This federal solicitation seeks proposals for a construction project to renovate the Sterile Processing and Supply department at the Fresno VA Medical Center. Key details include the required scope of work such as demolishing existing spaces, connecting temporary facilities, renovating areas to accommodate logistics functions, and fully renovating the sterile processing area. Interested parties must submit technical and price proposals by May 31st, 2023. The project value is estimated between $10-20 million. The contract type will be firm-fixed-price for one year. Small business subcontracting goals and plans are required from large businesses.
View the file
Other files
Show all 27
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1. SOLICITATION NUMBER
2. TYPE OF SOLICITATION
3. DATE ISSUED
PAGE OF PAGES
4. CONTRACT NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
6. PROJECT NUMBER
7. ISSUED BY
CODE
8. ADDRESS OFFER TO
a. NAME
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE
DOCUMENTS (
Title, identifying number, date) 12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES," indicate within how many calendar days after award in Item 12B.)
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 8/2014)
STANDARD FORM 1442
Prescribed by GSA-FAR (48 CFR) 52.236-1(d)
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
SOLICITATION
SOLICITATION
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR INFORMATION
CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".
SEALED BID (IFB)
NEGOTIATED (RFP)
11. The Contractor shall begin performance within ____________ calendar days and complete it within calendar days after receiving award, notice to proceed. This performance period is mandatory negotiable. (See _____________________________).
YES
NO
a.
Sealed offers in original and ___________________copies to perform the work required are due at the place specified in Item 8 by _____________ (hour) local time _____________________ (date). If this is a sealed bid solicitation, offers must be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, the date and time offers are due.
b.
An offer guarantee is, is not required.
c.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d.
Offers providing less than _______________________ calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
36C26123R0049 X 04-28-2023
36C261-23-AP-2142
570-23-2-457-0036 570-17-207 Department of Veterans Affairs Network Contracting Office (NCO) 21 VA Central California Health Care System 855 M Street, Suite 1020 Fresno CA 93721 Proposals have been authorized and are to be sent by email to:
Mandy Thompson mandy.thompson2@va.gov Mandy Thompson 559-225-6100 x6795 Project No.: 570-17-207 Project Title: Renovate Sterile Processing & Supply (SPS) Project Location: 2615 E. Clinton Ave., Fresno, CA 93703
Description: The Veterans Affairs Central California Healthcare System has a requirement to renovate the Sterile Processing and Supply (SPS) Department.
Contractor shall provide all materials, labor, tools, equipment, transportation, expertise, supervision, and administration for the work described in the contract documents (I.E., contract documents, solicitation documents, scope of work, specifications, drawings, and any other related documentation).
NAICS: 236220 Size Standard: $45.0M
This acquisition is for FULL AND OPEN COMPETITION
Acquisition method is competitively negotiated best value tradeoff selection process in accordance with FAR 15.101-1.
Both a price proposal and a technical proposal are required. Please see evaluation and submittal criteria.
Although not mandatory, all interested parties are strongly encouraged to attend the pre-proposal conference and site-visit.
Bid bonds, payment bonds, and performance bonds shall be required under this solicitation and any resultant contract.
Contractor is required to adhere to COVID-19 restrictions regarding masks while on or inside the facility.
The estimated magnitude of this construction project is between $10,000,000 and $20,000,000. This information is provided per VAAR 836.204.
X X 52.211-10 X 12:00
PDT
05-31-2023 X
14. NAME AND ADDRESS OF OFFEROR
15. TELEPHONE NUMBER
16. REMITTANCE ADDRESS
CODE
FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of the solicitation, if this offer is accepted by the Government in writing within __________ calendar days after the date offers are due.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER 20b. SIGNATURE 20c. OFFER DATE
21. ITEMS ACCEPTED:
22. AMOUNT
23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c 41 U.S.C. 3304(a) (
26. ADMINISTERED BY
27. PAYMENT WILL BE MADE BY
PHONE:
FAX:
28. NEGOTIATED AGREEMENT
29. AWARD
Your Contractor agrees offer on this solicitation is hereby accepted as to the items listed. This to furnish and deliver all items or perform all work requirements identified award consummates the contract, which consists of (a) the Government on this form and any continuation sheets for the consideration stated in solicitation and your offer, and (b) this contract award. No further cont-this contract. The rights and obligations of the parties to this contract ractual document is necessary.
shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED 31a. NAME OF CONTRACTING OFFICER
TO SIGN
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA 31c. AWARD DATE
BY
OFFER
AWARD
STANDARD FORM 1442 (REV. 8/2014) BACK
(Include ZIP Code) (Include area code) (Include only if different than Item 14.)
(Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each) (Type or print) (4 copies unless otherwise specified) (Type or print) (Type or print) (Contractor is required to sign this document and return _______ copies to issuing office.)
(Contractor is not required to sign this document.)
(Must be fully completed by offeror) (To be completed by Government)
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
Department of Veterans Affairs VA Sierra Pacific Network (VISN 21) VA Central California Health Care System 855 M Street, Suite 1020 Fresno CA 93721 Department of Veterans Affairs FMS-VA-2(101) Financial Services Center
PO BOX 149971
Austin TX 78714-9971 Mandy Thompson, Contracting Officer
Table of Contents
| PART I - THE SCHEDULE | 1 |
| SECTION A - SOLICITATION/CONTRACT FORM | 1 |
| A.1 SF 1442 SOLICITATION, OFFER, AND AWARD (Construction, Alteration, or Repair) | 1 |
| A.2 SF 1442 SOLICITATION, OFFER, AND AWARD (CONSTRUCTION, ALTERATION, OR REPAIR)– BACK | 2 |
| INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS | 6 |
| INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS | 7 |
| INSTRUCTIONS TO OFFERORS | 7 |
| EVALUATION FACTORS: | 11 |
| Statement of Work | 14 |
| 2.1 52.216-1 TYPE OF CONTRACT (APR 1984) | 18 |
| 2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) | 18 |
| 2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999) | 18 |
| 2.4 52.225-12 NOTICE OF BUY AMERICAN REQUIREMENT—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (MAY 2014) ALTERNATE II (JUN 2009) | 19 |
| 2.5 52.228-1 BID GUARANTEE (SEP 1996) | 20 |
| 2.6 52.228-17 INDIVIDUAL SURETY—PLEDGE OF ASSETS (BID GUARANTEE) (FEB 2021) | 21 |
| 2.7 52.233-2 SERVICE OF PROTEST (SEP 2006) | 21 |
| 2.8 52.236-27 SITE VISIT (CONSTRUCTION) (FEB 1995) ALTERNATE I (FEB 1995) | 22 |
| 2.9 52.252-1 SOLICITATION PROVISIONS INCORPORATED BY REFERENCE (FEB 1998) | 22 |
| 2.10 VAAR 852.228-72 ASSISTING SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED SMALL BUSINESSES IN OBTAINING BONDS (DEC 2009) | 23 |
| 2.11 VAAR 852.233-70 PROTEST CONTENT/ALTERNATIVE DISPUTE RESOLUTION (OCT 2018) | 23 |
| 2.12 VAAR 852.233-71 ALTERNATE PROTEST PROCEDURE (OCT 2018) | 24 |
| 2.13 VAAR 852.239-75 INFORMATION AND COMMUNICATION TECHNOLOGY ACCESSIBILITY NOTICE (FEB 2023) | 24 |
| REPRESENTATIONS AND CERTIFICATIONS | 26 |
| 3.1 52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2023) | 26 |
| 3.2 52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (NOV 2021) | 30 |
| 3.3 52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 32 |
| 3.4 52.209-13 VIOLATION OF ARMS CONTROL TREATIES OR AGREEMENTS—CERTIFICATION (NOV 2021) | 34 |
| GENERAL CONDITIONS | 37 |
| 4.1 52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS (DEC 2014) | 37 |
| 4.2 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS (NOV 2021) | 37 |
| 4.3 52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED ENTITIES (NOV 2021) | 38 |
| 4.4 52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018) | 40 |
| 4.5 52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984) ALTERNATE I (APR 1984) | 41 |
| 4.6 52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (MAR 2023) | 41 |
| 4.7 52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUN 2020) | 44 |
| 4.8 52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS ACT (DEC 2010) | 44 |
| 4.9 52.223-2 AFFIRMATIVE PROCUREMENT OF BIOBASED PRODUCTS UNDER SERVICE AND CONSTRUCTION CONTRACTS (SEP 2013) | 46 |
| 4.10 52.223-20 AEROSOLS (JUN 2016) | 46 |
| 4.11 52.223-21 FOAMS (JUN 2016) | 47 |
| 4.12 52.225-11 BUY AMERICAN—CONSTRUCTION MATERIALS UNDER TRADE AGREEMENTS (DEC 2022) ALTERNATE I (DEC 2022) | 48 |
| 4.13 SUPPLEMENTAL INSURANCE REQUIREMENTS | 54 |
| 4.14 52.236-1 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 1984) | 54 |
| 4.15 52.236-4 PHYSICAL DATA (APR 1984) | 55 |
| 4.16 52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998) | 55 |
| 4.17 VAAR 852.201-70 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 2022) | 58 |
| 4.18 VAAR 852.203-70 COMMERCIAL ADVERTISING (MAY 2018) | 58 |
| 4.19 VAAR 852.211-72 TECHNICAL INDUSTRY STANDARDS (NOV 2018) | 59 |
| ?.## SERVICE-DISABLED VETERAN-OWNED AND VETERAN-OWNED | 59 |
| SMALL BUSINESS EVALUATION FACTORS (JAN 2023) (DEVIATION) | 59 |
| 4.20 VAAR 852.215-71 EVALUATION FACTOR COMMITMENTS (OCT 2019) | 60 |
| ?.## VA SMALL BUSINESS SUBCONTRACTING PLAN MINIMUM REQUIREMENTS | 60 |
| (JAN 2023) (DEVIATION) | 60 |
| 4.21 VAAR 852.228-70 BOND PREMIUM ADJUSTMENT (JAN 2008) | 61 |
| 4.22 VAAR 852.232-71 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (INCLUDING NAS–CPM) (NOV 2018) (ALTERNATE I) | 61 |
| 4.23 VAAR 852.232-72 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS (NOV 2018) | 64 |
| 4.24 VAAR 852.236-71 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (APR 2019) | 65 |
| 4.25 VAAR 852.236-72 PERFORMANCE OF WORK BY THE CONTRACTOR (APR 2019) ALTERNATE I (APR 2019) | 66 |
| 4.26 VAAR 852.236-79 CONTRACTOR PRODUCTION REPORT (APR 2019) | 67 |
| 4.27 VAAR 852.236-80 SUBCONTRACTS AND WORK COORDINATION (APR 2019) | 67 |
| 4.28 VAAR 852.237-75 KEY PERSONNEL (OCT 2019) | 67 |
| 4.29 VAAR 852.242-70 GOVERNMENT CONSTRUCTION CONTRACT ADMINISTRATION (OCT 2020) | 68 |
| 4.30 VAAR 852.242-71 ADMINISTRATIVE CONTRACTING OFFICER (OCT 2020) | 69 |
| 4.31 VAAR 852.243-70 CONSTRUCTION CONTRACT CHANGES—SUPPLEMENT (SEP 2019) | 69 |
| 4.32 VAAR 852.246-75 WARRANTY OF CONSTRUCTION—GUARANTEE PERIOD SERVICES (OCT 2018) | 71 |
| 4.33 MANDATORY WRITTEN DISCLOSURES | 71 |
ATTACHMENTS………………………………………………………………………………………...72
INFORMATION REGARDING BIDDING MATERIAL, BID GUARANTEE AND BONDS
1.1 PROPOSAL MATERIAL:
Proposal materials consisting of the statement of work, specifications, other attachments, and contract forms are included and/or attached as part of this Request For Proposal. The VA will not provide printed copies of the specifications or solicitation documents. It is the responsibility of the offeror to obtain the proposal materials in a time and manner sufficient to respond to this solicitation by the specified due date.
1.2 BID GUARANTEE:
A Bid Guarantee, SF 24, is required for the solicitation in an amount not less than 20 percent of the proposal price but shall not exceed $3,000,000. Failure to furnish the required bid (proposal) guarantee in the proper form and amount, by the time set for receipt of proposals, may result in the rejection of the proposal. Copies of the SF 24 may be obtained from http://www.gsa.gov/portal/forms/type/TOP.
1.3 PAYMENT & PERFORMANCE BONDS:
The offeror to whom award is made will be required to furnish two bonds, a Payment Bond, SF 25A, and a Performance Bond, SF 25, each in the penal sum as noted in the General Conditions of the Solicitation. Copies of SFs 25 and 25A may be obtained from http://www.gsa.gov/portal/forms/type/TOP.
INSTRUCTIONS, CONDITIONS AND OTHER STATEMENTS TO BIDDERS/OFFERORS
INSTRUCTIONS TO OFFERORS
INTRODUCTION
1. Offerors are strongly encouraged to carefully review the entire solicitation, statement of work (SOW), specifications, drawings, evaluation factors, and these submission instructions when providing the written response. Failure to submit any of the following information, or failure to follow the formality requirements, may result in rejection of the offer. Please note: “Offeror” and “Prime Contractor” are synonymous and given the same meaning in the information below.
2. This is a Best Value trade-off source selection evaluation, conducted in accordance with Federal Acquisition Regulation (FAR) Part 15, Contracting by Negotiation, supplemented by Department of Veterans Affairs Acquisition Regulations (VAAR). FAR regulations are available electronically at https://www.acquisition.gov/browse/index/far, and VAAR regulations are available electronically at https://www.acquisition.gov/vaar.
3. Cursory responses or responses that merely reiterate and/or reformulate the Government statement of work and other project documents will not be considered for meeting the requirements of the solicitation. Assurance of experience, capability, and qualifications that clearly demonstrate and support the Offeror’s proposal are essential. The absence of such evidence shall adversely influence the evaluation of the Offeror’s proposal.
4. Offerors are required to meet all solicitation requirements, including terms and conditions, representations and certifications, and technical requirements, in addition to the evaluation factors. Failure to comply with the terms and conditions of the solicitation may result in the Offeror being ineligible for award.
5. Offerors are cautioned that the Government intends to award without discussions based solely on the initial offers received. Therefore, each initial offer received should be submitted on the most favorable terms, from both price and technical standpoints. If, during the evaluation process, it is determined to be in the best interest of the Government to hold discussions, Offeror responses to the Evaluation Notice (EN) and Final Proposal Revision (FPR) will be considered in making the source selection decision. If the Offeror’s proposal has been evaluated as acceptable at the time discussions are closed, any change or exception in the Final Proposal Revision are subject to evaluation and may introduce risk that the Offeror’s proposal is determined to be unacceptable and ineligible for award.
6. The period of performance for this project is stipulated in the Statement of Work (SOW).
7. Only one award will be made in response to this solicitation, and it will be made as a firm, fixed price (FFP) contract.
8. This solicitation is unrestricted. Offeror MUST have an active SAM UEI number and be current in System for Award Management (SAM) at time of offer submission and at time of award. Also, any Offeror that claims SDVOSB and VOSB status must also be verified in Veteran Small Business Certification (VetCert) database (https://veterans.certify.sba.gov/#home) at time of offer submission and at time of award.
1. SUBMISSION INSTRUCTIONS:
a. Offeror shall email both technical proposal and price proposal (do not combine these files into one file; they should remain as separate files) to Contracting Officer, Mandy Thompson, email mandy.thompson2@va.gov and Chuck Parke at Robert.parke2@va.gov by no later than the stated due date/time specified in block 13 of SF1442 (subject to amendment).
When submitting proposal, subject line of email shall state “RFP 36C26123R0049 – Renovate SPS Fresno”. Under no circumstances shall email file size exceed 10MB. Multiple emails are acceptable.
Hand-delivered or faxed solicitation responses cannot be accepted at this time due to COVID-19 safety protocols currently in place.
2. REQUESTS FOR INFORMATION (RFIs) CONCERNING THIS RFP:
All Requests for Information (RFIs) regarding this solicitation shall be submitted in writing and received no later than Thursday May 17, 2023, at 2:00 PM Pacific Time. All RFIs shall be emailed to Mandy Thompson at mandy.thompson2@va.gov and Chuck Parke at Robert.parke2@va.gov . Use the RFI form attached to the solicitation for the required format.
3. PRE-PROPOSAL SITE VISIT:
Offerors are urged and expected to inspect the site where services are to be performed and to satisfy themselves regarding all general and local conditions that may affect the cost of performing these services. Failure to inspect the site shall not constitute grounds for a claim after contract award. Refer to provision 52.236-27, Site Visit, for details about the date, time, and location of the site visit, as well as for required COVID-19 safety protocols currently in place at the facility.
A pre-proposal conference will be held via Microsoft Teams on Wednesday May 10, 2023 at 11:00 AM PST. The pre-proposal conference should be attended by people preparing the response. Please email me for a link to attend the meeting.
A site visit is scheduled for:
| Date: | Thursday May 11, 2023 | |
| Time: | 11:00 AM PST (promptly) | |
| Location: | Engineering Building 3 (cross street N. Mariposa St. and E. Harvard Ave.) |
VA Central California Health Care System 2615 E. Clinton Ave.
Fresno, CA 93703
4. PROPOSAL FORMAT:
a. All commitments made in the proposal may become a part of the resultant contract. The data submitted with each proposal shall be complete, concise, accurate, and not overly elaborate. Reliance on promotional brochures is discouraged.
b. Offerors may, at the discretion of the Government, be asked to provide information for clarification purposes regarding their proposals. Requests for such clarification information do not constitute discussions.
c. Offeror shall be held responsible for the validity of all information supplied in the proposal, including information provided by potential subcontractors. Should subsequent investigation disclose that any fact or condition was not as stated, the proposal may be rejected and may receive no further consideration.
d. If a revised proposal is requested, the number of revised copies to be submitted shall be the same as those of initial proposal, unless stated otherwise.
5. FORMAT AND CONTENT OF OFFEROR RESPONSE TO PROPOSAL:
Do not combine technical and price proposals together into one file. Keep separate.
TECHNICAL PROPOSAL shall be comprised of the following parts:
Response to Evaluation Factor 1 – Experience (use required Excel worksheet Attachment A to solicitation to submit response to this factor)
Response to Evaluation Factor 2 – Project Team (Submission of Project Team resume’s)
Response to Evaluation Factor 3 – SDVOSB/VOSB Status
PRICE PROPOSAL shall be comprised of the following parts:
Response to Evaluation Factor 4 – Price (fully completed Attachment B - Divisional Cost Break-Out sheet to include all columns (Material, Labor, and Total)) Completed/Signed Standard Form (SF) 1442 (fully completed and signed; be sure that block 17, total proposed project price, is also completed); also, acknowledgment of all amendments by either entering data in block 19 of SF 1442, or by completing blocks 15 a, b, and c of SF 30 (Amendments) and returning them with offer.
Completed/Signed Standard Form (SF) 24, Bid Bond with raised seals and Power of Attorney (Raised seals must be visible when scanned into a PDF file; Prime Contractor shall maintain original bid bond until after award.)
OTHER REQUIRED DOCUMENTS shall be comprised of the following parts:
Contractor’s license (Provide your state contractor’s license. If your state does not issue contractor’s licenses, provide your county or local contractor’s license or the recognized contractor license that allows you to operate your business.)
Fully executed Joint Venture Agreement (if applicable) Subcontracting Plan (see Attachment D and No. 4 Subcontracting Requirements below) PROSPECTIVE CONTRACTORS’ RESPONSIBILITY: Purchases shall be made from, and contracts shall be awarded to, responsible prospective contactors only. The presumed winning Prime Contractor must be determined as “Responsible” by the Contracting Officer in accordance with FAR Part 9, Contractor Qualifications. To aid in making this determination, Offerors shall provide:
1. Copy of Prime Contractor license: Provide your state contractor’s license. If your state does not issue contractor’s licenses, provide your county or local contractor’s license or the recognized contractor license that allows you to operate your business.
2. Copy of fully executed Joint Venture Agreement (if applicable)
3. Completed Representations and Certifications in SAM.gov; see FAR 52.204-8, 52.209-5, and 52.209-7.
4. Subcontracting Requirements: If you are a large business, submit a Small Business Subcontracting Plan for this project in the format provided in attachment D titled “Large Business Subcontracting Plan Template”. Offer shall include all information required in the attachment per FAR 19.704, Subcontracting Plan Requirements, including proposed subcontracting to Service-Disabled Veteran Owned Small Businesses (SDVOSBs) or Veteran Owned Small Businesses (VOSBs). The submission will be evaluated against the total small business goals of 38.5% and the subcontracting goals as provided by OSDBU. They are listed below as:
| - | Small Business……………………………………………..17.5% |
| - | Veteran-Owned Small Business…………………………….5% |
| - | Service-Disabled Veteran Owned Small Business…………3% |
| - | Small Disadvantaged Business……………………………..5% |
| - | Woman-Owned Small Business……………………………5% |
| - | HUB Zone Small Business…………………………………3% |
Offerors shall demonstrate a commitment to using small business concerns in the Small Business Subcontracting Plan and may list all subcontractors by name. If the proposed small business subcontracting goals do not meet the minimum VA Small Business Subcontracting Targets, include a detailed explanation describing the actions taken to arrive at that determination, along with an explanation for the goals that were proposed.
The Contracting Officer will obtain additional information as needed and specified in FAR 9.105-1 to make the Determination of Responsibility, to include, but not limited to the Federal Awardee Performance and Integrity Information System (FAPIIS), Excluded Parties List System (EPLS) and Past Performance Information Retrieval System (PPIRS).
SITE VISIT: Refer to Provision 52.236-27 for specific information regarding the project pre-proposal site visit. This pre-proposal site visit will be the only opportunity for potential Offerors to visit the site. All potential contractors, subcontractors, and suppliers are strongly encouraged to attend this pre-proposal site visit.
SYSTEM FOR AWARD MANAGEMENT (SAM): Federal Acquisition Regulations require that federal contractors register in the System for Award Management (SAM) database at https://sam.gov/SAM/ and enter all mandatory information into the system.
ADDITIONAL VETBIZ INFORMATION:
(a) Eligibility of SDVOSBs continues to be governed by the Small Business Administration regulations, 13 CFR subparts 125.8 through 125.13, as well as the FAR, except where expressly directed otherwise by the VAAR, and 38 CFR verification regulations for SDVOSBs.
(b) At the time of submission of offer, the Offeror must represent to the contracting officer that it is a—
(1) SDVOSB concern
(2) Small business concern under the North American Industry Classification System (NAICS) code assigned to the acquisition; and
(3) Verified for eligibility in the VetCert database (https://veterans.certify.sba.gov/#home).
(c) A joint venture may be considered an SDVOSB or VOSB concern if
(1) At least one member of the joint venture is an SDVOSB or VOSB concern, and makes the representations in paragraph (b) of this section;
(2) Each other concern is small under the size standard corresponding to the NAICS code assigned to the procurement;
(3) The joint venture meets the requirements of paragraph 7 of the size standard explanation of affiliates in FAR 19.101; and
(4) The joint venture meets the requirements of 13 CFR 125.15(b), modified to include Veteran-owned small businesses where this CFR section refers to SDVOSB concerns.
(d) Any SDVOSB or VOSB concern (nonmanufacturer) must meet the requirements in FAR 19.102(f) to receive a benefit under this program.
JOINT VENTURES: See 13 C.F.R. § 121.103(h)
(h) Receipts/employees attributable to joint venture partners. For size purposes, a concern must include in its receipts its proportionate share of joint venture receipts (whether that joint venture is populated or unpopulated), unless the proportionate share already is accounted for in receipts reflecting transactions between the concern and its joint ventures (e.g., subcontracts from a joint venture entity to joint venture partners). In determining the number of employees, a concern must include in its total number of employees its proportionate share of joint venture employees (whether the joint venture is populated or unpopulated). Once a joint venture receives a contract, it may submit additional offers for a period of two years from the date of that first award. An individual joint venture may be awarded one or more contracts after that two-year period as long as it submitted an offer including price prior to the end of that two-year period. SBA will find joint venture partners to be affiliated, and thus will aggregate their receipts and/or employees in determining the size of the joint venture for all small business programs, where the joint venture submits an offer after two years from the date of the first award. The same two (or more) entities may create additional joint ventures, and each new joint venture entity may submit offers for a period of two years from the date of the first contract to the joint venture without the partners to the joint venture being deemed affiliates. At some point, however, such a longstanding inter-relationship or contractual dependence between the same joint venture partners will lead to a finding of general affiliation between and among them. A joint venture: Must be in writing; must do business under its own name and be identified as a joint venture in the System for Award Management (SAM) for the award of a prime contract; may be in the form of a formal or informal partnership or exist as a separate limited liability company or other separate legal entity; and, if it exists as a formal separate legal entity, may not be populated with individuals intended to perform contracts awarded to the joint venture (i.e., the joint venture may have its own separate employees to perform administrative functions, including one or more Facility Security Officer(s), but may not have its own separate employees to perform contracts awarded to the joint venture). SBA may also determine that the relationship between a prime contractor and its subcontractor is a joint venture pursuant to paragraph (h)(2). For purposes of this paragraph (h), contract refers to prime contracts, novations of prime contracts, and any subcontract in which the joint venture is treated as a similarly situated entity as the term is defined in part 125 of this chapter.
NOTICE TO PROCEED (NTP): A notice to proceed (NTP) shall be issued after award of a fully executed contract. The NTP date and time are “to be determined” after award to a successful Offeror. Primary factor in determination to issue NTP shall be the Prime Contractor submission of, and the Government review and approval of both Payment and Performance Bonds, both of which are enforceable legal documents.
**END**
EVALUATION FACTORS:
EVALUATION PROCESS
This is a Best Value trade-off source selection evaluation, conducted in accordance with Federal Acquisition Regulation (FAR) Part 15, Contracting by Negotiation, supplemented by Department of Veterans Affairs Acquisition Regulations (VAAR). FAR regulations are available electronically at https://www.acquisition.gov/browse/index/far, and VAAR regulations are available electronically at https://www.acquisition.gov/vaar.
Offers shall be evaluated as follows:
Step 1: All offers will be evaluated individually on their own merit and in accordance with the following evaluation factors:
1. Factor 1: Experience
1. Factor 2: Project Team
1. Factor 3: SDVOSB/VOSB Status
1. Factor 4: Price Step 2: The offer that is determined to provide the best value to the Government in accordance with the evaluation factors will be considered for award.
Step 3: The Government will then evaluate the Offeror for responsibility determination, in accordance with FAR Part 9.104; if determined responsible, an award will be made to that firm.
EVALUATION FACTORS:
The Best Value trade-off source selection evaluation process will undergo a trade-off evaluation. The factors are listed in descending order of importance. Factors 1, 2, and 3, when combined are significantly more important than Factor 4 - Price.
Factor 1: EXPERIENCE Offerors shall use the attached Excel worksheet Attachment A titled “Factor 1 – Experience” for submitting your response to Factor 1.
Offeror shall demonstrate Experience by submitting examples of completed or substantially completed eighty percent (80%) and Hospital remodel and/or Sterile Processing and Supply (SPS) remodel, and/or any combination thereof. Relevant experience shall include projects valued at $6M or greater, shall be similar in scope and complexity as the proposed Renovate Sterile Processing and Supply (SPS) project and shall be recent (completed within the last eight (8) years). Offerors that have multiple recent and relevant prime contractor experience projects may be rated more favorably. Offerors are limited to a total of five (5) projects.
Relevant experience must be demonstrated as a Prime Contractor and not as a subcontractor.
