Attachment C - 598-21-106 Replace AHUs at JLM Drawings.pdf
PDF 5 MB Posted
- Solicitation number
- 36C25623R0080
About this file
This is a solicitation for mechanical construction services to replace four air handling units at the John L. McClellan Memorial Veterans Hospital in Little Rock, Arkansas. The solicitation was issued by the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16.
The scope of work involves replacing air handling units 47, 48, 48B, and 22. Services will include disconnecting and removing existing units, installing new units, and reconnecting ductwork, piping, controls, and utilities. The project also includes mechanical demolition and repairs to ductwork. The performance period is 270 calendar days.
The anticipated award date is October 2022. Pricing is to be provided as firm-fixed price. The solicitation is a 100% SDVOSB set-aside. Any questions are due by August 29, 2022, with proposals due by September 6, 2022.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:2
:4
P
M C
U s e rs
\r re n d e r\ D o c u m e n ts \R e v it F ile s \A
-3
-L it tl e
R o c k A
H U rr e n d e rM D
L P
G .r v t
G-001
COVER
1 2AC/RR
REPLACE AHUS 47,48, 48A,
AND 22
JOHN L. MCCLELLAN MEMORIAL
VETERANS HOSPITAL
4300 W 7TH STREET
LITTLE ROCK, AR 72205 AUGUST 18, 2022
100% BID DOCUMENTS
598-21-10620-395
REPLACE AHUS 47,48, 48A, AND 22
JOHN L. MCCLELLAN MEMORIAL VETERANS HOSPITAL
4300 W 7TH STREET
LITTLE ROCK, AR 72205
VA PROJECT #: 598-21-106
CA
DRAWING LIST
GENERAL
G-001 COVER 1 2
G-002 ICRA INFORMATION AND DETAILS 2 2
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 3
AD101 FIRST FLOOR DEMOLITION PLAN - AHU 47 2 3
A-101 FIRST FLOOR PLAN - AHU 47 3 3
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 13
MD101 FIRST FLOOR MECHANICAL DEMOLITION PLAN 2 13
MD102 THIRD FLOOR MECHANICAL DEMOLITION PLAN 3 13
MD103 SEVENTH FLOOR ROOF MECHANICAL DEMOLITION PLAN 4 13
M-101 FIRST FLOOR MECHANICAL PLAN 5 13
M-102 THIRD FLOOR AHU-22 MECHANICAL PLAN 6 13
M-103 THIRD FLOOR AHU-23 MECHANICAL PLAN 7 13
M-104 SEVENTH FLOOR ROOF MECHANICAL PLAN 8 13
M-501 MECHANICAL DETAILS 9 13
M-502 MECHANICAL DETAILS 10 13
M-503 MECHANICAL CONTROLS 11 13
M-504 MECHANICAL CONTROLS 12 13
M-601 MECHANICAL SCHEDULES 13 13
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 6
ED101 FIRST FLOOR POWER DEMOLITION PLAN 2 6
ED102 THIRD FLOOR POWER DEMOLITION PLAN 3 6
ED103 SEVENTH FLOOR POWER DEMOLITION PLAN 4 6
EP101 THIRD FLOOR POWER PLAN 5 6
EP102 SEVENTH FLOOR POWER PLAN 6 6
AREAS OF WORK
(SEE MECHANICAL
AND ELECTRICAL
PLANS)
AREA OF
WORK
CRANE LOCATION
FOR THIRD FLOOR
AHU INSTALL
STAGING AREA
PROJECT SITE MAP PROJECT LOCATION MAP
CRANE LOCATION
FOR SEVENTH
FLOOR AHU INSTALL
DocuSign Envelope ID: C2A37E0E-8AD7-4284-9C76-B9D4553D7BDF
8/16/2022
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS
FOR CONSTRUCTION AND RENOVATION
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L E
H E
IG
H
T
HEPA NEGATIVE
AIR UNIT
EXISTING WALL
EXISTING CEILING
FLEX DUCT
A
PLASTIC SHEET BARRIER
NON RATED
PLASTIC SHEET
BARRIER
EXISTING WALL
ASSEMBLY
EXISTING CEILING
BOTTOM SEALING
RUNNER
TOP SEALING
RUNNER
SUPPORT POLES,
QUANTITY PER
MANUF.
RECOMMENDATIONS
REQU.
AS
HEPA
NEGATIVE AIR
UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD.
FIRE RATED PLYWOOD,
TEMPORARY. SALVAGE
PROTECT AND STORE
EXISTING WINDOW TO
BE RE-INSTALLED
AFTER CONSTRUCTION
IS COMPLETE.
V .I
.F
V .I
.F
V.I.F.
V .I .F
E X
IS
T
IN
G
W A
L L
V .I .F
E X
IS
T
IN
G
W A
L L
ILSM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
PROVIDE STICKY
MATS (CHANGED END
OF SHIFT OR MORE IF
NECESSARY TO
MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
SUPPLY DUCTS
EITHER KEEP
RUNNING OR COVER
WHEN RUNNING TO
KEEP DUST OUT
COVER ALL RETURNS
AT THE
GRATE/DIFFUSERS
F L E
X D
U C
T
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INPECTION SHEETS
VISIBLE TO PUBLIC
FIRE PULL
STATION WITH
AUDIO / VISUAL
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
FOR THE REPLACEMENT OF AHUS 47, 48, 48A, AND 22.
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
DUST CONTROL PLAN NOTES
1. THE VAMC INFECTION CONTROL GROUP HAS CONFIRMED THE
DESIGNATION FOR THIS PROJECT IS LEVEL II FOR THE CLASS OF
PRECAUTIONS OR LEVEL OF INFECTION CONTROL ACTIVITIES. HARD
SURFACE BARRIERS SHALL BE USED EXCEPT IN THE AREA INDICATED ON
THE PHASING PLAN WITH PLASTIC BARRIERS (MINIMUM 4MIL) TO SEAL AREA
FROM NON-WORK AREA AS LONG AS THE SPRINKLER SYSTEM IS INTACT AND
ACTIVE.
1A. THIS PROJECT NEEDS AN ENTRY VESTIBULE FOR CLOTHING CHANGES
(PROVIDE AND LOCATE A STAGING AREA FOR HAZMAT SUITS NEAR THE
PLASTIC BARRIER ENTRANCE SPACES - CONSTRUCTION ANTEROOM. THEY
SHALL BE USED WHEN GOING INTO CONSTRUCTION AREA AND LEAVING THE
CONSTRUCTION AREA) AND TOOL STORAGE AND TIGHT SEALS SHALL BE
MAINTAINED AT THE FULL PERIMETER OF WALLS AND WALL PENETRATIONS.
ANY DUST SHALL BE IMMEDIATELY CLEANED IF TRACKED OUTSIDE OF THE
CONSTRUCTION BARRIER. UPON COMPLETION OF THE CONSTRUCTION
PHASE, DUST BARRIERS SHALL BE REMOVED CAREFULLY TO MINIMIZE
SPREADING OF DUST AND THE CONTRACTOR SHALL HAVE TEMPORARY
DUST PROTECTION IN PLACE BEFORE REMOVAL OF A PERMANENT BARRIER.
AFTER EACH PHASE, PERFORM TASKS STATED IN NOTE 6A.
2. PROVIDE STICKY MATS AND BLANKET AT THE PLASTIC BARRIER
ENTRANCE SPACES (CONSTRUCTION ANTEROOM) AND CHANGE DAILY OR
MORE OFTEN AS NEEDED TO PREVENT THE SPREAD OF DUST AND DEBRIS
INTO ADJACENT CLEAN SPACE.
INTERNAL DEMOLITION AND CONSTRUCTION ACTIVITIES DUST AND DEBRIS
CONTROL
3. USE CORRIDORS AS PRIMARY CONSTRUCTION ACCESS.
3A. TRAFFIC CONTROL: DESIGNATED ENTRY AND EXIT PROCEDURES
SHALL BE DEFINED. EGRESS PATHS SHALL BE FREE OF DEBRIS;
DESIGNATED ELEVATORS SHALL BE USED DURING SCHEDULED TIMES; AND
ONLY AUTHORIZED PERSONNEL SHALL BE ALLOWED TO ENTER THE
CONSTRUCTION ZONE. SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC
AWAY FROM THE CONSTRUCTION AREA AND MATERIALS.
4. CONTRACTOR SHALL USE TWO CARTS TO TRANSFER CONSTRUCTION
MATERIAL IN AND OUT OF THE PROJECT - A CLEAN CART SHALL BE USED;
THE NOT-SO-CLEAN CART SHALL BE USED BETWEEN THE MAIN ENTRY AND
THE CONSTRUCTION STAGING/PREP AREA.
4A. DEMOLITION DEBRIS: DEBRIS SHALL BE REMOVED IN CARTS WITH
TIGHTLY FITTED COVERS, USING DESIGNATED TRAFFIC ROUTES.
