Attachment B_Supplemental Price Breakdown_03272023.xlsx

XLSX spreadsheet 14 KB Posted

Attached to
Z2DA--570-17-207 | Renovate Sterile Processing and Supply (SPS)
Solicitation number
36C26123R0049
Issued by

About this file

This document contains an attachment with a pricing schedule for the renovation of a Sterile Processing and Supply department, along with details of a related federal contract opportunity posted on SAM.gov. The pricing schedule lists various construction requirements with allocated costs for materials, labor, and total costs. It provides pricing for general requirements, foundations, and other construction elements. Site improvements are also included with a total materials and labor cost of $2,000. The total estimated cost for all requirements is $14,000. The related federal contract opportunity is seeking offers for the renovation and was posted by the Department of Veterans Affairs Central California Healthcare System. The opportunity type is a solicitation and the requirement is to renovate the Sterile Processing and Supply department as described in the attached documents.

View the file

Other files

File Type Posted
36C26123R0049 0005.pdf PDF
GD CA20230018_06092023.docx DOCX document
570-17-207_SPS-PreBid RFI Log-20230613.pdf PDF
36C26123R0049 0004.pdf PDF
570-17-207_DWGs 100_Add 1 20230609.pdf PDF
2nd Floor Photos_Pre-Bid RFIs for SPS 2.zip ZIP file
Spec Sections.zip ZIP file
DWGs.zip ZIP file
GD CA20230018_06022023.docx DOCX document
HA Maps.pdf PDF
2nd Floor Photos_Pre-Bid RFIs for SPS 1.zip ZIP file
36C26123R0049 0003.pdf PDF
570-17-207_RFI Log_20230603.pdf PDF
Equipment Cut Sheets.zip ZIP file
2nd Floor Photos_Pre-Bid RFIs for SPS 3.zip ZIP file
36C26123R0049 0002.pdf PDF
Site Visit Sign-in Sheet_05112023.pdf PDF
36C26123R0049 0001.pdf PDF
Attachment A_Factor 1_Experience_05102023.xlsx XLSX spreadsheet
570-17-207 Drawings_20230413.pdf PDF
Attachment D_Large Business Subcontracting Plan Template_03272023.docx DOCX document
Attachment A_Factor 1_Experience_03272023.xlsx XLSX spreadsheet
36C26123R0049_04272023.docx DOCX document
570-17-207 Campus Asbestos Containing Materials (ACM) Report.pdf PDF
Attachment C_Request for Information (RFI) Form_36C26123R0049.docx DOCX document
P07 GD CA20230018_04212023.docx DOCX document
570-17-207 Specifications 20230404.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

ATTACHMENT B - PRICING SCHEDULE
Renovate Sterile Processing and Supply (SPS)
DESCRIPTIONMATERIALLABORTOTAL
General Requirements
Project Manager$ 1.00$$ 1.00
Superintendent/Safety$ 1.00$$ 1.00
Quality Control Manager$ 1.00$$ 1.00
Temporary Facilities & Controls$$$ - 0
Laborer$$ 1.00$ 1.00
Mobilization$$ 1.00$ 1.00
$$$ - 0
General Requirements Total$ 3.00$ 2.00$ 5.00
Foundations
$$$ - 0
$ 1.00
$$$ 1.00
Foundations Total$ 1.00$ - 0$ 1.00
Superstructure
$$$ - 0
$$$ - 0
Superstructure Total$ - 0$ - 0$ - 0
Exterior Enclosures
$$$ - 0
$$$ - 0
Exterior Enclosures Total$ - 0$ - 0$ - 0
Roofing
$$$ - 0
$$$ - 0
Roofing Total$ - 0$ - 0$ - 0
Interior Construction
$$$ - 0
$$$ - 0
Interior Construction Total$ - 0$ - 0$ - 0
Stairs
$$$ - 0
$$$ - 0
Stairs Total$ - 0$ - 0$ - 0
Interior Finishes
$$$ - 0
$$$ - 0
Interior Finishes Total$ - 0$ - 0$ - 0
Plumbing
$$$ - 0
$$$ - 0
Plumbing Total$ - 0$ - 0$ - 0
Heating, Ventillation & Air Conditioning
$$$ - 0
$$$ - 0
Heating, Ventillation & Air Conditioning Total$ - 0$ - 0$ - 0
Fire Protection
$$$ - 0
$$$ - 0
Fire Protection Total$ - 0$ - 0$ - 0
Electrical
$$$ - 0
$$$ - 0
Electrical Total$ - 0$ - 0$ - 0
Communications
$$$ - 0
$$$ - 0
Communications Total$ - 0$ - 0$ - 0
Equipment
$$$ - 0
$$$ - 0
Equipment Total$ - 0$ - 0$ - 0
Furnishings
$$$ - 0
$$$ - 0
Furnishings Total$ - 0$ - 0$ - 0
Selective Building Demolition
$$$ - 0
$$$ - 0
Selective Building Demolition Total$ - 0$ - 0$ - 0
Site preparation
$$$ - 0
$$$ - 0
Site Preparation Total$ - 0$ - 0$ - 0
Site Improvements
$ 1.00$ 1.00$ 2.00
$$$ - 0
Site Improvements Total$ 1.00$ 1.00$ 2.00
Sub Total$ 5.00$ 3.00$ 8.00
Overhead$ 1.00$ 1.00$ 2.00
Sub total$ 1.00$ 1.00$ 2.00
Profit$ 1.00$ 1.00$ 2.00
Sub total$ 1.00$ 1.00$ 2.00
Bonds and Insurance$ 1.00$ 1.00$ 2.00
TOTAL$ 8.00$ 6.00$ 14.00

File details come from the government source that posted it. Updated .