If the Offeror is a Joint Venture (JV) or a participant of Small Business Administration (SBA) Mentor-Protégé Program, recent relevant project experience should be submitted for projects completed by the Joint Venture entity or SBA Mentor-Protégé. If the JV or SBA Mentor-Protégé does not have shared experience, recent relevant projects should be submitted for each JV partner or for the Mentor and Protégé. Offerors who fail to submit experience for all JV partners or Mentor and Protégé may be rated lower. Offerors are still limited to a total of five (5) projects combined.
This factor will be evaluated to assess capability in performing recent and relevant projects.
The information requested above is required for the Government to evaluate proposals for the Experience evaluation factor. General statements claiming experience providing a Hospital remodel and/or Sterile Processing and Supply (SPS) remodel construction experience or similar relevant experience, as stated above, that do not include specific references to prior contract work, or that do not include the information required above, are not acceptable. FAILURE TO SUBMIT THE INFORMATION REQUIRED ABOVE TO SUPPORT THE OFFEROR’S CLAIMED EXPERIENCE MAY BE VIEWED BY THE GOVERNMENT AS EVIDENCE THAT THE OFFEROR LACKS EXPERIENCE IN PROVIDING HOSPITAL REMODEL AND/OR STERILE PROCESSING AND SUPPLY (SPS) REMODEL CONSTRUCTION EXPERIENCE WHEN EVALUATING PROPOSALS FOR THIS FACTOR.
Factor 2: Project Team. Submission of Project Team Resumes.
For each of the following Team Members, Offerors shall provide the resume for each Team Member proposed for submission of your response to Factor 2.
Example Team Members can include but are not limited to the following titles: Superintendent, Project Manager, Safety Manager, and Quality Control Manager.
Resumes requested above are required for the Government to evaluate proposals for the Project Team evaluation factor. FAILURE TO SUBMIT RESUMES AS REQUIRED ABOVE TO SUPPORT THE OFFEROR’S CLAIMED PROJECT TEAM QUALIFICATIONS MAY BE VIEWED BY THE GOVERNMENT AS EVIDENCE THAT THE OFFER LACKS A PROJECT TEAM TO PROVIDE HOSPITAL REMODEL AND/OR STERILE PROCESSING AND SUPPLY (SPS) REMODEL CONSTRUCTION EXPERIENCE WHEN EVALUATING PROPOSALS FOR THIS FACTOR.
Factor 3: SDVOSB/VOSB STATUS
SDVOSB/VOSB Status. This factor will be used to assess the Offeror’s status as a Service-Disabled Veteran-Owned Small Business (SDVOSB) or Veteran-Owned Small Business (VOSB) concern, or the Offeror’s proposed use of eligible SDVOSB/VOSB concerns as subcontractors.
(a) In an effort to achieve socioeconomic small business goals, VA shall evaluate offerors based on their service-disabled Veteran-owned or Veteran-owned small business certification status and their proposed use of eligible certified service-disabled Veteran-owned small businesses (SDVOSBs) and certified Veteran-owned small businesses (VOSBs) as subcontractors.
(b) Eligible and certified service-disabled Veteran-owned small businesses offerors will receive full credit, and offerors qualifying as Veteran-owned small businesses will receive partial credit for the certified Service-Disabled Veteran-Owned and Veteran-Owned Small Business Status evaluation factor. To receive credit, an offeror must be listed at the time of submission of offers and at time of award, as a certified SDVOSB/VOSB in the SBA certification database on the SBA Veteran Small Business Certification Program portal at https://veterans.certify.sba.gov/ (see 13 CFR 128) and be otherwise eligible in accordance with SBA size standards for the acquisition and limitations on subcontracting requirements set forth in SBA regulations (see 13 CFR 121, 125 and 128).
(c) Non-Veteran offerors proposing to use certified SDVOSBs or VOSBs as subcontractors will receive some consideration under this evaluation factor. Offerors must state in their proposals the names of the certified SDVOSBs and VOSBs with whom they intend to subcontract and provide a brief description of the proposed subcontracts and the approximate dollar values of the proposed subcontracts. In addition, the proposed subcontractors must be listed at the time of submission of offers and at time of award, as a certified SDVOSB/VOSB in the SBA certification database.
(d) Pursuant to 38 U.S.C. 8127(g), any business concern that is determined by VA to have willfully and intentionally misrepresented a company’s SDVOSB/VOSB status is subject to debarment for a period of not less than five years. This includes the debarment of all principals in the business.
This evaluation factor will be evaluated for Full Credit / Partial Credit / Some Consideration / No Credit.
The information requested above is required for the Government to evaluate proposals for the SDVOSB/VOSB Status evaluation factor. General statements claiming that an Offeror will use eligible SDVOSB/VOSB subcontractors to perform work under this procurement or that do not include the information required above are not acceptable. FAILURE TO SUBMIT THE INFORMATION REQUIRED ABOVE, INCLUDING THE SMALL BUSINESS CERTIFICATIONS, MAY BE VIEWED BY THE GOVERNMENT AS EVIDENCE THAT THE OFFEROR SHOULD RECEIVE NO CREDIT WHEN EVALUATING PROPOSALS FOR THIS FACTOR.
Factor 4: PRICE
Offers submitted to the Government are considered confidential.
Offeror shall submit a complete and reasonable price. Offerors shall use the Attachment B “Divisional Cost Break-Out Sheet” (which follows the Table of Contents) to submit price breakdown by division. Offeror shall complete all columns: Material, Labor, and Total.
In addition, Offeror shall insert the total proposed project price in block 17 of SF 1442, solicitation.
Failure to submit a completed Divisional Cost-Break-Out Sheet and insert the total proposed project price in block 17 of the SF 1442 may result in a proposal being eliminated for award without further consideration or evaluation.
This factor will be evaluated by determining if price submitted is fair and reasonable.
36C26123R0049
**END**
Statement of Work Project: 570-17-207 | Renovate Sterile Processing Supply Date: 04/05/2023
1. GENERAL DESCRIPTION
The awarded contractor shall provide all materials, labor, tools, equipment, transportation, supervision, project management, administrative support, and specialized expertise to perform the work stipulated in the Construction Documents. The project site is at the Fresno VA Medical Center at the cross streets of N. Fresno St. and E. Clinton Ave, Fresno, CA The below description is a general overview of the work activities and is not comprehensive. The contractor shall perform all work stated in this Scope of Work, the Construction Drawings, Construction Specifications, hereafter collectively referred to as the Construction Documents. These are included as attachments and are labeled as follows:
1. 570-17-207 Drawings
2. 570-17-207 Specifications 20230404
3. 570-17-207 Campus Asbestos Containing Material (ACM) report
The general description of work includes but is not limited to;
a) General construction work includes demolition of existing SPS, a connection of temporary trailer, renovation of the first floor of the warehouse to accommodate logistics, structural reinforcement at the warehouse to support SPS equipment on the roof, full renovation of the current SPS for new workflow, new electrical service, new Air Handling Unit (AHU), new Reverse Osmosis (RO) system, and connection of bridge pathway for mechanical connection, electrical service, and RO water. New utility connections for mechanical, plumbing, electrical, and low voltage will be installed throughout the SPS area.
b) Project will require phasing. Means and methods shall be agreed to between the VA and the general contractor (GC) to maintain functionality of all services for the SPS and the Warehouse. Below is the phasing as outlined by the contract documents.
1. Work in the warehouse on the first floor for logistics relocation, structural improvements, and temporary connections in place for the SPS trailer.
2. Connection of SPS trailer and added ramping for access.
3. New utilities in place
4. Renovation of SPS
5. Removal of a temporary trailer
c) Work in the public right of way of the City of Fresno is not anticipated. If it becomes required, it is subject to the inspection and approval of the City of Fresno. https://www.fresno.gov/darm/
d) Bidders shall provide a required Allowance in the bid amount for the reimbursement of certain expenses as described in the bid documents.
2. EXISTING CONDITIONS:
The existing SPS is on the 3rd floor of building one and is occupied by both SPS and Clean Storage. The space will need to be vacated before work, beginning with those user-provided temporary spaces.
The warehouse will be completed in phases to maintain operations.
The MEP connections at the SPS and the Warehouse have been located from field survey information and existing records documents. The VA and the design professional make no guarantees that all in-wall or in-ceiling conditions have been fully vetted and are in the exact locations as shown on the drawings. Once the SPS is empty, and the ceiling and walls can be removed, the construction contractor is advised to verify the existence and locations of existing utilities at no additional cost to the government.
3. CONSTRUCTION DURATION AND WORK HOURS/DAYS:
The total contract duration shall be 730 consecutive calendar days from issuance of the Notice to Proceed. Normal work hours for the contract are from 7:00 AM to 5:00 PM, unless specifically noted otherwise. The Contractor may request alternate working hours or additional working hours to meet project requirements. Requests shall be made to the Contracting Officer Representative (COR) in writing 14 days in advance of any utility shutdown. The contractor is beholden to the City of Fresno Municipal Code criteria for Construction Noise and shall request work hour exceptions in accordance with permissible criteria. The work week shall be defined as Monday through Friday with the exceptions of the following listed holidays, or the days observed in lieu thereof by the Department of Veterans Affairs:
| · New Year’s Day | January 1st | ||
| · Martin Luther King’s Birthday | Third Monday in January | ||
| · President’s Day | Third Monday in February | ||
| · Memorial Day | Last Monday in May | ||
| · Juneteenth | June 19th | ||
| · Independence Day | July 4th | ||
| · Labor Day | First Monday in September | ||
| · Columbus Day | Second Monday in October | ||
| · Veteran’s Day | November 11th | ||
| · Thanksgiving Day | Fourth Thursday in November | ||
| · Christmas Day | December 25th |
and other days specifically declared by the President of the United States to be National Holidays. Requests to work on the listed holidays shall be made in writing to the COR, 5 working days in advance.
4. SUBMITTALS, REQUESTS FOR INFORMATION (RFI) AND REQUESTS FOR DEVIATION (RFD)
a) The contractor is responsible for the timely submission of all submittals, shop drawings, and coordination drawings in accordance with drawings and specifications. The contractor shall allocate a minimum of fifteen (15) calendar days for the VA and A/E to conduct its evaluation of all submittals. The contractor is responsible for all time delays associated with submittals requiring re-submission.
b) The contractor shall allocate a minimum of ten (10) calendar days for the VA and A/E to respond to Requests for Information (RFI). The contractor shall submit RFI’s as early as possible. The contractor is responsible for the coordination of all Contract Documents. All time delays associated with the failure to timely submit RFI’s related to the Contract Documents shall be the responsibility of the contractor.
c) Contractor’s Requests for Deviation (RFD) shall be submitted for the VA’s consideration a minimum of twenty-one (21) calendar days in advance of the requested response date. The VA reserves the right to deny requests for deviation at any time, regardless of the reason. Request for Deviation responses may include necessary consideration to the government as terms of approval.
d) Contractor shall provide a platform, such as Procore, for access to project information and response and tracking of RFIs and Submittals from the VA and the A/E.
5. PROGRESS PAYMENTS
The contractor shall submit a Schedule of Values to the VA for review and approval within fourteen
(14) calendar days of the Notice to Proceed. The Schedule of values shall be itemized in accordance with the project specification Divisions. Line items shall also be developed for individual General Requirements components including but not limited to submission and approval of as-built documentation and Operation and Maintenance (O&M) Manuals.
Progress payments applications may be submitted to the VA on regularly scheduled intervals and must be reviewed and returned with approval signature prior to submission for payment.
Progress payments will be reviewed contingent on the following being completed at the time of submission:
a) Two (2) sets of As-built red marked drawings shall be current and available on the project site for review by the COR.
b) Waste Manifests for the progress payment interval shall be submitted to the COR.
c) Certified payroll for the progress payment interval shall be submitted to the COR.
d) The project schedule with Critical Path identified shall be current (no more than 10 days behind schedule). A revised schedule shall be submitted to the COR and Contracting Officer to identify measures planned to become in compliance with the Contract Duration limitations.
e) Contractor daily logs and Quality Control plans during the interval of the progress payment shall be up to date.
f) Punch-list and re-work items identified by the VA or through the Contractors Quality Control plan shall have been corrected or a written action plan shall be provided to identify method and date of corrective action plan.
g) All safety deficiencies shall have been corrected.
Failure to comply with any of the above will result in the rejection of the contractor’s request for progress payment review. The VA will review requests for payment only after each of the above items is complied with.
6. ADDITIONAL REQUIREMENTS
The contractor is required to comply with all facility and City of Fresno or governing jurisdiction’s standards for safety, security, Stormwater Pollution Prevention (SWPP), and dust control standards. Policies will be made available to the contractor at the Notice to Proceed meeting.
For execution of work activities, the contractor may be required to employ various professional services including but not limited to engineering, consulting, and/or surveying. Professional services required for the execution of work activities shall be performed at no additional cost to the government.
7. DEFINITIONS:
A. Contract Documents: All documents included and referenced in the executed contract. This includes the contract and references and the construction documents.
B. Construction Documents: All documents which identify the scope of work to be performed by the contractor. This includes the construction drawings, the specifications, the scope of work and all references included in the above documents.
C. Contracting Officer (CO): The services to be performed under this contract are subject to the general supervision, direction, control, and approval of the Contracting Officer.
D. Contracting Officers Representative (COR): The Contracting Officer's authorized representative at the construction site. His/Her duties include surveillance of all construction work to assure compliance with the contract documents, interpretation of the contract documents, approval of changed work, approval of all submittals, samples, shop drawings, etc.
E. A/E: Refers to the Architect-Engineer firm that prepared and produced the construction drawings and construction specification documents for subject project. Includes all Joint Venture (JV) partners, consultants, and sub-contractors to the one firm.
*** END ***
2.1 52.216-1 TYPE OF CONTRACT (APR 1984)
The Government contemplates award of a Firm-Fixed-Price contract resulting from this solicitation.
(End of Provision)
2.2 52.222-5 CONSTRUCTION WAGE RATE REQUIREMENTS—SECONDARY SITE OF THE WORK (MAY 2014) (a)(1) The offeror shall notify the Government if the offeror intends to perform work at any secondary site of the work, as defined in paragraph (a)(1)(ii) of the FAR clause at 52.222-6, Construction Wage Rate Requirements, of this solicitation.
(2) If the offeror is unsure if a planned work site satisfies the criteria for a secondary site of the work, the offeror shall request a determination from the Contracting Officer.
(b)(1) If the wage determination provided by the Government for work at the primary site of the work is not applicable to the secondary site of the work, the offeror shall request a wage determination from the Contracting Officer.
(2) The due date for receipt of offers will not be extended as a result of an offeror's request for a wage determination for a secondary site of the work.
(End of Provision)
2.3 52.222-23 NOTICE OF REQUIREMENT FOR AFFIRMATIVE ACTION TO ENSURE EQUAL EMPLOYMENT OPPORTUNITY FOR CONSTRUCTION (FEB 1999)
(a) The offeror's attention is called to the Equal Opportunity clause and the Affirmative Action Compliance Requirements for Construction clause of this solicitation.
(b) The goals for minority and female participation, expressed in percentage terms for the Contractor's aggregate workforce in each trade on all construction work in the covered area, are as follows:
| Goals for minority participation for each trade |
| Goals for female participation for each trade |
| 26.1 % |
| 6.9 % |
These goals are applicable to all the Contractor's construction work performed in the covered area. If the Contractor performs construction work in a geographical area located outside of the covered area, the Contractor shall apply the goals established for the geographical area where the work is actually performed. Goals are published periodically in the Federal Register in notice form, and these notices may be obtained from any Office of Federal Contract Compliance Programs office.
(c) The Contractor's compliance with Executive Order 11246, as amended, and the regulations in 41 CFR 60-4 shall be based on (1) its implementation of the Equal Opportunity clause, (2) specific affirmative action obligations required by the clause entitled "Affirmative Action Compliance Requirements for Construction," and (3) its efforts to meet the goals. The hours of minority and female employment and training must be substantially uniform throughout the length of the contract, and in each trade. The Contractor shall make a good faith effort to employ minorities and women evenly on each of its projects. The transfer of minority or female employees or trainees from Contractor to Contractor, or from project to project, for the sole purpose of meeting the Contractor's goals shall be a violation of the contract, Executive Order 11246, as amended, and the regulations in 41 CFR 60-4. Compliance with the goals will be measured against the total work hours performed.
(d) The Contractor shall provide written notification to the Deputy Assistant Secretary for Federal Contract Compliance, U.S. Department of Labor, within 10 working days following award of any construction subcontract in excess of $10,000 at any tier for construction work under the contract resulting from this solicitation. The notification shall list the—
(1) Name, address, and telephone number of the subcontractor;
(2) Employer's identification number of the subcontractor;
(3) Estimated dollar amount of the subcontract;
(4) Estimated starting and completion dates of the subcontract; and
(5) Geographical area in which the subcontract is to be performed.
(e) As used in this Notice, and in any…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .