This document is a solicitation amendment for a renovation project at a Veterans Affairs medical facility. The Department of Veterans Affairs Central California Healthcare System is seeking offers to renovate its Sterile Processing and Supply department. The solicitation due date has been extended to June 30, 2023 at 12:00 PM PST. The amendment also adds ten calendar days for government acceptance after offers are due, for a total of forty calendar days. All offerors must sign and return this amendment to be eligible for award. The project involves renovating the Sterile Processing and Supply department, and all other terms and conditions of the original solicitation remain in effect.

View the file

Other files

File Type Posted
GD CA20230018_06092023.docx DOCX document
570-17-207_SPS-PreBid RFI Log-20230613.pdf PDF
36C26123R0049 0004.pdf PDF
570-17-207_DWGs 100_Add 1 20230609.pdf PDF
2nd Floor Photos_Pre-Bid RFIs for SPS 2.zip ZIP file
Spec Sections.zip ZIP file
DWGs.zip ZIP file
GD CA20230018_06022023.docx DOCX document
HA Maps.pdf PDF
2nd Floor Photos_Pre-Bid RFIs for SPS 1.zip ZIP file
36C26123R0049 0003.pdf PDF
570-17-207_RFI Log_20230603.pdf PDF
Equipment Cut Sheets.zip ZIP file
2nd Floor Photos_Pre-Bid RFIs for SPS 3.zip ZIP file
36C26123R0049 0002.pdf PDF
Site Visit Sign-in Sheet_05112023.pdf PDF
36C26123R0049 0001.pdf PDF
Attachment A_Factor 1_Experience_05102023.xlsx XLSX spreadsheet
570-17-207 Drawings_20230413.pdf PDF
Attachment D_Large Business Subcontracting Plan Template_03272023.docx DOCX document
Attachment A_Factor 1_Experience_03272023.xlsx XLSX spreadsheet
36C26123R0049_04272023.docx DOCX document
Attachment B_Supplemental Price Breakdown_03272023.xlsx XLSX spreadsheet
570-17-207 Campus Asbestos Containing Materials (ACM) Report.pdf PDF
Attachment C_Request for Information (RFI) Form_36C26123R0049.docx DOCX document
P07 GD CA20230018_04212023.docx DOCX document
570-17-207 Specifications 20230404.pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

5. PROJECT NUMBER (if applicable)

CODE 7. ADMINISTERED BY

2. AMENDMENT/MODIFICATION NUMBER

CODE

6. ISSUED BY

8. NAME AND ADDRESS OF CONTRACTOR

4. REQUISITION/PURCHASE REQ. NUMBER 3. EFFECTIVE DATE

9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED

PAGE OF PAGES

10A. MODIFICATION OF CONTRACT/ORDER NUMBER

10B. DATED

BPA NO. 1. CONTRACT ID CODE

FACILITY CODE CODE

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers

E. IMPORTANT:

is extended,

(a) By completing Items 8 and 15, and returning __________ copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted; or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR

ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY is not extended.

12. ACCOUNTING AND APPROPRIATION DATA

(REV. 11/2016)

is required to sign this document and return ___________ copies to the issuing office. is not, A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO. IN ITEM 10A.

15C. DATE SIGNED

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES

SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER

Contractor

16C. DATE SIGNED

14. DESCRIPTION OF AMENDMENT/MODIFICATION

16B. UNITED STATES OF AMERICA

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER 16A. NAME AND TITLE OF CONTRACTING OFFICER

15B. CONTRACTOR/OFFEROR

STANDARD FORM 30 PREVIOUS EDITION NOT USABLE

Prescribed by GSA - FAR (48 CFR) 53.243

(Type or print) (Type or print)

(Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

(Number, street, county, State and ZIP Code)

(If other than Item 6)

(Specify type of modification and authority)

(such as changes in paying office, appropriation date, etc.)

(If required)

(SEE ITEM 11)

(SEE ITEM 13)

(X)

CHECK

ONE

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS,

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

(Signature of person authorized to sign) (Signature of Contracting Officer)

1 1

36C261-23-AP-2142

570-23-2-457-0036

570-17-207

Department of Veterans Affairs

VA Sierra Pacific Network (VISN 21)

VA Central California Health Care System

855 M Street, Suite 1020

Fresno CA 93721

Department of Veterans Affairs

VA Sierra Pacific Network (VISN 21)

VA Central California Health Care System

855 M Street, Suite 1020

Fresno CA 93721

To all Offerors/Bidders

36C26123R0049

06-21-2023

X

X X

Friday June 30, 2023 at 12:00 PM PST

X 1

The purpose of this amendment is to make the following changes and/or clarifications to the solicitation.

1. The solicitation due date has been extended to Friday June 30, 2023 at 12:00 PM PST.

2. Ten (10) calendar days are added for Government acceptance after date offers are due from thirty (30) to forty (40). Offers providing less than 40 calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.

3. All solicitation amendments are required to be signed and returned to be eligible for award.

4. All other terms and conditions remain in full force and effect.

*** The timeline for RFIs has expired. There will be absolutely no more RFIs accepted. ***