ATTACHMENT B_TECHNICAL SPECIFICATIONS .pdf

PDF 9 MB Posted

Attached to
Klamath Hatchery New Hatchery Building
Solicitation number
S-63500-00010819
Issued by
Jackson County, Cheshire CDP, Oregon

About this file

The document is the Technical Specifications for the Klamath Hatchery New Hatchery Building project in Oregon. The project includes constructing a new wood-framed hatchery building, with options for a non-combustible building envelope, an automatic transfer switch, and an emergency generator. The work consists of site preparation, concrete foundations and walls, framing, roofing, electrical, plumbing, HVAC, and other building systems. The project will also include site work such as grading, drainage, and landscaping. The contract has a base bid and three bid alternates. The Owner has submitted and paid for the plan review fee, structural building permit, and septic authorization, while the contractor is responsible for obtaining and paying for all other permits.

The Technical Specifications provide detailed requirements for the various components of the project, including measurement and payment, project management and coordination, submittal procedures, quality control, temporary facilities and controls, and other general requirements. Pricing is provided through a detailed schedule of bid items, which covers the various aspects of the work. The contractor is responsible for all labor, equipment, materials, and incidentals required to complete the project in accordance with the contract documents.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TECHNICAL SPECIFICATIONS

KLAMATH HATCHERY NEW HATCHERY BUILDING

TABLE OF CONTENTS

Division Section Title .............................................................................................................................. Page Number

DIVISION 01 – GENERAL REQUIREMENTS

01 09 10 Reference Standards ....................................................................................................................... TS-3 01 10 00 Summary of Work ............................................................................................................................ TS-7 01 22 00 Measurement and Payment ......................................................................................................... TS-11 01 31 00 Project Management and Coordination .................................................................................. TS-19 01 33 00 Submittal Procedures ..................................................................................................................... TS-27 01 35 13 Project Procedures .......................................................................................................................... TS-31 01 37 00 Schedule of Values ........................................................................................................................... TS-33 01 40 00 Quality Control .................................................................................................................................. TS-35 01 50 00 Temporary Facilities and Controls ........................................................................................... TS-37 01 60 00 Product Requirements ................................................................................................................... TS-43 01 70 00 Project Closeout ................................................................................................................................ TS-45 01 73 29 Cutting and Patching ...................................................................................................................... TS-47 01 73 00 Operating and Maintenance Data .............................................................................................. TS-51 01 78 39 Project Record Documents .......................................................................................................... TS-53

DIVISION 02 – EXISTING CONDITIONS

02 41 00 Demolition .......................................................................................................................................... TS-59

DIVISION 03 – CONCRETE

03 11 13 Cast-In-Place Concrete Forming ................................................................................................ TS-63 03 20 00 Concrete Reinforcing ...................................................................................................................... TS-69 03 30 00 Cast-In-Place Concrete ................................................................................................................... TS-75

DIVISION 04 – MASONRY

04 05 13 Stone Veneer Mortaring ................................................................................................................ TS-101 04 43 01 Stone Veneer ...................................................................................................................................... TS-105

DIVISION 05 – METALS

05 40 00 Cold-Formed Meal Framing ......................................................................................................... TS-111 05 44 00 Cold-Formed Steel Trusses .......................................................................................................... TS-117 05 50 00 Metal Fabrications ........................................................................................................................... TS-121 05 53 00 Metal Gratings ................................................................................................................................... TS-127

DIVISION 06 – WOOD, PLASTICS AND COMPOSITES

06 10 00 Rough Carpentry .............................................................................................................................. TS-133 06 17 53 Shop-Fabricated Wood Trusses ................................................................................................. TS-137

06 20 00 Finish Carpentry ............................................................................................................................... TS-141

DIVISION 07 – THERMAL AND MOISTURE PROTECTION

07 05 10 Rainscreen Drainage Lath ............................................................................................................ TS-147 07 21 00 Thermal Insulation .......................................................................................................................... TS-151 07 26 00 Weather Barriers ............................................................................................................................. TS-155 07 41 13 Metal Roof Panels ............................................................................................................................ TS-159 07 60 00 Flashing and Sheet Metal .............................................................................................................. TS-165 07 62 00 Sheet Metal Flashing and Trim ................................................................................................... TS-167 07 71 23 Manufactured Gutters and Downspouts ................................................................................ TS-171 07 84 00 Firestopping ....................................................................................................................................... TS-175 07 92 00 Caulking and Sealants .................................................................................................................... TS-185

DIVISION 08 – OPENINGS

08 11 00 Metal Doors and Frames ............................................................................................................... TS-195 08 14 29 Wood Doors ........................................................................................................................................ TS-205 08 33 23 Overhead Coiling Doors ................................................................................................................ TS-209 08 54 13 Vinyl Windows .................................................................................................................................. TS-215 08 70 00 Hardware............................................................................................................................................. TS-217 08 80 00 Glazing .................................................................................................................................................. TS-223

DIVISION 09 – FINISHES

09 21 00 Gypsum Wallboard .......................................................................................................................... TS-231 09 30 00 Tile ......................................................................................................................................................... TS-235 09 50 00 Acoustical Ceilings ........................................................................................................................... TS-239 09 61 19 Concrete Floor Staining ................................................................................................................. TS-245 09 65 00 Resilient Flooring ............................................................................................................................. TS-249 09 80 00 Protective Coatings ......................................................................................................................... TS-253 09 90 00 Painting and Coating ....................................................................................................................... TS-265

DIVISION 10 – SPECIALTIES

10 28 13 Toilet Accessories ............................................................................................................................ TS-269 10 44 00 Fire Extinguishers, Cabinets and Accessories ...................................................................... TS-271

DIVISION 11 – EQUIPMENT

11 45 00 Miscellaneous Equipment ............................................................................................................ TS-275

DIVISION 12 – FURNISHINGS

12 21 00 Horizontal Louver Blinds .............................................................................................................. TS-281 12 36 23 Plastic Countertops ......................................................................................................................... TS-285

DIVISION 22 – PLUMBING

22 00 00 Plumbing.............................................................................................................................................. TS-289 22 11 13 Facility Water Distribution Piping ............................................................................................ TS-293 22 11 16 Domestic Water Piping .................................................................................................................. TS-307 22 13 53 Facility Septic Tanks ....................................................................................................................... TS-321 22 33 13 Instantaneous Electric Water Heaters .................................................................................... TS-327 22 45 00 Emergency Plumbing Fixtures ................................................................................................... TS-331

DIVISION 23 – HEATING, VENTILATING AND AIR CONDITIONING (HVAC)

23 00 00 HVAC Systems ................................................................................................................................... TS-337

DIVISION 26 – ELECTRICAL

26 00 00 Electrical .............................................................................................................................................. TS-345 26 05 00 Electrical General Requirements ............................................................................................... TS-349 26 05 10 Basic Electrical Materials and Methods .................................................................................. TS-355 26 05 33 Electrical Raceways ........................................................................................................................ TS-361 26 27 13 Sevice and Distribution ................................................................................................................. TS-365 26 32 13 Packaged Engine Generator......................................................................................................... TS-369 26 36 23 Automatic Transfer Switch With Bypass-Isolation Feature ........................................... TS-383 26 50 00 Lighting ................................................................................................................................................ TS-389

DIVISION 31 – EARTHWORK

31 20 00 Earthwork and Trenching ............................................................................................................ TS-395 31 23 10 Site Demolition and Preparation ............................................................................................... TS-405 31 23 19 Dewatering ......................................................................................................................................... TS-411 31 51 00 Erosion Control ................................................................................................................................. TS-415

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 12 18 Surface Restoration ......................................................................................................................... TS-423

DIVISION 33 – UTILITIES

33 05 16 Precast Concrete Vaults and Culverts ..................................................................................... TS-429 33 41 00 Storm Utility Drainage Piping ..................................................................................................... TS-433

DIVISION 40 – PROCESS INTERCONNECTIONS

40 05 31.13 Polyvinyl Chloride Process Pipe ................................................................................................ TS-441 40 05 33 High-Density Polyethylene Process Pipe ............................................................................... TS-449 40 05 50 Process Valves ................................................................................................................................... TS-455 40 23 00 Water and Wastwater Process Piping ..................................................................................... TS-459

DIVISION 01 – GENERAL REQUIREMENTS

PAGE LEFT BLANK INTENTIONALLY

SECTION 01 09 10 – REFERENCE STANDARDS

PART 1 – GENERAL

1.1 QUALITY ASSURANCE

A. Titles of sections and paragraphs: Captions accompanying Technical Specification sec-tions and paragraphs are for convenience of reference only and are not to be used to de-fine the limits of subcontracts.

B. Applicable publications: Whenever in these Technical Specifications references are made to published specifications, codes, standards, or other requirements, it shall be under-stood that wherever no date is specified, only the latest specifications, standards, or re-quirements of the respective issuing agencies which have been published as of the date that the Work is advertised for bids, shall apply; except to the extent that said standards or requirements may be in conflict with applicable laws, ordinances, or governing codes.

No requirements set forth herein or shown on the Drawings shall be waived because of any provision of, or omission from, said standards or requirements.

C. Without limiting the generality of other requirements of the Technical Specifications, all Work specified herein shall conform to or exceed the requirements of applicable codes and the applicable requirements of the following documents to the extent that the provi-sions of such documents are not in conflict with the requirements of these Technical Spec-ifications nor the applicable codes.

D. In case of conflict between codes, reference standards, Drawings and the other Contract Documents, the most stringent requirements shall govern. Conflicts shall be brought to the attention of the Owner’s Authorized Representative for written clarification and di-rections prior to ordering or providing any materials or labor.

E. Applicable Standard Technical Specifications: The Contractor shall construct the Work specified herein in accordance with the requirements of the Contract Documents and the referenced portions of those referenced codes, standards, and specifications listed herein (except, that wherever references to “Standard Specifications” are made, the provisions therein for measurement and payment shall not apply).

F. References herein to “OSHA Regulations for Construction” shall mean Title 29, Part 1926, Construction Safety and Health Regulations, Code of Federal Regulations (OSHA), includ-ing all changes and amendments thereto.

G. References herein to “OSHA Standards” shall mean Title 29, Part 1910, Occupational Safety and Health Standards, Code of Federal Regulations (OSHA), including all changes and amendments thereto.

1.2 REFERENCE SPECIFICATIONS, CODES AND STANDARDS

A. THE FOLLOWING DOCUMENTS OR AGENCIES MAY BE REFERENCED IN THE CONTRACT

DOCUMENTS

AA Aluminum Association AABC Associated Air Balance Council AAMA Architectural Aluminum Manufacturer’s Association AAR Association of American Railroads AASHTO American Association of State Highway and Transportation Officials AATCC American Association of Textile Chemists and Colorists ACI American Concrete Institute ADC Air Diffusion Council

AEIC Associated Edison Illumination Companies AFBMA Anti-Friction Bearing Manufacturer’s Association, Inc.

AGA American Gas Association AGC Associated General Contractors of America AGMA American Gear Manufacturer’s Association AHAM Association of Home Appliance Manufacturer’s AI The Asphalt Institute AIA American Institute of Architects AISC American Institute of Steel Construction AISI American Iron and Steel Institute AITC American Institute of Timber Construction AMCA Air Moving and Conditioning Association ANS American Nuclear Society ANSI American National Standards Institute, Inc.

APA American Plywood Association API American Petroleum Institute APWA American Public Works Association AREA American Railway Engineering Association AHRI Air-Conditioning, Heating, and Refrigeration Institute ASA Acoustical Society of America ASAE American Society of Agricultural Engineers ASCE American Society of Civil Engineers ASHRAE American Society of Heating, Refrigerating, and Air Conditioning

Engineers ASLE American Society of Lubricating Engineers ASME American Society of Mechanical Engineers ASPA American Sod Producers Association ASQC American Society of Quality Control ASSE American Society of Sanitary Engineers ASTM American Society for Testing and Materials AWPA American Wood Preservers Association AWPI American Wood Preservers Institute AWS American Welding Society AWWA American Water Works Association BBC Basic Building Code, Building Officials and Code Administrators International BHMA Builders Hardware Manufacturer’s Association CBM Certified Ballast Manufacturers CDA Copper Development Association CEMA Conveyors Equipment Manufacturer’s Association CGA Compressed Gas Association CLPCA California Lathing and Plastering Contractors Association CLFMI Chain Link Fence Manufacturer’s Institute CMA Concrete Masonry Association COE Corp of Engineers CRSI Concrete Reinforcing Steel Institute CSI Construction Specifications Institute DCDMA Diamond Core Drill Manufacturer’s Association DOE Department of Ecology DOT Department of Transportation EEI Edison Electric Institute

EIA Electronic Industries Association EJCDC Engineer’s Joint Contract Documents Committee EJMA Expansion Joint Manufacturer’s Association EPA Environmental Protection Agency ETL Electrical Test Laboratories FGMA Flat Glass Marketing Association FM Factory Mutual FS Federal Specification GA Gypsum Association IBC International Building Code ICBO International Conference of Building Officials ICC Interstate Commerce Commission IEEE Institute of Electrical and Electronics Engineers IES Illuminating Engineering Society IME Institute of Makers of Explosives IMIA International Masonry Industry All-Weather Council IP Institute of Petroleum (London) IPC Institute of Printed Circuits IPCEA Insulated Power Cable Engineers Association ISA Instrument Society of America ISO International Organization for Standardization ITE Institute of Traffic Engineers MBMA Metal Building Manufacturer’s Association MFMA Maple Flooring Manufacturer’s Association MIL Military Specification ML/SFA Metal Lath/Steel Framing Association MPTA Mechanical Power Transmission Association MTI Marine Testing Institute NAAMM National Association of Architectural Metal Manufacturer’s NACE National Association of Corrosion Engineers NBS National Bureau of Standards NCCLS National Committee for Clinical Laboratory Standards NEBB National Environmental Balancing Bureau NEC National Electrical Code NEMA National Electrical Manufacturer’s Association NESC National Electric Safety Code NFPA National Fire Protection Association NGLI National Lubricating Grease Institute NMA National Microfilm Association NWMA National Woodwork Manufacturers Association OAC Oregon Administrative Code ODOT Oregon Department of Transportation OSSC Oregon Structural Specialty Code OSEPA Oregon State Environmental Protection Agency OSHA Occupational Safety and Health Administration PCA Portland Cement Association PCI Prestressed Concrete Institute PS Product Standard RCO Revised Code of Oregon RIS Redwood Inspection Service RVIA Recreational Vehicle Industry Association

RWMA Resistance Welder Manufacturer’s Association SAE Society of Automotive Engineers SAMA Scientific Apparatus Makers Association SDI Steel Deck Institute SDI Steel Door Institute SIS Swedish Standards Association SJI Steel Joist Institute SMA Screen Manufacturers Association SMACCNA Sheet Metal and Air Conditioning Contractors National Association SPR Simplified Practice Recommendation SSBC Southern Standard Building Code, Southern Building Code Congress SSPC Steel Structures Painting Council SSPWC Standard Specifications for Public Works Construction TAPPI Technical Association of the Pulp and Paper Industry TFI The Fertilizer Institute UL Underwriters Laboratories, Inc.

WCLIB West Coast Lumber Inspection Bureau WCRSI Western Concrete Reinforcing Steel Institute WIC Woodwork Institute of California WRI Wire Reinforcement Institute, Inc.

WSDOT Washington State Department of Transportation WWPA Western Wood Products Association

1.3 STANDARD SPECIFICATIONS

A. Where indicated in these Contract Documents, Work shall be in accordance with the ref-erenced sections of the most current edition of the Oregon Standard Specifications for Construction, hereinafter referred to as “Standard Specifications.”

B. The Technical Specifications of these Contract Documents shall supersede any provisions of the Standard Specifications in conflict herewith.

C. Reference to measurements and payment in the Standard Specifications do not apply to this Contract.

D. References to department, secretary, State, or other similar terms in the Standard Speci-fications shall mean Owner’s Authorized Representative.

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXECUTION (NOT USED)

END OF SECTION 01 09 10

SECTION 01 10 00 – SUMMARY OF WORK

1.1 SECTION INCLUDES

A. This Section includes a general description of the Work required for this Contract.

1.2 CONTRACT DOCUMENTS

A. This Project shall be constructed in accordance with:

1. Klamath Hatchery – New Hatchery Building – Project Manual.

2. Klamath Hatchery – New Hatchery Building – Construction Documents.

B. Standard Plans or Specifications, when referenced in this Project Manual, shall mean Oregon Standard Specifications for Construction, most current Edition; Volume 2;

Technical Specifications. A copy of this document shall be on site during construction.

1.3 PROJECT DESCRIPTION

A. In general, the work to be performed under this contract consists of the following:

1. Base Bid: Construct replacement wood-framed hatchery building including, clearing, and grubbing, building pad construction, trench drains, foundation and wall system, roof trusses, attic floor framing, electrical, plumbing, HVAC; connect to existing 12” process water supply line and existing 6” pump line, new discharge piping and storm piping including new manhole, concrete vaults and catch basins. Site work including grading, septic system, concrete sidewalks, and site restoration.

2. Bid Alternate 1: Mitigated Design-Construct non-combustible building envelope including concrete exterior walls, concrete interior shear wall and cold-formed steel interior bearing and furring walls and cold-formed steel roof trusses and associated framing.

3. Bid Alternate 2: Purchase and install automatic transfer switch for future generator.

4. Bid Alternate 3: Purchase and install emergency generator.

B. Contractor shall provide all necessary expertise, labor, equipment, materials, incidentals, and additional permits required to perform the work on the Klamath Hatchery – New Hatchery Building.

C. The Work to be performed under this Contract shall consist of furnishing tools, equipment, materials, supplies, and manufactured articles and for furnishing transportation and services, including fuel, power, water, and essential communications, and for the performance of all labor, work, or other operations required for the fulfillment of the Contract in strict accordance with the Contract Documents. Refer to Work by Owner in paragraph 1.4 below.

1.4 WORK BY OWNER

A. Owner has submitted and paid for Plan Review Fee, Structural Building Permit and

Septic Authorization. All additional permit fees, assessments, and/or charges, are the responsibility of the Contractor.

B. Owner to purchase troughs and have available for contractor to install.

1.5 LABOR AND SAFETY STANDARDS

A. All Work shall be done in accordance with these Technical Specifications and requirements of the State of Oregon and OSHA standards.

1.6 TEMPORARY FACILITIES

A. The Contractor shall furnish all temporary facilities such as portable toilets, job office, security fencing, and temporary power as needed to perform the Work. Refer to Section 01 50 00 Temporary Facilities and Controls.

1.7 PROJECT CONDITIONS

A. The Contractor shall coordinate the Work with the Owner’s Authorized Representative to minimize disturbance of ongoing hatchery operations.

B. The Contractor shall follow the requirements as listed in the attached Inadvertent

Discovery Plan for Cultural Resources as shown in the appropriate Exhibit. Full adherence to all Federal, State, and local laws shall apply to ground disturbance.

1.8 WORK AND STORAGE AREA

A. The primary Work, storage, and staging areas are designated on the Drawings and shall be available to the Contractor for Work including all functions incidental to the Work and storage areas during the construction period. All operations and storage of materials by the Contractor shall be confined to the immediate Work area and other approved areas as directed by the Owner’s Authorized Representative.

1.9 ACCESS TO THE WORK AREA

A. The Contractor shall repair any damage to access facilities and roadways for which the

Contractor is responsible and shall restore them to conditions at least equaling preconstruction conditions.

B. The Contractor shall take reasonable measures to limit entry of unauthorized persons and vehicles to the Work areas and to allow for access for employees, agents, etc., required for the performance of this Contract, and to authorized personnel of Federal, State, and local agencies, and to others having a right thereto.

1.10 RESTORATION OF EXISTING FACILITIES

A. The Contractor shall perform all Work to lines, grades, and cross sections shown on the

Drawings. Final grades shall match existing grades unless otherwise noted on the Drawings. Where final grades are indicated on the Drawings, grades shall slope uniformly between elevations shown. All final grades shall be free of hollows which would pond water and sloped to allow for surface drainage. All earthwork shall have finish surfaces which have neat, reasonably uniform appearance.

1.11 EASEMENTS AND RIGHTS-OF-WAYS

A. Confine construction operations to the immediate vicinity of the locations indicated on

Drawings and use due care in placing construction tools, equipment, excavated materials, and pipeline materials and supplies so as to cause the least possible damage to property and interference with traffic.

1.12 PERMITS

A. The Contractor shall be responsible for obtaining and paying for all permits necessary to complete the Work.

1. NOTE: Owner has applied and paid for the Plan Review Fee, Structural Building

Permit and Septic Authorization.

1.13 SUBSTANTIAL COMPLETION

A. Substantial completion dates are listed in the ITB.

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXECUTION (NOT USED)

END OF SECTION 01 10 00

SECTION 01 22 00 – MEASUREMENT AND PAYMENT

1.1 MEASUREMENT AND PAYMENT AND DESCRIPTION OF BID ITEMS

A. Partial payment of bid items shall be in conformance with the General Conditions.

Partial payment for Work completed, and materials installed which will become an integral part of the finished Work, shall be determined by the Owner’s Authorized Representative, and shall be made on the basis of duly certified and approved estimates of the Work, which, in the opinion of the Owner’s Authorized Representative, has been satisfactorily completed. It is understood that the determination by the Owner’s Authorized Representative as to whether or not a certificate or estimate for payment should be issued, or the amount of said payment, shall be based entirely upon the opinion of the Owner’s Authorized Representative. Said determination shall include without limitation the following factors:

1. All phases of the Work being accomplished in a proper manner and being pursued in a proper sequence of operation, particularly with regard to testing, cleanup, and surface restoration.

2. The observance by the Contractor of the requirement that all Work and operations be preceded by necessary submittals and approvals.

3. On the monthly estimates, partial payments for Work performed but not completed, may be made in accordance State of Oregon General Conditions for Public Improvement Contracts (General Conditions).

4. Retainage may be deducted from the above amounts as specified in the Contract.

a. The Contract price shall constitute full compensation for furnishing all plant, labor, equipment and materials, mobilization, demobilization, travel, and performing all operations required to complete the Work, as specified or incidental to, and as shown on the Drawings and Technical Specifications.

1.2 BASE BID

A. GENERAL

1. Bid Item – Mobilization, Demobilization and Bonding – Lump Sum

The bid price constitutes full payment and shall include preparatory work and operations necessary for the movement of personnel, equipment, supplies, and incidentals to and from the Project Site; for the establishment of offices, buildings, and other facilities necessary for the Work; costs for permit fees, bonds, and insurance for the Work; site cleanup during the Project and at the completion of the Project; and for other operations performed or costs incurred before the beginning of the Work.

2. Bid Item – Demolition – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for removal of existing structures, utilities, trees, or other improvements and preparation as needed to construct the improvements. The price shall include all removal, hauling, and disposal in accordance with applicable laws.

3. Bid Item – Erosion and Sediment Control – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary to install and maintain the erosion control measures. Price includes preparation of erosion control plans as specified, procurement of all required permits, and removal of all temporary erosion control measures once the Project is finished or as directed by the Owner’s Authorized Representative.

B. SITE

4. Bid Item – Excavation, Dewatering and Grading – Lump Sum

The bid price constitutes full payment and shall include all labor, materials, and equipment necessary to excavate, dewater, stockpile, replace native materials, retaining wall, and site grading to complete the facility. Price includes hauling and disposal of all excess materials once the project is finished or as directed by the Owner’s Authorized Representative.

5. Bid Item – Backfill Under Structures – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary to haul, stockpile, place, grade, compact, and compaction testing backfill under and behind structures.

6. Bid Item – Site Surfacing – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary to prepare, provide, and install gravel surfacing for the parking lot, driveway, and perimeter of structure. Item includes, but not limited to, placement, leveling, and compaction, and compaction testing.

7. Bid Item – Site Concrete – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary to prepare, install and finish all site concrete. Item includes, but not limited, to door landings, sidewalks, ramp, steps, piers, striping, reinforcing, and finishing.

8. Bid Item – Site & Building Drainage – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for catch basins, manholes, trench drain, and piping denoted on plans. Item includes, but not limited to, excavation, bedding, delivery, placement, backfill, grading, connections, compaction, and testing.

9. Bid Item – Surface Restoration – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary to restore disturbed surfaces as indicated or, where not indicated, to original or better conditions. Item includes, but not limited to, delivery, placement, grading, compaction, seeding, mulch, and testing.

10. Bid Item – Septic System – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for a complete and functional septic system. Item includes, but not limited to, septic tank, pump, pump line, vehicle rated access lids, delivery and setting in place, excavation, trenching, bedding, backfill, piping installation, grouting, testing, and finishing, sanitary drain lines, force mains, and venting, and equipment necessary for a complete and functional system.

11. Bid Item – Propane Tank – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for a complete and functional propane tank, size determined by Owner. Item includes, but not limited to, propane tank, delivery and setting in place, anchorage design, anchorage, supply piping, bollards, excavation, trenching, bedding, backfill, piping installation, testing, necessary for a complete and functional system.

C. CONCRETE

12. Bid Item – Building Foundation & Stem Walls – Lump Sum

The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for construction of the foundation, stem walls, and embedded items as needed to complete the improvements. Item includes, but not limited to, formwork, reinforcing, joints, embedded anchors, concrete in place, special inspection, testing, and finishing.

13. Bid Item – Building Slab and Trenches – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for construction of slabs and trenches as needed to complete the improvements. The price shall include formwork, reinforcing, joints, waterstops, concrete in place, testing, and finishing. Item includes, but not limited to, installation of metal angles and supports at trenches, including anchors and fasteners.

D. HATCHERY BUILDING

14. Bid Item – Premanufactured Wood Trusses– Lump Sum

The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for installation of premanufactured wood roof trusses, as needed to complete the improvements. Item includes, but not limited to, wood trusses, bracing, hardware, anchors, and fasteners.

15. Bid Item – Gypsum Board – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for installation of gypsum board as needed to complete the improvements. Item includes, but not limited to, all standard and moisture-resistant gypsum board, anchors, fasteners, tape, and texture.

16. Bid Item – Thermal & Moisture Protection – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for installation of all thermal and moisture protection as needed to complete the improvements. Item includes, but not limited to, membrane, joint sealants, joint tapping, flashing, weather barriers, firestopping, anchors, and fasteners.

17. Bid Item – Rough Carpentry – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for rough carpentry, as needed to complete the improvements.

Item includes, but not limited to, materials, fabrication, anchors, fasteners, hardware.

18. Bid Item – Finish Carpentry – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for interior and exterior finished carpentry, as needed to complete the improvements. Item includes, but not limited to, trim, fabrication, anchors, fasteners, hardware, and sealants.

19. Bid Item – Stairs – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for stairs and treads, as needed to complete the improvements. Item includes, but not limited to, fire retardant treated wood, fabrication, anchors, fasteners, hardware.

20. Bid Item – Man Doors – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for installation of all man doors, as needed to complete the improvements. Item includes, but not limited to, doors and frames, door hardware, fasteners, auto-closers, operators, sealing, and weather stripping.

21. Bid Item – Overhead Coiling Doors – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for installation of all overhead coiling doors, as needed to complete the improvements. Item includes, but not limited to, doors, tracks, framing, hardware, flashing, anchors, fasteners, finishes and operating devices.

22. Bid Item – Windows – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for installation of all windows, as needed to complete the improvements. Item includes, but not limited to, windows, frames, glazing and window hardware, flashing, hardware, anchors, fasteners, and finishes.

23. Bid Item – Cabinetry – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for fabrication and installation of custom cabinetry, as needed to complete the improvements. Item includes, but not limited to, hardware, fasteners, finishes, countertops, shelving.

24. Bid Item – Miscellaneous Hardware – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for installation of all miscellaneous hardware, as needed to complete the improvements. Item includes, but not limited to, miscellaneous hardware, anchors, and fasteners.

25. Bid Item – Finishes – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for the application of all surface finishes, as needed to complete the improvements. Item includes, but not limited to, painting, staining, sealing, and all other protective coatings.

26. Bid Item – Stone Veneer – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for the installation of all stone veneer, as needed to complete the improvements. Item includes, but not limited to, veneer, grouting, flashing, drainage, steel angle supports, anchors, fasteners.

27. Bid Item – Siding & Soffit – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for the installation of siding and soffit, as needed to complete the improvements. Item includes, but not limited to, flashing, anchors, fasteners.

28. Bid Item – Trench Grating & Embeds – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for fabrication and installation of grating support embeds and grating as needed to complete the improvements. Item includes, but not limited to, steel, fabrication, all anchors, fasteners, and finishes.

29. Bid Item – Handrails – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for fabrication and installation of all handrails as needed to complete the improvements. Item includes, but not limited to, steel, fabrication, all supports, anchors, fasteners, finishes and special inspection for post-installed concrete anchors.

30. Bid Item – Metal Roof, Gutters & Drain System – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for installation of metal roofing, gutters, downspouts and drain system as needed for a complete roofing system. Item includes, but not limited to, roofing, vented ridge, metal flashing, metal trim, weather barriers, gutters, downspouts, piping, anchors, and fasteners.

E. EQUIPMENT

31. Bid Item – Miscellaneous Equipment – Lump Sum

The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for installation of all appliances and equipment as needed to complete the improvements. Item includes, but not limited to, all appliances (i.e., fire extinguishers, refrigerators, hooded microwave, garbage disposals, water heater, eyewash water heaters, washer, and dryer, etc.) and accessories.

F. ELECTRICAL – LIGHTING – PLUMBING – HVAC

32. Bid Item – Electrical System – Lump Sum

The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for a complete and functional electrical system. Item includes, but not limited to, trenching and backfill, conduit, conductors, raceways, wiring, vaults, junction boxes, panels, switches, controls, cover plates, exit signage, emergency exit lighting, and equipment necessary for a complete and functional electrical system.

33. Bid Item – Alarm System Conduit – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for installation of alarm conduit and junction boxes for hatchery building. Wiring to be completed by others. Item includes, but not limited to, conduit, junction boxes, wiring troughs, connections, mounting hardware and fasteners.

34. Bid Item – Ventilation System – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for a complete and functional ventilation system for the building. Item includes, but not limited to, equipment, piping, ducting, louvers, anchors, fasteners, controls, mounting hardware, testing, and commissioning.

35. Bid Item – Heating/Cooling System – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for a complete and functional heating and cooling system for the building. Item includes, but not limited to, equipment, piping, ducting, louvers, dampers, anchors, fasteners, sealing products, programmable thermostat controls for HVAC zones, mounting hardware, testing, balancing, and commissioning.

Building heating and cooling shall have isolated zones that are individually controlled through separate digital controllers.

36. Bid Item – Lighting System – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for a complete and functional lighting system for the building.

Item includes, but not limited to, lighting intensity dimming controls for all lighting that is dimmable, standard toggle switches for non-dimmable lights, conduit, wiring, mounting hardware, and the cabinet housing. Rearing Room lighting controls shall be housed in an epoxy painted wash-down rated steel cabinet mounted to the wall, in location as shown. Rearing Room dimmer switches shall be assigned to lighting zone as shown.

37. Bid Item – Building Plumbing System – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for installation of complete plumbing system for building and NFPA 13D fire suppression system for living quarters. Item includes, but not limited to, pressure tanks, pumps, all fixtures, toilet accessories, eyewash stations, piping, HVAC condensate piping, sprinklers, connections, hardware, and fasteners.

38. Bid Item – Process Piping – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for installation of complete water and propane process piping system, including gravity and pump lines. Item includes, but not limited to, connections to existing piping, all fabrication, fittings, piping, supports, connections, hardware, fasteners, excavation, bedding and backfill.

G. MISCELLANEOUS

39. Bid Item – Owner Supplied Equipment – Lump Sum

The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for installation of owner-provided tanks. Item includes, but not limited to, placement of tanks, shims, and anchors.

1.3 BID ALTERNATE 1 – MITIGATED DESIGN

A. HATCHERY BUILDING

The following items replace matching item number on Base Bid.

12. Bid Item – Concrete Foundation & Walls – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for construction of the foundation, full height walls, and embedded items as needed to complete the improvements. Item includes, but not limited to, formwork, bracing, reinforcing, joints, embedded anchors, concrete in place, special inspection, testing, and finishing.

14. Bid Item – Cold Formed Steel Trusses & Accessories – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for installation of premanufactured cold-formed steel roof trusses, as needed to complete the improvements. Item includes, but not limited to, design, trusses, bracing, hardware, anchors, and fasteners.

17. Bid Item – Cold Formed Metal Framing & Accessories – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for cold-formed metal stud framing for interior bearing, furring walls and infill walls, attic, and roof framing not included in Item 16, as needed to complete the improvements. Item includes, but not limited to, fabrication, blocking, bracing, anchors, fasteners, hardware.

1.4 BID ALTERNATE 2 – EMERGENCY POWER TRANSFER SWITCH

A. HATCHERY BUILDING

1. Bid Item – Purchase & Install Automatic Transfer Switch – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for installation of automatic transfer switch in Electrical Room for future emergency generator. Item includes, but not limited to, switch, conduit, junction boxes, exterior plug connection for temporary generator connection, vaults, fabrication, fittings, supports, connections, hardware, fasteners, excavation, bedding and backfill and compaction.

1.5 BID ALTERNATE 3 – EMERGENCY GENERATOR

A. HATCHERY BUILDING

1. Bid Item – Purchase & Install Emergency Generator – Lump Sum The bid price constitutes full payment and shall include all labor, materials, and equipment necessary for installation and testing of emergency generator for a complete and functional emergency power system. Item includes, but not limited to, concrete slab, electrical design, conduit, wiring, junction boxes, fabrication, fittings, supports, connections, mounting hardware, fasteners, excavation, bedding, backfill and compaction.

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXECUTION (NOT USED)

END OF SECTION 01 22 00

SECTION 01 31 00 – PROJECT MANAGEMENT AND COORDINATION

1.1 SECTION INCLUDES

A. Section includes administrative provisions for coordinating construction operations on

Project including, but not limited to, the following:

1. Project Coordination.

2. Preconstruction meeting.

3. Progress meetings.

4. Preinstallation conferences.

5. Requests for Information (RFI).

6. Coordination drawings.

1.2 RELATED SECTIONS

A. Section 01 40 00 – Quality Control.

B. Section 01 70 00 – Project Closeout.

1.3 DEFINITIONS

A. RFI: Request from Contractor seeking information required by or clarifications of the

Contract Documents.

1.4 PROJECT COORDINATION

A. Coordinate scheduling, submittals, and the Work of the various Sections of the Technical

Specifications to assure efficient and orderly sequence of installation of interdependent construction elements, with provisions for accommodating items installed later.

B. Verify that utility requirement characteristics of operating equipment are compatible with building utilities. Coordinate Work of various Sections having interdependent responsibilities for installing, connecting to, and placing in service, all such equipment.

C. Coordinate space requirements and installation of mechanical and electrical Work, which are indicated diagrammatically on Drawings. Follow routing shown for piping, ductwork, and conduit as closely as practicable; place runs parallel with lines of building. Utilize spaces efficiently to maximize accessibility for other installations, for maintenance, and for repairs.

1. Provide coordination drawings showing space requirements of various trades in accordance with coordination drawing Article below.

D. In finished areas, except as otherwise indicated, conceal pipes, ducts, and wiring within the construction. Coordinate locations of fixtures and outlets with finish construction and components.

E. Coordinate completion and cleanup of Work of separate Sections in preparation for Substantial Completion and for portions of Work designated for Owner occupancy.

F. After Owner occupancy of premises, coordinate access to site for correction of defective Work and Work not in accordance with Contract Documents, to minimize disruption of Owner activities.

G. Conservation: Coordinate construction activities to ensure that operations are carried out with consideration given to conservation of energy, water, and materials. Coordinate use of temporary utilities to minimize waste.

1. Salvage materials and equipment involved in performance of, but not actually incorporated into, the Work. See other Sections for disposition of salvaged materials that are designated as Owner’s property.

PART 2 – PRODUCTS (NOT USED)

PART 3 – EXECUTION

3.1 PRECONSTRUCTION MEETING

A. Owner’s Authorized Representative will schedule a meeting after Notice to Proceed.

B. Attendance…