Attachment_C-_Cost_Breakdown.xlsx
XLSX spreadsheet 51 KB Posted
- Attached to
- Monitoring Well Sampling Services
- Solicitation number
- RFP-SM-0113
- Issued by
- Los Angeles County, California
About this file
Attachment C is a cost breakdown document for the West Basin Municipal Water District's Monitoring Well Sampling Services procurement for the West Coast Basin Barrier Project in Los Angeles County, California. The contract involves quarterly sampling of eleven groundwater monitoring wells across five cities, with proposals due on October 21, 2025, and a potential contract award in the week of November 19, 2025. The contract period is structured for three years, from December 2025 through November 2028, with quarterly sampling requirements and potential monthly sampling if water quality exceedances occur. The selected contractor will be responsible for well purging, gauging, sampling, traffic control, water hauling, and delivering approximately 70 sample bottles per well per quarter to the West Basin Water Quality Laboratory.
The cost breakdown template provides an opportunity for contractors to submit unit costs for each of the specified wells, with the district calculating the total contract amount based on proposed unit costs and potential resample events. The procurement offers additional evaluation points for Small Business Enterprises (SBE) and Local Business Enterprises (LBE), with up to six points available for such certifications. Substantial insurance requirements are in place, including $2,000,000 in Commercial General Liability, $2,000,000 in Business Automobile Liability, and $1,000,000 in Workers' Compensation. Contractors must provide all necessary equipment, including rental pumps, generators, and specialized tubing, and must follow strict protocols for water sample collection, particularly for PFAS compound testing and volatile organic compound analyses.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Cover
Attachment C-Cost
| ATTACHMENT C- Cost Breakdown |
| Directions: Use the template below to provide a total cost per well. You may use Optional columns A-F if desired, but only the Total Cost will be evaluated. |
Use the Well Information Sheet (Attachment 2) to base your costs on. Include any and all equipment, personnel, and tools required. This includes rental pumps, generators, and tubing. The DISTRICT does not provide any pumps or tubing beyond what is stated in the Well Information Sheet.
Please note that the DISTRICT will use the proposed costs to calculate a total contract amount. The total contract amount may include the proposed unit costs in addition to two resample events per quarter based on the highest individual well cost.
| Optional* | Required | |||
| Wells | Purging, Gauging, Sampling | Traffic Control | ||
| (if needed) | Scheduling/ Administrative | Equipment Fees (e.g. additional trucks) | Transport | |
| (to and from lab) | Total Cost | |||
| 735A | $0.00 | |||
| 1318N | $0.00 | |||
| 703G | $0.00 | |||
| 17B | $0.00 | |||
| 17C | $0.00 | |||
| 690A | $0.00 | |||
| 14B | $0.00 | |||
| 9B | $0.00 | |||
| WB1 380 | $0.00 | |||
| WB1 490 | $0.00 | |||
| WB1 640 | $0.00 |
*Optional columns are used to assist the Respondent in cost estimations. Only Total Cost (Column G) will be used in the evaluation process.
image1.emf
File details come from the government source that posted it. Updated .