EFFORTS SHALL BE MADE TO MINIMIZE USE OF ELEVATORS WITH AN
EMPHASIS ON TRANSPORT DURING THE LOWEST PERIOD OF ACTIVITY.
DEBRIS SHALL BE REMOVED DAILY AND AT TIMES SPECIFIED BY THE VAMC.
IF CHUTES ARE USED TO DIRECT DEBRIS OUTSIDE, HIGH EFFICIENCY
PARTICULATE AIR (HEPA) FILTERED NEGATIVE AIR MACHINES SHALL BE
USED, AND THE CHUTE OPENING SHALL BE SEALED WHEN NOT IN USE.
FILTERS SHALL BE BAGGED AND SEALED BEFORE BEING TRANSPORTED OUT
OF THE CONSTRUCTION AREA. THE CONTRACTOR SHALL NOT HAUL DEBRIS
THROUGH PATIENT-CARE AREAS WITHOUT PRIOR APPROVAL OF THE COR.
4B. EXTERIOR WINDOWS: WINDOWS SHALL BE SEALED TO MINIMIZE
INFILTRATION FROM ANY ADJACENT EXCAVATION DEBRIS.
4C. ALL EQUIPMENT REMAIN IN THE ORs AND ASSOCIATED ROOMS SHALL
BE COVERED AND PROTECTED PRIOR STARTING EACH CONSTRUCTION
PHASE.
VENTILATION AND ENVIRONMENTAL CONTROLS
5. AIR SYSTEM FLOW: THE COR VERIFY AND ACKNOWLEDGE
CONTRACTOR WHETHER THE CONSTRUCTION AREA USES FRESH/OUTSIDE
OR RE-CIRCULATED AIR; FILTERS SHALL BE ADDED OR RETURN VENTS
COVERED AS NEEDED WITH FILTER MATERIAL OR PLASTIC. AIR MUST FLOW
FROM CLEAN TO DIRTY AREAS.
5A. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE CONSTRUCTION AREA
SHALL BE NEGATIVE WITH RESPECT TO SURROUNDING AREAS AND WITH NO
DISRUPTION OF AIR SYSTEMS OF ADJACENT AREAS. USE OF THE NEGATIVE
AIR PRESSURE SYSTEM WITHIN THE ENCLOSURE TO REMOVE DUST SHALL
PASS AIR THROUGH AN INDUSTRIAL GRADE, PORTABLE HEPA FILTER
CAPABLE OF FILTRATION RATES OF 300-800 CUBIC FEET PER MINUTE
(FT3/MIN), OR EXHAUST AIR DIRECTLY TO THE OUTSIDE IF APPROVED BY
VAMC. IF EXHAUST SHALL BE TIED INTO A RE-CIRCULATED AIR SYSTEM, A
PRE-FILTER AND HEPA FILTER SHALL BE USED BEFORE EXHAUST TO
PREVENT CONTAMINATION OF THE DUCTS.
5B. ADJACENT AREAS: THE STATUS OF SEALED PENETRATIONS AND
INTACT CEILING SHALL BE VERIFIED DAILY.
5C. AIR EXCHANGE RATES AND PRESSURE RELATIONSHIPS: VAMC AND
CONTRACTOR SHALL VERIFY AND MAINTAIN PROPER RATES IN CRITICAL
AREAS NEAR CONSTRUCTION ACTIVITY AND ENSURE AIR IS NOT BEING RE-
CIRCULATED WITHOUT FILTRATION FROM THE CONSTRUCTION AREA
ELSEWHERE. PROVIDE AIR PRESSURE TESTING THROUGHOUT THE
PROJECT IN THE FREQUENCY AS IDENTIFIED BY THE COR.
CONTAMINATION OF PATIENT ROOMS, SUPPLIES, EQUIPMENT AND RELATED
AREAS
6. WORKSITE CLOTHING: CONTRACTOR PERSONNEL CLOTHING SHALL BE
FREE OF LOOSE SOIL AND DEBRIS BEFORE LEAVING THE CONSTRUCTION
AREA. IF PROTECTIVE APPAREL IS NOT WORN (E.G., COVERALLS, FOOTGEAR
AND HEADGEAR) A HEPA-FILTERED VACUUM SHALL BE USED TO REMOVE
DUST FROM CLOTHING BEFORE LEAVING THE BARRICADE. IF PROTECTIVE
APPAREL IS UTILIZED, THE CONTRACTOR SHALL CONSTRUCT A SPACE OR
ANTEROOM FOR CHANGING CLOTHING AND STORING EQUIPMENT
(DESIGNATED AREA. ALL EQUIPMENT, TOOLS, TOOL CARTS, AND MATERIALS
TRANSPORTED THROUGH OCCUPIED AREAS SHALL BE MADE FREE FROM
DUST AND MOISTURE BY VACUUMING AND WET WIPING BEFORE THEIR
REMOVAL FROM THE CONSTRUCTION ZONE OR WORK AREA.
6A. POST CONSTRUCTION: DO NOT REMOVE BARRIERS AND KEEP ALL
HVAC ISOLATION UNTIL CONTRACTOR HAS CLEANED CONSTRUCTION SITE,
VA EMS STAFF HAS DONE A TERMINAL CLEANING, AND VA INFECTIOUS
DISEASE CONTROL HAS INSPECTED AND APPROVED THE CLEANING.
7. CONTRACTOR TO COORDINATE WITH THE COR TO DETERMINE THE
LEVEL OF ICRA BARRIERS AND REMEDIATION TO BE IN PLACE DURING EACH
SECTION OF THE POJECT.
ICRA NOTES
III/IVLOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
II
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 IV
IV
IV
III/IV
III/IV
III
III/IV
I
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete ceiling system
- new construction
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet
- painting (but not sanding), wall covering
- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
- Bldg. #69 Therapy areas
- Respiratory Therapy
- Outpatient Clinics
- CBOC's
- Mental Health Units
- VACANT AREA ADJACENT TO
OCCUPIED AREA
- Office areas (non-clinical)
- Hallways
- FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
- Pharmacy
- Radiology/ CT Scanner
- Urgent Care
- Laboratories
- CLCs
- SPD; AMCU;
- Respiratory Isolation Rooms
- Surgery
III
TYPE DTYPE CTYPE B
Class IV or control procedures are necessary.
C
LA
S S
IV
C
LA
S
S
II
During Construction Project
C L-
I C
LA
S
S
II
I
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant after barriers are removed.
6. Remove or isolate HVAC system in areas where work was being performed.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering.
4. Vacuum work with HEPA-filtered vacuums.
5. Wet mop with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
1. Wipe surfaces to remove dust.
Upon Completion of Project
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
4. Complete all critical barriers before construction begins or implement control cube method.
5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.
6. Contain construction waste before transport in tightly covered containers.
7. Cover transport receptacles or carts. Tape covers.
8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.
9. Remove isolation of HVAC system in areas where work is being performed.
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection.
1. Includes all activities required by Class I
2. Provide active means to prevent airborne dust from dispersing into atmosphere.
3. Water mist work surfaces to control dust while cutting.
4. Seal unused doors with duct tape.
5. Block off and seal air vents.
6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
4. Complete all critical barriers or implement control cube method before construction begins.
5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
6. Seal holes, pipes, conduits, and punctures appropriately.
7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.
8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
9. Place adhesive walk-off mats at entrance to work area within anteroom.
10. Replace per manufacturer's recommendations. Do not remove barriers from work area until completed project is inspected each by the Hospital Safety Officer, Facilities Management Maintenance and Engineering Department and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.
11. Cover transport receptacles or carts. Tape covering
12. Vacuum work area with HEPA filtered vacuums.
13. Wet mop with disinfectant after barriers are removed.
14. Remove isolation of HVAC system in areas where work is being performed.
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:2
:4
P
M C
U s e rs
\r re n d e r\ D o c u m e n ts \R e v it F ile s \A
-3
-L it tl e
R o c k A
H U rr e n d e rM D
L P
G .r v t
G-002
ICRA INFORMATION AND DETAILS
2 2AC/RR
REPLACE AHUS 47,48, 48A,
AND 22
JOHN L. MCCLELLAN MEMORIAL
VETERANS HOSPITAL
4300 W 7TH STREET
LITTLE ROCK, AR 72205 AUGUST 18, 2022
100% BID DOCUMENTS
598-21-10620-395
CA
Scale: 1/2" = 1'-0"
ICRA MOBILE CONTAINMENT CART
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL TYPE
Scale: 1/2" = 1'-0"
CROSS SECTION "A"
Scale: 1/2" = 1'-0"
TYPICAL CONSTRUCTION PLAN LAYOUT
Scale: 3" = 1'-0"
ILSM CONSTRUCTION EGRESS SIGNAGE
AFF ABOVE FINISHED FLOOR
ACP/APC ACOUSTIC CEILING PANEL/
ACOUSTIC PANEL CEILING
ACT ACOUSTIC(AL) TILE
ADJ ADJUSTABLE
ADT'L ADDITIONAL
AGG AGGREGATE
ALT ALTERNATE
AL ALUMINUM
APPROX APPROXIMATE(LY)
ASPH ASPHALT
AUTO AUTOMATIC
B/O BOTTOM OF
BD BOARD
BLDG BUILDING
BLKG BLOCKING
BOT BOTTOM
BRG BEARING
CENTERLINE
C/C CENTER TO CENTER
CJ CONTROL JOINT
CLL CONTRACT LIMIT LINE
CEM CEMENT(ITIOUS)
CMU CONCRETE MASONRY UNIT
CLG CEILING
CLR CLEAR
COL COLUMN
CONC CONCRETE
CONST CONSTRUCTION
CONT CONTINUOUS
CPT CARPET
CT CERAMIC TILE
CTR CENTER(ED)
DF DRINKING FOUNTAIN
DS DOWNSPOUT
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DET/DTL DETAIL
DIA DIAMETER
DIM DIMENSION
DN DOWN
DWG(S) DRAWING(S)
E EAST
EC ELECTRICAL CONTRACTOR
EHO ELECTRICAL HOLD OPEN
EJ EXPANSION JOINT
EW EACH WAY
EA EACH
EIFS EXTERIOR INSULATION
FINISH SYSTEM
EL ELEVATION
ELEC ELECTRIC(AL)
ELEV ELEVATOR
EMER EMERGENCY
EQ EQUAL
EQUIP EQUIPMENT
EXIST EXISTING
EXT EXTERIOR
EWC ELECTRIC WATER COOLER
FD FLOOR DRAIN
FE FIRE EXTINGUISHER
FFE FINISH FLOOR ELEVATION
FV FIELD VERIFY
FEC FIRE EXTINGUISHER CABINET
FDN FOUNDATION
FIN FINISH
FLSHG FLASHING
FLR FLOOR
FRMG FRAMING
FT FOOT/FEET
FTG FOOTING
GC GENERAL CONTRACTOR
GA GAUGE
GALV GALVANIZED
GEN GENERAL
GYP GYPSUM
HM HOLLOW METAL
HDWR HARDWARE
HOL HOLLOW
HOR HORIZONTAL
HT HEIGHT
HVAC HEATING/VENTILATION/AIR
CONDITIONING
ID INSIDE DIAMETER
IN INCH
INCL INCLUDING
INSUL INSULATION
INT INTERIOR
JAN JANITOR
JT JOINT
LAV LAVATORY
LB(S) POUND(S)
L/S LANDSCAPE
LT LIGHT
MO MASONRY OPENING
MAS MASONRY
MAT'L MATERIAL
MAX MAXIMUM
MECH MECHANICAL
MFR MANUFACTURER
MIN MINIMUM
MISC MISCELLANEOUS
MTD MOUNTED
MTL METAL
N NORTH
NIC NOT IN CONTRACT
NTS NOT TO SCALE
NOM NOMINAL
OC ON CENTER
OD OUTSIDE DIAMETER
O TO O OUT TO OUT
OPNG OPENING
OPP OPPOSITE
OVHD OVERHEAD
PEB PRE-ENGINEERED BUILDING
PJF PREFORMED JOINT FILLER
PT PRESSURE TREATED
PERIM PERIMETER
PL PLATE
PLAM PLASTIC LAMINATE
PLBG PLUMBING
PLYWD PLYWOOD
PNT PAINT
PR PAIR
PTD PAINTED
PWR POWER
RB RUBBER BASE
RD ROOF DRAIN
RO ROUGH OPENING
RAD RADIUS
REC RECESSED
REINF REINFORCED
REQ'D REQUIRED
REV REVISED (REVISION)
RM ROOM
S SOUTH
SB SPLASH BLOCK
SF SQUARE FEET
SS STAINLESS STEEL
SIM SIMILAR
SPEC SPECIFICATIONS
SQ SQUARE
STD STANDARD
STL STEEL
STOR STORAGE
STRUCT STRUCTURAL
SUSP SUSPENDED
T&G TONGUE AND GROOVE
T/O TOP OF
TELE TELEPHONE
TRTD TREATED
TS TUBE STEEL
TYP TYPICAL
UNFIN UNFINISHED
UNO UNLESS NOTED OTHERWISE
VCT VINYL COMPOSITION TILE
VIF VERIFY IN FIELD
VERT VERTICAL
W WEST
W/ WITH
W/O WITHOUT
WC WATER CLOSET
WWF WELDED WIRE FABRIC
WD WOOD
WH WATER HEATER
WT WEIGHT
CL
DEMOLITION KEYNOTE WINDOW TYPE
DOOR NUMBER
TYPICAL KEYNOTE CEILING/ SOFFIT
HEIGHT
MATL
1'-0"
1. INDICATIONS OF PROJECT LIMITS OR LINES OF DEMARCATION ARE SHOWN FOR GENERAL SCOPE DEFINITION AND REFLECT THE UNDERSTANDING OF THE DESIGNER AS TO THE LIMITATIONS OF THE WORK AREA IN AN OCCUPIED AREA. ACTUAL CONTRACT LIMITS ARE TO BE DETERMINED BY AGREEMENT BETWEEN THE COR AND
CONTRACTOR BEFORE THE START OF THE WORK.
2. DRAWINGS ARE PREPARED USING PRODUCT DIMENSIONS AND DETAILS FROM BASIS OF DESIGN PRODUCT.
PRODUCTS MAY CHANGE IN DIMENSION AND DETAIL BEFORE THEY ARE INCORPORATED INTO
WORK. PRODUCTS FROM OTHER MANUFACTURER’S ARE ALSO ACCEPTABLE. DIMENSIONS AND DETAILS FOR ALTERNATE PRODUCTS MAY VARY FROM BASIS OF DESIGN. CONTRACTOR SHALL VERIFY INSTALLATION REQUIREMENTS FOR ALL PRODUCTS TO BE INCORPORATED INTO WORK (INCLUDING THICKNESS FOR RECESSED OR SEMI-RECESSED PRODUCTS) AND IS REPONSIBLE FOR ACCOMODATING AND COORDINATING CHANGES TO OTHER MATERIALS OR PRODUCTS THAT ARE NECESSARY BECAUSE OF THESE DIFFERENCES.
3. THE DRAWINGS AND SPECIFICATIONS ARE SEPARATED INTO DISCIPLINES FOR CONVENIENCE. THE SEPARATIONS ARE USED ONLY FOR THE PURPOSES OF CONVENIENCE AND REFERENCE AND IN NO WAY DO THEY DEFINE OR LIMIT THE SCOPE OR INTENT OF ANY PART OF THE DRAWINGS AND SPECIFICATIONS AS A WHOLE. THE FACT THAT THE DRAWINGS ARE SEPARATED IN NO WAY SUGGESTS THAT THE WORK IS NOT TO
BE CONSTRUCTED AS A COMPLETE, INTEGRATED AND UNIFIED WHOLE.
4. THE DRAWINGS AND SPECIFICATIONS, INCLUDING DRAWINGS PREPARED BY SPECIFIC ENGINEERING DISCIPLINES ARE COMPLEMENTARY; ITEMS SHOWN IN ANY ONE LOCATION IN THE DRAWINGS SHALL BE CONSIDERED TO BE REQUIREMENTS OF THE CONTRACT FOR CONSTRUCTION. IN THE EVENT OF AN INCONSISTENCY BETWEEN THE DRAWINGS AND SPECIFICATIONS, OR WITHIN EITHER DOCUMENT, THE CONTRACTOR SHALL SEEK CLARIFICATION OR INTERPRETATION FROM THE COR PRIOR TO BIDDING. WHERE INCONSISTENCIES ARE NOT CLARIFIED PRIOR TO BIDDING, AND WHERE THE ACTUAL SOLUTION OR INTENT CANNOT BE REASONABLY INFERRED, THE CONTRACTOR SHALL PROVIDE THE BETTER QUALITY OR GREATER
QUANTITY OF WORK.
5. THE CONTRACTOR SHALL NOTIFY THE COR IMMEDIATELY SHOULD DISCREPANCIES BE FOUND IN THE
DRAWINGS AND SPECIFICATIONS.
6. THE CONTRACTOR IS RESPONSIBLE FOR CHECKING ALL FIELD CONDITIONS AND DIMENSIONS AS THEY RELATE TO THIS PROJECT, FOR EACH PHASE. SHOULD DISCREPANCIES EXIST BETWEEN THE WORK INDICATED AND
ACTUAL FIELD CONDITIONS, NOTIFY THE COR PRIOR TO PROCEEDING WITH THE WORK.
7. DO NOT SCALE THE DRAWINGS. DRAWING SCALES AS INDICATED ARE FOR REFERENCE ONLY AND ARE NOT INTENDED TO ACCURATELY DEPICT ACTUAL OR DESIGNATED CONDITIONS. WRITTEN DIMENSIONS SHALL
GOVERN.
8. PROVIDE SEALANT AT ALL EXPOSED EDGES.
9. COORDINATE WORK OF ALL TRADES PRIOR TO STARTING CONSTRUCTION.
10. REFER TO ALL OTHER TRADE DRAWINGS AND SPECIFICATIONS FOR ADDITIONAL INFORMATION ON THIS
PROJECT.
11. PROVIDE BLOCKING AT PARTITIONS AS REQUIRED FOR MOUNTING OF WALL-MOUNTED ITEMS: PROVIDE SUPPLEMENTAL FRAMING AT WALL OPENINGS INCLUDING KING STUDS, JACK STUDS, AND CRIPPLE STUDS, AS
REQUIRED FOR COMPLETION OF THE WORK.
12. DIMENSIONS SHOWN ARE TO FACE OF STUD FRAMING, FACE OF CONCRETE/MASONRY WALLS, OR FINISHED
FACE OF EXISTING WALL SURFACE.
13. ALL WOOD IN CONTACT WITH CONCRETE SHALL BE PRESSURE TREATED.
14. GC TO COORDINATE AN APPROVED STAGING AREA WITH THE VA COR.
1. KEY NOTES AND DRAWINGS ARE INTENDED TO GRAPHICALLY REPRESENT GENERAL WORK AND DO NOT
PORTRAY FULL SCOPE OF THE PROJECT. SEE SPECIFICATIONS FOR DETAILED REQUIREMENTS.
2. REMOVE EXISTING CONSTRUCTION AS DESIGNATED HEREIN AND CLEAR AREA OF DEBRIS PRIOR TO
PROCEEDING WITH NEW CONSTRUCTION.
3. EXISTING EQUIPMENT REMOVED SHALL BE PROPERLY DISPOSED OF, OFF PROJECT GROUNDS. COORDINATE
WITH COR.
4. AT AREAS INDICATED TO BE PATCHED AND REPAIRED, FOR ADDITION AND RENOVATION PROJECTS: THE CONSTRUCTION AND ASSEMBLY OF THE PATCH OR REPAIR SHALL MATCH THE ASSEMBLY AND INTEGRITY OF THE ADJACENT EXISTING CONSTRUCTION, FOR FIRE RATING, MATERIALS, FINISH, THICKNESS, AND QUALITY.
5. COORDINATE WORKING HOURS ALLOWED FOR DEMOLITION AND WASTE REMOVAL WITH COR.
6. NOTIFY COR OF ANY DEMOLITION REQUIRED AND NOT INDICATED FOR INSTALLATION OF ELECTRICAL OR DATA ITEMS. AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE MATERIALS AND FINISHES TO MATCH
EXISTING.
7. CONTRACTOR SHALL PROTECT AREA ADJACENT TO THE DEMOLITION AND NEW CONSTRUCTION WORK TO PREVENT DAMAGES, (IF DAMAGED, REPAIR, RE-PATCH, SAND SMOOTH AND REFINISH TO MATCH EXISTING.)
REPAIR OR REPLACE ITEMS DAMAGED DURING CONSTRUCTION ACTIVITIES AT NO ADDITIONAL COST.
8. THE INFORMATION CONTAINED IN THESE DEMOLITION DOCUMENTS DEFINES GENERAL SCOPE ONLY AND DOES NOT RELIEVE THE CONTRACTOR OF THE RESPONSIBILITY OF PROVIDING ALL DEMOLITION REQUIRED FOR THE
COMPLETION OF THE PROJECT.
9. DO NOT ENCROACH ON ADJACENT OCCUPIED AREAS NOT IDENTIFIED WITHIN THE SCOPE OF WORK.
10. REFER TO THE ELECTRICAL DRAWINGS FOR FURTHER INFORMATION REGARDING DEMOLITION OF ELECTRICAL
SYSTEMS.
11. BEFORE THE START OF WORK, IDENTIFY ANY REQUIRED DEMOLITION BEYOND THE IDENTIFIED PROJECT SCOPE WHETHER ABOVE, BELOW, OR OUTSIDE THE PROJECT AREA. NOTIFY AND COORDINATE WITH THE COR, PROVIDE DEMOLITION OF THESE AREAS AND PATCH THE SAME AS A PART OF THE SCOPE OF THE PROJECT.
12. ALL DEMOLITION WORK SHALL BE PERFORMED WITH DUE CARE AND DILIGENCE IN ORDER TO PREVENT ARBITRARY DAMAGE OR INTERRUPTION OF SERVICE OR CONCEALED UTILITIES INTENDED TO REMAIN IN SERVICE. DISCOVERY OF UTILITIES OR CONDITIONS LOCATED DIFFERING FROM THOSE INDICATED OR THAT
ARE NOT IDENTIFIED, SHALL BE REPORTED TO THE COR.
13. AFTER REMOVAL OF EXISTING SOLID CONCRETE MASONRY WALL, FILL FLOOR VOIDS UP TO FINISH CONCRETE
LEVEL AND PERFORM FLOOR LEVELING FOR ENTIRE AREA OF RENOVATION.
14. VERIFY ALL EXISTING CONDITIONS PRIOR TO BEGINNING WORK. NOTIFY COR AND ARCHITECT OF ANY
CONFLICTS PRIOR TO PROCEEDING WITH DEMOLITION.
15. ALL ITEMS BEING SALVAGED OR REMOVED SHALL REMAIN THE PROPERTY OF THE OWNER UNTIL CONFIRMATION HAS BEEN MADE AS TO WHETHER THE OWNER WILL RETAIN SUCH ITEMS. ALL ITEMS NOT BEING RETAINED BY THE OWNER OR DESIGNATED ON THE DRAWINGS, ARE TO BE RELOCATED OR REMOVED
FROM THE SITE BY CONTRACTOR IN APPROVED MANNER.
16. CONTRACTOR SHALL NOTIFY COR OF ANY AREA REQUIRING DEMOLITION OTHER THAN SHOWN IN THESE DRAWINGS DUE TO UNFORSEEN CONDITIONS, TO ACCOMMODATE INSTALLATION OF ALL OTHER TRADES (INCLUDING ROOF PENETRATIONS). AFTER SUCH DEMOLITION AND INSTALLATION, PATCH OR REPLACE
MATERIALS AND FINISHES TO MATCH EXISTING.
17. COORDINATE WITH COR FOR CONSTRUCTION ACCESS ROUTE AND LOCATIONS OF DUMPSTER AREA.
COORDINATE WITH COR FOR SCHEDULE OF USE OF ACCESS ROUTE FOR WASTE REMOVAL AND CONTRACTOR
USE OF FREIGHT ELEVATOR (AS REQUIRED).
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO
PARTICIPATE IN VOLUNTARY STANDARD BODIES.
GENERAL: VA HAS ADOPTED THE LATEST EDITION OF THE FOLLOWING CODES AND STANDARDS AS A MINIMUM FOR ALL PROJECTS PERFORMED IN THE MODERNIZATION, ALTERATION, ADDITION, OR IMPROVEMENT OF ITS REAL PROPERTY AND THE CONSTRUCTION OF NEW STRUCTURES. VA DESIGN MANUALS AND MASTER SPECIFICATIONS SPECIFY OTHER CODES AND
STANDARDS THAT VA FOLLOWS ON ITS PROJECTS:
• AMERICANS WITH DISABILITIES ACT (ADA) STANDARDS, 2010
• NFPA 101 LIFE SAFETY CODE 2021 (SEE NOTES BELOW)
• PG 18-13: VA BARRIER FREE DESIGN STANDARD, JANUARY 2017
• 2021 INTERNATIONAL BUILDING CODE
• VA DESIGN GUIDE ARCHITECTURAL MANUAL 2014, AUGUST 2001
• DEPARTMENT OF VETERANS AFFAIRS: FIRE PROTECTION DESIGN MANUAL, DECEMBER 2021
• INTERNATIONAL FIRE CODE, 2021
• NFPA 13, INSTALLATION OF SPRINKLER SYSTEMS, 2022
• DEPARTMENT OF VETERANS AFFAIRS: PLUMBING DESIGN MANUAL, MAY 2021
• DEPARTMENT OF VETERANS AFFAIRS: VHA DIRECTIVE 1061, FEBRUARY 2021
• INTERNATIONAL PLUMBING CODE, 2021
• INTERNATIONAL MECHANICAL CODE, 2021
• NFPA 99, HEALTH CARE FACILITIES CODE, 2021
• ASHRAE 90.1-2019
• DEPARTMENT OF VETERANS AFFAIRS: HVAC DESIGN MANUAL, NOV 1, 2017, REV NOV 2021
• ASHRAE 90.1-2019 - ENERGY STANDARD FOR BUILDINGS EXCEPT LOW-RISE RESIDENTIAL BUILDINGS
• ASHRAE STANDARD 170.2021 (VENTILATION FOR HEALTH CARE FACILITIES)
• ASHRAE HANDBOOKS, 2021 FUNDAMENTALS, 2019 HVAC APPLICATIONS, 2020 HVAC SYSTEMS AND EQUIPMENT
• ASME B31.9, BUILDING SERVICES PIPING
• NFPA 90A, INSTALLATION OF AIR CONDITIONING AND VENTILATING SYSTEMS, 2021
• SMACNA, HVAC DUCT CONSTRUCTION STANDARDS, METAL AND FLEXIBLE
• SMACNA, HVAC AIR DUCT LEAKAGE TEST MANUAL
• FACILITIES GUIDELINES INSTITUTE: GUIDELINES FOR THE DESIGN AND CONSTRUCTION OF HOSPITALS 2018
• NFPA 70, NATIONAL ELECTRICAL CODE (NEC), 2020
• NFPA 72, NATIONAL FIRE ALARM CODE, 2022
• ILLUMINATING ENGINEERING SOCIETY (IES) LIGHTING HANDBOOK, 10TH EDITION
• DEPARTMENT OF VETERANS AFFAIRS: ELECTRICAL DESIGN MANUAL, DECEMBER 2019
• DEPARTMENT OF VETERANS AFFAIRS: PHYSICAL SECURITY AND RESILIENCY DESIGN MANUAL, MARCH 2022
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION
FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY
HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
ROOF SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
VIEW NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS
FACE OF EXISTING
WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTHNORTH
0 4 8 16
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:2
:3
P
M C
U s e rs
\r re n d e r\ D o c u m e n ts \R e v it F ile s \A
-3
-L it tl e
R o c k A
H U rr e n d e rM D
L P
G .r v t
A-001
ARCHITECTURAL SYMBOLS,
ABBREVIATIONS AND NOTES
1 3AC/RR
REPLACE AHUS 47,48, 48A,
AND 22
JOHN L. MCCLELLAN MEMORIAL
VETERANS HOSPITAL
4300 W 7TH STREET
LITTLE ROCK, AR 72205 AUGUST 18, 2022
100% BID DOCUMENTS
598-21-10620-395
CA
ABBREVIATIONS
ARCHITECTURAL SYMBOL LEGEND GENERAL NOTES
DEMOLITION NOTES
CODE STANDARDS AND EXECUTIVE ORDERS
GENERAL SYMBOL LEGEND
UP
J
K
M
P
R
21 22 23 24 25
H
G
FAN
ROOM
1E163-JLM
PACS
ROOM
1E211-JLM
1E215-JLM
CHIEF TECH
DIAGNOSTIC
SERVER
READING
ROOM
1E212-JLM
RADIOLOGIST
1E213A-JLM
READING
ROOM
1E214-JLM
DATA
ROOM
1E216-JLM
TRANSFUSION
ROOM
1E217-JLM
RADIOLOGIST
STAFF
OFFICE
1E218-JLM
RADIOLOGIST
STAFF
OFFICE
1E219-JLM
RADIOLOGIST
STAFF
OFFICE
1E220-JLM
1E223-JLM
BUDGET
ASSISTANT
ADMINISTRATIVE
OFFICE
1E224-JLM
QA
COORDINATOR
1E222-JLM
RADIOLOGIST
STAFF
OFFICE
1E221-JLM
CHIEF
RADIOLOGY
1E225-JLM
X-RAY
ACTIVE
FILES
1E133-JLM
X-RAY
FILES
1E158-JLM
MAMMOGRAPHY
1E135C-JLM
ULTRASOUND
1E135D-JLM
ULTRASOUND
1E135E-JLM
STEREO
BIOPSY
1E135B-JLM
WAITING
1E134A-JLM
RADIOLOGY
STAFF
1E133C-JLM
RADIOLOGY
STAFF
1E133A-JLM
RADIOLOGY
STAFF
1E133B-JLM
Room
1E133D-JLM
DRESS
1E13#-JLM
DRESS
1E13#-JLM
CORRIDOR
C182
CORRIDOR
C153
EYE
CLINIC
STAFF
OFFICE
1E109
NUTRITION
& FOOD
SC. OFF.
1E109
EYE
CLINIC
WAITING
1E108
VSO
STATE
OFF.
1E107
VSO DAV
OFF.
1E106
VSO
WAITING
C180A
CORR.
C180
EYE CLINIC
STAFF OFFICE
1E114
EYE CLINIC
STAFF OFFICE
1E113
TELE.
1E112
SIGNAL
1E111
ELECTRIC
1E110
EYE
CLINIC
RECEPT.
1E105
WOMEN
1E104
MEN
1E104
EXISTING WALL TO REMAIN
EXISTING DOOR TO REMAIN
DEMOLITION LEGEND
SCOPE OF WORK BOUNDARY
NOT IN SCOPE
J
K
M
P
R
21 22 23 24 25
H
G
CHIEF
TECH
DIAGNOSTIC
SERVER
1E215-JLM
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/1
/2
:2
:4
P
M C
U s e rs
\r re n d e r\ D o c u m e n ts \R e v it F ile s \A
-3
-L it tl e
R o c k A
H U rr e n d e rM D
L P
G .r v t
AD101
FIRST FLOOR DEMOLITION PLAN - AHU
2 3AC/RR
REPLACE AHUS 47,48, 48A,
AND 22
JOHN L. MCCLELLAN MEMORIAL
VETERANS HOSPITAL
4300 W 7TH STREET
LITTLE ROCK, AR 72205 AUGUST 18, 2022
100% BID DOCUMENTS
598-21-10620-395
CA
NORTH
0 4 8 16
Scale: 1/8" = 1'-0"
FIRST FLOOR DEMOLITION FLOOR PLAN
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
1 REMOVE CEILING TILES AND GRID FOR
INSTALLATION/ WORK ON MECHANICAL
EQUIPMENT.
2 INSTALL ICRA TEMPORARY BARRIER WITH
ZIPPER ENTRY AT EXISTING DOOR.
3 PROVIDE STICKY MATS BOTH SIDES.
4 REMOVE EXISTING AIR FILTER UNIT.
5 REMOVE SELECT AREA OF CEILING TILES
AS NEEDED TO COMPLETE THE SCOPE OF
WORK OUTSIDE THE CHIEF TECH
DIAGNOSTICS SERVER ROOM. REPLACE
ALL CEILING TILES DEFACED OR DAMAGED
DURING THE PROJECT DEMOLITION
AND/OR INSTALLATION. COORDINATE
WITH THE COR.
A. AHU 22 IS LOCATED ON THE MECHANICAL FLOOR,
3RD LEVEL. AHU 48 AND 48A ARE LOCATED ON THE
7TH FLOOR ROOF PENTHOUSE. SEE MECHANICAL
PLANS FOR AHU 22, 48, AND 48A.
B. ALL CEILING MOUNTED COMPONENTS, INCLUDING
BUT NOT LIMITED TO, TECHNOLOGY, LIGHTS AND
DIFFUSERS, TO BE SAVED AND REUSED. REPLACE IF
DAMAGED.
C. REPLACE ALL TILES DEFACED OR DAMAGED DURING
THE PROJECT.
D. COORDINATE WITH VA COR ON LOCATIONS OF ICRA
CONTAINMENT CART DURING DEMOLITION.
E. CONTRACTOR TO PROVIDE A WRITTEN SCHEDULE
SHOWING EACH AREA OF RENOVATION AND THE
ANTICIPATED WORK SCHEDULE AND DURATION OF
DEMOLITION AND INSTALLATION. ALL DATES AND
TIMES TO BE REVIEWED AND APPROVED BY THE
COR TWO (2) WEEKS PRIOR TO THE BEGINNING OF
DEMOLITION. IN STAFF/PATIENTS AREA, AFTER
HOURS WORK FROM 6PM TO 5AM ALLOWED ONLY.
IN MECHANICAL SPACES, 7AM TO 6PM DAYTIME
WORK ALLOWED ONLY. CONTRACTOR TO PROVIDE
SUFFICIENT TIME FOR CLEANUP AND TURNOVER TO
VA SAFETY TEAM FOR A SAFETY AND HYGIENE
INSPECTION PRIOR TO TURNOVER TO THE VA
STAFF.
Scale: 1/8" = 1'-0"
FIRST FLOOR REFLECTED CEILING DEMOLITION PLAN
NORTH
0 4 8 16
UP
J
K
M
P
R
21 22 23 24 25
H
G
FAN
ROOM
1E163-JLM
PACS
ROOM
1E211-JLM
1E215-JLM
CHIEF TECH
DIAGNOSTIC
SERVER
READING
ROOM
1E212-JLM
RADIOLOGIST
1E213A-JLM
READING
ROOM
1E214-JLM
DATA
ROOM
1E216-JLM
TRANSFUSION
ROOM
1E217-JLM
RADIOLOGIST
STAFF
OFFICE
1E218-JLM
RADIOLOGIST
STAFF
OFFICE
1E219-JLM
ADMINISTRATIVE
OFFICE
1E224-JLM
RADIOLOGIST
STAFF
OFFICE
1E220-JLM
X-RAY
ACTIVE
FILES
1E133-JLM
ULTRASOUND
1E135D-JLM
BUDGET
ASSISTANT
1E223-JLM
CHIEF
RADIOLOGY
1E225-JLM
RADIOLOGIST
STAFF
OFFICE
1E221-JLM
QA
COORDINATOR
1E222-JLM
RADIOLOGY
STAFF
1E133A-JLM
RADIOLOGY
STAFF
1E133B-JLM
RADIOLOGY
STAFF
1E133C-JLM
WAITING
1E134A-JLM
ULTRASOUND
1E135E-JLM
MAMMOGRAPHY
1E135C-JLM
STEREO
BIOPSY
1E135B-JLM
X-RAY
FILES
1E158-JLM
Room
1E133D-JLM
DRESS
1E13#-JLM
DRESS
1E13#-JLM
CORRIDOR
C153
CORRIDOR
C182
EXISTING WALL TO REMAIN
EXISTING DOOR TO REMAIN
NEW WORK LEGEND
NEW WALL
NEW DOOR
SCOPE OF WORK BOUNDARY
NOT IN SCOPE
J
K
M
P
R
21 22 23 24 25
H
G
FAN
ROOM
1E163-JLM
PACS
ROOM
1E211-JLM
CHIEF
TECH
DIAGNOSTIC
SERVER
1E215-JLM
READING
ROOM
1E212-JLM
RADIOLOGIST
1E213A-JLM
READING
ROOM
1E214-JLM
DATA
ROOM
1E216-JLM
TRANSFUSION
ROOM
1E217-JLM
RADIOLOGIST
STAFF
OFFICE
1E218-JLM
RADIOLOGIST
STAFF
OFFICE
1E219-JLM
RADIOLOGIST
STAFF
OFFICE
1E220-JLM
BUDGET
ASSISTANT
1E223-JLM
ADMINISTRATIVE
OFFICE
1E224-JLM
QA
COORDINATOR
1E222-JLM
RADIOLOGIST
STAFF
OFFICE
1E221-JLM
CHIEF
RADIOLOGY
1E225-JLM
X-RAY
ACTIVE
FILES
1E133-JLM
X-RAY
FILES
1E158-JLM
MAMMOGRAPHY
1E135C-JLM
ULTRASOUND
1E135D-JLM
ULTRASOUND
1E135E-JLM
STEREO
BIOPSY
1E135B-JLM
WAITING
1E134A-JLM
RADIOLOGY
STAFF
1E133C-JLM
RADIOLOGY
STAFF
1E133A-JLM
RADIOLOGY
STAFF
1E133B-JLM
Room
1E133D-JLM
DRESS
1E13#-JLM
DRESS
1E13#-JLM
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/1
/2
:2
:4
P
M C
U s e rs
\r re n d e r\ D o c u m e n ts \R e v it F ile s \A
-3
-L it tl e
R o c k A
H U rr e n d e rM D
L P
G .r v t
A-101
FIRST FLOOR PLAN - AHU 47
3 3AC/RR
REPLACE AHUS 47,48, 48A,
AND 22
JOHN L. MCCLELLAN MEMORIAL
VETERANS HOSPITAL
4300 W 7TH STREET
LITTLE ROCK, AR 72205 AUGUST 18, 2022
100% BID DOCUMENTS
598-21-10620-395
CA
NORTH
0 4 8 16
1 INSTALL NEW CEILING GRID AND TILE. MATCH
EXISTING CEILING SYSTEM IN MFR. COLOR OF
TILE/ GRID, WIDTH OF GRID, TEXTURE AND
EDGING OF THE TILE.
2 THE FLOOR FINISH WILL BE PATCHED AND
REPAIRED TO MATCH EXISTING.
N
AREA OF WORK
KEY PLAN
SCALE: NO SCALE
Scale: 1/8" = 1'-0"
FIRST FLOOR PLAN - AHU 47
A. AHU 22 IS LOCATED ON THE MECHANICAL FLOOR,
3RD LEVEL. AHU 48 AND 48A ARE LOCATED ON THE
7TH FLOOR ROOF PENTHOUSE. SEE MACHANICAL
PLANS FOR AHU 22, 48, AND 48A.
B. ALL NEW OR REUSED CEILING MOUNTED
COMPONENTS TO BE REINSTALLED IN THE SAME
LOCATIONS.
C. NEW FLOOR FINISHES TO MATCH EXISTING.
D. WALL TO BE REPAIRED OF ANY DAMAGED
SUSTAINED BY CONSTRUCTION ACTIVITIES. PAINT
TO MATCH EXISTING.
E. CEILING CONTRACTOR TO MEASURE EACH CEILING
AREA AND ESTABLISH A CEILING LAYOUT TO
BALANCE BORDER WIDTHS AT OPPOSITE EDGES OF
EACH ROOM. AVOID USE OF LESS-THAN 6" TILES.
F. ANY PENETRATIONS THROUGH RATED WALLS
SHALL BE SEALED WITH FIRE PROOF SEALANT. SEE
MECHANICAL AND ELECTRICAL SHEETS FOR
DETAILS.
G. CONTRACTOR TO PROVIDE A WRITTEN SCHEDULE
SHOWING EACH AREA OF RENOVATION AND THE
ANTICIPATED WORK SCHEDULE AND DURATION OF
DEMOLITION AND INSTALLATION. ALL DATES AND
TIMES TO BE REVIEWED AND APPROVED BY THE
COR TWO (2) WEEKS PRIOR TO THE BEGINNING OF
DEMOLITION. IN STAFF/PATIENTS AREA, AFTER
HOURS WORK FROM 6PM TO 5AM ALLOWED ONLY.
IN MECHANICAL SPACES, 7AM TO 6PM DAYTIME
WORK ALLOWED ONLY. CONTRACTOR TO PROVIDE
SUFFICIENT TIME FOR CLEANUP AND TURNOVER TO
VA SAFETY TEAM FOR A SAFETY AND HYGIENE
INSPECTION PRIOR TO TURNOVER TO THE VA
STAFF.
H. ALL TIE-IN WORK NEEDS TO OCCUR DURING
WEEKENDS.
Scale: 1/8" = 1'-0"
FIRST FLOOR REFLECTED CEILING PLAN
NORTH
0 4 8 16
A/E ARCHITECT / ENGINEER
AAHX AIR TO AIR HEAT EXCHANGER
AB AIR BLENDER
AAV AUTOMATIC AIR VENT
ACC AIR-COOLED CONDENSER
ACCH AIR-COOLED CHILLER
ACCU AIR-COOLED CONDENSING UNIT
ACU AIR CONDITIONING UNIT
ACD AUTOMATIC CONTROL DAMPER,
MODULATING
ACD-TP AUTOMATIC CONTROL DAMPER,TWO
POSITION
AD ACCESS DOOR
AF AFTER FILTER
AFCV AIR FLOW CONTROL VALVE
AFF ABOVE FINISHED FLOOR
AFMD AIR FLOW MEASURING DEVICE
AFW AIR FOIL WHEEL (FAN)
AHU AIR-HANDLING UNIT
AMP AMPERAGE
AP ACCESS PANEL
APD AIR PRESSURE DROP
ARI AIR CONDITIONING AND
REFRIGERATION INSTITUTE
AS AIR SEPARATOR
ASME AMERICAN SOCIETY OF MECHANICAL
ENGINEERS
AW AIR WASHER
AXF AXIAL FLOW
B BOILER
BD BUTTERFLY DAMPER
BDD BACKDRAFT DAMPER
BDR BASE BOARD RADIATOR
BFP BACKFLOW PREVENTER
BFT BOILER PLANT FIRE TUBE
BHP BRAKE HORSEPOWER
BHW HOT WATER HEATING BOILER
BHX BOILER BLOWDOWN HEAT
EXCHANGER
BIW BACKWARD INCLINED WHEEL (FAN)
BSC BIOLOGICAL SAFETY CABINETS
BT BUFFER TANK
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT PER HOUR
C CENTIGRADE (CELSIUS)
CC COOLING COIL
CCD COOLING COIL CONDENSATE DRAIN
CENT CENTRIFUGAL
CFH CUBIC FEET PER HOUR
CFM CUBIC FEET PER MINUTE
CFT CUBIC FEET
CFP CHEMICAL FEED PUMP
CH CHILLER
CHWP CHILLED WATER PUMP
CHW CHILLER WATER
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CI CAST IRON
CM CARBON MONOXIDE
CM CUBIC METER
CM/S CUBIC METER PER SECOND
CO CLEAN OUT
CO2 CARBON DIOXIDE
COMP COMPRESSOR UNIT
COP COEFFICIENT OF PERFORMANCE
CP CONDENSATE PUMP
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CV CONSTANT VOLUME
CW COLD WATER (POTABLE)
CHWCC CHILLED WATER COOLING COIL
D DAMPER - AUTOMATIC
D-1 OUTDOOR AIR DAMPER
D-2 RETURN AIR DAMPER
D-3 RELIEF AIR DAMPER
D-4 ECONOMIZER OUTDOOR AIR
DAMPER
dB DECIBELS Db DRY-BULB TEMPERATURE
DDC DIRECT DIGITAL CONTROLS
DEG DEGREE
DF DIFFUSER
DIA DIAMETER
DIW DEIONIZED WATER
DP DEW POINT TEMPERATURE
DP DIFFUSER PLATE
DPA DIFFERENTIAL PRESSURE
ASSEMBLY
DPS DIFFERENTIAL PRESSURE SENSOR
DX DIRECT EXPANSION
DXCC DIRECT EXPANSION COOLING COIL
EA EXHAUST AIR
EAT ENTERING AIR TEMPERATURE
ECC ENGINEERING CONTROL CENTER
EER ENERGY EFFICIENCY RATIO
EF EXHAUST FAN
EG EXHAUST GRILLE
EGS EMERGENCY GAS SHUTOFF
EH EXHAUST HOOD
EJ EXPANSION JOINT
EMD END OF MAIN DRIP (STEAM)
ENT ENTERING
ESP EXTERNAL STATIC PRESSURE
EWT ENTERING WATER TEMPERATURE
EX EXISTING
F FAHRENHEIT
F&T FLOAT AND THERMOSTATIC
F/SDPR COMBINATION FIRE SMOKE DAMPER
FA FREE AREA
FC FLEXIBLE CONNECTION
FCU FAN COIL UNIT (4 PIPE)
FCW FORWARD CURVED WHEEL (FAN)
FD FLOOR DRAIN
FD FIRE DAMPER
FF FINAL FILTER
FM FLOW METER
FPM FEET PER MINUTE
FPS FEET PER SECOND
FRP FIBER REINFORCED POLYESTER
FS FLOW SWITCH
FSTAT FREEZESTAT
FT FEET
FT-LB FOOT-POUND
FTR FIN TUBE RADIATION
FV FACE VELOCITY
GA GAUGE
GAL GALLONS
GH GRAVITY HOOD
GPD GALLONS PER DAY
GPH GALLONS PER HOUR
GPM GALLONS PER MINUTE
GS GALVANIZED STEEL
H HUMIDIFIER
H&CW HOT & COLD WATER
HAC HOUSEKEEPING AID CLOSET
HB HOSE BIBB
HC HEATING COIL
HD HEAD
HD HOOD
HHW HEATING HOT WATER
HHWC HEATING HOT WATER COIL
HHWP HEATING HOT WATER PUMP
HHWR HEATING HOT WATER RETURN
HHWS HEATING HOT WATER SUPPLY
HOA HAND/OFF/AUTOMATIC
HP HEAT PUMP
HP HORSEPOWER
HPDT HIGH PRESSURE DRIP TRAP
HPR HIGH PRESSURE RETURN (STEAM
CONDENSATE)
HPS HIGH PRESSURE SUPPLY (STEAM)
HRC HEAT RECOVERY COIL
HRD HEAT RECOVERY DEVICE
HRP HYDRONIC RADIANT (CEILING) PANEL
HRW HEAT RECOVERY WHEEL
HSTAT HUMIDISTAT
HUM HUMIDIFIER UNIT MOUNTED
HVU HEATING AND VENTILATING UNIT
HW HOT WATER
HWC HOT WATER COIL
HWUH HOT WATER UNIT HEATER
HX HEAT EXCHANGER
Hz HERTZ
I/O INPUT/OUTPUT
IAQ INDOOR AIR QUALITY
IBT INVERTED BUCKET TRAP
ICF IN-LINE CENTRIFUGAL FAN
ICU INTENSIVE CARE UNIT
ID INSIDE DIAMETER
IFB INTEGRAL FACE AND BYPASS
IN INCHES
IN HG INCHES OF MERCURY
IN WC INCH WATER COLUMN
IN WG INCH WATER GAUGE
IN-LB INCH-POUND
IPLV INTEGRATED PART LOAD VALUE
IRH INFRARED HEATER
IS INSECT SCREEN
IV INLET VANES
kg KILOGRAM kg/HR KILOGRAM PER HOUR kPa KILOPASCAL kW KILOWATT kWh KILOWATT HOUR
L LITER
L/s LITERS PER SECOND
LAT LEAVING AIR TEMPERATURE
LBS/HR POUNDS PER HOUR
LF LINEAR FOOT (FEET)
LH LATENT HEAT
LPR LOW PRESSURE RETURN (STEAM
CONDENSATE)
LPS LOW PRESSURE SUPPLY (STEAM)
LSD LINEAR SLOT DIFFUSER
LTCP LOCAL TEMPERATURE CONTROL
PANEL
LVG LEAVING
LVR LOUVER
LWT LEAVING WATER TEMPERATURE
M METER, SI UNIT
M/s METERS PER SECOND (OR
METERS/SECOND)
MA MIXED AIR
MAT MIXED AIR TEMPERATURE
MAV MANUAL AIR VENT
MAX MAXIMUM
MB MIXING BOX
MBH 1000 BTUH
MCA MINIMUM BRANCH CIRCUIT AMPACITY
MER MECHANICAL EQUIPMENT ROOM
MERV MINIMUM EFFICIENCY REPORTING
VALUE
MHP MOTOR HORSEPOWER
MIN MINIMUM
MM MILLIMETER
MOV MOTOR OPERATED VALVE
MPR MEDIUM PRESSURE RETURN (STEAM
CONDENSATE)
MPS MEDIUM PRESSURE SUPPLY (STEAM)
MTD MEAN TEMPERATURE DIFFERENCE
MVD MANUAL VOLUME DAMPER
NA NOT APPLICABLE
NC NOISE CRITERIA
NC NORMALLY CLOSED
NO NORMALLY OPEN
NOAA NATIONAL OCEANIC & ATMOSPHERIC
ADMINISTRATION
NOM NOMINAL
NPLV NON-STANDARD PART LOAD VALUE
NPSH NET POSITIVE SUCTION HEAD
NTS NOT TO SCALE
OA OUTSIDE AIR
OAI OUTSIDE AIR INTAKE
OD OUTSIDE DIAMETER
OR OPERATING ROOM
OSA OUTSIDE SUPPLY AIR
(CONDITIONED)
P PUMP
PC PUMPED CONDENSATE
PCF POUNDS PER CUBIC FOOT (FEET)
PD PRESSURE DROP
PF PRE-FILTER
PG PRESSURE GAGE
PHC PREHEAT COIL
PHCP PREHEAT COIL PUMP
PPM PARTS PER MILLION
PRV PRESSURE REGULATING VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH –
ABSOLUTE
PSIG POUNDS PER SQUARE INCH – GAGE
PSS PRIMARY SECONDARY SYSTEM
PSV PRESSURE SAFETY VALVE
R/E RETURN OR EXHAUST
RA RETURN AIR
RAT RETURN AIR TEMPERATURE
RDS ROOM DATA SHEETS
REA RELIEF AIR
RF RETURN FAN
RG RETURN GRILLE
RH RELATIVE HUMIDITY
RHC REHEAT COIL
RL REFRIGERANT LIQUID LINE
RLA RUN LOAD AMPERE
RPM REVOLUTIONS PER MINUTE
RS REFRIGERANT SUCTION
RTU ROOF TOP UNIT
RV RELIEF VALVE
SA SUPPLY AIR
SAD SOUND ATTENUATING DEVICE
SAT SUPPLY AIR TEMPERATURE
SC SHADING COEFFICIENT
SCFM STANDARD CUBIC FEET PER MINUTE
SCR SILICON CONTROLLED RECTIFIER
SD SMOKE DETECTOR
SD SUPPLY AIR DIFFUSER
SDPR SMOKE DAMPER
SDR SMOKE DAMPER (RETURN)
SDS SMOKE DAMPER (SUPPLY)
SEN SENSIBLE HEAT
SF SUPPLY FAN
SH STEAM HUMIDIFIER
SHC STEAM HEATING COIL
SI SQUARE INCHES
SP STATIC PRESSURE
SP GR SPECIFIC GRAVITY
SPD SUPPLY PROCESS AND
DISTRIBUTION
SPRV STEAM PRESSURE REDUCING VALVE
SPS STATIC PRESSURE SENSOR
SQ FT SQUARE FOOT (FEET)
SR SUPPLY AIR REGISTER
SS STAINLESS STEEL
SSR SOLID SEPARATOR
ST STEAM TRAP
SV STEAM SAFETY VALVE
SVS STEAM VENT SILENCER
T & PCV TEMPERATURE AND PRESSURE
CONTROL VALVE
TAB TESTING, ADJUSTING, BALANCE
TD TEMPERATURE DIFFERENCE
TDH TOTAL DYNAMIC HEAD
TDS TOTAL DISSOLVED SOLIDS
TP TRAP
TSP TOTAL STATIC PRESSURE
TSTAT THERMOSTAT
TU TERMINAL UNIT
UC UNDER CUT
UH UNIT HEATER
UL UNDERWRITERS LABORATORY
V VALVE
VAF VANE-AXIAL FAN
VAV VARIABLE AIR VOLUME
VD VOLUME DAMPER (MANUAL
OPPOSED BLADE)
VFD VARIABLE FREQUENCY DRIVE
VHA VETERANS HEALTH ADMINISTRATION
VI VIBRATION ISOLATOR
VP VACUUM PUMP
VPS VARIABLE PRIMARY SYSTEM
VR VACUUM (STEAM CONDENSATE)
RETURN
VSD VARIABLE SPEED DRIVE
VUH VERTICAL UNIT HEATER
W WATTS
Wb WET-BULB (TEMPERATURE)
WFCV WATER FLOW CONTROL VALVE
WFM WATER FLOWMETER
WFMD WATER FLOW MEASURING DEVICE
WG WATER GAGE
WPD WATER SIDE PRESSURE DROP
XT EXPANSION TANK
YR YEAR
MECHANICAL ABBREVIATIONS
CO2 CARBON DIOXIDE SENSOR
HUMIDISTAT OR HUMIDITY SENSOR
SUPPLY DIFFUSER
RETURN GRILLE
EXHAUST GRILLE
ROUND FLEX DUCT
LINEAR SLOT DIFFUSER
BALANCING DAMPER
FIRE DAMPER
SMOKE DAMPER
D
R INCLINED RISE, IN
DIRECTION OF AIRFLOW
INCLINED DROP, IN DIRECTION
OF AIRFLOW
CONNECT NEW DUCT
TO EXISTING
LIMIT OF DEMOLITION
VANED ELBOW (PROVIDE ALL
SQUARE OR RECTANGULAR
ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
STANDARD RADIUS ELBOW
(LONG RADIUS)
10x8 NEW DUCT (INSIDE
DIMENSIONS: WIDTH X DEPTH)
EXISTING DUCT TO REMAIN
EXISTING DUCT TO BE
DEMOLISHED
DUCT TRANSITION
END MOUNTED OR SIDEWALL GRILLE
SUPPLY
RETURN45°
45°
DN
DN
UP
UP
DNUP
STANDARD BRANCH SUPPLY OR
RETURN, NO SPLITTER (45° TAP)
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
RETURN DUCT (UP & DOWN)
S-60
S-15
CR-15
CHWS
CHWR
HIGH PRESSURE STEAM
PIPING (60 PSI)
LOW PRESSURE STEAM PIPING
(15 PSI AND BELOW)
LOW PRESSURE STEAM
CONDENSATE RETURN
CHILLED WATER SUPPLY PIPING
CHILLED WATER RETURN PIPING
PIPE UP
PIPE DOWN
BOTTOM CONNECTION
TOP CONNECTION
CAPPED OR PLUGGED PIPE
GLOBE VALVE
GATE VALVE
BALL VALVE
STEAM SAFETY VALVE
PRESSURE REGULATING VALVE
WYE STRAINER VALVE
BALANCING VALVE
MODULATING TWO-WAY CONTROL
VALVE
STEAM TRAP
D CONDENSATE DRAIN LINE
CR-60 HIGH PRESSURE STEAM
CONDENSATE RETURN
HWS
HWR
HEATING HOT WATER SUPPLY
PIPING
HEATING HOT WATER RETURN PIPING
RLS REFRIGERANT LINE SET (LIQUID
AND SUCTION)
CONNECT TO EXISTING PIPE
LIMIT OF DEMOLITION
INLINE CENTRIFUGAL PUMP
STEAM PRESSURE REDUCING
VALVE
DRAIN VALVE
TEST PLUG
SUPPLY
TERMINAL UNIT SUPPLY
DUCT BRANCH (CONICAL
TAP)
CHECK VALVE
FIRE / SMOKE DAMPER
VANED ELBOW (SHORT RADIUS) S-30
CR-30
MEDIUM PRESSURE STEAM
PIPING (16 PSI AND 59 PSI)
MEDIUM PRESSURE STEAM
CONDENSATE RETURN
THERMOSTAT OR TEMPERATURE SENSOR
TWO POSITION CONTROL VALVE
MODULATING THREE-WAY
CONTROL VALVE
T
H
F
SD
FS
MECHANICAL LEGEND
MOTORIZED DAMPER
1. WORK SHALL CONFORM TO APPLICABLE LOCAL, STATE, AND NATIONAL CODES AND APPLICABLE VA STANDARDS.
2. INSTALL EQUIPMENT IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS.
3. PROVIDE NEW MATERIALS, EQUIPMENT AND PRODUCTS INCORPORATED IN THE WORK, OF A SUITABLE GRADE FOR THE PURPOSES INTENDED.
4. WHERE POSSIBLE, PROVIDE STANDARD PRODUCTS OF THE VARIOUS MANUFACTURERS EXCEPT WHERE SPECIAL CONSTRUCTION OR PERFORMANCE FEATURES ARE REQUIRED.
5. EQUIPMENT OR MATERIAL DEVIATIONS FROM INDICATED CONTRACT REQUIREMENTS SHALL BE SUBJECT TO THE APPROVAL OF THE COR/VA. SUBMIT PROPOSED EQUIPMENT DEVIATIONS THAT ARE SIMILAR BOTH IN QUALITY AND CAPACITY TO THAT EQUIPMENT SPECIFIED, AS SOLELY DETERMINED BY THE COR/VA.
6. PROVIDE MECHANICAL EQUIPMENT THAT IS LISTED AND LABELED BY UNDERWRITERS LABORATORIES (U.L.).
7. INSTALL EQUIPMENT AS INDICATED, ALLOWING FOR SUFFICIENT ACCESS AND CLEARANCE SPACE FOR EQUIPMENT MAINTENANCE, REPAIRS, AND REPLACEMENT.
8. INSTALL EQUIPMENT WITH PROPER CLEARANCES FOR REQUIRED PIPING AND ELECTRICAL SERVICES AND CONNECTIONS. INSTALL EQUIPMENT WITH REQUIRED ACCESS AND CLEARANCES IN ACCORDANCE WITH MANUFACTURER'S WRITTEN RECOMMENDATIONS AND APPLICABLE CODES AND STANDARDS.
9. COORDINATE LOCATION, INSTALLATION, AND ROUTING OF DUCTWORK, PIPING, AND EQUIPMENT WITH WORK OF ALL OTHER TRADES.
10. PROVIDE SUPPORT FOR MECHANICAL EQUIPMENT. COORDINATE SUPPORT LOCATIONS WITH ALL CONTRACTORS PRIOR TO INSTALLATION.
11. PROVIDE POWER CONNECTIONS TO EQUIPMENT PROVIDED UNDER THIS CONTRACT AS WORK OF DIVISION 26.
12. PROVIDE CONTROL WIRING FOR MECHANICAL EQUIPMENT AS WORK OF DIVISION 23.
13. DUCTWORK AND PIPING LAYOUTS AND LOCATIONS ARE SCHEMATIC. DO NOT SCALE THESE DRAWINGS. COORDINATE AND DETERMINE EXACT ROUTING OF DUCTWORK AND
PIPING IN THE FIELD.
14. FIELD VERIFY DIMENSIONS BY ACTUAL MEASUREMENT AND OBSERVATION BEFORE ORDERING OR FABRICATING DUCTWORK, PIPING OR EQUIPMENT.
15. NOTIFY COR/VA REGARDING DISCREPANCIES BETWEEN CONTRACT DOCUMENTS AND EXISTING CONDITIONS OR DIMENSIONS BEFORE PERFORMING WORK. FAILURE TO VERIFY AND REPORT SHALL CONSTITUTE CONTRACTOR'S ACCEPTANCE OF EXISTING CONDITIONS AS FIT FOR THE PROPER EXECUTION OF THE WORK.
16. SEE ARCHITECTURAL DRAWINGS FOR FINAL LOCATION OF CEILING INSTALLED EQUIPMENT.
17. INSTALL DUCTWORK AND PIPING AS HIGH AS POSSIBLE AND AS CLOSE AS POSSIBLE TO BUILDING WALLS, CEILING AND…
This is the start of the file's text. The full file is on GovTribe.