This amendment to a federal solicitation provides clarification regarding recently submitted questions from potential offerors. The Department of Veterans Affairs seeks to replace aging air handling units at two medical centers and is open to a partial notice to proceed to allow contractors to begin administrative work in preparation for equipment delivery and installation. Spot cooling units of similar size to the units being removed will be required until new permanent units are installed. The existing direct digital controls system is no longer supported for expansion and a new front-end system from the current manufacturer, Siemens, will need to be provided as part of any proposal. Work can take place during normal business hours depending on barrier setup, with some hallway work potentially needing off-hours scheduling.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
5. PROJECT NUMBER (if applicable)
CODE7. ADMINISTERED BY
2. AMENDMENT/MODIFICATION NUMBER
CODE
6. ISSUED BY
8. NAME AND ADDRESS OF CONTRACTOR
4. REQUISITION/PURCHASE REQ. NUMBER3. EFFECTIVE DATE
9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED
PAGE OF PAGES
10A. MODIFICATION OF CONTRACT/ORDER NUMBER
10B. DATED
BPA NO. 1. CONTRACT ID CODE
FACILITY CODECODE
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers
E. IMPORTANT:
is extended,
(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.
12. ACCOUNTING AND APPROPRIATION DATA
(REV. 11/2016)
is required to sign this document and return ___________ copies to the issuing office.is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.
15C. DATE SIGNED
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER
Contractor
16C. DATE SIGNED
14. DESCRIPTION OF AMENDMENT/MODIFICATION
16B. UNITED STATES OF AMERICA
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER
15B. CONTRACTOR/OFFEROR
STANDARD FORM 30 PREVIOUS EDITION NOT USABLE
Prescribed by GSA - FAR (48 CFR) 53.243
(Type or print) (Type or print)
(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
(Number, street, county, State and ZIP Code)
(If other than Item 6)
(Specify type of modification and authority)
(such as changes in paying office, appropriation date, etc.)
(If required)
(SEE ITEM 11)
(SEE ITEM 13)
(X)
CHECK
ONE
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
(Signature of person authorized to sign) (Signature of Contracting Officer)
1 2
0002 598-23-2-8859-0005 598-21-106
36C256
Department of Veterans Affairs Veterans Health Administration Network Contracting Office 16 2200 Fort Roots Drive North Little Rock AR 72114
To all Offerors/Bidders 36C25623R0080
07-26-2023 X
X X
09-06-2023 at 1:00 PM CST
598-3630162-8859-854200-3220 23NR0PA19
The purpose of this amendment is to provide additional clarification regarding recently submitted RFI responses.
Please see the RFI Clarifications on page 2 of this amendment.
08-31-2023
The VA would like to provide additional Clarification regarding recently submitted RFI responses:
The VA is open to providing a partial NTP to permit General Contractor (GC) an opportunity to begin their submittal process and other administrative duties in preparation for execution. Upon VA approval of AHU equipment selection, lead time on deliverables that impact Period of Performance can be adjusted accordingly. Once the GC receives a confirmed delivery date for the AHU equipment, a construction NTP can be provided giving a four (4) week buffer before the scheduled delivery to coincide with the initial Period of Performance of 26 weeks for the construction phase.
Regarding contractor working during facility normal business hours. The AHUs at JLM are on the roof penthouse and the 3rd floor mechanical space. The AHUs at NLR are in mechanical spaces within the medical facility and some mechanical spaces are in hallways and they can have ICRA barriers around them for an active construction space. These can be handled during normal business hours. Depending on how the contractor sets up his ICRA barriers, this work should not interfere with facility operations. Some Hallway work may need to be accomplished after hours due to patient traffic in some of these hallways.
Clarification of DDC Controls with existing system: (Siemens and Trane). Siemens is an acceptable manufacturer and supplier. The front-end computer and software need to be the current Siemens control system, but the current CAVHS existing system is no longer updateable/expandable for our needs (in both NLR and JLM.) The cost for the new front-end items shall be included in the proposal.
Temporary Spot Coolers size: Spot coolers should be similar to the size of the units being removed until the new units are ready to install. The spot coolers should connect to the existing ductwork to provide the correct dispersion pattern. In some of the mech rooms we have multiple units in the say room. We can tie the ducts together with a cross over to supply air to the unit that is down.