Attachment C - 20-338 100 construction bid documents.pdf
PDF 47 MB Posted
- Solicitation number
- 36C25624R0005
About this file
This solicitation is for renovations to the ground floor services at a Veterans Affairs medical center. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16 is seeking bids to renovate approximately 15,000 square feet of space on the ground floor to improve clinical services. Bids are due by February 15, 2022 and the contract is expected to be awarded by April 30, 2022. The renovations include upgrades to electrical, mechanical, and plumbing systems as well as interior partitions, finishes, and fixtures. The contract term is 270 calendar days from the notice to proceed date.
View the file
Other files
Show all 28
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
PROJECT SITE MAP PROJECT LOCATION MAP
/1
/2
:3
:0
P
M C
U s e rs \d c o rd o n \D o c u m e n ts
\R e v it l o c a l\ A
-3
-Q
V A
L it tl e
R o c k s t
F lo o r
R e n o d c o rd o n a c g -p a .c o m
.r v t
G-001
COVER
1 17DGC
VA LITTLE ROCK GROUND
FLOOR RENOVATION
CAVHCS
4300 W. 7TH ST
LITTLE ROCK. ARKANSAS 72205
MAY 16, 2023
100% BID DOCUMENTS
598-21-10120-338-Q33
VA LITTLE ROCK GROUND FLOOR
RENOVATION
CAVHCS
4300 W. 7TH ST
LITTLE ROCK. ARKANSAS 72205
VA PROJECT #: 598-21-101
CLA
DRAWING LIST
FIRE SUPPRESSION
FX001 FIRE SUPPRESSION GENERAL INFORMATION 1 4
FK101 GROUND FLOOR FIRE SUPPRESSION DEMOLITION PLAN 2 4
FX101 GROUND FLOOR FIRE SUPPRESSION PLAN - AREA 'A' 3 4
FX102 GROUND FLOOR FIRE SUPPRESSION PLAN - AREA 'B' 4 4
PLUMBING
P-001 PLUMBING GENERAL INFORMATION 1 7
PD101 GROUND FLOOR PLUMBING DEMOLITION PLAN 2 7
P-101 GROUND FLOOR PLUMBING PLAN - AREA 'A' 3 7
P-102 GROUND FLOOR PLUMBING PLAN - AREA 'B' 4 7
P-501 PLUMBING DETAILS 5 7
P-502 PLUMBING DETAILS 6 7
P-601 PLUMBING SCHEDULES 7 7
MECHANICAL
M-001 MECHANICAL GENERAL INFORMATION 1 7
MD101 GROUND FLOOR MECHANICAL DEMOLITION PLAN 2 7
MH101 GROUND FLOOR HVAC PLAN - AREA 'A' 3 7
MH102 GROUND FLOOR HVAC PLAN - AREA 'B' 4 7
M-501 MECHANICAL DETAILS 5 7
M-502 MECHANICAL CONTROLS 6 7
M-601 MECHANICAL SCHEDULES 7 7
ELECTRICAL
E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 16
ED101 GROUND FLOOR OVERALL POWER DEMOLITION PLAN 2 16
ED102 GROUND FLOOR POWER DEMOLITION PLAN - AREA 'A' 3 16
ED103 GROUND FLOOR POWER DEMOLITION PLAN - AREA 'B' 4 16
ED104 GROUND FLOOR OVERALL LIGHTING DEMOLITION PLAN 5 16
ED105 GROUND FLOOR LIGHTING DEMOLITION PLAN - AREA 'A' 6 16
ED106 GROUND FLOOR LIGHTING DEMOLITION PLAN - AREA 'B' 7 16
EP101 GROUND FLOOR OVERALL POWER PLAN 8 16
EP102 GROUND FLOOR POWER PLAN - AREA 'A' 9 16
EP103 GROUND FLOOR POWER PLAN - AREA 'B' 10 16
EL101 GROUND FLOOR OVERALL LIGHTING PLAN 11 16
EL102 GROUND FLOOR LIGHTING PLAN - AREA 'A' 12 16
EL103 GROUND FLOOR LIGHTING PLAN - AREA 'B' 13 16
E-501 ELECTRICAL DETAILS 14 16
E-601 ELECTRICAL PARTIAL SINGLE LINE DIAGRAMS 15 16
E-602 ELECTRICAL SCHEDULES 16 16
TECHNOLOGY
T-001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 1 8
TD101 GROUND FLOOR OVERALL TECHNOLOGY DEMOLITION PLAN 2 8
TD102 GROUND FLOOR TECHNOLOGY DEMOLITION PLAN - AREA 'A' 3 8
TD103 GROUND FLOOR TECHNOLOGY DEMOLITION PLAN - AREA 'B' 4 8
T-101 GROUND FLOOR OVERALL TECHNOLOGY PLAN 5 8
T-102 GROUND FLOOR TECHNOLOGY PLAN - AREA 'A' 6 8
T-103 GROUND FLOOR TECHNOLOGY PLAN - AREA 'B' 7 8
T-501 TECHNOLOGY DETAILS 8 8
FIRE ALARM
FA001 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND, AND RISER 1 7
FL101 GROUND FLOOR OVERALL FIRE ALARM DEMOLITION PLAN 2 7
FL102 GROUND FLOOR FIRE ALARM DEMOLITION PLAN - AREA 'A' 3 7
FL103 GROUND FLOOR FIRE ALARM DEMOLITION PLAN - AREA 'B' 4 7
FA101 GROUND FLOOR OVERALL FIRE ALARM PLAN 5 7
FA102 GROUND FLOOR FIRE ALARM PLAN - AREA 'A' 6 7
FA103 GROUND FLOOR FIRE ALARM PLAN - AREA 'B' 7 7
DRAWING LIST
GENERAL
G-001 COVER 1 17
G-002 GENERAL INFORMATION 2 17
G-003 ICRA INFORMATION AND DETAILS 3 17
G-004 ICRA INSTALLATION EXAMPLES 4 17
GC101 GROUND FLOOR OVERALL PHASING PLAN 5 17
GC102 GROUND FLOOR PLAN - PHASE 1 6 17
GC103 GROUND FLOOR PLAN - PHASE 2 7 17
GC104 GROUND FLOOR PLAN - PHASE 3 8 17
GC105 GROUND FLOOR PLAN - PHASE 4 9 17
GC106 GROUND FLOOR PLAN - PHASE 5 10 17
GC107 GROUND FLOOR PLAN - PHASE 6 11 17
GC108 GROUND FLOOR PLAN - PHASE 7 12 17
GC109 GROUND FLOOR PLAN - PHASE 8 13 17
GC110 GROUND FLOOR PLAN - PHASE 9 14 17
GC111 GROUND FLOOR PLAN - PHASE 10 15 17
GL101 OVERALL GROUND FLOOR PLAN 16 17
GL102 GROUND FLOOR LIFE SAFETY PLAN 17 17
HAZARDOUS MATERIALS
H-101 GROUND FLOOR ABATEMENT PLAN (FOR REFERENCE ONLY) 1 1
ARCHITECTURAL
A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 11
A-002 GROUND FLOOR DEPARTMENT KEY PLAN 2 11
AD101 GROUND FLOOR DEMOLITION PLAN 3 11
AD110 GROUND FLOOR REFLECTED CEILING DEMOLITION PLAN 4 11
AE101 GROUND FLOOR PLAN 5 11
AE102 GROUND FLOOR - DIMENSION PLAN 6 11
AE110 GROUND FLOOR REFLECTED CEILING PLAN 7 11
AE401 ENLARGED PLANS, ELEVATION. 8 11
AE501 PARTITION TYPES, DETAILS 9 11
AE601 DOOR SCHEDULE, ELEVATIONS AND DETAILS 10 11
AE901 GROUND FLOOR - PROGRAM COMPARISON 11 11
INTERIORS
I-001 PRODUCT SCHEDULES, SYMBOLS AND ABBREVIATIONS 1 17
I-101 GROUND FLOOR OVERALL FINISH AND WALL PROTECTION PLAN 2 17
I-121 GROUND FLOOR OVERALL PATTERN PLAN 3 17
I-201 CASEWORK ELEVATIONS AND DETAILS 4 17
I-401 INTERIOR ELEVATIONS 5 17
I-411 GROUND FLOOR OVERALL EQUIPMENT PLAN 6 17
I-412 GROUND FLOOR ENLARGED EQUIPMENT PLAN - AREA 'A' 7 17
I-413 GROUND FLOOR ENLARGED EQUIPMENT PLAN - AREA 'B' 8 17
I-421 ENLARGED EQUIPMENT PLANS 9 17
I-422 ENLARGED EQUIPMENT PLANS 10 17
I-423 ENLARGED EQUIPMENT PLANS 11 17
I-424 ENLARGED EQUIPMENT PLANS 12 17
I-425 ENLARGED EQUIPMENT PLAN 13 17
I-431 ENLARGED TOILET PLANS AND ELEVATIONS 14 17
I-432 ENLARGED TOILET PLANS AND ELEVATIONS 15 17
I-501 INTERIOR DETAILS 16 17
I-601 EQUIPMENT SCHEDULE 17 17
AREA OF WORK
BUILDING 1
GROUND FLOOR
THE CENTRAL ARKANSAS
HEALTHCARE SYSTEM (CAVHS)
4300 W. 7TH ST
DocuSign Envelope ID: C0615F6C-CD24-42D0-86E1-E95A49E68611
5/11/2023
WALL SECTION
SYMBOL
INTERIOR ELEVATION
SYMBOL
COLUMN GRID
ELEVATION SYMBOL
REVISION NOTE
ENLARGED DETAIL
CALLOUT
ROOM DESIGNATION
SYMBOL
BREAK LINE
FLOOR SLOPE
DIRECTION SYMBOL
TYPICAL GRAPHIC SCALE
DETAIL #
PAGE #
DETAIL #
PAGE #
VIEW NORTH ARROW
A8.1
EXTERIOR ELEVATION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
A8.1
BUILDING SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
A8.1
DETAIL SECTION
SYMBOL
DETAIL #
PAGE #
A8.1
WALL GRID
(REPRESENTS FACE OF
EXISTING WALL)
XX.X
XX.X
ELEVATION
0'-0"
ROOM
NAME
101A
NORTHNORTH
0 4 8 16
EXPOSED
PLUMBING AT
BARRIER
FREE
LAVATORIES
SHALL BE
INSULATED.
LEVER OPERATING
CONTROLLED
SOAP DISPENSER
NOTE: SINKS IN COUNTERS TO BE
MOUNTED WITH RIM NO MORE
THAN 2'-10" HIGH AND WITH AT
LEAST 2'-3" KNEE CLEARANCE.
CLEAR
TYPICAL ACCESSIBLE
CLEARANCE AT LAVATORY
TYPICAL ACCESSIBLE
LAVATORY AND MIRROR
1'-3" 1'-3"
M
IN
M A
X
M
A X
M
A X6
A
.F .F
MIN
8"
MAX
6"
M
IN9
M
IN
M
IN
M A
X
17" MIN
TYPICAL URINAL
MOUNTING
CLEAR
15"
CLEAR
15"
"3
M
A X
T O
B O
T T
O M
O F
R
E F
L E
C T
IV
S
U R
F A
C E
F
M
IR
R
O R
4'-0" MAX TO
HIGHEST OPERABLE
POINT - IF FIRE
EXTINGUISHER
OVER 40 LBS
3'-6" MAX HT.
FIRE EXTINGUISHER
CABINET
ELECTRICAL CABINET
DUPLEX
OUTLET
SWITCH
THERMOSTAT
TELEPHONE
OR DATA
OUTLET
FIRE ALARM
PULL 3'-8"
(3'-6" MIN)
(4'-0" MAX.)
INTERCOM
STATION
DUPLEX
OUTLET
COMPUTER
TERMINAL
MISC. WALL DEVICES
O .C
O.C.
39" - 41"
3'-6" 1'-0"
9" O.C.
2'-0"
/2
M
IN
T O
T O
P
6" 3'-0"
ACCESSIBLE TOILET
WALL MOUNTED
1-1/2"
DIAMETER
GRAB BAR
SANITARY NAPKIN
DISPOSAL
TOILET TISSUE
DISPENSER
TOILET SEAT
COVER
DISPENSER
CARD
READER
NOTE: GRAB BARS
LOCATION, AND MOUNTING
ARE THE SAME IN NON
ACCESIBLE TOILET.
MOP BASIN
MOP SHELF
TYPICAL JANITORS CLOSET
ACCESSIBLE
ROBE/COAT HOOK
ROBE/COAT
HOOK
TOILET ACCESSORIES
6"
PAPER TOWEL
DISPENSER
2'-0" AT SIDEWALLS
AT COUNTER SINKS
1'-6" AT SIDEWALLS
AT LAVATORY
PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO
PARTICIPATE IN VOLUNTARY STANDARD BODIES.
GENERAL: BASED ON THE VA PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES, THIS PROJECT HAS BEEN DESIGNED TO, AND CONSTRUCTION SHALL COMPLY WITH THE FOLLOWING CODES AND GUIDELINES:
(AS OF EFFECTIVE PROJECT DESIGN CONTRACT DATE MARCH 30, 2021)
• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).
• INTERNATIONAL BUILDING CODE (IBC) 2021 (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES
BELOW)
• NFPA 101 LIFE SAFETY CODE 2021 (SEE NOTES BELOW)
• NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900
• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.
• VA SEISMIC DESIGN REQUIREMENTS, H-18-8
• NATIONAL ELECTRICAL CODE (NEC)
• INTERNATIONAL PLUMBING CODE (IPC) 2021
• SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.
• ASME BOILER AND PRESSURE VESSEL CODE
• ASME CODE FOR PRESSURE PIPING
• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN
STANDARD (PG-18-13)
• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)
• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL
BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)
• ENERGY POLICY ACT OF 2005 (EPACT)
• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH- RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.
• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)
• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE
VA MASTER CONSTRUCTION SPECIFICATION.
• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 170 - VENTILATION OF HEALTH CARE FACILITIES,
• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2019..
LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION
FEES.
NOTES:
1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).
2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY
HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.
CONSTRUCTION
STAGING AREA #1
CONSTRUCTION
STAGING AREA #2
1. LOCKER-ROOM REMODEL.
2. ROOM GC195 EMS SUPPLY CLOSET.
3. BED LIFT
# ALTERNATE NOTES
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:3
:1
P
M C
U s e rs \d c o rd o n \D o c u m e n ts
\R e v it l o c a l\ A
-3
-Q
V A
L it tl e
R o c k s t
F lo o r
R e n o d c o rd o n a c g -p a .c o m
.r v t
G-002
GENERAL INFORMATION
2 17DGC
VA LITTLE ROCK GROUND
FLOOR RENOVATION
CAVHCS
4300 W. 7TH ST
LITTLE ROCK. ARKANSAS 72205
MAY 16, 2023
100% BID DOCUMENTS
598-21-10120-338-Q33
CLA
GENERAL SYMBOL LEGEND
STANDARD MOUNTING HEIGHTS CODE STANDARDS AND EXECUTIVE ORDERS
Scale: 12" = 1'-0"
CONSTRUCTION STAGING
INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS
FOR CONSTRUCTION AND RENOVATION
PLASTIC WINDOW
SWIVEL CASTERS
WITH TWO
LOCKING BRAKES
MOBILE CART
A D
J U
S T
A B
L
H
IG
H T
HEPA NEGATIVE
AIR UNIT
EXISTING WALL
EXISTING CEILING
FLEX DUCT
B
SMOKE RATED
3 5/8" INSULATED WALL WITH
16 GAUGE METAL STUDS @
16" O.C. WALL TO EXTEND TO
UNDERSIDE OF DECK
EXISTING CEILING SYSTEM
BASE - TO MATCH
EXISTING AREA
EXISTING FLOOR
UNDERSIDE OF EXISTING
DECK
C E
IL
IN
G H
E
IG
H T
V A
R
IE
S F
IE
L D
V E
R
IF
Y
W A
L L
H E
IG
H
T V
A R
IE
S
F
IE
L D
V E
R
IF
Y
5"
FIRE RESISTANT SEALANT,
BOTH SIDES
HEPA NEGATIVE
AIR UNIT
FINISHED FLOORING TO BE KEPT
CLEAN. FLOORS NOT BEING REPLACED
MUST BE PROTECTED. COVER WITH
ROSIN PAPER / FIRE RATED PLYWOOD.
FIRE RATED PLYWOOD,
TEMPORARY. SALVAGE
PROTECT AND STORE
EXISTING WINDOW TO
BE RE-INSTALLED
AFTER CONSTRUCTION
IS COMPLETE.
V .I .F
E X
IS
T
IN
G
W A
L L
ISLM TEMPORARY BARRIER TAG
PROJECT:
PRIME CONTRACTOR:
SUB CONTRACTOR:
EMERGENCY CONTACT NO.:
BARRIER INSTALLATION DATE:
BARRIER EXPIRATION DATE:
FIRE EXTINGUISHER ON
PORTABLE FLOOR
BRACKET (ILSM MAY
REQUIRE MORE THAN
ONE).
PROVIDE STICKY MATS
(CHANGED END OF SHIFT
OR MORE IF NECESSARY
TO MAINTAIN
CLEANLINESS).
HEPA NEGATIVE
AIR UNIT
ISOLATE AND COVER ALL
SUPPLY DIFFUSERS NOT IN
OPERATION DURING PROJECT -
COORDINATE W/ COR
COVER ALL
RETURNS AT THE
GRATE/DIFFUSERS
SUSPENDED PLASTIC
ZIPPER WALL
CURTAIN BARRIER
POST ICRA, ILSM, FIRE
INPECTION SHEETS
VISIBLE TO PUBLIC
FIRE PULL
STATION WITH
AUDIO / VISUAL
FLEX DUCT
EXHAUST LOCATION
- SEE NOTE A
NOTE:
A. TURN UP EXHAUST ON EXTERIOR ON SIDE. CONTRACTOR SHALL VERIFY
LOCATION OF AIR INTAKES ARE AT THE PROPER DISTANCE FROM EXHAUST.
VERIFY LOCAL JURISDICATION CODE AND VA REQUIREMENTS FOR DISTANCE
PRIOR TO STARTING WORK.
G-003
_____3
G-003
G-003
ILSM SIGNAGE
INTERIM LIFE SAFETY MEASURES IN EFFECT
FOR VA LITTLE ROCK GROUND FLOOR RENOVATION
THIS EXIT IS CLOSED AND LEADS TO A
CONSTRUCTION AREA.
PLEASE USE ALL ALTERNATE EXITS AS MARKED.
1' - 5"
1/2"1/2"
/2
/2
/2
/2
/2
/2
EQ.EQ.
III/IVLOW Risk Group 1
Class III
Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that
It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation
II
I
III
MEDIUM Risk Group 2
HIGH Risk Group 3
HIGHEST Risk Group 4 IV
IV
IV
III/IV
III/IV
III
III/IV
I
III
Patient Risk Group Table
Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk
TYPE A
Construction Project Type
Major demolition and construction projects
Includes, but is not limited to:
- activities which require consecutive work shifts
- requires heavy demolition or removal of a complete ceiling system
- new construction
Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies
Includes, but is not limited to:
- sanding of walls for painting or wall covering
- removal of floor coverings, ceiling tiles and casework
- new wall construction
- minor duct work or electrical work above ceilings
- major cabling activities
- any activity which cannot be completed within a single work shift
Small scale, short duration activities which create minimal dust
Includes, but is not limited to:
- installation of telephone and computer cabling
- access to chase spaces
- cutting of walls or ceiling where dust migration can be controlled
Inspection and Non-Invasive Activities
Includes, but is not limited to:
- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet
- painting (but not sanding), wall covering
- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection
Type of Construction / Project Activity Table
Group 2 Medium Risk
Group 1 Low Risk
- Bldg. #69 Therapy areas
- Respiratory Therapy
- Outpatient Clinics
- CBOC's
- Mental Health Units
- VACANT AREA ADJACENT TO
OCCUPIED AREA
- Office areas (non-clinical)
- Hallways
- FES/EMS areas
I
Patient Risk Group
TYPE D
TYPE C
TYPE B
TYPE A
Group 4 Highest Risk
Group 3 High Risk
- Pharmacy
- Radiology/ CT Scanner
- Urgent Care
- Laboratories
- CLCs
- SPD; AMCU;
- Respiratory Isolation Rooms
- Surgery
III
TYPE DTYPE CTYPE B
Class IVor control procedures are necessary.
C
LA
S S
IV
C
LA
S
S
II
During Construction Project
C L-
I C
LA
S
S
II
I
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering
4. Vacuum work area with HEPA filtered vacuums.
5. Wet mop area with disinfectant after barriers are removed.
6. Remove or isolate HVAC system in areas where work was being performed.
1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.
2. Contain construction waste before transport in tightly covered containers.
3. Cover transport receptacles or carts. Tape covering.
4. Vacuum work with HEPA-filtered vacuums.
5. Wet mop with disinfectant.
6. Remove isolation of HVAC system in areas where work is being performed.
1. Wipe surfaces to remove dust.
Upon Completion of Project
1. Wipe work surfaces with disinfectant.
2. Contain construction waste before transport in tightly covered containers.
3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.
4. Remove isolation of HVAC system in areas where work is being performed.
1. Includes all activities required by Class II
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
4. Complete all critical barriers before construction begins or implement control cube method.
5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.
6. Contain construction waste before transport in tightly covered containers.
7. Cover transport receptacles or carts. Tape covers.
8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.
9. Remove isolation of HVAC system in areas where work is being performed.
1. Execute work by methods to minimize raising dust from construction operations.
2. Immediately replace a ceiling tile displaced for visual inspection.
1. Includes all activities required by Class I
2. Provide active means to prevent airborne dust from dispersing into atmosphere.
3. Water mist work surfaces to control dust while cutting.
4. Seal unused doors with duct tape.
5. Block off and seal air vents.
6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.
7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.
1. Includes all activities required by Class III
2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities
Management Maintenance and Engineering department before construction begins.
3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.
4. Complete all critical barriers or implement control cube method before construction begins.
5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.
6. Seal holes, pipes, conduits, and punctures appropriately.
7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.
8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.
9. Place adhesive walk-off mats at entrance to work area within anteroom.
10. Replace per manufacturer's recommendations. Do not remove barriers from work area until completed project is inspected each by the Hospital Safety Officer, Facilities Management Maintenance and Engineering Department and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.
11. Cover transport receptacles or carts. Tape covering
12. Vacuum work area with HEPA filtered vacuums.
13. Wet mop with disinfectant after barriers are removed.
14. Remove isolation of HVAC system in areas where work is being performed.
DUST CONTROL PLAN NOTES
A. THE USE OF TEMPORARY BARRIER SYSTEMS,
WHERE PERMITTED, CAN BE USED INSTEAD OF
NOTED PARTITIONS IN ACCEPTED BY THE COR
AND THE PARTITIONS COMPLY WITH REQUIRED
FIRE RATING.
B. TRAFFIC CONTROL: DESIGNATED ENTRY AND
EXIT PROCEDURES SHALL BE DEFINED.
EGRESS PATHS SHALL BE FREE OF DEBRIS;
DESIGNATED ELEVATORS SHALL BE USED
DURING SCHEDULED TIMES; AND ONLY
AUTHORIZED PERSONNEL SHALL BE ALLOWED
TO ENTER THE CONSTRUCTION ZONE.
SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC
AWAY FROM THE CONSTRUCTION AREA AND
MATERIALS.
C. DEMOLITION DEBRIS: DEBRIS SHALL BE
REMOVED IN CARTS WITH TIGHTLY FITTED
COVERS, USING DESIGNATED TRAFFIC
ROUTES .EFFORTS SHALL BE MADE TO
MINIMIZE USE OF ELEVATORS WITH AN
EMPHASIS ON TRANSPORT DURING THE
LOWEST PERIOD OF ACTIVITY. DEBRIS SHALL
BE REMOVED DAILY AND AT TIMES SPECIFIED
BY THE VAMC. IF CHUTES ARE USED TO DIRECT
DEBRIS OUTSIDE, HIGH EFFICIENCY
PARTICULATE AIR (HEPA) FILTERED NEGATIVE
AIR MACHINES SHALL BE USED, AND THE
CHUTE OPENING SHALL BE SEALED WHEN NOT
IN USE. FILTERS SHALL BE BAGGED AND
SEALED BEFORE BEING TRANSPORTED OUT
OF THE CONSTRUCTION AREA. THE
CONTRACTOR SHALL NOT HAUL DEBRIS
THROUGH PATIENT-CARE AREAS WITHOUT
PRIOR APPROVAL OF THE COR.
D. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE
CONSTRUCTION AREA SHALL BE NEGATIVE
WITH RESPECT TO SURROUNDING AREAS AND
WITH NO DISRUPTION OF AIR SYSTEMS OF
ADJACENT AREAS. USE OF THE NEGATIVE AIR
PRESSURE SYSTEM WITHIN THE ENCLOSURE
TO REMOVE DUST SHALL PASS AIR THROUGH
AN INDUSTRIAL GRADE, PORTABLE HEPA
FILTER CAPABLE OF FILTRATION RATES OF
300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR
EXHAUST AIR DIRECTLY TO THE OUTSIDE IF
APPROVED BY VAMC. IF EXHAUST SHALL BE
TIED INTO A RE-CIRCULATED AIR SYSTEM, A
PRE-FILTER AND HEPA FILTER SHALL BE USED
BEFORE EXHAUST TO PREVENT
CONTAMINATION OF THE DUCTS.
E. ADJACENT AREAS: THE STATUS OF SEALED
PENETRATIONS AND INTACT CEILING SHALL BE
VERIFIED DAILY.
F. AIR EXCHANGE RATES AND PRESSURE
RELATIONSHIPS: VAMC AND CONTRACTOR
SHALL VERIFY AND MAINTAIN PROPER RATES IN
CRITICAL AREAS NEAR CONSTRUCTION
ACTIVITY AND ENSURE AIR IS NOT BEING RE-
CIRCULATED WITHOUT FILTRATION FROM THE
CONSTRUCTION AREA ELSEWHERE. PROVIDE
AIR PRESSURE TESTING THROUGHOUT THE
PROJECT IN THE FREQUENCY AS IDENTIFIED BY
THE COR.
G. WORKSITE CLOTHING: CONTRACTOR
PERSONNEL CLOTHING SHALL BE FREE OF
LOOSE SOIL AND DEBRIS BEFORE LEAVING THE
CONSTRUCTION AREA. IF PROTECTIVE
APPAREL IS NOT WORN (E.G., COVERALLS,
FOOTGEAR AND HEADGEAR) A HEPA-FILTERED
VACUUM SHALL BE USED TO REMOVE DUST
FROM CLOTHING BEFORE LEAVING THE
BARRICADE. IF PROTECTIVE APPAREL IS
UTILIZED, THE CONTRACTOR SHALL
CONSTRUCT A SPACE OR ANTEROOM FOR
CHANGING CLOTHING AND STORING
EQUIPMENT (DESIGNATED AREA. ALL
EQUIPMENT, TOOLS, TOOL CARTS, AND
MATERIALS TRANSPORTED THROUGH
OCCUPIED AREAS SHALL BE MADE FREE FROM
DUST AND MOISTURE BY VACUUMING AND WET
WIPING BEFORE THEIR REMOVAL FROM THE
CONSTRUCTION ZONE OR WORK AREA.
H. POST CONSTRUCTION: DO NOT REMOVE
BARRIERS AND KEEP ALL HVAC ISOLATION
UNTIL CONTRACTOR HAS CLEANED
CONSTRUCTION SITE.
I. PROVIDE RATED BARRIERS AS INDICATED ON
DRAWINGS. BARRIERS SHALL BE INSPECTED BY
VA PRCA STAFF PRIOR TO START OF
CONSTRUCTION. MAINTAIN NEGATIVE
PRESSURE VENTILATION IN THE
CONSTRUCTION SPACE.
J. PROVIDE STICKY MAT AT EACH CONSTRUCTION
POINT IN ALL PHASES.
K. THESE DETAILS ARE TYPICAL ICRA DETAILS
AND NOT PROJECT SPECIFIC. ICRA
REQUIREMENTS ARE TO BE SUBMITTED FOR
REVIEW PRIOR TO INSTALLATION OF ICRA
REQUIREMENTS.
L. MAINTAIN RECORDS TO DOCUMENT THE
QUANTITY OF WASTE GENERATED; THE
QUANTITY OF WASTE DIVERTED THROUGH
SALE, REUSE, OR RECYCLING; AND THE
QUANTITY OF WASTE DISPOSED BY LANDFILL
OR INCINERATION.
M. ALL RECORDS TO BE PROVIDED TO THE
PROJECT COR MONTHLY TO TRACK AMOUNT
OF WASTE GENERATED.
N. ASBESTOS WASTE TO BE REPORTED TO
PROJECT COR BY ABATEMENT PHASE.
CONTRACTOR TO PROVIDE WASTE IN THE
FORM OF CUBIC YARD PER SQUARE FOOT
ABATED. ASBESTOS WASTE TO BE TRACKED
SEPARATELY FROM GENERAL CONSTRUCTION
WASTE.
DOOR INFORMATION
NO. QTY. WIDTH HEIGHT THICK TYPE MAT'L TYPE MAT'L DEPTH
FRAME INFORMATION
RATING HRDWR.
MISCELLANEOUS
REMARKS
TD001 (1) CONTRACTOR'S
DISCRETION ON
DOOR WIDTH-
3'-0" MIN.
7'-0" 1 3/4" A HM TYPE I HM 5 3/4" 20 MIN SET 1
DOOR AND FRAME SCHEDULE
MANUFACTURERS:
CORBIN RUSSWIN
McKINNEY
PEMKO
ROCKWOOD
NOTE:
HARDWARE MANUFACTURERS LISTED AS BASIS OF DESIGN.
ALTERNATE MANUFACTURERS ACCEPTABLE, SUBJECT TO
REVIEW BY ARCHITECT AND COR FOR EQUAL QUALITY
COMPLIANCE.
TYPE A TYPE I
2" VARIES 2"
HARDWARE SET 1
HINGES
DUST PROOF STRIKE
LATCH SET
DOOR CLOSER
KICK PLATES
GASKETING
TA2714
VA SPEC F01
DC6210xA11
K1050F
S888 x HEAD & JAMBES
32D
26D
32D
MK
RO
CO
RO
PE
CO
MK
PE
RO
PIN CODE OVER-RIDE DEVICE
TD002 (1) CONTRACTOR'S
DISCRETION ON
DOOR WIDTH-
3'-0" MIN.
7'-0" 1 3/4" A HM TYPE I HM 5 3/4" 20 MIN SET 1 PIN CODE OVER-RIDE DEVICE
TD003 (1) CONTRACTOR'S
DISCRETION ON
DOOR WIDTH-
3'-0" MIN.
7'-0" 1 3/4" A HM TYPE I HM 5 3/4" 20 MIN SET 1 PIN CODE OVER-RIDE DEVICE
TD004 (1) CONTRACTOR'S
DISCRETION ON
DOOR WIDTH-
3'-0" MIN.
7'-0" 1 3/4" A HM TYPE I HM 5 3/4" 20 MIN SET 1 PIN CODE OVER-RIDE DEVICE
TD006 (1) CONTRACTOR'S
DISCRETION ON
DOOR WIDTH-
3'-0" MIN.
7'-0" 1 3/4" A HM TYPE I HM 5 3/4" 20 MIN SET 1 PIN CODE OVER-RIDE DEVICE
TD005 (1) CONTRACTOR'S
DISCRETION ON
DOOR WIDTH-
3'-0" MIN.
7'-0" 1 3/4" A HM TYPE I HM 5 3/4" 20 MIN SET 1 PIN CODE OVER-RIDE DEVICE
TD008 (1) CONTRACTOR'S
DISCRETION ON
DOOR WIDTH-
3'-0" MIN.
7'-0" 1 3/4" A HM TYPE I HM 5 3/4" 90 MIN SET 1 PIN CODE OVER-RIDE DEVICE
TD007 (1) CONTRACTOR'S
DISCRETION ON
DOOR WIDTH-
3'-0" MIN.
7'-0" 1 3/4" A HM TYPE I HM 5 3/4" 20 MIN SET 1 PIN CODE OVER-RIDE DEVICE
A
.F . F
A P
P R
O X
SUSPENDED
PLASTIC ZIPPER
WALL CURTAIN
BARRIER
POST ICRA, ILSM, FIRE
INSPECTION SHEETS
VISIBLE TO PUBLIC
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:3
:1
P
M C
U s e rs \d c o rd o n \D o c u m e n ts
\R e v it l o c a l\ A
-3
-Q
V A
L it tl e
R o c k s t
F lo o r
R e n o d c o rd o n a c g -p a .c o m
.r v t
G-003
ICRA INFORMATION AND DETAILS
3 17DGC
VA LITTLE ROCK GROUND
FLOOR RENOVATION
CAVHCS
4300 W. 7TH ST
LITTLE ROCK. ARKANSAS 72205
MAY 16, 2023
100% BID DOCUMENTS
598-21-10120-338-Q33
CLA
Scale: 1/4" = 1'-0"
ICRA MOBILE CONTAINMENT CART
Scale: 3/4" = 1'-0"
ICRA BARRIER WALL TYPE
Scale: 1/4" = 1'-0"
CROSS SECTION "A"
Scale: 1/4" = 1'-0"
TYPICAL CONSTRUCTION PLAN LAYOUT
Scale: 3" = 1'-0"
ILSM CONSTRUCTION EGRESS SIGNAGE
ICRA DOOR SCHEDULE
Scale: 1/4" = 1'-0"
ICRA ROOM ELEVATION
C O
N S
T R
U C
T
IO
N E
N T
R A
N C
E
P L A
S T
IC
B
A R
R
IE
R
C O
N S
T R
U C
T
IO
N H
A L
L A
N D
N T
R A
N C
E
T E
M P
O R
A R
Y C
O N
S T
R U
C T
IO
N
W A
L L
T E
M P
O R
A R
Y C
O N
S T
R U
C T
IO
N
W A
L L
T E
M P
O R
A R
Y C
O N
S T
R U
C T
IO
N
W A
L L
H A
N D
W A
S H
C O
N S
T R
U C
T
IO
N E
N T
R A
N C
E
T E
M P
O R
A R
Y C
O N
S T
R U
C T
IO
N
W A
L L
O B
S C
U R
E D
T E
M P
O R
A
Y
C
N S
T R
U C
T
IO
N W
A L L
T E
M P
O R
A R
Y C
O N
S T
R U
C T
IO
N
W A
B
U
IL
T T
O C
E
IL
IN
G
F
R A
M
IN
G
T E
M P
O R
A R
Y C
O N
S T
R U
C T
IO
N
W A
T
C
E
IL
IN
G
N E
G A
T
IV
E A
IR
M
O N
IT
T E
M P
O R
A R
Y C
O N
S T
R U
C T
IO
N
W A
W
IT
H
N E
G A
T
IV
E A
IR
M
O N
IT
S E
A L
E D
D O
O R
W
IT
H T
A P
E
D O
O R
S E
A L
D
W
IT
H
T A
P E
D O
O R
P
IN
C O
D E
D E
V
IC
E
C O
V E
R S
U P
P L Y
D
IF
F U
S E
R
C O
V E
R S
U P
P L Y
D
IF
F U
S
O
V E
R S
U P
P L Y
D
IF
F U
S E
R
N E
G A
T
IV
E A
IR
U
N
IT
T E
M P
O R
A R
Y C
O N
S T
R U
C T
IO
N
W A
L L
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
/1
/2
:3
:1
P
M C
U s e rs \d c o rd o n \D o c u m e n ts
\R e v it l o c a l\ A
-3
-Q
V A
L it tl e
R o c k s t
F lo o r
R e n o d c o rd o n a c g -p a .c o m
.r v t
G-004
ICRA INSTALLATION EXAMPLES
4 17DGC
VA LITTLE ROCK GROUND
FLOOR RENOVATION
CAVHCS
4300 W. 7TH ST
LITTLE ROCK. ARKANSAS 72205
MAY 16, 2023
100% BID DOCUMENTS
598-21-10120-338-Q33
CLA
Scale: No Scale
ICRA EXAMPLES
N
AREA OF WORK
KEY PLAN
A BA B
A. PHOTOGRAPHS ARE FOR EXAMPLES ONLY.
CONTRACTOR TO COORDINATE WITH COR ON
ACCEPTABLE INSTALLATION FOR INFECTION
CONTROL RISK ASSESSMENT (ICRA) MEASURES.
1 PLASTIC ZIPPERED BARRIER, STICKY MATS,
NEGATIVE AIR MONITOR DEVICE.
2 CONSTRUCTION ENTRANCE – DOOR/FRAME,
STICKY MATS, NEGATIVE AIR MONITOR, PIN CODE
ACCESS CONTROL.
3 PLASTIC BARRIER.
4 CONSTRUCTION SIGNAGE - ALTERNATE EGRESS
ROUTE. CONTRACTOR TO CORRIDATE LOCATION
WITH COR. SEE SHEET G-003.
5 INSTALL PLASTIC/ACRYLIC SHEET 24" X 24" OVER
SUPPLY AND RETURN DIFFUSER FOR DURATION
OF PROJECT.
P
IP
E
F
IR
E
VALVE
V A L V E
S SS S
S S
S
S
S SS
S S
S
S SS
S S
S
S SS
S S
S S
S S
S
S
S S
S
S SS S
S SS S
S S
S S
S SS S
S S
S S
S SS
S S
S
S SS
S S
S S
S S
S S
S S
S S
S
S SS
S SS
S S
S S
S
S SS S S S
S S
S S
S S
S SS
S S
S S
S
S S
S S
S S
SS S
S S
S S
S
S S
S S
S S
S S
SS S
SS SSS
SS SSS
WOMEN'S
LOCKER
ROOM
GC180
WOMEN'S
BATHROOM
GC181
BIOMED.
WORKSHOP
GD114D
MEN'S
LOCKER
ROOM
GC182
RESIDENT
OFFICE
GC185
CLINICAL
& ED.
COORD.
GC187
DRUG
INFO.
OFF.
GC184
BIOMED
STORAGE
GD114C
CORR.
CG36
GC114G
EQUIP. REPAIR
SHOP
SURGICAL
BIOCHEMICAL
LABORATORY
GC155
LOUNGE
GC158
OFF.
GC159
CENTRAL
RECEIVING/STORAGE
ORDERING
GC188
MEDICINE
STORAGE
GC188A
CORR.
CG31A
DATA
GD101
ELEC.
STOR.
GD104
OFF.
GD105
TELEPHONE
EQUIP.
GC196
TELEPHONE
EQUIP.
GC197
PLUMBING
SHOP
GD114F
RESEARCH
OFF.
GC156
CORR.
CG30
CORR.
CG29
SOILED
LINEN
GA101
ELEC.
TRASH
GA108
CG5
SERVICES ELEV.
LOBBY
PAINT
ROOM
GD114A
EQUIP.
GD114C
ELECTRICAL
SHOP
GD114E
CORR.
CG36A
CARPENTRY
SHOP
GD114B
MECH.
GC191
CORR.
CG4
ANTEROOM
GC189B
I.V. PREP
GC189C
VAULT
GC190
CORR.
CG3A
CORR.
CG3
R.R.
GC194
GC192
PHARM. CONF.
RM.
CL.
GC193
ELEC.
GD112 SIGNAL
GD110
TELE.
GD11
M & O
SUPRV.
GA110
DIRECTOR'S
OFF.
GA109
DRESS.
GA104A
SHWR.
BATH.
GA104
VEST.
GA103A
LOUNGE
GA103
CORR.
CG7
CORR.
CG34
EMS
OFFICE
GE100B
EMS
OFFICE
GE100A
ENVIR.
SERVICES
GE100C
FOOD
SERVICE
GC195
STOR.
GE100D
CG1
PUBLIC ELEV.
LOBBY
TELE.
GA107
SIGNAL
GA106
ELEC.
GA105
CORR.
CG2
PHARM.
SERVICE
GC189
MEN'S
BATH.
GC183
CORR.
CG31B
CORR.
CG37B
INVENTORY
FORMULARY
MNGMNT
OFFICE
GC178
SECRETARY
GD113
BIOMEDICAL
SPRVSR
GD108
BIOMED.
ENG.
SPRVSR
GD107
BIOMEDICAL
OFFICE
GD106
BREAK/CONFERENCE
ROOM
GD109
1A
10C
3A
7A
A C D E G
CLEAN
RECEVING
OFFICE
7B 7C
10A10B10D10E
SPVSR.
BLDG.
MGMT.
GC102
N.I.C.
N.I.C.
N.I.C.
N.I.C.
N.I.C.
N .I .C
N.I.C.
N.I.C.
N.I.C.
VASCULAR
RESEARCH
OFF.
GC157
ANESTH.
RESEARCH
LAB
GC153
MED.
RSRCH.
DEPT.
CORE
EQUIP.
GC152
ONCOLOGY
LAB.
GC149
FOOD
STORAGE
GC162
MECH.
GC164
FREEZER
GR3
WALK-IN
REFRIDG.
GR2
REFRIDG.
GR1
OFF.
GC161
FOOD
STORAGE
GC0185
POT
WASHING
GC166
INFECT.
DISEASE
LAB.
PLMNRY.
GC146
MECH.
GC141
STOR.
GC145
WALK-IN
REFRIDG.
GC132
SPVSR.
OFF.
GC144
RECEIVING
CG160
HEMATOLOGY
GC143
RSRCH.
OFF.
GC129
ONCOLOGY
LAB.
GC150
JAN.
GC163
HEMATOP.
LAB.
GC128
GLASSWARE
WASH. &
STER.
GC127
STOR.
GC171
DIETETICS
SPVSR.
OFF.
GC170
DIETETICS
GC169
CONF.
GC172
JAN.
MEN'S
LOCKER
ROOM
183MEN'S
R.R.
109A
SHWR.
109C
DRESS.
109B
TRAY
CART
STORAGE
GC168DIETETIC
SERVICES
GC167
STOR.
WALK-IN
REF.
GC141A
OFF.
GC142
CORR.
CG24
ELEC.
GC138
SIGNAL
GC140
TELE.
GC139
CORR.
CG27
CORR.
CG28
CORR.
CG26
COMP.
C151
CORR.
CG32A
CORR.
CG32
DISHWASHING
GC173
H J L UN R
OFFICE
GE113C
CORR.
CG35
CORR.
CG35A
EQUIPMENT
REPAIR
SHOP
GD114H
GD114
EQIUP. REPAIR
SHOP STOR.
3B
8A8B
CORR.
CG31
JANITOR
GC177
4A
5A
B M P Q S
10A 10E
CORRIDOR PHASING 10 WILL BE THE LAST
SECTION COMPLETED AND WILL BE SEPARATED
INTO 5 PHASES OF 20’ TO 30’ SEGMENTS. THE
WALL PAINTING AND NEW CEILINGS CAN GO WITH
THE USE OF TEMPORARY ICRA BARRIERS AND
THE FLOOR REPLACEMENT CAN BE DONE IN
LARGER SEGMENTS OVER THREE TO FOUR
WEEKENDS. COORDINATE IN THE FIELD.
WEEKEND WORK ONLY.
FINISHES IMPROVEMENTS SHALL BE
PERFORMED BEHIND ICRA BARRIER. STAFF IN
THE PAINT SHOP, CARPENTRY SHOP,
ELECTRICAL SHOP, AND PLUMBING SHOP WILL
BE RELOCATED IN THIS PHASE. WEEKEND WORK
ONLY.
8A 8B
7B
THIS SECTION WILL NEED TO BE SEPARATED INTO
TWO SECTIONS COMPLETED SEPARATELY ALL
WORK WILL BE WEEKEND WORK ONLY.
(ELEVATOR LOBBY ADJACENT CORRIDOR TO
LOBBIES).
7C
7A
THIS CORRIDOR WORK WILL NEED TO BE
PERFORMED DURING A WEEKEND. THERE IS A
SECURITY DOOR THAT HAS A CARD ACCESS
THAT MUST BE MAINTAINED. ICRA BARRIERS
WILL REQUIRE EGRESS DOORS TO ACCESS THE
STAIRS. CORRIDOR PHASE 3B WORK CANNOT BE
PERFORMED AT SAME TIME AS CORRIDOR
PHASES 3A, 8A AND 8B WEEKEND WORK ONLY.
4A
THIS SECTION CAN BE PERFORMED WITH THE
PHASE 5 CONSTRUCTION WORK SINCE ACCESS
TO THE SPACES WILL NOT BE REQUIRED. ALL BUT
THE 20’ LEADING TO THE DOUBLE DOOR TO THE
NORTH. THE LAST 20’ WILL PROVIDE ACCESS TO
THE SPACE NORTH OF PHASE 5 AND PROVIDE
CONSTRUCTION ACCESS TO PHASES 4 AND 5.
THE 20’ SECTION CAN BE COMPLETED AFTER ALL
OTHER WORK IN PHASES 4 AND 5 COMPLETED
DURING A WEEKEND. CORRIDORS PHASES 4A
AND 5A WORK CANNOT BE PERFORMED AT SAME
TIME. WEEKEND WORK ONLY.
5A
THIS SECTION OF CORRIDOR WILL BE
COMPLETED IN TWO PHASES SINCE ALL
INTERIOR ROOMS HAVE ACCESS TO OTHER
SPACES LEADING TO PATHS OF EGRESS AND TO
MAIN CORRIDORS. THE CLOSING OF THE ACCESS
TO SOME CORRIDORS WILL CREATE DEAD END
CORRIDORS FOR A SHORT PERIOD DURING THE
CONSTRUCTION WORK. CORRIDOR PHASE 3B
WORK CANNOT BE PERFORMED AT SAME TIME
AS CORRIDORS PHASES 4A. 8A AND 8B WEEKEND
WORK ONLY.
3A
3B
PHASE 7 - WILL BE SEPARATED INTO 7A, 7B
AND 7C TO ALLOW OPERATION OF (1) SET OF
ELEVATORS DURING THE DURATION OF THE
PROJECT. AREA TO INCLUDE THE ELEVATOR
LOBBIES AND THE ADJACENT CORRIDORS FOR
THE LOBBIES. THIS WORK WILL BE
RESTRICTED TO WEEKEND WORK ONLY.
PHASE 8 - CORRIDOR CG37B WILL BE
COMPLETED IN MULTIPLE PARTS, A AND B. EACH
PART MUST BE COMPLETED BEFORE THE NEXT
PART IS TO COMMENCE. THE WORK IN THIS
PHASE IS RESTRICTED TO WEEKEND WORK
ONLY.
PHASE 1
PHASE 2
PHASE 3
PHASE 4
PHASE 5
PHASE 6
PHASE 7
PHASE 8 N.I.C
PHASE 9
PHASE 10
PHASE 1 - THE OFFICE AREA WEST OF
CORRIDOR CG34, AND TRASH GA108 THE
LOGISTICS TEAM WILL BE LOCATED IN THE
PHARMACY SPACE WHILE THEIR NEW SPACE IS
UNDER RENOVATION (THEY WILL ALREADY BE IN
THE PHARMACY SPACE DUE TO THE VACATING
THEIR OFFICE FOR THE SPS PROJECT.
5A
PHASE 2 - THE BIOMED ENGINEERING REPAIR
SHOP, EQUIPMENT REPAIR SHOP AND STORAGE.
BIOMED CORE TEAM AND TECHNICIANS WILL
RELOCATE TO GC155 BIOMED AOC TEAM
MEMBERS WILL OCCUPY AN EXAM RM ON THE
4TH OR 5TH FLOOR.
PHASE 3 - ENVIRONMENTAL SERVICES AREA,
OFFICES, AND CORRIDOR CG7 LOCATED TO THE
SOUTHEAST SIDE OF THE AREA OF WORK. THREE
NEW OFFICES TO SUPPORT MEDICAL SERVICES,
THE ENVIRONMENT SERVICES AREA, CORRIDOR
EMS OFFICES, M&O OFFICES AND ENGINEERING
OFFICES. EMS OFFICES WILL RELOCATE
RESIDENT OFFICE GC185, GC187, GC184, AND
PHARMACY CONFERENCE ROOM GC192.
PHASE 4 - OFFICE GC159, VASCULAR RESEARCH
OFFICE GC157, THE BIOCHEMICAL LABORATORY
AREA, AND ENGINEERING CORRIDOR CG30.
ROOMS WILL BE VACATED AND READY FOR
CONSTRUCTION AT THIS TIME.
PHASE 6 - SERVICES, VAULT, MEDICINE
STORAGE, CENTRAL RECEIVING / ORDERING.
PHARMACY CONFERENCE ROOM, AND
INVENTORY FORMULARY MANAGEMENT OFFICE,
EMS AND OTHER DEPARTMENTS WILL HAVE
ALREADY MOVED TO PERMANENT LOCATION
AND VACATED THE TEMPORARY.
PHASE 5 - MENS / WOMENS LOCKER ROOMS
TOILET AREAS, RESIDENT OFFICE. CLINICAL
EDUCATION COORDINATOR, DRUG
INFORMATION OFFICE, AND CORRIDOR CG31A
EMS WILL HAVE ALREADY TRANSITIONED TO
THEIR RENOVATED OFFICES. IF TEMPORARY
LOCKERS ARE REQUIRED, USE PHARMACY
CONFERENCE ROOM GC192 AS SMALL LOCKER
ROOMS FOR MEN AND WOMEN.
1A
PHASES - 3A - 3B / 4A / 5A / 7A, 7B, 7C / 8A, 8B / 9 / 10A,
10B, 10C, 10D, 10E
A. SHEETS GC101 - GC111 DEPICT THE EXISTING
ROOM NAMES AND WALL RATINGS. THESE
DRAWINGS ARE INTENDED TO SHOW THE PHASING
OF THE PROJECT.
B. CONTRACTOR TO COORDINATE WORK OF EACH
PHASE WITH COR PRIOR TO PROCEEDING WITH
THE WORK. CONTRACTOR TO PROVIDE A WRITTEN
PLAN OF ACTION TO THE COR 30 TO 60 DAYS
AFTER GIVEN NOTICE TO PROCEED. COR TO
REVIEW AND APPROVE PRIOR TO CONTRACTOR
ERECTING AND INSTALLING ANY PHASING OR ICRA
MEASURES.
C. REFER TO SHEET G-003 FOR TYPICAL DETAILS FOR
INFECTIOUS CONTROL MEASURES TO BE
IMPLEMENTED FOR EACH PHASE OF THE
PROJECT.
D. CONTRACTOR MAY BE REQUIRED TO PERFORM
SOME PARTS OF CONSTRUCTION DURING NON-
WORKING HOURS, COORDINATE ALL OFF HOURS
WORK WITH COR.
E. DESCRIPTION OF PHASING ON THIS SHEET
INCLUDES A GENERAL OVERVIEW OF THE SCOPE
OF WORK TO BE PERFORMED IN EACH PHASE.
REFER TO ALL CONTRACT DOCUMENTS FOR
ADDITIONAL ITEMS WHICH MAY NOT BE NOTED ON
THIS SHEET.
F. CONTRACTOR TO COORDINATE ALL NEW
MECHANICAL PENETRATIONS WITH PLUMBING
DRAWINGS AND ARCHITECTURAL DRAWINGS.
COORDINATE WITH SAFETY OFFICE FOR
PENETRATION PERMIT.
G. CONTRACTOR SHALL COORDINATE WITH THE COR
ALL SLAB PENETRATION WORK AND SLAB REPAIR
WORK TO BE PREFORMED.
CONTRACTOR TO COORDINATE SYSTEM
SHUTDOWNS WITH ADJACENT AREAS AND
DEPARTMENTS ABOVE AND BELOW SCOPE OF
WORK. PROVIDE 2 WEEKS NOTICE (MINIMUM).
H. CONTRACTOR TURNOVER TO VA. RETURN THE
PHASE/SPACE - AIR CLEARED, SPACE CLEANED
AND READY FOR A VA SAFETY INSPECTION AT 5AM
PRIOR TO COMPLETING THE PHASE WEEKEND
WORK DURATION WILL BE FRIDAY AT 6PM TIL
MONDAY AT 6AM.
I. ICRA BARRIERS DO NOT GET REMOVED UNTIL VA
SAFETY CLEARS THE SPACE.
J. FOOD SERVICES OPERATES - MONDAY THROUGH
FRIDAY 5:30 AM - 8:00 PM. SATURDAY THROUGH
SUNDAY 5:30 AM - 8:00 PM. PLEASE BE AWARE OF
STAFF AND EQUIPMENT COMING TO AND FROM
THIS AREA. DOORS TO FOOD SERVICE OFF OF
CONSTUCTION ZONES MUST BE SEALED ON BOTH
SIDES OF THE DOOR TO PREVENT ANY
DUST/DEBRIS FROM ENTERING THE KITCHEN.
POLY BARRIER ON CONSTRUCTION SIDE OF DOOR
TO FRAME AND DOOR TO FLOOR ON THE KITCHEN
SIDE.
1. PLASTIC BARRIER, CAUTION TAPE,
CONSTRUCTION SIGN.
2. PLASTIC ZIPPERED BARRIER, STICKY MATS,
NEGATIVE AIR MONITOR DEVICE.
3. CONSTRUCTION ENTRANCE (DOOR/FRAME),
STICKY MATS, NEGATIVE AIR MONITOR, PIN
CODE ACCESS CONTROL.
4. CONSTRUCTION WALL – TYPE B.
5. CONSTRUCTION ENTRANCE – ANTEROOM WITH
DOOR/FRAME, STICKY MATS, NEGATIVE AIR
MONITOR, PIN CODE ACCESS CONTROL.
6. PLASTIC ZIPPERED BARRIER, STICKY MATS,
CAUTION TAPE, CONSTRUCTION SIGN. PHASE
4B WEEKEND WORK.
7. (...) EGRESS TO ROUTE TO STAIR 2 SG-2.
8. OPENING FOR NEW DOOR AND FRAME
PROVIDE CONSTRUCTION DOOR AND FRAME.
9. ABATEMENT ONLY.
10. MINOR DEMOLITITON / ABATEMENT DURING
CONSTRUCTION.
11. PLASTIC ZIPPERED BARRIER, STICKY MATS,
CAUTION TAPE, CONSTRUCTION SIGN.
WEEKEND WORK.
12. PLASTIC ZIPPERED BARRIER, STICKY MATS.
13. PLASTIC BARRIER.
14. SEAL ELEVATOR DOOR AND FRAME AS
REQUIRED. CONSTRUCTION SIGNAGE INSIDE
ELEVATOR CARS: INDCATE GROUND FLOOR
ACCESS IS NOT AVAILABLE DURING
CONSTRUCTION HOURS.
15. N.I.C. AREA WILL BE VACANT DURING PHASE 9.
16. PLASTIC ZIPPERED BARRIER, STICKY MATS
FOR PHASES 3A, 3B.
17. CONSTRUCTION ENTRANCE EXISTING DOOR.
18. CONSTRUCTION SIGNAGE - ALTERNATE
EGRESS ROUTE. CONTRACTOR TO CORRIDATE
LOCATION WITH COR.
19. CONSTRUCTION ENTRANCE – ANTEROOM WITH
PLASTIC BARRIER, STICKY MATS, NEGATIVE AIR
MONITOR, PIN CODE ACCESS CONTROL.
20. CONSTRUCTION ENTRANCE – ANTEROOM
USING EXISTING DOOR/FRAME, REMOVE PASS
THRU WINDOWS AND INFILL WALL.STICKY
MATS, NEGATIVE AIR MONITOR, PIN CODE
ACCESS CONTROL ROOM GC189C.
21. INSTALL PLASTIC/ACRYLIC WRAP 24"X24" OVER
SUPPLY DIFFUSER.
22. CONSTRUCTION WALL WITH DOOR/FRAME
WHICH WILL REMAIN PLACE FOR ALL PHASES.
KEYNOTE LEGEND#
Engineers Architects
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/1
/2
:3
:2
P
M C
U s e rs \d c o rd o n \D o c u m e n ts
\R e v it l o c a l\ A
-3
-Q
V A
L it tl e
R o c k s t
F lo o r
R e n o d c o rd o n a c g -p a .c o m
.r v t
GC101
GROUND FLOOR OVERALL PHASING
PLAN
5 17DGC
VA LITTLE ROCK GROUND
FLOOR RENOVATION
CAVHCS
4300 W. 7TH ST
LITTLE ROCK. ARKANSAS 72205
MAY 16, 2023
100% BID DOCUMENTS
598-21-10120-338-Q33
CLA
N O
R T
H0 84 16
N
AREA OF WORK
KEY PLAN
A B
Scale: 3/32" = 1'-0"
GROUND FLOOR OVERALL PHASING PLAN
CORRIDOR PHASING
PHASING LEGEND PLAN PHASING
CORRIDORS - WEEKEND
WORK ONLY
TR
A
S H
TR
A
S H
PA
S
S T
H R
U
W
IN
D O
W
IV
H
O O
D S
C
P
IP
E
F
IR
E
S U
B H
K V
A
K V
A S
U B
D
VALVE
V A L V E
S SS S
S S
S
S
S SS
S S
S
S SS
S S
S
S SS
S S
S S
S S
S
S
S S
S
S SS S
S SS S
S S
S S
S SS S
S S
S S
S SS
S S
S
S SS
S S
S S
S S
S S
S S
S S
S
S SS
S SS
S S
S S
S
S SS S S S
S S
S S
S S
S SS
S S
S S
S
S S
S S
S S
SS S
S S
S S
S
S S
S S
S S
S S
SS S
SS SSS
SS SSS
A C D E G
H J L UN R
WOMEN'S
LOCKER
ROOM
GC180
WOMEN'S
BATHROOM
GC181
BIOMED.
WORKSHOP
GD114D
MEN'S
LOCKER
ROOM
GC182
RESIDENT
OFFICE
GC185
CLINICAL
& ED.
COORD.
GC187
DRUG
INFO.
OFF.
GC184
BIOMED
STORAGE
GD114C
CORR.
CG36
GC114G
EQUIP. REPAIR
SHOP
SURGICAL
BIOCHEMICAL
LABORATORY
GC155
LOUNGE
GC158
OFF.
GC159
CENTRAL
RECEIVING/STORAGE
ORDERING
GC188
MEDICINE
STORAGE
GC188A
CORR.
CG31A
DATA
GD101
ELEC.
STOR.
GD104
OFF.
GD105
TELEPHONE
EQUIP.
GC196
TELEPHONE
EQUIP.
GC197
PLUMBING
SHOP
GD114F
RESEARCH
OFF.
GC156
CORR.
CG30
CORR.
CG29
SOILED
LINEN
GA101
ELEC.
TRASH
GA108
CG5
SERVICES ELEV.
LOBBY
PAINT
ROOM
GD114A
EQUIP.
GD114C
ELECTRICAL
SHOP
GD114E
CORR.
CG36A
CARPENTRY
SHOP
GD114B
MECH.
GC191
CORR.
CG4
ANTEROOM
GC189B
I.V. PREP
GC189C
VAULT
GC190
CORR.
CG3A
CORR.
CG3
R.R.
GC194
GC192
PHARM. CONF.
RM.
CL.
GC193
ELEC.
GD112 SIGNAL
GD110
TELE.
GD11
M & O
SUPRV.
GA110
DIRECTOR'S
OFF.
GA109
DRESS.
GA104A
SHWR.
BATH.
GA104
VEST.
GA103A
LOUNGE
GA103
CORR.
CG7
CORR.
CG34
EMS
OFFICE
GE100B
EMS
OFFICE
GE100A
ENVIR.
SERVICES
GE100C
FOOD
SERVICE
GC195
STOR.
GE100D
CG1
PUBLIC ELEV.
LOBBY
TELE.
GA107
SIGNAL
GA106
ELEC.
GA105
CORR.
CG2
PHARM.
SERVICE
GC189
MEN'S
BATH.
GC183
CORR.
CG31B
CORR.
CG37B
INVENTORY
FORMULARY
MNGMNT
OFFICE
GC178
SECRETARY
GD113
BIOMEDICAL
SPRVSR
GD108
BIOMED.
ENG.
SPRVSR
GD107
BIOMEDICAL
OFFICE
GD106
BREAK/CONFERENCE
ROOM
GD109
1A
CLEAN
RECEVING
OFFICE
SPVSR.
BLDG.
MGMT.
GC102
N.I.C.
N.I.C.
N.I.C.
N.I.C.
N.I.C.
N .I .C
N.I.C.
N.I.C.
N.I.C.
VASCULAR
RESEARCH
OFF.
GC157
ANESTH.
RESEARCH
LAB
GC153
MED.
RSRCH.
DEPT.
CORE
EQUIP.
GC152
ONCOLOGY
LAB.
GC149
FOOD
STORAGE
GC162
MECH.
GC164
FREEZER
GR3
WALK-IN
REFRIDG.
GR2
REFRIDG.
GR1
OFF.
GC161
FOOD
STORAGE
GC0185
POT
WASHING
GC166
INFECT.
DISEASE
LAB.
PLMNRY.
GC146
Room
MECH.
GC141
STOR.
GC145
WALK-IN
REFRIDG.
GC132
SPVSR.
OFF.
GC144
RECEIVING
CG160
HEMATOLOGY
GC143
RSRCH.
OFF.
GC129
ONCOLOGY
LAB.
GC150
JAN.
GC163
HEMATOP.
LAB.
GC128
GLASSWARE
WASH. &
STER.
GC127
STOR.
GC171
DIETETICS
SPVSR.
OFF.
GC170
DIETETICS
GC169
CONF.
GC172
JAN.
MEN'S
LOCKER
ROOM
183MEN'S
R.R.
109A
SHWR.
109C
DRESS.
109B
TRAY
CART
STORAGE
GC168DIETETIC
SERVICES
GC167
STOR.
WALK-IN
REF.
GC141A
OFF.
GC142
CORR.
CG24
ELEC.
GC138
SIGNAL
GC140
TELE.
GC139
CORR.
CG27
CORR.
CG28
CORR.
CG26
COMP.
C151
CORR.
CG32A
CORR.
CG32
DISHWASHING
GC173
OFFICE
GE113C
CORR.
CG35
CORR.
CG35A
EQUIPMENT
REPAIR
SHOP
GD114H
GD114
EQIUP. REPAIR
SHOP STOR.
STAIR 1
SG1
LOCKSMITH
GD116
PHARMACY
STORAGE
GD117
CORRIDOR
CG36B
OPEN DOCK
GAS STORAGE
GD119
OXYGEN
MANIFOLD
ROOM
GD118
WAREHOUSE
GD103
ELECTRICAL
POWER ROOM
GD123
CLEAN
STORAGE
GD102
CORRIDOR
CGG37
SPD OFFICE
GD121
CHIEF SPD
OFFICE
GD120
SPD
EQUIPMENT
STORAGE
ISSUE
GD122
ACETIC ACID
ROOM
GD124
CLEAN/STERILE
STORAGE
GE113
CART WASH
GE109
JANITOR
GE108
STER. EQ.
ACCESS
GE112A
SOILED,
RECIEVING &
DECON AREA
GE107
DECON ANTE
GE107B
CORRIDOR
CG38
POLICE
STORAGE
GE101
WOMEN'S
LOUNGE
GE104
POLICE
STORAGE
GE102
WOMEN'S
LOUNGE
GE105
WOMEN'S RR
GE106
MEN'S RR
GE101A
NEPHROLOGY
LABORTORY 1
GE124
LABORTORY
GE122
CORRIDOR
CG11
STORAGE
GB123A
STORAGE
GB123
LABORATORY
GB120
OFFICE
GB121
GRNTLGY
RESEARCH
LAB. 6
GB113
STORAGE
GB114
CORRIDOR
CG10
GERONTOLOGY
RSRCH LAB. 7
GB115
GERIATRICS
LABORATORY
GB103
CORRIDOR
CG8
LABORATORY
GB100
GASTROENTERLOGY
LAB.
GB101
LABORATORY
GC100
CORRIDOR
CG21
CENTRIFUGE
CG21
LABORATORY
GC101
REAP
ENDOCRINLOGY
LAB.
GC116
CORRIDOR
CG22
JANITOR
GC115
COMP.
ROOM
GC108
DARK
ROOM
GC110
CULTURE
ROOM
GC109
CORRIDOR
CG23
STOR.
RM B
GC111
DARK
ROOM
GC107
ELECTRON
MICROSCOPY
PREP.
ROOM
GC113
ELECTRON
MICROSCOPY
FINISH
ROOM
GC114
STOR.
ROOM A
GC134
CORRIDOR
CG25
MICROTOME
ROOM A
GC133
ELECTRON
MICRSCOPY
GC131
LEAD
TECH.
OFFICE
GC130
TD004
FOW
5'-0"
B M P Q S
KEY NOTES INDICATED ARE TAKEN FROM KEY NOTE
LEGEND ON SHEET GC101. KEY NOTES SHOWN ARE
SPECIFIC TO THIS SHEET ONLY.
Engineers Architects
# KEY NOTES:
Revisions: Date
Drawing Title
Approved
Project Title
Location
VA PROJECT NUMBER
Building Number
Drawing Number
Dwg of
VA FORM 08-6231
Office of Construction and Facilities Management
CONSULTANTS: PROJECT MANAGER
SHEET NOTES:
WALL RATING LEGEND
1 HR - FIRE SEPARATION
2 HR - FIRE SEPARATION
SMOKE RESISTIVE HAZARDOUS AREA
Date Checked Drawn
FULLY SPRINKLERED
ACG Project Number
Headquarters:
Apogee Consulting Group, P.A.
1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.
S S S S
/1
/2
:3
:3
P
M C
U s e rs \d c o rd o n \D o c u m e n ts
\R e v it l o c a l\ A
-3
-Q
V A
L it tl e
R o c k s t
F lo o r
R e n o d c o rd o n a c g -p a .c o m
.r v t
GC102
GROUND FLOOR PLAN - PHASE 1
6 17DGC
VA LITTLE ROCK GROUND
FLOOR RENOVATION
CAVHCS
4300 W. 7TH ST
LITTLE ROCK. ARKANSAS 72205
MAY 16, 2023
100% BID DOCUMENTS
598-21-10120-338-Q33
CLA
N
AREA OF WORK
KEY PLAN
A BA B
Scale: 3/32" = 1'-0"
GROUND FLOOR PLAN - PHASE 1
PLAN PHASING
PHASE 1 THE OFFICE AREA WEST OF CORRIDOR
CG34, AND TRASH GA108 THE LOGISTICS TEAM
WILL BE LOCATED IN THE PHARMACY SPACE
WHILE THEIR NEW SPACE IS UNDER
RENOVATION (THEY WILL ALREADY BE IN THE
PHARMACY SPACE DUE TO VACATING THEIR
OFFICE FOR THE SPS PROJECT.
N O
R T
H0 84 16
1 PLASTIC BARRIER, CAUTION TAPE, CONSTRUCTION
SIGN.
2 PLASTIC ZIPPERED BARRIER, STICKY MATS,
NEGATIVE AIR MONITOR DEVICE.
22 CONSTRUCTION WALL WITH DOOR/FRAME WHICH
WILL REMAIN PLACE FOR ALL PHASES.
ICRA RECOMMENDATIONS
SEE G-003 FOR ICRA INFORMATION
C
ACTIVITY
LEVEL
RISK
GROUP
CONSTRUCTION
CLASS
1 IV
A. IF EXISTING CONCRETE FLOOR IS LEFT
EXPOSED AFTER ABATEMENT OR DEMOLITION
CONTRACTOR TO PROVIDE APPROVED BOARD
COVERING.
B. NEGATIVE AIR MACHINE - VENT TO THE OUTSIDE
(PROVIDED BY THE CONTRACTOR).
COORDINATE WITH COR.
C. NEGATIVE AIR MONITOR DEVICE DISPLAYED AT
CONSTRUCTION ENTRANCE.
D. EXISTING SPRINKLERS IN A CORRIDOR TO
REMAIN AS A PART OF THE CORRIDOR FIRE
PROTECTION.
E. ALL HARD DOOR/FRAME FOR CONSTRUCTION
ENTRANCES TO HAVE A PIN CODE READER
ACCESS CONTROL.
F. MOBILE PLASTIC CONSTRUCTION WALL -
POLYSHIELD BARRIERS.
G. SEALL ALL EDGES OF PLASTIC BARRIERS OR
CONSTRUCTION WALLS TIGHT TO ADJACENT
SURFACES.
H. ALL TEMPORARY WALLS, BARRIERS,
ENCLOSURES ARE TO BE SEALED TIGHT TO
MINIMIZE CIRCULATION OF DUST, DEBRIS,
NOISE. HOWEVER ALL BARRIERS MUST BE BUILT
TO BE REMOVED WITH MINIMAL EFFORT IN
CASE OF AN EMERGENCY.
I. CONTRACTOR TURNOVER TO VA -
CONTRACTOR TO RETURN SPACE AIR CLEARED,
SPACE CLEANED FOR VA SAFETY INSPECTION
PRIOR TO COMPLETING THE PHASE. WEEKEND
WORK DURATION WILL BE (FRIDAY AT 6PM -
MONDAY 6AM).
J. CONSTRUCTION ENTRANCES:
a. IF THE FULL SCOPE OF THE PHASE IS
LESS THAN TWO WEEKS, A PLASTIC
ZIPPERED BARRIER IS ACCEPTABLE.
b. IF THE FULL SCOPE OF THE PHASE IS
MORE THAN TWO WEEKS, A HARD WALL,
DOOR AND FRAME ENTRANCE IS
REQUIRED.
N.I.C. EGRESS
N.I.C. EGRESS TO REMAIN IN PLACE.
A S E
D U
C T
C H
A S
E
TR
A
S H
TR
A
S H
A.T.C. 212
F R
E E
Z E
R
PA
S
S T
H R
U
W
IN
D O
W
IV
H
O O
D S
C
P
IP
E
F
IR
E
S U
B H
K V
A
K V
A S
U B
D
VALVE
V A L V E
A C D E G
H J L UN R
WOMEN'S
LOCKER
ROOM
GC180
WOMEN'S
BATHROOM
GC181
BIOMED.
WORKSHOP
GD114D
MEN'S
LOCKER
ROOM
GC182
RESIDENT
OFFICE
GC185
CLINICAL
& ED.
COORD.
GC187
DRUG
INFO.
OFF.
GC184
BIOMED
STORAGE
GD114C
CORR.
CG36
GC114G
EQUIP. REPAIR
SHOP
SURGICAL
BIOCHEMICAL
LABORATORY
GC155
LOUNGE
GC158
OFF.
GC159
CENTRAL
RECEIVING/STORAGE
ORDERING
GC188
MEDICINE
STORAGE
GC188A
CORR.
CG31A
DATA
GD101
ELEC.
STOR.
GD104
OFF.
GD105
TELEPHONE
EQUIP.
GC196
TELEPHONE
EQUIP.
GC197
PLUMBING
SHOP
GD114F
RESEARCH
OFF.
GC156
CORR.
CG30
CORR.
CG29
SOILED
LINEN
GA101
ELEC.
TRASH
GA108
CG5
SERVICES ELEV.
LOBBY
PAINT
ROOM
GD114A
EQUIP.
GD114C
ELECTRICAL
SHOP
GD114E
CORR.
CG36A
CARPENTRY
SHOP
GD114B
MECH.
GC191
CORR.
CG4
ANTEROOM
GC189B
I.V. PREP
GC189C
VAULT
GC190
CORR.
CG3A
CORR.
CG3
R.R.
GC194
GC192
PHARM. CONF.
RM.
CL.
GC193
ELEC.
GD112 SIGNAL
GD110
TELE.
GD11
M & O
SUPRV.
GA110
DIRECTOR'S
OFF.
GA109
DRESS.
GA104A
SHWR.
BATH.
GA104
VEST.
GA103A
LOUNGE
GA103
CORR.
CG7
CORR.
CG34
EMS
OFFICE
GE100B
EMS
OFFICE
GE100A
ENVIR.
SERVICES
GE100C
FOOD
SERVICE
GC195
STOR.
GE100D
CG1
PUBLIC ELEV.
LOBBY
TELE.
GA107
SIGNAL
GA106
ELEC.
GA105
CORR.
CG2
PHARM.
SERVICE
GC189
MEN'S
BATH.
GC183
CORR.
CG31B
CORR.
CG37B
INVENTORY
FORMULARY
MNGMNT
OFFICE
GC178
SECRETARY
GD113
BIOMEDICAL
SPRVSR
GD108
BIOMED.
ENG.
SPRVSR
GD107
BIOMEDICAL
OFFICE
GD106
BREAK/CONFERENCE
ROOM
GD109
CLEAN
RECEVING
OFFICE
SPVSR.
BLDG.
MGMT.
GC102
N.I.C.
N.I.C.
N.I.C.
N.I.C.
N.I.C.
N .I .C
N.I.C.
N.I.C.
N.I.C.
VASCULAR
RESEARCH
OFF.
GC157
ANESTH.
RESEARCH
LAB
GC153
MED.
RSRCH.
DEPT.
CORE
EQUIP.
GC152
ONCOLOGY
LAB.
GC149
FOOD
STORAGE
GC162
MECH.
GC164
FREEZER
GR3
WALK-IN
REFRIDG.
GR2
REFRIDG.
GR1
OFF.
GC161
FOOD
STORAGE
GC0185
POT
WASHING
GC166
INFECT.
DISEASE
LAB.
PLMNRY.
GC146
Room
MECH.
GC141
STOR.
GC145
WALK-IN
REFRIDG.
GC132
SPVSR.
OFF.
GC144
RECEIVING
CG160
HEMATOLOGY
GC143
RSRCH.
OFF.
GC129
ONCOLOGY
LAB.
GC150
JAN.
GC163
HEMATOP.
LAB.
GC128
GLASSWARE
WASH. &
STER.
GC127
STOR.
GC171
DIETETICS
SPVSR.
OFF.
GC170
DIETETICS
GC169
CONF.
GC172
JAN.
MEN'S
LOCKER
ROOM
183MEN'S
R.R.
109A
SHWR.
109C
DRESS.
109B
TRAY
CART
STORAGE
GC168DIETETIC
SERVICES
GC167
STOR.
WALK-IN
REF.
GC141A
OFF.
GC142
CORR.
CG24
ELEC.
GC138
SIGNAL
GC140
TELE.
GC139
CORR.
CG27
CORR.
CG28
CORR.
CG26
COMP.
C151
CORR.
CG32A
CORR.
CG32
DISHWASHING
GC173
OFFICE
GE113C
CORR.
CG35
CORR.
CG35A
EQUIPMENT
REPAIR
SHOP
GD114H
GD114
EQIUP. REPAIR
SHOP STOR.
STAIR 1
SG1
LOCKSMITH
GD116
PHARMACY
STORAGE
GD117
CORRIDOR
CG36B
OPEN DOCK
GAS STORAGE
GD119
OXYGEN
MANIFOLD
ROOM
GD118
WAREHOUSE
GD103
ELECTRICAL
POWER ROOM
GD123
CLEAN
STORAGE
GD102
CORRIDOR
CGG37
SPD OFFICE
GD121
CHIEF SPD
OFFICE
GD120
SPD
EQUIPMENT
STORAGE
ISSUE
GD122
ACETIC ACID
ROOM
GD124
CLEAN/STERILE
STORAGE
GE113
CART WASH
GE109
JANITOR
GE108
STER. EQ.
ACCESS
GE112A
SOILED,
RECIEVING &
DECON AREA
GE107
DECON ANTE
GE107B
CORRIDOR
CG38
POLICE
STORAGE
GE101
WOMEN'S
LOUNGE
GE104
POLICE
STORAGE
GE102
WOMEN'S
LOUNGE
GE105
WOMEN'S RR
GE106
MEN'S RR
GE101A
NEPHROLOGY
LABORTORY 1
GE124
LABORTORY
GE122
CORRIDOR
CG11
STORAGE
GB123A
STORAGE
GB123
LABORATORY
GB120
OFFICE
GB121
GRNTLGY
RESEARCH
LAB. 6
GB113
STORAGE
GB114
CORRIDOR
CG10
GERONTOLOGY
RSRCH LAB. 7
GB115
GERIATRICS
LABORATORY
GB103
CORRIDOR
CG8
LABORATORY
GB100
GASTROENTERLOGY
LAB.
GB101
LABORATORY
GC100
CORRIDOR
CG2…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .