ATTACHMENT B - SOUTH FLORIDA NC GMC COST SCHEDULE.xlsx
XLSX spreadsheet 28 KB Posted
- Solicitation number
- 36C78624R50137
About this file
This document is a cost schedule for ground maintenance services at the South Florida National Cemetery, which is part of a larger federal contract opportunity. The cost schedule covers a base period and four one-year option periods, and includes detailed pricing for a wide range of services such as mowing, edging, trimming, trash/debris removal, sprinkler system maintenance, grave site repairs, landscaping, pest control, pressure washing, and headstone maintenance and transport. The estimated quantities and unit prices are provided for each service item. The overall contract is solicited by the Department of Veterans Affairs National Cemetery Administration, with a total estimated cost across the base and option periods. Key details on response dates, award, and set-asides are not provided in this specific document.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN - MIN & MAX
| South Florida National Cemetery Ground Maintenance Services | |||||||
| Base Period | |||||||
| CLIN | SOW | Description | Est. Qty | Unit | Unit Price | Total | Type |
| 0001 | B.4.1.1 | MOWING TURF AREA (169 +/- Acres - Empire Zoyzia, Celebration Bermuda & St. Augustine) | 52 | WK | $0.00 | Service | |
| 0002 | B.4.1.2 | MOWING NON-TURF AREA (130+/- Areas - St. Augustine & Bahia) | 52 | WK | $0.00 | Service | |
| 0003 | B.4.1.3 | EDGING OF WALKWAYS AND CURBS | 52 | WK | $0.00 | Service | |
| 0004 | B.4.1.4 | TRIMMING OF HEADSTONES, MONUMENTS, MARKERS AND OTHER VERTICLE SERFACES | 52 | WK | $0.00 | Service | |
| 0005 | B.4.1.5 | TRASH, DEBRIS, AND GRAVE DECORATION/FLORAL REMOVAL | 12 | MO | $0.00 | Service | |
| 0006 | B.4.1.6 | SWEEPING/BLOWING OFF WALKWAYS & ROADWAYS as needed weekly-billed monthly | 12 | MO | $0.00 | Service | |
| 0007 | B.4.1.7 | UNDERGROUND SPRINKLER SYSTEM OPERATION, INSPECTION AND MAINTENANCE-Monthly system check-Includes Controler and Sprinkler adjustments as needed | 12 | MO | $0.00 | Service | |
| 0008 | B.4.1.7 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis (See Section B.4.1.7) - All Parts and Supplies Provided By Government. | 1200 | EA (15 Min) | $0.00 | Construction | |
| 0009 | B.4.2.1 | SUNKEN GRAVE REPAIR & GROUNDS REPAIR (CASKET SITES) | 100 | EA | $0.00 | Construction | |
| 0010 | B.4.2.1a | SUNKEN CREMATION AND SMALL AREA SITE GROUNDS REPAIRS | 100 | EA | $0.00 | Construction | |
| 0011 | B.4.2.1b | SOD REPAIRS AND INSTALLATION | 5000 | SQFT | $0.00 | Construction | |
| 0012 | B.4.3 | LEAF AND TRASH COLLECTION & REMOVAL | 12 | MO | $0.00 | Service | |
| 0013 | B.4.4.1 | PLANTING BEDS | 12 | MO | $0.00 | Service | |
| 0014 | B.4.4.2 | MULCHING | 4 | QTR | $0.00 | Service | |
| 0015 | B.4.4.3 | TREE TRIMMING/PRUNING/SHRUB MAINTENANCE | 12 | MO | $0.00 | Service | |
| 0016 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 3X8) | 1100 | EA | $0.00 | Service | |
| 0017 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 4X10) | 10 | EA | $0.00 | Service | |
| 0018 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET TRADITIONAL 5X10) | 18 | EA | $0.00 | Service | |
| 0019 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (IN-GROUND CREMATION 4X4) | 1000 | EA | $0.00 | Service | |
| 0020 | B.4.5.2 | CORE AERIFICATION (Aeration) - High traffic areas as needed/directed by COR Est. 10 acres per job (Sept) | 1 | JB | $0.00 | Service | |
| 0021 | B.4.5.3 | FERTILIZATION - Celebration Bermuda (1lb N per 1000/per app) See Flow Chart (Oct, Dec, Feb, Apr, May, Jun) | 6 | JB | $0.00 | Service | |
| 0022 | B.4.5.3 | FERTILIZATION - Empire Zoysia and St Augustine (.75lb N per 1000/per app)See Flow Chart (Oct, Dec, Feb, Apr, May, Jun) | 6 | JB | $0.00 | Service | |
| 0023 | B.4.5.4 | GYPSUM APPLICATION - early Fall | 1 | JB | $0.00 | Service | |
| 0024 | B.4.5.5 | PRE-EMERGE APPLICATIONS: Celebration Bermuda and Empire zoysia turf - See Flow Chart (Nov, Feb, Jun) | 3 | JB | $0.00 | Service | |
| 0025 | B.4.5.5 | PRE-EMERGE APPLICATIONS:-St Augustine and Bahia turf - See Flow Chart (Nov, Feb, Jun) | 3 | JB | $0.00 | Service | |
| 0026 | B.4.5.5 | POST-EMERGE WEED: applications Spot Treat-See Flow Chart | 200 | EA | $0.00 | Service | |
| 0027 | B.4.5.5 | POST-EMERGE WEED: APPLICATIONS BLANKET TREAT:See Flow Chart | 2 | JB | $0.00 | Service | |
| 0028 | B.4.5.5 | Bermugrass control in Empire Zoysia | 4 | JB | $0.00 | Service | |
| 0029 | B.4.6.1 | ARMADILLOS, MOLES, IGUANAS AND OTHER PEST CONTROL | 12 | MO | $0.00 | Service | |
| 0030 | B.4.6.2 | FIRE ANT CONTROL- Daily as needed spot treatments-See Flow Chart | 200 | EA | $0.00 | Service | |
| 0031 | B.4.6.2 | FIRE ANT CONTROL - Blanket application | 2 | JB | $0.00 | Service | |
| 0032 | B.4.6.3 | INSECT/PEST/DISEASE CONTROL - Blanket application as needed/identified | 1 | JB | $0.00 | Service | |
| 0033 | B.4.6.3 | INSECT/PEST/DISEASE CONTROL - Spot application as needed/identified | 1 | JB | $0.00 | Service | |
| 0034 | B.4.7 | STORM DAMAGE AND DEBRIS CLEAN-UP | 1 | JB | $0.00 | Service | |
| 0035 | B.4.8.1 | DAILY INTERMENT SHELTER SETUP/TEAR DOWN | 600 | EA | $0.00 | Service | |
| 0036 | B.4.9.1 | HEADSTONE SETTING, AND REALIGNMENT (INITIAL) (Construction) | 1200 | EA | $0.00 | Construction | |
| 0037 | B.4.9.1 | HEADSTONE SETTING (REPLACEMENT) (Construction) | 250 | EA | $0.00 | Construction | |
| 0038 | B.4.9.2 | HEADSTONE REALIGNMENT (Construction) | 500 | EA | $0.00 | Construction | |
| 0039 | B.4.9.2 | HEADSTONE FINE TUNE ALIGNMENT (Bump & Run) | 2000 | EA | $0.00 | Service | |
| 0040 | B.4.9.1 | HEADSTONE TRANSPORT (1ST AND 2ND) | 1200 | EA | $0.00 | Service | |
| 0041 | B.4.10.1 | CASKET TRANSPORTATION | 900 | EA | $0.00 | Service | |
| 0042 | B.4.10.1 | CREMATION TRANSPORTATION | 750 | EA | $0.00 | Service | |
| 0043 | B.4.10.2 | CHAIN OF CUSTODY | 1300 | EA | $0.00 | Service | |
| 0044 | B.4.11.1 | PREASURE WASHING: All Headstones and Niches | 4 | JB | $0.00 | Service | |
| 0045 | B.4.11.2 | PRESSURE WASHING: Shelters A, B, C, D (Oct, Jan, Apr, July) | 4 | JB | $0.00 | Service | |
| 0046 | B.4.11.2 | PRESSURE WASHING: Administration & Maintenance Buildings (Oct, Jan, Apr, July) | 4 | JB | $0.00 | Service | |
| 0047 | B.4.12 | PRESSURE WASHING: Walkways, Curbs, Signs and Front & Maintenance Gate | 2 | JB | $0.00 | Service | |
| 0048 | B.4.4.3 | Palm Tree Pruning and Debooting | 25 | JB | $0.00 | Service | |
| Base Year Total Estimate COST | $0.00 |
| Option Year One (1) | |||||||
| CLIN | SOW | Description | Est. Qty | Unit | Est. Cost | Total | |
| 10001 | B.4.1.1 | MOWING TURF AREA (169 +/- Acres - Empire Zoyzia, Celebration Bermuda & St. Augustine) | 52 | WK | $0.00 | Service | |
| 10002 | B.4.1.2 | MOWING NON-TURF AREA (130+/- Areas - St. Augustine & Bahia) | 52 | WK | $0.00 | Service | |
| 10003 | B.4.1.3 | EDGING OF WALKWAYS AND CURBS | 52 | WK | $0.00 | Service | |
| 10004 | B.4.1.4 | TRIMMING OF HEADSTONES, MONUMENTS, MARKERS AND OTHER VERTICLE SERFACES | 52 | WK | $0.00 | Service | |
| 10005 | B.4.1.5 | TRASH, DEBRIS, AND GRAVE DECORATION/FLORAL REMOVAL | 12 | MO | $0.00 | Service | |
| 10006 | B.4.1.6 | SWEEPING/BLOWING OFF WALKWAYS & ROADWAYS as needed weekly-billed monthly | 12 | MO | $0.00 | Service | |
| 10007 | B.4.1.7 | UNDERGROUND SPRINKLER SYSTEM OPERATION, INSPECTION AND MAINTENANCE-Monthly system check-Includes Controler and Sprinkler adjustments as needed | 12 | MO | $0.00 | Service | |
| 10008 | B.4.1.7 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis (See Section B.4.1.7) - All Parts and Supplies Provided By Government. | 1200 | EA (15 Min) | $0.00 | Construction | |
| 10009 | B.4.2.1 | SUNKEN GRAVE REPAIR & GROUNDS REPAIR (CASKET SITES) | 100 | EA | $0.00 | Construction | |
| 10010 | B.4.2.1a | SUNKEN CREMATION AND SMALL AREA SITE GROUNDS REPAIRS | 100 | EA | $0.00 | Construction | |
| 10011 | B.4.2.1b | SOD REPAIRS AND INSTALLATION | 5000 | SQFT | $0.00 | Construction | |
| 10012 | B.4.3 | LEAF AND TRASH COLLECTION & REMOVAL | 12 | MO | $0.00 | Service | |
| 10013 | B.4.4.1 | PLANTING BEDS | 12 | MO | $0.00 | Service | |
| 10014 | B.4.4.2 | MULCHING | 4 | QTR | $0.00 | Service | |
| 10015 | B.4.4.3 | TREE TRIMMING/PRUNING/SHRUB MAINTENANCE | 12 | MO | $0.00 | Service | |
| 10016 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 3X8) | 1100 | EA | $0.00 | Service | |
| 10017 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 4X10) | 10 | EA | $0.00 | Service | |
| 10018 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET TRADITIONAL 5X10) | 18 | EA | $0.00 | Service | |
| 10019 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (IN-GROUND CREMATION 4X4) | 1000 | EA | $0.00 | Service | |
| 10020 | B.4.5.2 | CORE AERIFICATION (Aeration) - High traffic areas as needed/directed by COR Est. 10 acres per job (Sept) | 1 | JB | $0.00 | Service | |
| 10021 | B.4.5.3 | FERTILIZATION - Celebration Bermuda (1lb N per 1000/per app) See Flow Chart (Oct, Dec, Feb, Apr, May, Jun) | 6 | JB | $0.00 | Service | |
| 10022 | B.4.5.3 | FERTILIZATION - Empire Zoysia and St Augustine (.75lb N per 1000/per app)See Flow Chart (Oct, Dec, Feb, Apr, May, Jun) | 6 | JB | $0.00 | Service | |
| 10023 | B.4.5.4 | GYPSUM APPLICATION - early Fall | 1 | JB | $0.00 | Service | |
| 10024 | B.4.5.5 | PRE-EMERGE APPLICATIONS: Celebration Bermuda and Empire zoysia turf - See Flow Chart (Nov, Feb, Jun) | 3 | JB | $0.00 | Service | |
| 10025 | B.4.5.5 | PRE-EMERGE APPLICATIONS:-St Augustine and Bahia turf - See Flow Chart (Nov, Feb, Jun) | 3 | JB | $0.00 | Service | |
| 10026 | B.4.5.5 | POST-EMERGE WEED: applications Spot Treat-See Flow Chart | 200 | EA | $0.00 | Service | |
| 10027 | B.4.5.5 | POST-EMERGE WEED: APPLICATIONS BLANKET TREAT:See Flow Chart | 2 | JB | $0.00 | Service | |
| 10028 | B.4.5.5 | Bermugrass control in Empire Zoysia | 4 | JB | $0.00 | Service | |
| 10029 | B.4.6.1 | ARMADILLOS, MOLES, IGUANAS AND OTHER PEST CONTROL | 12 | MO | $0.00 | Service | |
| 10030 | B.4.6.2 | FIRE ANT CONTROL- Daily as needed spot treatments-See Flow Chart | 200 | EA | $0.00 | Service | |
| 10031 | B.4.6.2 | FIRE ANT CONTROL - Blanket application | 2 | JB | $0.00 | Service | |
| 10032 | B.4.6.3 | INSECT/PEST/DISEASE CONTROL - Blanket application as needed/identified | 1 | JB | $0.00 | Service | |
| 10033 | B.4.6.3 | INSECT/PEST/DISEASE CONTROL - Spot application as needed/identified | 1 | JB | $0.00 | Service | |
| 10034 | B.4.7 | STORM DAMAGE AND DEBRIS CLEAN-UP | 1 | JB | $0.00 | Service | |
| 10035 | B.4.8.1 | DAILY INTERMENT SHELTER SETUP/TEAR DOWN | 600 | EA | $0.00 | Service | |
| 10036 | B.4.9.1 | HEADSTONE SETTING, AND REALIGNMENT (INITIAL) (Construction) | 1200 | EA | $0.00 | Construction | |
| 10037 | B.4.9.1 | HEADSTONE SETTING (REPLACEMENT) (Construction) | 250 | EA | $0.00 | Construction | |
| 10038 | B.4.9.2 | HEADSTONE REALIGNMENT (Construction) | 500 | EA | $0.00 | Construction | |
| 10039 | B.4.9.2 | HEADSTONE FINE TUNE ALIGNMENT (Bump & Run) | 2000 | EA | $0.00 | Service | |
| 10040 | B.4.9.1 | HEADSTONE TRANSPORT (1ST AND 2ND) | 1200 | EA | $0.00 | Service | |
| 10041 | B.4.10.1 | CASKET TRANSPORTATION | 900 | EA | $0.00 | Service | |
| 10042 | B.4.10.1 | CREMATION TRANSPORTATION | 750 | EA | $0.00 | Service | |
| 10043 | B.4.10.2 | CHAIN OF CUSTODY | 1300 | EA | $0.00 | Service | |
| 10044 | B.4.11.1 | PREASURE WASHING: All Headstones and Niches | 4 | JB | $0.00 | Service | |
| 10045 | B.4.11.2 | PRESSURE WASHING: Shelters A, B, C, D (Oct, Jan, Apr, July) | 4 | JB | $0.00 | Service | |
| 10046 | B.4.11.2 | PRESSURE WASHING: Administration & Maintenance Buildings (Oct, Jan, Apr, July) | 4 | JB | $0.00 | Service | |
| 10047 | B.4.12 | PRESSURE WASHING: Walkways, Curbs, Signs and Front & Maintenance Gate | 2 | JB | $0.00 | Service | |
| 10048 | B.4.4.3 | Palm Tree Pruning and Debooting | 25 | JB | $0.00 | Service | |
| Option Year One Total Estimate COST | $0.00 |
| Option Year Two (2) | |||||||
| CLIN | SOW | Description | Est. Qty | Unit | Est. Cost | Total | |
| 20001 | B.4.1.1 | MOWING TURF AREA (169 +/- Acres - Empire Zoyzia, Celebration Bermuda & St. Augustine) | 52 | WK | $0.00 | Service | |
| 20002 | B.4.1.2 | MOWING NON-TURF AREA (130+/- Areas - St. Augustine & Bahia) | 52 | WK | $0.00 | Service | |
| 20003 | B.4.1.3 | EDGING OF WALKWAYS AND CURBS | 52 | WK | $0.00 | Service | |
| 20004 | B.4.1.4 | TRIMMING OF HEADSTONES, MONUMENTS, MARKERS AND OTHER VERTICLE SERFACES | 52 | WK | $0.00 | Service | |
| 20005 | B.4.1.5 | TRASH, DEBRIS, AND GRAVE DECORATION/FLORAL REMOVAL | 12 | MO | $0.00 | Service | |
| 20006 | B.4.1.6 | SWEEPING/BLOWING OFF WALKWAYS & ROADWAYS as needed weekly-billed monthly | 12 | MO | $0.00 | Service | |
| 20007 | B.4.1.7 | UNDERGROUND SPRINKLER SYSTEM OPERATION, INSPECTION AND MAINTENANCE-Monthly system check-Includes Controler and Sprinkler adjustments as needed | 12 | MO | $0.00 | Service | |
| 20008 | B.4.1.7 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis (See Section B.4.1.7) - All Parts and Supplies Provided By Government. | 1200 | EA (15 Min) | $0.00 | Construction | |
| 20009 | B.4.2.1 | SUNKEN GRAVE REPAIR & GROUNDS REPAIR (CASKET SITES) | 100 | EA | $0.00 | Construction | |
| 20010 | B.4.2.1a | SUNKEN CREMATION AND SMALL AREA SITE GROUNDS REPAIRS | 100 | EA | $0.00 | Construction | |
| 20011 | B.4.2.1b | SOD REPAIRS AND INSTALLATION | 5000 | SQFT | $0.00 | Construction | |
| 20012 | B.4.3 | LEAF AND TRASH COLLECTION & REMOVAL | 12 | MO | $0.00 | Service | |
| 20013 | B.4.4.1 | PLANTING BEDS | 12 | MO | $0.00 | Service | |
| 20014 | B.4.4.2 | MULCHING | 4 | QTR | $0.00 | Service | |
| 20015 | B.4.4.3 | TREE TRIMMING/PRUNING/SHRUB MAINTENANCE | 12 | MO | $0.00 | Service | |
| 20016 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 3X8) | 1100 | EA | $0.00 | Service | |
| 20017 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 4X10) | 10 | EA | $0.00 | Service | |
| 20018 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET TRADITIONAL 5X10) | 18 | EA | $0.00 | Service | |
| 20019 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (IN-GROUND CREMATION 4X4) | 1000 | EA | $0.00 | Service | |
| 20020 | B.4.5.2 | CORE AERIFICATION (Aeration) - High traffic areas as needed/directed by COR Est. 10 acres per job (Sept) | 1 | JB | $0.00 | Service | |
| 20021 | B.4.5.3 | FERTILIZATION - Celebration Bermuda (1lb N per 1000/per app) See Flow Chart (Oct, Dec, Feb, Apr, May, Jun) | 6 | JB | $0.00 | Service | |
| 20022 | B.4.5.3 | FERTILIZATION - Empire Zoysia and St Augustine (.75lb N per 1000/per app)See Flow Chart (Oct, Dec, Feb, Apr, May, Jun) | 6 | JB | $0.00 | Service | |
| 20023 | B.4.5.4 | GYPSUM APPLICATION - early Fall | 1 | JB | $0.00 | Service | |
| 20024 | B.4.5.5 | PRE-EMERGE APPLICATIONS: Celebration Bermuda and Empire zoysia turf - See Flow Chart (Nov, Feb, Jun) | 3 | JB | $0.00 | Service | |
| 20025 | B.4.5.5 | PRE-EMERGE APPLICATIONS:-St Augustine and Bahia turf - See Flow Chart (Nov, Feb, Jun) | 3 | JB | $0.00 | Service | |
| 20026 | B.4.5.5 | POST-EMERGE WEED: applications Spot Treat-See Flow Chart | 200 | EA | $0.00 | Service | |
| 20027 | B.4.5.5 | POST-EMERGE WEED: APPLICATIONS BLANKET TREAT:See Flow Chart | 2 | JB | $0.00 | Service | |
| 20028 | B.4.5.5 | Bermugrass control in Empire Zoysia | 4 | JB | $0.00 | Service | |
| 20029 | B.4.6.1 | ARMADILLOS, MOLES, IGUANAS AND OTHER PEST CONTROL | 12 | MO | $0.00 | Service | |
| 20030 | B.4.6.2 | FIRE ANT CONTROL- Daily as needed spot treatments-See Flow Chart | 200 | EA | $0.00 | Service | |
| 20031 | B.4.6.2 | FIRE ANT CONTROL - Blanket application | 2 | JB | $0.00 | Service | |
| 20032 | B.4.6.3 | INSECT/PEST/DISEASE CONTROL - Blanket application as needed/identified | 1 | JB | $0.00 | Service | |
| 20033 | B.4.6.3 | INSECT/PEST/DISEASE CONTROL - Spot application as needed/identified | 1 | JB | $0.00 | Service | |
| 20034 | B.4.7 | STORM DAMAGE AND DEBRIS CLEAN-UP | 1 | JB | $0.00 | Service | |
| 20035 | B.4.8.1 | DAILY INTERMENT SHELTER SETUP/TEAR DOWN | 600 | EA | $0.00 | Service | |
| 20036 | B.4.9.1 | HEADSTONE SETTING, AND REALIGNMENT (INITIAL) (Construction) | 1200 | EA | $0.00 | Construction | |
| 20037 | B.4.9.1 | HEADSTONE SETTING (REPLACEMENT) (Construction) | 250 | EA | $0.00 | Construction | |
| 20038 | B.4.9.2 | HEADSTONE REALIGNMENT (Construction) | 500 | EA | $0.00 | Construction | |
| 20039 | B.4.9.2 | HEADSTONE FINE TUNE ALIGNMENT (Bump & Run) | 2000 | EA | $0.00 | Service | |
| 20040 | B.4.9.1 | HEADSTONE TRANSPORT (1ST AND 2ND) | 1200 | EA | $0.00 | Service | |
| 20041 | B.4.10.1 | CASKET TRANSPORTATION | 900 | EA | $0.00 | Service | |
| 20042 | B.4.10.1 | CREMATION TRANSPORTATION | 750 | EA | $0.00 | Service | |
| 20043 | B.4.10.2 | CHAIN OF CUSTODY | 1300 | EA | $0.00 | Service | |
| 20044 | B.4.11.1 | PREASURE WASHING: All Headstones and Niches | 4 | JB | $0.00 | Service | |
| 20045 | B.4.11.2 | PRESSURE WASHING: Shelters A, B, C, D (Oct, Jan, Apr, July) | 4 | JB | $0.00 | Service | |
| 20046 | B.4.11.2 | PRESSURE WASHING: Administration & Maintenance Buildings (Oct, Jan, Apr, July) | 4 | JB | $0.00 | Service | |
| 20047 | B.4.12 | PRESSURE WASHING: Walkways, Curbs, Signs and Front & Maintenance Gate | 2 | JB | $0.00 | Service | |
| 20048 | B.4.4.3 | Palm Tree Pruning and Debooting | 25 | JB | $0.00 | ||
| Option Year Two Total Estimate COST | $0.00 |
| Option Year Three (3) | |||||||
| CLIN | SOW | Description | Est. Qty | Unit | Est. Cost | Total | |
| 30001 | B.4.1.1 | MOWING TURF AREA (169 +/- Acres - Empire Zoyzia, Celebration Bermuda & St. Augustine) | 52 | WK | $0.00 | Service | |
| 30002 | B.4.1.2 | MOWING NON-TURF AREA (130+/- Areas - St. Augustine & Bahia) | 52 | WK | $0.00 | Service | |
| 30003 | B.4.1.3 | EDGING OF WALKWAYS AND CURBS | 52 | WK | $0.00 | Service | |
| 30004 | B.4.1.4 | TRIMMING OF HEADSTONES, MONUMENTS, MARKERS AND OTHER VERTICLE SERFACES | 52 | WK | $0.00 | Service | |
| 30005 | B.4.1.5 | TRASH, DEBRIS, AND GRAVE DECORATION/FLORAL REMOVAL | 12 | MO | $0.00 | Service | |
| 30006 | B.4.1.6 | SWEEPING/BLOWING OFF WALKWAYS & ROADWAYS as needed weekly-billed monthly | 12 | MO | $0.00 | Service | |
| 30007 | B.4.1.7 | UNDERGROUND SPRINKLER SYSTEM OPERATION, INSPECTION AND MAINTENANCE-Monthly system check-Includes Controler and Sprinkler adjustments as needed | 12 | MO | $0.00 | Service | |
| 30008 | B.4.1.7 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis (See Section B.4.1.7) - All Parts and Supplies Provided By Government. | 1200 | EA (15 Min) | $0.00 | Construction | |
| 30009 | B.4.2.1 | SUNKEN GRAVE REPAIR & GROUNDS REPAIR (CASKET SITES) | 100 | EA | $0.00 | Construction | |
| 30010 | B.4.2.1a | SUNKEN CREMATION AND SMALL AREA SITE GROUNDS REPAIRS | 100 | EA | $0.00 | Construction | |
| 30011 | B.4.2.1b | SOD REPAIRS AND INSTALLATION | 5000 | SQFT | $0.00 | Construction | |
| 30012 | B.4.3 | LEAF AND TRASH COLLECTION & REMOVAL | 12 | MO | $0.00 | Service | |
| 30013 | B.4.4.1 | PLANTING BEDS | 12 | MO | $0.00 | Service | |
| 30014 | B.4.4.2 | MULCHING | 4 | QTR | $0.00 | Service | |
| 30015 | B.4.4.3 | TREE TRIMMING/PRUNING/SHRUB MAINTENANCE | 12 | MO | $0.00 | Service | |
| 30016 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 3X8) | 1100 | EA | $0.00 | Service | |
| 30017 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 4X10) | 10 | EA | $0.00 | Service | |
| 30018 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET TRADITIONAL 5X10) | 18 | EA | $0.00 | Service | |
| 30019 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (IN-GROUND CREMATION 4X4) | 1000 | EA | $0.00 | Service | |
| 30020 | B.4.5.2 | CORE AERIFICATION (Aeration) - High traffic areas as needed/directed by COR Est. 10 acres per job (Sept) | 1 | JB | $0.00 | Service | |
| 30021 | B.4.5.3 | FERTILIZATION - Celebration Bermuda (1lb N per 1000/per app) See Flow Chart (Oct, Dec, Feb, Apr, May, Jun) | 6 | JB | $0.00 | Service | |
| 30022 | B.4.5.3 | FERTILIZATION - Empire Zoysia and St Augustine (.75lb N per 1000/per app)See Flow Chart (Oct, Dec, Feb, Apr, May, Jun) | 6 | JB | $0.00 | Service | |
| 30023 | B.4.5.4 | GYPSUM APPLICATION - early Fall | 1 | JB | $0.00 | Service | |
| 30024 | B.4.5.5 | PRE-EMERGE APPLICATIONS: Celebration Bermuda and Empire zoysia turf - See Flow Chart (Nov, Feb, Jun) | 3 | JB | $0.00 | Service | |
| 30025 | B.4.5.5 | PRE-EMERGE APPLICATIONS:-St Augustine and Bahia turf - See Flow Chart (Nov, Feb, Jun) | 3 | JB | $0.00 | Service | |
| 30026 | B.4.5.5 | POST-EMERGE WEED: applications Spot Treat-See Flow Chart | 200 | EA | $0.00 | Service | |
| 30027 | B.4.5.5 | POST-EMERGE WEED: APPLICATIONS BLANKET TREAT:See Flow Chart | 2 | JB | $0.00 | Service | |
| 30028 | B.4.5.5 | Bermugrass control in Empire Zoysia | 4 | JB | $0.00 | Service | |
| 30029 | B.4.6.1 | ARMADILLOS, MOLES, IGUANAS AND OTHER PEST CONTROL | 12 | MO | $0.00 | Service | |
| 30030 | B.4.6.2 | FIRE ANT CONTROL- Daily as needed spot treatments-See Flow Chart | 200 | EA | $0.00 | Service | |
| 30031 | B.4.6.2 | FIRE ANT CONTROL - Blanket application | 2 | JB | $0.00 | Service | |
| 30032 | B.4.6.3 | INSECT/PEST/DISEASE CONTROL - Blanket application as needed/identified | 1 | JB | $0.00 | Service | |
| 30033 | B.4.6.3 | INSECT/PEST/DISEASE CONTROL - Spot application as needed/identified | 1 | JB | $0.00 | Service | |
| 30034 | B.4.7 | STORM DAMAGE AND DEBRIS CLEAN-UP | 1 | JB | $0.00 | Service | |
| 30035 | B.4.8.1 | DAILY INTERMENT SHELTER SETUP/TEAR DOWN | 600 | EA | $0.00 | Service | |
| 30036 | B.4.9.1 | HEADSTONE SETTING, AND REALIGNMENT (INITIAL) (Construction) | 1200 | EA | $0.00 | Construction | |
| 30037 | B.4.9.1 | HEADSTONE SETTING (REPLACEMENT) (Construction) | 250 | EA | $0.00 | Construction | |
| 30038 | B.4.9.2 | HEADSTONE REALIGNMENT (Construction) | 500 | EA | $0.00 | Construction | |
| 30039 | B.4.9.2 | HEADSTONE FINE TUNE ALIGNMENT (Bump & Run) | 2000 | EA | $0.00 | Service | |
| 30040 | B.4.9.1 | HEADSTONE TRANSPORT (1ST AND 2ND) | 1200 | EA | $0.00 | Service | |
| 30041 | B.4.10.1 | CASKET TRANSPORTATION | 900 | EA | $0.00 | Service | |
| 30042 | B.4.10.1 | CREMATION TRANSPORTATION | 750 | EA | $0.00 | Service | |
| 30043 | B.4.10.2 | CHAIN OF CUSTODY | 1300 | EA | $0.00 | Service | |
| 30044 | B.4.11.1 | PREASURE WASHING: All Headstones and Niches | 4 | JB | $0.00 | Service | |
| 30045 | B.4.11.2 | PRESSURE WASHING: Shelters A, B, C, D (Oct, Jan, Apr, July) | 4 | JB | $0.00 | Service | |
| 30046 | B.4.11.2 | PRESSURE WASHING: Administration & Maintenance Buildings (Oct, Jan, Apr, July) | 4 | JB | $0.00 | Service | |
| 30047 | B.4.12 | PRESSURE WASHING: Walkways, Curbs, Signs and Front & Maintenance Gate | 2 | JB | $0.00 | Service | |
| 30048 | B.4.4.3 | Palm Tree Pruning and Debooting | 25 | JB | $0.00 | Service | |
| Option Year Three Total Estimate COST | $0.00 |
| Option Year Four (4) | |||||||
| CLIN | SOW | Description | Est. Qty | Unit | Est. Cost | Total | |
| 40001 | B.4.1.1 | MOWING TURF AREA (169 +/- Acres - Empire Zoyzia, Celebration Bermuda & St. Augustine) | 52 | WK | $0.00 | Service | |
| 40002 | B.4.1.2 | MOWING NON-TURF AREA (130+/- Areas - St. Augustine & Bahia) | 52 | WK | $0.00 | Service | |
| 40003 | B.4.1.3 | EDGING OF WALKWAYS AND CURBS | 52 | WK | $0.00 | Service | |
| 40004 | B.4.1.4 | TRIMMING OF HEADSTONES, MONUMENTS, MARKERS AND OTHER VERTICLE SERFACES | 52 | WK | $0.00 | Service | |
| 40005 | B.4.1.5 | TRASH, DEBRIS, AND GRAVE DECORATION/FLORAL REMOVAL | 12 | MO | $0.00 | Service | |
| 40006 | B.4.1.6 | SWEEPING/BLOWING OFF WALKWAYS & ROADWAYS as needed weekly-billed monthly | 12 | MO | $0.00 | Service | |
| 40007 | B.4.1.7 | UNDERGROUND SPRINKLER SYSTEM OPERATION, INSPECTION AND MAINTENANCE-Monthly system check-Includes Controler and Sprinkler adjustments as needed | 12 | MO | $0.00 | Service | |
| 40008 | B.4.1.7 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis (See Section B.4.1.7) - All Parts and Supplies Provided By Government. | 1200 | EA (15 Min) | $0.00 | Construction | |
| 40009 | B.4.2.1 | SUNKEN GRAVE REPAIR & GROUNDS REPAIR (CASKET SITES) | 100 | EA | $0.00 | Construction | |
| 40010 | B.4.2.1a | SUNKEN CREMATION AND SMALL AREA SITE GROUNDS REPAIRS | 100 | EA | $0.00 | Construction | |
| 40011 | B.4.2.1b | SOD REPAIRS AND INSTALLATION | 5000 | SQFT | $0.00 | Construction | |
| 40012 | B.4.3 | LEAF AND TRASH COLLECTION & REMOVAL | 12 | MO | $0.00 | Service | |
| 40013 | B.4.4.1 | PLANTING BEDS | 12 | MO | $0.00 | Service | |
| 40014 | B.4.4.2 | MULCHING | 4 | QTR | $0.00 | Service | |
| 40015 | B.4.4.3 | TREE TRIMMING/PRUNING/SHRUB MAINTENANCE | 12 | MO | $0.00 | Service | |
| 40016 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 3X8) | 1100 | EA | $0.00 | Service | |
| 40017 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 4X10) | 10 | EA | $0.00 | Service | |
| 40018 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET TRADITIONAL 5X10) | 18 | EA | $0.00 | Service | |
| 40019 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (IN-GROUND CREMATION 4X4) | 1000 | EA | $0.00 | Service | |
| 40020 | B.4.5.2 | CORE AERIFICATION (Aeration) - High traffic areas as needed/directed by COR Est. 10 acres per job (Sept) | 1 | JB | $0.00 | Service | |
| 40021 | B.4.5.3 | FERTILIZATION - Celebration Bermuda (1lb N per 1000/per app) See Flow Chart (Oct, Dec, Feb, Apr, May, Jun) | 6 | JB | $0.00 | Service | |
| 40022 | B.4.5.3 | FERTILIZATION - Empire Zoysia and St Augustine (.75lb N per 1000/per app)See Flow Chart (Oct, Dec, Feb, Apr, May, Jun) | 6 | JB | $0.00 | Service | |
| 40023 | B.4.5.4 | GYPSUM APPLICATION - early Fall | 1 | JB | $0.00 | Service | |
| 40024 | B.4.5.5 | PRE-EMERGE APPLICATIONS: Celebration Bermuda and Empire zoysia turf - See Flow Chart (Nov, Feb, Jun) | 3 | JB | $0.00 | Service | |
| 40025 | B.4.5.5 | PRE-EMERGE APPLICATIONS:-St Augustine and Bahia turf - See Flow Chart (Nov, Feb, Jun) | 3 | JB | $0.00 | Service | |
| 40026 | B.4.5.5 | POST-EMERGE WEED: applications Spot Treat-See Flow Chart | 200 | EA | $0.00 | Service | |
| 40027 | B.4.5.5 | POST-EMERGE WEED: APPLICATIONS BLANKET TREAT:See Flow Chart | 2 | JB | $0.00 | Service | |
| 40028 | B.4.5.5 | Bermugrass control in Empire Zoysia | 4 | JB | $0.00 | Service | |
| 40029 | B.4.6.1 | ARMADILLOS, MOLES, IGUANAS AND OTHER PEST CONTROL | 12 | MO | $0.00 | Service | |
| 40030 | B.4.6.2 | FIRE ANT CONTROL- Daily as needed spot treatments-See Flow Chart | 200 | EA | $0.00 | Service | |
| 40031 | B.4.6.2 | FIRE ANT CONTROL - Blanket application | 2 | JB | $0.00 | Service | |
| 40032 | B.4.6.3 | INSECT/PEST/DISEASE CONTROL - Blanket application as needed/identified | 1 | JB | $0.00 | Service | |
| 40033 | B.4.6.3 | INSECT/PEST/DISEASE CONTROL - Spot application as needed/identified | 1 | JB | $0.00 | Service | |
| 40034 | B.4.7 | STORM DAMAGE AND DEBRIS CLEAN-UP | 1 | JB | $0.00 | Service | |
| 40035 | B.4.8.1 | DAILY INTERMENT SHELTER SETUP/TEAR DOWN | 600 | EA | $0.00 | Service | |
| 40036 | B.4.9.1 | HEADSTONE SETTING, AND REALIGNMENT (INITIAL) (Construction) | 1200 | EA | $0.00 | Construction | |
| 40037 | B.4.9.1 | HEADSTONE SETTING (REPLACEMENT) (Construction) | 250 | EA | $0.00 | Construction | |
| 40038 | B.4.9.2 | HEADSTONE REALIGNMENT (Construction) | 500 | EA | $0.00 | Construction | |
| 40039 | B.4.9.2 | HEADSTONE FINE TUNE ALIGNMENT (Bump & Run) | 2000 | EA | $0.00 | Service | |
| 40040 | B.4.9.1 | HEADSTONE TRANSPORT (1ST AND 2ND) | 1200 | EA | $0.00 | Service | |
| 40041 | B.4.10.1 | CASKET TRANSPORTATION | 900 | EA | $0.00 | Service | |
| 40042 | B.4.10.1 | CREMATION TRANSPORTATION | 750 | EA | $0.00 | Service | |
| 40043 | B.4.10.2 | CHAIN OF CUSTODY | 1300 | EA | $0.00 | Service | |
| 40044 | B.4.11.1 | PREASURE WASHING: All Headstones and Niches | 4 | JB | $0.00 | Service | |
| 40045 | B.4.11.2 | PRESSURE WASHING: Shelters A, B, C, D (Oct, Jan, Apr, July) | 4 | JB | $0.00 | Service | |
| 40046 | B.4.11.2 | PRESSURE WASHING: Administration & Maintenance Buildings (Oct, Jan, Apr, July) | 4 | JB | $0.00 | Service | |
| 40047 | B.4.12 | PRESSURE WASHING: Walkways, Curbs, Signs and Front & Maintenance Gate | 2 | JB | $0.00 | Service | |
| 40048 | B.4.4.3 | Palm Tree Pruning and Debooting | 25 | JB | $0.00 | Service | |
| Option Year Four Total Estimate COST | $0.00 |
| Contract Total Amounts | |
| BASE YEAR | $0.00 |
| OPTION YEAR 1 | $0.00 |
| OPTION YEAR 2 | $0.00 |
| OPTION YEAR 3 | $0.00 |
| OPTION YEAR 4 | $0.00 |
| TOTAL BASE +4 | $0.00 |
File details come from the government source that posted it. Updated .