existing Conditions (incl. abatement/demo)
Div. 03
Concrete
Div. 04
Masonry
Div. 05
Metals
Div. 06
Woods and Plastics
Div. 07
Thermal and Moisture Protection
Div. 08
Openings
Div. 09
Finishes
Div. 10
Specialties
Div. 11
Equipment
Div. 12
Furnishings
Div. 13
Special Construction
Div. 14
Conveying Systems
Div. 21
Fire Suppressions
Div. 22
Plumbing
Div. 23
Heating, Ventilation and Air Conditioning
Div. 26
Electrical
Div. 27
Communications
Div. 28
Electronic Safety and Security
Div. 31
Earthwork
Div. 32
Exterior Improvements
Div. 33
Utilities

Total Bid Price Excluding allowance:

Exhibit 7 - Price Schedule Bid Form

CLIN 019-020 –Training South Lower
Alternate 01:

Replace Natural Gas with Diesel Add [ ] Deduct [ ]

DIVISION NO.
DESCRIPTION
DIVISION COST
Div. 01
General Requirements
Div. 02
Existing Conditions (incl. abatement/demo)
Div. 03
Concrete
Div. 04
Masonry
Div. 05
Metals
Div. 06
Woods and Plastics
Div. 07
Thermal and Moisture Protection
Div. 08
Openings
Div. 09
Finishes
Div. 10
Specialties
Div. 11
Equipment
Div. 12
Furnishings
Div. 13
Special Construction
Div. 14
Conveying Systems
Div. 21
Fire Suppressions
Div. 22
Plumbing
Div. 23
Heating, Ventilation and Air Conditioning
Div. 26
Electrical
Div. 27
Communications
Div. 28
Electronic Safety and Security
Div. 31
Earthwork
Div. 32
Exterior Improvements
Div. 33
Utilities

Total Bid Price Excluding allowance:

Exhibit 7 - Price Schedule Bid Form

CLIN 022-023 –Ready Reserve North E24
Alternate 01:

Replace Natural Gas with Diesel Add [ ] Deduct [ ]

DIVISION NO.
DESCRIPTION
DIVISION COST
Div. 01
General Requirements
Div. 02
Existing Conditions (incl. abatement/demo)
Div. 03
Concrete
Div. 04
Masonry
Div. 05
Metals
Div. 06
Woods and Plastics
Div. 07
Thermal and Moisture Protection
Div. 08
Openings
Div. 09
Finishes
Div. 10
Specialties
Div. 11
Equipment
Div. 12
Furnishings
Div. 13
Special Construction
Div. 14
Conveying Systems
Div. 21
Fire Suppressions
Div. 22
Plumbing
Div. 23
Heating, Ventilation and Air Conditioning
Div. 26
Electrical
Div. 27
Communications
Div. 28
Electronic Safety and Security
Div. 31
Earthwork
Div. 32
Exterior Improvements
Div. 33
Utilities

Total Bid Price Excluding allowance: