ATTACHMENT B - SOUTH FLORIDA NC GMC COST SCHEDULE - Updated 8-6-2024.xlsx
XLSX spreadsheet 28 KB Posted
- Solicitation number
- 36C78624R50137
About this file
This document is an attachment titled "ATTACHMENT B - SOUTH FLORIDA NC GMC COST SCHEDULE - Updated 8-6-2024.xlsx" that appears to be a cost schedule related to a federal contract opportunity for Grounds Maintenance Services at the South Florida National Cemetery.
The document provides a detailed cost schedule for various grounds maintenance tasks and services, including mowing, edging, trimming, trash/debris removal, sprinkler system operation, grave/site repair, landscaping, pest control, storm damage cleanup, headstone services, and transportation services. The cost schedule lists the contract line items, descriptions, estimated quantities, units, and unit prices for the base period and four option years. The total estimated cost for the base year and four option years is provided. The related federal contract opportunity is solicitation number 36C78624R50137 for "Grounds Maintenance Services for South Florida National Cemetery -- S208" issued by the Department of Veterans Affairs National Cemetery Administration.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CLIN - MIN & MAX
| South Florida National Cemetery Ground Maintenance Services | |||||||
| Base Period | |||||||
| CLIN | SOW | Description | Est. Qty | Unit | Unit Price | Total | Type |
| 0001 | B.4.1.1 | MOWING TURF AREA (169 +/- Acres - Empire Zoyzia, Celebration Bermuda & St. Augustine) | 52 | WK | $0.00 | Service | |
| 0002 | B.4.1.2 | MOWING NON-TURF AREA (130+/- Areas - St. Augustine & Bahia) | 52 | WK | $0.00 | Service | |
| 0003 | B.4.1.3 | EDGING OF WALKWAYS AND CURBS | 52 | WK | $0.00 | Service | |
| 0004 | B.4.1.4 | TRIMMING OF HEADSTONES, MONUMENTS, MARKERS AND OTHER VERTICLE SERFACES | 52 | WK | $0.00 | Service | |
| 0005 | B.4.1.5 | TRASH, DEBRIS, AND GRAVE DECORATION/FLORAL REMOVAL | 12 | MO | $0.00 | Service | |
| 0006 | B.4.1.6 | SWEEPING/BLOWING OFF WALKWAYS & ROADWAYS as needed weekly-billed monthly | 12 | MO | $0.00 | Service | |
| 0007 | B.4.1.7 | UNDERGROUND SPRINKLER SYSTEM OPERATION, INSPECTION AND MAINTENANCE-Monthly system check-Includes Controler and Sprinkler adjustments as needed | 12 | MO | $0.00 | Service | |
| 0008 | B.4.1.7 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis (See Section B.4.1.7) - All Parts and Supplies Provided By Government. | 1200 | EA (15 Min) | $0.00 | Construction | |
| 0009 | B.4.2.1 | SUNKEN GRAVE REPAIR & GROUNDS REPAIR (CASKET SITES) | 100 | EA | $0.00 | Construction | |
| 0010 | B.4.2.1a | SUNKEN CREMATION AND SMALL AREA SITE GROUNDS REPAIRS | 100 | EA | $0.00 | Construction | |
| 0011 | B.4.2.1b | SOD REPAIRS AND INSTALLATION | 5000 | SQFT | $0.00 | Construction | |
| 0012 | B.4.3 | LEAF AND TRASH COLLECTION & REMOVAL | 12 | MO | $0.00 | Service | |
| 0013 | B.4.4.1 | PLANTING BEDS | 12 | MO | $0.00 | Service | |
| 0014 | B.4.4.2 | MULCHING | 4 | QTR | $0.00 | Service | |
| 0015 | B.4.4.3 | TREE TRIMMING/PRUNING/SHRUB MAINTENANCE | 12 | MO | $0.00 | Service | |
| 0016 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 3X8) | 1100 | EA | $0.00 | Service | |
| 0017 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 4X10) | 10 | EA | $0.00 | Service | |
| 0018 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET TRADITIONAL 5X10) | 18 | EA | $0.00 | Service | |
| 0019 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (IN-GROUND CREMATION 4X4) | 1000 | EA | $0.00 | Service | |
| 0020 | B.4.5.2 | CORE AERIFICATION (Aeration) - High traffic areas as needed/directed by COR Est. 10 acres per job (Sept) | 1 | JB | $0.00 | Service | |
| 0021 | B.4.5.3 | FERTILIZATION - Celebration Bermuda (1lb N per 1000/per app) See Flow Chart (Oct, Dec, Feb, Apr, May, Jun) | 6 | JB | $0.00 | Service | |
| 0022 | B.4.5.3 | FERTILIZATION - Empire Zoysia and St Augustine (.75lb N per 1000/per app)See Flow Chart (Oct, Dec, Feb, Apr, May, Jun) | 6 | JB | $0.00 | Service | |
| 0023 | B.4.5.4 | GYPSUM APPLICATION - early Fall | 1 | JB | $0.00 | Service | |
| 0024 | B.4.5.5 | PRE-EMERGE APPLICATIONS: Celebration Bermuda and Empire zoysia turf - See Flow Chart (Nov, Feb, Jun) | 3 | JB | $0.00 | Service | |
| 0025 | B.4.5.5 | PRE-EMERGE APPLICATIONS:-St Augustine and Bahia turf - See Flow Chart (Nov, Feb, Jun) | 3 | JB | $0.00 | Service | |
| 0026 | B.4.5.5 | POST-EMERGE WEED: applications Spot Treat-See Flow Chart | 200 | EA | $0.00 | Service | |
| 0027 | B.4.5.5 | POST-EMERGE WEED: APPLICATIONS BLANKET TREAT:See Flow Chart | 2 | JB | $0.00 | Service | |
| 0028 | B.4.5.5 | Bermugrass control in Empire Zoysia | 4 | JB | $0.00 | Service | |
| 0029 | B.4.6.1 | ARMADILLOS, MOLES, IGUANAS AND OTHER PEST CONTROL | 12 | MO | $0.00 | Service | |
| 0030 | B.4.6.2 | FIRE ANT CONTROL- Daily as needed spot treatments-See Flow Chart | 200 | EA | $0.00 | Service | |
| 0031 | B.4.6.2 | FIRE ANT CONTROL - Blanket application | 2 | JB | $0.00 | Service | |
| 0032 | B.4.6.3 | INSECT/PEST/DISEASE CONTROL - Blanket application as needed/identified | 1 | JB | $0.00 | Service | |
| 0033 | B.4.6.3 | INSECT/PEST/DISEASE CONTROL - Spot application as needed/identified | 1 | JB | $0.00 | Service | |
| 0034 | B.4.7 | STORM DAMAGE AND DEBRIS CLEAN-UP | 1 | JB | $0.00 | Service | |
| 0035 | B.4.8.1 | DAILY INTERMENT SHELTER SETUP/TEAR DOWN | 600 | EA | $0.00 | Service | |
| 0036 | B.4.9.1 | HEADSTONE SETTING, AND REALIGNMENT (INITIAL) (Construction) | 1200 | EA | $0.00 | Construction | |
| 0037 | B.4.9.1 | HEADSTONE SETTING (REPLACEMENT) (Construction) | 250 | EA | $0.00 | Construction | |
| 0038 | B.4.9.2 | HEADSTONE REALIGNMENT (Construction) | 500 | EA | $0.00 | Construction | |
| 0039 | B.4.9.2 | HEADSTONE FINE TUNE ALIGNMENT (Bump & Run) | 2000 | EA | $0.00 | Service | |
| 0040 | B.4.9.1 | HEADSTONE TRANSPORT (1ST AND 2ND) | 1200 | EA | $0.00 | Service | |
| 0041 | B.4.10.1 | CASKET TRANSPORTATION | 900 | EA | $0.00 | Service | |
| 0042 | B.4.10.1 | CREMATION TRANSPORTATION | 750 | EA | $0.00 | Service | |
| 0043 | B.4.10.2 | CHAIN OF CUSTODY | 1300 | EA | $0.00 | Service | |
| 0044 | B.4.11.1 | PREASURE WASHING: All Headstones and Niches | 4 | JB | $0.00 | Service | |
| 0045 | B.4.11.2 | PRESSURE WASHING: Shelters A, B, C, D (Oct, Jan, Apr, July) | 4 | JB | $0.00 | Service | |
| 0046 | B.4.11.2 | PRESSURE WASHING: Administration & Maintenance Buildings (Oct, Jan, Apr, July) | 4 | JB | $0.00 | Service | |
| 0047 | B.4.12 | PRESSURE WASHING: Walkways, Curbs, Signs and Front & Maintenance Gate | 2 | JB | $0.00 | Service | |
| 0048 | B.4.4.3 | Palm Tree Pruning and Debooting | 25 | JB | $0.00 | Service | |
| 0049 | B.4.5.3 | Fertilization for the Argentine Bahia | 2 | JB | $0.00 | Service | |
| Base Year Total Estimate COST | $0.00 |
| Option Year One (1) | ||||||||
| CLIN | SOW | Description | Est. Qty | Unit | Est. Cost | Total | 2 | |
| 1001 | B.4.1.1 | MOWING TURF AREA (169 +/- Acres - Empire Zoyzia, Celebration Bermuda & St. Augustine) | 52 | WK | $0.00 | Service | ||
| 1002 | B.4.1.2 | MOWING NON-TURF AREA (130+/- Areas - St. Augustine & Bahia) | 52 | WK | $0.00 | Service | ||
| 1003 | B.4.1.3 | EDGING OF WALKWAYS AND CURBS | 52 | WK | $0.00 | Service | ||
| 1004 | B.4.1.4 | TRIMMING OF HEADSTONES, MONUMENTS, MARKERS AND OTHER VERTICLE SERFACES | 52 | WK | $0.00 | Service | ||
| 1005 | B.4.1.5 | TRASH, DEBRIS, AND GRAVE DECORATION/FLORAL REMOVAL | 12 | MO | $0.00 | Service | ||
| 1006 | B.4.1.6 | SWEEPING/BLOWING OFF WALKWAYS & ROADWAYS as needed weekly-billed monthly | 12 | MO | $0.00 | Service | ||
| 1007 | B.4.1.7 | UNDERGROUND SPRINKLER SYSTEM OPERATION, INSPECTION AND MAINTENANCE-Monthly system check-Includes Controler and Sprinkler adjustments as needed | 12 | MO | $0.00 | Service | ||
| 1008 | B.4.1.7 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis (See Section B.4.1.7) - All Parts and Supplies Provided By Government. | 1200 | EA (15 Min) | $0.00 | Construction | ||
| 1009 | B.4.2.1 | SUNKEN GRAVE REPAIR & GROUNDS REPAIR (CASKET SITES) | 100 | EA | $0.00 | Construction | ||
| 1010 | B.4.2.1a | SUNKEN CREMATION AND SMALL AREA SITE GROUNDS REPAIRS | 100 | EA | $0.00 | Construction | ||
| 1011 | B.4.2.1b | SOD REPAIRS AND INSTALLATION | 5000 | SQFT | $0.00 | Construction | ||
| 1012 | B.4.3 | LEAF AND TRASH COLLECTION & REMOVAL | 12 | MO | $0.00 | Service | ||
| 1013 | B.4.4.1 | PLANTING BEDS | 12 | MO | $0.00 | Service | ||
| 1014 | B.4.4.2 | MULCHING | 4 | QTR | $0.00 | Service | ||
| 1015 | B.4.4.3 | TREE TRIMMING/PRUNING/SHRUB MAINTENANCE | 12 | MO | $0.00 | Service | ||
| 1016 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 3X8) | 1100 | EA | $0.00 | Service | ||
| 1017 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 4X10) | 10 | EA | $0.00 | Service | ||
| 1018 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET TRADITIONAL 5X10) | 18 | EA | $0.00 | Service | ||
| 1019 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (IN-GROUND CREMATION 4X4) | 1000 | EA | $0.00 | Service | ||
| 1020 | B.4.5.2 | CORE AERIFICATION (Aeration) - High traffic areas as needed/directed by COR Est. 10 acres per job (Sept) | 1 | JB | $0.00 | Service | ||
| 1021 | B.4.5.3 | FERTILIZATION - Celebration Bermuda (1lb N per 1000/per app) See Flow Chart (Oct, Dec, Feb, Apr, May, Jun) | 6 | JB | $0.00 | Service | ||
| 1022 | B.4.5.3 | FERTILIZATION - Empire Zoysia and St Augustine (.75lb N per 1000/per app)See Flow Chart (Oct, Dec, Feb, Apr, May, Jun) | 6 | JB | $0.00 | Service | ||
| 1023 | B.4.5.4 | GYPSUM APPLICATION - early Fall | 1 | JB | $0.00 | Service | ||
| 1024 | B.4.5.5 | PRE-EMERGE APPLICATIONS: Celebration Bermuda and Empire zoysia turf - See Flow Chart (Nov, Feb, Jun) | 3 | JB | $0.00 | Service | ||
| 1025 | B.4.5.5 | PRE-EMERGE APPLICATIONS:-St Augustine and Bahia turf - See Flow Chart (Nov, Feb, Jun) | 3 | JB | $0.00 | Service | ||
| 1026 | B.4.5.5 | POST-EMERGE WEED: applications Spot Treat-See Flow Chart | 200 | EA | $0.00 | Service | ||
| 1027 | B.4.5.5 | POST-EMERGE WEED: APPLICATIONS BLANKET TREAT:See Flow Chart | 2 | JB | $0.00 | Service | ||
| 1028 | B.4.5.5 | Bermugrass control in Empire Zoysia | 4 | JB | $0.00 | Service | ||
| 1029 | B.4.6.1 | ARMADILLOS, MOLES, IGUANAS AND OTHER PEST CONTROL | 12 | MO | $0.00 | Service | ||
| 1030 | B.4.6.2 | FIRE ANT CONTROL- Daily as needed spot treatments-See Flow Chart | 200 | EA | $0.00 | Service | ||
| 1031 | B.4.6.2 | FIRE ANT CONTROL - Blanket application | 2 | JB | $0.00 | Service | ||
| 1032 | B.4.6.3 | INSECT/PEST/DISEASE CONTROL - Blanket application as needed/identified | 1 | JB | $0.00 | Service | ||
| 1033 | B.4.6.3 | INSECT/PEST/DISEASE CONTROL - Spot application as needed/identified | 1 | JB | $0.00 | Service | ||
| 1034 | B.4.7 | STORM DAMAGE AND DEBRIS CLEAN-UP | 1 | JB | $0.00 | Service | ||
| 1035 | B.4.8.1 | DAILY INTERMENT SHELTER SETUP/TEAR DOWN | 600 | EA | $0.00 | Service | ||
| 1036 | B.4.9.1 | HEADSTONE SETTING, AND REALIGNMENT (INITIAL) (Construction) | 1200 | EA | $0.00 | Construction | ||
| 1037 | B.4.9.1 | HEADSTONE SETTING (REPLACEMENT) (Construction) | 250 | EA | $0.00 | Construction | ||
| 1038 | B.4.9.2 | HEADSTONE REALIGNMENT (Construction) | 500 | EA | $0.00 | Construction | ||
| 1039 | B.4.9.2 | HEADSTONE FINE TUNE ALIGNMENT (Bump & Run) | 2000 | EA | $0.00 | Service | ||
| 1040 | B.4.9.1 | HEADSTONE TRANSPORT (1ST AND 2ND) | 1200 | EA | $0.00 | Service | ||
| 1041 | B.4.10.1 | CASKET TRANSPORTATION | 900 | EA | $0.00 | Service | ||
| 1042 | B.4.10.1 | CREMATION TRANSPORTATION | 750 | EA | $0.00 | Service | ||
| 1043 | B.4.10.2 | CHAIN OF CUSTODY | 1300 | EA | $0.00 | Service | ||
| 1044 | B.4.11.1 | PREASURE WASHING: All Headstones and Niches | 4 | JB | $0.00 | Service | ||
| 1045 | B.4.11.2 | PRESSURE WASHING: Shelters A, B, C, D (Oct, Jan, Apr, July) | 4 | JB | $0.00 | Service | ||
| 1046 | B.4.11.2 | PRESSURE WASHING: Administration & Maintenance Buildings (Oct, Jan, Apr, July) | 4 | JB | $0.00 | Service | ||
| 1047 | B.4.12 | PRESSURE WASHING: Walkways, Curbs, Signs and Front & Maintenance Gate | 2 | JB | $0.00 | Service | ||
| 1048 | B.4.4.3 | Palm Tree Pruning and Debooting | 25 | JB | $0.00 | Service | ||
| 1049 | B.4.5.3 | Fertilization for the Argentine Bahia | 2 | JB | $0.00 | Service | ||
| Option Year One Total Estimate COST | $0.00 |
| Option Year Two (2) | |||||||
| CLIN | SOW | Description | Est. Qty | Unit | Est. Cost | Total | |
| 2001 | B.4.1.1 | MOWING TURF AREA (169 +/- Acres - Empire Zoyzia, Celebration Bermuda & St. Augustine) | 52 | WK | $0.00 | Service | |
| 2002 | B.4.1.2 | MOWING NON-TURF AREA (130+/- Areas - St. Augustine & Bahia) | 52 | WK | $0.00 | Service | |
| 2003 | B.4.1.3 | EDGING OF WALKWAYS AND CURBS | 52 | WK | $0.00 | Service | |
| 2004 | B.4.1.4 | TRIMMING OF HEADSTONES, MONUMENTS, MARKERS AND OTHER VERTICLE SERFACES | 52 | WK | $0.00 | Service | |
| 2005 | B.4.1.5 | TRASH, DEBRIS, AND GRAVE DECORATION/FLORAL REMOVAL | 12 | MO | $0.00 | Service | |
| 2006 | B.4.1.6 | SWEEPING/BLOWING OFF WALKWAYS & ROADWAYS as needed weekly-billed monthly | 12 | MO | $0.00 | Service | |
| 2007 | B.4.1.7 | UNDERGROUND SPRINKLER SYSTEM OPERATION, INSPECTION AND MAINTENANCE-Monthly system check-Includes Controler and Sprinkler adjustments as needed | 12 | MO | $0.00 | Service | |
| 2008 | B.4.1.7 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis (See Section B.4.1.7) - All Parts and Supplies Provided By Government. | 1200 | EA (15 Min) | $0.00 | Construction | |
| 2009 | B.4.2.1 | SUNKEN GRAVE REPAIR & GROUNDS REPAIR (CASKET SITES) | 100 | EA | $0.00 | Construction | |
| 2010 | B.4.2.1a | SUNKEN CREMATION AND SMALL AREA SITE GROUNDS REPAIRS | 100 | EA | $0.00 | Construction | |
| 2011 | B.4.2.1b | SOD REPAIRS AND INSTALLATION | 5000 | SQFT | $0.00 | Construction | |
| 2012 | B.4.3 | LEAF AND TRASH COLLECTION & REMOVAL | 12 | MO | $0.00 | Service | |
| 2013 | B.4.4.1 | PLANTING BEDS | 12 | MO | $0.00 | Service | |
| 2014 | B.4.4.2 | MULCHING | 4 | QTR | $0.00 | Service | |
| 2015 | B.4.4.3 | TREE TRIMMING/PRUNING/SHRUB MAINTENANCE | 12 | MO | $0.00 | Service | |
| 2016 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 3X8) | 1100 | EA | $0.00 | Service | |
| 2017 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 4X10) | 10 | EA | $0.00 | Service | |
| 2018 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET TRADITIONAL 5X10) | 18 | EA | $0.00 | Service | |
| 2019 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (IN-GROUND CREMATION 4X4) | 1000 | EA | $0.00 | Service | |
| 2020 | B.4.5.2 | CORE AERIFICATION (Aeration) - High traffic areas as needed/directed by COR Est. 10 acres per job (Sept) | 1 | JB | $0.00 | Service | |
| 2021 | B.4.5.3 | FERTILIZATION - Celebration Bermuda (1lb N per 1000/per app) See Flow Chart (Oct, Dec, Feb, Apr, May, Jun) | 6 | JB | $0.00 | Service | |
| 2022 | B.4.5.3 | FERTILIZATION - Empire Zoysia and St Augustine (.75lb N per 1000/per app)See Flow Chart (Oct, Dec, Feb, Apr, May, Jun) | 6 | JB | $0.00 | Service | |
| 2023 | B.4.5.4 | GYPSUM APPLICATION - early Fall | 1 | JB | $0.00 | Service | |
| 2024 | B.4.5.5 | PRE-EMERGE APPLICATIONS: Celebration Bermuda and Empire zoysia turf - See Flow Chart (Nov, Feb, Jun) | 3 | JB | $0.00 | Service | |
| 2025 | B.4.5.5 | PRE-EMERGE APPLICATIONS:-St Augustine and Bahia turf - See Flow Chart (Nov, Feb, Jun) | 3 | JB | $0.00 | Service | |
| 2026 | B.4.5.5 | POST-EMERGE WEED: applications Spot Treat-See Flow Chart | 200 | EA | $0.00 | Service | |
| 2027 | B.4.5.5 | POST-EMERGE WEED: APPLICATIONS BLANKET TREAT:See Flow Chart | 2 | JB | $0.00 | Service | |
| 2028 | B.4.5.5 | Bermugrass control in Empire Zoysia | 4 | JB | $0.00 | Service | |
| 2029 | B.4.6.1 | ARMADILLOS, MOLES, IGUANAS AND OTHER PEST CONTROL | 12 | MO | $0.00 | Service | |
| 2030 | B.4.6.2 | FIRE ANT CONTROL- Daily as needed spot treatments-See Flow Chart | 200 | EA | $0.00 | Service | |
| 2031 | B.4.6.2 | FIRE ANT CONTROL - Blanket application | 2 | JB | $0.00 | Service | |
| 2032 | B.4.6.3 | INSECT/PEST/DISEASE CONTROL - Blanket application as needed/identified | 1 | JB | $0.00 | Service | |
| 2033 | B.4.6.3 | INSECT/PEST/DISEASE CONTROL - Spot application as needed/identified | 1 | JB | $0.00 | Service | |
| 2034 | B.4.7 | STORM DAMAGE AND DEBRIS CLEAN-UP | 1 | JB | $0.00 | Service | |
| 2035 | B.4.8.1 | DAILY INTERMENT SHELTER SETUP/TEAR DOWN | 600 | EA | $0.00 | Service | |
| 2036 | B.4.9.1 | HEADSTONE SETTING, AND REALIGNMENT (INITIAL) (Construction) | 1200 | EA | $0.00 | Construction | |
| 2037 | B.4.9.1 | HEADSTONE SETTING (REPLACEMENT) (Construction) | 250 | EA | $0.00 | Construction | |
| 2038 | B.4.9.2 | HEADSTONE REALIGNMENT (Construction) | 500 | EA | $0.00 | Construction | |
| 2039 | B.4.9.2 | HEADSTONE FINE TUNE ALIGNMENT (Bump & Run) | 2000 | EA | $0.00 | Service | |
| 2040 | B.4.9.1 | HEADSTONE TRANSPORT (1ST AND 2ND) | 1200 | EA | $0.00 | Service | |
| 2041 | B.4.10.1 | CASKET TRANSPORTATION | 900 | EA | $0.00 | Service | |
| 2042 | B.4.10.1 | CREMATION TRANSPORTATION | 750 | EA | $0.00 | Service | |
| 2043 | B.4.10.2 | CHAIN OF CUSTODY | 1300 | EA | $0.00 | Service | |
| 2044 | B.4.11.1 | PREASURE WASHING: All Headstones and Niches | 4 | JB | $0.00 | Service | |
| 2045 | B.4.11.2 | PRESSURE WASHING: Shelters A, B, C, D (Oct, Jan, Apr, July) | 4 | JB | $0.00 | Service | |
| 2046 | B.4.11.2 | PRESSURE WASHING: Administration & Maintenance Buildings (Oct, Jan, Apr, July) | 4 | JB | $0.00 | Service | |
| 2047 | B.4.12 | PRESSURE WASHING: Walkways, Curbs, Signs and Front & Maintenance Gate | 2 | JB | $0.00 | Service | |
| 2048 | B.4.4.3 | Palm Tree Pruning and Debooting | 25 | JB | $0.00 | ||
| 2049 | B.4.5.3 | Fertilization for the Argentine Bahia | 2 | JB | $0.00 | Service | |
| Option Year Two Total Estimate COST | $0.00 |
| Option Year Three (3) | |||||||
| CLIN | SOW | Description | Est. Qty | Unit | Est. Cost | Total | |
| 3001 | B.4.1.1 | MOWING TURF AREA (169 +/- Acres - Empire Zoyzia, Celebration Bermuda & St. Augustine) | 52 | WK | $0.00 | Service | |
| 3002 | B.4.1.2 | MOWING NON-TURF AREA (130+/- Areas - St. Augustine & Bahia) | 52 | WK | $0.00 | Service | |
| 3003 | B.4.1.3 | EDGING OF WALKWAYS AND CURBS | 52 | WK | $0.00 | Service | |
| 3004 | B.4.1.4 | TRIMMING OF HEADSTONES, MONUMENTS, MARKERS AND OTHER VERTICLE SERFACES | 52 | WK | $0.00 | Service | |
| 3005 | B.4.1.5 | TRASH, DEBRIS, AND GRAVE DECORATION/FLORAL REMOVAL | 12 | MO | $0.00 | Service | |
| 3006 | B.4.1.6 | SWEEPING/BLOWING OFF WALKWAYS & ROADWAYS as needed weekly-billed monthly | 12 | MO | $0.00 | Service | |
| 3007 | B.4.1.7 | UNDERGROUND SPRINKLER SYSTEM OPERATION, INSPECTION AND MAINTENANCE-Monthly system check-Includes Controler and Sprinkler adjustments as needed | 12 | MO | $0.00 | Service | |
| 3008 | B.4.1.7 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis (See Section B.4.1.7) - All Parts and Supplies Provided By Government. | 1200 | EA (15 Min) | $0.00 | Construction | |
| 3009 | B.4.2.1 | SUNKEN GRAVE REPAIR & GROUNDS REPAIR (CASKET SITES) | 100 | EA | $0.00 | Construction | |
| 3010 | B.4.2.1a | SUNKEN CREMATION AND SMALL AREA SITE GROUNDS REPAIRS | 100 | EA | $0.00 | Construction | |
| 3011 | B.4.2.1b | SOD REPAIRS AND INSTALLATION | 5000 | SQFT | $0.00 | Construction | |
| 3012 | B.4.3 | LEAF AND TRASH COLLECTION & REMOVAL | 12 | MO | $0.00 | Service | |
| 3013 | B.4.4.1 | PLANTING BEDS | 12 | MO | $0.00 | Service | |
| 3014 | B.4.4.2 | MULCHING | 4 | QTR | $0.00 | Service | |
| 3015 | B.4.4.3 | TREE TRIMMING/PRUNING/SHRUB MAINTENANCE | 12 | MO | $0.00 | Service | |
| 3016 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 3X8) | 1100 | EA | $0.00 | Service | |
| 3017 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 4X10) | 10 | EA | $0.00 | Service | |
| 3018 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET TRADITIONAL 5X10) | 18 | EA | $0.00 | Service | |
| 3019 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (IN-GROUND CREMATION 4X4) | 1000 | EA | $0.00 | Service | |
| 3020 | B.4.5.2 | CORE AERIFICATION (Aeration) - High traffic areas as needed/directed by COR Est. 10 acres per job (Sept) | 1 | JB | $0.00 | Service | |
| 3021 | B.4.5.3 | FERTILIZATION - Celebration Bermuda (1lb N per 1000/per app) See Flow Chart (Oct, Dec, Feb, Apr, May, Jun) | 6 | JB | $0.00 | Service | |
| 3022 | B.4.5.3 | FERTILIZATION - Empire Zoysia and St Augustine (.75lb N per 1000/per app)See Flow Chart (Oct, Dec, Feb, Apr, May, Jun) | 6 | JB | $0.00 | Service | |
| 3023 | B.4.5.4 | GYPSUM APPLICATION - early Fall | 1 | JB | $0.00 | Service | |
| 3024 | B.4.5.5 | PRE-EMERGE APPLICATIONS: Celebration Bermuda and Empire zoysia turf - See Flow Chart (Nov, Feb, Jun) | 3 | JB | $0.00 | Service | |
| 3025 | B.4.5.5 | PRE-EMERGE APPLICATIONS:-St Augustine and Bahia turf - See Flow Chart (Nov, Feb, Jun) | 3 | JB | $0.00 | Service | |
| 3026 | B.4.5.5 | POST-EMERGE WEED: applications Spot Treat-See Flow Chart | 200 | EA | $0.00 | Service | |
| 3027 | B.4.5.5 | POST-EMERGE WEED: APPLICATIONS BLANKET TREAT:See Flow Chart | 2 | JB | $0.00 | Service | |
| 3028 | B.4.5.5 | Bermugrass control in Empire Zoysia | 4 | JB | $0.00 | Service | |
| 3029 | B.4.6.1 | ARMADILLOS, MOLES, IGUANAS AND OTHER PEST CONTROL | 12 | MO | $0.00 | Service | |
| 3030 | B.4.6.2 | FIRE ANT CONTROL- Daily as needed spot treatments-See Flow Chart | 200 | EA | $0.00 | Service | |
| 3031 | B.4.6.2 | FIRE ANT CONTROL - Blanket application | 2 | JB | $0.00 | Service | |
| 3032 | B.4.6.3 | INSECT/PEST/DISEASE CONTROL - Blanket application as needed/identified | 1 | JB | $0.00 | Service | |
| 3033 | B.4.6.3 | INSECT/PEST/DISEASE CONTROL - Spot application as needed/identified | 1 | JB | $0.00 | Service | |
| 3034 | B.4.7 | STORM DAMAGE AND DEBRIS CLEAN-UP | 1 | JB | $0.00 | Service | |
| 3035 | B.4.8.1 | DAILY INTERMENT SHELTER SETUP/TEAR DOWN | 600 | EA | $0.00 | Service | |
| 3036 | B.4.9.1 | HEADSTONE SETTING, AND REALIGNMENT (INITIAL) (Construction) | 1200 | EA | $0.00 | Construction | |
| 3037 | B.4.9.1 | HEADSTONE SETTING (REPLACEMENT) (Construction) | 250 | EA | $0.00 | Construction | |
| 3038 | B.4.9.2 | HEADSTONE REALIGNMENT (Construction) | 500 | EA | $0.00 | Construction | |
| 3039 | B.4.9.2 | HEADSTONE FINE TUNE ALIGNMENT (Bump & Run) | 2000 | EA | $0.00 | Service | |
| 3040 | B.4.9.1 | HEADSTONE TRANSPORT (1ST AND 2ND) | 1200 | EA | $0.00 | Service | |
| 3041 | B.4.10.1 | CASKET TRANSPORTATION | 900 | EA | $0.00 | Service | |
| 3042 | B.4.10.1 | CREMATION TRANSPORTATION | 750 | EA | $0.00 | Service | |
| 3043 | B.4.10.2 | CHAIN OF CUSTODY | 1300 | EA | $0.00 | Service | |
| 3044 | B.4.11.1 | PREASURE WASHING: All Headstones and Niches | 4 | JB | $0.00 | Service | |
| 3045 | B.4.11.2 | PRESSURE WASHING: Shelters A, B, C, D (Oct, Jan, Apr, July) | 4 | JB | $0.00 | Service | |
| 3046 | B.4.11.2 | PRESSURE WASHING: Administration & Maintenance Buildings (Oct, Jan, Apr, July) | 4 | JB | $0.00 | Service | |
| 3047 | B.4.12 | PRESSURE WASHING: Walkways, Curbs, Signs and Front & Maintenance Gate | 2 | JB | $0.00 | Service | |
| 3048 | B.4.4.3 | Palm Tree Pruning and Debooting | 25 | JB | $0.00 | Service | |
| 3049 | B.4.5.3 | Fertilization for the Argentine Bahia | 2 | JB | $0.00 | Service | |
| Option Year Three Total Estimate COST | $0.00 |
| Option Year Four (4) | |||||||
| CLIN | SOW | Description | Est. Qty | Unit | Est. Cost | Total | |
| 4001 | B.4.1.1 | MOWING TURF AREA (169 +/- Acres - Empire Zoyzia, Celebration Bermuda & St. Augustine) | 52 | WK | $0.00 | Service | |
| 4002 | B.4.1.2 | MOWING NON-TURF AREA (130+/- Areas - St. Augustine & Bahia) | 52 | WK | $0.00 | Service | |
| 4003 | B.4.1.3 | EDGING OF WALKWAYS AND CURBS | 52 | WK | $0.00 | Service | |
| 4004 | B.4.1.4 | TRIMMING OF HEADSTONES, MONUMENTS, MARKERS AND OTHER VERTICLE SERFACES | 52 | WK | $0.00 | Service | |
| 4005 | B.4.1.5 | TRASH, DEBRIS, AND GRAVE DECORATION/FLORAL REMOVAL | 12 | MO | $0.00 | Service | |
| 4006 | B.4.1.6 | SWEEPING/BLOWING OFF WALKWAYS & ROADWAYS as needed weekly-billed monthly | 12 | MO | $0.00 | Service | |
| 4007 | B.4.1.7 | UNDERGROUND SPRINKLER SYSTEM OPERATION, INSPECTION AND MAINTENANCE-Monthly system check-Includes Controler and Sprinkler adjustments as needed | 12 | MO | $0.00 | Service | |
| 4008 | B.4.1.7 | Irrigation- Straight Time Hourly Rate - All labor for repairs will be charged at the hourly rate indicated in the schedule and broken down into quarterly hour (15 min) increments as appropriate. Labor Rates For Irrigation repairs to be provided on an "As-Needed / As-Requested" basis (See Section B.4.1.7) - All Parts and Supplies Provided By Government. | 1200 | EA (15 Min) | $0.00 | Construction | |
| 4009 | B.4.2.1 | SUNKEN GRAVE REPAIR & GROUNDS REPAIR (CASKET SITES) | 100 | EA | $0.00 | Construction | |
| 4010 | B.4.2.1a | SUNKEN CREMATION AND SMALL AREA SITE GROUNDS REPAIRS | 100 | EA | $0.00 | Construction | |
| 4011 | B.4.2.1b | SOD REPAIRS AND INSTALLATION | 5000 | SQFT | $0.00 | Construction | |
| 4012 | B.4.3 | LEAF AND TRASH COLLECTION & REMOVAL | 12 | MO | $0.00 | Service | |
| 4013 | B.4.4.1 | PLANTING BEDS | 12 | MO | $0.00 | Service | |
| 4014 | B.4.4.2 | MULCHING | 4 | QTR | $0.00 | Service | |
| 4015 | B.4.4.3 | TREE TRIMMING/PRUNING/SHRUB MAINTENANCE | 12 | MO | $0.00 | Service | |
| 4016 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 3X8) | 1100 | EA | $0.00 | Service | |
| 4017 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET CRYPT 4X10) | 10 | EA | $0.00 | Service | |
| 4018 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (CASKET TRADITIONAL 5X10) | 18 | EA | $0.00 | Service | |
| 4019 | B.4.5.1 | CUT, SUPPLY & INSTALL SOD ON ALL 1ST & SUBSEQUENT GRAVESITES (IN-GROUND CREMATION 4X4) | 1000 | EA | $0.00 | Service | |
| 4020 | B.4.5.2 | CORE AERIFICATION (Aeration) - High traffic areas as needed/directed by COR Est. 10 acres per job (Sept) | 1 | JB | $0.00 | Service | |
| 4021 | B.4.5.3 | FERTILIZATION - Celebration Bermuda (1lb N per 1000/per app) See Flow Chart (Oct, Dec, Feb, Apr, May, Jun) | 6 | JB | $0.00 | Service | |
| 4022 | B.4.5.3 | FERTILIZATION - Empire Zoysia and St Augustine (.75lb N per 1000/per app)See Flow Chart (Oct, Dec, Feb, Apr, May, Jun) | 6 | JB | $0.00 | Service | |
| 4023 | B.4.5.4 | GYPSUM APPLICATION - early Fall | 1 | JB | $0.00 | Service | |
| 4024 | B.4.5.5 | PRE-EMERGE APPLICATIONS: Celebration Bermuda and Empire zoysia turf - See Flow Chart (Nov, Feb, Jun) | 3 | JB | $0.00 | Service | |
| 4025 | B.4.5.5 | PRE-EMERGE APPLICATIONS:-St Augustine and Bahia turf - See Flow Chart (Nov, Feb, Jun) | 3 | JB | $0.00 | Service | |
| 4026 | B.4.5.5 | POST-EMERGE WEED: applications Spot Treat-See Flow Chart | 200 | EA | $0.00 | Service | |
| 4027 | B.4.5.5 | POST-EMERGE WEED: APPLICATIONS BLANKET TREAT:See Flow Chart | 2 | JB | $0.00 | Service | |
| 4028 | B.4.5.5 | Bermugrass control in Empire Zoysia | 4 | JB | $0.00 | Service | |
| 4029 | B.4.6.1 | ARMADILLOS, MOLES, IGUANAS AND OTHER PEST CONTROL | 12 | MO | $0.00 | Service | |
| 4030 | B.4.6.2 | FIRE ANT CONTROL- Daily as needed spot treatments-See Flow Chart | 200 | EA | $0.00 | Service | |
| 4031 | B.4.6.2 | FIRE ANT CONTROL - Blanket application | 2 | JB | $0.00 | Service | |
| 4032 | B.4.6.3 | INSECT/PEST/DISEASE CONTROL - Blanket application as needed/identified | 1 | JB | $0.00 | Service | |
| 4033 | B.4.6.3 | INSECT/PEST/DISEASE CONTROL - Spot application as needed/identified | 1 | JB | $0.00 | Service | |
| 4034 | B.4.7 | STORM DAMAGE AND DEBRIS CLEAN-UP | 1 | JB | $0.00 | Service | |
| 4035 | B.4.8.1 | DAILY INTERMENT SHELTER SETUP/TEAR DOWN | 600 | EA | $0.00 | Service | |
| 4036 | B.4.9.1 | HEADSTONE SETTING, AND REALIGNMENT (INITIAL) (Construction) | 1200 | EA | $0.00 | Construction | |
| 4037 | B.4.9.1 | HEADSTONE SETTING (REPLACEMENT) (Construction) | 250 | EA | $0.00 | Construction | |
| 4038 | B.4.9.2 | HEADSTONE REALIGNMENT (Construction) | 500 | EA | $0.00 | Construction | |
| 4039 | B.4.9.2 | HEADSTONE FINE TUNE ALIGNMENT (Bump & Run) | 2000 | EA | $0.00 | Service | |
| 4040 | B.4.9.1 | HEADSTONE TRANSPORT (1ST AND 2ND) | 1200 | EA | $0.00 | Service | |
| 4041 | B.4.10.1 | CASKET TRANSPORTATION | 900 | EA | $0.00 | Service | |
| 4042 | B.4.10.1 | CREMATION TRANSPORTATION | 750 | EA | $0.00 | Service | |
| 4043 | B.4.10.2 | CHAIN OF CUSTODY | 1300 | EA | $0.00 | Service | |
| 4044 | B.4.11.1 | PREASURE WASHING: All Headstones and Niches | 4 | JB | $0.00 | Service | |
| 4045 | B.4.11.2 | PRESSURE WASHING: Shelters A, B, C, D (Oct, Jan, Apr, July) | 4 | JB | $0.00 | Service | |
| 4046 | B.4.11.2 | PRESSURE WASHING: Administration & Maintenance Buildings (Oct, Jan, Apr, July) | 4 | JB | $0.00 | Service | |
| 4047 | B.4.12 | PRESSURE WASHING: Walkways, Curbs, Signs and Front & Maintenance Gate | 2 | JB | $0.00 | Service | |
| 4048 | B.4.4.3 | Palm Tree Pruning and Debooting | 25 | JB | $0.00 | Service | |
| 4049 | B.4.5.3 | Fertilization for the Argentine Bahia | 2 | JB | $0.00 | Service | |
| Option Year Four Total Estimate COST | $0.00 |
| Contract Total Amounts | |
| BASE YEAR | $0.00 |
| OPTION YEAR 1 | $0.00 |
| OPTION YEAR 2 | $0.00 |
| OPTION YEAR 3 | $0.00 |
| OPTION YEAR 4 | $0.00 |
| TOTAL BASE +4 | $0.00 |
File details come from the government source that posted it. Updated .