Attachment C - 20-338 100 construction bid documents.pdf

PDF 47 MB Posted

Attached to
598-21-101 Renovate Ground Floor Services 36C25624R0005 | Amendment 0008
Solicitation number
36C25624R0005
Issued by

About this file

This solicitation is for renovations to the ground floor services at a Veterans Affairs medical center. The Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 16 is seeking bids to renovate approximately 15,000 square feet of space on the ground floor to improve clinical services. Bids are due by February 15, 2022 and the contract is expected to be awarded by April 30, 2022. The renovations include upgrades to electrical, mechanical, and plumbing systems as well as interior partitions, finishes, and fixtures. The contract term is 270 calendar days from the notice to proceed date.

View the file

Other files

File Type Posted
A0008_Attachment A_Clarifications to RFIs 02.13.24.pdf PDF
36C25624R0005 0008.pdf PDF
A0008_Attachment B_2022 VA Standard Paint Colors.pdf PDF
36C25624R0005 0007.pdf PDF
A0007_Clarification to RFIs 01.31.24.pdf PDF
A0006_Attachment B_033000 Cast in Place Concrete.pdf PDF
A0006_Attachment D_Appendix H Cutsheets.pdf PDF
36C25624R0005 0006.pdf PDF
A0006_Attachment A_RFIs and Responses to RFP 36C25624R0005.pdf PDF
A0006_Attachment E_Revised Schedule of Offer Items.pdf PDF
A0006_Attachment C_Appendix I - MechCalcs.pdf PDF
36C25624R0005 0005.pdf PDF
A0004_2024-01-17 Attendance Sheet for OIT site visit.pdf PDF
A0004_OIT Related Information.pdf PDF
36C25624R0005 0004.pdf PDF
A0004_Photos of each OIT room.docx DOCX document
36C25624R0005 0003.pdf PDF
A0002 598-21-101 Site Visit Attendance Sheet 01.05.24.pdf PDF
36C25624R0005 0002.pdf PDF
36C25624R0005 0001.pdf PDF
Attachment F - Contractor Evaluation Form.pdf PDF
Final Solicitation 36C25624R0005 598-21-101 Renovate Ground Floor.pdf PDF
Attachment B - 20-338 100 BD Specs.pdf PDF
Attachment H - JLM Site Visit Parking and Meet point.pdf PDF
Attachment A - 598-21-101 Renovate Ground Floor SOW.doc DOC document
Attachment G - EXHIBIT A PERFORMANCE RELEVANCY SURVEY.docx DOCX document
Attachment E - Wage Determination AR20220032 Dated 09012023.pdf PDF
Attachment D - Appendix H Cutsheets.pdf PDF
Show all 28

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

PROJECT SITE MAP PROJECT LOCATION MAP

/1

/2

:3

:0

P

M C

U s e rs \d c o rd o n \D o c u m e n ts

\R e v it l o c a l\ A

-3

-Q

V A

L it tl e

R o c k s t

F lo o r

R e n o d c o rd o n a c g -p a .c o m

.r v t

G-001

COVER

1 17DGC

VA LITTLE ROCK GROUND

FLOOR RENOVATION

CAVHCS

4300 W. 7TH ST

LITTLE ROCK. ARKANSAS 72205

MAY 16, 2023

100% BID DOCUMENTS

598-21-10120-338-Q33

VA LITTLE ROCK GROUND FLOOR

RENOVATION

CAVHCS

4300 W. 7TH ST

LITTLE ROCK. ARKANSAS 72205

VA PROJECT #: 598-21-101

CLA

DRAWING LIST

FIRE SUPPRESSION

FX001 FIRE SUPPRESSION GENERAL INFORMATION 1 4

FK101 GROUND FLOOR FIRE SUPPRESSION DEMOLITION PLAN 2 4

FX101 GROUND FLOOR FIRE SUPPRESSION PLAN - AREA 'A' 3 4

FX102 GROUND FLOOR FIRE SUPPRESSION PLAN - AREA 'B' 4 4

PLUMBING

P-001 PLUMBING GENERAL INFORMATION 1 7

PD101 GROUND FLOOR PLUMBING DEMOLITION PLAN 2 7

P-101 GROUND FLOOR PLUMBING PLAN - AREA 'A' 3 7

P-102 GROUND FLOOR PLUMBING PLAN - AREA 'B' 4 7

P-501 PLUMBING DETAILS 5 7

P-502 PLUMBING DETAILS 6 7

P-601 PLUMBING SCHEDULES 7 7

MECHANICAL

M-001 MECHANICAL GENERAL INFORMATION 1 7

MD101 GROUND FLOOR MECHANICAL DEMOLITION PLAN 2 7

MH101 GROUND FLOOR HVAC PLAN - AREA 'A' 3 7

MH102 GROUND FLOOR HVAC PLAN - AREA 'B' 4 7

M-501 MECHANICAL DETAILS 5 7

M-502 MECHANICAL CONTROLS 6 7

M-601 MECHANICAL SCHEDULES 7 7

ELECTRICAL

E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS 1 16

ED101 GROUND FLOOR OVERALL POWER DEMOLITION PLAN 2 16

ED102 GROUND FLOOR POWER DEMOLITION PLAN - AREA 'A' 3 16

ED103 GROUND FLOOR POWER DEMOLITION PLAN - AREA 'B' 4 16

ED104 GROUND FLOOR OVERALL LIGHTING DEMOLITION PLAN 5 16

ED105 GROUND FLOOR LIGHTING DEMOLITION PLAN - AREA 'A' 6 16

ED106 GROUND FLOOR LIGHTING DEMOLITION PLAN - AREA 'B' 7 16

EP101 GROUND FLOOR OVERALL POWER PLAN 8 16

EP102 GROUND FLOOR POWER PLAN - AREA 'A' 9 16

EP103 GROUND FLOOR POWER PLAN - AREA 'B' 10 16

EL101 GROUND FLOOR OVERALL LIGHTING PLAN 11 16

EL102 GROUND FLOOR LIGHTING PLAN - AREA 'A' 12 16

EL103 GROUND FLOOR LIGHTING PLAN - AREA 'B' 13 16

E-501 ELECTRICAL DETAILS 14 16

E-601 ELECTRICAL PARTIAL SINGLE LINE DIAGRAMS 15 16

E-602 ELECTRICAL SCHEDULES 16 16

TECHNOLOGY

T-001 TECHNOLOGY GENERAL NOTES, SYMBOL LEGEND, AND ABBREVIATIONS 1 8

TD101 GROUND FLOOR OVERALL TECHNOLOGY DEMOLITION PLAN 2 8

TD102 GROUND FLOOR TECHNOLOGY DEMOLITION PLAN - AREA 'A' 3 8

TD103 GROUND FLOOR TECHNOLOGY DEMOLITION PLAN - AREA 'B' 4 8

T-101 GROUND FLOOR OVERALL TECHNOLOGY PLAN 5 8

T-102 GROUND FLOOR TECHNOLOGY PLAN - AREA 'A' 6 8

T-103 GROUND FLOOR TECHNOLOGY PLAN - AREA 'B' 7 8

T-501 TECHNOLOGY DETAILS 8 8

FIRE ALARM

FA001 FIRE ALARM GENERAL NOTES, SYMBOL LEGEND, AND RISER 1 7

FL101 GROUND FLOOR OVERALL FIRE ALARM DEMOLITION PLAN 2 7

FL102 GROUND FLOOR FIRE ALARM DEMOLITION PLAN - AREA 'A' 3 7

FL103 GROUND FLOOR FIRE ALARM DEMOLITION PLAN - AREA 'B' 4 7

FA101 GROUND FLOOR OVERALL FIRE ALARM PLAN 5 7

FA102 GROUND FLOOR FIRE ALARM PLAN - AREA 'A' 6 7

FA103 GROUND FLOOR FIRE ALARM PLAN - AREA 'B' 7 7

DRAWING LIST

GENERAL

G-001 COVER 1 17

G-002 GENERAL INFORMATION 2 17

G-003 ICRA INFORMATION AND DETAILS 3 17

G-004 ICRA INSTALLATION EXAMPLES 4 17

GC101 GROUND FLOOR OVERALL PHASING PLAN 5 17

GC102 GROUND FLOOR PLAN - PHASE 1 6 17

GC103 GROUND FLOOR PLAN - PHASE 2 7 17

GC104 GROUND FLOOR PLAN - PHASE 3 8 17

GC105 GROUND FLOOR PLAN - PHASE 4 9 17

GC106 GROUND FLOOR PLAN - PHASE 5 10 17

GC107 GROUND FLOOR PLAN - PHASE 6 11 17

GC108 GROUND FLOOR PLAN - PHASE 7 12 17

GC109 GROUND FLOOR PLAN - PHASE 8 13 17

GC110 GROUND FLOOR PLAN - PHASE 9 14 17

GC111 GROUND FLOOR PLAN - PHASE 10 15 17

GL101 OVERALL GROUND FLOOR PLAN 16 17

GL102 GROUND FLOOR LIFE SAFETY PLAN 17 17

HAZARDOUS MATERIALS

H-101 GROUND FLOOR ABATEMENT PLAN (FOR REFERENCE ONLY) 1 1

ARCHITECTURAL

A-001 ARCHITECTURAL SYMBOLS, ABBREVIATIONS AND NOTES 1 11

A-002 GROUND FLOOR DEPARTMENT KEY PLAN 2 11

AD101 GROUND FLOOR DEMOLITION PLAN 3 11

AD110 GROUND FLOOR REFLECTED CEILING DEMOLITION PLAN 4 11

AE101 GROUND FLOOR PLAN 5 11

AE102 GROUND FLOOR - DIMENSION PLAN 6 11

AE110 GROUND FLOOR REFLECTED CEILING PLAN 7 11

AE401 ENLARGED PLANS, ELEVATION. 8 11

AE501 PARTITION TYPES, DETAILS 9 11

AE601 DOOR SCHEDULE, ELEVATIONS AND DETAILS 10 11

AE901 GROUND FLOOR - PROGRAM COMPARISON 11 11

INTERIORS

I-001 PRODUCT SCHEDULES, SYMBOLS AND ABBREVIATIONS 1 17

I-101 GROUND FLOOR OVERALL FINISH AND WALL PROTECTION PLAN 2 17

I-121 GROUND FLOOR OVERALL PATTERN PLAN 3 17

I-201 CASEWORK ELEVATIONS AND DETAILS 4 17

I-401 INTERIOR ELEVATIONS 5 17

I-411 GROUND FLOOR OVERALL EQUIPMENT PLAN 6 17

I-412 GROUND FLOOR ENLARGED EQUIPMENT PLAN - AREA 'A' 7 17

I-413 GROUND FLOOR ENLARGED EQUIPMENT PLAN - AREA 'B' 8 17

I-421 ENLARGED EQUIPMENT PLANS 9 17

I-422 ENLARGED EQUIPMENT PLANS 10 17

I-423 ENLARGED EQUIPMENT PLANS 11 17

I-424 ENLARGED EQUIPMENT PLANS 12 17

I-425 ENLARGED EQUIPMENT PLAN 13 17

I-431 ENLARGED TOILET PLANS AND ELEVATIONS 14 17

I-432 ENLARGED TOILET PLANS AND ELEVATIONS 15 17

I-501 INTERIOR DETAILS 16 17

I-601 EQUIPMENT SCHEDULE 17 17

AREA OF WORK

BUILDING 1

GROUND FLOOR

THE CENTRAL ARKANSAS

HEALTHCARE SYSTEM (CAVHS)

4300 W. 7TH ST

DocuSign Envelope ID: C0615F6C-CD24-42D0-86E1-E95A49E68611

5/11/2023

WALL SECTION

SYMBOL

INTERIOR ELEVATION

SYMBOL

COLUMN GRID

ELEVATION SYMBOL

REVISION NOTE

ENLARGED DETAIL

CALLOUT

ROOM DESIGNATION

SYMBOL

BREAK LINE

FLOOR SLOPE

DIRECTION SYMBOL

TYPICAL GRAPHIC SCALE

DETAIL #

PAGE #

DETAIL #

PAGE #

VIEW NORTH ARROW

A8.1

EXTERIOR ELEVATION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

A8.1

BUILDING SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

A8.1

DETAIL SECTION

SYMBOL

DETAIL #

PAGE #

A8.1

WALL GRID

(REPRESENTS FACE OF

EXISTING WALL)

XX.X

XX.X

ELEVATION

0'-0"

ROOM

NAME

101A

NORTHNORTH

0 4 8 16

EXPOSED

PLUMBING AT

BARRIER

FREE

LAVATORIES

SHALL BE

INSULATED.

LEVER OPERATING

CONTROLLED

SOAP DISPENSER

NOTE: SINKS IN COUNTERS TO BE

MOUNTED WITH RIM NO MORE

THAN 2'-10" HIGH AND WITH AT

LEAST 2'-3" KNEE CLEARANCE.

CLEAR

TYPICAL ACCESSIBLE

CLEARANCE AT LAVATORY

TYPICAL ACCESSIBLE

LAVATORY AND MIRROR

1'-3" 1'-3"

M

IN

M A

X

M

A X

M

A X6

A

.F .F

MIN

8"

MAX

6"

M

IN9

M

IN

M

IN

M A

X

17" MIN

TYPICAL URINAL

MOUNTING

CLEAR

15"

CLEAR

15"

"3

M

A X

T O

B O

T T

O M

O F

R

E F

L E

C T

IV

S

U R

F A

C E

F

M

IR

R

O R

4'-0" MAX TO

HIGHEST OPERABLE

POINT - IF FIRE

EXTINGUISHER

OVER 40 LBS

3'-6" MAX HT.

FIRE EXTINGUISHER

CABINET

ELECTRICAL CABINET

DUPLEX

OUTLET

SWITCH

THERMOSTAT

TELEPHONE

OR DATA

OUTLET

FIRE ALARM

PULL 3'-8"

(3'-6" MIN)

(4'-0" MAX.)

INTERCOM

STATION

DUPLEX

OUTLET

COMPUTER

TERMINAL

MISC. WALL DEVICES

O .C

O.C.

39" - 41"

3'-6" 1'-0"

9" O.C.

2'-0"

/2

M

IN

T O

T O

P

6" 3'-0"

ACCESSIBLE TOILET

WALL MOUNTED

1-1/2"

DIAMETER

GRAB BAR

SANITARY NAPKIN

DISPOSAL

TOILET TISSUE

DISPENSER

TOILET SEAT

COVER

DISPENSER

CARD

READER

NOTE: GRAB BARS

LOCATION, AND MOUNTING

ARE THE SAME IN NON

ACCESIBLE TOILET.

MOP BASIN

MOP SHELF

TYPICAL JANITORS CLOSET

ACCESSIBLE

ROBE/COAT HOOK

ROBE/COAT

HOOK

TOILET ACCESSORIES

6"

PAPER TOWEL

DISPENSER

2'-0" AT SIDEWALLS

AT COUNTER SINKS

1'-6" AT SIDEWALLS

AT LAVATORY

PURPOSE: THE PUBLIC BUILDINGS AMENDMENT ACT OF 1988, PUBLIC LAW (PUB. L.) 100-678 REQUIRES FEDERAL AGENCIES TO FOLLOW NATIONAL RECOGNIZED "MODEL" BUILDING CODES. THE FEDERAL PARTICIPATION IN THE DEVELOPMENT AND USE OF VOLUNTARY STANDARDS, OFFICE OF MANAGEMENT AND BUDGET (OMB) CIRCULAR A-119, REQUIRES ALL EXECUTIVE AGENCIES TO RELY ON VOLUNTARY STANDARDS, BOTH DOMESTIC AND INTERNATIONAL, WHENEVER FEASIBLE, AND TO

PARTICIPATE IN VOLUNTARY STANDARD BODIES.

GENERAL: BASED ON THE VA PG-18-3 DESIGN AND CONSTRUCTION PROCEDURES, THIS PROJECT HAS BEEN DESIGNED TO, AND CONSTRUCTION SHALL COMPLY WITH THE FOLLOWING CODES AND GUIDELINES:

(AS OF EFFECTIVE PROJECT DESIGN CONTRACT DATE MARCH 30, 2021)

• VA DIRECTIVES, DESIGN MANUALS, MASTER SPECIFICATIONS, VA NATIONAL CAD STANDARD APPLICATION GUIDE, AND OTHER GUIDANCE ON THE TECHNICAL INFORMATION LIBRARY (TIL) (HTTP://WWW.CFM.VA.GOV/TIL/).

• INTERNATIONAL BUILDING CODE (IBC) 2021 (ONLY WHEN SPECIFICALLY REFERENCED IN VA DESIGN DOCUMENTS, SEE NOTES

BELOW)

• NFPA 101 LIFE SAFETY CODE 2021 (SEE NOTES BELOW)

• NFPA NATIONAL FIRE CODES WITH THE EXCEPTION OF NFPA 5000 AND NFPA 900

• OCCUPATIONAL, SAFETY AND HEALTH ADMINISTRATION (OSHA) STANDARDS.

• VA SEISMIC DESIGN REQUIREMENTS, H-18-8

• NATIONAL ELECTRICAL CODE (NEC)

• INTERNATIONAL PLUMBING CODE (IPC) 2021

• SAFETY CODE FOR ELEVATORS AND ESCALATORS, AMERICAN SOCIETY OF MECHANICAL ENGINEERS (ASME) A 17.1.

• ASME BOILER AND PRESSURE VESSEL CODE

• ASME CODE FOR PRESSURE PIPING

• ARCHITECTURAL BARRIERS ACT ACCESSIBILITY STANDARDS (ABAAS) INCLUDING VA SUPPLEMENT, BARRIER FREE DESIGN

STANDARD (PG-18-13)

• BUILDING CODE REQUIREMENTS FOR REINFORCED CONCRETE, AMERICAN CONCRETE INSTITUTE AND COMMENTARY (ACI 318)

• MANUAL OF STEEL CONSTRUCTION, LOAD AND RESISTANCE FACTOR DESIGN SPECIFICATIONS FOR STRUCTURAL STEEL

BUILDINGS, AMERICAN INSTITUTE OF STEEL CONSTRUCTION (AISC)

• ENERGY POLICY ACT OF 2005 (EPACT)

• DOE INTERIM FINAL RULE: ENERGY CONSERVATION STANDARDS FOR NEW FEDERAL, COMMERCIAL AND MULTI-FAMILY HIGH- RISE RESIDENTIAL BUILDINGS AND NEW LOW-RISE RESIDENTIAL BUILDINGS, 10 CFR PARTS 433, 434 AND 435.

• FEDERAL LEADERSHIP IN HIGH PERFORMANCE AND SUSTAINABLE BUILDINGS: MEMORANDUM OF UNDERSTANDING (MOU)

• THE PROVISIONS FOR CONSTRUCTION AND SAFETY SIGNS. STATED IN THE GENERAL REQUIREMENTS SECTION 01010 OF THE

VA MASTER CONSTRUCTION SPECIFICATION.

• VENTILATION FOR ACCEPTABLE INDOOR AIR QUALITY – ASHRAE STANDARD 170 - VENTILATION OF HEALTH CARE FACILITIES,

• SAFETY STANDARD FOR REFRIGERATION SYSTEMS – ASHRAE STANDARD 15 – 2019..

LOCAL CODES: AS AN AGENCY OF THE FEDERAL GOVERNMENT, VA IS NOT SUBJECT TO LOCAL IMPOSITION OF CODE ENFORCEMENT PROCEDURES (DRAWING REVIEWS, BUILDING PERMITS, INSPECTIONS, FEES, ETC.). VA MUST FUNCTION AS THE AUTHORITY HAVING JURISDICTION (AHJ) AND THUS HAS THE RESPONSIBILITY TO GUARD PUBLIC HEALTH AND SAFETY THROUGH ENFORCING ITS ADOPTED CODES. HOWEVER, LOCAL AUTHORITIES SHOULD BE NOTIFIED ABOUT PLANNED PROJECTS AND GIVEN OPPORTUNITY TO REVIEW DRAWINGS PROVIDED THAT VA DOES NOT PAY FOR REVIEW OR INSPECTION

FEES.

NOTES:

1. NFPA 101 PRIMARILY ADDRESSES LIFE SAFETY AND FIRE PROTECTION FEATURES WHILE THE IBC ADDRESSES A WIDE RANGE OF CONSIDERATIONS, INCLUDING, BUT NOT LIMITED TO, STRUCTURAL STRENGTH, SEISMIC STABILITY, SANITATION, ADEQUATE LIGHT AND VENTILATION, AND ENERGY CONSERVATION. VA BUILDINGS MUST MEET THE REQUIREMENTS OF NFPA 101 AND DOCUMENTS REFERENCED BY NFPA 101 IN ORDER TO COMPLY WITH THE ACCREDITATION REQUIREMENTS OF THE JOINT COMMISSION. THEREFORE, DESIGNS SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF NFPA 101 AND DOCUMENTS REFERENCED THEREIN. DESIGN FEATURES NOT ADDRESSED BY NFPA 101 OR DOCUMENTS REFERENCED THEREIN SHALL COMPLY WITH THE REQUIREMENTS OF THE LATEST EDITION OF THE IBC OR AS OTHERWISE ADDRESSED ABOVE IN THIS PROGRAM GUIDE. FOR DESIGN FEATURES THAT ARE ADDRESSED BY BOTH THE IBC AS WELL AS NFPA 101 OR A DOCUMENT REFERENCED BY NFPA 101, THE REQUIREMENTS OF NFPA 101 OR THE DOCUMENT REFERENCED BY NFPA 101 SHALL BE USED EXCLUSIVELY (THIS APPLIES EVEN IF THE IBC REQUIREMENTS ARE DIFFERENT).

2. CONFLICTS BETWEEN NATIONALLY RECOGNIZED CODES AND STANDARDS AND VA REQUIREMENTS – SHOULD A CONFLICT EXIST BETWEEN VA REQUIREMENTS AND VA ADOPTED NATIONALLY RECOGNIZED CODES AND STANDARDS, THE CONFLICT SHALL BE BROUGHT TO THE ATTENTION OF VA. THE RESOLUTION OF THE CONFLICT SHALL BE MADE BY THE AUTHORITY

HAVING JURISDICTION FOR VA TO ENSURE A CONSISTENCY SYSTEM WIDE.

CONSTRUCTION

STAGING AREA #1

CONSTRUCTION

STAGING AREA #2

1. LOCKER-ROOM REMODEL.

2. ROOM GC195 EMS SUPPLY CLOSET.

3. BED LIFT

# ALTERNATE NOTES

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:3

:1

P

M C

U s e rs \d c o rd o n \D o c u m e n ts

\R e v it l o c a l\ A

-3

-Q

V A

L it tl e

R o c k s t

F lo o r

R e n o d c o rd o n a c g -p a .c o m

.r v t

G-002

GENERAL INFORMATION

2 17DGC

VA LITTLE ROCK GROUND

FLOOR RENOVATION

CAVHCS

4300 W. 7TH ST

LITTLE ROCK. ARKANSAS 72205

MAY 16, 2023

100% BID DOCUMENTS

598-21-10120-338-Q33

CLA

GENERAL SYMBOL LEGEND

STANDARD MOUNTING HEIGHTS CODE STANDARDS AND EXECUTIVE ORDERS

Scale: 12" = 1'-0"

CONSTRUCTION STAGING

INFECTION CONTROL RISK MITIGATION RECOMMENDATIONS MATRIX OF PRECAUTIONS

FOR CONSTRUCTION AND RENOVATION

PLASTIC WINDOW

SWIVEL CASTERS

WITH TWO

LOCKING BRAKES

MOBILE CART

A D

J U

S T

A B

L

H

IG

H T

HEPA NEGATIVE

AIR UNIT

EXISTING WALL

EXISTING CEILING

FLEX DUCT

B

SMOKE RATED

3 5/8" INSULATED WALL WITH

16 GAUGE METAL STUDS @

16" O.C. WALL TO EXTEND TO

UNDERSIDE OF DECK

EXISTING CEILING SYSTEM

BASE - TO MATCH

EXISTING AREA

EXISTING FLOOR

UNDERSIDE OF EXISTING

DECK

C E

IL

IN

G H

E

IG

H T

V A

R

IE

S F

IE

L D

V E

R

IF

Y

W A

L L

H E

IG

H

T V

A R

IE

S

F

IE

L D

V E

R

IF

Y

5"

FIRE RESISTANT SEALANT,

BOTH SIDES

HEPA NEGATIVE

AIR UNIT

FINISHED FLOORING TO BE KEPT

CLEAN. FLOORS NOT BEING REPLACED

MUST BE PROTECTED. COVER WITH

ROSIN PAPER / FIRE RATED PLYWOOD.

FIRE RATED PLYWOOD,

TEMPORARY. SALVAGE

PROTECT AND STORE

EXISTING WINDOW TO

BE RE-INSTALLED

AFTER CONSTRUCTION

IS COMPLETE.

V .I .F

E X

IS

T

IN

G

W A

L L

ISLM TEMPORARY BARRIER TAG

PROJECT:

PRIME CONTRACTOR:

SUB CONTRACTOR:

EMERGENCY CONTACT NO.:

BARRIER INSTALLATION DATE:

BARRIER EXPIRATION DATE:

FIRE EXTINGUISHER ON

PORTABLE FLOOR

BRACKET (ILSM MAY

REQUIRE MORE THAN

ONE).

PROVIDE STICKY MATS

(CHANGED END OF SHIFT

OR MORE IF NECESSARY

TO MAINTAIN

CLEANLINESS).

HEPA NEGATIVE

AIR UNIT

ISOLATE AND COVER ALL

SUPPLY DIFFUSERS NOT IN

OPERATION DURING PROJECT -

COORDINATE W/ COR

COVER ALL

RETURNS AT THE

GRATE/DIFFUSERS

SUSPENDED PLASTIC

ZIPPER WALL

CURTAIN BARRIER

POST ICRA, ILSM, FIRE

INPECTION SHEETS

VISIBLE TO PUBLIC

FIRE PULL

STATION WITH

AUDIO / VISUAL

FLEX DUCT

EXHAUST LOCATION

- SEE NOTE A

NOTE:

A. TURN UP EXHAUST ON EXTERIOR ON SIDE. CONTRACTOR SHALL VERIFY

LOCATION OF AIR INTAKES ARE AT THE PROPER DISTANCE FROM EXHAUST.

VERIFY LOCAL JURISDICATION CODE AND VA REQUIREMENTS FOR DISTANCE

PRIOR TO STARTING WORK.

G-003

_____3

G-003

G-003

ILSM SIGNAGE

INTERIM LIFE SAFETY MEASURES IN EFFECT

FOR VA LITTLE ROCK GROUND FLOOR RENOVATION

THIS EXIT IS CLOSED AND LEADS TO A

CONSTRUCTION AREA.

PLEASE USE ALL ALTERNATE EXITS AS MARKED.

1' - 5"

1/2"1/2"

/2

/2

/2

/2

/2

/2

EQ.EQ.

III/IVLOW Risk Group 1

Class III

Note: Infection Control approval will be required when the Construction Activity and Risk Level indicate that

It is the Contractor's Responsibility to provide the following Infection Control Precautions depending upon the Area Class Designation

II

I

III

MEDIUM Risk Group 2

HIGH Risk Group 3

HIGHEST Risk Group 4 IV

IV

IV

III/IV

III/IV

III

III/IV

I

III

Patient Risk Group Table

Infection Control Matrix - Class of Precautions: Construction Project by Patient Risk

TYPE A

Construction Project Type

Major demolition and construction projects

Includes, but is not limited to:

- activities which require consecutive work shifts

- requires heavy demolition or removal of a complete ceiling system

- new construction

Work that generates a moderate to high level of dust or requires demolition or removal of any fixed building components or assemblies

Includes, but is not limited to:

- sanding of walls for painting or wall covering

- removal of floor coverings, ceiling tiles and casework

- new wall construction

- minor duct work or electrical work above ceilings

- major cabling activities

- any activity which cannot be completed within a single work shift

Small scale, short duration activities which create minimal dust

Includes, but is not limited to:

- installation of telephone and computer cabling

- access to chase spaces

- cutting of walls or ceiling where dust migration can be controlled

Inspection and Non-Invasive Activities

Includes, but is not limited to:

- removal of ceiling tiles for visual inspection limited to 1 tile to 50 square feet

- painting (but not sanding), wall covering

- electrical trim work, minor plumbing, and activities which do not generate dust or require cutting of walls or access to ceilings other than for visual inspection

Type of Construction / Project Activity Table

Group 2 Medium Risk

Group 1 Low Risk

- Bldg. #69 Therapy areas

- Respiratory Therapy

- Outpatient Clinics

- CBOC's

- Mental Health Units

- VACANT AREA ADJACENT TO

OCCUPIED AREA

- Office areas (non-clinical)

- Hallways

- FES/EMS areas

I

Patient Risk Group

TYPE D

TYPE C

TYPE B

TYPE A

Group 4 Highest Risk

Group 3 High Risk

- Pharmacy

- Radiology/ CT Scanner

- Urgent Care

- Laboratories

- CLCs

- SPD; AMCU;

- Respiratory Isolation Rooms

- Surgery

III

TYPE DTYPE CTYPE B

Class IVor control procedures are necessary.

C

LA

S S

IV

C

LA

S

S

II

During Construction Project

C L-

I C

LA

S

S

II

I

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering

4. Vacuum work area with HEPA filtered vacuums.

5. Wet mop area with disinfectant after barriers are removed.

6. Remove or isolate HVAC system in areas where work was being performed.

1. Remove barrier materials carefully to minimize spreading of dirt and debris associated with construction.

2. Contain construction waste before transport in tightly covered containers.

3. Cover transport receptacles or carts. Tape covering.

4. Vacuum work with HEPA-filtered vacuums.

5. Wet mop with disinfectant.

6. Remove isolation of HVAC system in areas where work is being performed.

1. Wipe surfaces to remove dust.

Upon Completion of Project

1. Wipe work surfaces with disinfectant.

2. Contain construction waste before transport in tightly covered containers.

3. Wet mop and/or vacuum work area with HEPA filtered vacuum before leaving work areas.

4. Remove isolation of HVAC system in areas where work is being performed.

1. Includes all activities required by Class II

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

4. Complete all critical barriers before construction begins or implement control cube method.

5. Maintain negative air pressure within work site utilizing HEPA-equipped air filtration units.

6. Contain construction waste before transport in tightly covered containers.

7. Cover transport receptacles or carts. Tape covers.

8. Wet mop and/or vacuum with HEPA filtered vacuum before leaving work areas.

9. Remove isolation of HVAC system in areas where work is being performed.

1. Execute work by methods to minimize raising dust from construction operations.

2. Immediately replace a ceiling tile displaced for visual inspection.

1. Includes all activities required by Class I

2. Provide active means to prevent airborne dust from dispersing into atmosphere.

3. Water mist work surfaces to control dust while cutting.

4. Seal unused doors with duct tape.

5. Block off and seal air vents.

6. Replace adhesive walk-off mats at entrance and exit of work area. Replace used mats in accordance with manufacturer's recommendations.

7. Remove or isolate HVAC system in area where work is being done to prevent contamination of duct system.

1. Includes all activities required by Class III

2. Obtain Infection Control Permit from Hospital Safety Officer or Facilities

Management Maintenance and Engineering department before construction begins.

3. Isolate HVAC system in areas where work is being done to prevent contamination of duct system.

4. Complete all critical barriers or implement control cube method before construction begins.

5. Maintain negative air pressure within work site utilizing HEPA equipped air filtration units.

6. Seal holes, pipes, conduits, and punctures appropriately.

7. Construct anteroom and require all personnel to pass through this room so they can be vacuumed sing a HEPA vacuum cleaner before leaving work site or they can wear cloth or paper coveralls that re removed each time they leave the work site.

8. All personnel entering work site are required to wear shoe covers. Shoe covers must be changed each time the worker exits the work area.

9. Place adhesive walk-off mats at entrance to work area within anteroom.

10. Replace per manufacturer's recommendations. Do not remove barriers from work area until completed project is inspected each by the Hospital Safety Officer, Facilities Management Maintenance and Engineering Department and thoroughly cleaned by the Hospital Environmental Services Department or their contracted Environmental Service Company Contain construction waste before transport in tightly covered containers.

11. Cover transport receptacles or carts. Tape covering

12. Vacuum work area with HEPA filtered vacuums.

13. Wet mop with disinfectant after barriers are removed.

14. Remove isolation of HVAC system in areas where work is being performed.

DUST CONTROL PLAN NOTES

A. THE USE OF TEMPORARY BARRIER SYSTEMS,

WHERE PERMITTED, CAN BE USED INSTEAD OF

NOTED PARTITIONS IN ACCEPTED BY THE COR

AND THE PARTITIONS COMPLY WITH REQUIRED

FIRE RATING.

B. TRAFFIC CONTROL: DESIGNATED ENTRY AND

EXIT PROCEDURES SHALL BE DEFINED.

EGRESS PATHS SHALL BE FREE OF DEBRIS;

DESIGNATED ELEVATORS SHALL BE USED

DURING SCHEDULED TIMES; AND ONLY

AUTHORIZED PERSONNEL SHALL BE ALLOWED

TO ENTER THE CONSTRUCTION ZONE.

SIGNAGE SHALL DIRECT PEDESTRIAN TRAFFIC

AWAY FROM THE CONSTRUCTION AREA AND

MATERIALS.

C. DEMOLITION DEBRIS: DEBRIS SHALL BE

REMOVED IN CARTS WITH TIGHTLY FITTED

COVERS, USING DESIGNATED TRAFFIC

ROUTES .EFFORTS SHALL BE MADE TO

MINIMIZE USE OF ELEVATORS WITH AN

EMPHASIS ON TRANSPORT DURING THE

LOWEST PERIOD OF ACTIVITY. DEBRIS SHALL

BE REMOVED DAILY AND AT TIMES SPECIFIED

BY THE VAMC. IF CHUTES ARE USED TO DIRECT

DEBRIS OUTSIDE, HIGH EFFICIENCY

PARTICULATE AIR (HEPA) FILTERED NEGATIVE

AIR MACHINES SHALL BE USED, AND THE

CHUTE OPENING SHALL BE SEALED WHEN NOT

IN USE. FILTERS SHALL BE BAGGED AND

SEALED BEFORE BEING TRANSPORTED OUT

OF THE CONSTRUCTION AREA. THE

CONTRACTOR SHALL NOT HAUL DEBRIS

THROUGH PATIENT-CARE AREAS WITHOUT

PRIOR APPROVAL OF THE COR.

D. NEGATIVE AIR PRESSURE: THE AIR WITHIN THE

CONSTRUCTION AREA SHALL BE NEGATIVE

WITH RESPECT TO SURROUNDING AREAS AND

WITH NO DISRUPTION OF AIR SYSTEMS OF

ADJACENT AREAS. USE OF THE NEGATIVE AIR

PRESSURE SYSTEM WITHIN THE ENCLOSURE

TO REMOVE DUST SHALL PASS AIR THROUGH

AN INDUSTRIAL GRADE, PORTABLE HEPA

FILTER CAPABLE OF FILTRATION RATES OF

300-800 CUBIC FEET PER MINUTE (FT3/MIN), OR

EXHAUST AIR DIRECTLY TO THE OUTSIDE IF

APPROVED BY VAMC. IF EXHAUST SHALL BE

TIED INTO A RE-CIRCULATED AIR SYSTEM, A

PRE-FILTER AND HEPA FILTER SHALL BE USED

BEFORE EXHAUST TO PREVENT

CONTAMINATION OF THE DUCTS.

E. ADJACENT AREAS: THE STATUS OF SEALED

PENETRATIONS AND INTACT CEILING SHALL BE

VERIFIED DAILY.

F. AIR EXCHANGE RATES AND PRESSURE

RELATIONSHIPS: VAMC AND CONTRACTOR

SHALL VERIFY AND MAINTAIN PROPER RATES IN

CRITICAL AREAS NEAR CONSTRUCTION

ACTIVITY AND ENSURE AIR IS NOT BEING RE-

CIRCULATED WITHOUT FILTRATION FROM THE

CONSTRUCTION AREA ELSEWHERE. PROVIDE

AIR PRESSURE TESTING THROUGHOUT THE

PROJECT IN THE FREQUENCY AS IDENTIFIED BY

THE COR.

G. WORKSITE CLOTHING: CONTRACTOR

PERSONNEL CLOTHING SHALL BE FREE OF

LOOSE SOIL AND DEBRIS BEFORE LEAVING THE

CONSTRUCTION AREA. IF PROTECTIVE

APPAREL IS NOT WORN (E.G., COVERALLS,

FOOTGEAR AND HEADGEAR) A HEPA-FILTERED

VACUUM SHALL BE USED TO REMOVE DUST

FROM CLOTHING BEFORE LEAVING THE

BARRICADE. IF PROTECTIVE APPAREL IS

UTILIZED, THE CONTRACTOR SHALL

CONSTRUCT A SPACE OR ANTEROOM FOR

CHANGING CLOTHING AND STORING

EQUIPMENT (DESIGNATED AREA. ALL

EQUIPMENT, TOOLS, TOOL CARTS, AND

MATERIALS TRANSPORTED THROUGH

OCCUPIED AREAS SHALL BE MADE FREE FROM

DUST AND MOISTURE BY VACUUMING AND WET

WIPING BEFORE THEIR REMOVAL FROM THE

CONSTRUCTION ZONE OR WORK AREA.

H. POST CONSTRUCTION: DO NOT REMOVE

BARRIERS AND KEEP ALL HVAC ISOLATION

UNTIL CONTRACTOR HAS CLEANED

CONSTRUCTION SITE.

I. PROVIDE RATED BARRIERS AS INDICATED ON

DRAWINGS. BARRIERS SHALL BE INSPECTED BY

VA PRCA STAFF PRIOR TO START OF

CONSTRUCTION. MAINTAIN NEGATIVE

PRESSURE VENTILATION IN THE

CONSTRUCTION SPACE.

J. PROVIDE STICKY MAT AT EACH CONSTRUCTION

POINT IN ALL PHASES.

K. THESE DETAILS ARE TYPICAL ICRA DETAILS

AND NOT PROJECT SPECIFIC. ICRA

REQUIREMENTS ARE TO BE SUBMITTED FOR

REVIEW PRIOR TO INSTALLATION OF ICRA

REQUIREMENTS.

L. MAINTAIN RECORDS TO DOCUMENT THE

QUANTITY OF WASTE GENERATED; THE

QUANTITY OF WASTE DIVERTED THROUGH

SALE, REUSE, OR RECYCLING; AND THE

QUANTITY OF WASTE DISPOSED BY LANDFILL

OR INCINERATION.

M. ALL RECORDS TO BE PROVIDED TO THE

PROJECT COR MONTHLY TO TRACK AMOUNT

OF WASTE GENERATED.

N. ASBESTOS WASTE TO BE REPORTED TO

PROJECT COR BY ABATEMENT PHASE.

CONTRACTOR TO PROVIDE WASTE IN THE

FORM OF CUBIC YARD PER SQUARE FOOT

ABATED. ASBESTOS WASTE TO BE TRACKED

SEPARATELY FROM GENERAL CONSTRUCTION

WASTE.

DOOR INFORMATION

NO. QTY. WIDTH HEIGHT THICK TYPE MAT'L TYPE MAT'L DEPTH

FRAME INFORMATION

RATING HRDWR.

MISCELLANEOUS

REMARKS

TD001 (1) CONTRACTOR'S

DISCRETION ON

DOOR WIDTH-

3'-0" MIN.

7'-0" 1 3/4" A HM TYPE I HM 5 3/4" 20 MIN SET 1

DOOR AND FRAME SCHEDULE

MANUFACTURERS:

CORBIN RUSSWIN

McKINNEY

PEMKO

ROCKWOOD

NOTE:

HARDWARE MANUFACTURERS LISTED AS BASIS OF DESIGN.

ALTERNATE MANUFACTURERS ACCEPTABLE, SUBJECT TO

REVIEW BY ARCHITECT AND COR FOR EQUAL QUALITY

COMPLIANCE.

TYPE A TYPE I

2" VARIES 2"

HARDWARE SET 1

HINGES

DUST PROOF STRIKE

LATCH SET

DOOR CLOSER

KICK PLATES

GASKETING

TA2714

VA SPEC F01

DC6210xA11

K1050F

S888 x HEAD & JAMBES

32D

26D

32D

MK

RO

CO

RO

PE

CO

MK

PE

RO

PIN CODE OVER-RIDE DEVICE

TD002 (1) CONTRACTOR'S

DISCRETION ON

DOOR WIDTH-

3'-0" MIN.

7'-0" 1 3/4" A HM TYPE I HM 5 3/4" 20 MIN SET 1 PIN CODE OVER-RIDE DEVICE

TD003 (1) CONTRACTOR'S

DISCRETION ON

DOOR WIDTH-

3'-0" MIN.

7'-0" 1 3/4" A HM TYPE I HM 5 3/4" 20 MIN SET 1 PIN CODE OVER-RIDE DEVICE

TD004 (1) CONTRACTOR'S

DISCRETION ON

DOOR WIDTH-

3'-0" MIN.

7'-0" 1 3/4" A HM TYPE I HM 5 3/4" 20 MIN SET 1 PIN CODE OVER-RIDE DEVICE

TD006 (1) CONTRACTOR'S

DISCRETION ON

DOOR WIDTH-

3'-0" MIN.

7'-0" 1 3/4" A HM TYPE I HM 5 3/4" 20 MIN SET 1 PIN CODE OVER-RIDE DEVICE

TD005 (1) CONTRACTOR'S

DISCRETION ON

DOOR WIDTH-

3'-0" MIN.

7'-0" 1 3/4" A HM TYPE I HM 5 3/4" 20 MIN SET 1 PIN CODE OVER-RIDE DEVICE

TD008 (1) CONTRACTOR'S

DISCRETION ON

DOOR WIDTH-

3'-0" MIN.

7'-0" 1 3/4" A HM TYPE I HM 5 3/4" 90 MIN SET 1 PIN CODE OVER-RIDE DEVICE

TD007 (1) CONTRACTOR'S

DISCRETION ON

DOOR WIDTH-

3'-0" MIN.

7'-0" 1 3/4" A HM TYPE I HM 5 3/4" 20 MIN SET 1 PIN CODE OVER-RIDE DEVICE

A

.F . F

A P

P R

O X

SUSPENDED

PLASTIC ZIPPER

WALL CURTAIN

BARRIER

POST ICRA, ILSM, FIRE

INSPECTION SHEETS

VISIBLE TO PUBLIC

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:3

:1

P

M C

U s e rs \d c o rd o n \D o c u m e n ts

\R e v it l o c a l\ A

-3

-Q

V A

L it tl e

R o c k s t

F lo o r

R e n o d c o rd o n a c g -p a .c o m

.r v t

G-003

ICRA INFORMATION AND DETAILS

3 17DGC

VA LITTLE ROCK GROUND

FLOOR RENOVATION

CAVHCS

4300 W. 7TH ST

LITTLE ROCK. ARKANSAS 72205

MAY 16, 2023

100% BID DOCUMENTS

598-21-10120-338-Q33

CLA

Scale: 1/4" = 1'-0"

ICRA MOBILE CONTAINMENT CART

Scale: 3/4" = 1'-0"

ICRA BARRIER WALL TYPE

Scale: 1/4" = 1'-0"

CROSS SECTION "A"

Scale: 1/4" = 1'-0"

TYPICAL CONSTRUCTION PLAN LAYOUT

Scale: 3" = 1'-0"

ILSM CONSTRUCTION EGRESS SIGNAGE

ICRA DOOR SCHEDULE

Scale: 1/4" = 1'-0"

ICRA ROOM ELEVATION

C O

N S

T R

U C

T

IO

N E

N T

R A

N C

E

P L A

S T

IC

B

A R

R

IE

R

C O

N S

T R

U C

T

IO

N H

A L

L A

N D

N T

R A

N C

E

T E

M P

O R

A R

Y C

O N

S T

R U

C T

IO

N

W A

L L

T E

M P

O R

A R

Y C

O N

S T

R U

C T

IO

N

W A

L L

T E

M P

O R

A R

Y C

O N

S T

R U

C T

IO

N

W A

L L

H A

N D

W A

S H

C O

N S

T R

U C

T

IO

N E

N T

R A

N C

E

T E

M P

O R

A R

Y C

O N

S T

R U

C T

IO

N

W A

L L

O B

S C

U R

E D

T E

M P

O R

A

Y

C

N S

T R

U C

T

IO

N W

A L L

T E

M P

O R

A R

Y C

O N

S T

R U

C T

IO

N

W A

B

U

IL

T T

O C

E

IL

IN

G

F

R A

M

IN

G

T E

M P

O R

A R

Y C

O N

S T

R U

C T

IO

N

W A

T

C

E

IL

IN

G

N E

G A

T

IV

E A

IR

M

O N

IT

T E

M P

O R

A R

Y C

O N

S T

R U

C T

IO

N

W A

W

IT

H

N E

G A

T

IV

E A

IR

M

O N

IT

S E

A L

E D

D O

O R

W

IT

H T

A P

E

D O

O R

S E

A L

D

W

IT

H

T A

P E

D O

O R

P

IN

C O

D E

D E

V

IC

E

C O

V E

R S

U P

P L Y

D

IF

F U

S E

R

C O

V E

R S

U P

P L Y

D

IF

F U

S

O

V E

R S

U P

P L Y

D

IF

F U

S E

R

N E

G A

T

IV

E A

IR

U

N

IT

T E

M P

O R

A R

Y C

O N

S T

R U

C T

IO

N

W A

L L

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

/1

/2

:3

:1

P

M C

U s e rs \d c o rd o n \D o c u m e n ts

\R e v it l o c a l\ A

-3

-Q

V A

L it tl e

R o c k s t

F lo o r

R e n o d c o rd o n a c g -p a .c o m

.r v t

G-004

ICRA INSTALLATION EXAMPLES

4 17DGC

VA LITTLE ROCK GROUND

FLOOR RENOVATION

CAVHCS

4300 W. 7TH ST

LITTLE ROCK. ARKANSAS 72205

MAY 16, 2023

100% BID DOCUMENTS

598-21-10120-338-Q33

CLA

Scale: No Scale

ICRA EXAMPLES

N

AREA OF WORK

KEY PLAN

A BA B

A. PHOTOGRAPHS ARE FOR EXAMPLES ONLY.

CONTRACTOR TO COORDINATE WITH COR ON

ACCEPTABLE INSTALLATION FOR INFECTION

CONTROL RISK ASSESSMENT (ICRA) MEASURES.

1 PLASTIC ZIPPERED BARRIER, STICKY MATS,

NEGATIVE AIR MONITOR DEVICE.

2 CONSTRUCTION ENTRANCE – DOOR/FRAME,

STICKY MATS, NEGATIVE AIR MONITOR, PIN CODE

ACCESS CONTROL.

3 PLASTIC BARRIER.

4 CONSTRUCTION SIGNAGE - ALTERNATE EGRESS

ROUTE. CONTRACTOR TO CORRIDATE LOCATION

WITH COR. SEE SHEET G-003.

5 INSTALL PLASTIC/ACRYLIC SHEET 24" X 24" OVER

SUPPLY AND RETURN DIFFUSER FOR DURATION

OF PROJECT.

P

IP

E

F

IR

E

VALVE

V A L V E

S SS S

S S

S

S

S SS

S S

S

S SS

S S

S

S SS

S S

S S

S S

S

S

S S

S

S SS S

S SS S

S S

S S

S SS S

S S

S S

S SS

S S

S

S SS

S S

S S

S S

S S

S S

S S

S

S SS

S SS

S S

S S

S

S SS S S S

S S

S S

S S

S SS

S S

S S

S

S S

S S

S S

SS S

S S

S S

S

S S

S S

S S

S S

SS S

SS SSS

SS SSS

WOMEN'S

LOCKER

ROOM

GC180

WOMEN'S

BATHROOM

GC181

BIOMED.

WORKSHOP

GD114D

MEN'S

LOCKER

ROOM

GC182

RESIDENT

OFFICE

GC185

CLINICAL

& ED.

COORD.

GC187

DRUG

INFO.

OFF.

GC184

BIOMED

STORAGE

GD114C

CORR.

CG36

GC114G

EQUIP. REPAIR

SHOP

SURGICAL

BIOCHEMICAL

LABORATORY

GC155

LOUNGE

GC158

OFF.

GC159

CENTRAL

RECEIVING/STORAGE

ORDERING

GC188

MEDICINE

STORAGE

GC188A

CORR.

CG31A

DATA

GD101

ELEC.

STOR.

GD104

OFF.

GD105

TELEPHONE

EQUIP.

GC196

TELEPHONE

EQUIP.

GC197

PLUMBING

SHOP

GD114F

RESEARCH

OFF.

GC156

CORR.

CG30

CORR.

CG29

SOILED

LINEN

GA101

ELEC.

TRASH

GA108

CG5

SERVICES ELEV.

LOBBY

PAINT

ROOM

GD114A

EQUIP.

GD114C

ELECTRICAL

SHOP

GD114E

CORR.

CG36A

CARPENTRY

SHOP

GD114B

MECH.

GC191

CORR.

CG4

ANTEROOM

GC189B

I.V. PREP

GC189C

VAULT

GC190

CORR.

CG3A

CORR.

CG3

R.R.

GC194

GC192

PHARM. CONF.

RM.

CL.

GC193

ELEC.

GD112 SIGNAL

GD110

TELE.

GD11

M & O

SUPRV.

GA110

DIRECTOR'S

OFF.

GA109

DRESS.

GA104A

SHWR.

BATH.

GA104

VEST.

GA103A

LOUNGE

GA103

CORR.

CG7

CORR.

CG34

EMS

OFFICE

GE100B

EMS

OFFICE

GE100A

ENVIR.

SERVICES

GE100C

FOOD

SERVICE

GC195

STOR.

GE100D

CG1

PUBLIC ELEV.

LOBBY

TELE.

GA107

SIGNAL

GA106

ELEC.

GA105

CORR.

CG2

PHARM.

SERVICE

GC189

MEN'S

BATH.

GC183

CORR.

CG31B

CORR.

CG37B

INVENTORY

FORMULARY

MNGMNT

OFFICE

GC178

SECRETARY

GD113

BIOMEDICAL

SPRVSR

GD108

BIOMED.

ENG.

SPRVSR

GD107

BIOMEDICAL

OFFICE

GD106

BREAK/CONFERENCE

ROOM

GD109

1A

10C

3A

7A

A C D E G

CLEAN

RECEVING

OFFICE

7B 7C

10A10B10D10E

SPVSR.

BLDG.

MGMT.

GC102

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N .I .C

N.I.C.

N.I.C.

N.I.C.

VASCULAR

RESEARCH

OFF.

GC157

ANESTH.

RESEARCH

LAB

GC153

MED.

RSRCH.

DEPT.

CORE

EQUIP.

GC152

ONCOLOGY

LAB.

GC149

FOOD

STORAGE

GC162

MECH.

GC164

FREEZER

GR3

WALK-IN

REFRIDG.

GR2

REFRIDG.

GR1

OFF.

GC161

FOOD

STORAGE

GC0185

POT

WASHING

GC166

INFECT.

DISEASE

LAB.

PLMNRY.

GC146

MECH.

GC141

STOR.

GC145

WALK-IN

REFRIDG.

GC132

SPVSR.

OFF.

GC144

RECEIVING

CG160

HEMATOLOGY

GC143

RSRCH.

OFF.

GC129

ONCOLOGY

LAB.

GC150

JAN.

GC163

HEMATOP.

LAB.

GC128

GLASSWARE

WASH. &

STER.

GC127

STOR.

GC171

DIETETICS

SPVSR.

OFF.

GC170

DIETETICS

GC169

CONF.

GC172

JAN.

MEN'S

LOCKER

ROOM

183MEN'S

R.R.

109A

SHWR.

109C

DRESS.

109B

TRAY

CART

STORAGE

GC168DIETETIC

SERVICES

GC167

STOR.

WALK-IN

REF.

GC141A

OFF.

GC142

CORR.

CG24

ELEC.

GC138

SIGNAL

GC140

TELE.

GC139

CORR.

CG27

CORR.

CG28

CORR.

CG26

COMP.

C151

CORR.

CG32A

CORR.

CG32

DISHWASHING

GC173

H J L UN R

OFFICE

GE113C

CORR.

CG35

CORR.

CG35A

EQUIPMENT

REPAIR

SHOP

GD114H

GD114

EQIUP. REPAIR

SHOP STOR.

3B

8A8B

CORR.

CG31

JANITOR

GC177

4A

5A

B M P Q S

10A 10E

CORRIDOR PHASING 10 WILL BE THE LAST

SECTION COMPLETED AND WILL BE SEPARATED

INTO 5 PHASES OF 20’ TO 30’ SEGMENTS. THE

WALL PAINTING AND NEW CEILINGS CAN GO WITH

THE USE OF TEMPORARY ICRA BARRIERS AND

THE FLOOR REPLACEMENT CAN BE DONE IN

LARGER SEGMENTS OVER THREE TO FOUR

WEEKENDS. COORDINATE IN THE FIELD.

WEEKEND WORK ONLY.

FINISHES IMPROVEMENTS SHALL BE

PERFORMED BEHIND ICRA BARRIER. STAFF IN

THE PAINT SHOP, CARPENTRY SHOP,

ELECTRICAL SHOP, AND PLUMBING SHOP WILL

BE RELOCATED IN THIS PHASE. WEEKEND WORK

ONLY.

8A 8B

7B

THIS SECTION WILL NEED TO BE SEPARATED INTO

TWO SECTIONS COMPLETED SEPARATELY ALL

WORK WILL BE WEEKEND WORK ONLY.

(ELEVATOR LOBBY ADJACENT CORRIDOR TO

LOBBIES).

7C

7A

THIS CORRIDOR WORK WILL NEED TO BE

PERFORMED DURING A WEEKEND. THERE IS A

SECURITY DOOR THAT HAS A CARD ACCESS

THAT MUST BE MAINTAINED. ICRA BARRIERS

WILL REQUIRE EGRESS DOORS TO ACCESS THE

STAIRS. CORRIDOR PHASE 3B WORK CANNOT BE

PERFORMED AT SAME TIME AS CORRIDOR

PHASES 3A, 8A AND 8B WEEKEND WORK ONLY.

4A

THIS SECTION CAN BE PERFORMED WITH THE

PHASE 5 CONSTRUCTION WORK SINCE ACCESS

TO THE SPACES WILL NOT BE REQUIRED. ALL BUT

THE 20’ LEADING TO THE DOUBLE DOOR TO THE

NORTH. THE LAST 20’ WILL PROVIDE ACCESS TO

THE SPACE NORTH OF PHASE 5 AND PROVIDE

CONSTRUCTION ACCESS TO PHASES 4 AND 5.

THE 20’ SECTION CAN BE COMPLETED AFTER ALL

OTHER WORK IN PHASES 4 AND 5 COMPLETED

DURING A WEEKEND. CORRIDORS PHASES 4A

AND 5A WORK CANNOT BE PERFORMED AT SAME

TIME. WEEKEND WORK ONLY.

5A

THIS SECTION OF CORRIDOR WILL BE

COMPLETED IN TWO PHASES SINCE ALL

INTERIOR ROOMS HAVE ACCESS TO OTHER

SPACES LEADING TO PATHS OF EGRESS AND TO

MAIN CORRIDORS. THE CLOSING OF THE ACCESS

TO SOME CORRIDORS WILL CREATE DEAD END

CORRIDORS FOR A SHORT PERIOD DURING THE

CONSTRUCTION WORK. CORRIDOR PHASE 3B

WORK CANNOT BE PERFORMED AT SAME TIME

AS CORRIDORS PHASES 4A. 8A AND 8B WEEKEND

WORK ONLY.

3A

3B

PHASE 7 - WILL BE SEPARATED INTO 7A, 7B

AND 7C TO ALLOW OPERATION OF (1) SET OF

ELEVATORS DURING THE DURATION OF THE

PROJECT. AREA TO INCLUDE THE ELEVATOR

LOBBIES AND THE ADJACENT CORRIDORS FOR

THE LOBBIES. THIS WORK WILL BE

RESTRICTED TO WEEKEND WORK ONLY.

PHASE 8 - CORRIDOR CG37B WILL BE

COMPLETED IN MULTIPLE PARTS, A AND B. EACH

PART MUST BE COMPLETED BEFORE THE NEXT

PART IS TO COMMENCE. THE WORK IN THIS

PHASE IS RESTRICTED TO WEEKEND WORK

ONLY.

PHASE 1

PHASE 2

PHASE 3

PHASE 4

PHASE 5

PHASE 6

PHASE 7

PHASE 8 N.I.C

PHASE 9

PHASE 10

PHASE 1 - THE OFFICE AREA WEST OF

CORRIDOR CG34, AND TRASH GA108 THE

LOGISTICS TEAM WILL BE LOCATED IN THE

PHARMACY SPACE WHILE THEIR NEW SPACE IS

UNDER RENOVATION (THEY WILL ALREADY BE IN

THE PHARMACY SPACE DUE TO THE VACATING

THEIR OFFICE FOR THE SPS PROJECT.

5A

PHASE 2 - THE BIOMED ENGINEERING REPAIR

SHOP, EQUIPMENT REPAIR SHOP AND STORAGE.

BIOMED CORE TEAM AND TECHNICIANS WILL

RELOCATE TO GC155 BIOMED AOC TEAM

MEMBERS WILL OCCUPY AN EXAM RM ON THE

4TH OR 5TH FLOOR.

PHASE 3 - ENVIRONMENTAL SERVICES AREA,

OFFICES, AND CORRIDOR CG7 LOCATED TO THE

SOUTHEAST SIDE OF THE AREA OF WORK. THREE

NEW OFFICES TO SUPPORT MEDICAL SERVICES,

THE ENVIRONMENT SERVICES AREA, CORRIDOR

EMS OFFICES, M&O OFFICES AND ENGINEERING

OFFICES. EMS OFFICES WILL RELOCATE

RESIDENT OFFICE GC185, GC187, GC184, AND

PHARMACY CONFERENCE ROOM GC192.

PHASE 4 - OFFICE GC159, VASCULAR RESEARCH

OFFICE GC157, THE BIOCHEMICAL LABORATORY

AREA, AND ENGINEERING CORRIDOR CG30.

ROOMS WILL BE VACATED AND READY FOR

CONSTRUCTION AT THIS TIME.

PHASE 6 - SERVICES, VAULT, MEDICINE

STORAGE, CENTRAL RECEIVING / ORDERING.

PHARMACY CONFERENCE ROOM, AND

INVENTORY FORMULARY MANAGEMENT OFFICE,

EMS AND OTHER DEPARTMENTS WILL HAVE

ALREADY MOVED TO PERMANENT LOCATION

AND VACATED THE TEMPORARY.

PHASE 5 - MENS / WOMENS LOCKER ROOMS

TOILET AREAS, RESIDENT OFFICE. CLINICAL

EDUCATION COORDINATOR, DRUG

INFORMATION OFFICE, AND CORRIDOR CG31A

EMS WILL HAVE ALREADY TRANSITIONED TO

THEIR RENOVATED OFFICES. IF TEMPORARY

LOCKERS ARE REQUIRED, USE PHARMACY

CONFERENCE ROOM GC192 AS SMALL LOCKER

ROOMS FOR MEN AND WOMEN.

1A

PHASES - 3A - 3B / 4A / 5A / 7A, 7B, 7C / 8A, 8B / 9 / 10A,

10B, 10C, 10D, 10E

A. SHEETS GC101 - GC111 DEPICT THE EXISTING

ROOM NAMES AND WALL RATINGS. THESE

DRAWINGS ARE INTENDED TO SHOW THE PHASING

OF THE PROJECT.

B. CONTRACTOR TO COORDINATE WORK OF EACH

PHASE WITH COR PRIOR TO PROCEEDING WITH

THE WORK. CONTRACTOR TO PROVIDE A WRITTEN

PLAN OF ACTION TO THE COR 30 TO 60 DAYS

AFTER GIVEN NOTICE TO PROCEED. COR TO

REVIEW AND APPROVE PRIOR TO CONTRACTOR

ERECTING AND INSTALLING ANY PHASING OR ICRA

MEASURES.

C. REFER TO SHEET G-003 FOR TYPICAL DETAILS FOR

INFECTIOUS CONTROL MEASURES TO BE

IMPLEMENTED FOR EACH PHASE OF THE

PROJECT.

D. CONTRACTOR MAY BE REQUIRED TO PERFORM

SOME PARTS OF CONSTRUCTION DURING NON-

WORKING HOURS, COORDINATE ALL OFF HOURS

WORK WITH COR.

E. DESCRIPTION OF PHASING ON THIS SHEET

INCLUDES A GENERAL OVERVIEW OF THE SCOPE

OF WORK TO BE PERFORMED IN EACH PHASE.

REFER TO ALL CONTRACT DOCUMENTS FOR

ADDITIONAL ITEMS WHICH MAY NOT BE NOTED ON

THIS SHEET.

F. CONTRACTOR TO COORDINATE ALL NEW

MECHANICAL PENETRATIONS WITH PLUMBING

DRAWINGS AND ARCHITECTURAL DRAWINGS.

COORDINATE WITH SAFETY OFFICE FOR

PENETRATION PERMIT.

G. CONTRACTOR SHALL COORDINATE WITH THE COR

ALL SLAB PENETRATION WORK AND SLAB REPAIR

WORK TO BE PREFORMED.

CONTRACTOR TO COORDINATE SYSTEM

SHUTDOWNS WITH ADJACENT AREAS AND

DEPARTMENTS ABOVE AND BELOW SCOPE OF

WORK. PROVIDE 2 WEEKS NOTICE (MINIMUM).

H. CONTRACTOR TURNOVER TO VA. RETURN THE

PHASE/SPACE - AIR CLEARED, SPACE CLEANED

AND READY FOR A VA SAFETY INSPECTION AT 5AM

PRIOR TO COMPLETING THE PHASE WEEKEND

WORK DURATION WILL BE FRIDAY AT 6PM TIL

MONDAY AT 6AM.

I. ICRA BARRIERS DO NOT GET REMOVED UNTIL VA

SAFETY CLEARS THE SPACE.

J. FOOD SERVICES OPERATES - MONDAY THROUGH

FRIDAY 5:30 AM - 8:00 PM. SATURDAY THROUGH

SUNDAY 5:30 AM - 8:00 PM. PLEASE BE AWARE OF

STAFF AND EQUIPMENT COMING TO AND FROM

THIS AREA. DOORS TO FOOD SERVICE OFF OF

CONSTUCTION ZONES MUST BE SEALED ON BOTH

SIDES OF THE DOOR TO PREVENT ANY

DUST/DEBRIS FROM ENTERING THE KITCHEN.

POLY BARRIER ON CONSTRUCTION SIDE OF DOOR

TO FRAME AND DOOR TO FLOOR ON THE KITCHEN

SIDE.

1. PLASTIC BARRIER, CAUTION TAPE,

CONSTRUCTION SIGN.

2. PLASTIC ZIPPERED BARRIER, STICKY MATS,

NEGATIVE AIR MONITOR DEVICE.

3. CONSTRUCTION ENTRANCE (DOOR/FRAME),

STICKY MATS, NEGATIVE AIR MONITOR, PIN

CODE ACCESS CONTROL.

4. CONSTRUCTION WALL – TYPE B.

5. CONSTRUCTION ENTRANCE – ANTEROOM WITH

DOOR/FRAME, STICKY MATS, NEGATIVE AIR

MONITOR, PIN CODE ACCESS CONTROL.

6. PLASTIC ZIPPERED BARRIER, STICKY MATS,

CAUTION TAPE, CONSTRUCTION SIGN. PHASE

4B WEEKEND WORK.

7. (...) EGRESS TO ROUTE TO STAIR 2 SG-2.

8. OPENING FOR NEW DOOR AND FRAME

PROVIDE CONSTRUCTION DOOR AND FRAME.

9. ABATEMENT ONLY.

10. MINOR DEMOLITITON / ABATEMENT DURING

CONSTRUCTION.

11. PLASTIC ZIPPERED BARRIER, STICKY MATS,

CAUTION TAPE, CONSTRUCTION SIGN.

WEEKEND WORK.

12. PLASTIC ZIPPERED BARRIER, STICKY MATS.

13. PLASTIC BARRIER.

14. SEAL ELEVATOR DOOR AND FRAME AS

REQUIRED. CONSTRUCTION SIGNAGE INSIDE

ELEVATOR CARS: INDCATE GROUND FLOOR

ACCESS IS NOT AVAILABLE DURING

CONSTRUCTION HOURS.

15. N.I.C. AREA WILL BE VACANT DURING PHASE 9.

16. PLASTIC ZIPPERED BARRIER, STICKY MATS

FOR PHASES 3A, 3B.

17. CONSTRUCTION ENTRANCE EXISTING DOOR.

18. CONSTRUCTION SIGNAGE - ALTERNATE

EGRESS ROUTE. CONTRACTOR TO CORRIDATE

LOCATION WITH COR.

19. CONSTRUCTION ENTRANCE – ANTEROOM WITH

PLASTIC BARRIER, STICKY MATS, NEGATIVE AIR

MONITOR, PIN CODE ACCESS CONTROL.

20. CONSTRUCTION ENTRANCE – ANTEROOM

USING EXISTING DOOR/FRAME, REMOVE PASS

THRU WINDOWS AND INFILL WALL.STICKY

MATS, NEGATIVE AIR MONITOR, PIN CODE

ACCESS CONTROL ROOM GC189C.

21. INSTALL PLASTIC/ACRYLIC WRAP 24"X24" OVER

SUPPLY DIFFUSER.

22. CONSTRUCTION WALL WITH DOOR/FRAME

WHICH WILL REMAIN PLACE FOR ALL PHASES.

KEYNOTE LEGEND#

Engineers Architects

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/1

/2

:3

:2

P

M C

U s e rs \d c o rd o n \D o c u m e n ts

\R e v it l o c a l\ A

-3

-Q

V A

L it tl e

R o c k s t

F lo o r

R e n o d c o rd o n a c g -p a .c o m

.r v t

GC101

GROUND FLOOR OVERALL PHASING

PLAN

5 17DGC

VA LITTLE ROCK GROUND

FLOOR RENOVATION

CAVHCS

4300 W. 7TH ST

LITTLE ROCK. ARKANSAS 72205

MAY 16, 2023

100% BID DOCUMENTS

598-21-10120-338-Q33

CLA

N O

R T

H0 84 16

N

AREA OF WORK

KEY PLAN

A B

Scale: 3/32" = 1'-0"

GROUND FLOOR OVERALL PHASING PLAN

CORRIDOR PHASING

PHASING LEGEND PLAN PHASING

CORRIDORS - WEEKEND

WORK ONLY

TR

A

S H

TR

A

S H

PA

S

S T

H R

U

W

IN

D O

W

IV

H

O O

D S

C

P

IP

E

F

IR

E

S U

B H

K V

A

K V

A S

U B

D

VALVE

V A L V E

S SS S

S S

S

S

S SS

S S

S

S SS

S S

S

S SS

S S

S S

S S

S

S

S S

S

S SS S

S SS S

S S

S S

S SS S

S S

S S

S SS

S S

S

S SS

S S

S S

S S

S S

S S

S S

S

S SS

S SS

S S

S S

S

S SS S S S

S S

S S

S S

S SS

S S

S S

S

S S

S S

S S

SS S

S S

S S

S

S S

S S

S S

S S

SS S

SS SSS

SS SSS

A C D E G

H J L UN R

WOMEN'S

LOCKER

ROOM

GC180

WOMEN'S

BATHROOM

GC181

BIOMED.

WORKSHOP

GD114D

MEN'S

LOCKER

ROOM

GC182

RESIDENT

OFFICE

GC185

CLINICAL

& ED.

COORD.

GC187

DRUG

INFO.

OFF.

GC184

BIOMED

STORAGE

GD114C

CORR.

CG36

GC114G

EQUIP. REPAIR

SHOP

SURGICAL

BIOCHEMICAL

LABORATORY

GC155

LOUNGE

GC158

OFF.

GC159

CENTRAL

RECEIVING/STORAGE

ORDERING

GC188

MEDICINE

STORAGE

GC188A

CORR.

CG31A

DATA

GD101

ELEC.

STOR.

GD104

OFF.

GD105

TELEPHONE

EQUIP.

GC196

TELEPHONE

EQUIP.

GC197

PLUMBING

SHOP

GD114F

RESEARCH

OFF.

GC156

CORR.

CG30

CORR.

CG29

SOILED

LINEN

GA101

ELEC.

TRASH

GA108

CG5

SERVICES ELEV.

LOBBY

PAINT

ROOM

GD114A

EQUIP.

GD114C

ELECTRICAL

SHOP

GD114E

CORR.

CG36A

CARPENTRY

SHOP

GD114B

MECH.

GC191

CORR.

CG4

ANTEROOM

GC189B

I.V. PREP

GC189C

VAULT

GC190

CORR.

CG3A

CORR.

CG3

R.R.

GC194

GC192

PHARM. CONF.

RM.

CL.

GC193

ELEC.

GD112 SIGNAL

GD110

TELE.

GD11

M & O

SUPRV.

GA110

DIRECTOR'S

OFF.

GA109

DRESS.

GA104A

SHWR.

BATH.

GA104

VEST.

GA103A

LOUNGE

GA103

CORR.

CG7

CORR.

CG34

EMS

OFFICE

GE100B

EMS

OFFICE

GE100A

ENVIR.

SERVICES

GE100C

FOOD

SERVICE

GC195

STOR.

GE100D

CG1

PUBLIC ELEV.

LOBBY

TELE.

GA107

SIGNAL

GA106

ELEC.

GA105

CORR.

CG2

PHARM.

SERVICE

GC189

MEN'S

BATH.

GC183

CORR.

CG31B

CORR.

CG37B

INVENTORY

FORMULARY

MNGMNT

OFFICE

GC178

SECRETARY

GD113

BIOMEDICAL

SPRVSR

GD108

BIOMED.

ENG.

SPRVSR

GD107

BIOMEDICAL

OFFICE

GD106

BREAK/CONFERENCE

ROOM

GD109

1A

CLEAN

RECEVING

OFFICE

SPVSR.

BLDG.

MGMT.

GC102

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N .I .C

N.I.C.

N.I.C.

N.I.C.

VASCULAR

RESEARCH

OFF.

GC157

ANESTH.

RESEARCH

LAB

GC153

MED.

RSRCH.

DEPT.

CORE

EQUIP.

GC152

ONCOLOGY

LAB.

GC149

FOOD

STORAGE

GC162

MECH.

GC164

FREEZER

GR3

WALK-IN

REFRIDG.

GR2

REFRIDG.

GR1

OFF.

GC161

FOOD

STORAGE

GC0185

POT

WASHING

GC166

INFECT.

DISEASE

LAB.

PLMNRY.

GC146

Room

MECH.

GC141

STOR.

GC145

WALK-IN

REFRIDG.

GC132

SPVSR.

OFF.

GC144

RECEIVING

CG160

HEMATOLOGY

GC143

RSRCH.

OFF.

GC129

ONCOLOGY

LAB.

GC150

JAN.

GC163

HEMATOP.

LAB.

GC128

GLASSWARE

WASH. &

STER.

GC127

STOR.

GC171

DIETETICS

SPVSR.

OFF.

GC170

DIETETICS

GC169

CONF.

GC172

JAN.

MEN'S

LOCKER

ROOM

183MEN'S

R.R.

109A

SHWR.

109C

DRESS.

109B

TRAY

CART

STORAGE

GC168DIETETIC

SERVICES

GC167

STOR.

WALK-IN

REF.

GC141A

OFF.

GC142

CORR.

CG24

ELEC.

GC138

SIGNAL

GC140

TELE.

GC139

CORR.

CG27

CORR.

CG28

CORR.

CG26

COMP.

C151

CORR.

CG32A

CORR.

CG32

DISHWASHING

GC173

OFFICE

GE113C

CORR.

CG35

CORR.

CG35A

EQUIPMENT

REPAIR

SHOP

GD114H

GD114

EQIUP. REPAIR

SHOP STOR.

STAIR 1

SG1

LOCKSMITH

GD116

PHARMACY

STORAGE

GD117

CORRIDOR

CG36B

OPEN DOCK

GAS STORAGE

GD119

OXYGEN

MANIFOLD

ROOM

GD118

WAREHOUSE

GD103

ELECTRICAL

POWER ROOM

GD123

CLEAN

STORAGE

GD102

CORRIDOR

CGG37

SPD OFFICE

GD121

CHIEF SPD

OFFICE

GD120

SPD

EQUIPMENT

STORAGE

ISSUE

GD122

ACETIC ACID

ROOM

GD124

CLEAN/STERILE

STORAGE

GE113

CART WASH

GE109

JANITOR

GE108

STER. EQ.

ACCESS

GE112A

SOILED,

RECIEVING &

DECON AREA

GE107

DECON ANTE

GE107B

CORRIDOR

CG38

POLICE

STORAGE

GE101

WOMEN'S

LOUNGE

GE104

POLICE

STORAGE

GE102

WOMEN'S

LOUNGE

GE105

WOMEN'S RR

GE106

MEN'S RR

GE101A

NEPHROLOGY

LABORTORY 1

GE124

LABORTORY

GE122

CORRIDOR

CG11

STORAGE

GB123A

STORAGE

GB123

LABORATORY

GB120

OFFICE

GB121

GRNTLGY

RESEARCH

LAB. 6

GB113

STORAGE

GB114

CORRIDOR

CG10

GERONTOLOGY

RSRCH LAB. 7

GB115

GERIATRICS

LABORATORY

GB103

CORRIDOR

CG8

LABORATORY

GB100

GASTROENTERLOGY

LAB.

GB101

LABORATORY

GC100

CORRIDOR

CG21

CENTRIFUGE

CG21

LABORATORY

GC101

REAP

ENDOCRINLOGY

LAB.

GC116

CORRIDOR

CG22

JANITOR

GC115

COMP.

ROOM

GC108

DARK

ROOM

GC110

CULTURE

ROOM

GC109

CORRIDOR

CG23

STOR.

RM B

GC111

DARK

ROOM

GC107

ELECTRON

MICROSCOPY

PREP.

ROOM

GC113

ELECTRON

MICROSCOPY

FINISH

ROOM

GC114

STOR.

ROOM A

GC134

CORRIDOR

CG25

MICROTOME

ROOM A

GC133

ELECTRON

MICRSCOPY

GC131

LEAD

TECH.

OFFICE

GC130

TD004

FOW

5'-0"

B M P Q S

KEY NOTES INDICATED ARE TAKEN FROM KEY NOTE

LEGEND ON SHEET GC101. KEY NOTES SHOWN ARE

SPECIFIC TO THIS SHEET ONLY.

Engineers Architects

# KEY NOTES:

Revisions: Date

Drawing Title

Approved

Project Title

Location

VA PROJECT NUMBER

Building Number

Drawing Number

Dwg of

VA FORM 08-6231

Office of Construction and Facilities Management

CONSULTANTS: PROJECT MANAGER

SHEET NOTES:

WALL RATING LEGEND

1 HR - FIRE SEPARATION

2 HR - FIRE SEPARATION

SMOKE RESISTIVE HAZARDOUS AREA

Date Checked Drawn

FULLY SPRINKLERED

ACG Project Number

Headquarters:

Apogee Consulting Group, P.A.

1151 Kildaire Farm Road, Suite 120 Cary, North Carolina 27511 www.acg-pa.com 919-858-7420 U.S. Department of Veterans Affairs# © COPYRIGHT Apogee Consulting Group, P.A.

S S S S

/1

/2

:3

:3

P

M C

U s e rs \d c o rd o n \D o c u m e n ts

\R e v it l o c a l\ A

-3

-Q

V A

L it tl e

R o c k s t

F lo o r

R e n o d c o rd o n a c g -p a .c o m

.r v t

GC102

GROUND FLOOR PLAN - PHASE 1

6 17DGC

VA LITTLE ROCK GROUND

FLOOR RENOVATION

CAVHCS

4300 W. 7TH ST

LITTLE ROCK. ARKANSAS 72205

MAY 16, 2023

100% BID DOCUMENTS

598-21-10120-338-Q33

CLA

N

AREA OF WORK

KEY PLAN

A BA B

Scale: 3/32" = 1'-0"

GROUND FLOOR PLAN - PHASE 1

PLAN PHASING

PHASE 1 THE OFFICE AREA WEST OF CORRIDOR

CG34, AND TRASH GA108 THE LOGISTICS TEAM

WILL BE LOCATED IN THE PHARMACY SPACE

WHILE THEIR NEW SPACE IS UNDER

RENOVATION (THEY WILL ALREADY BE IN THE

PHARMACY SPACE DUE TO VACATING THEIR

OFFICE FOR THE SPS PROJECT.

N O

R T

H0 84 16

1 PLASTIC BARRIER, CAUTION TAPE, CONSTRUCTION

SIGN.

2 PLASTIC ZIPPERED BARRIER, STICKY MATS,

NEGATIVE AIR MONITOR DEVICE.

22 CONSTRUCTION WALL WITH DOOR/FRAME WHICH

WILL REMAIN PLACE FOR ALL PHASES.

ICRA RECOMMENDATIONS

SEE G-003 FOR ICRA INFORMATION

C

ACTIVITY

LEVEL

RISK

GROUP

CONSTRUCTION

CLASS

1 IV

A. IF EXISTING CONCRETE FLOOR IS LEFT

EXPOSED AFTER ABATEMENT OR DEMOLITION

CONTRACTOR TO PROVIDE APPROVED BOARD

COVERING.

B. NEGATIVE AIR MACHINE - VENT TO THE OUTSIDE

(PROVIDED BY THE CONTRACTOR).

COORDINATE WITH COR.

C. NEGATIVE AIR MONITOR DEVICE DISPLAYED AT

CONSTRUCTION ENTRANCE.

D. EXISTING SPRINKLERS IN A CORRIDOR TO

REMAIN AS A PART OF THE CORRIDOR FIRE

PROTECTION.

E. ALL HARD DOOR/FRAME FOR CONSTRUCTION

ENTRANCES TO HAVE A PIN CODE READER

ACCESS CONTROL.

F. MOBILE PLASTIC CONSTRUCTION WALL -

POLYSHIELD BARRIERS.

G. SEALL ALL EDGES OF PLASTIC BARRIERS OR

CONSTRUCTION WALLS TIGHT TO ADJACENT

SURFACES.

H. ALL TEMPORARY WALLS, BARRIERS,

ENCLOSURES ARE TO BE SEALED TIGHT TO

MINIMIZE CIRCULATION OF DUST, DEBRIS,

NOISE. HOWEVER ALL BARRIERS MUST BE BUILT

TO BE REMOVED WITH MINIMAL EFFORT IN

CASE OF AN EMERGENCY.

I. CONTRACTOR TURNOVER TO VA -

CONTRACTOR TO RETURN SPACE AIR CLEARED,

SPACE CLEANED FOR VA SAFETY INSPECTION

PRIOR TO COMPLETING THE PHASE. WEEKEND

WORK DURATION WILL BE (FRIDAY AT 6PM -

MONDAY 6AM).

J. CONSTRUCTION ENTRANCES:

a. IF THE FULL SCOPE OF THE PHASE IS

LESS THAN TWO WEEKS, A PLASTIC

ZIPPERED BARRIER IS ACCEPTABLE.

b. IF THE FULL SCOPE OF THE PHASE IS

MORE THAN TWO WEEKS, A HARD WALL,

DOOR AND FRAME ENTRANCE IS

REQUIRED.

N.I.C. EGRESS

N.I.C. EGRESS TO REMAIN IN PLACE.

A S E

D U

C T

C H

A S

E

TR

A

S H

TR

A

S H

A.T.C. 212

F R

E E

Z E

R

PA

S

S T

H R

U

W

IN

D O

W

IV

H

O O

D S

C

P

IP

E

F

IR

E

S U

B H

K V

A

K V

A S

U B

D

VALVE

V A L V E

A C D E G

H J L UN R

WOMEN'S

LOCKER

ROOM

GC180

WOMEN'S

BATHROOM

GC181

BIOMED.

WORKSHOP

GD114D

MEN'S

LOCKER

ROOM

GC182

RESIDENT

OFFICE

GC185

CLINICAL

& ED.

COORD.

GC187

DRUG

INFO.

OFF.

GC184

BIOMED

STORAGE

GD114C

CORR.

CG36

GC114G

EQUIP. REPAIR

SHOP

SURGICAL

BIOCHEMICAL

LABORATORY

GC155

LOUNGE

GC158

OFF.

GC159

CENTRAL

RECEIVING/STORAGE

ORDERING

GC188

MEDICINE

STORAGE

GC188A

CORR.

CG31A

DATA

GD101

ELEC.

STOR.

GD104

OFF.

GD105

TELEPHONE

EQUIP.

GC196

TELEPHONE

EQUIP.

GC197

PLUMBING

SHOP

GD114F

RESEARCH

OFF.

GC156

CORR.

CG30

CORR.

CG29

SOILED

LINEN

GA101

ELEC.

TRASH

GA108

CG5

SERVICES ELEV.

LOBBY

PAINT

ROOM

GD114A

EQUIP.

GD114C

ELECTRICAL

SHOP

GD114E

CORR.

CG36A

CARPENTRY

SHOP

GD114B

MECH.

GC191

CORR.

CG4

ANTEROOM

GC189B

I.V. PREP

GC189C

VAULT

GC190

CORR.

CG3A

CORR.

CG3

R.R.

GC194

GC192

PHARM. CONF.

RM.

CL.

GC193

ELEC.

GD112 SIGNAL

GD110

TELE.

GD11

M & O

SUPRV.

GA110

DIRECTOR'S

OFF.

GA109

DRESS.

GA104A

SHWR.

BATH.

GA104

VEST.

GA103A

LOUNGE

GA103

CORR.

CG7

CORR.

CG34

EMS

OFFICE

GE100B

EMS

OFFICE

GE100A

ENVIR.

SERVICES

GE100C

FOOD

SERVICE

GC195

STOR.

GE100D

CG1

PUBLIC ELEV.

LOBBY

TELE.

GA107

SIGNAL

GA106

ELEC.

GA105

CORR.

CG2

PHARM.

SERVICE

GC189

MEN'S

BATH.

GC183

CORR.

CG31B

CORR.

CG37B

INVENTORY

FORMULARY

MNGMNT

OFFICE

GC178

SECRETARY

GD113

BIOMEDICAL

SPRVSR

GD108

BIOMED.

ENG.

SPRVSR

GD107

BIOMEDICAL

OFFICE

GD106

BREAK/CONFERENCE

ROOM

GD109

CLEAN

RECEVING

OFFICE

SPVSR.

BLDG.

MGMT.

GC102

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N.I.C.

N .I .C

N.I.C.

N.I.C.

N.I.C.

VASCULAR

RESEARCH

OFF.

GC157

ANESTH.

RESEARCH

LAB

GC153

MED.

RSRCH.

DEPT.

CORE

EQUIP.

GC152

ONCOLOGY

LAB.

GC149

FOOD

STORAGE

GC162

MECH.

GC164

FREEZER

GR3

WALK-IN

REFRIDG.

GR2

REFRIDG.

GR1

OFF.

GC161

FOOD

STORAGE

GC0185

POT

WASHING

GC166

INFECT.

DISEASE

LAB.

PLMNRY.

GC146

Room

MECH.

GC141

STOR.

GC145

WALK-IN

REFRIDG.

GC132

SPVSR.

OFF.

GC144

RECEIVING

CG160

HEMATOLOGY

GC143

RSRCH.

OFF.

GC129

ONCOLOGY

LAB.

GC150

JAN.

GC163

HEMATOP.

LAB.

GC128

GLASSWARE

WASH. &

STER.

GC127

STOR.

GC171

DIETETICS

SPVSR.

OFF.

GC170

DIETETICS

GC169

CONF.

GC172

JAN.

MEN'S

LOCKER

ROOM

183MEN'S

R.R.

109A

SHWR.

109C

DRESS.

109B

TRAY

CART

STORAGE

GC168DIETETIC

SERVICES

GC167

STOR.

WALK-IN

REF.

GC141A

OFF.

GC142

CORR.

CG24

ELEC.

GC138

SIGNAL

GC140

TELE.

GC139

CORR.

CG27

CORR.

CG28

CORR.

CG26

COMP.

C151

CORR.

CG32A

CORR.

CG32

DISHWASHING

GC173

OFFICE

GE113C

CORR.

CG35

CORR.

CG35A

EQUIPMENT

REPAIR

SHOP

GD114H

GD114

EQIUP. REPAIR

SHOP STOR.

STAIR 1

SG1

LOCKSMITH

GD116

PHARMACY

STORAGE

GD117

CORRIDOR

CG36B

OPEN DOCK

GAS STORAGE

GD119

OXYGEN

MANIFOLD

ROOM

GD118

WAREHOUSE

GD103

ELECTRICAL

POWER ROOM

GD123

CLEAN

STORAGE

GD102

CORRIDOR

CGG37

SPD OFFICE

GD121

CHIEF SPD

OFFICE

GD120

SPD

EQUIPMENT

STORAGE

ISSUE

GD122

ACETIC ACID

ROOM

GD124

CLEAN/STERILE

STORAGE

GE113

CART WASH

GE109

JANITOR

GE108

STER. EQ.

ACCESS

GE112A

SOILED,

RECIEVING &

DECON AREA

GE107

DECON ANTE

GE107B

CORRIDOR

CG38

POLICE

STORAGE

GE101

WOMEN'S

LOUNGE

GE104

POLICE

STORAGE

GE102

WOMEN'S

LOUNGE

GE105

WOMEN'S RR

GE106

MEN'S RR

GE101A

NEPHROLOGY

LABORTORY 1

GE124

LABORTORY

GE122

CORRIDOR

CG11

STORAGE

GB123A

STORAGE

GB123

LABORATORY

GB120

OFFICE

GB121

GRNTLGY

RESEARCH

LAB. 6

GB113

STORAGE

GB114

CORRIDOR

CG10

GERONTOLOGY

RSRCH LAB. 7

GB115

GERIATRICS

LABORATORY

GB103

CORRIDOR

CG8

LABORATORY

GB100

GASTROENTERLOGY

LAB.

GB101

LABORATORY

GC100

CORRIDOR

CG2…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .